United Steelworkers v. Saint-Gobain Ceramic , 467 F.3d 540 ( 2006 )


Menu:
  •                                 RECOMMENDED FOR FULL-TEXT PUBLICATION
    Pursuant to Sixth Circuit Rule 206
    File Name: 06a0402p.06
    UNITED STATES COURT OF APPEALS
    FOR THE SIXTH CIRCUIT
    _________________
    X
    -
    UNITED STEELWORKERS OF AMERICA,
    Plaintiff-Appellant, -
    AFL-CIO-CLC,
    -
    -
    No. 05-6851
    ,
    v.                                          >
    -
    -
    Defendant-Appellee. -
    SAINT GOBAIN CERAMICS & PLASTICS, INC.,
    -
    N
    Appeal from the United States District Court
    for the Western District of Kentucky at Louisville.
    No. 04-00603—Charles R. Simpson III, District Judge.
    Argued: September 20, 2006
    Decided and Filed: October 30, 2006
    Before: GUY, SUTTON, and ALARCÓN, Circuit Judges.*
    _________________
    COUNSEL
    ARGUED: David R. Jury, UNITED STEELWORKERS OF AMERICA, Pittsburgh, Pennsylvania,
    for Appellant. John W. Woodard, Jr., WYATT, TARRANT & COMBS, LLP, Louisville, Kentucky,
    for Appellee. ON BRIEF: Daniel M. Kovalik, Paul L. Edenfield, UNITED STEELWORKERS OF
    AMERICA, Pittsburgh, Pennsylvania, for Appellant. John W. Woodard, Jr., Edwin S. Hopson,
    WYATT, TARRANT & COMBS, LLP, Louisville, Kentucky, for Appellee.
    _________________
    OPINION
    _________________
    SUTTON, Circuit Judge. General Drivers, Warehousemen and Helpers, Local Union 89
    v. Moog Louisville Warehouse, 
    852 F.2d 871
    (6th Cir. 1988), held that the application of an express
    time-limitations bar in a collective bargaining agreement prohibiting the arbitration of untimely
    grievance appeals presents a substantive question of arbitrability for a court to decide, as opposed
    to a procedural question for an arbitrator to decide. Consistent with that decision, the district court
    in this case granted the company’s motion to preclude arbitration as a matter of law based on the late
    filing of a grievance appeal. Like two prior panels of this court, we have serious misgivings about
    *
    The Honorable Arthur L. Alarcón, Circuit Judge of the United States Court of Appeals for the Ninth Circuit,
    sitting by designation.
    1
    No. 05-6851           United Steelworkers of Am. v. Saint Gobain                              Page 2
    Ceramics & Plastics
    the soundness of Moog’s reasoning. See Armco Employees Indep. Fed’n v. AK Steel Corp., 
    252 F.3d 854
    (6th Cir. 2001); Raceway Park, Inc. v. Local 47, Serv. Employees Int’l Union, 
    167 F.3d 953
    (6th
    Cir. 1999). But like those panels, we are constrained to follow Moog and therefore affirm.
    I.
    Saint Gobain Ceramics makes refractory products for a variety of industrial clients. The
    United Steelworkers of America represents the Louisville-based workers of the company. The two
    parties entered into a collective bargaining agreement that went into effect on February 14, 2002,
    and lasted until February 13, 2005.
    On March 2, 2004, the company fired two union members for insubordination. On the same
    day, the union filed grievances challenging the propriety of both discharges.
    The collective bargaining agreement contained a four-step process for resolving grievances.
    The union’s grievances proceeded without complications through steps one, two and three. On
    March 29, 2004, the company issued a written denial of both step-3 grievances, which the union
    received on April 8, 2004. The agreement gave the union 30 days, excluding weekends and
    holidays, to appeal the company’s decision to step 4—arbitration. If the union failed to appeal
    within the time limit, the agreement provided that the union forfeited its right to arbitrate the
    grievance. The union appealed the denials by letter dated May 19, 2004, and the company received
    the appeals on May 24, 2004. The company informed the union that the appeals could not proceed
    to arbitration because it had received them after the 30-day deadline.
    The union filed an action in federal district court under § 301 of the Labor-Management
    Relations Act, 29 U.S.C. § 185, to compel arbitration of the grievances under the collective
    bargaining agreement. Faced with cross-motions for summary judgment, the district court held that
    the grievances were not arbitrable given this court’s decision in Moog and given the union’s failure
    to comply with the limitations period.
    II.
    A.
    When an employer and a union agree to submit grievances arising from a collective
    bargaining agreement to arbitration, the “limited” function of the federal courts is “to ascertain[]
    whether the party seeking arbitration is making a claim which on its face is governed by the
    contract.” United Steelworkers of Am. v. Am. Mfg. Co., 
    363 U.S. 564
    , 567–68 (1960). Whether a
    collective bargaining agreement commits a dispute to arbitration, the Supreme Court has held, is a
    question of substantive arbitrability for the courts to decide. See John Wiley & Sons, Inc. v.
    Livingston, 
    376 U.S. 543
    , 547 (1964) (“[W]hether or not the company was bound to arbitrate, as
    well as what issues it must arbitrate, is a matter to be determined by the Court on the basis of the
    contract entered into by the parties.”) (internal quotation marks omitted). Whether the parties have
    complied with the procedural requirements for arbitrating the case, by contrast, is a question for the
    arbitrator to decide. 
    Id. at 556–57.
    If doubt exists over whether a dispute falls on one side or the
    other of this dichotomy, the presumption in favor of arbitrability makes the question one for the
    arbitrator. AT&T Techs., Inc. v. Commc’ns Workers of Am., 
    475 U.S. 643
    , 647 (1986).
    In John Wiley & Sons, the Court considered whether the application of a time-limitations bar
    presented a substantive question of arbitrability for the court or a procedural question for the
    arbitrator. Opposing arbitration, the company argued that the union had failed to comply with two
    preconditions to arbitration and that the application of these provisions presented a threshold
    question of arbitrability for the courts. First, the company noted, the union had not complied with
    No. 05-6851           United Steelworkers of Am. v. Saint Gobain                                 Page 3
    Ceramics & Plastics
    steps 1 and 2 of the grievance procedure, which preceded the duty to arbitrate under step 
    3. 376 U.S. at 556
    . Second, the company noted, the union had not complied with the following time limitation:
    “Notice of any grievance must be filed with the Employer and with the Union Shop Steward within
    four (4) weeks after its occurrence or latest existence. The failure by either party to file the
    grievance within this time limitation shall be construed and be deemed to be an abandonment of the
    grievance.” 
    Id. at 556
    n.11. The Court rejected the company’s argument. “Once it is determined
    . . . that the parties are obligated to submit the subject matter of a dispute to arbitration,” it held,
    “‘procedural’ questions which grow out of the dispute and bear on its final disposition should be left
    to the arbitrator.” 
    Id. at 557.
    “Reservation of ‘procedural’ issues for the courts,” the Court pointed
    out, would “not only create the difficult task of separating related issues, but would also produce
    frequent duplication of effort.” 
    Id. at 558.
    The Court therefore ordered the company to comply with
    its duty to arbitrate the underlying dispute, leaving it to the arbitrator to determine whether the time-
    limitations bar applied.
    Given the general rule that procedural questions arising from an arbitration clause are
    reserved for arbitrators and given Wiley & Sons’ application of that rule in the context of a time-
    limitations bar, one might assume that all timeliness questions raise procedural questions for
    arbitrators to decide. But after General Drivers, Warehousemen and Helpers, Local Union 89 v.
    Moog Louisville Warehouse, 
    852 F.2d 871
    (6th Cir. 1988), that is not the case. At issue in Moog
    was this timeliness provision: “[I]f the Union fails to notify the Company . . . within 15 calendar
    days after the Company gives its answer in writing to a grievance at Step (b) of the grievance
    procedure, . . . then the Union shall be conclusively presumed to have accepted the Company’s
    answer thereto and said grievance shall not thereafter be arbitrable.” 
    Id. at 873.
    Because this
    “contractual language” in the court’s eyes “clearly indicate[d] that the particular grievance in dispute
    [was] excluded from arbitration,” the court held that it had the duty “first” to decide whether “the
    union met the conditions precedent to arbitration”—that the application of this timeliness provision
    in other words presented a question of arbitrability for the court to decide. 
    Id. at 875.
    Concluding
    that the company had no duty to arbitrate untimely grievances and that the union had not “met the
    conditions precedent to arbitration,” the court dismissed the union’s action to compel arbitration.
    Moog requires us to treat the timeliness question presented here as one of substantive
    arbitrability. Like the collective bargaining agreement in Moog, this agreement contains an express
    time-limitations bar. The contract gives the union “30 days from the time of the written Step 3
    decision to notify the Company in writing that it is appealing a grievance to arbitration.” Art. 28,
    § 1, Step 4. “Grievances not appealed within the time limits set forth in Steps 1, 2, 3, or 4,” it then
    says, “shall be considered settled on the basis of the decision last made and shall not be eligible for
    further discussion or appeal.” 
    Id. § 4
    (emphasis added).
    Together, these provisions expressly prevent untimely appeals of a grievance to arbitration.
    Much like the provision in Moog, the express language of the agreement demonstrates that the
    parties intended to foreclose arbitration of grievances that the union failed to appeal within 30 days.
    Because Moog makes this timeliness question one of arbitrability for the courts to decide, it falls to
    us to decide whether the union satisfied this “condition[] precedent to 
    arbitration.” 852 F.2d at 875
    .
    In resisting this conclusion, the union points out that Moog applies only when “the
    contractual language . . . clearly indicates that the particular grievance in dispute is excluded from
    
    arbitration.” 852 F.2d at 875
    (emphasis added). But the modest differences between the time-
    limitation provisions in the two cases do not suffice to treat them differently. The Moog provision
    said that failure to comply with the 15-day deadline meant that “the Union shall be conclusively
    presumed to have accepted the Company’s answer thereto and said grievance shall not thereafter be
    arbitrable.” 
    Id. at 873.
    Today’s provision says that failure to comply with the 30-day deadline
    means that the “[g]rievance[] . . . shall be considered settled on the basis of the decision last made
    No. 05-6851           United Steelworkers of Am. v. Saint Gobain                               Page 4
    Ceramics & Plastics
    and shall not be eligible for further discussion or appeal.” Art. 28, § 4. Both provisions come to the
    same end: Failure to comply with the time requirement means that the dispute has been “settled”
    in the one case and “conclusively presumed . . . accepted” in the other, making the grievance not
    “arbitrable” in the one case and “not . . . eligible for further discussion or appeal” in the other.
    Moog, it is true, involved a provision that used the word “arbitrable” while this provision
    uses the word “appeal.” But the two words mean the same thing. As the timeliness provision itself
    says in this case, “the Union shall have thirty (30) days from the time of the written Step 3 decision
    to notify the Company in writing that it is appealing a grievance to arbitration.” Art. 28, § 1, Step
    4 (emphasis added). The only appeal available at that stage in the grievance process is an appeal
    to arbitration, making this contractual language no less unambiguous than the language in Moog.
    Cf. 
    Armco, 252 F.3d at 861
    (declining to apply Moog where failure to satisfy the time bar meant that
    “no further action may be taken on [the grievance]” and where the clause “does not specifically
    mention arbitrability at all or give any indication that such questions are not arbitrable”).
    The union next argues that Howsam v. Dean Witter Reynolds, Inc., 
    537 U.S. 79
    (2002),
    forces us to reach a different conclusion. “[I]n the absence of an agreement to the contrary,”
    Howsam says, “issues of substantive arbitrability are for a court to decide and issues of procedural
    arbitrability, i.e., whether prerequisites such as time limits, notice, laches, estoppel, and other
    conditions precedent to an obligation to arbitrate have been met, are for the arbitrators to decide.”
    
    Id. at 85
    (internal quotation marks and ellipses omitted) (emphasis added). But we do not read Moog
    as eliminating the dichotomy between issues of substantive arbitrability and procedural arbitrability
    when it comes to “time limit[]” provisions. It instead stands for the proposition that time limitations
    that an agreement makes an express precondition to arbitration present an issue of substantive
    arbitrability because the parties in effect have made “an agreement to the contrary.”
    The union saves its best argument for last—that the en banc court should overrule Moog.
    Time has not been kind to Moog, as two panels of this court have expressly criticized its reasoning
    and, no less expressly, called for its overruling. See Armco Employees Indep. Fed’n v. AK Steel
    Corp., 
    252 F.3d 854
    , 860–61 (6th Cir. 2001); Raceway Park, Inc. v. Local 47, Serv. Employees Int’l
    Union, 
    167 F.3d 953
    , 963 (6th Cir. 1999). We embrace Raceway Park’s and Armco’s criticism and
    would simply add that Moog appears to create a false dichotomy between express and non-express
    time bars. Most time bars naturally say—clearly and expressly—that if a party does not satisfy the
    time deadline, the party is barred from filing the action. Put differently, the interpretive problem
    with time bars rarely relates to the consequences of missing a deadline; it relates to determining
    when the clock starts running and when it stops.
    The other courts of appeals, it bears adding, have hewed to the Supreme Court’s decision in
    Wiley & Sons, seconded by Howsam, that the application of time-bar provisions generally presents
    a question of procedural arbitrability for the arbitrator rather than substantive arbitrability for the
    court. See Local 285, Serv. Employees Int’l Union, AFL-CIO v. Nonotuck Res. Assocs., Inc., 
    64 F.3d 735
    , 739–40 (1st Cir. 1995); Rochester Tel. Corp. v. Commc’n Workers, 
    340 F.2d 237
    , 238–39 (2d
    Cir. 1965); Chauffers, Teamsters & Helpers, Local Union No. 765 v. Stroehmann Bros. Co., 
    625 F.2d 1092
    , 1093–94 (3d Cir. 1980); Local 1422, Int’l Longshoremen’s Ass’n v. S.C. Stevedores
    Ass’n, 
    170 F.3d 407
    , 410 (4th Cir. 1999); Smith Barney Shearson, Inc. v. Boone, 
    47 F.3d 750
    ,
    753–54 (5th Cir. 1995); Beer Sales Drivers, Local 744 v. Metro. Distribs., 
    763 F.2d 300
    , 303 (7th
    Cir. 1985); Auto., Petroleum & Allied Indus. Employees Union, Local No. 618 v. Town & Country
    Ford, Inc., 
    709 F.2d 509
    , 511–14 (8th Cir. 1983); Toyota of Berkeley v. Auto. Salesmen’s Union,
    Local 1095, 
    834 F.2d 751
    , 754 (9th Cir. 1987); Denhardt v. Trailways, Inc., 
    767 F.2d 687
    , 689–90
    (10th Cir.1985); Aluminum, Brick & Glass Workers Int’l Union v. AAA Plumbing Pottery Corp., 
    991 F.2d 1545
    , 1548 n.1, 1550 (11th Cir. 1993); Washington Hosp. Ctr. v. Serv. Employees Int’l Union,
    Local 722, 
    746 F.2d 1503
    , 1506–08 (D.C. Cir. 1984).
    No. 05-6851            United Steelworkers of Am. v. Saint Gobain                                 Page 5
    Ceramics & Plastics
    To the extent courts of appeals have made exceptions to this rule, they are not premised on
    Moog’s reasoning. Some courts of appeals have decided that a time-bar provision that is crystal
    clear in its terms, consequences and application may present a substantive question of arbitrability
    for judicial consideration. See In the Matter of the Application of CBS, Inc. v. Snyder, 
    989 F.2d 89
    ,
    91–92 (2d Cir. 1993); Philadelphia Printing Pressmen’s Union No. 16 v. Int’l Paper Co., 
    648 F.2d 900
    , 904 (3d Cir. 1981); Smith Barney Shearson, Inc. v. Boone, 
    47 F.3d 750
    , 753 (5th Cir. 1995);
    United Steelworkers of Am. v. Cherokee Elec. Coop., 
    1987 U.S. Dist. LEXIS 13344
    , at *8–11 (N.D.
    Ala. Feb. 19, 1987), aff’d, 
    829 F.2d 1131
    (11th Cir. 1987), cert. denied, 
    485 U.S. 1038
    (1988).
    Other courts of appeals appear not to make any such exception. See Local 285, Serv. Employees
    Int’l Union, AFL-CIO v. Nonotuck Res. Assocs., Inc., 
    64 F.3d 735
    , 740 (1st Cir. 1995); Local 1422,
    Int’l Longshoremen’s Ass’n v. S.C. Stevedores Ass’n, 
    170 F.3d 407
    , 410 (4th Cir. 1999); Beer Sales
    Drivers, Local 744 v. Metro. Distribs., 
    763 F.2d 300
    , 303 (7th Cir. 1985); Auto., Petroleum & Allied
    Indus. Employees Union, Local No. 618 v. Town & Country Ford, Inc., 
    709 F.2d 509
    , 514 (8th Cir.
    1983); Toyota of Berkeley v. Auto. Salesmen’s Union, Local 1095, 
    834 F.2d 751
    , 754 (9th Cir.
    1987); Denhardt v. Trailways, Inc., 
    767 F.2d 687
    , 689 (10th Cir.1985); Washington Hosp. Ctr. v.
    Serv. Employees Int’l Union, Local 722, 
    746 F.2d 1503
    , 1508, 1511–12 (D.C. Cir. 1984).
    As best we can tell, Moog stands alone in saying that the clarity of a time-bar provision
    (providing, for example, that an appeal to arbitration is barred if not filed within a certain number
    of days), without regard to the clarity of its application (determining, for example, when the clock
    begins and ends), by itself makes a dispute one of substantive arbitrability. Under these
    circumstances, we would prefer to take a path not open to us—ignore or overrule Moog. See 6th Cir.
    R. 206(c); Salmi v. Sec’y of Health & Human Servs., 
    774 F.2d 685
    , 689 (6th Cir. 1985). Until the
    en banc court overrules Moog, however, we must follow the decision for better or worse.
    B.
    Because Moog makes this timeliness question one of substantive arbitrability, we must
    decide whether the union satisfied this “condition[] precedent to arbitration.” 
    Moog, 852 F.2d at 875
    . Under the collective bargaining agreement, the parties “agreed that the Union shall have thirty
    (30) days from the time of the written Step 3 decision to notify the Company in writing that it is
    appealing a grievance to arbitration.” Art. 28, § 1, Step 4. In determining whether the union has
    satisfied this requirement, the agreement also provides that “Saturdays, Sundays, holidays and off
    days” do not count toward the 30 days. Art. 28, § 2. The company issued its written denial of the
    step-3 grievance on March 29, 2004, and the union received the decisions on April 8, 2004. The
    union appealed the decisions on May 19, 2004.
    At stake is whether the clock started running on March 29 (when the company issued the
    decisions) or on April 8 (when the union received the decisions). While the issue is not free from
    doubt, the language of the agreement favors the earlier start date. In establishing a limitations
    period, the agreement says that the union shall have 30 days “from the time of the written Step 3
    decision,” not 30 days from the union’s receipt of that decision. “[T]he time of the written . . .
    decision” language suggests that the clock must begin running when the company issues the
    decision, not when the union receives it.
    The context in which the provision appears supports this interpretation. Consider the next
    sentence of the agreement, which says, “Upon receipt of such notice of appeal to arbitration, the
    parties will meet within ten (10) days in an effort to select an impartial arbitrator.” Art. 28, § 1, Step
    4 (emphasis added). The juxtaposition of these two sentences shows that the drafters understood
    the difference between a time requirement premised on “receipt” on the one hand and “the time of
    . . . decision” on the other, and we may assume that they made these linguistic choices intentionally.
    See Gutierrez v. Ada, 
    528 U.S. 250
    , 255 (2000) (noting that “words and people are known by their
    No. 05-6851            United Steelworkers of Am. v. Saint Gobain                                 Page 6
    Ceramics & Plastics
    companions”); see also Art. 28, § 1, Step 3 (requiring action “[w]ithin seven (7) calendar days
    following receipt of this notice of appeal”) (emphasis added). In addition, paragraph 6 of this
    Article uses this same 30-day period after the step-3 decision to prompt another dispute resolution
    procedure—an expedited arbitration process. It says that the request for expedited arbitration must
    be filed within 30 days “following the date of the answer given in the third step,” a verbal
    formulation that is consistent with starting the clock within 30 days of “the time of the . . . decision.”
    The union counters that this analysis would permit the company to make a decision, then
    delay sending it to the union until well into, if not after, the running of the 30-day limitations period.
    The requirement that the parties implement the agreement in “good faith” precludes the company
    from doing any such thing. See Art. 28, § 4. And other provisions of the agreement make getting
    away with such a delay even more implausible. Step 1 of the grievance procedure requires the
    aggrieved employee to discuss the grievance within 48 hours of the occurrence, and gives the
    supervisor 48 hours to answer the grievance orally. Step 2 of the procedure gives the dissatisfied
    employee 72 hours to set forth in writing his objection to the step 1 answer, and gives the supervisor
    72 hours to answer the complaint in writing. Step 3 gives the aggrieved employee five days
    following the disposition of step 2 to ask for a meeting to resolve the grievance; it then requires a
    meeting about the grievance within seven days; and it then requires the company to issue a written
    decision “[w]ithin seven (7) days following the Step 3 meeting.” Notably, for our purposes, if the
    company fails to satisfy this seven-day requirement, the time bar on any appeal to arbitration does
    not apply. See Art. 28, § 4 (“Grievances not appealed within the time limits . . . shall not be eligible
    for further discussion or appeal. Grievances not answered by the Company within the time limits
    specified in any step of this procedure shall be allowed without precedent.”). The brief timetables
    throughout this process, together with this seven-day requirement, eliminate the specter that the
    company could so delay issuing the decision that the time for appeal would lapse before the
    employee knew about the decision or even come close to lapsing before that time. The district court
    correctly dismissed the union’s action to enforce the arbitration clause.
    III.
    For these reasons, we affirm.
    

Document Info

Docket Number: 05-6851

Citation Numbers: 467 F.3d 540

Filed Date: 10/30/2006

Precedential Status: Precedential

Modified Date: 1/12/2023

Authorities (22)

Local 285, Service Employees International Union, Afl-Cio v.... , 64 F.3d 735 ( 1995 )

Monty D. Denhardt v. Trailways, Inc. , 767 F.2d 687 ( 1985 )

Aluminum Brick and Glass Workers International Union v. Aaa ... , 991 F.2d 1545 ( 1993 )

Rochester Telephone Corporation v. Communication Workers of ... , 340 F.2d 237 ( 1965 )

United Steelworkers v. Cherokee , 829 F.2d 1131 ( 1987 )

in-the-matter-of-the-application-of-cbs-inc-and-neal-pilson-and-ted , 989 F.2d 89 ( 1993 )

Jan M. Sexton Salmi v. Secretary of Health and Human ... , 774 F.2d 685 ( 1985 )

Philadelphia Printing Pressmen's Union No. 16, Aniline ... , 648 F.2d 900 ( 1981 )

Chauffeurs, Teamsters and Helpers, Local Union No. 765 v. ... , 625 F.2d 1092 ( 1980 )

General Drivers, Warehousemen and Helpers, Local Union 89 v.... , 852 F.2d 871 ( 1988 )

Raceway Park, Inc. Toledo Maumee Raceways, Inc. v. Local 47,... , 167 F.3d 953 ( 1999 )

local-1422-international-longshoremens-association-international , 170 F.3d 407 ( 1999 )

smith-barney-shearson-inc-v-warren-boone-individually-and-as-trustee , 47 F.3d 750 ( 1995 )

Armco Employees Independent Federation v. Ak Steel ... , 252 F.3d 854 ( 2001 )

Automotive, Petroleum and Allied Industries Employees Union,... , 709 F.2d 509 ( 1983 )

Washington Hospital Center v. Service Employees ... , 746 F.2d 1503 ( 1984 )

Toyota of Berkeley, a Corporation v. Automobile Salesmen's ... , 834 F.2d 751 ( 1987 )

United Steelworkers v. American Manufacturing Co. , 80 S. Ct. 1343 ( 1960 )

John Wiley & Sons, Inc. v. Livingston , 84 S. Ct. 909 ( 1964 )

At&T Technologies, Inc. v. Communications Workers , 106 S. Ct. 1415 ( 1986 )

View All Authorities »