Northern Laramie Range Alliance v. Federal Energy Regulatory Commission ( 2013 )


Menu:
  •                                                                     FILED
    United States Court of Appeals
    Tenth Circuit
    October 22, 2013
    Elisabeth A. Shumaker
    PUBLISH                       Clerk of Court
    UNITED STATES COURT OF APPEALS
    TENTH CIRCUIT
    NORTHERN LARAMIE RANGE
    ALLIANCE,
    Petitioner,                              No. 12-9567
    v.                                            (Petition for Review)
    FEDERAL ENERGY REGULATORY
    COMMISSION,
    Respondent.
    PETITION FOR REVIEW
    FROM THE FEDERAL ENERGY REGULATORY COMMISSION
    (F.E.R.C. No. EL 11-51-001)
    Kenneth G. Lay, Glenrock, Wyoming (Alyson Meyer Gould, Holsinger Law,
    Denver, Colorado, with him on the briefs) for Petitioner.
    Karin L. Larson, Solicitor, Federal Energy Regulatory Commission, Office of
    General Counsel, Washington, D.C. (David L. Morenoff, Solicitor, Federal Energy
    Regulatory Commission, Office of General Counsel, Washington, D.C.; and
    Robert Harris Solomon, Solicitor, Federal Energy Regulatory Commission, Office
    of General Counsel, Washington, D.C., with her on the briefs) for Respondent.
    Before BRISCOE, Chief Circuit Judge, SEYMOUR, and BACHARACH, Circuit
    Judges.
    BACHARACH, Circuit Judge.
    This action grew out of efforts by Wasatch Wind Intermountain, LLC to
    establish two wind energy projects. Wasatch was able to sell the wind energy by
    certifying both projects as qualifying facilities. These efforts drew the ire of the
    Northern Laramie Range Alliance, which objected to Wasatch’s certification. The
    Federal Energy Regulatory Commission (FERC) rejected the objections, and the
    Alliance appeals FERC’s decision.
    We can entertain the appeal only if the Alliance has established standing,
    which requires traceability and redressability. For both, the Alliance relies on
    increases in electricity rates. But the wind projects have not been completed,
    Wasatch has not found a buyer for the anticipated wind power, and we do not
    know whether sales of wind energy would increase or decrease a utility’s costs.
    Even beyond these uncertainties, electricity rates depend on the actions of third
    parties, those of the utility and the state regulatory commission. With the
    multitude of uncertainties surrounding the effect of Wasatch’s certification or
    decertification on electricity rates, we conclude that the Alliance has not shown
    either traceability or redressability. We therefore dismiss the petition for lack of
    standing.
    I.    Background
    The issues of traceability and redressability require us to examine:
    !      the relationship between the Alliance, Rocky Mountain Power, and
    Wasatch,
    2
    !      the regulatory framework underlying Wasatch’s certification,
    !      the regulatory concept of “avoided costs,” and
    !      the administrative proceedings that resulted in the existing electricity
    rates.
    A.     The Relationship Between Alliance, Rocky Mountain Power, and
    Wasatch
    Our analysis of standing begins with the relationship among the Alliance,
    Rocky Mountain Power, and Wasatch. Many Alliance members buy their
    electricity from Rocky Mountain Power, which had two contracts with Wasatch.
    One contract terminated before the appeal, and the other contract ended during the
    pendency of the appeal. Following termination of the contracts, Wasatch has yet
    to complete the facilities or find a buyer for the wind energy.
    B.     The Regulatory Framework
    The relationship among the Alliance, Rocky Mountain Power, and Wasatch
    must be viewed against the backdrop of the regulatory framework. That
    framework is designed to encourage production of alternative sources of energy
    such as wind power.
    The regulatory framework grew out of the Public Utilities Regulatory
    Policies Act (PURPA). See F.E.R.C. v. Mississippi, 
    456 U.S. 742
    , 746-47 (1982).
    Through the Act, Congress attempted to promote renewable energy sources by
    requiring utilities to buy power from small facilities that met criteria established
    by the statute and FERC. See Am. Paper Inst., Inc. v. Am. Elec. Power Serv.
    3
    Corp., 
    461 U.S. 402
    , 405-06 (1983); 16 U.S.C. § 796(17)(A)-(E). If a producer of
    wind power believes it satisfies the statutory criteria, it can certify compliance. 18
    C.F.R. § 292.207(a). Wasatch certified compliance, and that certification drew
    continued opposition by the Alliance.
    The opposition stems from the statutory cap of 80 megawatts on the volume
    of wind power that a production facility can generate and still be considered small
    enough to qualify for statutory benefits. 16 U.S.C. § 796(17)(A)(ii). Though
    Wasatch regards itself as the developer of two separately qualifying small-
    production facilities, the Alliance disagrees. This disagreement stems from a
    dispute over whether Wasatch plans to develop a single facility or two facilities.
    Wasatch plans to develop two turbine clusters, and they will be considered parts of
    the same facility if they are located within a mile of each other. 18 C.F.R.
    § 292.204(a)(2)(i)-(ii). But the clusters will be more than a mile apart.
    Wasatch considered the planned clusters to be two separate facilities and
    certified their compliance with the required criteria. This certification triggered
    Rocky Mountain Power’s obligation under PURPA to buy the output of wind
    energy produced by Wasatch at the two sites. 16 U.S.C. § 824a-3(a)(2); 18 C.F.R.
    § 292.303(a). In carrying out this obligation, Rocky Mountain Power entered into
    20-year agreements for each wind project in 2010. But for Wasatch’s self-
    certification, Rocky Mountain Power would not have signed these agreements with
    Wasatch.
    4
    C.     Rocky Mountain Power’s “Avoided Costs”
    To determine the effect of Wasatch’s certification on Alliance members, we
    must understand how the regulations affect rates. The effect stems from a
    statutory inducement for a small power-production facility: When the facility
    satisfies the statutory and regulatory criteria, it can force a utility to buy the
    energy for its “avoided cost.” 16 U.S.C. § 824a-3(a)-(b), (d); 18 C.F.R.
    §§ 292.101(b)(6), 292.303(a), 292.304(a)(2). This cost is the incremental cost the
    utility would have paid to generate or purchase that electricity from another
    source. 18 C.F.R. § 292.101(b)(6); see 16 U.S.C. § 824a-3(d).
    D.     Administrative Proceedings in the Wyoming Commission and the
    Eventual Agreement
    Ultimately, it was up to the Wyoming Public Service Commission to
    determine Rocky Mountain Power’s avoided costs. See 16 U.S.C. § 824a-3(f).
    According to the Alliance, the Commission calculated these costs in a manner that
    required rate increases. This argument requires us to understand how the
    Wyoming Commission ultimately decided on the existing rates.
    These rates were set as Rocky Mountain Power was experiencing increases
    in its own costs. Rocky Mountain Power tried to offset these cost increases by
    raising rates charged to consumers. But a rate increase required approval of the
    Wyoming Public Service Commission.
    5
    So, Rocky Mountain Power applied for a rate hike, listing its contracts and
    explaining its increase in costs. Some parties objected, and the regulatory
    proceedings ended in 2012 with a stipulation. In the eventual stipulation, Rocky
    Mountain Power agreed to reduce the amount of the rate increase by over
    $12,000,000. In re Rocky Mountain Power, 
    2012 WL 6700584
    , at *1-*2 (Wyo.
    Pub. Serv. Comm’n Oct. 8, 2012) (unpublished). But that settlement does not
    supply any information about the ultimate effect of the Wasatch contracts on
    electricity rates.
    II.    Article III Standing Analysis
    Some standing requirements are based on Article III of the constitution, and
    others are based on prudential considerations. We need not analyze prudential
    standing if the claimant lacks standing under Article III. See Wyoming v. U.S.
    Dep’t of Interior, 
    674 F.3d 1220
    , 1231 (10th Cir. 2012); Mount Evans Co. v.
    Madigan, 
    14 F.3d 1444
    , 1451 (10th Cir. 1994). We hold that the Alliance has not
    satisfied two constitutional requirements of standing: traceability and
    redressability.
    A.     Burden of Persuasion
    The party invoking federal jurisdiction bears the burden of establishing
    traceability and redressability. See Lujan v. Defenders of Wildlife, 
    504 U.S. 555
    ,
    561 (1992). To satisfy this burden, the Alliance must not only satisfy the pleading
    requirements but also provide support “with the manner and degree of evidence
    6
    required at the successive stages of litigation.” Id. The resulting question is how
    to define this burden when we entertain a direct appeal from an administrative
    decision.
    The Seventh, Eighth, and D.C. Circuit Courts of Appeals have defined this
    burden by analogizing the appeal to a summary judgment motion brought by the
    petitioner. Iowa League of Cities v. EPA, 
    711 F.3d 844
    , 869-70 (8th Cir. 2013);
    Citizens Against Ruining the Env’t v. EPA, 
    535 F.3d 670
    , 675 (7th Cir. 2008);
    Sierra Club v. EPA, 
    292 F.3d 895
    , 899-900 (D.C. Cir. 2002). These courts hold
    that the petitioner must supply evidence to show traceability and redressability.
    Iowa League of Cities, 711 F.3d at 869-70; Citizens Against Ruining the Env’t,
    535 F.3d at 675; Sierra Club, 292 F.3d at 899-900.
    This approach is based on the similarity of the proposed remedy when a
    claimant seeks summary judgment in district court and appeals an administrative
    decision to our court. In both situations, the claimant is seeking a final judgment
    on the merits. Iowa League of Cities, 711 F.3d at 869-70; Sierra Club, 292 F.3d at
    899. Because of the similarity in the proposed remedy, other circuits have used
    the summary-judgment standard to define a petitioner’s burden of production
    when standing is disputed in an administrative appeal to a federal appellate court.
    Iowa League of Cities, 711 F.3d at 869-70; Sierra Club, 292 F.3d at 899.
    We agree with this reasoning and follow the approach taken by the Seventh,
    Eighth, and D.C. Circuit Courts of Appeals. Thus, the Alliance must produce
    7
    evidence on each element of standing as if it were moving for summary judgment
    in district court. To prove these elements, the Alliance must proffer “specific
    facts” supported by “affidavit or other evidence.” Lujan, 504 U.S. at 561. If
    FERC contests these facts, the Alliance would not enjoy “the benefit of any
    inference” and it would need to satisfy its burden of persuasion under a
    preponderance-of-the-evidence standard. See Iowa League of Cities, 711 F.3d at
    870.
    This proof must show that the Alliance had standing when it filed its
    petition for review. See Nova Health Sys. v. Gandy, 
    416 F.3d 1149
    , 1154 (10th
    Cir. 2005); see also Friends of the Earth, Inc. v. Laidlaw Envtl. Servs. (TOC), Inc.,
    
    528 U.S. 167
    , 180 (2000) (“[W]e have an obligation to assure ourselves that
    [plaintiff] had Article III standing at the outset of the litigation.”).
    B.     Traceability
    The Alliance bases standing solely on the belief that the Wyoming Public
    Service Commission has approved a rate increase as a result of the certification
    that Wasatch had met the FERC criteria. But that certification does not affect
    electricity rates. Instead, electricity rates are determined by the actions of two
    third-parties: Rocky Mountain Power and the Wyoming Public Service
    Commission. Thus, electricity rates are traceable to Wasatch’s certification only
    if:
    8
    !      Rocky Mountain Power sought higher rates as a result of the
    certification and
    !      the Wyoming Public Service Commission allowed Rocky Mountain
    Power to increase rates because of an agreement to buy wind power
    from Wasatch.
    The Alliance has not shown a likelihood that electricity rates increased because of
    Wasatch’s certification. As a result, the Alliance has not satisfied its burden of
    persuasion.
    1.     The Test for Traceability
    Standing exists only if the injury is “‘fairly . . . trace[able] to the challenged
    action of the defendant . . . and not . . . th[e] result [of] the independent action of
    some third party not before the court.’” Lujan, 504 U.S. at 560 (citation omitted).
    But here, the injury “depends on the unfettered choices made by independent
    actors,” Rocky Mountain Power and the Wyoming Commission. ASARCO Inc. v.
    Kadish, 
    490 U.S. 605
    , 615 (1989). Thus, the Alliance must show that Rocky
    Mountain Power and the Commission increased rates because of Wasatch’s
    certification. See Lujan, 504 U.S. at 561-62. Traceability is absent when we have
    to guess why the third parties acted as they did. See Clapper v. Amnesty Int’l
    USA, __ U.S. __, 
    133 S. Ct. 1138
    , 1149 (2013) (traceability is lacking because the
    respondents could only guess at the authority for the government’s interception of
    their communications); Nova Health Sys. v. Gandy, 
    416 F.3d 1149
    , 1157 (10th Cir.
    9
    2005) (traceability is lacking because it was “merely speculative whether these
    defendants caused Nova’s decision”).
    2.     The Alliance’s Arguments for Traceability
    In an effort to minimize this guesswork, the Alliance argues that rates have
    already been raised because of one of the Wasatch contracts. This argument is
    based on four supposed facts: (1) Wyoming’s electricity rates “are grounded in a
    determination of the revenue required for a utility to meet its expenses, plus a
    stipulated return;” 1 (2) Rocky Mountain Power presented the Commission with the
    cost of one of the wind projects; 2 (3) the Commission approved the entire
    stipulated rate increase; 3 and (4) Rocky Mountain Power was utilizing all of its
    transmission capacity. 4 In the Alliance’s view, Rocky Mountain Power’s rates are
    tied to a specific rate of return and the Commission approved the entire stipulated
    increase. Therefore, according to the Alliance, the Wasatch costs contributed to
    the eventual rate increase.
    1
    Pet’r’s Supp. Resp. Br. at 4.
    2
    Sarvey Aff. at 2, Ex. 2.
    3
    In re Rocky Mountain Power, 
    2012 WL 6700584
    , at *6 (Wyo. Pub. Serv. Comm’n
    Oct. 8, 2012) (unpublished).
    4
    Pet’r’s Reply Br. at 6.
    10
    3.     The Flaws in the Alliance’s Arguments
    The Alliance cannot tie the rate increase to the costs of the wind projects
    because: (1) Wasatch’s contracts were relatively insignificant compared to Rocky
    Mountain Power’s other costs, (2) certification would have affected the existing
    rates only if the Wyoming Commission had unnecessarily allowed Rocky
    Mountain Power to charge higher rates, and (3) the Alliance provides no
    explanation or support for its argument that Rocky Mountain Power was utilizing
    all of its transmission capacity. In addition, the Alliance’s underlying argument
    on the merits assumes that a second turbine cluster would be built. If it would not,
    certification of the single project would have been appropriate even if the Court
    were to adopt the Alliance’s position on the merits.
    Wasatch’s Minuscule Share of Rocky Mountain Power’s
    Production Costs
    The Alliance’s argument is flawed in that it assumes that Rocky Mountain
    Power requested and obtained a rate increase based on the cost of a single
    contract, which accounted for less than 1% of the production costs. 5 We have no
    reason to connect this tiny portion of Rocky Mountain Power’s costs to the
    eventual rate increase.
    5
    Rocky Mountain Power’s long-term purchases totaled $445,990,114 and the net
    power cost for the wind project is $3,772,711 (about 0.85% of the total). Sarvey Aff., Ex.
    2.
    11
    The Assumption that the Wyoming Commission Allowed
    Rocky Mountain Power to Pass Along Excessive Rates to
    Consumers
    In addition to attributing the rate increase to a supplier that accounts for less
    than 1% of the costs, the Alliance erroneously assumes that the Wyoming Public
    Service Commission allowed Rocky Mountain Power to charge excessive rates to
    consumers.
    The Alliance’s argument, connecting the rate increase to the Wasatch
    contract, rests on three assumptions:
    !      The connection assumes that the Wyoming Public Service
    Commission allowed Rocky Mountain Power to charge ratepayers
    higher costs because it had assumed them in the Wasatch contracts;
    !      the connection further assumes that wind power is more expensive
    than conventional energy sources; and
    !      the connection also assumes that the eventual settlement included a
    rate hike based on an increase in costs from the Wasatch contract.
    The Alliance’s first assumption is that a third party (the Wyoming Public
    Service Commission) would allow another third party (Rocky Mountain Power) to
    pass on higher costs resulting from the Wasatch contracts. This assumption
    involves a series of related assumptions that ultimately depended on the actions of
    two third-parties: Rocky Mountain Power and the Wyoming Public Service
    Commission.
    In 2009, Rocky Mountain Power entered into a stipulation with various
    interested parties, which was approved with some modifications by the Wyoming
    12
    Public Service Commission. Pet’r’s Supp. Resp. Br., Ex. H at 2-3; In re Rocky
    Mountain Power, 
    2009 WL 6357879
    , at *11 (Wyo. Pub. Serv. Comm’n Nov. 30,
    2009) (unpublished). The stipulation provided a formula for the prices that Rocky
    Mountain Power would pay Wasatch for its wind power. This formula contained a
    “wind proxy,” which set Wasatch’s prices based on market prices for wind energy.
    According to the Alliance, the wind proxy contained prices higher than those for
    energy from conventional sources, such as natural gas. But at that point, rates had
    not yet been affected because the Wyoming Public Service Commission had not
    yet decided whether to allow Rocky Mountain Power to pass along all of its costs
    to ratepayers. That decision was still three years away.
    When the subject of a rate increase arose, the Wyoming Public Service
    Commission had discretion about which costs could be passed along to ratepayers.
    With this discretion, the Wyoming Commission had to decide whether to allow
    Rocky Mountain Power to pass along to ratepayers the higher wind costs approved
    three years earlier. In deciding how to exercise this discretion, the Wyoming
    Commission was not constrained by federal law or Wasatch’s certification of its
    projects.
    When the Wyoming Commission approved rates in 2012, it did so based on
    its own exercise of discretion to allow Rocky Mountain Power to pass along its
    higher costs to consumers. That was the prerogative of the Commission, but it
    13
    involved a step that was not causally related to certification of the Wasatch
    projects.
    Second, the Alliance implicitly assumes that projected costs of wind power
    would exceed those of conventional energy sources. This assumption is essential
    to the Alliance’s argument: If wind power costs the same as conventional sources
    of power, for example, Rocky Mountain Power’s projected expenses would have
    been the same with or without the Wasatch contract. But the Alliance proffered no
    evidence comparing the costs of wind power and other sources of energy.
    The third assumption is that the eventual rates were calculated based on the
    cost of the Wasatch contract. Though the Wyoming Commission ultimately
    approved a rate increase, these rates resulted from a settlement. In this settlement,
    Rocky Mountain Power dropped its proposed rate increase by over $12,000,000
    without identifying how the compromise had been calculated. Thus, we have no
    way of knowing whether the use of a wind proxy had any effect on the eventual
    rates.
    The Alliance’s argument, connecting rates and the Wasatch contract, is
    based on three questionable assumptions. Underlying these assumptions is a need
    for guesswork that is fatal to the Alliance’s argument on traceability.
    14
    The Alliance’s Assertion that Rocky Mountain Power Lacked
    “Unutilized Transmission Capacity” for Wasatch’s Wind Power
    The Alliance also urges a link between the certification and the eventual
    rates based on Rocky Mountain Power’s lack of any “unutilized transmission
    capacity” to deliver Wasatch’s wind energy. Pet’r’s Reply Br. at 6. But the
    Alliance provides no explanation or support for: (1) its assertion that Rocky
    Mountain Power had no unutilized transmission capacity for Wasatch’s wind
    power, or (2) how the absence of unutilized transmission capacity would cause an
    increase in electricity rates.
    In its reply brief, the Alliance points to an unsworn allegation that Rocky
    Mountain Power’s chief executive officer had told an Alliance representative as
    late as mid-2010 that there was no capacity in the system to accept additional
    power generation. Pet’r’s Reply Br. at 6; see Agency Record, Item No. 2 at 2-3.
    The unsworn statement, however, is only an allegation; it is not evidence.
    The Alliance’s allegation appears questionable, for Rocky Mountain Power
    stated in mid-2010 that it was investing in Wyoming to develop transmission
    systems so that the company could develop economic wind projects. In re Rocky
    Mountain Power, 
    2010 WL 3743887
    , at *4-*5 (Wyo. Pub. Serv. Comm’n July 29,
    2010). But, we need not decide here whether Rocky Mountain Power would have
    added transmission lines even without the Wasatch contract. In assuming that
    these lines would not have been added, the Alliance provides no evidence; and that
    15
    absence of evidence is fatal because the Alliance bears the burden of persuasion.
    Accordingly, we reject the Alliance’s argument involving the supposed absence of
    any unutilized transmission capacity for Wasatch’s wind power.
    The Alliance’s False Assumption that Wasatch Would Timely
    Build the Second Turbine Cluster
    The Alliance’s argument on traceability not only assumes a connection
    between certification and rates, but also assumes that Wasatch will build the
    second turbine cluster. If Wasatch does not do so, it would be left with only one
    cluster; and the Alliance does not question FERC’s right to certify only one of
    Wasatch’s turbine clusters.
    Though we must base the Alliance’s assumption on the possibilities existing
    when the appeal began, we cannot help but notice that Wasatch has not yet built
    the second cluster. Indeed, it was Wasatch’s failure to build the second cluster
    that led Rocky Mountain Power to terminate the sole remaining contract. With
    that history in mind, we cannot lightly assume that the building of the second
    cluster would have been considered inevitable when the Alliance began this
    action.
    4.    Conclusion
    Did Wasatch’s relatively small supply of energy affect the costs that Rocky
    Mountain Power was allowed to pass on to ratepayers? We have no way of
    16
    knowing. And, as a result, the Alliance has failed to satisfy its burden on
    traceability.
    C.        Redressability
    The Alliance has also failed to satisfy its burden on redressability.
    1.   Test for Redressability
    The injury is redressable only if a favorable decree (an order requiring
    decertification) would likely provide redress. See Lujan, 504 U.S. at 561. This
    inquiry turns on what Rocky Mountain Power and the Wyoming Commission
    would do if the Wasatch projects were decertified. And there is no way of
    knowing what they would do.
    2.   The Alliance’s Failure to Show a Likelihood of Lower Rates
    from Decertification
    If the projects are decertified, the Alliance predicts that Rocky Mountain
    Power would refuse to buy wind power from Wasatch and reduce costs through
    this refusal. But Rocky Mountain Power’s rates have already been approved. In
    light of this approval, we have no reason to expect a voluntary or involuntary rate
    reduction even if Wasatch were to lose its certification.
    A voluntary reduction appears unlikely because Rocky Mountain Power
    would lack any apparent incentive to drop rates based on elimination of less than
    1% of its budgeted net power costs.
    17
    An involuntary rate reduction appears equally unlikely: Why would the
    Wyoming Public Service Commission require a rate reduction when: (1) the
    Wasatch contract affected less than 1% of Rocky Mountain Power’s forecasted
    costs, and (2) Rocky Mountain Power agreed to drop its proposed rate hike by over
    $12,000,000 and the Wasatch contract would have accounted for less than
    $4,000,000? In these circumstances, we cannot possibly know what the Wyoming
    Commission would do with Rocky Mountain Power’s rates if Wasatch were to lose
    certification. And without knowing whether the Commission would revisit the
    rates already approved, we conclude that the Alliance has not satisfied its burden
    on redressability. See Klamath Water Users Ass’n v. F.E.R.C., 
    534 F.3d 735
    , 739-
    40 (D.C. Cir. 2008) (an increase in electricity rates was not redressable because
    the challengers had not shown that utilities would lower electricity rates,
    reasoning that the state regulators had already set retail rates); Burton v. Cent.
    Interstate Low-Level Radioactive Waste Compact Comm’n, 
    23 F.3d 208
    , 210 (8th
    Cir. 1994) (a ratepayer allegedly incurring an increase in electricity rates would
    lack standing to challenge regulatory action because even with a favorable decree,
    the utility might or might not adjust its rates); Starbuck v. City & Cnty. of San
    Francisco, 
    556 F.2d 450
    , 458 (9th Cir. 1977) (ratepayers lacked standing to
    challenge a utility’s use of transmission lines, though the ratepayers alleged a
    desire to reduce electricity rates, because of uncertainty about the rates with a
    favorable decree).
    18
    3.     The Alliance’s Failure to Show Likely Savings to Ratepayers if
    Wasatch Were to Lose Certification
    The Alliance suggests that decertification could benefit ratepayers because
    they would obtain a part of the savings if Rocky Mountain Power’s expenses dip
    below a certain level. This is indeed a possibility, for ratepayers would receive
    70% of the savings if Rocky Mountain Power’s actual net power costs dip below
    the projections. Pet’r’s Supp. Resp. Br., Ex. C at 6. And one might imagine the
    possibility that ratepayers could enjoy a fraction of the savings if Rocky Mountain
    Power could cut expenses.
    One such cut, the Alliance imagines, is the cost of buying wind power from
    Wasatch. Through this set of possibilities, the Alliance suggests that
    decertification might allow ratepayers to obtain 70% of the savings if Rocky
    Mountain Power were relieved of the obligation to buy Wasatch’s wind power.
    This argument involves a basic fallacy: It assumes that the cost of wind
    power will exceed the price of conventional energy sources over the life of the
    contracts. But there is nothing in the record to compare the long-term costs of
    wind power and energy from conventional sources.
    The Alliance submitted its own literature, which stated that as of an
    unspecified date, “the cost to utilities of obtaining power from conventional
    sources [was] below that of wind . . ., due principally to declining prices for
    natural gas.” Pet’r’s Reply Br., Ex. D at 2. This literature arguably constitutes
    19
    inadmissible hearsay. See Fed. R. Evid. 801(c). But even if we were to consider
    the Alliance’s literature, the Wasatch contract was to last twenty years; 6 and the
    record lacks any evidence suggesting that wind power is likely to cost more than
    traditional energy sources over a twenty-year period. The Alliance’s argument on
    redressability involves an unproven assumption about future costs of wind power
    that we cannot lightly assume.
    Without this unproven assumption, we have no reason to expect any
    tangible benefit to ratepayers if the Wasatch projects were decertified.
    4.     Conclusion
    We conclude that the Alliance has failed to satisfy its burden on
    redressability. The electricity rates are already set, and the Alliance’s argument
    on redressability assumes future rates and actions by third parties that we cannot
    predict with any reasonable measure of comfort.
    D.     Suggestion to Postpone Review
    The Alliance suggests that Wasatch may not be able to complete the wind
    projects and points out that both contracts have ended. With termination of the
    contracts, the Alliance invites us to consider whether to dismiss this matter
    “without prejudice” on grounds that the “record and the Court would ‘benefit from
    postponing review.’ ” Pet’r’s Supp. Resp. Br. at 12 (quoting Qwest Commc’ns
    Int’l, Inc. v. FCC, 
    240 F.3d 886
    , 895 (10th Cir. 2001)).
    6
    Pet’r’s Supp. Resp. Br., Ex. H at 2-3.
    20
    We have no reason to postpone review. Standing is gauged at the time the
    petition is filed, and the Alliance has had ample time and opportunity to address
    traceability and redressability as of the time that it began the action. Thus, we
    decline to postpone our review.
    III.   Conclusion
    We hold that the Alliance lacks standing because it has not shown: (1) that
    the alleged increase in electricity rates is traceable to an alleged error in FERC’s
    decision, or (2) that the alleged injury would likely be redressed by a favorable
    decision. Accordingly, the petition is dismissed.
    21