Jason Grab v. Boh Brothers Construction Co. , 506 F. App'x 271 ( 2013 )


Menu:
  •    Case: 11-30606    Document: 00512102131   Page: 1   Date Filed: 01/04/2013
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE FIFTH CIRCUIT  United States Court of Appeals
    Fifth Circuit
    FILED
    January 4, 2013
    No. 11-30606                   Lyle W. Cayce
    Clerk
    JASON GRAB, et al., Plaintiffs
    v.
    BOH BROTHERS CONSTRUCTION COMPANY, L.L.C., et al., Defendants
    JACOB KINCHEN, Plaintiff – Appellee Cross-Appellant, and
    WENDY KINCHEN, Plaintiff – Cross-Appellant
    v.
    TRAYLOR BROTHERS, INC., KIEWET SOUTHERN COMPANY &
    MASSMAN CONSTRUCTION COMPANY, a Joint Venture, Defendant –
    Cross-Appellee, and BOH BROTHERS CONSTRUCTION COMPANY, L.L.C.,
    Defendant – Appellant Cross-Appellee
    LARY SCOTT ABSHIRE, individually and on behalf of his minor child,
    Kinley Lyric-Grace Abshire, Plaintiff – Appellee Cross-Appellant
    v.
    TRAYLOR BROTHERS, INC., KIEWET SOUTHERN COMPANY &
    MASSMAN CONSTRUCTION COMPANY, A Joint Venture, Defendant –
    Cross-Appellee, and BOH BROTHERS CONSTRUCTION COMPANY, L.L.C.,
    Defendant – Appellant Cross-Appellee
    CONSOLIDATED WITH No. 11-30999
    JASON GRAB, Plaintiff
    v.
    BOH BROTHERS CONSTRUCTION COMPANY, L.L.C., Intervenor-
    Appellant, and BOH BROTHERS CONSTRUCTION COMPANY, L.L.C.,
    Defendant-Appellant
    JACOB KINCHEN, Plaintiff-Appellee
    v.
    BOH BROTHERS CONSTRUCTION COMPANY, L.L.C., Defendant-
    Appellant
    Case: 11-30606       Document: 00512102131         Page: 2     Date Filed: 01/04/2013
    LARY SCOTT ABSHIRE, individually and on behalf of his minor child,
    Kinley Lyric-Grace Abshire, Plaintiff-Appellee
    v.
    BOH BROTHERS CONSTRUCTION COMPANY, L.L.C., Defendant-
    Appellant
    Appeals from the United States District Court
    for the Eastern District of Louisiana
    Nos. 2:09-CV-3439; 2:09-CV-4128; 2:10-CV-838
    Before DAVIS, JONES, and SMITH, Circuit Judges.
    PER CURIAM:*
    Plaintiff-Appellees are two ironworkers who were severely injured in the
    course of the reconstruction of the Interstate-10 twin span bridge across Lake
    Pontchartrain. The appellees performed part of their work from a derrick barge,
    the BIG MAC, and part of their work from the bridge structure. The district
    court determined one employee to be a seaman on summary judgment, and
    determined the other employee to be a seaman after a bench trial. Because the
    record supports the district court’s conclusion that the appellees contributed to
    the mission of the BIG MAC and had a connection to it which is substantial in
    terms of nature and duration, we AFFIRM the judgment based on the district
    court’s conclusion that both men are seamen under the Jones Act.
    I.
    In 2008, Boh Brothers Construction Company, L.L.C. (“Boh Brothers”);
    and Traylor Brothers, Inc., Kiewet Southern Co., and Massman Construction
    Co., a Joint Venture (“the Joint Venture”); were jointly engaged in the
    *
    Pursuant to 5TH CIR. R. 47.5, the court has determined that this opinion should not
    be published and is not precedent except under the limited circumstances set forth in 5TH CIR.
    R. 47.5.4.
    2
    Case: 11-30606      Document: 00512102131    Page: 3   Date Filed: 01/04/2013
    construction of the new Interstate-10 twin span bridge across Lake
    Pontchartrain, connecting New Orleans with Slidell, Louisiana. Boh Brothers
    received the contract to construct the approaches of the new bridge, while the
    Joint Venture received the contract to construct the high-rise portions of the new
    bridge.
    Jacob Kinchen (“Kinchen”) and Lary Scott Abshire (“Abshire”) were
    ironworkers employed by Boh Brothers to help construct the bridge. On July 3,
    2008, Kinchen and Abshire were traveling from the bridge work site to shore in
    a crew boat piloted by Kinchen when the boat allided with a Joint Venture
    survey tower in Lake Pontchartrain. The survey tower that was struck was one
    of four such towers constructed in Lake Pontchartrain to ensure the proper
    construction of the bridge. The tower stood seven to nine feet above the water,
    measured 42 inches across at its base and 24 inches across at its top, and was
    capped with a white navigational light. At the time of the accident, Kinchen’s
    vision was partially obstructed by two large tires that a Boh Brothers supervisor
    had placed on the front of the boat. Kinchen and Abshire sustained severe
    injuries as a result of the allision.
    At the time of the accident, Kinchen was employed by Boh Brothers as an
    ironworker foreman and headed a crew that was responsible for placing the
    girders on the bridge. Abshire was assigned as an ironworker in Kinchen’s crew,
    and the day of the accident was Abshire’s first day of employment. Both
    employees were land-based and traveled daily to and from the work site by
    crewboat. Kinchen and his crew operated from a large crane barge, the BIG
    MAC, which was used to lift the girders and materials and support the crew
    necessary to construct the bridge. The ironworker crew was responsible for
    erecting work platforms around bridge pilings, setting caps on the pilings,
    setting pads, and setting the bridge girders. Abshire and Kinchen, as members
    of the ironworker crew, were also responsible for assisting in the navigation of
    3
    Case: 11-30606     Document: 00512102131      Page: 4   Date Filed: 01/04/2013
    the BIG MAC from one work station to another. Although the barge remained
    stationary most of the time, it was necessary to routinely move the barge, with
    the aid of a tugboat, along the length of the bridge as work progressed and away
    from the bridge at the end of each day.
    Following the accident, Kinchen and Abshire brought suit against Boh
    Brothers and the Joint Venture, each alleging that as seamen, they were entitled
    to recover damages under the Jones Act and general maritime law. The trial
    court granted summary judgment in Kinchen’s favor on the issue of seaman
    status. Specifically, the court found that the evidence established that Kinchen
    contributed to the bridge-construction function of the BIG MAC, that he spent
    30–95% of his time aboard the barge, that he was partially responsible for
    assisting with the navigation and maintenance of the barge, and that his work
    sufficiently exposed him to traditional maritime perils.
    Because Abshire was injured his first day on the job, the district court
    denied his summary judgment motion on seaman status and proceeded to a
    bench trial on this issue. After the bench trial, the district court concluded that
    Abshire was also a seaman. It found that the testimony established that
    Abshire’s prospective employment with Boh Brothers would have required him
    to assist in the mission of the BIG MAC, spend at least 30% of his time aboard
    the barge, assist with its navigation and maintenance, and sufficiently expose
    him to traditional maritime perils on Lake Pontchartrain.
    In its findings of fact, the district court also apportioned fault for the
    accident 50% to Kinchen and 50% to Boh Brothers, with no fault being allocated
    to Abshire or the Joint Venture. Specifically, the court found that Boh Brothers
    negligently placed the tires on the crew boat in a manner that would obscure the
    pilot’s view, and that Kinchen was not attentive while piloting the boat knowing
    that he was in a construction zone and that his vision was obstructed. The
    4
    Case: 11-30606     Document: 00512102131      Page: 5    Date Filed: 01/04/2013
    district court awarded Abshire general damages of $1,325,000 and Kinchen
    general damages of $900,000, subject to a reduction for his comparative fault.
    II.
    We review an order granting a motion for summary judgment de novo.
    Storebrand Ins. Co. U.K., Ltd. v. Emp’rs Ins. of Wausau, 
    139 F.3d 1052
    , 1055
    (5th Cir. 1998). Summary judgment is warranted when the pleadings,
    depositions, interrogatories, and admissions on file, together with the affidavits,
    if any, show that there is no genuine issue as to any material fact. FED. R. CIV.
    P. 56; Celotex v. Catrett, 
    477 U.S. 317
    , 322 (1986). In contrast, we review a
    district court’s findings of fact for clear error and its legal conclusions de novo.
    Klamath Strategic Inv. Fund v. United States, 
    568 F.3d 537
    , 543 (5th Cir. 2009).
    III.
    Boh Brothers first argues that the district court erred in its determination
    that Kinchen and Abshire were “seamen” entitled to the protections of the Jones
    Act. To qualify as a seaman, first “an employee’s duties must ‘contribute to the
    function of the vessel or to the accomplishment of its mission.’” Chandris, Inc.
    v. Latsis, 
    515 U.S. 347
    , 368 (1995) (quoting McDermott Int’l., Inc. v. Wilander,
    
    498 U.S. 337
    , 355 (1991)). Second, “a seaman must have a connection to a vessel
    . . . that is substantial in terms of both its duration and its nature.” 
    Id. (emphasis added). “The
    duration of a worker’s connection to a vessel and the
    nature of the worker’s activities, taken together, determine whether a maritime
    employee is a seaman because the ultimate inquiry is whether the worker in
    question is a member of the vessel’s crew or simply a land-based employee who
    happens to be working on the vessel at a given time.” 
    Id. at 370. As
    an initial matter, there can be little doubt that both Kinchen and
    Abshire satisfy the first prong of the Chandris seaman test. It is undisputed that
    the BIG MAC is a vessel in navigation, and that Kinchen and Abshire’s primary
    responsibility was to assist in the accomplishment of the vessel’s purpose: the
    5
    Case: 11-30606     Document: 00512102131    Page: 6   Date Filed: 01/04/2013
    assembly of the Pontchartrain bridge. See In re Endeavor Marine Inc., 
    234 F.3d 287
    , 290 (5th Cir. 2000) (“To satisfy the first prong of the Chandris test, the
    claimant need only show that he/she does the ship’s work.” (internal quotation
    marks omitted)).
    However, Boh Brothers disputes the district court’s conclusion that
    Kinchen and Abshire have satisfied the second prong of the Chandris test and
    that they each have a connection to the BIG MAC which is substantial in both
    nature and duration.
    A.
    Boh Brothers argues first that Kinchen is not a seaman and asks us to
    reverse the district court’s grant of summary judgment to the contrary. The
    question of seaman status is a mixed question of law and fact, but may rightfully
    be determined on summary judgment where the underlying facts are
    uncontroverted and “the only rational inference to be drawn from the evidence
    is that the worker [is] a seaman.” Beard v. Shell Oil Co., 
    606 F.2d 515
    , 517 (5th
    Cir. 1979); see 
    Chandris, 515 U.S. at 369
    .
    Boh Brothers argues primarily that Kinchen cannot satisfy the second
    Chandris prong because Kinchen is a land-based worker whose job does not
    regularly expose him to the “perils of the sea.” As Boh Brothers correctly points
    out, the primary purpose of this inquiry is to separate those “sea-based maritime
    employees . . . from those land-based workers who have only a transitory or
    sporadic connection to a vessel.” 
    Chandris, 515 U.S. at 368
    ; see also In re
    Endeavor Marine Inc., 
    234 F.3d 287
    .
    More importantly, Boh Brothers’s argument ignores the Supreme Court’s
    articulation of the relevant inquiry: whether Kinchen’s connection to the BIG
    MAC is “substantial in terms of both its duration and its nature.” 
    Chandris, 515 U.S. at 355
    . The weight of the evidence is that Kinchen, as an ironworker
    foreman, spent a substantial portion of his time on the BIG MAC, which moved
    6
    Case: 11-30606        Document: 00512102131          Page: 7     Date Filed: 01/04/2013
    around the work site transporting and supporting men and materials to
    construct portions of the bridge. As to the nature of Kinchen’s work, all of
    Kinchen’s substantial time aboard the BIG MAC was devoted to the furtherance
    and supervision of the crane barge’s objective, the construction of the
    Pontchartrain bridge. Kinchen was cross-trained to perform a variety of tasks
    related to the maintenance and function of the barge. Moreover, the fact that
    Kinchen returned home daily did not remove him from his exposure to
    cognizable dangers of the sea.1 Nor does the classification of Kinchen as a bridge
    ironworker, a traditionally land-based occupation, serve to negate the seaman
    status to which Kinchen would otherwise be entitled by virtue of his connection
    to the BIG MAC. See Sw. Marine, Inc. v. Gizoni, 
    502 U.S. 81
    , 89 (1991).2
    This Court’s decision in In re Endeavor Marine also supports the
    conclusion that Kinchen is a seaman. 
    234 F.3d 287
    . In that case, we considered
    whether a derrick barge’s crane operator satisfied the Chandris test and
    qualified as a seaman. The injured crane operator worked on a barge in the
    Mississippi River and was responsible for unloading cargo from other vessels at
    the port. 
    Id. at 289. Like
    Kinchen, the crane operator in In re Endeavor Marine
    performed a traditionally land-based job which never carried him beyond the
    immediate vicinity of the port where he was assigned. See 
    id. In reaching the
    conclusion that the crane operator was a seaman, we rejected the district court’s
    reasoning that an employee could not be a seaman if “his duties do not literally
    1
    See Stewart v. Dutra Constr. Co., 
    543 U.S. 481
    , 497 (2005) (“[I]t seems a stretch of the
    imagination to class the deck hands of a mud dredge in the quiet waters of a Potomac creek
    with the bold and skillful mariners who breast the angry waves of the Atlantic; but such and
    so far-reaching are the principles which underlie the jurisdiction of the courts of admiralty
    that they adapt themselves to all the new kinds of property and new sets of operatives and
    new conditions which are brought into existence in the progress of the world.” (quoting Saylor
    v. Taylor, 
    77 F. 476
    , 479 (4th Cir. 1896)).
    2
    “It is not the employee’s particular job that is determinative, but the employee’s
    connection to a vessel.” Sw. 
    Marine, 502 U.S. at 89
    (quoting 
    Wilander, 498 U.S. at 354
    ).
    7
    Case: 11-30606       Document: 00512102131         Page: 8    Date Filed: 01/04/2013
    carry him to sea.” 
    Id. at 292. Because
    the nature of the crane operator’s duties
    revolved around the largely stationary crane barge which remained exposed to
    maritime perils, we found that the crane operator was a seaman as a matter of
    law. 
    Id. Kinchen’s maritime connection
    to the BIG MAC is indistinguishable from
    the crane operator’s comparable connection in In re Endeavor Marine. Because
    his connection to the BIG MAC was substantial in both duration and nature,
    Kinchen qualifies as a seaman.
    B.
    Boh Brothers also argues that Abshire is not a seaman and that the
    district court erred in finding to the contrary.3 As with the question of Kinchen’s
    seaman status, the inquiry here also concerns whether Abshire had a connection
    to the BIG MAC “that is substantial in terms of both its duration and its
    nature.” 
    Chandris, 515 U.S. at 368
    .
    Beginning with the question of the nature of Abshire’s connection to the
    BIG MAC, Boh Brothers has raised the same argument that it did with respect
    to the nature of Kinchen’s connection. Our above reasoning with regard to
    Kinchen applies equally to Abshire. He therefore has the requisite connection
    to the BIG MAC that is substantial in nature.
    Abshire’s seaman status thus turns on whether he has a connection to the
    BIG MAC that is substantial in duration. Although Abshire was injured on his
    first day of work, the appropriate scope of the duration inquiry is not limited to
    the day of his injury, but should instead consider the full breadth of the intended
    scope and duties of his employment. See 
    id. at 372; Becker
    v. Tidewater, Inc.,
    
    335 F.3d 376
    , 389 (5th Cir. 2003). “If a maritime employee receives a new work
    3
    The district court determined that Abshire had satisfied the nature element on
    summary judgment, but did not conclude that he had satisfied the duration element until after
    the bench trial. We accordingly review these issues under the applicable standard of review.
    See supra section II.
    8
    Case: 11-30606       Document: 00512102131         Page: 9     Date Filed: 01/04/2013
    assignment . . . , he is entitled to have the assessment of the substantiality of his
    vessel-related work made on the basis of his activities in his new position.”
    
    Chandris, 515 U.S. at 372
    . Abshire was engaged as a full time employee on the
    Pontchartrain bridge project with the expectation that his employment was
    permanent or to extend indefinitely until the job was completed.
    Where the worker divides his time between vessel and land, an employee
    can only establish the requisite connection to a vessel—and thus qualify as a
    seaman—if he spends a substantial portion of his time in service of the vessel.
    See 
    id. at 371. This
    circuit has quantified the minimum duration of time
    necessary to qualify as “substantial” for the purpose of classifying an employee
    as a seaman: “[A]s a general rule, [a worker] must show [substantial duration]
    by demonstrating that 30 percent or more of his time is spent in service of that
    vessel.” 
    Becker, 335 F.3d at 388–89
    (quoting Roberts v. Cardinal Servs. Inc., 
    266 F.3d 368
    , 375 (5th Cir. 2001)).
    Abshire’s duties and the portion of his time he would have spent in service
    of the BIG MAC on this job were the subject of intense factual dispute at the
    bench trial. A Boh Brothers project supervisor testified that Abshire would have
    spent no more than about 20% of his time aboard the BIG MAC. However, two
    other ironworkers with similar duties to Abshire testified that 30-40% of his
    time would be spent aboard the barge. Additionally, Kinchen, who was Abshire’s
    immediate supervisor, testified that Abshire would have spent 60% of his time
    on the BIG MAC. In light of this evidence, we find no clear error in the trial
    court’s decision to credit the testimony of Abshire’s foreman and fellow
    employees. We therefore decline to disturb the trial court’s factual finding that
    Abshire would have spent at least 30% of his time aboard the BIG MAC and thus
    satisfied the duration component of the Chandris seaman test.4
    4
    Citing Federal Rule of Evidence 602, Boh Brothers argues that the district court erred
    by crediting testimony from other journeymen ironworkers and foremen although such
    9
    Case: 11-30606       Document: 00512102131         Page: 10     Date Filed: 01/04/2013
    The record therefore fully supports the district court’s finding that Abshire
    had a connection to the vessel which was substantial in duration and nature,
    and therefore was a seaman.
    C.
    Boh Brothers also challenges the $1,325,000 general damages award to
    Abshire. Because a damage award is a finding of fact, we review such awards for
    clear error. Nichols v. Petroleum Helicopters, Inc., 
    17 F.3d 119
    , 121 (5th Cir.
    1994).
    When the crewboat allided with the survey tower, Abshire’s entire body
    was thrown forward, causing his left side to strike the wall of the boat’s cabin.
    It is undisputed that Abshire had substantial injuries resulting from the allision,
    including left sacral fractures, left pelvis fractures, multiple spinal fractures, a
    partially collapsed lung, and crushed testicles. Besides his immediate traumatic
    injuries, Abshire underwent multiple surgeries, suffered a severe staph
    infection, panic attacks and anxiety, and sustained reflex sympathetic dystrophy
    (complex regional pain syndrome), a condition of the nerves following an injury
    resulting in disproportionate discomfort and pain. On the date of the accident,
    Abshire was 29 years old. Trial testimony established that Abshire is
    permanently disabled, will continue to degenerate, and will likely require follow-
    up surgeries and treatment for the rest of his life.5
    workers had no supervisory authority over Abshire. However, Boh Brothers misreads Rule
    602, which requires only that a witness “ha[ve] personal knowledge of the matter.” Because
    Rule 602 requires only personal knowledge and not supervisory authority, the testimony of the
    other journeymen ironworkers and foremen is certainly admissible.
    5
    Unchallenged is the district court’s award of $1,346,824 for Abshire’s future medical
    expenses, as well an award of $2,128,614 for his lost wages and fringe benefits.
    10
    Case: 11-30606       Document: 00512102131        Page: 11     Date Filed: 01/04/2013
    In light of the evidence establishing the severe and permanent nature of
    Abshire’s injuries, we cannot say that a general damages award of $1,325,000
    constitutes clear error.6
    D.
    Next, Abshire and Kinchen challenge the district court’s factual finding
    that the Joint Venture’s erection and maintenance of the survey tower was not
    a cause of the accident. The analysis of a maritime tort is guided by general
    principles of negligence law, and includes the requirement that the plaintiff
    demonstrate a “causal connection between the defendant’s conduct and the
    plaintiff’s injury.” In re Great Lakes Dredge & Dock Co. LLC, 
    624 F.3d 201
    , 211
    (5th Cir. 2010).
    Abshire and Kinchen argue that the record requires a finding that the
    Joint Venture’s negligent maintenance of the survey tower involved in the
    allision was a cause of the accident. Specifically, they contend that the survey
    piling’s lack of discrete markings and color made it difficult to see under variable
    daylight conditions. Furthermore, they contend that the Joint Venture failed to
    obtain the proper regulatory permit required for such structures in navigable
    waters.
    However, the record amply supports the district court’s finding that the
    survey tower’s coloration and regulatory certification had nothing to do with the
    allision. According to the trial testimony, the accident occurred on a clear day
    6
    See, e.g., Thornton v. Diamond Offshore Management Co., 326 Fed. App’x 318 (5th Cir
    2009) (unpublished) (upholding $2,500,000 general damages award for a plaintiff whose hand
    and arm were crushed, requiring multiple surgeries and resulting in permanent disability).
    Even the cases cited by Boh Brothers suggest that Abshire’s award is appropriate given the
    admittedly severe nature of his injuries and his substantial expected medical expenses. See,
    e.g., McGee v. Rowan Companies Inc., 
    2009 WL 3150309
    (E.D. La. Sept. 24, 2009)
    (unpublished) (awarding $900,000 in general damages to Jones Act plaintiff who suffered
    crushed knee, extensive pain, and disability); McCuller v. Nautical Ventures, LLC, 
    2009 WL 3254290
    (E.D. La. Oct. 6, 2009) (unpublished), vacated in part on other grounds, 434 Fed.
    App’x 408 (5th Cir. 2011) (awarding $800,000 in general damages to maritime plaintiff who
    suffered injured back, pain, and disability).
    11
    Case: 11-30606      Document: 00512102131         Page: 12    Date Filed: 01/04/2013
    and the survey tower was clearly visible from approximately a mile away.
    Furthermore, Kinchen, who was operating the boat at the time of the accident,
    testified that he had piloted the crewboat between the worksite and shore daily
    for at least two months and that he was aware of the existence of the survey
    towers and their approximate location. When asked at trial why he hit the
    survey tower, Kinchen testified that the only reason he hit the tower was
    because of the tires on the front of the boat.7
    The record therefore fully supports the district court’s finding that the
    survey tower was not a cause of the allision.
    E.
    The parties have also challenged the district court’s factual finding
    relating to allocation of fault and the district court’s discretionary call relating
    to its refusal to re-open evidence after the conclusion of the trial. However, after
    a careful review of the record, we are unable to conclude that the district court
    committed clear error or abused its discretion in either of these rulings.
    IV.
    For the reasons stated above, the judgment of the district court is
    AFFIRMED.
    7
    The following exchange took place upon Kinchen’s cross-examination by Boh Brothers
    counsel:
    Counsel: Can you tell me why you hit that GPS tower on July the 3rd, 2008?
    Kinchen: Because I didn’t see it.
    Counsel: Why didn’t you see it?
    Kinchen: Because they had tires on the front of the boat.
    Counsel: Is there any other reason why you hit that tower, other than the tires were
    on the front of the push knees?
    Kinchen: No, sir.
    12