USA v. Alabama Power Company , 730 F.3d 1278 ( 2013 )


Menu:
  •                Case: 11-12168       Date Filed: 09/19/2013      Page: 1 of 28
    [PUBLISH]
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE ELEVENTH CIRCUIT
    ________________________
    No. 11-12168
    ________________________
    D.C. Docket No. 2:01-cv-00152-VEH
    UNITED STATES OF AMERICA,
    Plaintiff-Appellant,
    ALABAMA ENVIRONMENTAL COUNCIL,
    Intervenor-Appellant,
    versus
    ALABAMA POWER COMPANY,
    Defendant-Appellee.
    __________________________
    Appeals from the United States District Court
    for the Northern District of Alabama
    _________________________
    (September 19, 2013)
    Before BARKETT and JORDAN, Circuit Judges, and HODGES, * District Judge.
    *
    Honorable Wm. Terrell Hodges, United States District Judge for the Middle District of Florida,
    sitting by designation.
    Case: 11-12168     Date Filed: 09/19/2013   Page: 2 of 28
    JORDAN, Circuit Judge:
    This case, brought by the United States against Alabama Power Company
    for alleged violations of the Clean Air Act, 
    42 U.S.C. § 7401
     et seq., has lasted for
    over a decade, lending some literal support to Justice Holmes' quip that "[l]awyers
    spend their professional careers shoveling smoke."1       The government's central
    allegation is that Alabama Power, contrary to the Act, made major modifications at
    three of its coal-fired power plants without obtaining a permit or installing modern
    pollution control devices.
    In support of its case, the government sought to introduce the expert
    testimony of Robert Koppe, a power plant reliability engineer, and Dr. Ranajit
    Sahu, an environmental permitting engineer. The testimony of these two experts,
    according to the government, would show that Alabama Power should have
    expected the modifications to significantly increase pollutant emissions at the
    plants, in violation of the Act. The district court, relying on United States v.
    Cinergy Corp., 
    623 F.3d 455
     (7th Cir. 2010), excluded the testimony of Mr. Koppe
    and Dr. Sahu, agreeing with Alabama Power that their methodology relied on
    incorrect and unrealistic assumptions about the operation of Alabama Power's
    generating units. See United States v. Alabama Power Co., 
    773 F. Supp. 2d 1250
    1
    Statement attributed to Justice Oliver Wendell Holmes, Jr. in 1 EDWARD W. KNAPPMAN,
    WATERGATE AND THE WHITE HOUSE 100 (1973).
    2
    Case: 11-12168     Date Filed: 09/19/2013   Page: 3 of 28
    (N.D. Ala. 2011) ("Alabama Power I"). The district court also struck, as an
    untimely new expert opinion, additional statements and calculations made by Dr.
    Sahu in his supplemental declaration. See United States v. Alabama Power Co.,
    
    274 F.R.D. 686
     (N.D. Ala. 2011) ("Alabama Power II"). Because the government
    indicated that it could not proceed without the expert testimony excluded in
    Alabama Power I, the district court entered summary judgment in favor of
    Alabama Power. See Alabama Power II, 274 F.R.D. at 686.
    The government and the Alabama Environmental Council, an intervenor,
    now appeal. Following review of the voluminous record, and with the benefit of
    oral argument, we affirm without further discussion the district court's ruling in
    Alabama Power II. That ruling, in our view, was not an abuse of discretion. We
    reverse, however, the district court's wholesale exclusion of the expert testimony of
    Mr. Koppe and Dr. Sahu in Alabama Power I, vacate the judgment in favor of
    Alabama Power, and remand for further proceedings. The Koppe-Sahu model, as
    utilized here, is sufficiently reliable to establish a relationship between potential
    generation of electricity and expected pollutant emissions at Alabama Power's
    modified plants. The Seventh Circuit's decision in Cinergy Corp., moreover, does
    not preclude admission of the expert testimony.
    3
    Case: 11-12168   Date Filed: 09/19/2013   Page: 4 of 28
    I
    The Clean Air Act seeks to protect the nation's air resources and promote
    public health through the prevention and control of air pollution. See 
    42 U.S.C. § 7401
    (b). The Act directs the Environmental Protection Agency to develop national
    standards regulating the emission of certain hazardous airborne pollutants. 
    Id.
     at §
    7409. The Act also tasks the EPA with overseeing each State's adoption of control
    measures and policies, i.e., the State Implementation Plan, to ensure that each State
    achieves the required air quality standards. Id. at § 7410. In its enforcement role,
    the EPA may bring suit directly against any operator of a pollution source for
    violation of the Act, regulations promulgated under the Act, or the relevant SIP.
    Id. at § 7413.
    Under the Act's Prevention of Significant Deterioration ("PSD") Program,
    enacted in 1977, major new sources of air pollution must limit their emissions to
    preserve the country's air quality and protect human health. Sources built before
    1977 are exempt from this requirement unless they undergo a "major
    modification." See 
    42 U.S.C. § 7475
    ; 
    40 C.F.R. § 52.21
    (b)(2)(i). A "major
    modification" includes physical or operational changes to a power plant that would
    result in a "significant net emissions increase" in sulfur dioxide and nitrogen oxide.
    See 
    40 C.F.R. § 52.21
    (b)(2)(i).       A net emissions increase for either of these
    pollutants is "significant" if it is greater than 40 tons per year. See 40 C.F.R §
    4
    Case: 11-12168        Date Filed: 09/19/2013   Page: 5 of 28
    52.21(b)(23)(i); Ala. Adm. Code § 335-3-14-.04(1)(a). 2 The permitting process
    requires an operator to adopt stringent pollutant emission controls at the plant,
    including the incorporation of costly equipment and procedures. See Nat'l Parks &
    Conservation Ass'n, Inc. v. Tennessee Valley Auth., 
    502 F.3d 1316
    , 1319 (11th Cir.
    2007). See also Alabama Power Co. v. Costle, 
    636 F.2d 323
    , 351 (D.C. Cir. 1979).
    A
    When a coal-fired power plant is operating, it burns coal to fuel an intense
    fire that converts water to steam. The steam passes over and turns the blades of a
    turbine; the kinetic energy of the turning blades is then converted into electricity by
    a generator. The process involves numerous mechanical components working in
    concert in an extremely inhospitable environment. A power-plant operator might
    schedule ahead to shut down a plant and complete regular maintenance and repair
    components. A shut-down, however, may also be unscheduled (e.g., when there is
    a sudden catastrophic failure).
    A plant does not generate electricity when it is shut down and, therefore,
    does not need to burn coal during periods of inactivity. If the repair or replacement
    of a problematic component renders a plant more reliable and less susceptible to
    future shut-downs, the plant will be able to run consistently for a longer period of
    time.      Assuming that the operator wishes to exploit this extra availability to
    2
    The parties agree that these standards control.
    5
    Case: 11-12168    Date Filed: 09/19/2013    Page: 6 of 28
    generate more electricity, more coal will need to be burned. Because coal-fueled
    combustion produces sulfur dioxide and nitrogen oxide, such increased plant
    operations may result in increased pollutant emissions.
    B
    In 1985, Alabama Power conducted an air-flow conversion of Unit 10 at its
    Gorgas plant from a "forced draft" system to a "balanced draft" system. In 1989,
    Alabama Power completely replaced the primary reheaters (a major boiler
    component) of Unit 2 at its Greene County plant. Similarly, in 1997, Alabama
    Power replaced a reheater section of Unit 2 at its Barry plant. Alabama Power did
    not obtain permits under the Clean Air Act for these projects.
    These modifications, according to the government, were performed to
    reduce the amount of time each plant would spend shut down for future
    maintenance and repairs. By replacing older infrastructure, prone to failure, with
    newer, more reliable components, Alabama Power intended to improve the
    reliability of its plants.   As a consequence of this improved reliability, the
    government asserted, the modified power plants would be able to generate
    electricity for longer intervals throughout the year than before the modifications.
    Additionally, the government alleged, the balanced draft conversion at Gorgas Unit
    10 would not only increase the plant's availability, but also raise its maximum
    hourly capacity for electricity generation.    In order to exploit this additional
    6
    Case: 11-12168   Date Filed: 09/19/2013   Page: 7 of 28
    capacity, the plant would need to burn even more coal. More coal burned to
    exploit additional capacity, in the government's view, would also increase pollutant
    emissions. In short, the government believed that the Gorgas, Greene County, and
    Barry projects constituted "major modifications" under the Clean Air Act.
    To satisfy its burden under the Act, the government had to show that at the
    time of the projects Alabama Power expected, or should have expected, that its
    modifications would result in a "significant net emissions increase" of sulfur
    dioxide or nitrogen oxide at each plant. See Cinergy Corp., 
    623 F.3d at 459
     ("the
    permit must be obtained before the modification is made, and so the effect on
    emissions is a prediction rather than an observation"); United States v. Ohio Edison
    Co., 
    276 F. Supp. 2d 829
    , 865 (S.D. Ohio 2003) ("the determination of whether a
    given project will cause a significant net pollution increase requires a pre-
    construction determination as to the additional pollutants projected to be emitted as
    a result of the proposed physical change"). The expert testimony of Mr. Koppe and
    Dr. Sahu, which we explain later, was critical to the government's ability to make
    that showing.
    III
    As noted earlier, the district court struck the expert testimony of Mr. Koppe
    and Dr. Sahu because it concluded that their methodology was unreliable within
    the meaning of Daubert v. Merrell Dow Pharms., 
    509 U.S. 579
    , 595 (1993), and its
    7
    Case: 11-12168    Date Filed: 09/19/2013   Page: 8 of 28
    progeny. We review that ruling for abuse of discretion. See, e.g., Toole v. Baxter
    Healthcare Corp., 
    235 F.3d 1307
    , 1312 (11th Cir. 2000). "A district court abuses
    its discretion if it applies an incorrect legal standard, follows improper procedures
    in making the determination, or makes findings of fact that are clearly erroneous."
    Chicago Tribune Co. v. Bridgestone/Firestone, Inc., 
    263 F.3d 1304
    , 1309 (11th
    Cir. 2001).
    Under Rule 702, a district court acts as a gatekeeper to keep out irrelevant or
    unreliable expert testimony. See Kumho Tire Co., Ltd. v. Carmichael, 
    526 U.S. 137
    , 145 (1999); Daubert, 
    509 U.S. at 596
    . This gatekeeping role, however, "is
    not intended to supplant the adversary system or the role of the jury: 'vigorous
    cross-examination, presentation of contrary evidence, and careful instruction on the
    burden of proof are the traditional and appropriate means of attacking shaky but
    admissible evidence.'" Allison v. McGhan Med. Corp., 
    184 F.3d 1300
    , 1311-12
    (11th Cir. 1999) (citing Daubert, 
    509 U.S. at 596
    ). In evaluating the reliability of
    scientific expert testimony, a district court "must assess whether the reasoning or
    methodology underlying the testimony is scientifically valid and whether the
    reasoning or methodology properly can be applied to the facts in issue." United
    States v. Frazier, 
    387 F.3d 1244
    , 1261-62 (11th Cir. 2004) (en banc) (internal
    quotation marks and ellipsis omitted).
    8
    Case: 11-12168   Date Filed: 09/19/2013   Page: 9 of 28
    With these standards in mind, we turn to the expert testimony of Mr. Koppe
    and Dr. Sahu, and the reasons the district court gave for its exclusion.
    A
    The Koppe-Sahu model consists of two parts. The first is an analysis of
    each modification's expected effect on the power plant's availability and capacity
    to generate additional electricity. The second is a calculation of the marginal
    increase of pollutant emissions at each power plant due to increases in availability
    and capacity.
    Mr. Koppe's analysis constituted the first part of the model. Mr. Koppe
    examined Alabama Power's rationale for its projects and how each project
    addressed certain problematic components prone to failure.          Mr. Koppe also
    analyzed the historical operating data and records of each unit to determine the
    number of hours it spent shut down due to that specific, faulty component. The
    replacement of that component, Mr. Koppe opined, would preclude similar
    shutdowns in the future, thereby increasing the unit's overall availability to
    generate electricity.
    In the case of Gorgas Unit 10, however, the balanced draft conversion
    project addressed a system design flaw that led to numerous component failures
    and limited the unit's overall reliability and performance. Because the scope of
    that project was larger than the replacement of a single component, Mr. Koppe was
    9
    Case: 11-12168       Date Filed: 09/19/2013     Page: 10 of 28
    unable to perform his standard availability analysis. Instead, he reviewed the
    records of nine other units owned by Southern Company (the parent of Alabama
    Power) that had undergone balanced draft conversions before Gorgas Unit 10. He
    found that, on average, the modified units suffered fewer outages and, therefore,
    experienced greater availability than before their modifications. Notably, Southern
    Company had also conducted the same analysis of those nine units in September of
    1982, three years before the modification of Gorgas Unit 10. See D.E. 321, Ex. 4
    at 93-94. Southern Company's own study concluded, as did Mr. Koppe, that a
    balanced draft conversion should be expected to improve a unit's availability. Id.3
    According to Mr. Koppe, because Alabama Power was aware that a balanced draft
    conversion would likely improve a unit's availability, it should have expected an
    increase in availability at Gorgas Unit 10.
    Additionally, Mr. Koppe cited to another Alabama Power study (this one
    conducted in September of 1983) which estimated a significant increase in Gorgas
    Unit 10's maximum capacity for electricity generation following a balanced draft
    conversion. See id. at 96-97. That study also projected the number of hours per
    year the unit would operate at this increased capacity. See id. Because these
    estimates came directly from Alabama Power, and could reasonably be imputed as
    3
    Alabama Power referenced Southern Company's study, along with its findings, in an April
    1983 statement supporting the draft conversion proposal for Gorgas Unit 10. See D.E. 321, Ex.4
    at 92.
    10
    Case: 11-12168     Date Filed: 09/19/2013   Page: 11 of 28
    the company's expectations for the modification at Gorgas Unit 10, Mr. Koppe
    incorporated these estimates in his calculations.
    As to all three modifications, Mr. Koppe reviewed the pre-project operation
    records of each unit to analyze its utilization by Alabama Power. Based on these
    records and his analysis, Mr. Koppe was confident that any additional hours made
    available to the power plants due to the modifications would actually be utilized by
    Alabama Power to generate additional electricity. Based on this analysis, Mr.
    Koppe calculated the expected increase in electricity generation at each modified
    plant. These estimates were then passed along to Dr. Sahu for the second stage of
    the model.
    Because the emission of pollutants accompanies the generation of electricity
    at a coal-fired power plant, Dr. Sahu constructed an algorithm to convert Mr.
    Koppe's estimates of increased generation into the associated increase in pollutant
    emissions. The actual conversion factors employed by Dr. Sahu were specific to
    each power plant because the distinctive physical and operational attributes of each
    power plant will affect its emission of pollutants.
    The Koppe-Sahu model predicted a "significant net increase" in the sulfur
    dioxide and nitrogen oxide emissions from each of the three units due to the
    modifications.    Because these predictions were based on industry-standard
    11
    Case: 11-12168       Date Filed: 09/19/2013       Page: 12 of 28
    practices 4 and utilized documents generated by and/or readily accessible to
    Alabama Power, the government asserted that the company should have expected
    similar increases of emissions before undertaking the modifications. Alabama
    Power's failure to obtain appropriate permits, according to the government,
    violated the Clean Air Act.
    B
    The district court held that the model's "presumption that an increase in a
    facility's annual capacity will result in a proportionately equal increase in its output
    is only valid if the facility is operated virtually continuously at the highest level of
    output possible." Alabama Power I, 773 F. Supp. 2d at 1258. In other words, the
    district court held that the Koppe-Sahu methodology was only valid for "baseload"
    units, which it defined as facilities which "operate[ ] 'virtually continuously' at 'full
    4
    To determine a unit's increase in generation due to an increase in availability, Mr. Koppe used a
    method recommended by the Electric Power Research Institute. See D.E. 373-2 at 11. In a study
    published in 1985, the EPRI – "a membership organization composed of domestic utilities
    engaged in the commercial production of electricity," Critical Mass Energy Project v. Nuclear
    Regulatory Comm'n, 
    820 F.2d 278
    , 280 n.10 (D.C. Cir. 1987) – noted that this method was
    useful for predicting increased generation at both baseload coal plants as well as cycling coal
    plants. See D.E. 373-2 at 12. Dr. Sahu based his emission conversion factors on the
    methodology provided by the EPA in a publication entitled "Compilation of Air Pollutant
    Emission Factors AP-42." See D.E. 331 at 21.
    12
    Case: 11-12168         Date Filed: 09/19/2013        Page: 13 of 28
    capacity.'" 
    Id. at 1256
     (quoting Cinergy Corp., 
    623 F.3d at 459-60
    ). 5 Relying on
    Cinergy Corp., the district court excluded the testimony of Mr. Koppe and Dr.
    Sahu after determining that each of the Alabama Power units in question were not
    baseload facilities.
    We disagree with the district court's legal rationale and analysis, and
    conclude that the exclusion of the expert testimony of Mr. Koppe and Dr. Sahu
    constituted       an      abuse      of      discretion.           Although         the     Koppe-
    Sahu model can certainly be used to estimate pollutant emissions from baseload
    plants, its validity is not limited solely to such facilities. The model can be used to
    5
    The parties disagree about the proper definition of a "baseload" unit, but given our decision we
    need not determine which definition is correct. Because we are remanding, however, we do note
    that the district court's definition – which was based solely on how often a unit is operating –
    does not take into account an important component in determining the classification of a power
    plant – the cost of operation:
    Optimizing output is usually achieved by operating at full capacity the plants that
    are cheapest to operate, to supply the baseload (the minimum required at all
    times), and by using plants that are more costly to operate to meet surges in
    demand. Utilities operate power generation equipment in three general ways:
    baseload, cycling, and peaking. Baseload equipment is operated virtually
    continuously; such operation results in a low cost per kilowatt hour. Cycling
    equipment is operated on a regular or fairly regular basis, but not continuously,
    because of its higher per kilowatt hour cost. For example, such equipment might
    be needed daily during hours of high demand and then shut down at night.
    Peaking equipment is generally used only during hours of maximum demand.
    Cinergy Corp., 
    623 F.3d at 459-60
     (internal quotation marks omitted and emphasis added). See
    also United States v. Louisiana Generating, LLC, ___ F. Supp. 2d ___, ___, 
    2012 WL 1676706
    at*3-4 (M.D. La. 2012) ("Unsurprisingly, economic principles dictate how a plant is used. The
    Cinergy Corp. court . . . determined that because the plant in question was old and expensive to
    run it was a cycling unit. . . . The capacity at which a plant operates is a function of its status as
    baseload or cycling, not the other way around.").
    13
    Case: 11-12168     Date Filed: 09/19/2013   Page: 14 of 28
    estimate such emissions from so-called "cycling" units, which are "operated on a
    regular or fairly regular basis, but not continuously." Cinergy Corp., 
    623 F.3d at 459-60
    .
    In Cinergy Corp., the Seventh Circuit held that expert testimony similar to
    that provided by Mr. Koppe and Dr. Sahu could not reliably predict how
    modifications would affect the generation of electricity and, consequently,
    emissions for cycling facilities.   See 
    id.
        The Seventh Circuit noted that the
    "formula" before it carried a presumption of reliability when estimating a baseload
    unit's emissions, but concluded that such a presumption was not valid for a cycling
    unit. See 
    id. at 460
     ("There can be no presumption that an increase in [a cycling
    plant's] annual capacity would result in a proportionately equal increase in its
    output . . . In contrast, if a baseload plant is modified to enable it to produce more
    electricity, there is a presumption that it will produce at the higher rate enabled by
    the modification").
    "The rules relating to Daubert issues are not precisely calibrated and must be
    applied in case-specific evidentiary circumstances that often defy generalization."
    United States v. Brown, 
    415 F.3d 1257
    , 1266 (11th Cir. 2005). Assuming that
    Cinergy Corp. is persuasive, the district court misconstrued the reach of the
    Seventh Circuit's decision. Simply because a model cannot be presumed reliable in
    a specific context, as Cinergy Corp. held, does not mean that it is per se unreliable
    14
    Case: 11-12168     Date Filed: 09/19/2013    Page: 15 of 28
    in that context. The district court therefore erred in ruling that under Cinergy
    Corp. the Koppe-Sahu model is "reliable only when used with 'baseload' electric
    generating units" and "works only if the unit is operated as a baseload unit."
    Alabama Power I, 773 F. Supp. 2d at 1256.
    What the Seventh Circuit actually held in Cinergy Corp. is that testimony
    like the Koppe-Sahu methodology "doesn't work for a cycling facility . . . [w]ithout
    expert testimony to support an estimate of actual emissions caused by the
    modifications." Cinergy Corp., 
    623 F.3d at 460
     (emphasis added). Although the
    government lacked sufficient expert testimony to support the use of its theory in
    Cinergy Corp., here it submitted ample evidence to support the Koppe-Sahu
    model.
    At the Daubert hearing, Mr. Koppe testified that the model was robust
    enough to predict emission increases for either cycling or baseload units. See D.E.
    370 at 44:23-25. The model, according to Mr. Koppe, would be valid for cycling
    units so long as three underlying conditions were satisfied: (1) that the unit,
    assuming the modification provides additional hours of unit availability, will
    actually use the additional available hours; (2) that the unit will not spend more
    time in reserve shutdown in the future that it did in the past; and (3) that the output
    factor for the unit will not decrease. Id. at 43:10-15. Mr. Koppe affirmed that each
    15
    Case: 11-12168     Date Filed: 09/19/2013    Page: 16 of 28
    of the three relevant units, based on his review and analysis, satisfied these
    conditions. See id. at 44:18-22.
    The district court rejected the applicability of these conditions because of an
    ostensible lack of supporting evidence. See Alabama Power I, 773 F.Supp.2d at
    1259 n.14 ("Daubert does not permit the Court to admit opinion evidence which is
    connected to existing data only by the ipse dixit of the expert").6 The district
    court's finding about the lack of evidentiary support for the conditions, however,
    was clearly erroneous. As the excerpts below show, Mr. Koppe's assertions about
    the satisfaction of the conditions were not mere ipse dixit, and we are left with a
    “definite and firm conviction that a mistake has been committed.” Concrete Pipe
    and Products of California, Inc. v. Const. Laborers Pension Trust for Southern
    California, 
    508 U.S. 602
    , 622 (1993) (internal quotation marks and citation
    omitted).
    (1) EVIDENCE THAT THE UNITS WOULD LIKELY USE EXTRA AVAILABILITY POST-
    PROJECT
    • There are a number of things I quote that talk about we're [i.e.,
    Alabama Power] going to be using this unit more in the future but the
    main thing is the projections that are in the worth of unit improvement
    books, which are the projections of capacity factors that are all
    consistent with rising utilization and little or no reserve shutdown.
    Koppe Deposition, D.E. 321-5 at 294:16-22.
    6
    Generally speaking, an ipse dixit is "[s]omething asserted but not proved." BLACK'S LAW
    DICTIONARY 905 (9th ed. 2009).
    16
    Case: 11-12168     Date Filed: 09/19/2013    Page: 17 of 28
    • Alabama Power knew that increasing the EAF [Equivalent
    Availability Factor, i.e., availability] of a unit would increase the
    amount of electricity that unit generated. This principle is implicit in
    the methodology used in Alabama Power's Worth of Unit
    Improvement books to assess the 'worth' of a one percent reduction in
    a unit's EFOR [Effective Forced Outage Rate, i.e., outages]. Koppe
    Expert Report, D.E. 321-4 at 6.
    • Former Alabama Power employee Joseph Tyner testified that if
    Alabama Power increased the availability of Gorgas 10 as a result of
    balanced-draft conversion, he would expect that it would generate
    more megawatts. 
    Id.
     (alterations in original omitted).
    • At the time of each project, the Company expected that any
    incremental reduction in the amount of outage time at a unit would
    result in an incremental increase in generation by that unit. This
    expectation is realistic. It is shared by every utility… It is embedded
    in the system planning models used by the Company. It is implicit in
    the Company's Worth of Unit Improvement Books. And it was
    confirmed by the Company's representative, Mr. Lucius Burris, during
    his Rule 30(b)(6) deposition. Koppe Amended Rebuttal Report, D.E.
    321-2 at 3.
    • At the time of the project, Gorgas 10 was the most heavily utilized
    of all of the Company's coal units. This means that Gorgas 10 was
    one of the least expensive units to operate. The Company would
    reduce utilization of other, more expensive, units before reducing that
    of Gorgas 10. Id. at 33 (citation omitted).
    • The [Greene County 2 and Barry 2] projects . . . all took place
    during 1989 through 1997. This was a time when the Company and
    the industry were expecting increases in the utilization of coal units.
    Given the situation at the times of these projects, it is unlikely that the
    17
    Case: 11-12168     Date Filed: 09/19/2013   Page: 18 of 28
    Company would have expected that utilization of any of the units
    would decrease. Id.
    • I found the projections that were presented in the Worth of Unit
    Improvement Book (WUIB) that the Company issued during the
    calendar year during which the project was implemented. For each
    unit, the WUIB presents . . . the expected future service hours for each
    unit for each calendar year in the future. For each project, I looked at
    the company's forecasts for the five calendar years immediately
    following the year in which the project was implemented. Id.
    • In order for [Greene County 2] unit to meet its expected load
    demands in the upcoming years, these sections [i.e., the reheater] will
    require replacement. Alabama Power Company Supporting Statement
    for Greene County 2 Project, D.E. 321-9.
    (2) EVIDENCE THAT THE UNITS WERE NOT PLANNED TO EXPERIENCE MORE
    RESERVE SHUTDOWN TIME
    • In the early 1980s, [the Company's] units spent some time in reserve
    shutdown. During 1982-1983, the amount of time in reserve shutdown
    ranged from a low of 14 days per year (at Gorgas 10) to a high of 107
    days per year (at Greene County 2). The amount of time the units
    spent in reserve shutdown generally decreased through the 1980s, then
    spiked during 1989-1991, then decreased through the 1990s. During
    the late 1990s, the [Alabama Power] units each spent no time, or only
    minimal amounts of time, in reserve shutdown. Koppe Expert Report,
    D.E. 321-4 at 22.
    • [For Gorgas 10 and Greene County 2, each] unit had spent little time
    in reserve shutdown pre-project and the Company [according to
    forecasts prepared by Alabama Power] expected the same post-
    project. For [Barry Unit 2], the unit had spent a considerable amount
    of time in reserve shutdown pre-project. However, the Company
    forecast that [Barry Unit 2] would spend little or no time in reserve
    18
    Case: 11-12168     Date Filed: 09/19/2013    Page: 19 of 28
    shutdown post-project. Koppe Amended Rebuttal Report, D.E. 321-2
    at 23.
    • For each project, the data [from the Company's documents] indicate
    that the Company expected little or no reserve shutdown at each of the
    affected units post-project. Id. at 35.
    (3) EVIDENCE THAT EACH UNIT'S OUTPUT FACTOR WOULD NOT DECREASE
    • The output factors for the [ ] Alabama Power units increased through
    the 1980s, decreased during 1989-1991, and then increased through
    the 1990s. By the late 1990s, each of the five units was operating
    with an output factor in the range of 90 to 93%. Koppe Expert
    Report, D.E. 321-4 at 22.
    • Over time, it was expected that each of the units would be
    'committed' more often and, when they were run on line, run at higher
    output levels. Koppe Amended Rebuttal Report, D.E. 321-2 at n.3
    (quoting Report of Alabama Power's Expert, D. Wayne Moore, D.E.
    318-1 at 19).
    • For each project, I looked at the company's forecasts for the five
    calendar years immediately following the year in which the project
    was implemented. Using those data, I calculated the average expected
    post-project values of the CF [capacity factor] and the OF [output
    factor]. I used the GADS data for the 60 months preceding each
    project to calculate the average actual pre-project values of the CF and
    the OF. . . . [based on these calculations] the Company expected
    substantial increases in both the Output Factor and Capacity Factor of
    the affected unit. Id. at 33-35.
    • Based on those data [i.e., Alabama Power's own pre-project
    evaluation], I calculated the expected post-project output factor for the
    unit [Gorgas Unit 10] [based on information from [Alabama Power's]
    19
    Case: 11-12168    Date Filed: 09/19/2013   Page: 20 of 28
    own pre-project evaluation]. This was larger than the actual pre-
    project output factor. Id. at 33.
    In sum, there was a sufficient evidentiary basis under Rule 702 – including
    Alabama Power's own records and predictions – to support Mr. Koppe's assertions
    that the three initial conditions were satisfied and that the Koppe-Sahu
    methodology applied to Barry Unit 2, Greene County Unit 2, and Gorgas Unit 10,
    even if those units are deemed cycling rather than baseload.          Cf. Louisiana
    Generating, 
    2012 WL 1676706
    , at *4 ("Cinergy is not controlling on this court, of
    course, and the court finds that the failure of La-Gen to seriously contend there is
    another source of power to satisfy its baseload demand is all the court needs to
    determine that the units in question are baseload units. As such, the Sahu/Koppe
    methodology is reliable under Daubert and the rules of evidence for forecasting
    emissions under the PSD program.").
    C
    The district court was also critical of the rigor of the evaluation performed
    by Mr. Koppe because he admitted that, if any of the units in question spent a lot of
    time on reserve shutdown, he would have to conduct further investigation to
    determine whether the three conditions had been met. Given this admission, the
    district court believed that it could not rely on the assertion by Mr. Koppe that he
    had conducted sufficient investigation to determine whether the conditions had in
    20
    Case: 11-12168       Date Filed: 09/19/2013      Page: 21 of 28
    fact been satisfied. See Alabama Power I, 773 F. Supp. 2d at 1259 n.13. But Mr.
    Koppe's admission was largely irrelevant, and did not support wholesale exclusion
    of the Koppe-Sahu model, for the district court itself found (or noted without
    contradiction in the record) that the three units spent little time on reserve
    shutdown.7
    Alabama Power may have a number of reasons why the Koppe-
    Sahu methodology should not be accepted as persuasive at trial, but it offers no
    persuasive argument to support the notion that Daubert and its progeny require all-
    out exclusion of the expert testimony of Mr. Koppe and Dr. Sahu prior to trial.
    That the Koppe-Sahu model always predicts an increase in pollutant emissions as a
    result of increased unit availability is not a fatal Daubert flaw, as Alabama Power
    suggests, but rather a natural outcome of the model's deterministic nature.
    Although a court may certainly evaluate the mathematical rigor of a model, the
    possible existence of a more thorough, more complex model is not a basis for
    wholesale exclusion. See Allison, 
    184 F.3d at 1311-12
    .
    V
    We affirm the district court's striking of the additional statements and
    calculations contained in Dr. Sahu’s supplemental declaration in Alabama Power
    7
    In contrast, Cinergy Corp.concerned a "low-utilization" unit that apparently spent a lot of time
    on reserve shutdown. See 
    623 F.3d at 460
    .
    21
    Case: 11-12168    Date Filed: 09/19/2013   Page: 22 of 28
    II, reverse the district court's exclusion of the expert testimony of Mr. Koppe and
    Dr. Sahu in Alabama Power I, vacate the judgment in favor of Alabama Power,
    and remand for further proceedings.
    AFFIRMED IN PART, REVERSED IN PART, VACATED, AND REMANDED.
    22
    Case: 11-12168        Date Filed: 09/19/2013        Page: 23 of 28
    HODGES, District Judge, dissenting:
    Technical skill and effectiveness is best demonstrated by the ability to
    isolate, simplify, and analyze the individual components of complex problems.
    Precision and brevity in doing so are the hallmarks of excellence. Judge Jordan’s
    opinion for the court reflects those qualities in cogently explaining the regulatory
    scheme and technical background that produces the Daubert issue to be decided on
    this appeal. I dissent, with utmost respect, only from the ultimate conclusion
    reversing the district court’s ruling on the Daubert issue excluding the expert
    testimony of Mr. Koppe and Dr. Sahu. My specific disagreement relates to the
    court’s application of the governing standard of review – abuse of discretion –
    under which I would affirm the district court in all respect.1
    As I understand the abuse of discretion standard, particularly as applied to
    Daubert issues of admissibility of expert opinion under Fed. R. Evid. 702, the
    district court has a “range of choice.” United States v. Brown, 
    415 F.3d 1257
    ,
    1
    In Joiner v. General Elec. Co., 
    78 F.3d 524
     (11th Cir. 1996) this court recognized the general
    rule that evidentiary rulings are reviewed for abuse of discretion; but, the court said, relying upon
    Daubert, “[b]ecause the Federal Rules of Evidence governing expert testimony display a
    preference for admissibility, we apply a particularly stringent standard of review to the trial
    judge’s exclusion of expert testimony.” 
    Id. at 529
    . The Supreme Court reversed, holding that
    abuse of discretion was the proper standard of review and that “[a] court of appeals applying
    ‘abuse-of-discretion’ review to such rulings may not categorically distinguish between rulings
    allowing expert testimony and rulings disallowing it.” General Elec. Co. v. Joiner, 
    522 U.S. 136
    , 142, 
    118 S. Ct. 512
    , 517 (1997). The Supreme Court also held that the outcome
    determinative effect of the evidentiary ruling by the district court does not affect the abuse of
    discretion standard of review. 
    Id. at 143
    . 
    118 S. Ct. at 517
    . See also Kumho Tire Co., Ltd. v.
    Carmichael, 
    526 U.S. 137
    , 142, 
    119 S. Ct. 1167
    , 1171 (1999).
    23
    Case: 11-12168      Date Filed: 09/19/2013    Page: 24 of 28
    1265 (11th Cir. 2005) (citing Rasbury v. Internal Revenue Serv. (In re Rasbury), 
    24 F.3d 159
    , 168 (11th Cir. 1994)). “[U]nder the abuse of discretion standard of
    review there will be occasions in which we affirm the district court even though we
    would have gone the other way had it been our call.” 2 Rasbury, 
    24 F.3d at 168
    .
    Further, “[w]hat is true about the review of evidentiary issues in general applies
    with equal or even greater force to Daubert issues in particular, an area where the
    abuse of discretion standard thrives.” Brown, 
    415 F.3d at 1265-66
    . It is an area
    that involves, to quote Chief Judge Carnes’ metaphor, a “heavy thumb – really a
    thumb and a finger or two – that is put on the district court’s side of the scale. . . .”
    
    Id. at 1268
    . See also Kirkpatrick v. Breg, Inc., 
    613 F. 3d 1329
    , 1344 (11th Cir.
    2010). That deference to the district court regarding Daubert evidentiary rulings is
    not idle dicta is established by research disclosing that, in the last five years, there
    have been 54 reported decisions of this court (13 published opinions and 41
    unpublished opinions) reviewing district court evidentiary rulings under Daubert,
    and the district court was reversed in only three of those cases. This does not
    mean, of course, that Daubert rulings in the district courts are altogether
    unreviewable, see Brown, 
    415 F.3d at 1266
    , but the rarity of reversals does signify
    an awareness that when it comes to managing the gate at Fed. R. Evid. 702, both
    2
    Research discloses that this passage in Rasbury has been quoted in other Eleventh Circuit
    opinions no less than 45 times.
    24
    Case: 11-12168    Date Filed: 09/19/2013   Page: 25 of 28
    this court and the Supreme Court have consistently emphasized the need to defer to
    the district court’s discretionary gatekeeping decisions under Fed. R. Evid. 702
    including, in particular, decisions involving reliability determinations. “[T]he law
    grants a district court the same broad latitude when it decides how to determine
    reliability as it enjoys in respect to its ultimate reliability determination.” Kumho
    Tire Company, Ltd., 
    526 U.S. at 142
    , 
    119 S. Ct. at
    1171 (citing Joiner, 
    522 U.S. at 143
    , 
    118 S. Ct. at 517
    ).
    The district court heard testimony that electrical generating facilities are
    generally referred to as either baseload or cycling in character. Mr. Koppe testified
    that the term “baseload” means that the facility is one that is operated continuously
    when available. 773 F.Supp.2d at 1257, n. 8. A “cycling” unit is one that is used
    at different levels intermittently depending upon the peaks and valleys of demand.
    With respect to baseload units, Mr. Koppe testified that his method of calculating
    increased output (and, ultimately, increased emissions) can be applied as a “no
    brainer” to baseload units “because the units are used [by definition] all the time
    when available.” See D.E. 370, p. 44. With respect to cycling units, however, Mr.
    Koppe testified that in order to properly apply his method, particularized
    investigation would be required concerning three anticipated conditions:
    THE WITNESS: Yes. There are a couple of
    different ways to look at it. I could count it as two or
    three. I’m trying to think of the easiest way to say it.
    25
    Case: 11-12168     Date Filed: 09/19/2013    Page: 26 of 28
    You need to – you need to conclude that, one, they
    will actually use the additional available hours. We said
    that. The second is that the unit won’t spend more time
    in reserve shutdown in the future than it did in the past.
    And then the third thing is that the output factor for the
    unit won’t decrease.
    Now, both of those – those second – the second
    and third thing would both be consequences of needing
    the unit less. They’re just different parts of the
    consequences of needing the unit less. (D.E. 370, p. 43).
    Later during the hearing the district court questioned Mr. Koppe about his
    investigation of those three factors with respect to the remaining units in dispute:
    THE COURT: Okay. Did you or anyone – that
    would, I guess, be Dr. Sahu – do the three areas of
    investigation that you did for Wabash projects [in the
    Cinergy case] for any of the three units at issue in this
    case?
    THE WITNESS: Yes. I did it for all three.
    THE COURT: You did those three areas of
    investigation even though they were baseload plants?
    THE WITNESS: Yes. The investigation was very
    easy in some cases. For example, because they’re
    baseload plants, because they operate for every hour
    when they’re available, then the – it is a fact that if they
    are available for more hours, they will run for more
    hours.
    THE COURT: So you didn’t go – well, then that’s
    not – it sounds to me like you investigated far enough to
    determine that an investigation was not – further
    investigation was not necessary.
    26
    Case: 11-12168     Date Filed: 09/19/2013    Page: 27 of 28
    THE WITNESS: That’s correct. And with respect
    to the reserve shutdown, that was easy. With respect to
    the output factor, as I said, I looked at a whole bunch of
    different things, including the company’s own
    projections that the output factors were going to increase.
    And obviously, if they’re going to increase, they’re not
    going to decrease.
    THE COURT: But if the plants had been cycling,
    would you have done more investigation in any of these
    three areas that you identified that you had to do in the
    less easy or more complicated Wabash situation?
    THE WITNESS: Yes.
    THE COURT: Okay. If the plants had been
    cycling, you would have done more investigation in at
    least one of these three areas?
    THE WITNESS: Yes.
    THE COURT: Okay. Thank you. Thank you.
    (D.E. 370, pp. 67-68).
    In its decision the district court concluded that each of the three facilities in
    issue (Barry Unit 2, Greene County Unit 2 and Gorgas Unit 10) were not baseload
    units and, therefore, that the Koppe/Sahu method of determining increased
    emissions could not reliably be applied, according to Mr. Koppe’s own admission,
    absent additional investigation concerning the assumptions upon which the method
    rested. On this record, in my view, that conclusion was within the “range of
    choice” available to the district court in its discretion. Or, stated another way, the
    choice it made was not a clear error in judgment.
    27
    Case: 11-12168    Date Filed: 09/19/2013   Page: 28 of 28
    The majority opinion makes the best case possible for a contrary result based
    upon other evidence upon which the district court might have relied in reaching
    that result. And, indeed, if this appeal involved error correction on de novo
    review, a reversal might well be the appropriate result. But applying the abuse of
    discretion standard, I believe the district court is due to be affirmed. As the
    Supreme Court noted in Daubert itself:
    We recognize that, in practice, a gatekeeping role for the
    judge, no matter how flexible, inevitably on occasion will
    prevent the jury from learning of authentic insights and
    innovations. That, nevertheless, is the balance that is
    struck by Rules of Evidence designed not for the
    exhaustive search for cosmic understanding but for the
    particularized resolution of legal disputes.
    Daubert v. Merrell Dow Pharmaceuticals Inc., 
    509 U.S. 579
    , 597, 
    113 S. Ct. 2786
    ,
    2798-99 (1993).
    28