Minnesota v. Kalman W. Abrams Metals, Inc. , 155 F.3d 1019 ( 1998 )


Menu:
  •                       United States Court of Appeals
    FOR THE EIGHTH CIRCUIT
    ___________
    No. 97-3545
    ___________
    State of Minnesota,                   *
    *
    Plaintiff - Appellant,         *
    *
    v.                             *
    *
    Kalman W. Abrams Metals, Inc.;        *
    Blum Holdings, Inc.; A & D Recycling, *
    Inc.; Martin Bush Iron & Metal        * Appeal from the United States
    Company; Metalsmith Recycling Co.,    * District Court for the
    * District of Minnesota.
    Defendants - Appellees,        *
    *
    Kirschbaum-Krupp Metal Co.; Leder     *
    Brothers Company,                     *
    *
    Defendants.                    *
    ___________
    Submitted: June 11, 1998
    Filed: September 17, 1998
    ___________
    Before BOWMAN, Chief Judge, HEANEY and LOKEN, Circuit Judges.
    ___________
    LOKEN, Circuit Judge.
    The State of Minnesota has sued to recover costs incurred by the Minnesota
    Pollution Control Agency (MPCA) in cleaning up lead-contaminated soils. The
    defendants are present and former owners of companies that furnished scrap wire to the
    site’s proprietor for an environmentally unsound recycling process. The State asserts
    claims under the federal “superfund” law, the Comprehensive Environmental Response,
    Compensation, and Liability Act of 1980 (CERCLA), 42 U.S.C. §§ 9601-75, and its
    state law counterpart, the Minnesota Environmental Response and Liability Act
    (MERLA), Minn. Stat. §§115B.01-.24. The State appeals the grant of summary
    judgment in favor of non-settling defendants. We agree that the State’s claims must in
    large part be rejected because MPCA conducted the cleanup in an arbitrary and
    capricious manner. But we conclude the State may recover from responsible private
    parties for the non-arbitrary portion of response costs that ultimately produced a
    successful environmental remedy. Accordingly, we reverse in part and remand.
    I. Background.
    For over ten years, Gerald McGuire obtained used insulated wire from Twin
    Cities scrap dealers, burned insulation off the wire on his residential property in Mora,
    Minnesota, and returned or resold clean wire to the scrap dealers. McGuire was paid
    based on the weight of insulation burned off. The burning process generated ash,
    which McGuire spread over portions of his property. He also may have conducted
    smelting activities generating slag that he deposited on the premises. In April 1985,
    MPCA obtained a search warrant and inspected the McGuire property. When a
    preliminary soil analysis revealed hazardous lead concentrations, McGuire ceased his
    burning operations but advised MPCA that he could not afford to clean up the site. The
    agency placed the site on its Permanent List of Priorities under MERLA. See Minn.
    Stat. § 115B.17, subd. 13.
    In June, 1986, the United States Environmental Protection Agency (EPA)
    conducted a Site Assessment at MPCA’s request. Soil analyses revealed hazardous
    concentrations of lead and elevated concentrations of other metals that posed “an
    imminent and substantial threat to human health and the environment,” particularly to
    -2-
    McGuire’s young children and grandchildren who often played on the site. MPCA
    designated the site as a “Class C” priority but took no action until March 1989, when
    it sent McGuire a formal Request for Information (RFI) asking him to identify suppliers
    of the insulated wire he had burned.1 The agency then sent RFIs to the scrap dealers
    who eventually became defendants. Sam Blum denied knowledge of dealing with
    McGuire. The others admitted having McGuire burn insulation off used wire for them,
    and one admitted furnishing lead cable for burning. One denied responsibility for any
    release or threatened release of hazardous substances, while the others simply
    answered the RFI questions and denied knowledge of any such releases.
    On August 28, 1990, MPCA issued a Request for Response Action (RFRA)
    formally asking McGuire to remedy the releases and threatened releases of hazardous
    substances at his property, and notifying him that, if he failed to do so, the agency could
    commence an action to compel performance or complete the requested actions and seek
    reimbursement from him.2 At the same time, the agency determined that he would not
    comply based upon his prior representations of poverty and authorized the expenditure
    of $350,000 from the superfund to clean up the site. At the agency Board meeting
    approving these actions, MPCA staff advised its Commissioners that no RFRAs should
    be issued to the scrap dealers because their liability was not entirely clear.
    1
    The RFI is an informal data-gathering administrative procedure. It is described
    by MPCA as “one of the first steps taken by the MPCA to comply with” MERLA by
    helping the agency identify private parties who may be “Responsible Persons” -- those
    who are liable under MERLA because their wastes or waste disposal practices have
    contributed to the release or threatened release of hazardous substances.
    2
    The RFRA is the administrative procedure adopted by MPCA to comply with
    Minn. Stat. § 115B.17, subd. 1(a)(1), (3), the MERLA provision requiring that, before
    spending state superfund monies, MPCA “shall” (i) request “any responsible party
    known to the agency” to take reasonable and necessary remedial action, and (ii)
    determine that the actions requested will not be taken “by any known responsible
    party.”
    -3-
    In January 1991, MPCA selected Delta Environmental Consultants to investigate
    the site and supervise the contractor hired to complete the selected remedy. MPCA
    later contracted with Microbial Biotechnology, Inc. (MBI), to perform on-site lead
    extraction using a treatment method known as soil washing. The agency announced to
    the public that the “whole cleanup process . . . will cost approximately $200,000” and
    distributed news releases advising this would be its first on-site attempt to extract lead
    from contaminated soil. It held a public meeting on June 27, 1991, at a local
    sportsmen’s club to apprise the community of its decision.
    After the cleanup began, MBI discovered that 1500 cubic yards of soil were
    contaminated, rather than 500 cubic yards, prompting MPCA to authorize spending an
    additional $350,000. Despite this additional funding, the MBI cleanup was a failure.
    Mechanical problems plagued MBI’s equipment, and actual soil conditions were not
    conducive to soil washing. MBI failed to respond to MPCA complaints and finally quit
    the job in November 1991. MPCA terminated MBI’s contract after spending
    $195,301.57 on this phase of the cleanup effort. MPCA next paid $25,000 to Cognis,
    Inc., a California firm, to test a different on-site soil treatment process. Cognis reported
    that it could not meet MPCA’s rigorous lead treatment goal. MPCA then abandoned
    on-site remediation and, after a final bid process, hired Remediation Services, Inc.
    (RSI), to perform on-site stabilization of the soil followed by off-site disposal. RSI
    successfully completed the task in one month at a cost of $293,621.79. No further
    cleanup work is anticipated, and the site has been removed from the State’s Permanent
    List of Priorities.
    MPCA incurred a total of $660,384.82 in response costs to clean up the
    McGuire site. In January 1996, the State commenced this action to recover all
    response costs from the scrap dealers. Defendants are Kalman W. Abrams Metals, Inc.
    (KWA); two companies allegedly responsible for the actions of Martin Bush Iron &
    Metal Company (Martin Bush); Blum Holdings, the former owner of Sam Blum Iron
    -4-
    & Metal Company (Blum Holdings); A & D Recycling, Inc., the present owner of Sam
    Blum Iron & Metal (A & D Recycling); and two companies allegedly responsible for the
    actions of Leder Brothers Scrap Iron & Metal Company (Leder Brothers).
    The district court issued four orders disposing of the State’s claims. First, it
    granted summary judgment in favor of Blum Holdings on the ground that the State did
    not initiate legal or administrative proceedings before that corporation dissolved. The
    State appeals that ruling, which will be the last issue addressed in this opinion. Second,
    the court issued two orders granting summary judgment on the merits in favor of KWA,
    Martin Bush, and A & D Recycling. The court dismissed the State’s CERCLA claims
    on the ground that MPCA is not entitled to reimbursement because it acted arbitrarily
    and capriciously in selecting a soil treatment plan and in failing to properly notify
    defendants of its proposed response action. The court dismissed the State’s MERLA
    claims as time-barred by the six-year statute of limitations in Minn. Stat. § 115B.11. The
    State appeals these rulings, which are the principal focus of this opinion. Finally, after
    the State filed its notice of appeal, the district court entered a consent decree as to Leder
    Brothers reflecting a prior settlement. Appellees rely on the timing of this decree as one
    basis for their motion to dismiss the State’s appeal for lack of jurisdiction, the issue we
    will next address.
    II. Appellate Jurisdiction.
    Appellees move to dismiss the appeal, arguing we lack jurisdiction because the
    district court orders being appealed did not resolve claims against Leder Brothers and
    did not resolve pending claims among the defendants. The motion is denied.
    In the district court, all the defendants initially moved for summary judgment. The
    State notified the district court in July 1997 that it had settled with Leder Brothers. The
    three orders being appealed resolved all the State’s claims against the four non-settling
    defendants -- Blum Holdings in August 1996, KWA and Martin Bush in August
    -5-
    1997, and A & D Recycling on September 15, 1997. The court’s August 1997 summary
    judgment order noted that Leder Brothers “originally joined in this motion, but have
    since settled with the plaintiffs.” The settlement was not final in August 1997 because
    MPCA was awaiting public comments on the proposed consent decree. The State filed
    its notice of appeal on September 19, four days after the order entering summary
    judgment in favor of A & D Recycling.
    “No statute or rule specifies the essential elements of a final judgment”; what is
    required is “some clear and unequivocal manifestation by the trial court of its belief that
    the decision made, so far as the court is concerned, is the end of the case.” Goodwin v.
    United States, 
    67 F.3d 149
    , 151 (8th Cir. 1995). When it dismissed all claims against
    the last three non-settling defendants, the district court understood that Leder Brothers
    had settled and therefore its last two summary judgment rulings need not include those
    parties. Although the consent decree was not entered until October, final approval of the
    settlement was the kind of “ministerial task” that does not defeat finality, like calculation
    of the tax refund in 
    Goodwin, 67 F.3d at 151
    . The court’s August and September orders
    granting summary judgment contain the requisite “clear and unequivocal manifestation”
    of the court’s belief that it had ended the case. Therefore, the three summary judgment
    orders became final and appealable on September 15, 1997.
    Defendants’ cross claims, counterclaims, and third-party claims were contingent
    upon defendants being liable to the State. Not surprisingly, therefore, the district court
    did not address those claims when it granted summary judgment in favor of the non-
    settling defendants. This did not affect the finality of the court’s last summary judgment
    order or our jurisdiction. If appellees were aggrieved by the court’s failure to address
    their contingent claims, they should have cross appealed.
    -6-
    III. The State’s CERCLA Claims.
    CERCLA provides that responsible persons are liable for “all costs of removal
    or remedial action incurred by the United States Government or a State or an Indian tribe
    not inconsistent with the national contingency plan [NCP].” 42 U.S.C. § 9607(a)(1)-
    (4)(A). If the State establishes that it incurred response costs to remedy a release or
    threatened release of hazardous substances from a facility, and that defendants are
    responsible persons, then defendants have the burden of proving that the costs incurred
    were inconsistent with the NCP, an issue that is judicially reviewed under the arbitrary
    and capricious standard of review for agency action. See 42 U.S.C. § 9613(j)(2); United
    States v. Northeastern Pharm. & Chem. Co. (“NEPACCO”), 
    810 F.2d 726
    , 747-48 (8th
    Cir. 1986), cert. denied, 
    484 U.S. 848
    (1987), followed in Washington State Dept. of
    Transp. v. Washington Natural Gas Co., 
    59 F.3d 793
    , 802 (9th Cir. 1995), and United
    States v. Hardage, 
    982 F.2d 1436
    , 1442 (10th Cir. 1992), cert. denied sub nom. Advance
    Chem. Co. v. United States, 
    510 U.S. 913
    (1993). “Congress has not provided that
    private parties must pay for the consequences of arbitrary and capricious agency action.”
    Matter of Bell Petroleum Servs., Inc., 
    3 F.3d 889
    , 905 (5th Cir. 1993).
    This appeal turns on whether MPCA incurred costs inconsistent with the NCP.
    The NCP is a set of EPA regulations that “establish[es] procedures and standards for
    responding to releases of hazardous substances.” County Line Inv. Co. v. Tinney, 
    933 F.2d 1508
    , 1511 (10th Cir. 1991). “The NCP is designed to make the party seeking
    response costs choose a cost-effective course of action to protect the public health and
    the environment.” Washington 
    DOT, 59 F.3d at 802
    . For the purpose of reviewing the
    grant of summary judgment on this issue, we assume without deciding that appellees are
    responsible persons, that the McGuire site was a “facility,” and that MPCA incurred
    response costs to remedy the release of hazardous substances at that facility. Thus, the
    only question is whether MPCA remedied the environmental problem in an arbitrary and
    capricious manner.
    -7-
    There is a threshold problem in evaluating state agency cleanup action for
    consistency with the NCP. The EPA regulations distinguish between removal actions --
    those taken to counter imminent and substantial threats to public health and welfare --
    and remedial actions, which are longer term, more permanent responses. The NCP
    prescribes more detailed procedures and standards for remedial actions. Compare 40
    C.F.R. §§ 300.410, 300.415 (removal actions), with §§ 300.420-300.435 (remedial
    actions). The district court concluded that MPCA conducted a remedial action at the
    McGuire site and compared that action against the remedial action requirements of the
    NCP. MPCA argues we must remand for further factual development of that issue,
    noting the obvious fact that lead contaminants were “removed” from the site. However,
    MPCA conducted the cleanup under state laws and regulations that permit the agency
    to incur and recover “response costs.” State law does not distinguish procedurally
    between removal and remedial actions. Therefore, MPCA never made the determination
    required by § 300.415(b) of the NCP, a determination EPA must make before it may
    take emergency or short-term removal action. In these circumstances, we agree with the
    district court that the permanent nature of the McGuire site cleanup and the leisurely
    manner in which MPCA dealt with the problem make it appropriate to hold the agency
    to the NCP standards for remedial action.
    The district court concluded that MPCA conducted the McGuire site cleanup in
    an arbitrary and capricious manner for the following reasons:
    -- MPCA failed to undertake a feasibility study before selecting the soil washing
    remedy, as the NCP requires. See 40 C.F.R. §§ 300.430(a)(2), 300.430(e).
    -- MPCA instead relied on EPA’s May 1986 Site Assessment, but MPCA ignored
    the EPA contractor’s warning that the soil washing option was “questionable”
    because it would not “address total lead concentrations,” and its recommendation
    that “complete removal of the contaminated material would be the most
    environmentally sound and cost-effective method at this site.” While
    -8-
    the State “may take some risks to develop experimental remedies,” the
    court observed, “the risk the State took here was without any record
    support.”
    -- MPCA acted inconsistently with the NCP when it gave the public minimal
    public notice of the proposed soil washing remedy and contracted to implement
    that remedy before the public comment period ended. As a consequence,
    “defendants were denied any real opportunity to comment on the State’s clean-up
    plans.”
    -- The experimental soil washing remedy “failed, forcing the State to hire new
    contractors, at increased expense, to clean up the site.”
    Our review of the MPCA administrative record supports these conclusions. The EPA
    site assessment team warned MPCA in May 1986 that soil washing was questionable
    and recommended complete removal. The Bureau of Mines, which had significant soil
    washing experience, had rejected soil washing as a way to remedy lead contamination.
    Yet MPCA went ahead with the soil washing option in 1991 without further feasibility
    study and in the face of an additional warning from its own contractor, Delta: “The
    disadvantages of soil washing are . . . the uncertainty in the effectiveness of the process
    and the relatively high costs.” In addition, no preliminary studies were conducted
    despite MPCA’s knowledge that MBI had never conducted a full-scale remediation
    project. MPCA did not verify MBI’s financial stability nor require it to post a
    performance bond. The record reflects that MPCA obstinately insisted on employing an
    untried, high-risk, high-cost remedy; failed to adequately study the nature and extent of
    the contamination problem in advance; and failed to monitor MBI and modify the
    remedy when the unevaluated problem turned out to be greater than anticipated. We
    agree with the district court that appellees met their burden of proving this was arbitrary
    and capricious agency action inconsistent with the NCP within the meaning of 42 U.S.C.
    § 9607(a)(1-4)(A).
    However, we disagree with the district court’s decision to preclude the State from
    any cost recovery under CERCLA. The record leaves no doubt, indeed, appellees
    -9-
    virtually concede, that remedial action to clean up the McGuire site was appropriate
    under CERCLA. The statute provides that the State may recover “all costs . . . not
    inconsistent with the [NCP].” Therefore, the State may recover all costs except those
    that appellees prove were inconsistent with the NCP. See 
    NEPACCO, 810 F.2d at 747
    .
    The district court erred in concluding without discussion that MPCA’s arbitrary and
    capricious actions during the MBI phase of the cleanup completely bar the State from
    recovering all costs incurred. Thus, the case must be remanded.
    An issue that is likely to emerge on remand is worthy of further comment.
    Appellees argue that MPCA was arbitrary and capricious not only in initially choosing
    the wrong remedy, but also in unreasonably and unnecessarily increasing the cost of the
    appropriate remedy ultimately implemented by RSI. In most cases, if the agency has
    chosen a remedial plan that is not arbitrary and capricious, such as the RSI remedy, a
    responsible person may not challenge portions of the costs incurred in implementing that
    remedy. This is because § 9607(a)(1-4)(A) permits recovery of “all costs,” not merely
    “all reasonable costs.” See 
    Hardage, 982 F.2d at 1443
    ; 
    NEPACCO, 810 F.2d at 747
    -48;
    but see United States v. R.W. Meyer, Inc., 
    889 F.2d 1497
    , 1508 (6th Cir. 1989), cert.
    denied, 
    494 U.S. 1057
    (1990). However, those prior cases involved responsible persons
    that had been afforded prior notice of the proposed cleanup and an opportunity to
    undertake an agency-supervised cleanup at their own expense. Both CERCLA and the
    NCP require this kind of involvement of responsible persons before federal superfund
    monies are expended. See 42 U.S.C. §§ 9613(k)(2)(D), 9617; 40 C.F.R. §§ 300.400(b),
    300.415(a)(2). Moreover, MPCA’s statutory obligation to afford responsible persons
    prior opportunity to undertake a necessary cleanup is, if anything, even more explicit
    under state law. See Minn. Stat. § 115B.17, subd. 1(a)(1).
    We agree with the district court that MPCA failed to meet its obligations to notify
    and involve responsible persons before undertaking to clean up the McGuire site. The
    State argues that the scrap dealers were not “known” responsible persons when MPCA
    authorized the expenditure of state superfund monies and commenced the
    -10-
    cleanup. But the scrap dealers were known generators, and Leder Brothers was known
    to have furnished lead cable for McGuire’s insulation-burning operations. The agency
    clearly knew enough to decide that it would likely seek reimbursement from the scrap
    dealers under CERCLA or MERLA. Therefore, they should have been given a formal
    opportunity to comment on the proposed cleanup plan and to undertake the cleanup at
    their own expense. As the court said in Aetna Casualty & Surety Company v. Pintlar
    Corporation, 
    948 F.2d 1507
    , 1517 (9th Cir. 1991):
    The extent of CERCLA liability is far-reaching. The ability to
    choose the response action greatly empowers the government. In order to
    influence the nature and costs of the environmental studies and cleanup
    measures, [responsible persons] must get involved from the outset. In
    many instances, it is more prudent for [a responsible person] to undertake
    the environmental studies and cleanup measures itself than to await the
    EPA’s subsequent suit in a cost recovery action.
    See also 
    Bell, 3 F.3d at 897
    ; Key Tronic Corp. v. United States, 
    511 U.S. 809
    , 820
    (1994) (“[t]racking down other responsible solvent polluters increases the probability
    that a cleanup will be effective and get paid for”).3 Because MPCA’s actions were
    inconsistent with the NCP in this regard, appellees are entitled to prove that this
    inconsistency caused the State to incur unreasonable or unnecessary response costs in
    implementing even an appropriate remedial action. The State may not recover response
    costs incurred in implementing appropriate remedial actions to the extent appellees prove
    on remand that they would have and could have accomplished the cleanup more cost
    effectively.
    3
    It is also fundamentally fair to require the government to affirmatively involve
    potentially responsible parties before committing superfund resources because private
    parties may not obtain pre-enforcement review of proposed CERCLA response actions.
    See Gopher Oil Co. v. Bunker, 
    84 F.3d 1047
    , 1051 (8th Cir. 1996).
    -11-
    It is important to everyone that necessary environmental remediation be timely
    completed as cost effectively as possible. Therefore, the kind of arbitrary and wasteful
    agency action that occurred in this case cannot be rewarded. On the other hand, private
    parties that are responsible for necessary cleanups should not receive a financial windfall
    from the superfund because the environmental constable blundered. We believe the
    CERCLA cost recovery standards set forth in this opinion will encourage those involved
    in future cleanups to achieve the most cost-effective and environmentally appropriate
    solution.
    IV. The State’s MERLA Claims.
    The State also sued to recover its response costs under the state superfund statute,
    MERLA. The district court dismissed these claims as time-barred under MERLA’s
    statute of limitations, a ruling the parties extensively debate on appeal. However, we
    need not decide this important issue of state law.
    Though the two statutes have significant differences, MERLA “was patterned
    after its federal counterpart,” CERCLA. Westling v. County of Mille Lacs, 581 N.W.2d.
    815, 817 n.1 (Minn. 1998); Musicland Group, Inc. v. Ceridian Corp., 
    508 N.W.2d 524
    ,
    529 (Minn. App. 1993). MERLA allows the State to recover from responsible persons
    all “reasonable and necessary” response costs incurred by MPCA. See Minn. Stat.
    §§ 115B.04, subd. 1(a), 115B.17, subd. 6. However, before taking any remedial action,
    MPCA must “[r]equest any responsible party known to the agency to take actions which
    the agency deems reasonable and necessary,” and “[d]etermine that the actions requested
    by the agency will not be taken by any known responsible party in the manner and within
    the time requested.” Minn. Stat. § 115B.17, subd. 1(a)(1), (3). For the reasons stated
    in Part III of this opinion, we conclude that the State would not be entitled on remand
    to any greater recovery for its response actions under
    -12-
    MERLA than under CERCLA. Therefore, we need not further consider the MERLA
    claims.4
    V. The Blum Holdings Dissolution Issue.
    In October 1994, A & D Recycling purchased the assets of Sam Blum Iron &
    Metal Company, and the seller changed its corporate name to Blum Holdings. In April
    1995, Blum Holdings advised MPCA that it did undoubtedly sell “very small quantities”
    of insulated wire to McGuire and repurchase clean wire from him. Blum Holdings then
    filed a notice of intent to dissolve with the Minnesota Secretary of State, see Minn. Stat.
    § 302A.723, and the company sent notice of its intent to dissolve to MPCA as a creditor,
    see Minn. Stat. § 302A.727, subd. 1. MPCA served notice of its claim, and Blum
    Holdings rejected the claim on August 17, 1995. That gave the State until October 25,
    1995, “to pursue any other remedies.” Minn. Stat. § 302A.727, subd. 3(b). The State
    did not commence this lawsuit until January 1996. Accordingly, the district court
    dismissed the claim against Blum Holdings as barred by Minn. Stat. § 302A.727, subd.
    3(d), because the State did not timely “initiate legal, administrative, or arbitration
    proceedings with respect to the claim.”
    On appeal, the State first argues that its RFI to Blum Holdings in 1989 and an
    April 1995 letter constitute the initiation of an administrative proceeding for purposes
    of § 302A.727, subd. 3(d). Like the district court, we disagree. This novel interpretation
    of the RFI is contrary to the cover letter which accompanied the RFI sent to Blum
    Holdings (“The main purpose of the RFI is to gather information . . .”), and it has no
    support in MERLA, the MPCA’s regulations, or case law. The April 1995 letter was
    sent to Sam Blum and A & D Recycling, not Blum Holdings; the letter simply
    4
    The State’s statement of issues presented for review does not challenge the
    district court’s dismissal of the State’s other state law claims. See F.R.A.P. 28(a)(3).
    That portion of the court’s summary judgment rulings is therefore affirmed.
    -13-
    requested a meeting to explore the accuracy of Blum’s prior denial of having furnished
    insulated wire to McGuire for burning. These were certainly preliminary steps in the
    MERLA enforcement process. Cf. Comfort Lake Ass’n, Inc. v. Dresel Contracting, Inc.,
    
    138 F.3d 351
    , 357 (8th Cir. 1998). But they were not the initiation of the kind of formal
    proceedings that § 302A.727, subd. 3(d), requires a creditor to commence to avoid the
    normal consequences of corporate dissolution. See Onan Corp. v. Industrial Steel Corp.,
    
    770 F. Supp. 490
    , 493-94 (D. Minn. 1989), aff’d, 
    909 F.2d 511
    (8th Cir.), cert. denied,
    
    498 U.S. 968
    (1990).
    The State alternatively argues that CERCLA preempts state dissolution statutes
    such as § 302A.727. This contention is foreclosed by 
    NEPACCO, 810 F.2d at 746
    (state law governs capacity to be sued under CERCLA), and 
    Onan, 770 F. Supp. at 495
    .
    The order granting summary judgment in favor of Blum Holdings is affirmed.
    The judgment of the district court is affirmed in part and reversed in part, and the
    case is remanded for further proceedings not inconsistent with this opinion. The State’s
    motion to strike appellees’ appendices is denied.
    A true copy.
    Attest:
    CLERK, U. S. COURT OF APPEALS, EIGHTH CIRCUIT.
    -14-