Long Ex Rel. Estate of Long v. CSX Transportation, Inc. , 635 F. App'x 724 ( 2015 )


Menu:
  •               Case: 15-11994    Date Filed: 12/23/2015     Page: 1 of 9
    [DO NOT PUBLISH]
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE ELEVENTH CIRCUIT
    ________________________
    No. 15-11994
    Non-Argument Calendar
    ________________________
    D.C. Docket No. 1:13-cv-00990-ODE
    DANIEL HOWARD LONG,
    Individually, as Surviving Spouse and
    Personal Representative for the Estate of Linda E. Long,
    Plaintiff - Appellant,
    versus
    CSX TRANSPORTATION, INC.,
    a foreign corporation,
    Defendant - Appellee,
    J. F. WILLIAMS, et al.,
    Defendants.
    ________________________
    Appeal from the United States District Court
    for the Northern District of Georgia
    ________________________
    (December 23, 2015)
    Case: 15-11994     Date Filed: 12/23/2015    Page: 2 of 9
    Before HULL, MARCUS, and EDMONDSON, Circuit Judges.
    PER CURIAM:
    In this state-law civil action, Plaintiff Daniel Long appeals the district
    court’s grant of summary judgment in favor of Defendant CSX Transportation, Inc.
    (“CSXT”) on Plaintiff’s negligence claim. This case arises out of a collision
    between a car driven by Plaintiff’s wife -- a car in which Plaintiff was also a
    passenger -- and a CSXT train at a railway crossing in Covington, Georgia
    (“Emory Street Crossing”). No reversible error has been shown; we affirm.
    The Emory Street Crossing consists of a two-lane road that runs in a north-
    south direction across the CSXT rail lines. Before 1974, the Emory Street
    Crossing was comprised of four railroad tracks (from north to south: the northern
    track, the pass track, the main line, and the house track) and was equipped with
    flashing lights and bells. In 1974, CSXT’s predecessor and the Georgia
    Department of Transportation entered into an agreement (“1974 Agreement”) to
    remove the unused northern track and to install new crossing signals and automatic
    gates on either side of the Emory Street Crossing. In conformance with the design
    specifications attached to the 1974 Agreement, the new protective devices were
    2
    Case: 15-11994      Date Filed: 12/23/2015   Page: 3 of 9
    installed 15 feet north of the pass track (then northern-most track) and 15 feet
    south of the house track (the southern-most track).
    Sometime before the mid-1980’s CSXT removed the house track: the
    southern-most track. No corresponding change was made to the location of the
    protective devices south of the Emory Street Crossing. As a result, at the time of
    the collision, the protective devices -- which included flashing lights, bells, and an
    automatic gate -- were located 36 feet south of the then southern-most track: the
    main line.
    On the day of the collision, a westbound train activated the protective
    devices at the Emory Street Crossing just as Plaintiff’s wife approached the
    crossing from the south. Plaintiff’s wife slowed down in response to the flashing
    lights and bells but came to a full stop only after she had already driven past the
    automatic gate. The automatic gate then lowered directly behind Plaintiff’s car.
    The car’s front bumper was 17 feet from the nearest track. After remaining
    stopped for about 30 seconds, Plaintiff’s wife began driving forward across the
    track and was struck by the oncoming train. As a result of the collision, Plaintiff’s
    wife died; and Plaintiff suffered severe injuries.
    3
    Case: 15-11994        Date Filed: 12/23/2015        Page: 4 of 9
    Plaintiff filed this civil action against CSXT 1 in state court, alleging, in
    pertinent part, that CSXT was negligent for failing to relocate the protective
    devices after taking away the house track.2 CSXT removed the case to federal
    court. The district court granted CSXT’s motion for summary judgment,
    concluding that CSXT owed no duty to relocate the protective devices at the
    Emory Street Crossing.
    We review a district court’s grant of summary judgment de novo, viewing
    all evidence and drawing all reasonable inferences in favor of the non-moving
    party. Holloman v. Mail-Well Corp., 
    443 F.3d 832
    , 836-37 (11th Cir. 2006).
    Summary judgment is appropriate where the record presents no genuine issue of
    material fact and where the moving party is entitled to judgment as a matter of law.
    
    Id.
    Plaintiff contends that CSXT had a contractual duty, pursuant to the 1974
    Agreement, to relocate the protective devices south of the Emory Street Crossing
    after removing the house track. Plaintiff relies on the design specifications
    attached to the 1974 Agreement, which specify, among other things, that the
    protective devices were to be constructed 15 feet from the center of each of the
    1
    Defendants Georgia Department of Transportation and J.F. Williams were dismissed in the
    district court and are not parties to this appeal.
    2
    On appeal, Plaintiff raises no challenge to the district court’s determination that Plaintiff
    abandoned the remaining claims in Plaintiff’s complaint.
    4
    Case: 15-11994   Date Filed: 12/23/2015     Page: 5 of 9
    then-contemplated northern-most (the pass track) and southern-most (the house
    track) tracks.
    Under Georgia law, “the cardinal rule of contract construction is to ascertain
    the parties’ intent, and where the contract terms are clear and unambiguous, the
    court will look to that alone to find the true intent of the parties.” Parris Props.,
    LLC v. Nichols, 
    700 S.E.2d 848
    , 853 (Ga. Ct. App. 2010).
    The 1974 Agreement provides that, after the protective devices are installed
    and “found to be in satisfactory working order,” the devices “shall be immediately
    put into service, operated and maintained by [CSXT] so long as [CSXT] operate[s]
    trains across” the Emory Street Crossing, or until the parties agree that the signals
    are no longer necessary, the crossing is abandoned, or until “other legal
    requirements necessitate cessation of operation and maintenance of signals
    thereat.” In addition, CSXT “will operate and maintain at its sole expense any
    grade crossing protective devices that are installed or modified pursuant to this
    agreement.” (emphasis added).
    In determining the parties’ intent, we look first to the plain meaning of the
    terms used in the contract. In this context, the term “operate” means “to cause or
    direct the functioning of; to control the working of”; and the term “maintain”
    means “to take action to preserve in working order.” See operate, v., Oxford
    English Dictionary, http://www.oed.com/view/Entry/131741 (2015); maintain, v.,
    5
    Case: 15-11994     Date Filed: 12/23/2015   Page: 6 of 9
    Oxford English Dictionary, http://www.oed.com/view/Entry/112562 (2015).
    Given these definitions, and considering the phrase “operate and maintain” in
    context, the 1974 Agreement imposes unambiguously a duty on CSXT to control
    the working of, and to keep in working order, the protective devices.
    We reject Plaintiff’s contention that CSXT’s contractual duty to “operate
    and maintain” the protective devices also encompasses an additional duty: a duty
    to “maintain” at all times the 15-foot distance between the protective devices and
    whatever might become in the future the presently existing nearest track. Nothing
    in the 1974 Agreement or the attached design specifications can be interpreted
    reasonably as imposing such ongoing duty. Nor does the plain language of the
    1974 Agreement or the attached design specifications require CSXT to relocate the
    protective devices upon future removal of a track or for any other reason. The
    contract terms in the 1974 Agreement are clear and unambiguous, imposing no
    duty on CSXT to keep on relocating protective devices.
    Plaintiff also argues that CSXT had a common law duty to relocate the
    protective devices. Even if we assume -- without deciding -- that CSXT had a duty
    at common law related to the installation of protective devices at railroad
    crossings, we have accepted that the common law duty has been preempted by the
    Georgia Code of Public Transportation (“GCPT”), O.C.G.A. § 32-1-1 et seq.
    6
    Case: 15-11994     Date Filed: 12/23/2015    Page: 7 of 9
    In CSX Transp., Inc. v. Trism Specialized Carriers, Inc., 
    182 F.3d 788
     (11th
    Cir. 1999), we addressed the effect of the GCPT on a railroad’s common law duty
    to install protective devices at a railroad crossing. We concluded -- based on the
    Georgia Court of Appeals’s decision in Evans Timber Co., Inc. v. Cent. of Ga.
    R.R. Co., 
    519 S.E.2d 706
     (Ga. Ct. App. 1999) -- that the GCPT “overrule[s] the
    state common law cause of action against railroads for negligent failure to install
    adequate warning devices at public grade crossings.” Trism, 
    182 F.3d at 792
    ; see
    Evans Timber, 
    519 S.E.2d at 709
     (“The GCPT precludes a common-law cause of
    action against a railroad for the failure to install adequate protective devices at a
    grade crossing on a public road where the railroad has not been requested to do so
    by the appropriate governmental entity.”). Because the Georgia Supreme Court
    had not yet decided the issue and because no “persuasive indication [existed] that
    the state’s highest court would rule otherwise,” we determined that we were
    “bound to apply the law as decided by the Georgia Court of Appeals” in Evans
    Timber. Trism, 
    182 F.3d at 792
    .
    Plaintiff contends that the Georgia Supreme Court’s decision in Fortner v.
    Town of Register, 
    604 S.E.2d 175
     (Ga. 2004), must alter our conclusions. We
    disagree. Fortner overruled Evans Timber only “[t]o the extent that the holding of
    Evans Timber is based on . . . dicta [in the Georgia Supreme Court’s decision in
    Kitchen v. CSX Transp., 
    453 S.E.2d 712
     (Ga. 1995)].” Fortner, 
    604 S.E.2d at 178
    .
    7
    Case: 15-11994     Date Filed: 12/23/2015    Page: 8 of 9
    But the Georgia Court of Appeals did not see itself as bound by dicta in the
    Kitchen opinion; the decision about protective devices in Evans Timber is based on
    a number of other factors, including the statutory language, trial testimony, and the
    legislative intent. See Evans Timber, 
    519 S.E.2d at 709-10
    . Furthermore, the
    Georgia Supreme Court in Fortner never says it overruled the ultimate conclusion
    about protective devices in Evans Timber (that the GCPT preempted the railroad’s
    common law duty to install protective devices). Thus, Evans Timber and Trism
    remain good law to us.
    In addition, to the extent that Fortner speaks about a railroad’s common law
    duty to install protective devices, that language in the Fortner opinion is itself non-
    binding dicta. The issue before the state court in Fortner was whether the GCPT
    preempts a railroad’s common law duty “to prevent vegetation from obstructing
    vision at a railroad crossing”: an issue that the Georgia Supreme Court
    distinguished expressly from the issue raised in this appeal. See Fortner, 
    604 S.E.2d at 177-78
    .
    Evans Timber is like this case and is the only Georgia state appellate
    decision to address directly the issue presented in this appeal. And nothing in
    Fortner which is not like this case persuades us it is reasonably certain that the
    Georgia Supreme Court would reach a different decision. Thus, we conclude --
    consistent with Evans Timber and with our decision in Trism -- that the GCPT
    8
    Case: 15-11994     Date Filed: 12/23/2015   Page: 9 of 9
    preempted the common law duty CSXT might have had to relocate the protective
    devices at the Emory Street Crossing.
    Plaintiff has failed to demonstrate that CSXT owed a duty to relocate the
    protective devices, as track was removed. Plaintiff’s claim for negligence fails as a
    matter of law. See Johnson v. Am. Nat’l Red Cross, 
    578 S.E.2d 106
    , 108 (Ga.
    2003) (To recover for negligence, a plaintiff must show, among other things, that
    defendant owed plaintiff a duty).
    AFFIRMED.
    9
    

Document Info

Docket Number: 15-11994

Citation Numbers: 635 F. App'x 724

Judges: Hull, Marcus, Edmondson

Filed Date: 12/23/2015

Precedential Status: Non-Precedential

Modified Date: 11/6/2024