Standard Bank, Plc v. Runge, Inc. , 443 F. App'x 347 ( 2011 )


Menu:
  •                                                                                      FILED
    United States Court of Appeals
    UNITED STATES COURT OF APPEALS                             Tenth Circuit
    TENTH CIRCUIT                               October 6, 2011
    Elisabeth A. Shumaker
    Clerk of Court
    STANDARD BANK, PLC,
    Plaintiff - Appellant,
    v.                                                           No. 10-1045
    (D.C. No. 1:07-CV-01989-RPM)
    RUNGE, INC., f/k/a Runge Mining, Inc.,                         (D. Colo.)
    d/b/a Pincock, Allen & Holt,
    Defendant - Appellee.
    ORDER AND JUDGMENT
    Before BRISCOE, Chief Circuit Judge, HOLLOWAY, and O'BRIEN, Circuit Judges.
    Standard Bank, PLC appeals from the district court’s grant of summary judgment
    in favor of engineering firm Runge, Inc., d.b.a. Pincock, Allen & Holt (PAH). Standard
    filed tort claims against PAH for preparing an allegedly flawed viability report in
    connection with Standard’s financing of a coal mine that went bankrupt. The district
    court concluded the claims were barred by the economic loss rule. We affirm.
    
    This order and judgment is an unpublished decision, not binding precedent. 10th
    Cir. R. 32.1(A). Citation to unpublished decisions is not prohibited. Fed. R. App. 32.1.
    It is appropriate as it relates to law of the case, issue preclusion and claim preclusion.
    Unpublished decisions may also be cited for their persuasive value. 10th Cir. R. 32.1(A).
    Citation to an order and judgment must be accompanied by an appropriate parenthetical
    notation B (unpublished). 
    Id. BACKGROUND In
    2005, Bronco Hazleton, Co., a wholly owned subsidiary of Bronco Energy
    Fund, Inc. (Bronco) entered into a contract to purchase the Hazleton coal mine in Indiana
    for $25 million. Royal Bank of Scotland (RBS), which was to provide the financing for
    the deal, required an evaluation by an independent engineer as part of its due diligence.
    To that end, RBS contacted PAH and instructed it to deal directly with Bronco. When
    Bronco retained PAH as the independent engineer, it made an immediate payment of
    $35,000 to be credited toward PAH’s fees.
    The contract1 between Bronco and PAH required PAH to perform its work at
    Hazleton “in accordance with the standard of care of its profession, which means
    generally accepted professional practices, in the same or similar localities, related to the
    nature of the work accomplished, at the time the services are performed.” (R. Vol. 6 at
    1188.) It limited PAH’s total liability to the greater of the amount of fees paid under the
    contract or $50,000 but offered the possibility of increased exposure to liability in
    exchange for a higher fee. The contract explicitly said no third party beneficiaries were
    intended and required each party to obtain written permission from the other before
    disclosing the contents of the report to outsiders. PAH presented a preliminary report to
    Bronco in August 2005. [Vol. 1 at 32] Included in the report was pointed language saying
    Bronco had retained PAH and “PAH has prepared this report for use by RBS as RBS
    1
    There was no signed contract between Bronco and PAH. The district court
    concluded PAH’s written proposal to provide services became the contract when Bronco
    made payment for PAH’s services. The parties do not argue otherwise. When we refer
    to the contract, we are referring to PAH’s proposal.
    -2-
    evaluates the merits of the Hazelton venture.” (R. Vol. 1 at 37).
    RBS pulled out of the deal on September 26, 2005, the day before closing. A few
    days later, an independent broker mentioned the deal to Standard, which stepped in to
    provide financing. Internal documents show Standard was projecting a 69% internal rate
    of return on the transaction. Standard, like RBS, required a report from an independent
    engineer. RBS “release[d]” the contractors it had used to perform the due diligence,
    including PAH, to Standard. (R. Vol. 7 at 1513.) In November 2005, PAH submitted a
    report nearly identical to the one provided to RBS. It was “[p]repared for Standard” and
    the recitals were amended to read, “PAH, in its role as IE [independent engineer], intends
    that this report will be used by Standard as Standard evaluates the merits of the Hazelton
    venture.” (R. Vol. 1 at 98, 103.) The total amount of the loan was $35 million. The
    transaction closed in December 2005 and PAH’s outstanding fees were paid out of the
    funds Standard loaned to Bronco, but listed under “Lender Transaction Expenses.” (R.
    Vol. 7 at 1461.)
    In January 2006, Standard started the process of syndicating the loan. In
    connection with its plan to market the project to other banks, it asked PAH to change the
    recitals in its report. Standard wanted the language saying Bronco had retained PAH to
    be replaced by language less likely to cause other banks to be concerned about PAH’s
    independence. PAH complied. Its new report contained no reference to Bronco having
    retained it; instead it simply said PAH had been retained as an independent engineer to
    perform work on behalf of Standard and other potential lenders evaluating the mine.
    Standard was unable to syndicate the loan because the mine soon failed and Bronco
    -3-
    declared bankruptcy in May 2006, less than six months after the purchase.
    By March 2006 serious problems with the mine became evident. Standard alleges
    the problems should have been, but were not, flagged in PAH’s report.2 Standard
    retained another engineering firm to reevaluate the mine (that firm, incidentally, limited
    its liability to Standard to the amount of its fee). Standard attempted to rescue the mine
    by providing Bronco with debtor-in-possession financing. The efforts were unsuccessful.
    In September 2007, Standard sued PAH for negligent misrepresentation and
    professional negligence. The parties later filed cross-motions for summary judgment.
    Concluding the economic loss rule barred Standard’s claims, the district court entered
    summary judgment in favor of PAH.
    DISCUSSION
    “We review a grant of summary judgment de novo.” Grantham v. Ohio Cas. Co.,
    
    97 F.3d 434
    , 435 (10th Cir. 1996) (citation omitted). Whether Colorado’s economic loss
    rule applies to bar a claim is a question of law also subject to de novo review.3 Level 3
    Commc’ns, LLC. v. Liebert Corp., 
    535 F.3d 1146
    , 1162 (10th Cir. 2008).
    The Colorado Supreme Court adopted the economic loss rule in Town of Alma v.
    2
    Standard claims PAH miscalculated the mine’s reserves of Clean Air Act
    compliant coal, overstating the amount by one hundred percent. Bronco quickly
    discovered it could not extract enough compliant coal to satisfy its obligations under
    existing contracts. Standard also claims PAH failed to disclose that its geologist had
    discovered a number of partings (layers of rock in the coal seam) rendering portions of
    the mine unworkable. According to Standard, the report also overstated the mine’s coal-
    preparation ability and neglected to account for royalties required to be paid on all coal
    sales. PAH disagrees with the substance and legal effect of Standard’s allegations.
    Those quarrels do not impact the narrow issue before us.
    3
    Both parties agree that Colorado law applies in this diversity action.
    -4-
    AZCO Construction, 
    10 P.3d 1256
    , 1264 (Colo. 2000). “[A] party suffering only
    economic loss from the breach of an express or implied contractual duty may not assert a
    tort claim for such a breach absent an independent duty of care under tort law.” 
    Id. “The scope
    of this rule includes third-party contract beneficiaries who may have a cause of
    action for breach of contractual duties.” 
    Id. at n.12.
    The application of the rule focuses
    on the source of the duty alleged to have been breached. 
    Id. at 1263.
    In Town of Alma, the town and several individuals sued AZCO for shoddy
    workmanship on the town’s water distribution system. 
    Id. at 1258.
    Appearing to depart
    from an earlier trend in its case law, the Colorado Supreme Court decided the economic
    loss rule barred the plaintiffs’ tort claims. 
    Id. at 1264-65.
    The court concluded the
    claims were based on the duties stated in the construction contract and not on an
    independent tort duty. 
    Id. at 1264.
    As it was the first case to apply the economic loss
    rule, the court felt the need to reconcile its earlier, seemingly inconsistent, cases, which
    did not discuss (or even mention) the rule. It distinguished the cases on the following
    bases: (1) the common law duty underlying the tort in one case was not limited where the
    contract did not address the duty of care (the standard of workmanship); (2) the duty
    underlying the tort in another was entirely separate from the duty created by the contract
    between the parties, and (3) in the third case policy concerns required finding a builder
    had an independent duty to act without negligence in constructing a residence.4 
    Id. at 4
            These cases also all involved private homeowners. Colorado apparently applies
    the independent duty rule differently in residential construction cases, i.e., it allows
    negligence claims by private homeowners against subcontractors despite the fact the
    -5-
    1265-66.
    Four years later, the Colorado Supreme Court expanded the application of the rule
    in commercial cases. BRW, Inc. v. Dufficy & Sons, Inc., 
    99 P.3d 66
    (Colo. 2004).
    Dufficy, a subcontractor on a municipal construction project, attempted to sue the
    project’s engineer (BRW) and its inspector for negligence and negligent
    misrepresentation.5 
    Id. at 67.
    Dufficy claimed it incurred additional costs due to BRW’s
    faulty plans and the inspecting entity’s failure to timely inspect the project and its
    misrepresentations concerning another subcontractor’s work. 
    Id. at 70.
    The court
    applied the economic loss rule even though there was no contract between Dufficy and
    BRW or the inspector. 
    Id. at 72.
    It extended the rule, saying it “applies when the
    claimant seeks to remedy only an economic loss that arises from interrelated contracts.”
    
    Id. It also
    rejected the notion that “a licensed engineer owes an independent duty of care
    under tort law to the contractors and subcontractors with respect to the plans and
    specifications drafted and prepared by the engineer and relied upon by the contractor or
    subcontractor.”6 
    Id. at 71.
    If there was a duty in tort, it was not sufficiently independent
    claims were based on duties set forth in contracts between the subcontractors and prime
    contractors. See infra n.7.
    5
    Standard pled professional malpractice in addition to a negligent
    misrepresentation claim of the type considered in BRW. It is not clear whether a
    professional malpractice claim against an engineer can be brought by a third party non-
    client in Colorado or whether malpractice should be dealt with differently from other tort
    claims under the economic loss rule. However, the parties have not attempted to draw a
    distinction between the two claims on appeal so we will not consider the malpractice
    claim separately. See Kokins v. Teleflex, Inc., 
    621 F.3d 1290
    , 1302 n.6 (10th Cir. 2010)
    (arguments not raised on appeal are deemed to be waived).
    6
    There is some tension in the line of Colorado cases applying the economic loss
    -6-
    of the contract to preclude application of the economic loss rule.
    The court reasoned the economic loss rule barred Dufficy’s claims because:
    [The case] involve[d] contractual duties that arose out of a network of
    agreements of which all parties had notice. The [p]roject involved
    commercially sophisticated parties able to negotiate and bargain for an
    allocation of risks, duties, and remedies. Dufficy was aware that it would
    be bound by BRW’s plans and specification before it entered into a contract
    [with another subcontractor]. Dufficy had the opportunity to allocate the
    risks that might occur in following BRW’s plans and relying on [the
    inspector’s] inspection of the [p]roject, but failed to do so. Rather, when
    Dufficy contracted with [another subcontractor], it agreed to be bound by
    BRW’s plans and specifications and did not obtain provisions protecting
    itself from economic loss.
    
    Id. at 73.
    To determine if the economic loss rule bars recovery in tort in this case, we first
    rule. In A.C. Excavating v. Yacht Club II Homeowners Association, Inc., the yacht club
    homeowners sued subcontractors who worked on their homes for negligent construction.
    
    114 P.3d 862
    (Colo. 2005). The subcontractors had contracted with the general
    contractor and developer, but not with the homeowner’s association or its members. The
    court held “the economic loss rule has no application to negligent residential construction
    claims against subcontractors because subcontractors owe homeowners an independent
    duty of care to act without negligence in the construction of homes.” A.C. 
    Excavating, 114 P.3d at 870
    . The court appears to have concluded the existence of an independent
    tort duty was enough to render the economic loss rule inapplicable, 
    id. at 866,
    even
    though the standard of care was laid out in the contracts between the subcontractors and
    the general contractor and developer. 
    Id. at 873
    (Kourlis, J., dissenting). The court
    mentioned BRW, but did not discuss the case in depth or resolve the tension created by its
    decision. 
    Id. at 865-66.
            We are left to identify and apply distinguishing principles. The economic loss
    rule, as articulated in BRW, “applies between and among commercial 
    parties,” 99 P.3d at 72
    , and Colorado courts apparently provide heightened protection for private consumers,
    particularly in the context of residential construction.
    This case is analogous to BRW, not A.C. Excavating; it involves sophisticated
    commercial entities and presents none of the concerns present in the residential
    construction cases cited by Standard.
    -7-
    turn to whether the duties between these commercial parties were governed by a set of
    “interrelated contracts.” 
    Id. at 72.
    Standard argues BRW does not apply here for several
    reasons. First, Standard would have us limit the “interrelated contracts” analysis in BRW
    to construction cases. The language in BRW, however, indicates a broader reach was
    intended. It refers consistently to “commercial parties” and the distinction between
    commercial and consumer transactions is logical, given the purposes and history of the
    economic loss rule in Colorado. 
    Id. at 72
    (“The economic loss rule applies between and
    among commercial parties for three main policy reasons, none of which depends upon or
    is limited to the existence of a two-party contract: (1) to maintain a distinction between
    contract and tort law; (2) to enforce expectancy interests of the parties so that they can
    reliably allocate risks and costs during their bargaining; and (3) to encourage the parties
    to build cost considerations into the contract because they will not be able to recover
    economic damages in tort.”).
    Standard also claims the contracts here were not interrelated because they were not
    negotiated or agreed to contemporaneously and therefore it had no opportunity to bargain
    in advance of PAH’s work. In BRW, “BRW completed the drawings and specifications”
    before the City invited bids for the general contractor. 
    Id. at 68.
    The general contractor
    then contracted with a subcontractor, who contracted with Dufficy. The opinion does not
    say how long it took for the series of contracts to be negotiated, but clearly the design
    work was completed before Dufficy’s contract, just as PAH’s work was completed before
    -8-
    Standard entered the picture. 7
    Additionally, Standard argues PAH had an independent duty as an “evaluative
    professional” to provide “an accurate evaluation to all intended recipients of its report.”
    (Appellant’s Opening Br. at 42.)
    [Colorado has] recognized that some special relationships by their nature
    automatically trigger an independent duty of care that supports a tort action
    even when the parties have entered into a contractual relationship. See,
    e.g., Bebo Constr. Co. v. Mattox & O’Brien, P.C., 
    990 P.2d 78
    , 83 (Colo.
    1999) (attorney-client relationship creates independent duty of care);
    Greenberg v. Perkins, 
    845 P.2d 530
    , 534 (Colo. 1993) (physician-patient
    relationship creates independent duty of care, as does physician's
    independent medical examination of non-patient); Farmers Group, Inc. v.
    Trimble, 
    691 P.2d 1138
    , 1141-42 (Colo. 1984) (quasi-fiduciary nature of
    insurer-insured relationship creates independent duty of care).
    Town of 
    Alma, 10 P.3d at 1263
    .
    However, in BRW, the Colorado Supreme Court was reviewing an appellate
    court’s conclusion that engineers and its inspectors owe an independent duty sufficient to
    preclude application of the economic loss rule to parties relying on their work. It
    reversed the appellate court. In doing so, the supreme court identified three factors for
    7
    In Level 3 Communications, LLC, Level 3 purchased electrical backup systems
    and batteries for the systems from 
    Liebert. 535 F.3d at 1151-52
    . When permanent
    batteries were delayed by the manufacturer (not Liebert), Liebert agreed to provide
    temporary batteries for the systems. 
    Id. at 1149,
    1151-52. The batteries, which Level 3
    claimed Liebert represented as new, turned out to be two years old. 
    Id. at 1149.
    We
    concluded the economic loss rule did not apply because the subject of the alleged
    misrepresentation was outside the scope of the original contract; it involved a separate
    negotiation to provide temporary batteries not contemplated under the original contract.
    
    Liebert, 535 F.3d at 1163
    (“the sale of the [temporary] batteries laid outside [the
    contract’s] scope, and the parties were merely negotiating a new contract rather than
    operating under the existing one”). Here, the alleged misrepresentation was made in the
    course of the evaluation required by the very contracts at issue. The conduct clearly falls
    within the scope of the contracts.
    -9-
    determining the source of the duty at issue: “(1) whether the relief sought in negligence is
    the same as the contractual relief; (2) whether there is a recognized common law duty of
    care in negligence; and (3) whether the negligence duty differs in any way from the
    contractual duty.” BRW, Inc., 99 P.3d. at 74. It clearly identified the tipping point, “[i]f
    we conclude that the duty of care owed by BRW [and the inspector] was memorialized in
    the contracts, it follows that the plaintiff has not shown any duty independent of the
    interrelated contracts and the economic loss rule bars the tort claim and holds the parties
    to the contracts’ terms.” 
    Id. It decided
    Dufficy’s claims of negligence and negligent
    misrepresentation against BRW and the inspector were barred by the economic loss rule
    because the contract between BRW and the city and the contract between BRW and the
    inspector set forth the duties BRW and the inspector allegedly breached. 
    Id. at 74-75.
    That is also the case here. Standard is alleging PAH breached the very duty of care set
    forth in the Bronco/PAH contract -- the duty to provide professionally competent services
    in its evaluation of the mine.8
    The relationships here were governed by a set of interrelated contracts between
    sophisticated commercial entities, all of which had the opportunity to allocate risk and
    loss through negotiation of their separate contracts. The Senior Credit Agreement
    between Bronco and Standard references the “Independent Engineer’s Report” and sets
    forth requirements for its contents in order for the transaction to go forward. (R. Vol. 2 at
    210). When it drafted and executed the Senior Credit Agreement, Standard knew it
    8
    The contract not only set forth the duty, it also expressly limited PAH’s liability
    for any breach of that duty to the amount of its fees.
    - 10 -
    would be relying on the PAH report in its process of approving the deal.
    When Standard took over the deal, RBS sent it a “release” of all consultants,
    including PAH, but “ma[d]e no representation or warranty as to any of the[] consultants
    and legal advisors or any of the reports and other documents they ha[d] prepared” and
    disclaimed “any and all liability to you resulting from your use of these consultants and
    legal advisors or your use of any of those reports and other documents.” (R. Vol. 7 at
    1513). Yet, even after RBS disclaimed liability, Standard made no effort to ensure it had
    protections in place from another source.
    The BRW court noted, “[e]ven though a subcontractor may not have the
    opportunity to directly negotiate with the engineer or architect, it has the opportunity to
    allocate the risks of following specified design plans when it enters into a contract with a
    party involved in the network of 
    contracts.” 99 P.3d at 72
    . There is no reason Standard
    could not have taken action to allocate the risk of any inaccuracies in the report. It could
    have, for example, required Bronco to pay PAH to increase its liability exposure,
    contracted with PAH directly for its services and requested it to add Standard as a named
    insured on its professional liability insurance coverage for the transaction, or sought an
    opinion from another engineer who was willing to bargain on liability issues. Standard
    argues it was never given the contract between Bronco and PAH, but nothing suggests
    Standard ever requested to see the contract. It is simply trying to skirt liability for its lack
    of diligence.9 It is also undisputed that Standard was generally familiar with these types
    9
    Standard’s focus on a possible 69% internal rate of return may have caused it to
    - 11 -
    of contracts and their terms.
    Finally, Standard argues the economic loss rule should not apply because in this
    case, it would deprive a plaintiff who has no remedy in contract from asserting a tort.10
    However, that is precisely what happened in BRW - the subcontractor was left with no
    claim against the engineer or inspector in contract or tort – its only remedy was against
    let down its guard. Its internal reports note the risk of proceeding at the pace required by
    its late takeover of the financing:
    [W]e have some degree of discomfort with respect to the speed at which we
    have had to put this deal together. Although we have sought to cover all
    the avenues, realistically in the time available we have some concern that
    certain aspects may not have received the typical level of scrutiny. This
    fact combined with the fact that there is little additional liquidity to address
    such errors is a real risk in this transaction. . . . [T]he risk profile is reflected
    in the return . . . .
    (R. Vol. 7 at 1420.) It ultimately decided to proceed, despite the possibility some
    contingencies might be left unaddressed, because of the “highly remunerative” nature of
    the transaction. (Id. at 1421.)
    10
    Standard claims it has no contract remedy available because the contractual
    relationship between PAH and Bronco did not extend to it through novation or a third-
    party beneficiary theory nor was there an implied contract between it and PAH. On the
    other hand, PAH argues Standard’s remedy, if any, is to recover its losses on one of those
    theories and Standard would be limited to contract damages – the fees paid to PAH,
    approximately $95,000. The district court did not address this issue because it found the
    claims were barred entirely. Because the economic loss rule bars Standard’s claims, we
    need not address it either.
    Standard requests permission to amend its complaint to include contract claims if
    we find the tort claims are barred. We “ha[ve] repeatedly and unequivocally held that,
    once judgment is entered, the filing of an amended complaint is not permissible until
    judgment is set aside or vacated . . . .” The Tool Box, Inc. v. Ogden City Corp., 
    419 F.3d 1084
    , 1087 (10th Cir. 2005) (quotations omitted). “The fact that a party desiring to
    amend after judgment has been entered is obliged first to obtain relief from the judgment
    imposes some important restrictions on the ability to employ Rule 15(a) [of the Federal
    Rules of Civil Procedure, which governs amendment of complaints].” 
    Id. (quotations omitted).
    Because we affirm the judgment of the district court, Standard’s request to
    amend is denied.
    - 12 -
    the city. BRW makes it clear the Colorado courts do allow the economic loss rule to
    deprive a sophisticated commercial plaintiff of its only remedy against a particular
    defendant. One of the purposes of the rule announced by the Colorado Supreme Court is
    “to encourage the parties to build the cost considerations into the contract because they
    will not be able to recover economic damages in tort.” 
    Id. at 72
    (emphasis added).
    Standard is left with no contract remedy because it failed to bargain for such a remedy
    when it had the opportunity. A party who fails to protect itself in a contract may be left
    without any remedy at all as a result of its oversight. The district court properly
    determined the economic loss rule bars Standard’s recovery.
    AFFIRMED. Standard’s request for a remand with directions to permit it to
    amend its complaint is DENIED.
    Entered by the Court:
    Terrence L. O’Brien
    United States Circuit Judge
    - 13 -
    

Document Info

Docket Number: 10-1045

Citation Numbers: 443 F. App'x 347

Judges: Briscoe, Holloway, O'Brien

Filed Date: 10/6/2011

Precedential Status: Non-Precedential

Modified Date: 11/5/2024