Confer v. Murphy Oil Corp ( 1998 )


Menu:
  •                     UNITED STATES COURT OF APPEALS
    FOR THE FIFTH CIRCUIT
    ____________________
    No. 98-60116
    Summary Calendar
    ____________________
    EDWARD LEE CONFER,
    Plaintiff-Appellant,
    versus
    MURPHY OIL CORPORATION,
    Defendant-Appellee.
    Appeal from the United States District Court
    for the Southern District of Mississippi
    (2:96-CV-84-PG)
    August 19, 1998
    Before KING, BARKSDALE, and STEWART, Circuit Judges.
    PER CURIAM:*
    Edward Lee Confer appeals the summary judgment awarded Murphy
    Oil Corporation, dismissing his Jones Act and general maritime law
    claims.    We AFFIRM.
    Confer was employed by Murphy Oil as a mechanic, assigned to
    the MR. GUS II, which was originally built and used as a jack-up
    drill rig.     In 1984, the MR. GUS II was outfitted as a production
    platform, with, inter alia, all of the drilling equipment being
    removed.   In 1989, the MR. GUS II was moved to its present location
    in the Gulf of Mexico; its jacking system was disabled to prevent
    *
    Pursuant to 5TH CIR. R. 47.5, the Court has determined
    that this opinion should not be published and is not precedent
    except under the limited circumstances set forth in 5TH CIR. R.
    47.5.4.
    inadvertent movement and secured to the ocean floor by sand bags.
    Confer was injured aboard the MR. GUS II in 1995, when he slipped
    and fell while answering an alarm. Consequently, Confer filed this
    action pursuant to the Jones Act, 
    46 U.S.C. § 688
    , and general
    maritime law.
    Murphy Oil moved for summary judgment, contending that Confer
    failed to meet the prerequisites for coverage under the Jones Act
    because he was not permanently assigned to a vessel in navigation.
    The district court agreed, holding that, on the date of Confer’s
    injury, the MR. GUS II was not a vessel as required by the Jones
    Act.
    Confer contends the district court erred in granting summary
    judgment because the MR. GUS II is a vessel, and that in any event,
    he was permanently assigned as the seaman operating the life boat
    of the MR. GUS II, which was itself a vessel, thus entitling him to
    seaman’s status.
    Needless to say, we review a grant of summary judgment de
    novo, applying the same standard as the district court.   See Little
    v. Liquid Air Corp., 
    37 F.3d 1069
    , 1075 (5th Cir. 1994).    Summary
    Judgment is proper where there is no material fact issue, and the
    movant is entitled to judgment as a matter of law.     Id.; see FED.
    R. CIV. P. 56(c).
    Moreover, we review Confer’s contention that he was a seaman
    assigned to the lifeboat of the MR. GUS II for plain error, due to
    his failure to properly raise the issue in the district court.   See
    Douglass v. United Servs. Auto. Ass’n, 
    79 F.3d 1415
    , 1424 (5th Cir.
    - 2 -
    1996)(en banc); Highlands Ins. Co. v. National Union Fire Ins. Co.,
    
    27 F.3d 1027
    , 1031-32 (5th Cir. 1994), cert. denied, 
    513 U.S. 1112
    (1995).
    Having reviewed the record, and the briefs of the parties, we
    find no error, plain or otherwise, and AFFIRM the summary judgment,
    for essentially the same reasons stated by the district court.   See
    Confer v. Murphy Oil Corp., No. 2:96-CV-84-PG, slip op. at 8 (S.D.
    Miss. Fed. 28, 1997).
    AFFIRMED