United States Ex Rel. Administrator of Environmental Protection Agency v. CITGO Petroleum Corp. ( 2013 )


Menu:
  •      Case: 11-31117    Document: 00512311654      Page: 1    Date Filed: 07/17/2013
    IN THE UNITED STATES COURT OF APPEALS
    FOR THE FIFTH CIRCUIT  United States Court of Appeals
    Fifth Circuit
    FILED
    July 17, 2013
    No. 11-31117                     Lyle W. Cayce
    Clerk
    UNITED STATES OF AMERICA, on behalf of Administrator of
    Environmental Protection Agency,
    Plaintiff-Appellant/Cross-Appellee
    v.
    CITGO PETROLEUM CORPORATION,
    Defendant-Appellee/Cross-Appellant
    Appeals from the United States District Court
    for the Western District of Louisiana
    Before JONES, BARKSDALE, and SOUTHWICK, Circuit Judges.
    LESLIE H. SOUTHWICK, Circuit Judge:
    The United States brought suit against CITGO Petroleum Corporation,
    seeking civil penalties and injunctive relief under the Clean Water Act (“CWA”).
    After a bench trial, the district court imposed a $6 million penalty against
    CITGO and ordered injunctive relief. The United States appeals, arguing the
    amount of the penalty is inadequate. CITGO cross-appeals, arguing the district
    court lacked jurisdiction. There is jurisdiction, but we conclude the district court
    erred in failing to provide a reasonable approximation of economic benefit as
    required under the CWA and our caselaw. We VACATE the civil penalty award
    and REMAND for further proceedings.
    Case: 11-31117      Document: 00512311654         Page: 2    Date Filed: 07/17/2013
    No. 11-31117
    FACTS AND PROCEDURAL HISTORY
    In 2006, a severe rainstorm caused two wastewater storage tanks at
    CITGO’s Lake Charles, Louisiana refinery to fail. Over two million gallons of oil
    flooded into the surrounding waterways. The spill forced the closure of a nearby
    navigation channel for ten days, disrupting local businesses. Recreational
    activities on the impacted waterways were restricted for weeks following the
    spill. The spill also damaged over 100 acres of marsh habitat. Fish and other
    aquatic life were adversely impacted, and several birds were killed.
    In April 2007, the Louisiana Department of Environmental Quality used
    its authority under state law to issue a compliance order, citing CITGO for
    violations of water quality laws as a result of the 2006 spill. The Department
    required corrective action and notified CITGO of the potential penalties it faced.
    Settlement discussions began, then were suspended due to an investigation
    being conducted by the federal Environmental Protection Agency.
    In June 2008, the United States and Louisiana filed the present action in
    federal district court as co-plaintiffs. The United States sought civil penalties
    and injunctive relief under the CWA, and Louisiana sought penalties and costs
    as provided by the Louisiana Environmental Quality Act.1 Louisiana amended
    its compliance order in July 2008, explaining that it now would pursue penalties
    against CITGO in federal court.
    CITGO conceded liability. The district court held a two-week bench trial
    solely on the issue of damages. The court found that CITGO had failed to
    maintain its wastewater storage tanks properly and had allowed sludge and
    waste oil to accumulate in the tanks, lessening their capacity to accommodate
    stormwater. The court noted that CITGO violated its own standard operating
    procedures by allowing the tanks to become overburdened. Additionally, CITGO
    1
    The district court awarded Louisiana $3 million in damages for CITGO’s violation of
    state law. Louisiana is not a party in this appeal, and CITGO does not challenge the award.
    2
    Case: 11-31117     Document: 00512311654    Page: 3   Date Filed: 07/17/2013
    No. 11-31117
    was forced to make several unauthorized discharges of oily wastewater, totaling
    over 30 million gallons, into a surge pond to prevent the wastewater storage
    tanks from overflowing.
    The district court concluded that CITGO’s numerous failures amounted to
    ordinary negligence, rejecting the government’s argument for a finding of gross
    negligence. The court noted that at the time of the spill, CITGO had designed
    a plan to address its overloaded storage tanks. Additionally, CITGO had taken
    steps to improve the plant, including the addition of a third wastewater storage
    tank, which was under construction at the time of the spill. Finally, the court
    recognized that an “exceptional amount of rain”– approximately 11 inches – had
    fallen on the day of the spill. The court reasoned that had the rainstorm not
    been so massive, the tanks likely would not have overflowed.
    The court then considered the penalty factors of the CWA. See 
    33 U.S.C. § 1321
    (b)(8). It determined that CITGO should be penalized on a per-barrel
    basis under 
    33 U.S.C. § 1321
    (b)(7)(A). The court found that under “the totality
    of the circumstances,” a per-barrel penalty of $111 was reasonable. It accepted
    CITGO’s estimate that approximately 54,000 barrels of oil had spilled into the
    waterways and assessed a civil penalty of $6 million. The court also ordered
    extensive injunctive relief, which included the requirement that CITGO build a
    fourth storage tank.
    DISCUSSION
    I. Diligent Prosecution Bar
    CITGO argues the district court erred by denying its motion to dismiss for
    lack of jurisdiction, and urges this court to vacate the judgment and order the
    suit dismissed. What CITGO relies upon is a provision in the CWA precluding
    federal prosecution where “a State has commenced and is diligently prosecuting”
    an action under comparable state law. 
    33 U.S.C. § 1319
    (g)(6)(A)(ii). The United
    States argues Louisiana was not displaying diligence. If the bar is factually
    3
    Case: 11-31117     Document: 00512311654       Page: 4   Date Filed: 07/17/2013
    No. 11-31117
    inapplicable, it would not matter whether it is a jurisdictional bar. The district
    court made no fact findings on this question and, indeed, gave no explanation as
    to why the motion was denied.
    As we noted already, in April 2007 the Louisiana Department of
    Environmental Quality issued a compliance order to CITGO for violations
    resulting from the oil spill and gave notice of potential penalties. The State and
    CITGO engaged in some settlement negotiations. According to a June 2008
    internal Department memorandum, those negotiations were put on hold because
    of an EPA criminal investigation. When the complaint in the current suit was
    filed in June 2008, the state administrative action was pending but the attention
    being given to it was, at best, desultory. In July 2008, the State amended its
    compliance order, explaining that it intended to pursue monetary penalties for
    CITGO’s violation of state law in federal court.
    We cannot see diligence in these procedural steps. Little had occurred
    prior to the current suit being brought under the CWA. Nearly simultaneously
    with the filing of this suit, the State indicated it would no longer pursue with
    diligence or otherwise the comparable relief being sought administratively.
    There was no diligent prosecution by the State and no jurisdictional issue
    to resolve. The motion to dismiss was properly denied.
    II. Civil Penalty
    The district court imposed a $6 million civil penalty on CITGO for its
    violation of the CWA. The United States had recommended a penalty of $247
    million. On appeal, the United States argues the penalty is unreasonably low
    and inconsistent with the court’s findings on the penalty factors. The United
    States also argues the district court failed to make necessary fact-findings on the
    amount of economic benefit to CITGO and erred in some of its other findings.
    Finally, it argues the district court should have found CITGO’s inactions and
    delays in managing its wastewater system to be gross negligence.
    4
    Case: 11-31117       Document: 00512311654   Page: 5   Date Filed: 07/17/2013
    No. 11-31117
    The factors to be considered in awarding a civil penalty are identified in
    the CWA. A district court’s analysis of those factors is highly discretionary.
    Despite this discretion, we conclude that the district court’s failure to quantify
    the economic benefit to CITGO of deferring for nearly a decade its response to
    the known deficiencies at its Lake Charles plant requires reversal. As we will
    explain, because economic benefit serves as the starting point for calculating the
    civil penalty and is adjusted based on the remaining statutory factors, on
    remand the district court should consider its analysis of the factors afresh after
    making a reasonable approximation of economic benefit.
    A. Penalty Factors
    The assessment of civil penalties under the CWA is left to the district
    court’s discretion. The exercise of that discretion is guided by consideration of
    the following factors:
    the seriousness of the violation or violations, the economic benefit
    to the violator, if any, resulting from the violation, the degree of
    culpability involved, any other penalty for the same incident, any
    history of prior violations, the nature, extent, and degree of success
    of any efforts of the violator to minimize or mitigate the effects of
    the discharge, the economic impact of the penalty on the violator,
    and any other matters as justice may require.
    
    33 U.S.C. § 1321
    (b)(8).      The Supreme Court has described the process of
    weighing the penalty factors as “highly discretionary.” Tull v. United States, 
    481 U.S. 412
    , 427 (1987). We review factual findings in support of a district court’s
    penalty calculation for clear error. Sierra Club, Lone Star Chapter v. Cedar
    Point Oil Co., 
    73 F.3d 546
    , 573 (5th Cir. 1996). A court’s determination of the
    amount of a penalty to be assessed is reviewed under the highly deferential
    abuse-of-discretion standard. 
    Id.
    We find particularly instructive one of our precedents in which we
    reversed a district court’s “highly discretionary” award of a civil penalty under
    5
    Case: 11-31117     Document: 00512311654      Page: 6    Date Filed: 07/17/2013
    No. 11-31117
    the CWA. See United States v. Marine Shale Processors, 
    81 F.3d 1329
     (5th Cir.
    1996).   We started with the observation that “calculation of discretionary
    penalties is not an exact science, and few courts could comply with [the
    defendant’s] request that the importance of each factor be precisely delineated.”
    
    Id. at 1338
    . We found an error in fact finding, then held that because the
    district court had failed to articulate with some precision how it had relied on
    different facts to compute the penalty, we needed to vacate and remand for the
    district court to calculate the fine again. 
    Id. at 1339
    . We will explain why we
    find ourselves in an analogous position.
    The economic benefit to CITGO that resulted “from the violation” is the
    critical factor in this appeal, critical in part because the district court made no
    finding on it. Though the “violation” in its most limited sense was the oil spill
    from which CITGO obtained no economic benefit, such a narrow reading of this
    statutory factor is inconsistent with the manner in which other courts have
    interpreted the requirement. Generally, courts consider the financial benefit to
    the offender of delaying capital expenditures and maintenance costs on
    pollution-control equipment. See United States v. Smithfield Foods, Inc., 
    191 F.3d 516
    , 530 (4th Cir. 1999); Atl. States Legal Found., Inc. v. Tyson Foods, Inc.,
    
    897 F.2d 1128
    , 1141 (11th Cir. 1990).
    One court concluded that there are two general approaches to calculate
    economic benefit: “(1) the cost of capital, i.e., what it would cost the polluter to
    obtain the funds necessary to install the equipment necessary to correct the
    violation; and (2) the actual return on capital, i.e., what the polluter earned on
    the capital that it declined to divert for installation of the equipment.” United
    States v. Allegheny Ludlum Corp., 
    366 F.3d 164
    , 169 (3d Cir. 2004); see also
    United States v. Mun. Auth. of Union Twp. (Dean Dairy), 
    150 F.3d 259
    , 266 (3d
    Cir. 1998) (noting that “methods other than the delayed or avoided capital
    expenditure for ascertaining economic benefit” have been used).
    6
    Case: 11-31117    Document: 00512311654     Page: 7    Date Filed: 07/17/2013
    No. 11-31117
    Besides the choices to make in calculating economic benefit, courts must
    also choose how to set the amount of the penalty:
    The CWA does not prescribe a specific method for determining
    appropriate civil penalties for violations. In Dean Dairy, we noted
    that some courts use the “top down” approach in which the
    maximum penalty is set ($25,000 per day of violation at the times
    relevant here), and reduced as appropriate considering the six
    enumerated elements of § 1319(d) as mitigating factors, while other
    courts employ the “bottom up” approach, in which economic benefit
    is established, and the remaining five elements of § 1319(d) are used
    to adjust the figure upward or downward. Dean Dairy, 
    150 F.3d at 265
    .
    Allegheny Ludlum, 
    366 F.3d at
    178 n.6. This circuit has never held that a
    particular approach must be followed, and we do not decide otherwise today.
    Regardless of the mathematics, we conclude that a district court generally must
    “make a ‘reasonable approximation’ of economic benefit when calculating a
    penalty under the CWA.” Cedar Point Oil, 
    73 F.3d at 576
    .
    We now examine what the district court decided here. It stated that the
    purpose of this penalty factor is to recoup any benefit gained by the polluter in
    failing to comply with the law, which indicates the court was defining the factor
    as do we. The court found that CITGO had decided to forgo certain maintenance
    projects that would have prevented the spill in an effort to minimize costs and
    increase profits. The court found, though, that the exact amount of cost savings
    was “almost impossible to determine” given the numerous and conflicting
    estimations of economic benefit presented by the parties at trial. Therefore,
    instead of quantifying the economic benefit, the court provided a range and
    found “the amount of [economic] gain to CITGO was less than the $83 million
    argued by the government, but more than the $719.00 asserted by CITGO.”
    We interpret these findings to have left economic benefit as a non-factor.
    Overall, the district court’s failure to quantify economic benefit has made our
    review more difficult. Proper consideration of economic benefit is integral to
    7
    Case: 11-31117     Document: 00512311654       Page: 8    Date Filed: 07/17/2013
    No. 11-31117
    arriving at an appropriate damage award. Whether the economic benefit is a
    floor, adjusted by a court’s analysis of the other factors, or helps determine how
    much to lower the ceiling established in other ways, it should not be ignored. In
    this case, based on CITGO’s history of avoiding corrective actions for years, we
    find it particularly inappropriate not to have made an estimate, though
    admittedly difficult, of the economic benefit.
    The remaining factors include the “seriousness of the violation.” The
    district court found the spill was “massive,” “excessive,” and a “tragedy.” Both
    parties agree with this assessment, as do we. The district court considered
    CITGO’s “degree of culpability” and found that it was “fully at fault” for the spill
    and was negligent. The government points out that the CWA’s penalty provision
    is a strict-liability provision and allows for the imposition of penalties up to
    $1,100/barrel even in the absence of negligence. See 
    33 U.S.C. § 1321
    (b)(7)(A)
    and 
    40 C.F.R. § 19.4
     (adjusting civil penalties under CWA for inflation).
    Because CITGO was found to be negligent – a higher degree of culpability than
    strict liability – the United States argues that the district court’s penalty of
    $111/barrel is unreasonable given that up to $1,100/barrel was authorized.
    With respect to the fifth factor, “history of prior violations,” the court found
    that CITGO had made unauthorized discharges of oily wastewater on at least
    six occasions prior to the spill and had been in violation of its permits for over
    950 days. CITGO’s history of violations, the district court found, reflected a lack
    of environmental responsibility and a general disregard of its duty to operate its
    business safely. According to the government, the district court’s penalty of
    $111/barrel is clearly contrary to these findings. In light of our discussion of
    gross negligence below, the findings regarding this factor need to be re-evaluated
    on remand.
    The United States claims the district court erred in relying on CITGO’s
    efforts to minimize or mitigate the spill’s effects – factor six – as a basis for
    8
    Case: 11-31117     Document: 00512311654       Page: 9   Date Filed: 07/17/2013
    No. 11-31117
    imposing a lower penalty. CITGO estimated that it spent approximately $65
    million in clean-up and response costs. At the height of its response, CITGO had
    deployed 1,500 people; 60 miles of boom; vacuum trucks; skimmers; portable
    barges; and other clean-up equipment. The district court acknowledged these
    efforts, but still found CITGO’s first response to the spill “lacking.” There was
    evidence that CITGO, at least initially, failed to contain the spill and did not
    fully inform the Coast Guard of the severity of the spill. Though there are
    different findings that could have been made, we do not discern any clear error
    in the facts found here or abuse of discretion in weighing this factor as the
    district court did.
    The government also argues that the court placed too much emphasis on
    the eighth factor, which permits consideration of “any other matters as justice
    may require.” In analyzing this factor, the court noted that CITGO was a major
    employer in the Lake Charles community. Additionally, as one of the largest
    refineries in the nation, the Lake Charles facility had a positive impact on the
    state’s economy. The court recognized the obvious negative impact the spill had
    on the community but concluded that it was only fair to view CITGO’s role in the
    community as a whole, rather than limit its view to a single, extremely negative
    event. According to the government, the fact that a polluter operates a large
    facility that benefits the local and state economies is not a basis for assessing a
    low penalty and contravenes the purpose of civil penalties under the CWA –
    punishment and deterrence. We conclude that the district court’s analysis of
    this factor was not clear error.
    Finally, the government takes issue with the court’s consideration of the
    injunctive relief ordered in assessing the penalty. While not addressed under its
    analysis of the factors, the court explained in the penalty section of its order that
    it had taken into account the injunctive relief ordered in determining that
    $111/barrel was an appropriate penalty. As stated, the district court ordered
    9
    Case: 11-31117     Document: 00512311654      Page: 10   Date Filed: 07/17/2013
    No. 11-31117
    CITGO to construct a fourth wastewater storage tank. The court also ordered
    CITGO to perform sediment sampling, to conduct a stormwater drainage
    calibration study, to repair and properly use the tanks’ oil-skimming equipment,
    and to install other equipment designed to prevent future spills. Evidently, the
    court reduced the civil penalty an unspecified amount based on the award of
    injunctive relief. The district court’s consideration of the cost of the injunctive
    relief does not strike us as clear error.
    The district court needed to have made a finding on the amount of
    economic benefit. We conclude such a finding is central to the ability of a district
    court to assess the statutory factors and for an appellate court to review that
    assessment. We therefore vacate the civil penalty award and remand for re-
    evaluation. Regardless of how the district court then exercises its discretion,
    within a top-down, a bottom-up, or some other analytical framework, the
    economic benefit factor creates a nearly indispensable reference point. We have
    upheld some of the findings on various factors, and found error in others. On
    remand, the district court may take a renewed look at all factors in light of the
    new findings on some.
    B. Gross Negligence
    Under the CWA, a court may impose a higher per-barrel civil penalty if the
    violation was “the result of gross negligence or willful misconduct.” 
    33 U.S.C. § 1321
    (b)(7)(D).   According to the government, there was ample evidence
    presented at trial in support of CITGO’s gross negligence.           Further, the
    government argues that the district court erroneously applied the state-law
    definition of gross negligence rather than the definition supplied by the CWA.
    The district court began its analysis of gross negligence by stating “[u]nder
    Louisiana law, gross negligence is willful, wanton, and reckless conduct that
    falls between intent to do wrong and ordinary negligence.” This statement, the
    government argues, creates uncertainty as to whether the district court applied
    10
    Case: 11-31117     Document: 00512311654      Page: 11    Date Filed: 07/17/2013
    No. 11-31117
    the proper legal standard. The government points out that the state-law
    definition equates gross negligence with willful misconduct, whereas the CWA
    uses those terms in the disjunctive.
    “Gross negligence” is a label that straddles the divide between intentional
    and accidental actions. The Louisiana Supreme Court has said that “often
    [there is] no clear distinction between such willful, wanton, or reckless conduct
    and ‘gross’ negligence, and the two have tended to merge and take on the same
    meaning.” Brown v. ANA Ins. Grp., 
    994 So. 2d 1265
    , 1269 n.7 (La. 2008)
    (quotations omitted). We see no error in the district court’s articulation of its
    understanding of this term that is neither fish nor fowl. It does not appear that
    the district court relied on the state-law definition anyway. After it offered the
    state-law definition of gross negligence, the district court stated that “it does not
    find that CITGO’s actions or inactions rise to the level of gross negligence or
    willful misconduct” and “the Court finds no gross negligence or willful
    misconduct on the part of CITGO.” Given these subsequent statements, we
    conclude the district court applied the correct legal standard.
    The government also contends that the district court’s failure to find gross
    negligence is contrary to the overwhelming evidence of such negligence. CITGO
    completed construction on a multi-million dollar wastewater treatment facility
    at its Lake Charles refinery in 1994. According to CITGO, the facility was
    designed to withstand a “25-year/24-hour” storm (a storm of a strength seen only
    once in 25 years, lasting 24 hours). By 1996, just two years after the facility’s
    completion, a supervisor requested the construction of an additional storage
    tank, citing the inadequacy of the two existing storage tanks to accommodate
    stormwater. The following year, a CITGO engineer warned: “Since the system
    is already marginal for stormwater capacity, it is imperative that excess oil and
    solids be removed so that this capacity can be used to store stormwater.”
    11
    Case: 11-31117       Document: 00512311654        Page: 12     Date Filed: 07/17/2013
    No. 11-31117
    Despite this warning, CITGO failed to repair the oil-skimming system
    designed to remove floating waste oil. While CITGO employed other methods
    to remove waste oil from the tanks, such as using portable pumps, it had
    abandoned those methods by 2000. As a result, sludge and waste oil continued
    to accumulate in the tanks for years, causing the tank levels to rise and
    lessening their ability to accommodate stormwater.2
    In 2002, CITGO employed an environmental consulting firm to evaluate
    the facility’s stormwater capacity. The results of that study again called for the
    addition of a third storage tank. CITGO points out that it acted on this
    recommendation and constructed a third tank. It did not begin construction
    until 2005 – three years after receiving the recommendation – and it did not
    complete construction until 2007, which unfortunately was after the spill.
    CITGO’s own investigation of the spill revealed it had several “root
    causes.” First, CITGO’s wastewater treatment facility was inadequate to handle
    stormwater, a fact identified by the 2002 study. Second, CITGO did not have a
    procedure in place to monitor the amount of waste oil accumulating in the tanks.
    Third, CITGO failed to remove waste oil and sludge from the tanks on a regular
    basis.
    Despite the above facts, all of which were put before the district court
    during a two-week bench trial through testimony from numerous witnesses and
    the introduction of hundreds of exhibits, the district court concluded in less than
    one page of analysis that CITGO was not grossly negligent. Not illogically, the
    district court credited CITGO for having undertaken, prior to the storm, the
    construction of the third storage tank. That tank, though, was not completed
    until more than a year after the storm. The district court found that prior to the
    2
    CITGO’s standard operating procedures required the contents of the tanks to be
    brought down to a level of 5.5 feet prior to a storm event. CITGO’s corporate representative
    testified that at the time of the storm, the tanks’ contents measured at 17 feet.
    12
    Case: 11-31117     Document: 00512311654      Page: 13   Date Filed: 07/17/2013
    No. 11-31117
    completion of the third storage tank, CITGO had made other improvements to
    the plant’s functionality and capacity, including paving a dike around the
    storage tanks to contain overflows. The court also referred to evidence that
    CITGO was working on a plan to remove the excess sludge from the tanks
    shortly before the spill; though it is unclear from the record what steps if any
    had been taken to implement the plan. Finally, the court reasoned that even
    though the tanks were overburdened, it was unlikely that they would have
    overflowed had it not been for the excessive amount of rain that fell on the day
    of the spill.
    A district court’s “finding that a party is negligent or grossly negligent is
    a finding of fact and must stand unless clearly erroneous.” Houston Exploration
    Co. v. Halliburton Energy Servs., Inc., 
    269 F.3d 528
    , 531 (5th Cir. 2001). “A
    finding of fact is ‘clearly erroneous’ when although there is evidence to support
    it, the reviewing court on the entire evidence is left with the definite and firm
    conviction that a mistake has been committed.” 
    Id.
     In this case there is some
    evidence of CITGO’s efforts to address the inadequacies of its wastewater
    storage tanks. By finding nothing more than simple negligence, the district
    court discounted the seriousness of CITGO’s multi-year wait before it began
    taking the corrective measures required at this plant. In our view, though,
    almost winning a highly risky gamble with the environment does not much
    affect the egregiousness of having been gambling in the first place.
    We have acknowledged the need to uphold the district court’s findings
    unless clearly erroneous. We make no ruling on this question now. The
    category of negligence into which CITGO’s conduct is placed is part of the
    overall analysis underlying the setting of the appropriate penalty. Because of
    the conclusions we have already set out, the district court will have the
    obligation on remand to re-analyze the civil penalty award. At that time, the
    district court should reconsider all its findings with respect to CITGO’s conduct,
    13
    Case: 11-31117    Document: 00512311654      Page: 14    Date Filed: 07/17/2013
    No. 11-31117
    giving special attention to what CITGO knew prior to the oil spill and its delays
    in addressing recognized deficiencies.
    C. Penalty Calculation
    The government raises two issues with respect to the district court’s
    calculation of the civil penalty. First, it argues that the court erred in refusing
    to apply the “top-down” method of calculating the penalty. We have already
    answered that question. Second, it contests the court’s use of CITGO’s estimate
    of the amount of oil spilled in calculating the penalty.
    On the question of how much oil was spilled, the district court accepted
    CITGO’s estimation. After evaluating the methods of calculation used by the
    parties’ experts, the court found CITGO’s estimate of 54,000 barrels “more
    reasonable and credible” than the government’s higher estimate of 76,800
    barrels. The government’s argument on this issue is essentially that the court
    credited the wrong expert. “Where there are two permissible views of the
    evidence, the factfinder’s choice between them cannot be clearly erroneous.”
    Bertucci Contracting Corp. v. M/V ANTWERPEN, 
    465 F.3d 254
    , 258 (5th Cir.
    2006).   Consequently, we reject the government’s argument that the district
    court erred with respect to its findings on the amount of oil spilled.
    The district court’s civil penalty is VACATED and this case is
    REMANDED for further consideration of the statutory penalty factors and its
    finding of negligence consistent with this opinion.
    14