Greater Yellowstone v. Lewis ( 2010 )


Menu:
  •                   FOR PUBLICATION
    UNITED STATES COURT OF APPEALS
    FOR THE NINTH CIRCUIT
    GREATER YELLOWSTONE COALITION;         
    NATURAL RESOURCES DEFENSE
    COUNCIL; SIERRA CLUB;
    DEFENDERS OF WILDLIFE,
    Plaintiffs-Appellants,
    v.
    WILMA A. LEWIS; TOM TIDWELL;
    ROBERT V. ABBEY; THOMAS J.
    VILSACK; KEN SALAZAR; BRENT
    LARSON, Supervisor, Caribou-                No. 09-35729
    Targhee National Forest,
    Defendants-Appellees,
          D.C. No.
    4:08-cv-00388-
    J.R. SIMPLOT COMPANY; UNITED                   MHW
    STEELWORKERS LOCAL 632; CITY OF
    POCATELLO; CITY OF CHUBBUCK;
    CITY OF SODA SPRINGS; POWER
    COUNTY; CARIBOU COUNTY;
    BANNOCK COUNTY; IDAHO FARM
    BUREAU FEDERATION; TOWN OF
    AFTON, WYOMING; LINCOLN
    COUNTY, WYOMING,
    Defendant-intervenors-Appellees.
    
    119
    120        GREATER YELLOWSTONE COALITION v. LEWIS
    GREATER YELLOWSTONE COALITION;          
    NATURAL RESOURCES DEFENSE
    COUNCIL; SIERRA CLUB;
    DEFENDERS OF WILDLIFE,
    Plaintiffs,
    and
    ASHLEY CREEK PROPERTIES, L.L.C.,
    Petitioner-intervenor-Appellant,
    v.
    BRENT LARSON, Supervisor,
    Caribou-Targhee National Forest,
    in his official capacity; WILMA A.
    LEWIS; TOM TIDWELL; ROBERT V.           
    ABBEY; THOMAS J. VILSACK; KEN
    SALAZAR,
    Defendants,
    UNITED STEELWORKERS LOCAL 632;
    CITY OF POCATELLO; CITY OF
    CHUBBUCK; CITY OF SODA SPRINGS;
    POWER COUNTY; CARIBOU COUNTY;
    BANNOCK COUNTY; IDAHO FARM
    BUREAU FEDERATION; TOWN OF
    AFTON, WYOMING; LINCOLN
    COUNTY, WYOMING,
    Defendant-intervenors,
    
    GREATER YELLOWSTONE COALITION v. LEWIS         121
    and                        No. 09-35753
    J.R. SIMPLOT COMPANY,                        D.C. No.
    Defendant-intervenor-Appellee.      4:08-cv-00388-
    MHW
          OPINION
    Appeal from the United States District Court
    for the District of Idaho
    Mikel H. Williams, Magistrate Judge, Presiding
    Argued and Submitted
    October 6, 2010—Seattle, Washington
    Filed December 23, 2010
    Before: Betty B. Fletcher, A. Wallace Tashima and
    Sidney R. Thomas, Circuit Judges.
    Opinion by Judge Thomas;
    Dissent by Judge B. Fletcher
    124       GREATER YELLOWSTONE COALITION v. LEWIS
    COUNSEL
    Timothy J. Preso and Douglas L. Honnold; Earthjustice;
    Bozeman, Montana; attorneys for the appellants.
    Robert H. Foster, Aaron P. Avila, and Justin R. Pidot; United
    States Department of Justice; Washington, D.C.; attorneys for
    the appellees.
    David H. Maguire; Maguire & Penrod; Pocatello, Idaho; and
    James Sanderson; Afton Wyoming; attorneys for intervenor-
    defendants United Steelworkers Local 632; Idaho Farm
    GREATER YELLOWSTONE COALITION v. LEWIS          125
    Bureau Federation; City of Pocatello, Idaho; City of Soda
    Springs, Idaho; City of Afton, Wyoming; Power County,
    Idaho; Bannock County, Idaho; Caribou County, Idaho; and
    Lincoln County, Wyoming.
    Albert P. Barker and Paul L. Arrington; Barker Rosholt &
    Simpson, LLP; Boise, Idaho, attorneys for intervenor-
    defendant J. R. Simplot Company.
    OPINION
    THOMAS, Circuit Judge:
    Greater Yellowstone Coalition, Natural Resources Defense
    Council, Sierra Club, and Defenders of Wildlife (collectively
    “Greater Yellowstone”) appeal the district court grant of sum-
    mary judgment on Greater Yellowstone’s action claiming that
    the expansion of the J.R. Simplot Smoky Canyon Mine would
    violate the National Environmental Policy Act (“NEPA”), the
    Clean Water Act (“CWA”), and the National Forest Manage-
    ment Act (“NFMA”). We have jurisdiction under 
    28 U.S.C. § 1291
    , and we affirm.
    I
    Since 1984, J.R. Simplot Company (“Simplot”) has oper-
    ated the Smoky Canyon Mine in parts of the Caribou National
    Forest to acquire phosphate ore. Current mining operations
    encompass five panels, labeled A to E, occupying around
    5,000 acres of land. Overburden from these panels contains
    waste rock with a high selenium concentration. Although
    essential to animal health in small amounts, selenium is toxic
    at elevated levels. Highly toxic selenium concentrations have
    been found in area streams. Because of the high selenium
    levels produced at the site, the existing mining operations are
    subject to an ongoing site investigation and response action
    126         GREATER YELLOWSTONE COALITION v. LEWIS
    under the Comprehensive Environmental Response, Compen-
    sation, and Liability Act.1
    To extend the life of the Smoky Canyon Mine, Simplot
    proposed to extract resources from two federal mineral leases
    adjacent to the mine, designated as panels F and G. Simplot
    sought approval from the two federal agencies with jurisdic-
    tion over the federal land. The United States Bureau of Land
    Management (“BLM”) has jurisdiction over all phosphate
    mining leases on public land, see 
    30 U.S.C. § 211
    , and the
    United States Forest Service has the authority to provide a
    special use permit in furtherance of mining operations where
    such activities occur on forest system lands, such as the Cari-
    bou National Forest, see 
    36 C.F.R. § 251
    .
    The agencies released a Draft Environmental Impact State-
    ment (“DEIS”) for public comment in 2005. The agencies
    held three public meetings in January 2006 and received
    38,616 letters, emails, and comment forms responding to the
    DEIS. In October 2007, the agencies published a Final Envi-
    ronmental Impact Statement (“FEIS”). In the FEIS, the agen-
    cies concluded that the mine expansion would not contribute
    to violations of water quality standards. The agencies based
    this conclusion on the combined effects of (1) Simplot’s
    efforts to reduce the selenium pollution seeping from Smoky
    Canyon’s existing pits, and (2) Simplot’s proposed store and
    release cover system.
    In light of the existing selenium pollution, especially in
    Sage Creek, the agencies acknowledged the necessity of
    remediating the current mining areas in order to avoid exacer-
    bating the current water quality violations. The agencies
    1
    Appendix 2A of the Final Environmental Impact Statement explains
    the proposed remediation efforts as of 2007, including the diversion of
    Pole Canyon Creek around the Pole Canyon Overburden Area. As counsel
    noted at oral arguments, such a diversion has successfully been imple-
    mented.
    GREATER YELLOWSTONE COALITION v. LEWIS          127
    determined two areas—Pole Canyon and Panel E—were the
    major sources of existing selenium pollution in Sage Creek.
    The agencies noted in the FEIS that determining all sources
    of existing pollution would require additional investigation.
    The FEIS evaluated the remediation efforts at Pole Canyon
    and Panel E, and concluded that the remediation efforts would
    significantly reduce existing selenium levels.
    In combination with remediating existing pollution, Sim-
    plot sought to limit future selenium pollution from the mine
    expansion by reducing the amount of water that would flow
    through the newly extracted waste rock. Simplot conducted
    scientific modeling and analysis to predict the rate at which
    water would filter through the overburden and into surface
    water, and the amount of selenium such water would carry.
    Based on that information, Simplot designed a cover that
    would be placed throughout panels F and G to limit the perco-
    lation of water. However, when Simplot tested this cover
    using a HELP3 water balance model, the agencies determined
    the amount of precipitation entering the overburden needed to
    be reduced further.
    To achieve the required reductions in percolation, Simplot
    developed the Deep Dinwoody Cover System, which consists
    of layers of one to two feet of topsoil, three feet of material
    from a geological stratum known as the Dinwoody Formation,
    and two feet of chert—a coarse material that encourages
    moisture storage and subsequent removal of moisture by
    evapotranspiration. The agencies eventually adopted this
    design in the FEIS.
    To test the Dinwoody Cover, Simplot hired an independent
    environmental consultant, O’Kane Consultants, that per-
    formed two sets of studies using conservative estimates of the
    Dinwoody Cover elements. O’Kane first used 100 years of
    daily climate data to run a one-dimensional model study that
    estimated annual water infiltration based on evaporation, tran-
    spiration, runoff, and vertical percolation. Because the one-
    128        GREATER YELLOWSTONE COALITION v. LEWIS
    dimensional model did not account for horizontal movement
    of water, O’Kane then performed two two-dimensional
    studies. The first two-dimensional study took into account the
    full size of the mine, and was run across twenty years, includ-
    ing the five wettest years. The second two-dimensional study
    was run across the full 100 years, but used a shortened slope
    length instead of the full size of the mine. The two studies
    were conducted using this methodology because a full two-
    dimensional model would have taken at least three months to
    complete.
    During the environmental review process, the agencies con-
    vened a twenty-four person interdisciplinary group of experts,
    six of whom were tasked with reviewing water quality issues.
    These six experts (“the technical review team”) reviewed the
    results of the O’Kane studies to evaluate the models and
    results. One of these experts, Dr. Christopher Carlson, the
    Forest Service’s National Ground Water Program Leader,
    expressed concern with the modeling. In his view, it failed to
    account for the seasonal surge of snowmelt and precipitation
    that occurs in the area. To address this concern, the technical
    review team asked a separate consulting firm, Knight Piésold
    Consulting Engineers, whether the studies accounted for sea-
    sonal variations. Knight Piésold concluded that the studies did
    account for seasonal variations by including in the inputs the
    peak flows, even though the output (the total water percolat-
    ing through the cover) was reported annually. Because the
    studies showed the total annual output was no more than 0.7
    inches of water, the annual output would remain the same
    even if that entire 0.7 inches seeped through during the peak
    flow months. After analyzing the O’Kane studies, the techni-
    cal review team noted that the lack of monthly outputs “led
    to uncertainty within the technical review team about the
    short-term accuracy” of the results. However, the technical
    review team concluded that additional modeling was not nec-
    essary because the team members were confident in the long-
    term results and because Simplot agreed to testing of the
    cover to confirm it operated as the model predicted.
    GREATER YELLOWSTONE COALITION v. LEWIS                      129
    Throughout the review process, the agencies collaborated
    with the Idaho Department of Environmental Quality
    (“IDEQ”), the Idaho agency charged with enforcing water
    quality standards in Idaho. The IDEQ appointed members to
    the technical review team, assisted with sampling and inter-
    preting results, and participated in the modeling review. It
    concluded that the mine expansion would not result in viola-
    tion of either surface or groundwater quality standards, and
    concurred with the agencies’ approval of the project.
    The project was approved by the agencies, despite Greater
    Yellowstone’s objections. After exhausting the administrative
    remedies, Greater Yellowstone filed suit in district court
    alleging the agencies’ approval violated the CWA, the
    NFMA, and NEPA. Greater Yellowstone sought a prelimi-
    nary injunction against the mine expansion. The court granted
    J.R. Simplot Company, various Idaho and Wyoming cities
    and counties, United Steelworkers Local 632, and the Idaho
    Farm Bureau Federation intervenor status. The district court
    denied the motion for a preliminary injunction and granted
    summary judgment for the agencies.2 Greater Yellowstone
    filed a timely appeal to this court.
    We review a district court’s grant of summary judgment de
    novo. Arakaki v. Hawaii, 
    314 F.3d 1091
    , 1094 (9th Cir.
    2002). We may set aside agency action if it is “arbitrary,
    capricious, an abuse of discretion, or otherwise not in accor-
    dance with law.” 
    5 U.S.C. § 706
    (2)(A). As we recently
    explained:
    2
    Greater Yellowstone appealed the district court’s denial of the prelimi-
    nary injunction motion to this court. We held that the district court too nar-
    rowly confined its analysis of irreparable harm, so we vacated in part and
    remanded, issuing a temporary stay until such proceedings could be com-
    pleted. On remand, the district court again denied the preliminary injunc-
    tion motion. Greater Yellowstone appealed and filed a motion for an
    emergency injunction pending appeal, which we denied. Greater Yellow-
    stone’s second appeal for review of the district court’s preliminary injunc-
    tion decision was dismissed as moot after the district court’s summary
    judgment decision.
    130         GREATER YELLOWSTONE COALITION v. LEWIS
    [W]e will reverse a decision as arbitrary and capri-
    cious only if the agency relied on factors Congress
    did not intend it to consider, entirely failed to con-
    sider an important aspect of the problem, or offered
    an explanation that runs counter to the evidence
    before the agency or is so implausible that it could
    not be ascribed to a difference in view or the product
    of agency expertise.
    The Lands Council v. McNair, 
    537 F.3d 981
    , 987 (9th Cir.
    2008) (en banc), overruled on other grounds by Winter v. Nat-
    ural Res. Def. Council, 
    129 S. Ct. 365
     (2008) (quotations and
    citations omitted). Agencies have discretion to rely on their
    own experts’ reasonable opinions to resolve a conflict
    between or among specialists, even if we find contrary views
    more persuasive. Marsh v. Or. Natural Res. Council, 
    490 U.S. 360
    , 378 (1989). In sum, our “inquiry must ‘be searching and
    careful,’ but ‘the ultimate standard of review is a narrow
    one.’ ” 
    Id.
     (quoting Citizens to Preserve Overton Park, Inc. v.
    Volpe, 
    401 U.S. 402
    , 416 (1971)).
    II
    On appeal, Greater Yellowstone contends that the agencies:
    (1) acted arbitrarily and capriciously in violation of NEPA,
    the CWA, and the NFMA; (2) violated NEPA’s hard look and
    public disclosure requirements; and (3) failed to acquire a
    § 401 certification as required under the CWA.
    A
    The district court correctly concluded that the agencies did
    not act arbitrarily or capriciously in violation of the CWA and
    the NFMA by approving the mine expansion.
    [1] The CWA requires federal agencies to determine that
    approved actions do not result in pollution in violation of state
    water quality standards. 
    33 U.S.C. § 1323
    (a). The IDEQ has
    GREATER YELLOWSTONE COALITION v. LEWIS            131
    promulgated regulations establishing the maximum accept-
    able level of selenium at .00005 milligrams per liter. Idaho
    Admin. Code § 58.01.02.210.01. The NFMA requires the For-
    est Service to develop comprehensive management plans for
    each unit of the National Forest System, 
    16 U.S.C. § 1604
    (a),
    and all subsequent agency action must be consistent with the
    governing forest plan, 
    id.
     § 1604(i). The Caribou National
    Forest Plan provides that in phosphate mine areas,
    “[o]verburden and soil materials shall be managed according
    to state-of-the-art protocols to help prevent the release of haz-
    ardous substances in excess of state and/or federal regulatory
    standards.” U.S. Dep’t of Agriculture, Forest Service, Revised
    Forest Plan for the Caribou National Forest 4-83 (Feb. 2003).
    Although selenium pollution is currently a serious problem
    at the site, the agencies concluded in their FEIS that Simplot’s
    mine expansion would not result in increased selenium pollu-
    tion in violation of Idaho law or the Caribou National Forest
    Plan, as prohibited by the CWA and NFMA. This determina-
    tion rested on the agencies’ conclusion that existing selenium
    pollution could be reduced and future selenium pollution
    could be limited. In reviewing agency decisions, we must
    determine whether the agencies’ decision is “founded on a
    rational conclusion between the facts found and the choices
    made.” Ariz. Cattle Growers’ Ass’n v. U.S. Fish & Wildlife,
    
    273 F.3d 1229
    , 1243 (9th Cir. 2001).
    [2] Greater Yellowstone argues that the agencies failed
    adequately to examine other sources of existing selenium pol-
    lution when concluding that remediation at two of the known
    sources—Pole Canyon and Panel E—would be sufficient to
    offset future pollution from the mine expansion. The agencies
    acknowledged that without decreasing existing pollution, the
    mine expansion would exacerbate the current selenium excee-
    dences. The agencies then examined the available evidence,
    which indicated that Pole Canyon and Panel E were the major
    contributors of the existing selenium contamination. After
    evaluating the data, the agencies determined that remediation
    132        GREATER YELLOWSTONE COALITION v. LEWIS
    efforts at Pole Canyon and Panel E alone would be sufficient
    to offset selenium from the expansion. Because this is a ratio-
    nal conclusion from the facts found, neither the CWA or the
    NFMA required the agencies to identify further any other pos-
    sible source of pollution.
    Greater Yellowstone argues the agencies’ reliance on the
    O’Kane studies was arbitrary and capricious because the
    studies failed to account for seasonal variations. Although
    Greater Yellowstone points to Dr. Carlson’s concerns about
    whether the studies adequately modeled peak flows, the
    record demonstrates that the agencies fully evaluated Dr. Car-
    lson’s concerns. Not only did O’Kane assure the agencies that
    the models addressed seasonal variations, the technical review
    team specifically asked a separate consultant whether the
    studies accounted for such changes in precipitation. All of the
    experts agreed that the model effectively accounted for sea-
    sonal variation in the long-term. Although the team admitted
    to uncertainty about the short-term accuracy of the model, this
    limited qualification of the team’s conclusions falls far short
    of Greater Yellowstone’s assertion that it “failed to consider
    an important aspect of the problem.” Motor Vehicle Mfrs.
    Ass’n v. State Farm Auto Ins. Co., 
    463 U.S. 29
    , 43 (1983).
    [3] Because the record demonstrates that the agencies fully
    considered Dr. Carlson’s concerns, examined the relevant evi-
    dence, and made a reasonable conclusion, their actions were
    not arbitrary or capricious.
    B
    [4] The district court properly concluded that the agencies
    did not violate NEPA. NEPA requires two things: that an
    agency “consider every significant aspect of the environmen-
    tal impact of a proposed action,” and that it “inform the public
    that it has indeed considered environmental concerns in its
    decisionmaking process.” Baltimore Gas & Elec. Co. v. Natu-
    ral Res. Def. Council, 
    462 U.S. 87
    , 97 (1983) (quotations
    GREATER YELLOWSTONE COALITION v. LEWIS           133
    omitted). Unlike the CWA, NEPA does not require particular
    environmental standards or mandate that agencies achieve
    substantive environmental results. Bering Strait Citizens for
    Responsible Res. Dev. v. U.S. Army Corps of Eng’rs, 
    524 F.3d 938
    , 947 (9th Cir. 2008). Greater Yellowstone asserts that the
    agencies violated NEPA by failing to conduct the hard look
    required and by failing fully to disclose internal uncertainties
    about the studies.
    1
    [5] Greater Yellowstone contends the agencies should have
    conducted a more searching review in two ways. First,
    Greater Yellowstone argues the agencies should have ordered
    additional two-dimensional modeling to respond to Dr. Carl-
    son’s claim that the models did not account for seasonal varia-
    tions. Failure to order additional studies does not, however,
    equate to a failure to evaluate the environmental impact of the
    proposal. As discussed previously, the agencies’ technical
    review team conducted a thorough review of the extensive
    modeling studies, and specifically asked an outside consultant
    to evaluate Carlson’s concerns. Although Greater Yellow-
    stone may disagree with the conclusion that the model fully
    accounted for seasonal variations, reliance on the model does
    not constitute a NEPA violation because the agencies con-
    ducted the requisite investigation. See Marsh, 
    490 U.S. at 378
    (“When specialists express conflicting views, an agency must
    have discretion to rely on the reasonable opinions of its own
    qualified experts even if, as an original matter, a court might
    find contrary views more persuasive.”). Indeed, the record
    supports the conclusion that the proposed cover design could
    handle such seasonal fluctuations.
    [6] The fact that the agencies relied on future testing to
    verify the model’s predictions does not invalidate the previ-
    ous, rigorous evaluation the agencies conducted. Because the
    agencies had already satisfied NEPA’s hard look requirement,
    the decision to require future testing should not now be con-
    134           GREATER YELLOWSTONE COALITION v. LEWIS
    strued as undermining their evaluation of the environmental
    impacts of the mine expansion. Due to this testing, the agen-
    cies are in a unique position to monitor the effectiveness of
    the cover system. Furthermore, because the requirement of
    future testing is a condition of the permit issued to Simplot,
    the agencies obviously can enforce that condition of the per-
    mit. Should the testing reveal significant inadequacies or mis-
    calculations in the modeling, the agencies presumably are
    authorized to, and will require Simplot to, take corrective
    action.3
    Greater Yellowstone’s reliance on Western Watersheds
    Project v. Kraayenbrink, ___ F.3d __, 
    2010 WL 340012
     (9th
    Cir. Sept. 1, 2010), in which we held that the BLM’s failure
    to address concerns raised by experts violated NEPA’s hard
    look requirement, is misplaced. In Western Watersheds, the
    BLM offered “no reasoned analysis whatsoever” in support of
    its conclusion and “never seriously considered” a “deluge of
    concerns.” 
    Id.
     at *16-*17. In contrast, the agencies here not
    only fully recognized and evaluated the impact of future sele-
    nium pollution, they specifically asked an outside consultant
    about the one concern Greater Yellowstone says they ignored,
    justifiably relied on the vast majority of experts who said the
    model accounted for seasonal variations, and further imple-
    3
    As everyone acknowledges, it will take years for any effects of sele-
    nium pollution to materialize fully. However, the monitoring efforts
    detailed in Appendix 2E of the FEIS explain how the agencies will evalu-
    ate, from the day the mine opens, any changes that may affect long term
    water quality. Among other things, Simplot is required to analyze ground
    and surface water samples bi-annually, monitor fish population surveys,
    aquatic habitat surveys, and selenium concentration inventories regularly,
    and construct the cover system in phases to ensure compliance before final
    implementation. Simplot must then submit the data from this monitoring
    to the agencies annually. Furthermore, “[w]here non-compliance with state
    and federal standards . . . is noted, BLM may issue an order to the opera-
    tor. . . . If there is a failure to comply with an order or there is an imminent
    threat of serious or irreparable damage to the environment a cessation of
    mining order may be issued by the BLM.”
    GREATER YELLOWSTONE COALITION v. LEWIS              135
    mented testing and monitoring to ensure compliance. This is
    all NEPA requires.
    [7] The second way in which Greater Yellowstone asserts
    the agencies should have conducted a more searching review
    is by identifying other existing sources of pollution in addi-
    tion to Pole Canyon and Panel E. By failing to evaluate other
    potential sources, Greater Yellowstone contends the agencies
    did not give the environmental impact of the mine expansion
    the requisite “hard look.” NEPA, however, only mandates an
    evaluation of a proposed plan’s future environmental impact.
    Because the agencies reasonably concluded that remediation
    efforts at Pole Canyon and Panel E alone would sufficiently
    offset future pollution, any other investigation of existing pol-
    lution was not required.
    2
    Greater Yellowstone argues that the agencies also violated
    NEPA by failing to disclose the internal uncertainty as to the
    model’s short term accuracy and by publicly denying any
    uncertainty. The district court properly determined that the
    agencies appropriately disclosed all relevant uncertainties.
    [8] An agency, “must acknowledge and respond to com-
    ments by outside parties that raise significant uncertainties
    and reasonably support that such uncertainties exist.” McNair,
    
    537 F.3d at 1001
    . However,
    [T]o the extent our case law suggests that a NEPA
    violation occurs every time [an agency] does not
    affirmatively address an uncertainty in the EIS, we
    have erred. After all, to require the [agency] to affir-
    matively present every uncertainty in its EIS would
    be an onerous requirement, given that experts in
    every scientific field routinely disagree; such a
    requirement might inadvertently prevent the
    136        GREATER YELLOWSTONE COALITION v. LEWIS
    [agency] from acting due to the burden it would
    impose.
    
    Id.
     We cannot hold in this case that one statement indicating
    uncertainty within the technical review team represents a sig-
    nificant uncertainty as to the model’s ability to predict future
    pollution levels. This conclusion is supported by the volumi-
    nous evidence in the record manifesting confidence in the
    modeling results and the ultimate determination by the techni-
    cal review team supporting the models’ predictions.
    Greater Yellowstone relies on Lands Council v. Powell,
    
    395 F.3d 1019
    , 1031 (9th Cir. 2005), in which we held that
    the Forest Service violated NEPA when it relied upon a
    flawed model and failed to disclose the limitations of that
    model in the EIS. In Powell, however, the government con-
    ceded that the model did not include relevant variables. 
    Id. at 1031-32
    . In contrast, the agencies here argue that the relevant
    variables reflecting seasonal variations were included and that
    Dr. Carlson’s objections went to the time scale of the model
    output rather than the input variables.
    [9] Because the one sentence in the record indicating some
    uncertainty within the team does not rise to the level of “sig-
    nificant uncertainty” contemplated by McNair, we hold that
    the agencies did not violate NEPA’s disclosure requirements.
    C
    The district court correctly concluded that Simplot did not
    fail to acquire a § 401 certification as required under the
    CWA. The § 401 certification requirement applies only to dis-
    charges from point sources. See Or. Natural Desert Ass’n v.
    Dombeck, 
    172 F.3d 1092
    , 1095-97 (9th Cir. 1998). Simplot
    was not required to obtain a § 401 certification because the
    mining pits protected by the cover do not qualify as a point
    source.
    GREATER YELLOWSTONE COALITION v. LEWIS           137
    [10] Pursuant to § 401 of the CWA, “[a]ny applicant for a
    Federal license or permit to conduct any activity . . . which
    may result in any discharge into the navigable waters, shall
    provide the licensing or permitting agency a certification from
    the State in which the discharge originates.” 
    33 U.S.C. § 1341
    (a)(1). The CWA defines “discharge” as including
    “any addition of any pollutant to navigable waters from any
    point source.” 
    Id.
     § 1362(12)(A). A point source is defined by
    the CWA as “any discernible, confined and discrete convey-
    ance . . . from which pollutants are or may be discharged.” Id.
    § 1362(14).
    [11] The text of § 401 and the case law are clear that some
    type of collection or channeling is required to classify an
    activity as a point source. See Trustees for Alaska v. EPA, 
    749 F.2d 549
    , 558 (9th Cir. 1984) (“[P]oint and nonpoint sources
    are not distinguished by the kind of pollution they create or
    by the activity causing the pollution, but rather by whether the
    pollution reaches the water through a confined, discrete con-
    veyance.”). When evaluating what constitutes a point source
    in the mining context specifically, we have noted that Con-
    gress intended “runoff caused primarily by rainfall around
    activities that employ or create pollutants” to be a nonpoint
    source. 
    Id.
     (citing United States v. Earth Sciences, Inc., 
    599 F.2d 368
    , 373 (10th Cir. 1979)).
    [12] In the proposed mine expansion, there are two poten-
    tial discharges where polluted water enters the ground and,
    eventually, surface water. First, water runs off the top of the
    cover. This water enters a type of stormwater drain system
    before it is released. This stormwater system is exactly the
    type of collection or channeling contemplated by the CWA,
    and Simplot has obtained the requisite § 401 certification for
    that system.
    [13] The second potential source of discharge occurs when
    some water seeps through the cover and into the pits contain-
    ing waste rock. This is nonpoint source pollution because
    138        GREATER YELLOWSTONE COALITION v. LEWIS
    there is no confinement or containment of the water; the cover
    is designed to divert water away from the pits. As such, the
    water filters into the pits at a rate less than water would filter
    into the surrounding ground that is not protected by the cover.
    The small amount of precipitation (around 0.7 inches a year)
    that does make it through the cover is not collected or chan-
    neled, but instead filters through 200 feet of overburden and
    250 to 750 feet of undisturbed material beneath the overbur-
    den, eventually entering the surface water. See N.W. Envtl.
    Def. Ctr. v. Brown, ___ F.3d ___, 
    2010 WL 3222105
    , at *4-
    5 (9th Cir. Aug. 17, 2010) (“Stormwater that is not collected
    or channeled and then discharged, but rather runs off and dis-
    sipates in a natural and unimpeded manner, is not a discharge
    from a point source.”). The pits that collect the waste rock do
    not constitute point sources within the meaning of the CWA,
    and Simplot was not required to obtain a permit under § 401.
    III
    The agencies did not act arbitrarily and capriciously in their
    review and approval of Simplot’s proposed mine expansion
    project. The agencies complied with NEPA’s procedural
    requirements by fully evaluating the environmental impacts of
    the mine and disclosing those results to the public. Simplot
    was not required to obtain a § 401 certification. The district
    court properly granted summary judgment to the agencies.
    AFFIRMED.
    B. Fletcher, Circuit Judge, dissenting:
    I respectfully dissent. Although I concur in Part II.C of the
    majority opinion, I cannot agree with the majority that the
    federal agencies acted neither arbitrarily nor capriciously
    when approving the Smoky Canyon Mine expansion project.
    The majority violates both the letter and the spirit of the appli-
    GREATER YELLOWSTONE COALITION v. LEWIS             139
    cable federal environmental standards by approving agency
    action despite currently lacking critical information and by
    deferring key evaluations to some unspecified future date.
    I
    To understand fully what is at issue in this case, it is neces-
    sary to focus on two key facts. First, in 2003, the Environ-
    mental Protection Agency, U.S. Forest Service, and Idaho
    Department of Environmental Quality signed an Administra-
    tive Order on Consent pursuant to the Comprehensive Envi-
    ronmental Compensation Liability Act (CERCLA) with the
    J.R. Simplot Company (“Simplot”). This order required Sim-
    plot to undertake a set of “removal response actions” to clean
    up selenium pollution the company’s mining activities had
    caused in and around the Smoky Canyon Mine. There is no
    evidence, however, that Simplot has complied with its obliga-
    tion to develop and implement a comprehensive clean-up plan
    for pollution stemming from existing mine panels A, B, C,
    and D. In fact, Simplot has only identified some of the
    sources of extant selenium pollution caused by its mining
    activities in Smoky Canyon.
    Second, Simplot is at the helm of an industry that contrib-
    utes millions of dollars annually to the economy of southeast-
    ern Idaho and western Wyoming. Simplot’s Smoky Canyon
    Mine in eastern Idaho provides phosphate ore through a slurry
    line to a manufacturing facility known as the Don Plant in
    Pocatello, Idaho. The claim is that, if the Smoky Canyon
    Mine expansion project were halted, the Don Plant would face
    closure. As evident from the myriad intervenors in this law
    suit, significant economic interests oppose this outcome.
    For example, according to the United Steelworkers Local
    632, the union which represents more than 250 employees at
    the Don Plant, that facility provides over $33 million in
    wages, salaries, and benefits for residents of four counties.
    The Don Plant is thus a key source of employment in an area
    140        GREATER YELLOWSTONE COALITION v. LEWIS
    where many residents lack post-high school educations and
    where unemployment is chronic. Roger Chase, a former Sim-
    plot employee who served as the mayor of Pocatello from
    2002 through 2009, estimated that Simplot jobs paid twenty
    to thirty percent more than other new jobs available in Poca-
    tello. Chase also testified that Simplot “provides substantial
    benefits to the City of Pocatello,” including funding for Idaho
    State University. The Idaho Farm Bureau Federation has
    warned that the closure of the Don Plant would adversely
    affect Idaho farmers’ farming costs and overall standards of
    living. County commissioners for communities adjacent to the
    Don Plant estimated that the closure of either the mine or the
    plant would result in the loss of millions of dollars in tax reve-
    nues, jeopardizing local school district budgets and other
    social services in the region.
    II
    Against this backdrop, Simplot applied to the Bureau of
    Land Management (“BLM”) and the U.S. Forest Service (col-
    lectively, “the agencies”) for permission to expand the Smoky
    Canyon Mine into two new panels, F and G. The expansion
    would extend the life of the mine, and of the Don Plant, by
    fourteen to sixteen years. On the record before us, I cannot
    agree with the majority that the agencies did not act arbitrarily
    or capriciously in approving the mine expansion project, in
    violation of the Clean Water Act (“CWA”), National Forest
    Management Act (“NFMA”), and the National Environmental
    Policy Act (“NEPA”). Rather, I would hold that the agencies
    violated these federal laws in three distinct ways: (1) by
    authorizing the expansion project on the basis of admittedly
    incomplete information regarding sources of extant selenium
    pollution, without any indication that the missing information
    could not reasonably be obtained; (2) by relying on the results
    of concededly inadequate modeling to predict the water qual-
    ity impacts of the expansion project; and (3) by adopting what
    amounts to a “test while mining” scheme, relying on post-
    decisional modeling rather than additional modeling prior to
    GREATER YELLOWSTONE COALITION v. LEWIS            141
    project approval to evaluate the expanded mine’s environ-
    mental impacts.
    A
    Under the CWA, states are required to compile a list of
    water bodies, called a § 303(d) list, that do not achieve appli-
    cable water quality standards. See 
    33 U.S.C. § 1313
    (d). The
    Final Environmental Impact Statement (“FEIS”) for the mine
    expansion project referenced the 2002 list, which encom-
    passed twenty-four miles of streams considered impaired by
    selenium. The impaired water bodies include South Fork Sage
    Creek, Pole Canyon Creek, and various other tributaries to
    Sage Creek. The record nowhere reveals what kind of
    remediation has been undertaken.
    In evaluating the mine expansion project, the agencies
    determined that remediation at just two known sources of
    selenium pollution, Pole Canyon and Panel E, would suffice
    to offset future pollution caused from additional mining. This
    determination was critical for the agencies’ authorization of
    the mine expansion project, which was premised in part on
    the assumption that the successful remediation of these sites
    would be sufficient to offset additional selenium discharges
    associated with new mining activities without pushing the
    total selenium levels over legal limits.
    The majority contends that the agencies’ decision that the
    remediation of Pole Canyon and Panel E would adequately
    offset future mine-related pollution is rational, and accepts the
    agencies’ conclusion that these areas are the major sources of
    existing selenium pollution. Maj. Op. at 126-27, 131. The
    record, however, belies these conclusions, and indicates that
    Pole Canyon and Panel E are but two of the known sources
    of existing selenium pollution.
    In choosing to focus on Pole Canyon and Panel E, the For-
    est Service and BLM relied on a contractor employed by Sim-
    142        GREATER YELLOWSTONE COALITION v. LEWIS
    plot to assess these sites. It concluded that the sites were
    exclusively responsible for the selenium contamination in
    Hoopes Spring and South Fork Sage Creek Spring. The agen-
    cies acknowledged, however, that the contractor’s conclusion
    was but “one possible interpretation” of the limited available
    data, and further that “additional investigation” would be
    required to determine all the “source(s)” of existing selenium
    contamination in the area. Indeed, the record before the agen-
    cies at the time of their determination mentioned selenium
    contributions from at least two other sources: Panel A and
    Panel D. Yet these sources were not included in the proposed
    remediation plan.
    When agencies evaluate “reasonably foreseeable significant
    adverse effects on the human environment in an environmen-
    tal impact statement,” and incomplete information “is essen-
    tial to a reasoned choice among alternatives and the overall
    costs of obtaining it are not exorbitant,” NEPA requires that
    that information be obtained and included in the EIS. See 
    40 C.F.R. §§ 1502.22
    , 1502.22(a). It is undeniable that the miss-
    ing information at issue here — the extent of existing sele-
    nium pollution at the site of a proposed mine expansion
    project — “is essential to a reasoned choice among alterna-
    tives.” 
    Id.
     Although the agencies acknowledged the need for
    “further investigation” before all sources of selenium contam-
    ination at Smoky Canyon could be identified, there is no indi-
    cation on the record before this court that the costs of such
    investigation would be exorbitant. The agencies’ failure to
    obtain and include a comprehensive list of the sources of sele-
    nium contamination at Smoky Canyon, therefore, violates
    federal law. This failing is particularly egregious given that
    Simplot’s mining operations at Smoky Canyon have been
    subject to CERCLA response actions for over seven years.
    The majority holds that, since NEPA “only mandates an
    evaluation of a proposed plan’s future environmental impact,”
    further investigation of existing pollution was not required.
    Maj. Op. at 135. This is error. Under the circumstances of this
    GREATER YELLOWSTONE COALITION v. LEWIS            143
    case, any meaningful evaluation of the mine expansion proj-
    ect’s future environmental impacts requires a thorough under-
    standing of existing pollution in the project area. Put
    differently, because Simplot’s prior mining activities have so
    polluted Smoky Canyon, additional mining will necessarily
    exacerbate pollution in violation of state and federal environ-
    mental standards unless significant remediation is completed
    before any new mining occurs. A comprehensive understand-
    ing of existing pollution on site is a prerequisite to any deter-
    mination of where remediation efforts should begin.
    Given the foregoing, the agencies’ conclusion that the
    remediation of Pole Canyon and Panel E will be sufficient to
    offset future pollution from the Smoky Canyon Mine expan-
    sion project is hardly a rational conclusion. Motor Vehicle
    Mfrs. Ass’n of U.S. v. State Farm Mut. Auto. Ins. Co., 
    463 U.S. 29
    , 43 (1983) (To avoid making an arbitrary and capri-
    cious determination, agencies “must examine the relevant data
    and articulate a satisfactory explanation for [their] action
    including a ‘rational connection between the facts found and
    the choice made.’ ” (quoting Burlington Truck Lines, Inc. v.
    United States, 
    371 U.S. 156
    , 168 (1962)); see also Port of
    Seattle v. FERC, 
    499 F.3d 1016
    , 1035 (9th Cir. 2007), cert.
    denied, 
    130 S. Ct. 1051
     (2010).
    B
    As the majority notes, one of the experts who participated
    in the environmental review process was Dr. Christopher Car-
    lson, the Forest Service’s National Ground Water Program
    Leader. In a detailed memorandum written in January 2007,
    Dr. Carlson analyzed the proposed cover system for Panels F
    and G. Dr. Carlson observed that “as the modeling effort
    progressed, [Simplot’s] contractor had substantial difficulty
    getting the selected model to execute appropriately,” leading
    it to “implement a number of short cuts and approximations
    in the analyses . . . .” These shortcuts “resulted in a cover
    evaluation process that did not fully characterize or evaluate
    144        GREATER YELLOWSTONE COALITION v. LEWIS
    the expected cover performance, design options, modeling
    assumptions and input uncertainty, or the overall uncertainty
    in the predictions.” This led Dr. Carlson to conclude, on the
    basis of his extensive expertise in such matters, that “both the
    agencies and public are left with a limited understanding of
    the expected operation of the cover system, its critical design
    features, and the key expected stressors.”
    More specifically, Dr. Carlson noted that since the cover
    would be set “at an elevation of about 7500 [feet] in the north-
    ern tier of the country, the primary environmental forcings
    that the cover will be expected to handle while limiting infil-
    tration are seasonal in nature (e.g., freeze-thaw, snowmelt,
    wetting-drying, evapotranspiration).” In other words, an abso-
    lutely central question regarding the ability of the proposed
    cover to function as intended involved the cover’s capacity to
    respond to seasonal variations.
    Yet, as Dr. Carlson noted, “the short cuts taken to speed the
    [modeling] process” led to an evaluation of model output on
    only an average annual basis. Of the 33 inches of precipita-
    tion received each year in the area, however, approximately
    22 inches — or two thirds — are associated with the spring
    snowmelt. A major seasonal surge is thus predictable, and rel-
    evant to the cover’s actual functioning capability. The model-
    ing completed did not account for any such surges. This
    critical shortcoming prompted Dr. Carlson to conclude “that
    the lack of seasonal information, when the snowmelt domi-
    nated hydrology of the area would be most extreme, limits
    reviewers’ ability to fully characterize the expected conditions
    and develop a complete understanding of the processes likely
    to be important for both near-term and long-term cover per-
    formance.” (emphasis added) Dr. Carlson’s objections were a
    reiteration of concerns he had expressed in October 2006,
    when he warned that an evaluation of the proposed cover
    design that was based “purely on an annual average basis
    when we know there are significant seasonal aspects to the
    hydrological cycle should not be acceptable.”
    GREATER YELLOWSTONE COALITION v. LEWIS                     145
    Rather than confront and address these fundamental inade-
    quacies in the modeling completed, and instead of ordering
    additional modeling to obtain the seasonal information which
    the Forest Service’s own groundwater expert had deemed crit-
    ical, the agencies simply concluded that “there is sufficient
    information to implement the store and release cover system
    developed,” and that “[n]o further cover modeling efforts are
    needed.”
    The majority accepts this conclusion on the basis of the
    agencies’ contention that “the annual output would remain the
    same even if [the] entire 0.7 inches [of water percolating
    through the cover annually] seeped through during the peak
    flow months.” Maj. Op. at 128. Yet there is no evidence in the
    record before this court that the proposed cover design could
    handle such seasonal fluctuations, or what would happen if all
    or even most of the annual output seeped through the cover
    in a few short weeks in the spring.1 Indeed, the agencies’ tech-
    nical review team admitted that the lack of monthly output
    analysis “led to uncertainty within [the team] about the short-
    term accuracy” of the modeling results.2
    This is, therefore, not a case involving reasonable scientific
    disagreements among qualified experts. Cf. Marsh v. Or. Nat-
    ural Res. Council, 
    490 U.S. 360
    , 378 (1989). Rather, this is
    a case in which the agency’s expert raised substantial
    uncertainties that were supported by scientific authority, and
    which the agencies entirely failed to address in the FEIS.
    Under NEPA, “federal agencies must specifically discuss at
    1
    The majority argues that the agencies’ determination is sound since
    “the relevant variables reflecting seasonal variations were included [in the
    modeling] and . . . Dr. Carlson’s objections went to the time scale of the
    model output rather than the input variables.” Maj. Op. at 136. This obfus-
    cates the issue: namely, that the model’s output predictions are not trust-
    worthy in light of the corners cut and limitations Dr. Carlson identified.
    2
    Simplot’s offer to test the proposed cover design further to ensure that
    it performs as predicted after the mine expansion is underway is another
    indication that the agencies’ conclusions lack adequate factual bases.
    146        GREATER YELLOWSTONE COALITION v. LEWIS
    appropriate points in the final [EIS] any responsible opposing
    view which was not adequately addressed in the draft [EIS]
    and . . . indicate the [agencies]’s response to the issues raised.
    A failure to do so is itself a NEPA violation.” Wildwest Inst.
    v. Bull, 
    547 F.3d 1162
    , 1171 (9th Cir. 2008) (citing 
    40 C.F.R. § 1502.9
    (b)) (alterations in original; quotation marks omit-
    ted).
    Rather than address Dr. Carlson’s measured analysis, the
    defendants make every effort to minimize or discredit the
    import of his opinions, a lead the majority willingly follows.
    But Dr. Carlson is not just one person on a larger team of
    experts. He is the leader of the U.S. Forest Service’s National
    Ground Water Program, and, as such, has deep expertise on
    the water pollution problems that lie at the very heart of the
    mine expansion project. Moreover, the additional modeling
    necessary to ascertain the seasonal viability of the proposed
    cover design could, by all accounts, have been completed in
    as little as four to ten days. The defendants’ dismissive atti-
    tude, therefore, may reflect little more than uncertainty as to
    what might surface if additional studies or investigation had
    been completed. The court should not endorse such an aver-
    sion to finding out the truth.
    The majority emphasizes that all the experts involved
    “agreed that the model effectively accounted for seasonal
    variation in the long-term.” Maj. Op. at 132. This is an over-
    statement; there is no indication that Dr. Carlson ever found
    that the modeling completed was effective in any respect.
    Even assuming that the majority’s characterization is accu-
    rate, however, it is irrelevant to the questions raised on this
    appeal and to the court’s role in evaluating the adequacy of
    agency action. Even if the model effectively accounted for
    seasonal variation in the long-term, this alone is insufficient,
    because the mine expansion project will, at most, extend the
    life of the Smoky Canyon Mine for fourteen to sixteen years.
    The agencies’ conclusions, and the majority’s opinion, leave
    open the possibility that significant environmental pollution
    GREATER YELLOWSTONE COALITION v. LEWIS            147
    will occur at the Smoky Canyon Mine in the near term. If this
    is not “fail[ure] to consider an important aspect of the prob-
    lem,” what is? Motor Vehicle Mfrs. Ass’n, 
    463 U.S. at 43
    .
    C
    NEPA’s “look before you leap” requirements dictate that
    agencies “consider every significant aspect of the environ-
    mental impact of a proposed action” before that action is
    approved. Bering Strait Citizens for Responsible Res. Dev. v.
    U.S. Army Corps of Engineers, 
    524 F.3d 938
    , 947 (9th Cir.
    2008) (quoting Baltimore Gas & Elec. Co. v. Natural Res.
    Defense Council, Inc., 
    462 U.S. 87
    , 97 (1983)). It is not
    appropriate or acceptable “to defer consideration of cumula-
    tive impacts to a future date. ‘NEPA requires consideration of
    the potential impact of an action before the action takes
    place.’ ” Neighbors of Cuddy Mountain v. U.S. Forest Serv.,
    
    137 F.3d 1372
    , 1380 (9th Cir. 1998) (quoting City of Tenakee
    Springs v. Clough, 
    915 F.2d 1308
    , 1313 (9th Cir. 1990)
    (emphasis in original)).
    The agencies’ actions here are completely contrary to these
    well-established legal principles. As evident from the forego-
    ing, the agencies did not conduct a “previous, rigorous evalu-
    ation” of the proposed cover design via their limited
    modeling. Maj. Op. at 133. The majority’s contention that this
    modeling “satisfied NEPA’s hard look requirement” is belied
    by the record before this court. Indeed, the majority seems to
    recognize that myriad lingering questions central to a thor-
    ough evaluation of the mine expansion project remain:
    “Should the testing reveal significant inadequacies or miscal-
    culations in the modeling,” the majority asserts, “the agencies
    presumably are authorized to, and will require Simplot to,
    take corrective action.” 
    Id.
    It is telling that no legal authority is cited for this proce-
    dure. The majority’s approval is especially troubling given
    that the proposed expansion might extend the life of the mine
    148          GREATER YELLOWSTONE COALITION v. LEWIS
    for another fourteen to sixteen years, a time period in which
    the full extent of new pollution caused may not even register.3
    When the effects from the expansion become clear, Simplot
    may be “long gone” — leaving selenium-contaminated water-
    ways responsible for abnormalities in aquatic life, dead live-
    stock, and other destructive consequences in its wake.
    III
    The environmental harm that will result from expanded
    mining in Smoky Canyon can only be prevented with careful,
    reasoned evaluations that account for detailed scientific opin-
    ions and tailor remedial steps in light of those opinions. The
    majority’s willingness to accept the flawed and incomplete
    assessments of the agencies in this case amounts to an abdica-
    tion of the judicial function. We should hold that the record
    before this court reveals significant omissions and woefully
    inadequate assessments of known and unknown problems
    associated with the proposed cover design; that, absent a com-
    prehensive assessment of existing sources of selenium pollu-
    tion in the Smoky Canyon area, the remediation efforts
    necessary to clean up existing pollution Simplot has already
    created cannot proceed; and that the agencies’ decision to
    approve the mine expansion project in light of these deficien-
    cies is arbitrary and capricious and in violation of federal
    environmental law.
    I dissent.
    3
    The agencies concede that it takes ten years for new selenium pollution
    to register, and for remediation efforts to show any results.