Alongi v. Ford Mtr Co ( 2004 )


Menu:
  •                                  RECOMMENDED FOR FULL-TEXT PUBLICATION
    Pursuant to Sixth Circuit Rule 206
    File Name: 04a0351p.06
    UNITED STATES COURTS OF APPEALS
    FOR THE SIXTH CIRCUIT
    _________________
    CHARLES ALONGI, et al.,                                  X
    Plaintiffs-Appellees, -
    -
    -   No. 02-2514
    v.                                                -
    >
    ,
    FORD MOTOR CO .; ENVIRON , INC.,                          -
    Defendants-Appellants. -
    N
    Appeal from the United States District Court
    for the Eastern District of Michigan at Detroit.
    No. 02-70199—Nancy G. Edmunds, District Judge.
    Argued: April 21, 2004
    Decided and Filed: October 13, 2004
    Before: BOGGS, Chief Judge; and NELSON and SUTTON, Circuit Judges.
    _________________
    COUNSEL
    ARGUED: Maurice G. Jenkins, DICKINSON, WRIGHT, PLLC, Detroit, Michigan, for Appellants. Brian
    P. Swanson, ROY, SHECTER & VOCHT, Bloomfield Hills, Michigan, for Appellees. ON BRIEF:
    Maurice G. Jenkins, Paul R. Bernard, DICKINSON, WRIGHT, PLLC, Detroit, Michigan, for Appellants.
    Lynn H. Shecter, ROY, SHECTER & VOCHT, Bloomfield Hills, Michigan, for Appellees.
    _________________
    OPINION
    _________________
    BOGGS, Chief Judge. The question that the parties have raised and briefed in this case is whether
    the plaintiffs’ amended complaint – which, on its face, asserts exclusively state-law causes of action – is pre-
    empted in whole or in part by the Labor-Management Relations Act, see 29 U.S.C. § 185, and/or the
    National Labor Relations Act, see 29 U.S.C. § 158. The district court held that two claims in plaintiffs’
    amended complaint were pre-empted, and dismissed them in the belief that primary jurisdiction over these
    claims lay with the NLRB. It held that the other two claims were not pre-empted by federal law, and
    remanded them to the state courts of Michigan.
    Defendants appeal from this order, arguing that all of the plaintiffs’ claims are pre-empted by federal
    law, and that, in addition, all of the claims are untimely under the federal statute of limitations. Accordingly,
    defendants ask this court to order dismissal of the plaintiffs’ complaint in its entirety, with prejudice.
    1
    No. 02-2514             Alongi, et al. v. Ford Motor Co., et al.                                          Page 2
    We affirm the district court insofar as it held that the two challenged claims in the plaintiffs’
    amended complaint were not completely preempted, but we go further. Mindful of our independent
    obligation to ensure our subject-matter jurisdiction, we conclude that none of the claims in the plaintiffs’
    original complaint were completely preempted by the Labor-Management Relations Act, either. That means
    that removal jurisdiction in federal court was lacking from the outset of this case. We further conclude that
    we are obligated to act on this jurisdictional defect in the earlier proceedings, even though neither party has
    raised it. We accordingly vacate the district court’s rulings on the plaintiffs’ original and amended
    complaints, and remand to the district court for entry of an order dismissing all claims without prejudice,
    and entry of an order remanding the entire case to state court.
    I
    This is an appeal from the district court’s partial grant and partial denial of defendants’ motion to
    dismiss the plaintiffs’ amended complaint under Fed. R. Civ. P. 12(b)(6). Accordingly, the facts are taken
    from the amended complaint, or, where noted, from plaintiffs’ original complaint.
    Plaintiffs are ex-employees of Environ, Inc., a former subsidiary of co-defendant Ford Motor Co.
    Plaintiffs worked at Environ’s Wayne County, Michigan facility, and were represented by Local 2659 of the
    United Steelworkers of America (the “Union”). Environ’s primary business was salvaging Ford’s test and
    prototype vehicles and collecting recalled Firestone tires. Plaintiffs allege that Environ improperly resold
    the recalled tires to dealers and stores. They also allege that Environ sold other parts salvaged from test
    vehicles to commercial dealers, even though the parts had not been approved for commercial use. Plaintiffs
    protested these practices, but were threatened with the loss of their jobs if they refused to participate in them.
    From June to September 1999, the Union and Environ negotiated a new, six-year collective
    bargaining agreement (CBA), to take effect on September 27, 1999. One of the Union’s lead negotiators
    was David Lenart, the business agent for Local 2659. Environ’s chief negotiator was Martin Cygan, the vice
    president and COO of Environ. The resulting agreement contained no provision for the job security of
    Environ employees in the event the plant closed.
    Plaintiffs have alleged somewhat differing accounts of what happened at the negotiations. In their
    original complaint, plaintiffs alleged that during the negotiation of the CBA, Cygan represented that Environ
    would remain open for at least six more years and that all employees would be guaranteed their jobs during
    the period of the CBA. The original complaint also said that Cygan represented that Environ was financially
    secure. It claimed that the Union’s bargaining committee communicated these alleged representations to
    the plaintiffs and other employees, who relied on them. After the federal district court held some claims in
    their original complaint to be pre-empted by federal law (as discussed below at page 3), the plaintiffs
    amended their complaint. The amended complaint alleges that Cygan made the same representations noted
    above, but did so after the ratification of the CBA.
    Plaintiffs further allege (in both versions of the complaint) that at the time Cygan made these
    representations, he and Environ knew that a decision had been made to close the plant. Plaintiffs assert that
    this decision was made in part because of employee complaints about Environ’s use of recalled Firestone
    tires.
    On August 2, 2000, nearly a year into the CBA period, Environ informed the plaintiffs, and the rest
    of the plant’s hourly employees, that the plant would close. The Union and Environ then executed a “plant
    closing agreement” that extended certain seniority-based severance payments, benefits, and the like to the
    outgoing employees. This agreement did not contain any guarantees pertaining to job security. The
    plaintiffs and the other Environ employees were officially terminated on November 30, 2000.
    After the closing, Ford sold Environ to DST Industries, Inc. DST took over a number of Environ’s
    contracts and eventually opened a plant on the former Environ site, where it engages in a similar business.
    No. 02-2514              Alongi, et al. v. Ford Motor Co., et al.                                          Page 3
    A small number of ex-Environ employees were given jobs with DST, including Lenart, the former union
    negotiator, who received a managerial position. Plaintiffs, however, were not given jobs at DST.
    Plaintiffs brought this suit in the Circuit Court of Wayne County, Michigan, on December 12, 2001.
    Their original complaint asserted four counts, all pleaded under state law. We designate these counts with
    arabic numerals:
    (1) Violation of Michigan public policy. This claim was founded upon Mich. Comp. Laws
    § 750.125, a misdemeanor statute that criminalizes bribery of the agents or employees of another. The
    plaintiffs asserted that defendants violated public policy by giving Lenart a supervisory position at DST in
    return for Lenart’s acquiescence in negotiating a CBA that knowingly failed to protect the plaintiffs from
    the planned plant closing, despite Lenart’s fiduciary relationship to the plaintiffs. Plaintiffs argued that the
    statutory anti-bribery provision gave rise to an implied cause of action against defendants.
    (2) Common law fraud. This claim asserted that Cygan knowingly made misrepresentations during
    the CBA negotiations that Environ was sound and would remain open for six years, which misled the
    plaintiffs.
    (3) Civil conspiracy. This claim asserted that the alleged payoff agreement between Lenart and
    Environ management constituted a civil conspiracy to violate public policy (as described in Count 1 above).
    (4) Discharge in violation of public policy. This claim asserted that Environ required plaintiffs to
    participate in reselling unapproved parts, prototype vehicles, and recalled tires, in violation of the federal
    statute requiring sellers to comply with federal motor vehicle safety standards, 49 U.S.C. § 30112. It further
    alleged that Environ had retaliated against plaintiffs (who had complained about this) by not rehiring them
    to DST or any other Ford entity after the Environ plant closed. This, the plaintiffs argued, violated Michigan
    public policy.
    The defendants responded by removing the case to federal district court and asserting that the
    complaint raised questions of federal labor law. The plaintiffs’ state-law claims, they argued, were
    completely pre-empted by federal law, because adjudicating them would require interpretation of the CBA.
    Plaintiffs disagreed, and moved to remand the case to state court.
    The district court denied the plaintiffs’ motion to remand. It concluded that there was federal
    subject-matter jurisdiction over plaintiffs’ Count 2, for fraud. The court reasoned that adjudicating Count
    2 would require a court to look to the CBA and the negotiation process that produced it; accordingly, the
    count was completely pre-empted by federal labor law, and provided a basis for removal to federal court.
    To the extent that the other counts might not be so pre-empted, the court added, it would exercise
    supplemental jurisdiction over them.
    Defendants then filed a motion to dismiss the complaint pursuant to Fed. R. Civ. P. 12(b)(6) and Fed.
    R. Civ. P. 12(c). They contended that all of plaintiff’s claims were essentially federal in nature, and that,
    as a result, the claims were subject to dismissal with prejudice as untimely under the six-month federal
    statute of limitations applicable to claims under the NLRA. See DelCostello v. Int’l Bhd. of Teamsters, 
    462 U.S. 151
    , 172 (1983). (Indeed, plaintiffs conceded in a later filing before the district court that if any of their
    claims are pre-empted by federal labor law, then those claims are indeed untimely under the applicable
    statute of limitations.)
    Plaintiffs responded to the defendants’ motion to dismiss by filing an amended complaint that recast
    their allegations. Like the original complaint, the amended complaint asserted four counts, which we will
    designate with Roman numerals:
    No. 02-2514                 Alongi, et al. v. Ford Motor Co., et al.                                                       Page 4
    (I) Violation of Michigan public policy. This count was again pleaded under Mich. Comp. Laws
    § 750.125. It now asserts generally that Lenart was part of the Union’s CBA bargaining team, and that
    defendants violated public policy by helping Lenart obtain a supervisory position at DST, in order to
    “influence the action of Lenart in relation to the business of USWA and/or USWA Local 2659.”
    (II) Fraud. This claim was amended to assert that Cygan made knowingly false “individual
    promises” and “personal guarantees” to the plaintiffs, to the effect that Environ would remain open for six
    years and that that their jobs were secure. At one point, the amended complaint asserts that Cygan made
    these representations to employees in meetings that occurred “[f]ollowing [the] ratification of the collective
    bargaining agreement,” and that the representations were “separate from the collective bargaining
    agreement.” However, in ¶ 151, the amended complaint retains an allegation found in the original
    complaint: that “[a]s a result of th[e] representations, plaintiffs ratified the Collective Bargaining Agreement
    without requiring that their collective bargaining representatives negotiate re-employment assurances should
    the Environ plant close.” Plaintiffs allege that they were “damaged [by the fraud] in that they did not seek
    other employment during the period the plant remained open.”
    (III) Civil conspiracy. This claim simply asserts that the actions by the defendants alleged in Counts
    I and II constitute a civil conspiracy, and that plaintiffs were damaged by the conspiracy.
    (IV) Discharge in violation of public policy. This claim was essentially unchanged from the original
    complaint. As before, it asserts that Environ required plaintiffs to participate in reselling unapproved parts,
    prototype vehicles, and recalled tires, in violation of the federal statute requiring sellers to comply with
    federal motor vehicle safety standards, 49 U.S.C. § 30112. It further alleges that Environ had retaliated
    against plaintiffs (who had complained about this) by not rehiring them to DST or any other Ford entity after
    the Environ plant closed.
    The district court heard defendants’ motion to dismiss, and considered it as if directed to the
    amended complaint. On November 19, 2002, in a written opinion, the court concluded that amended Counts
    I and III were both pre-empted and subject to dismissal, but Counts II and IV were not.
    The court held that Count I (conferring a benefit on Lenart in violation of public policy) was pre-
    empted by § 8 of the NLRA, because it implicated the good faith of the employer in the CBA bargaining
    process. The court cited San Diego Bldg. Trades Council v. Garmon, 
    359 U.S. 236
    (1959), for this
    proposition. However, it rejected defendants’ argument that Count I was also pre-empted by § 301 of the
    LMRA on the ground that it required a court to interpret the CBA’s provisions. 
    Ibid. Similarly, the court
    held that Count III (civil conspiracy) was pre-empted by § 8 of the NLRA, because it was predicated, in part,
    upon the same conduct alleged in Count I.
    Next, the court held that amended Counts II (fraud) and IV (retaliatory discharge against public
    policy) were not pre-empted. Concerning Count II, it stated that this count, as amended, asserted only that
    Cygan made misrepresentations to plaintiffs about their job security after the CBA was negotiated,1 and thus
    reasoned that the claim did not relate to the agreement or the collective bargaining process. It noted that,
    “[a]ccording to plaintiffs, Cygan’s misrepresentations were not made during the collective bargaining
    process and did not impact plaintiffs’ decision to ratify the CBA.” Concerning Count IV, the court reasoned
    that this count was not pre-empted by § 301 of the LMRA, because it did not depend on the interpretation
    of the CBA. Plaintiffs did not seek relief under the CBA, nor did they allege that defendants violated the
    CBA by allegedly refusing to recommend plaintiffs for employment with DST.
    1
    As defendants observe, this was no t entirely ac curate. We have previously no ted that the amended co mplaint actually
    retained (in Count II, ¶ 151) an allegation that the plaintiffs had ratified the CBA based in part on misrepresentations made during
    the negotiations. However, as we discuss below, the presence of this allegation does not alter the ultimate outcome of the
    preemptio n inquiry.
    No. 02-2514              Alongi, et al. v. Ford Motor Co., et al.                                          Page 5
    Thus, the district court held that two of the amended counts properly sounded in federal labor law,
    and two in state law. However, the court did not retain jurisdiction over any of the counts in the amended
    complaint. Instead, since it had held that Counts I and III were pre-empted by § 8 of the NLRA (rather than
    by § 301 of the LMRA), the court concluded that those counts belonged under the primary jurisdiction of
    the NLRB, not in federal district court. See 
    Garmon, 359 U.S. at 242
    . Thus it dismissed Counts I and III
    without prejudice, and remanded Counts II and IV to state court.
    Neither the plaintiffs nor the defendants have appealed from the district court’s holding that Counts
    I and III were pre-empted under § 8 of the NLRA. However, the defendants have timely appealed from the
    district court’s holding with respect to Counts II and IV. They ask this court to hold that these claims are
    pre-empted under § 8 of the NLRA and § 301 of the LMRA, and then to proceed to adjudicate those claims
    on the merits, by dismissing them with prejudice as time-barred under federal law.
    II
    Review of the district court’s decision as to whether a plaintiff’s state-law claims are pre-empted by
    federal law is de novo. Martin v. Assoc. Truck Lines, Inc., 
    801 F.2d 246
    , 248 (6th Cir. 1986).
    A
    Both §7 and § 8 of the National Labor Relations Act, see 29 U.S.C. §§ 157-158, and § 301 of the
    Labor-Management Relations Act, see 29 U.S.C. § 185, exercise pre-emptive effect over state law tort
    claims that fall within their respective purviews. However, the standards for pre-emption under each statute,
    and the effects of pre-emption, are different.
    The National Labor Relations Act. Section 7 of the NLRA affirms a right of employees to “form,
    join, or assist labor organizations” and to “bargain collectively” with their employers. 29 U.S.C. § 157.
    Correspondingly, § 8 of the NLRA prohibits various “unfair labor practices” that interfere with that right.
    As relevant here, § 8(d) requires an employer to bargain in good faith with respect to “wages, hours and
    other terms and conditions of employment.” 29 U.S.C. § 158(d); Serrano v. Jones & Laughlin Steel Co.,
    
    790 F.2d 1279
    , 1286 (6th Cir. 1986). When a plaintiff’s claim involves “an activity [that] is arguably subject
    to § 7 or § 8 of the Act, the States as well as the federal courts must defer to the exclusive competence of
    the National Labor Relations Board if the danger of state interference with national policy is to be averted.”
    
    Garmon, 359 U.S. at 245
    . As refined by later cases, the Garmon doctrine requires a court to apply a
    “balancing approach” to discern whether a state-law claim is pre-empted, in cases where the activity at issue
    is only “arguably” within the scope of the NLRA. 
    Serrano, 790 F.2d at 1284-85
    . “When . . . the conduct
    at issue is only a peripheral concern of the Act or touches on interests so deeply rooted in local feeling and
    responsibility that . . . it could not be inferred that Congress intended to deprive the state of the power to act,
    [courts] refuse to invalidate state regulation or sanction of the conduct.” Local 926, Int’l Union of Operating
    Eng’rs v. Jones, 
    460 U.S. 669
    , 676 (1983) (citations and punctuation omitted).
    This type of pre-emption requires a court to yield primary jurisdiction over a given state-law claim
    to the NLRB, regardless of whether the claim was originally brought in federal or state court. However, it
    does not provide a basis for removal to federal court. “A claim of Garmon pre-emption is a claim that the
    state court has no power to adjudicate the subject matter of the case, and when a claim of Garmon pre-
    emption is raised, it must be considered and resolved by the state court.” Int’l Longshoremen’s Ass’n v.
    Davis, 
    476 U.S. 380
    , 393 (1986).
    The Labor-Management Relations Act. Section 301(a) of the Labor-Management Relations Act
    provides that the federal district courts have plenary jurisdiction, without regard to citizenship or amount
    in controversy, over “[s]uits for violation of contracts between an employer and a labor organization
    representing employees.” 29 U.S.C. § 185(a). The Supreme Court has recognized that the “unusually
    powerful pre-emptive force of § 301,” Beneficial Nat. Bank v. Anderson, 
    539 U.S. 1
    , 7 (2003) (internal
    No. 02-2514             Alongi, et al. v. Ford Motor Co., et al.                                        Page 6
    quotation marks omitted), places it in the small category of statutes that “not only pre-emp[t] state law but
    also authoriz[e] removal of actions that sought relief only under state law.” 
    Ibid. (citing Avco Corp.
    v. Aero
    Lodge No. 735, Int’l Ass’n of Machinists and Aerospace Workers, 
    390 U.S. 557
    (1968)). Section 301's
    sphere of complete pre-emption extends to state law claims that are “substantially dependent on analysis of
    a collective bargaining agreement,” but it does not reach claims that only “tangentially involve CBA
    provisions.” Fox v. Parker Hannifin Corp., 
    914 F.2d 795
    , 799-800 (6th Cir. 1990) (internal quotations
    omitted); see DeCoe v. Gen. Motors Corp., 
    32 F.3d 212
    , 216 (6th Cir. 1994) (“[S]ection 301 preempts state
    law rules that substantially implicate the meaning of collective bargaining agreement terms.”); Livadas v.
    Bradshaw, 
    512 U.S. 107
    , 124 (1994).
    Our court applies a two-step approach to deciding whether § 301 complete pre-emption applies to
    a state-law claim. 
    DeCoe, 32 F.3d at 216
    . First, we examine whether proof of the state law claim requires
    interpretation of collective bargaining agreement terms. Second, we ascertain whether the right claimed by
    the plaintiff is created by the collective bargaining agreement or by state law. If the right both arises from
    state law and does not require contract interpretation, then there is no preemption. However, if neither or
    only one criterion is satisfied, § 301 preemption is warranted. 
    Ibid. In some cases,
    both the pre-emptive effect of NLRA §§ 7-8 and the complete pre-emptive effect of
    LMRA § 301 will apply to a plaintiff’s state law claims. A federal court does not yield to the “primary
    jurisdiction” of the NLRB in such cases. “[I]n cases . . . where a party’s conduct gives rise to both a charge
    of an unfair labor practice [under the NLRA] and a claimed breach of a collective bargaining agreement
    [under § 301], the NLRB and the district court share concurrent jurisdiction.” Local Union No. 884, United
    Rubber, Cork, Linoleum, & Plastic Workers of Am. v. Bridgestone/Firestone, Inc., 
    61 F.3d 1347
    , 1356 (8th
    Cir. 1995) (internal quotation marks and citation omitted); see William E. Arnold Co. v. Carpenters Dist.
    Council, 
    417 U.S. 12
    , 15-16 (1974).
    B
    With these standards in mind, we turn to the parties’ arguments. We will focus first upon the
    question of complete preemption under § 301, since if none of plaintiffs’ claims are completely pre-empted,
    then we lack jurisdiction over this dispute between non-diverse parties, and it would be inappropriate to
    proceed to the question of possible NLRA preemption. The defendants place heavy emphasis on our
    decision in Adkins v. General Motors Corp., 
    946 F.2d 1201
    (6th Cir. 1991). They argue that Adkins
    requires us to hold that plaintiffs’ amended Count II for fraud is completely pre-empted by federal law. We
    disagree, concluding that two decisions of the United States Supreme Court bear more directly on the facts
    here.
    In Adkins, plaintiffs were union members at GMC’s Frigidaire plant. Plaintiffs’ union negotiated
    a CBA with GMC, in which plaintiffs made certain concessions in return for a separate negotiated agreement
    with GMC called the “bridge agreement.” This agreement gave the plaintiffs the right to transfer to the
    nearby GMC Delco plant, and also gave them the right to transfer back to the Frigidaire plant if there were
    layoffs at Delco. 
    Id. at 1202-03.
    The plaintiffs transferred to the Delco plant. Later, GMC sold the
    Frigidaire plant and that plant closed temporarily. The union then negotiated a new CBA with GMC in
    which the company agreed to rehire the laid-off Frigidaire employees. However, this agreement abrogated
    the earlier “bridge agreement” between the plaintiffs and GMC. Within a year, many Delco employees were
    laid off, including the plaintiffs. When they tried to rejoin the Frigidaire plant, they learned that the bridge
    agreement had been abrogated. 
    Id. at 1203-04.
    Plaintiffs brought suit for fraud, claiming that, prior to
    ratification of the new CBA, their union had made false representations to them, to the effect that their
    “bridge agreement” rights would not be affected. Plaintiffs alleged that the union did so as a result of
    collaboration between the local and GMC, and that this was fraud under state law. 
    Id. at 1204.
           We held the plaintiffs’ fraud claim to be pre-empted by § 301, and thus subject to dismissal with
    prejudice under the six-month federal statute of limitations. 
    Id. at 1210,
    1213. We reasoned, in part:
    No. 02-2514                  Alongi, et al. v. Ford Motor Co., et al.                                                        Page 7
    The plaintiffs’ claim, as the [district] court understood it, was that the president of
    Local 801 had fraudulently induced them to ratify the 1979 collective-bargaining agreement
    that abrogated the “bridge agreement.” . . . The damage alleged by plaintiffs was the loss of
    “bridge agreement” entitlements, which had been effected by the 1979 collective-bargaining
    agreement. In order to adjudicate this claim, the court below would have been obliged, at a
    minimum, to determine that the “bridge agreement” conferred such rights on the plaintiffs,
    that the subsequent collective-bargaining agreement abrogated those rights, and that the
    plaintiffs agreed to the 1979 collective-bargaining agreement because the president of Local
    801 misrepresented those rights as the court construed them. As the court below correctly
    concluded, such a judicial undertaking would necessarily involve the federal courts in
    adjudicating a claim “substantially dependent on analysis of collective-bargaining
    agreements.”
    
    Id. at 1208
    (emphasis added).
    Thus, Adkins held that there was complete pre-emption under § 301 in a case when the plaintiffs
    asserted that they were fraudulently induced to sign one labor contract, thereby forfeiting entitlements that
    were allegedly conferred by another labor contract. However, in the later case of Textron Lycoming
    Reciprocating Engine Div., AVCO Corp. v. UAW, 
    523 U.S. 653
    (1998), the Supreme Court made clear that
    a simple claim of fraudulent inducement to sign a labor contract, without more, is not a “suit for violation
    of contracts,” and so is not pre-empted by § 301. Plaintiffs in Textron claimed that management used
    fraudulent representations of job security to induce them to sign a collective bargaining agreement with a
    no-strike clause. 
    Id. at 654-55.
    They sued for a declaratory judgment that the resultant CBA was invalid.
    However, plaintiffs did not allege that either party had violated the terms of the CBA.2 
    Id. at 655.
    The
    Supreme Court held that the plaintiffs’ claim was insufficient to create federal subject-matter jurisdiction
    under § 301. 
    Id. at 658.
             Likewise, in Caterpillar, Inc. v. Williams, 
    482 U.S. 386
    (1987), the Supreme Court held that claims
    that the plaintiffs’ employer had breached individual promises of employment security to the plaintiffs by
    firing them, did not give rise to complete preemption under § 301, even though the firings took place during
    a time when plaintiffs were unionized employees governed by a CBA. The Court unanimously held that
    removal to federal court was improper. 
    Id. at 394,
    399. It acknowledged that the plaintiffs “could have
    brought suit under § 301” to enforce their rights under the CBA, which would have made removal
    appropriate, but held that the plaintiffs’ decision not to do so was entitled to respect, since their claims did
    not substantially depend upon interpretation of the CBA. 
    Id. at 394-95.
             The plaintiffs’ amended Count II for fraud in the present case resembles the claims held to be non-
    preempted in Caterpillar and Textron. The pivotal allegations are found in ¶¶ 141-42 and ¶ 151 of the
    Amended Complaint. Paragraphs 141 and 142 state that Cygan made “individual promises” and “personal
    guarantees” to the plaintiffs, to the effect that Environ would remain open for six years and that their jobs
    were secure. They further assert that Cygan made these representations in meetings with employees that
    occurred “[f]ollowing [the] ratification of the collective bargaining agreement,” and that the representations
    were “separate from the collective bargaining agreement.” Paragraph 151 alleges other misrepresentations.
    It states: “As a result of [Cygan’s] representations [about job security], plaintiffs ratified the Collective
    Bargaining Agreement without requiring that their collective bargaining representatives negotiate re-
    employment assurances should the Environ plant close.”
    2
    In Adkins, while the plaintiffs’ claims sounded principally in fraud, they also asserted a claim for tortio us interference with
    contract, premised on the argument that defendants’ representations to the plaintiffs had created a new employment contract, which
    defendants then intentionally breach ed. 
    See 946 F.2d at 1204
    & n.1.
    No. 02-2514              Alongi, et al. v. Ford Motor Co., et al.                                          Page 8
    These allegations do not require a court (or a factfinder) to apply the provisions of the 1999 collective
    bargaining agreement between the plaintiffs and Environ, but only to determine whether Environ
    representatives made the statements alleged, and whether plaintiffs reasonably relied on them.
    Nor is plaintiffs’ amended Count IV, for retaliatory discharge in violation of public policy, preempted
    by § 301. The plaintiffs allege that they were not rehired after the closing of the Environ plant because the
    defendants sought to retaliate against them for objecting to Environ’s use of unapproved automotive parts,
    in violation of federal standards. This claim deals with alleged conduct that occurred outside of the
    collective bargaining context. While the claim makes reference to an alleged violation of a federal statute,
    49 U.S.C. § 30112, and to federal auto safety standards, the right that plaintiffs are asserting arises under
    the public policy of Michigan. See 
    DeCoe, 32 F.3d at 216
    (noting that first factor in § 301 preemption
    inquiry turns on whether the asserted right stems from state or from federal law). Moreover, the elements
    that plaintiffs must establish to prevail on this claim do not make any reference to the terms of a collective
    bargaining agreement. See 
    ibid. Under Michigan law,
    plaintiffs must show that: (1) they engaged in
    protected activity; (2) the defendants took an employment action adverse to plaintiffs; and (3) the adverse
    action was causally connected to performing the protected activity. Authier v. Ginsberg, 
    757 F.2d 796
    , 798
    (6th Cir. 1985); Clifford v. Cactus Drilling Corp., 
    353 N.W.2d 469
    , 474 (Mich. 1984).
    To repeat, Count IV claims that defendants’ policy of reselling recalled Firestone tires and
    experimental parts from test vehicles violated 49 U.S.C. § 30112, which requires compliance with federal
    auto safety regulations. Plaintiffs claim that they objected to participating in these illegal activities, and that
    this caused Ford to retaliate against them, after the plant closed, by refusing to recommend them for jobs at
    DST or at any Ford entity. None of these allegations has anything to do with the principal CBA between
    the plaintiffs and Environ. As a matter of logic, the CBA could not authorize plaintiffs to participate in an
    (ostensible) violation of federal law even if it purported to do so. Rather, the analysis of Count IV is
    controlled by the Supreme Court’s decision in Lingle v. Norge Div. of Magic Chef, Inc., 
    486 U.S. 399
    (1988). There, the Court held unanimously that § 301 did not preempt a plaintiff’s state-law claim that her
    employer improperly discharged her in retaliation for filing a worker’s compensation claim. It stated that
    the retaliatory-discharge claim turned on “purely factual questions pertain[ing] to the conduct of the
    employee and the conduct and motivation of the employer. Neither of the elements require[d] a court to
    interpret any term of a collective bargaining agreement.” 
    Id. at 407.
    Because the claim could be resolved
    without “construing the collective bargaining agreement,” it was independent of the CBA and was not pre-
    empted by § 301. 
    Ibid. The same is
    true here.
    Defendants argue, however, that Count IV is still completely preempted because it implicates the
    separate “plant closing agreement” between the plaintiffs and Environ. While the amended complaint
    nowhere discusses the content of the plant closing agreement, defendants assert that this agreement contains
    provisions authorizing the alleged failure to rehire or recommend the plaintiffs.
    We conclude that even if this is so, it does not establish complete pre-emption. In effect, the
    defendants contend that § 301 should preempt Count IV because the defendants are certain to raise a
    defense that requires interpretation of a collective bargaining agreement. The Supreme Court has rejected
    this view. It is true that the doctrine of complete preemption goes beyond the usual contours of the well-
    pleaded complaint rule, in that it requires courts to attend to the underlying substance of a plaintiff’s cause
    of action, and not merely whether it is denominated as arising from state or federal law. But, as the Supreme
    Court has instructed us, the complete preemption doctrine does not abrogate the federal courts’ traditional
    focus on the complaint, in deciding questions of removal jurisdiction. The Caterpillar Court explained:
    It is true that when a defense to a state claim is based on the terms of a collective-bargaining
    agreement, the state court will have to interpret that agreement to decide whether the state
    claim survives. But the presence of a federal question, even a § 301 question, in a defensive
    argument does not overcome the paramount policies embodied in the well-pleaded complaint
    rule—that the plaintiff is the master of the complaint, that a federal question must appear on
    No. 02-2514             Alongi, et al. v. Ford Motor Co., et al.                                          Page 9
    the face of the complaint, and that the plaintiff may, by eschewing claims based on federal
    law, choose to have the cause heard in state court. When a plaintiff invokes a right created
    by a collective-bargaining agreement, the plaintiff has chosen to plead what we have held
    must be regarded as a federal claim, and removal is at the defendant's option. But a defendant
    cannot, merely by injecting a federal question into an action that asserts what is plainly a
    state-law claim, transform the action into one arising under federal law, thereby selecting the
    forum in which the claim shall be 
    litigated. 482 U.S. at 398-99
    ; see also 
    Livadas, 512 U.S. at 124
    (noting that “the bare fact that a collective bargaining
    agreement will be consulted in the course of state-law litigation . . . does not require the claim to be
    extinguished”; offering as an example of mere “consultation” a case in which a CBA sets the wage rates that
    must be consulted in order to compute a plaintiff’s damages for loss of employment) (citation omitted). The
    distinction drawn by the Court in Caterpillar applies precisely to the defendants’ argument here. We
    therefore hold that Count IV is not completely pre-empted.
    Because there is no complete pre-emption, under § 301 of the LMRA, of any of the counts in the
    amended complaint, we affirm the district court’s holding that removal to federal court was improper. As
    a consequence of that holding, we have no jurisdiction to consider whether any of those claims may be
    preempted by §7 and § 8 of the National Labor Relations Act; the matter is for the state courts to consider.
    See Lattin v. Kurdziel, No. 97-1384, 
    149 F.3d 1183
    , 
    1998 WL 344070
    (6th Cir. May 26, 1998) (per curiam).
    To the extent that the district court decided the question of NLRA preemption, this was error.
    C
    We believe the district court’s analysis of the preemption issues raised by this case was erroneous
    in another respect, one which we are obliged to address even though the parties have not raised it. In a prior
    stage of litigation, the court held that removal of plaintiffs’ original complaint was proper, on the ground
    that plaintiffs’ original fraud count (Count 2) was preempted under § 301. The court did not consider
    whether the other counts in the original complaint were also completely pre-empted, since in its view the
    exercise of supplemental jurisdiction over those counts would be appropriate in any case – given that Count
    2 provided a basis for federal jurisdiction.
    The only possible source of federal subject-matter jurisdiction in this case, which was originally filed
    in state court, is removal jurisdiction, on the ground that some of plaintiffs’ claims are completely pre-
    empted by federal law. Subject-matter jurisdiction cannot be conferred by consent of the parties, nor can
    it be waived. Ammex, Inc. v. Cox, 
    351 F.3d 697
    , 702 (6th Cir. 2003).
    We hold that none of the claims in plaintiffs’ original complaint were completely pre-empted by
    § 301. The district court premised its holding that Count 2 of the original complaint, for fraud, was
    completely pre-empted, on the presence of an allegation that Cygan, the management negotiator, misled the
    plaintiffs into ratifying the CBA with false representations as to Environ’s financial status and the plaintiffs’
    job security. However, as we noted in our analysis of the fraud count in the amended complaint, see Part
    
    II-B, supra
    , claims of fraudulent inducement to sign a labor contract do not normally give rise to § 301
    preemption. 
    Textron, 523 U.S. at 658
    . Here, the fraud allegations in Count 2 of the original complaint are
    not “substantially dependent on analysis of [the] collective bargaining agreement,” and so the claim was not
    completely pre-empted. Parker Hannifin 
    Corp., 914 F.2d at 800
    .
    The same is true of the other three counts in the original complaint. Count 1 essentially alleges that
    Environ violated Michigan’s public policy by bribing Lenart (plaintiffs’ negotiator) with a managerial
    position, in return for Lenart’s failing to secure strong employment guarantees in the CBA. The argument
    for § 301 preemption here must turn on the fact that a court hearing this claim might have to ascertain
    whether the resulting CBA did in fact fail to include such guarantees. Cf. 
    Adkins, 946 F.2d at 1208
    (finding
    complete preemption when plaintiffs alleged fraudulent inducement to sign a new CBA abrogating rights
    No. 02-2514             Alongi, et al. v. Ford Motor Co., et al.                                       Page 10
    already conferred by another CBA). However, we conclude that original Count 1 is not completely
    preempted, in light of the narrow analysis used by the Supreme Court in Textron, which was decided after
    our decision in Adkins. The Textron Court essentially concluded that, because the state fraud claim before
    it did not “alleg[e] that [defendant] has violated the contract,” nor turn on any finding that the contract’s
    terms were violated, it was not completely 
    preempted. 523 U.S. at 658
    . Here, Count 1 presents no stronger
    case for preemption.
    It follows that original Count 3 (conspiracy) also is not preempted, since it merely asserts that the
    conduct alleged in original Count 1 (which is not preempted) was a tortious conspiracy. And original Count
    4 (discharge in violation of public policy) is materially identical to the Count IV in plaintiffs’ amended
    complaint. Our analysis of amended Count IV in Part 
    II-B, supra
    , applies to original Count 4 as well, and
    compels us to conclude that Count 4 was not completely pre-empted.
    Accordingly, the district court lacked subject-matter jurisdiction to dispose of the counts in the
    original complaint, as well as the amended complaint. We accordingly vacate its prior rulings in this
    litigation. The plaintiffs are free to re-file their original complaint in state court, if they choose, and such
    a filing would not give rise to a jurisdictional basis for removal to federal court. The issue of complete
    preemption is the only issue we decide. We express no opinion on the merits of any of the claims in the
    original or amended complaints, nor as to whether any of these claims may be subject to preemption under
    the NLRA and the Garmon doctrine.
    III
    The district court’s order is AFFIRMED insofar as it held that Counts II and IV of the amended
    complaint were not completely pre-empted under § 301, and remanded those counts to the circuit court of
    Wayne County, Michigan. The district court’s order dismissing Counts I and III of the amended complaint
    is REVERSED and REMANDED for entry of an order remanding the rest of the case to the same state court.
    The district court’s other legal rulings in this case are VACATED.