Normandy Apartments, Limited v. United States ( 2015 )


Menu:
  •   United States Court of Appeals
    for the Federal Circuit
    ______________________
    NORMANDY APARTMENTS, LIMITED,
    Plaintiff-Appellant
    v.
    UNITED STATES,
    Defendant-Appellee
    ______________________
    2014-5135
    ______________________
    Appeal from the United States Court of Federal
    Claims in No. 1:10-cv-00051-EGB, Senior Judge Eric G.
    Bruggink.
    ______________________
    Decided: November 20, 2015
    ______________________
    TERRY MICHAEL MCKEEVER, Foshee & Yaffe, Oklaho-
    ma City, OK, argued for plaintiff-appellant.
    AMANDA TANTUM, Commercial Litigation Branch, Civ-
    il Division, United States Department of Justice, Wash-
    ington, DC, argued for defendant-appellee.         Also
    represented by JOYCE R. BRANDA, ROBERT E. KIRSCHMAN,
    JR., KIRK T. MANHARDT; PATRICIA SHARIN FLAGG, Office of
    General Counsel, United States Department of Housing
    and Urban Development, Washington, DC.
    ______________________
    2               NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    Before NEWMAN, REYNA, and WALLACH, Circuit Judges.
    Opinion for the court filed by WALLACH, Circuit Judge.
    Additional views filed by REYNA, Circuit Judge, with
    whom WALLACH, Circuit Judge, joins.
    Dissenting opinion filed by NEWMAN, Circuit Judge.
    WALLACH, Circuit Judge.
    Normandy Apartments, Ltd. (“Normandy”) appeals
    the United States Court of Federal Claims’ orders grant-
    ing the government’s: (1) motion to dismiss for lack of
    jurisdiction; and (2) motion for summary judgment on
    Normandy’s takings claim. Normandy Apartments, Ltd.
    v. United States, 
    116 Fed. Cl. 431
    (2014); see also Nor-
    mandy Apartments, Ltd. v. United States, 
    100 Fed. Cl. 247
    (2011). For the reasons set forth below, this court
    affirms.
    BACKGROUND
    I. Facts
    Normandy owned and managed Normandy Apart-
    ments, a low-income rental housing project constructed in
    1968 in Tulsa, Oklahoma. Tenants’ rents at Normandy
    Apartments were federally subsidized under the Section 8
    project-based program, see 42 U.S.C. § 1437f, which was
    created “to ‘ai[d] low-income families in obtaining a decent
    place to live . . . by subsidizing private landlords who
    would rent to low-income tenants.’” Cisneros v. Alpine
    Ridge Grp., 
    508 U.S. 10
    , 12 (1993) (alteration in original)
    (quoting 42 U.S.C. § 1437f(a)). In this system, a monthly
    rent is set for each apartment, the tenants pay a portion
    of that rent based on their ability to pay, and the United
    States Department of Housing and Urban Development
    (“HUD”) pays the difference between each tenant’s contri-
    bution and the allowable rent for the unit. 42 U.S.C.
    § 1437f(c)(3).
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES             3
    Effective October 1, 1992, Normandy and the United
    States, acting through HUD, entered into a Section 8
    rental subsidy agreement called a Housing Assistance
    Payments (“HAP”) contract (the “Original HAP Con-
    tract”). Pursuant to this contract, HUD agreed to pay the
    difference between the tenant’s contribution and the rent,
    and Normandy agreed it would “‘maintain and operate
    the contract units and related facilities so as to provide
    decent, safe, and sanitary housing as defined by HUD,’ to
    clean and ‘make repairs with reasonable promptness,’ to
    ‘respond promptly to HUD’s Physical Inspection Reports
    and to implement corrective actions within a reasonable
    time.’” 
    Normandy, 116 Fed. Cl. at 434
    (quoting Original
    HAP Contract).      HUD enforces these requirements
    through inspections, audits, and other actions, including
    withholding assistance payments. 42 U.S.C. § 1437c(h);
    24 C.F.R. § 886.123. HUD’s Real Estate Assessment
    Center (“REAC”) inspects Section 8 housing and assigns a
    score on a 100-point scale. 24 C.F.R. §§ 5.705, 200.857
    (2014).
    In 1997, the Original HAP Contract expired, and
    Normandy and HUD renewed the contract annually until
    2004. On October 1, 2004, when the prior year’s HAP
    contract had expired, Normandy entered into the next
    renewal contract (“2004 HAP Contract”)—the basis for
    Normandy’s breach of contract claims. Though the earlier
    HAP contracts had been made with HUD, in the 2004
    HAP Contract, the Oklahoma Housing Finance Authority
    (“OHFA”), a public housing agency (“PHA”), was identi-
    fied as the “contract administrator.” Normandy, 116 Fed.
    Cl. at 434. While HUD was no longer a party to the
    contract, the rest of the contract terms in the Original
    HAP Contract were renewed, including the provision that
    Normandy “maintain and operate the contract units and
    related facilities so as to provide decent, safe, and sani-
    tary housing as defined by HUD.” 
    Id. 4 NORMANDY
    APARTMENTS, LTD.    v. UNITED STATES
    On May 23, 2000, Normandy entered into a separate
    “Use Agreement” with HUD, which “allowed Normandy to
    prepay its HUD-backed mortgage and terminate the 1967
    Regulatory Agreement between it and HUD.” Id.; see also
    
    id. at 435
    (“The Use Agreement is independent of the
    HAP contract, although the former contemplates the
    possibility that a HAP contract may cover some or all of
    the units.”). Under the Use Agreement, Normandy pre-
    paid its HUD-insured mortgage, and, in exchange, Nor-
    mandy agreed to continue housing low-income families
    until June 1, 2009, the original maturity date of the
    mortgage. Pursuant to the Use Agreement, Normandy’s
    use of the apartment complex was restricted to “rental
    housing for tenants of lower income,” Normandy agreed
    not to evict existing tenants based on income, J.A. 148,
    Normandy was required to maintain the apartment
    complex “in a condition that is decent, safe, sanitary, and
    in good repair, as well as in compliance with all applicable
    state and local building and health codes,” J.A. 151, and
    Normandy was required to obtain HUD’s approval before
    conveying the property.
    Pursuant to the 2004 HAP Contract, in November
    2004, REAC “inspected the Normandy Apartments to
    verify the units were safe, decent, and sanitary.” Nor-
    
    mandy, 116 Fed. Cl. at 435
    . The apartments received a
    failing score. Normandy corrected the identified problems
    and, when OHFA conducted an inspection in February
    2005, it noted the previous deficiencies had been fixed.
    HUD itself did not reinspect the apartments, but notified
    Normandy in February 2006 that it was closing the
    November 2004 inspection.
    Under 24 C.F.R. §§ 200.855(c)(l), 886.323 (2014), HUD
    is required to inspect a property between nine and fifteen
    months from the date of the prior inspection. Here, the
    next REAC inspection did not occur until August 23,
    2006, more than twenty months after the November 2004
    inspection. Normandy failed this inspection, but subse-
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES            5
    quently requested that HUD adjust the score “because the
    apartment complex was undergoing repairs; specifically,
    all of the windows were being replaced.” Nor
    mandy, 116 Fed. Cl. at 435
    . On October 15, 2006, Normandy inquired
    with HUD about the status of its appeal regarding its
    failing score. In November, HUD replied and notified
    Normandy that it had missed the deadline to appeal the
    score.
    In March 2007, HUD requested that Normandy write
    a letter certifying that it was in compliance with the
    inspection requirements. Because the window replace-
    ment was ongoing, Normandy was not able to certify its
    compliance and instead provided a letter from its window
    contractor stating the anticipated completion date for the
    repairs. HUD then informed Normandy that it would
    perform a reinspection, but never did so. Instead, it sent
    a June 20, 2007, letter notifying Normandy that HUD
    “would cease to fund housing assistance payments be-
    cause [Normandy] had defaulted on the HAP [C]ontract
    by repeatedly failing to maintain the apartments.” 
    Id. Specifically, on
    September 28, 2007, HUD warned
    Normandy that its assistance payments would be termi-
    nated and that Normandy should stop accepting new low-
    income qualified tenants. HUD also notified Normandy
    that any affected tenants could apply for vouchers to
    offset their rent at the Normandy Apartments or enable
    them to move elsewhere. Shortly before November 1,
    2007, HUD informed Normandy that it was obligated to
    continue honoring the below-market rental rates during
    the existing lease terms.
    Normandy attempted to sell the apartment complex
    before the HUD payments stopped. Normandy alleges
    that on October 16, 2007, Summit Assets Management,
    L.L.C. (“Summit”) agreed to purchase the Normandy
    Apartments for $8 million. Pursuant to the Use Agree-
    ment, Normandy sought HUD’s approval of the sale, but,
    6              NORMANDY APARTMENTS, LTD.    v. UNITED STATES
    according to Normandy, HUD withheld its approval and
    Summit did not purchase the apartments. “Normandy
    claims a loss of approximately $2.75 million because the
    apartments subsequently decreased in value and, as of
    2009, were appraised at $5.25 million.” 
    Id. at 436.
                          II. Proceedings
    On October 18, 2007, Normandy filed a lawsuit in the
    United States District Court for the Western District of
    Oklahoma, requesting, in relevant part, a preliminary
    injunction ordering HUD to continue making housing
    assistance payments pending the litigation. Normandy
    Apartments, Ltd. v. U.S. Dep’t of Hous. & Urban Dev., No.
    CIV-07-1161-R, 
    2007 U.S. Dist. LEXIS 81330
    , at *1 (W.D.
    Okla. Nov. 1, 2007). The court concluded it lacked juris-
    diction because Normandy’s claim fell under the Tucker
    Act and therefore belonged in the United States Court of
    Federal Claims. The court nevertheless addressed the
    merits of the preliminary injunction, and found Norman-
    dy was unable to satisfy the necessary irreparable harm
    element to obtain the injunction.
    Normandy appealed the district court’s decision to the
    United States Court of Appeals for the Tenth Circuit. See
    Normandy Apartments, Ltd. v. U.S. Dep’t of Hous. &
    Urban Dev., 
    554 F.3d 1290
    (10th Cir. 2009). The Tenth
    Circuit affirmed-in-part and reversed-in-part, holding
    “when a party asserts that the government’s breach of
    contract is contrary to federal regulations, statutes, or the
    Constitution, and when the party seeks relief other than
    money damages, the [Administrative Procedure Act’s
    (“APA”)] waiver of sovereign immunity applies and the
    Tucker Act does not preclude a federal district court from
    taking jurisdiction.” 
    Id. at 1300.
         Normandy did not pursue its APA claims and instead,
    on January 25, 2010, brought suit in the United States
    Court of Federal Claims (“Claims Court”). Normandy’s
    first Complaint asserted a breach of the 2004 HAP Con-
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES             7
    tract and requested approximately $3.5 million in damag-
    es. The government moved to dismiss the case for lack of
    subject matter jurisdiction on the grounds that the United
    States was not a party to the 2004 HAP Contract. The
    Claims Court agreed, finding that without a contract
    between Normandy and the United States, it lacked
    jurisdiction. 
    Normandy, 100 Fed. Cl. at 256
    –58.
    In an amended Complaint, Normandy alleged “that
    HUD’s actions interfered with [its] property interests in
    the apartment complex, the Use Agreement, the [2004]
    HAP [C]ontract, and its purchase agreement with Sum-
    mit.” 
    Normandy, 116 Fed. Cl. at 437
    . The government
    filed a motion to dismiss the takings claim. The Claims
    Court converted the motion into a summary judgment
    motion and granted that motion. It also reaffirmed its
    dismissal for lack of jurisdiction regarding Normandy’s
    contract claim.
    Normandy appeals; this court has jurisdiction pursu-
    ant to 28 U.S.C. § 1295(a)(3) (2012).
    DISCUSSION
    I. Standard of Review
    “We review the Court of Federal Claims’ grant of
    summary judgment under a de novo standard of review,
    with justifiable factual inferences being drawn in favor of
    the party opposing summary judgment.” Winstar Corp. v.
    United States, 
    64 F.3d 1531
    , 1539 (Fed. Cir. 1995), aff’d
    and remanded, 
    518 U.S. 839
    (1996). A motion for sum-
    mary judgment is properly granted if “there is no genuine
    dispute as to any material fact and the movant is entitled
    to judgment as a matter of law.” Fed. R. Civ. P. 56(a).
    “The existence or nonexistence of a contract is a mixed
    question of law and fact; contract interpretation is a
    question of law, reviewed de novo.” S. Cal. Fed. Sav. &
    Loan Ass’n v. United States, 
    422 F.3d 1319
    , 1328 (Fed.
    Cir. 2005).
    8              NORMANDY APARTMENTS, LTD.    v. UNITED STATES
    II. The Claims Court Correctly Dismissed Normandy’s
    Breach of Contract Claim for Lack of Jurisdiction
    A. The United States Is Not a Party to the 2004 HAP
    Contract
    The United States “is immune from suit save as it
    consents to be sued . . . and the terms of its consent to be
    sued in any court define that court’s jurisdiction to enter-
    tain the suit.” United States v. Testan, 
    424 U.S. 392
    , 399
    (1976) (quoting United States v. Sherwood, 
    312 U.S. 584
    ,
    586 (1941)). “To maintain a cause of action pursuant to
    the Tucker Act that is based on a contract, the contract
    must be between the plaintiff and the government and
    entitle the plaintiff to money damages in the event of the
    government’s breach of that contract.” Ransom v. United
    States, 
    900 F.2d 242
    , 244 (Fed. Cir. 1990). In other words,
    privity of contract is a “prerequisite for standing to sue in
    the Court of Federal Claims under the Tucker Act.” Nat’l
    Leased Hous. Ass’n v. United States, 
    105 F.3d 1423
    , 1435
    (Fed. Cir. 1997).
    The Claims Court held that “[t]he conclusion is ines-
    capable: HUD and Normandy had no contractual rela-
    tionship in the 2004 HAP [Contract]. [Normandy] is
    unable to enforce its rights in that [C]ontract against the
    federal government because the United States was not a
    party to it.” 
    Normandy, 116 Fed. Cl. at 443
    .
    The named parties and the signatories of the 2004
    HAP Contract are OHFA and Normandy. J.A. 82 (nam-
    ing, in a section titled “Parties to Renewal Contract,”
    OHFA as the “Contract Administrator” and Normandy
    Apartment Limited as the “Name of Owner”). HUD is
    neither a named party nor a signatory to the 2004 HAP
    Contract. Section 4a(1) of the 2004 HAP Contract states:
    “The Renewal Contract is a housing assistance payments
    contract . . . between the Contract Administrator and the
    Owner of the Project.” J.A. 84. Additionally, where the
    [C]ontract requires “Signatures” on its last page, the
    NORMANDY APARTMENTS, LTD.    v. UNITED STATES               9
    signing party under the line “Contract administrator
    (HUD or PHA)” is solely OHFA. J.A. 92. Normandy is
    the only other signatory that appears on the contract.
    J.A. 92; see also 24 C.F.R. §§ 880.201, 881.201 (noting, in
    the definition of “Contract,” that the HAP Contract is
    “entered into by the owner and the contract administra-
    tor,” and defining “Contract Administrator” as “[t]he
    entity which enters into the Contract with the owner”).
    Thus, by its plain language, the United States was not a
    party to the 2004 HAP Contract.
    Nonetheless, Normandy insists “HUD was a party in
    privity to the 2004 [HAP Contract]” and relies on Eng-
    lewood Terrace Limited Partnership v. United States, 
    79 Fed. Cl. 516
    , 534 (2007), aff’d in part and rev’d on other
    grounds, 479 F. App’x 969 (Fed. Cir. 2012) (unpublished),
    to argue that the Claims Court “should have drawn from
    the reasoning” of that decision. Appellant’s Br. 19–20.
    In that case, HUD attempted to modify a HAP agree-
    ment by “substitut[ing] the short-term contracts for what
    was reasonably anticipated to be a four-year contract” to
    incentivize the property owner to improve its performance
    under the HAP Contract. 
    Englewood, 79 Fed. Cl. at 534
    .
    Explaining “that a subsequent agreement between the
    parties could supercede [sic] a term in an earlier agree-
    ment by the same parties, if that was the mutual intent of
    the parties,” the Englewood court found “[b]ased on the
    record, [the] substitution was a unilateral act, on the part
    of HUD, imposed on Englewood.” 
    Id. The court
    reasoned
    “[i]t is not logical, or based on the record, to conclude that
    Englewood . . . was a willing participant in converting its
    anticipated four-year contract into uncertain, short-term
    contracts of varying length.” 
    Id. According to
    Normandy, “[t]he facts in this case can
    be plugged directly into the Englewood analysis. In order
    for the HUD to modify the prior Use Agreement and
    HAP[] Agreements in a manner that would revoke its
    10            NORMANDY APARTMENTS, LTD.    v. UNITED STATES
    contract privity with Normandy, both parties must mutu-
    ally assent.” Appellant’s Br. 21. Furthermore, Normandy
    argues that “[b]y signing the 2004 HAP Renewal Agree-
    ment, Normandy had absolutely no intention of sacrificing
    its ability to recover against the HUD in the event HUD
    breached its prior agreements with Normandy.” 
    Id. As an
    initial matter, Normandy did not make this ar-
    gument before the Claims Court and it is therefore
    waived. Gant v. United States, 
    417 F.3d 1328
    , 1332 (Fed.
    Cir. 2005) (“Arguments not made in the court or tribunal
    whose order is under review are normally considered
    waived.”). In any event, Englewood is inapposite and is
    not binding on this court. Here, the Original HAP Con-
    tract was between Normandy and HUD, with HUD noted
    as the contract administrator, while the 2004 HAP Con-
    tract was between Normandy and OHFA, with OHFA
    noted as the contract administrator. By contrast, Eng-
    lewood dealt with “a subsequent agreement between the
    parties” and “an earlier agreement by the same parties.”
    
    Englewood, 79 Fed. Cl. at 534
    (second emphasis added).
    Thus, the Englewood court had no need to address the
    question of privity, and its reasoning does not apply to the
    instant case.
    Normandy also argues that “[t]he purpose of the
    [2004] HAP [] Contract was to renew the expiring terms of
    the [O]riginal HAP [C]ontract except for those terms
    specifically modified by the Renewal Contract,” and “[i]n
    essence, the HUD remained a party to the provisions of
    the HAP Renewal Contract that pertained to HUD’s role,
    and this would include any renewed provisions.” Appel-
    lant’s Br. 22–23. The 2004 HAP Contract did specifically
    modify the earlier contract, however, in that OHFA was
    named the contract administrator, and HUD was not. See
    Senate Manor Props., LLC v. U.S. Dep’t of Hous. & Urban
    Dev., 315 F. App’x 235, 237–38 (Fed. Cir. 2008) (un-
    published) (explaining HUD was not in privity because
    “section 4a of the 2005 HAP [R]enewal [C]ontract stated
    NORMANDY APARTMENTS, LTD.    v. UNITED STATES             11
    that terms of the expiring HAP [C]ontract were renewed
    ‘[e]xcept as specifically modified by the Renewal Con-
    tract’” (fourth alteration in original)).
    Normandy also argues “HUD stepped in[to] the shoes
    of OHFA, giving itself privity” with respect to the 2004
    HAP Contract. Appellant’s Br. 26. However, that HUD
    provided funding, oversight, and enforcement does not
    make HUD a party under the contract. In Katz v. Cisne-
    ros, this court held that “a grant of benefits and subse-
    quent oversight by HUD is insufficient to establish a
    contractual obligation between [a property developer] and
    the government.” 
    16 F.3d 1204
    , 1209–10 (Fed. Cir. 1994).
    “‘This is true even if the local agency is acting merely as a
    conduit for the federal funds.’” 
    Id. (quoting Marshall
    N.
    Dana Constr., Inc. v. United States, 
    229 Ct. Cl. 862
    (1982)); see also Nat’l Leased Hous. Ass’n v. United States,
    
    105 F.3d 1423
    , 1436 (Fed. Cir. 1997) (plaintiffs arguing
    that the United States was in privity of contract because
    “the PHAs acted as ‘agents’ for the United States,” and
    this court finding the United States was not in privity of
    contract). Accordingly, Normandy fails to show HUD was
    in privity of contract.
    B. HUD Did Not Have an Implied-in-Fact Contract with
    Normandy
    Normandy alternatively argues that “[e]ven if this
    court finds that the HUD was not a party in privity to the
    2004 HAP [Contract], HUD had privity with Normandy
    through an implied-in-fact contract.” Appellant’s Br. 29.
    “An implied-in-fact contract is one ‘founded upon a meet-
    ing of the minds, which, although not embodied in an
    express contract, is inferred, as a fact, from conduct of the
    parties showing, in the light of the surrounding circum-
    stances, their tacit understanding.’” City of Cincinnati v.
    United States, 
    153 F.3d 1375
    , 1377 (Fed. Cir. 1998) (quot-
    ing Balt. & Ohio R.R. Co. v. United States, 
    261 U.S. 592
    ,
    597 (1923)). “It is well settled that the existence of an
    12            NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    express contract precludes the existence of an implied-in-
    fact contract dealing with the same subject matter, unless
    the implied contract is entirely unrelated to the express
    contract.” Schism v. United States, 
    316 F.3d 1259
    , 1278
    (Fed. Cir. 2002). Because the 2004 HAP Contract and
    Use Agreement contain requirements related to decent,
    safe, and sanitary conditions and the 2004 HAP Contract
    contained the requirements related to HAP payments, the
    existence of an implied-in-fact contract regarding the
    same requirements is precluded.
    C. The Claims Court Correctly Found that HUD Did Not
    Breach the 2000 Use Agreement
    On May 23, 2000, Normandy entered into a separate
    “Use Agreement” with HUD, which allowed Normandy to
    prepay its HUD-backed mortgage and terminate a previ-
    ous Regulatory Agreement between it and HUD. Nor-
    mandy contends that HUD “breached its obligations
    under the 2000 Use Agreement” because “HUD’s conduct
    at issue took place within [the Use Agreement] time
    period” and the “[Use] [A]greement incorporates any
    applicable HAP contract.” Appellant’s Br. 17. The Claims
    Court found there was “not the slightest hint that the
    parties to the Use Agreement intended to incorporate
    therein the provisions of current and future HAP con-
    tracts dealing with the payment of rent subsidies.” J.A.
    466–67. Normandy points to the Use Agreement’s refer-
    ence to § 221(d)(3) of the National Housing Act, now 12
    U.S.C. § 1715l, to argue that HUD was required to pro-
    vide subsidies to property owners through HAP contracts.
    Normandy asserts that 12 U.S.C. § 1715(d)(3) is an “ex-
    press part of the Use Agreement.” Appellant’s Br. 19.
    The reference to § 221(d)(3) Normandy relies on is in
    the section of the Use Agreement reciting facts, and is
    referenced in order to note that Normandy had “covenant-
    ed that, in the event the Regulatory Agreement terminat-
    ed by prepayment, in full, . . . [Normandy] would continue
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES            13
    to operate the Normandy Apartments project (as defined
    therein) in accordance with Section 221(d)(3) of the NHA,
    or any successor legislation, until the Maturity Date.”
    J.A. 145. The other reference to § 221(d)(3) pertains to
    the insurance of the loan secured by the mortgage of the
    Normandy Apartments, and is not relevant here.
    “[T]he incorporating contract must use language that
    is express and clear, so as to leave no ambiguity about the
    identity of the document being referenced, nor any rea-
    sonable doubt about the fact that the referenced docu-
    ment is being incorporated into the contract.” Northrop
    Grumman Info. Tech., Inc. v. United States, 
    535 F.3d 1339
    , 1344 (Fed. Cir. 2008). Furthermore, “[t]his court
    has been reluctant to find that statutory or regulatory
    provisions are incorporated into a contract with the
    government unless the contract explicitly provides for
    their incorporation.” St. Christopher Assocs., L.P. v.
    United States, 
    511 F.3d 1376
    , 1384 (Fed. Cir. 2008).
    Here, the reference to § 221(d)(3) is reciting facts and,
    even if it were expressly part of the contract as Normandy
    claims, it does not unambiguously incorporate the 2004
    HAP Contract.
    Normandy insists that “[e]ven if such language does
    not incorporate all of into [sic] the contract the parties’
    statutory obligations under the statute, there still re-
    mains a genuine issue of material fact as to whether the
    HUD breached the Use Agreement.” Appellant’s Br. 18.
    Normandy misunderstands the decision below: the Claims
    Court did not grant summary judgment in favor of the
    government; it dismissed for lack of jurisdiction because
    HUD was not in privity of contract. See 
    Normandy, 116 Fed. Cl. at 443
    (“Defendant has maintained and we previ-
    ously held that plaintiff was not in privity with HUD and
    thus could not sue to enforce the [2004] HAP [] [C]ontract
    in this court. . . . We reach the same conclusion again.”
    (citation omitted)). Accordingly, because the reference to
    § 221(d)(3) does not make HUD in privity of contract, we
    14             NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    affirm the Claims Court’s dismissal for lack of jurisdiction
    over the breach of contract claim.
    III. HUD’s Conduct Did Not Constitute a Regulatory
    Taking
    The Claims Court found HUD’s conduct was not a
    taking because “[Normandy’s] right to receive the housing
    assistance payments was controlled by the HAP
    [R]enewal [C]ontract with OHFA. Those payments were
    conditioned, however, on performance to the satisfaction
    of a third party, HUD.” 
    Id. at 442.
    The court further
    explained that though Normandy “may disagree with how
    HUD handled the administrative procedures involved in
    weighing the performance and the conclusion that HUD
    reached, [] there is no question that the right to receive
    those payments was limited by contract, and, indirectly,
    by the regulatory regime incorporated into that contract.”
    
    Id. “The result,”
    the court stated, “is that HUD was not
    ‘taking’ a property interest when it exercised its regulato-
    ry role of monitoring the condition of the building. [Nor-
    mandy] did not, by contract, have the right to those
    payments free of potential HUD oversight. It had con-
    tracted away that right.” 
    Id. On appeal,
    Normandy’s primary argument is that it
    “had an investment-backed expectation to collect mini-
    mum rents set forth under the 2000 Use Agreement and
    applicable HAP contract unless Congress failed to appro-
    priate funds or HUD exercised its regulatory and contrac-
    tual remedy to abate or terminate HAP payments after
    complying with the applicable contracts and HUD regula-
    tions.” Appellant’s Br. 15. Normandy also contends that
    it “received minimal rent from the tenant-based voucher
    program. And some low-income tenants paid no rent for
    several months after HUD’s abatement of the HAP pay-
    ments.” 
    Id. at 37.
    Thus, to Normandy, “the govern-
    ment . . . went too far when it abated the HAP contract
    payments and shifted a public burden of providing hous-
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES             15
    ing to low-income tenants disproportionately to Norman-
    dy.” 
    Id. at 37–38.
         “A ‘taking’ may occur either by physical invasion or by
    regulation.” Acceptance Ins. Cos. v. United States, 
    583 F.3d 849
    , 854 (Fed. Cir. 2009). “Typically, when consider-
    ing whether government action constitutes a regulatory
    taking, we apply factors set forth in Penn Central [Trans-
    portation Co. v. New York City, 
    438 U.S. 104
    (1978)]: (1)
    ‘[t]he economic impact of the regulation on the claimant’;
    (2) ‘the extent to which the regulation has interfered with
    distinct investment-backed expectations’; and (3) ‘the
    character of the governmental action.’” CCA Assocs. v.
    United States, 
    667 F.3d 1239
    , 1244 (Fed. Cir. 2011) (quot-
    ing Penn 
    Cent., 438 U.S. at 124
    ).
    The Claims Court correctly determined that the Penn
    Central factors do not support Normandy’s takings claim.
    With regard to the first Penn Central factor, the economic
    impact of the regulation, Normandy argues that “HUD
    failed to give it notice of default, the corrective action
    required, and a reasonable time to cure the default before
    HUD abated the HAP payments”; Normandy has found
    “no compensation alternative that was directly available
    to Normandy once the HAP payments were abated”; and
    Normandy was unable to sell the apartments because
    “HUD did not give reasonable, if any, consideration to the
    proposed sale before its denial.” Appellant’s Br. 36, 39.
    Normandy asserts it had an “investment backed ex-
    pectation” that it would continue to receive HAP pay-
    ments, even though it could “expect [that] subsidy
    payments might be abated.” 
    Id. at 40.
    The Claims Court
    held Normandy “had neither an investment-backed
    expectation in the right to receive subsidy payments
    outside the limitations imposed by the HAP contract nor
    did it have such an expectation in the right to set rents
    after it voluntarily agreed to limit that right in exchange
    for the right to prepay its mortgage.” Normandy, 116
    16            NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    Fed. Cl. at 442. Though Normandy broadly addresses the
    first and second Penn Central factors, it does so without
    specificity. Additionally, because the Use Agreement was
    in effect until 2009, Normandy “was, completely inde-
    pendent of the HAP contract or any HUD regulations,
    obligated to preserve the Normandy project for low in-
    come tenants at reduced rents and could not raise rents
    without HUD’s approval.” 
    Id. at 441.
         Normandy fails to at all address the third Penn Cen-
    tral factor, the character of the government regulation.
    As the Claims Court found, “[t]he [O]riginal HAP
    [C]ontract made it clear that, should Normandy fail to
    correct deficiencies in performance to the satisfaction of
    HUD, HUD could stop assistance payments.” 
    Id. Thus, “[t]o
    the extent that plaintiff had a property right in
    receiving payments, it was one arising out of the HAP
    contract. The relationship between plaintiff and the
    Section 8 housing program is a voluntary one created by
    contract.” 
    Id. (emphasis added;
    footnote omitted). Nor-
    mandy’s right to the HAP payments was governed by the
    2004 HAP Contract with OHFA and conditioned upon
    third-party HUD’s inspections. As the Claims Court
    noted, Normandy may take issue with the process or
    administrative procedures of HUD, but its actions do not
    constitute a taking.
    Accordingly, Normandy “did not, by contract, have the
    right to those payments free of potential HUD oversight.
    It had contracted away that right.” 
    Id. at 442.
    The same
    line of reasoning applies to Normandy’s ability to sell the
    apartment to Summit. That Agreement provides that
    Normandy “shall not without the written approval of the
    Secretary [of HUD] . . . convey . . . any part of the Resi-
    dential Area.” J.A. 204. Normandy thus contracted away
    that right, and HUD’s withholding of approval does not
    constitute a taking.
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES            17
    IV. The Dissent
    The Dissent expresses concern whether “the United
    States was correctly eliminated from its contracts with
    Normandy Apartments, thereby eliminating Tucker Act
    jurisdiction in the Court of Federal Claims.” Dissent Op.
    2. Specifically, the Dissent argues judicial estoppel pre-
    vents the government from first arguing before the dis-
    trict court that the United States was a contractual party
    and jurisdiction lies with the Claims Court and then later
    arguing, in the Claims Court, that OHFA is the contrac-
    tual party, not the United States. See 
    id. at 4–8.
        In support, the Dissent cites arguments made by the
    government to the district court and the Tenth Circuit.
    The Dissent states that before the district court, “[t]he
    United States responded that Normandy was in the
    wrong court, and that this was a Tucker Act suit on a
    contract with the United States. The government stated
    that ‘this case belongs in the Claims Court and [the
    Western District of Oklahoma] lacks jurisdiction.’” 
    Id. at 2
    (alterations in original) (quoting Government’s Resp. in
    Opp’n to Pl.’s Mot. for Prelim. Inj. 20, Normandy Apart-
    ments, 
    2007 U.S. Dist. LEXIS 81330
    ). The Dissent also
    says that before the Tenth Circuit, the government stated
    “these were contracts with the United States and were
    actionable only in the Court of Federal Claims under the
    Tucker Act,” such that “‘the Tucker Act impliedly forbids
    the relief sought in this case.’” 
    Id. (quoting Government’s
    Resp. in Opp’n to Pl.’s Mot. for Prelim. Inj. 40, Normandy
    Apartments, 
    2007 U.S. Dist. LEXIS 81330
    ). 1
    1     The Dissent quotes the government’s Tenth Cir-
    cuit brief, which adopts a passage from the government’s
    district court brief. For purposes of clarity, we cite only
    the government’s district court brief.
    18            NORMANDY APARTMENTS, LTD.    v. UNITED STATES
    The language cited by the Dissent was in the govern-
    ment’s Response in Opposition to Normandy’s Motion for
    Preliminary Injunction, specifically the section discussing
    why the district court lacked subject matter jurisdiction.
    See Government’s Resp. in Opp’n to Pl.’s Mot. for Prelim.
    Inj. 20, Normandy Apartments, 
    2007 U.S. Dist. LEXIS 81330
    . Where a motion to dismiss for lack of subject
    matter jurisdiction challenges the sufficiency of the plead-
    ing’s factual allegations, the court assumes those allega-
    tions are true. Cedars-Sinai Med. Ctr. v. Watkins, 
    11 F.3d 1573
    , 1583–84 (Fed. Cir. 1993). Any factual statements
    made by the government within this portion of its brief
    must be viewed through that lens.
    The government noted the evidence submitted by
    Normandy “indicates that under its current HAP
    [C]ontract [it] is eligible for payments” that exceed the
    Tucker Act’s $10,000 ceiling for exclusive jurisdiction in
    the Claims Court, 28 U.S.C. § 1346(a)(2). Government’s
    Resp. in Opp’n to Pl.’s Mot. for Prelim. Inj. 21–22, Nor-
    mandy Apartments, 
    2007 U.S. Dist. LEXIS 81330
    . Thus,
    the government’s arguments imply that it considered
    Tucker Act jurisdiction to be appropriate in the Claims
    Court in situations where a party is ultimately seeking
    monetary relief in excess of $10,000. See 
    id. That conten-
    tion based on assumed facts, in Normandy’s Complaint
    and Motion, is simply irrelevant here.
    The Dissent’s second quotation is found in the same
    brief. 
    Id. at 40.
    The Dissent says the government stated
    “these were contracts with the United States and were
    actionable only in the Court of Federal Claims under the
    Tucker Act.” Dissent Op. 2. The quotation does not
    support this proposition when viewed in the context of the
    brief’s structure and surrounding arguments. It is found
    in the government’s preliminary injunction argument
    discussing jurisdiction and the likelihood of success on the
    merits.
    NORMANDY APARTMENTS, LTD.    v. UNITED STATES              19
    In discussing the likelihood of the merits, the gov-
    ernment explicitly incorporated by reference arguments
    made in its discussion of subject matter jurisdiction. It
    stated “[t]he Tenth Circuit has held that the Tucker Act
    impliedly forbids federal courts from ordering declaratory
    or injunctive relief, at least in the form of specific perfor-
    mance, for contract claims against the federal govern-
    ment, and that the APA thus does not waive sovereign
    immunity for such claims.” Government’s Resp. in Opp’n
    to Pl.’s Mot. for Prelim. Inj. 40, Normandy Apartments,
    
    2007 U.S. Dist. LEXIS 81330
    (citing Robbins v. Bureau of
    Land Mgmt., 
    438 F.3d 1074
    , 1082 (10th Cir. 2006)). The
    government concluded that section by arguing if the
    District Court lacked jurisdiction, then Normandy did not
    show a likelihood of success. 
    Id. The Dissent
    also contends the government, in this ap-
    peal, no longer argues the United States is not a contrac-
    tual party and no longer directly challenges Tucker Act
    jurisdiction; and that instead the government argues the
    merits of the termination. Dissent Op. 8–9.
    That is certainly true to the extent that the govern-
    ment no longer contested technical jurisdictional issues
    because Normandy’s case was in the proper venue to
    determine the merits of the case. Thus, the government
    addressed the merits—i.e., whether the United States
    was a party to the 2004 HAP Contract. The Claims Court
    determined HUD was not in privity with Normandy and
    accordingly, as a matter of fact, the Claims Court lacked
    jurisdiction to hear this case.
    Thus, the Dissent’s assertion of inconsistency evapo-
    rates under the light of a full review of the record upon
    which it relies.
    CONCLUSION
    For the reasons set forth above, the decisions of the
    Claims Court dismissing the breach of contract claim for
    20           NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    lack of jurisdiction and granting summary judgment on
    the takings claim are
    AFFIRMED
    United States Court of Appeals
    for the Federal Circuit
    ______________________
    NORMANDY APARTMENTS, LIMITED,
    Plaintiff-Appellant
    v.
    UNITED STATES,
    Defendant-Appellee
    ______________________
    2014-5135
    ______________________
    Appeal from the United States Court of Federal
    Claims in No. 1:10-cv-00051-EGB, Senior Judge Eric G.
    Bruggink.
    ______________________
    REYNA, Circuit Judge, additional views, with whom
    WALLACH, Circuit Judge, joins.
    I join the court’s opinion. I write separately to explain
    why our opinion raises troubling concern. HUD is man-
    dated by Congress to implement and administer the
    Section 8 program. Through its regulations and past
    practices, HUD has obligated itself to Section 8 property
    owners. Yet by creating a separate contract between
    OHFA and Normandy, HUD has insulated itself from
    liability. The court’s opinion describes why Normandy
    cannot recover from HUD on the basis of HUD’s breach of
    an express or implied contract. Nor can Normandy recov-
    er in property law for the reasons the court explains.
    2             NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    Attempts to recover from HUD on other theories
    would also have likely failed. The court has generally
    rejected the notion that a local PHA acts as HUD’s agent
    in administering a HAP contract, despite HUD’s extensive
    involvement in contract administration. See, e.g., New
    Era Constr. v. United States, 
    890 F.2d 1152
    , 1154–57
    (Fed. Cir. 1989). Though Normandy could have claimed
    third-party beneficiary status under HUD and OHFA’s
    Annual Contributions Contract (i.e., the contract under
    which a local PHA receives HUD funding), this court has
    refused to label a property owner a third-party beneficiary
    to such contracts. See, e.g., Nat’l Leased Hous. Ass’n v.
    United States, 
    105 F.3d 1423
    , 1436–37 (Fed. Cir. 1997);
    Katz v. Cisneros, 
    16 F.3d 1204
    , 1210 (Fed. Cir. 1994).
    Judicial estoppel arguments would similarly fail be-
    cause while HUD argued in the district court that Nor-
    mandy’s claim belonged in the Court of Federal Claims,
    the government did not clearly maintain that HUD was a
    party to the 2004 HAP contract. J.A. 461 (HUD contend-
    ed generally that “[a]llegations in Plaintiff’s Complaint
    and Motion [for injunctive relief] demonstrate that this
    case belongs in the [Court of Federal Claims] and that
    this Court lacks jurisdiction”). Judicial estoppel argu-
    ments thus fail at least because HUD’s position at the
    Court of Federal Claims was not “clearly inconsistent”
    with its earlier position in district court. See New Hamp-
    shire v. Maine, 
    532 U.S. 742
    , 743 (2001).
    In addition, Normandy could not recover from OHFA
    under the 2004 HAP contract because HUD’s assistance
    payments to OHFA under HUD and OHFA’s Annual
    Contributions Contract would likely be a condition prece-
    dent to OHFA’s performance under the 2004 HAP con-
    tract. See Haddon Hous. Assocs., Ltd. P’ship v. United
    States, 
    711 F.3d 1330
    , 1338 (Fed. Cir. 2013) (“Generally, a
    party to a contract may assert the nonoccurrence of a
    contractual condition precedent as a defense to a claim of
    breach.”). In other words, OHFA’s performance under the
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES              3
    2004 HAP contract depends on HUD funding under the
    Annual Contributions Contract.
    To be clear, this is not a typical case in which sover-
    eign immunity bars suit against the government. HUD
    simultaneously obligated itself to OHFA—and, by exten-
    sion, Normandy—under the Annual Contributions Con-
    tract and exercised significant control of Normandy’s
    property under the 2004 HAP contract, all while remain-
    ing insulated from liability. Under HUD’s scheme, the
    government conveniently escapes liability in contract
    under the Tucker Act—a statute that provided “the wid-
    est and most unequivocal waiver of federal immunity
    from suit,” see United States v. Mitchell, 
    463 U.S. 206
    , 215
    (1983), a waiver that Justice Holmes once deemed a
    “great act of justice,” United States v. Emery, Bird, Thayer
    Realty Co., 
    237 U.S. 28
    , 32 (1915).
    But justice is hard to find in this case. Despite Nor-
    mandy’s alleged $2.75 million loss, Normandy appears to
    have no recourse against the government or anyone else.
    The government’s position in this litigation risks under-
    mining Section 8 by discouraging property owner partici-
    pation in the Section 8 program, the purpose of which is
    to provide low-income families with a decent place to live.
    See, e.g., 42 U.S.C. § 1437f. By limiting incentives for
    property owner participation, HUD’s scheme may have
    negative consequences for Section 8 tenants. Be that as it
    may, problems offered up by this case and others like it
    are outside this court’s authority to remedy and are best
    left for another branch of government to address.
    United States Court of Appeals
    for the Federal Circuit
    ______________________
    NORMANDY APARTMENTS, LIMITED,
    Plaintiff-Appellant
    v.
    UNITED STATES,
    Defendant-Appellee
    ______________________
    2014-5135
    ______________________
    Appeal from the United States Court of Federal
    Claims in No. 1:10-cv-00051-EGB, Senior Judge Eric G.
    Bruggink.
    ______________________
    NEWMAN, Circuit Judge, dissenting.
    The United States, acting through the Department of
    Housing and Urban Development (HUD), has since 1968
    contracted with Normandy Apartments to provide federal-
    ly subsidized low-income apartments, called “Section 8
    housing” as established by the National Housing Act, 42
    U.S.C. § 1437f. After inspections by HUD, wherein HUD
    criticized Normandy’s compliance with the requirement
    that the apartments be maintained in “decent, safe, and
    sanitary” condition, in 2007 HUD terminated its subsidy
    payments. Normandy objected to the termination, stating
    that the perceived non-compliance was based on tempo-
    rary disruption due to the ongoing apartment project of
    installing double-pane windows throughout the complex,
    2             NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    and that it had inadequate opportunity to remedy any
    perceived deficiency in property maintenance.
    My concern relates to whether the United States was
    correctly eliminated from its contracts with Normandy
    Apartments, thereby eliminating Tucker Act jurisdiction
    in the Court of Federal Claims. The government success-
    fully argued this position in the Oklahoma district court
    and in the Tenth Circuit, and successfully argued the
    contrary position in the Court of Federal Claims. The
    panel majority now denies Normandy Apartments all
    access to judicial review.
    DISCUSSION
    Normandy Apartments had initially filed suit against
    the United States Department of Housing and Urban
    Development in the United States District Court for the
    Western District of Oklahoma, asking that court to re-
    quire HUD to continue the rental subsidies at least until
    the merits of the issue were resolved. The United States
    responded that Normandy was in the wrong court, and
    that this was a Tucker Act suit on a contract with the
    United States. The government stated that “this case
    belongs in the Claims Court and [the Western District of
    Oklahoma] lacks jurisdiction.” U.S. Dist. Ct. Br. 20. The
    district court agreed. Normandy Apartments, Ltd., v. U.S.
    Dep’t of Hous. & Urban Dev., No. Civ.-07-1161-R, 2007
    WL3232610 (W.D. Okla. Nov. 1, 2007).
    Normandy appealed to the Tenth Circuit, and the
    United States again moved for dismissal, stating that
    these were contracts with the United States and were
    actionable only in the Court of Federal Claims under the
    Tucker Act. U.S. Br. to 10th Cir. (“The Tucker Act im-
    pliedly forbids the relief sought in this case”). The Tenth
    Circuit agreed, ruling that Normandy’s contract claims
    were within the “exclusive jurisdiction” of the Court of
    Federal Claims. Normandy Apartments., Ltd. v. U.S.
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES            3
    Dep’t of Hous. & Urban Dev., 
    554 F.3d 1290
    , 1295-96
    (10th Cir. 2009).
    Normandy then filed suit in the Court of Federal
    Claims. However, in the Court of Federal Claims the
    United States argued that there was no jurisdiction in the
    Court of Federal Claims. The government argued that
    the contracts were not with the United States, but with
    an Oklahoma state agency that had signed the most
    recent Renewal Agreement as “Contract Administrator.”
    The Court of Federal Claims agreed, and dismissed the
    suit.
    Thus the United States obtained dismissal of the con-
    tract claims by the Oklahoma district court and the Tenth
    Circuit on the argument that the contracts are with the
    United States and can be litigated only in the Court of
    Federal Claims. The United States then obtained dismis-
    sal of the contract claims by the Court of Federal Claims
    on the argument that the contracts are not with the
    United States, but with the Oklahoma Contract Adminis-
    trator. Normandy has exhausted the supply of courts in
    which it can seek resolution of its claim for breach of
    contract. In its shifting positions, the government avoid-
    ed judicial determination of the merits for eight years. I
    respectfully dissent.
    The HUD contracts
    Normandy Apartments had two contracts with the
    United States Department of Housing and Urban Devel-
    opment. The Housing Assistance Payments (HAP) Re-
    newal Agreement of 2004 traces its renewals to 1968. The
    Regulatory Use Agreement of 2000 stated the conditions
    of Normandy’s prepayment of its mortgage, and also
    contained all of the substantive terms of the Renewal
    Agreement.
    The Renewal Agreement states that “the purpose of
    the Renewal contract is to renew the expiring contract for
    4             NORMANDY APARTMENTS, LTD.    v. UNITED STATES
    a new term,” Contract Section 4c. Section 4 authorizes
    HUD to assign the contract to a PHA (public housing
    agency), but provides that “[n]otwithstanding such as-
    signment, HUD shall remain a party to the provisions of
    the Renewal Contract that specify HUD’s role pursuant to
    the Renewal Contract, including such provisions of Sec-
    tion 9 (HUD requirements), Section 10 (statutory changes
    during term), and section 11 (PHA default) of the Renewal
    Contract.” Section 4(a)(2).
    The Renewal Agreement, but not the Regulatory Use
    Agreement, was signed by the Oklahoma Housing and
    Finance Authority as “Contract Administrator,” as au-
    thorized by § 1437f(b)(1) of the Housing Act. No substan-
    tive changes were made to HUD’s continuing authority
    and responsibility. The government does not dispute that
    the rental subsidies continued to be provided by HUD,
    and that HUD retained full control and responsibility for
    all of the contract provisions, including the rights of
    inspection and termination as here exercised.
    In accordance with the contracts, HUD conducted pe-
    riodic inspections of the Normandy Apartments property.
    In 2007 HUD terminated the federal subsidy payments,
    on the ground that Normandy had not properly main-
    tained the apartments, leading to the litigation starting in
    Oklahoma in October 2007, and ending with the Federal
    Circuit.
    Suit in Oklahoma District Court
    Normandy filed suit in the District Court for the
    Western District of Oklahoma, seeking to enjoin the
    termination that was ordered by HUD, and to require
    that the rental subsidies be continued at least during
    resolution of the issues in dispute. The United States
    moved for dismissal on jurisdictional grounds, stating
    that at “issue in the instant case are agreements between
    Plaintiff and HUD.” Def.‘s Resp. to Pl.’s Mot. for Prelim.
    Inj. at 2. As the district court recited, the United States
    NORMANDY APARTMENTS, LTD.    v. UNITED STATES              5
    raised the question ”whether this court has jurisdiction to
    entertain this action or whether jurisdiction lies exclu-
    sively in the Court of Federal Claims pursuant to the
    Tucker Act, 28 U.S.C. § 1491.” Normandy, 
    2007 WL 3232610
    , at *1.
    The government provided the affidavit of Mr. Herman
    Ransom in his position as Director of the HUD Multifami-
    ly Hub responsible for HUD’s housing programs in the
    region that includes Oklahoma. He averred that “Nor-
    mandy Apartments, Ltd. (‘the owner’) entered into a
    Housing Assistance Payments (‘HAP’) contract with HUD
    September 2004,” and that the contracts provided that
    HUD would pay Monthly Rental Assistance “according to
    HUD’s regulations and administrative procedures,” citing
    Agmt. §7(a). Ransom Aff. Mr. Ransom also described the
    Regulatory Use Agreement of 2000, between Normandy
    Apartments and HUD. He stressed that the Normandy
    Apartments contracts are with the United States, with
    elaboration such as “HUD has not authorized OHFA to
    conduct physical inspections of Normandy Apartments.”
    Ransom Aff. Thus the government argued that these
    were contracts with the United States, and that remedy
    for the asserted breach was available only in the Court of
    Federal Claims. The Oklahoma district court agreed, and
    ruled that “Plaintiff’s claims arise out of a contract with
    the government and are for breach of that contract and
    breach of regulations covering and relating to that con-
    tract, the latter of which plaintiff could not even assert if
    it did not have a HAP contract with HUD.” Normandy,
    
    2007 WL 3232610
    , at *2.
    The district court recited “HUD’s decision to abate
    Housing Assistance Payments and to terminate the HAP
    contract,” and reiterated that “plaintiff’s claims are
    founded upon an express contract with the United States
    and on regulations of an executive department. See 28
    U.S.C. § 1491.” Normandy, 
    2007 WL 3232610
    , at *1, *2.
    The court held that “jurisdiction over this case lies exclu-
    6             NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    sively in the United States Court of Federal Claims
    pursuant to the Tucker Act.” 
    Id. at *2.
        Appeal to the Tenth Circuit
    Normandy Apartments appealed to the Tenth Circuit,
    and the government again moved for dismissal for lack of
    jurisdiction. The Circuit court held that although Nor-
    mandy’s APA claims were within the district court’s
    jurisdiction, since the contracts were between the United
    States and Normandy Apartments, the count “alleging an
    ordinary breach of contract, seeks equitable relief for a
    contract claim against the government. Because the
    Court of Federal Claims has exclusive jurisdiction to hear
    such a claim, the district court properly declined to take
    jurisdiction over it.” 
    Normandy, 554 F.3d at 1299
    .
    The Tenth Circuit observed that “[u]nder HUD regu-
    lations and Normandy’s contract with HUD, Normandy
    was required to maintain the units,” 
    id. at 1294,
    and
    reiterated that the Court of Federal Claims is the exclu-
    sive venue for suit for breach of a contract of this magni-
    tude with the United States, 
    id. at 1299.
        The Court of Federal Claims
    Normandy Apartments then filed suit in the Court of
    Federal Claims. However, unlike the position on which it
    had prevailed in the district court and the Tenth Circuit,
    the government argued that the contracts are not with
    the United States, but with the Oklahoma housing au-
    thority as “Contract Administrator.” The principles of
    judicial estoppel foreclose such maneuvers:
    Where a party assumes a certain position in a le-
    gal proceeding, and succeeds in maintaining that
    position, he may not thereafter, simply because
    his interests have changed, assume a contrary po-
    sition, especially if it be to the prejudice of the
    party who has acquiesced in the position formerly
    taken by him.
    NORMANDY APARTMENTS, LTD.   v. UNITED STATES              7
    New Hampshire v. Maine, 
    532 U.S. 742
    , 749 (2001); see,
    e.g., Pegram v. Herdrich, 
    530 U.S. 211
    , 227 n.8 (2000)
    (“Judicial estoppel generally prevents a party from pre-
    vailing in one phase of a case on an argument and then
    relying on a contradictory argument to prevail in another
    phase.”).
    This is not a new principle, see Davis v. Wakelee, 
    156 U.S. 680
    (1895):
    It may be laid down as a general proposition that,
    where a party assumes a certain position in a le-
    gal proceeding, and succeeds in maintaining that
    position, he may not thereafter, simply because
    his interests have changed, assume a contrary po-
    sition, especially if it be to the prejudice of the
    party who has acquiesced in the position formerly
    taken by him.
    
    Id. at 689.
    Nor is this principle new to the Federal Cir-
    cuit. In Data Gen. Corp. v. Johnson, 
    78 F.3d 1556
    , 1565
    (Fed. Cir. 1996) this court recognized that “where a party
    successfully urges a particular position in a legal proceed-
    ing it is estopped from taking a contrary position in a
    subsequent proceeding where its interests have changed.”
    On this appeal the government does not dispute that
    HUD retained its full contract rights and obligations,
    including the right of termination. It was HUD that
    inspected the property, and it was HUD that terminated
    the contracts. This relationship is not overridden by the
    selection of a state housing authority as “contract admin-
    istrator.” By the Housing statute, HUD “is authorized to
    enter into annual contributions contracts with public
    housing agencies pursuant to which such agencies may
    enter into contracts to make assistance payments,” 42
    U.S.C. §1437f(b)(1), and “[t]he Secretary shall embody the
    provisions for such annual contributions in a contract
    guaranteeing their payment,” 42 USC §1437c(a)(1).
    8             NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    However, such authorization does not remove HUD from
    its contractual obligations to the property owner.
    HUD’s public housing Guidebook for Section 8 con-
    tracts is explicit that HUD is “contractually bound” by the
    Renewal Contract executed by a state housing authority:
    When a Renewal Contract is executed by a PHA
    [public housing authority] pursuant to this
    Guidebook, in accordance with HUD requirements
    and on the form prescribed by HUD, HUD is con-
    tractually bound by the Renewal Contract provi-
    sions that specify HUD’s role pursuant to the
    Renewal Contract.
    William C. Apgar, HUD Office of Multifamily Housing,
    Section 8 Renewal Policy (2001). The Guidebook is explic-
    it that a renewal executed by a state housing authority
    does not relieve HUD of its contract obligations. And
    although the 2004 Renewal Agreement was signed by the
    Oklahoma authority, the Regulatory Use Agreement,
    which incorporates all of the contract obligations between
    HUD and Normandy Apartments, was executed by HUD,
    with no reference to any state authority.
    Despite these explicit statements of HUD’s position,
    obligations, and authority, the Court of Federal Claims
    held that the “plaintiff is unable to enforce its rights in
    that contract against the federal government because the
    United States was not a party to it.” Fed. Cl. Op. at 20.
    The Court of Federal Claims also rejected Normandy’s
    alternative ground that its property had been taken in
    violation of its Fifth Amendment rights. Normandy now
    appeals to the Federal Circuit.
    Appeal to the Federal Circuit
    The government no longer argues that these contracts
    are not with the United States, and does not directly
    challenge Tucker Act jurisdiction. The government re-
    cites that HUD funded the federal subsidy to Normandy,
    NORMANDY APARTMENTS, LTD.    v. UNITED STATES               9
    that HUD inspected the Normandy Apartment premises,
    and that HUD terminated the subsidy payments. See,
    e.g., U.S. Br. 6-7 (“HUD abated—that is, suspended—
    funding for HAP payments by OFHA to Normandy”). The
    government does not argue in this court that the Oklaho-
    ma “Contract Administrator” removed the United States
    from the contracts with Normandy.
    Instead, the United States now seeks to argue the
    merits of the termination, stating that HUD did not
    breach the contracts because Normandy had not main-
    tained the apartments in “decent, safe, and sanitary
    condition.” U.S. Br. 7. The propriety of the termination is
    the issue for which Normandy has been seeking a forum,
    now for eight years. The merits of the contract claim have
    never been decided. And the Federal Circuit is not a trial
    forum, for ab initio resolution of Normandy’s claim.
    Summary
    The United States argued successfully in the Okla-
    homa district court and the Tenth Circuit that this case
    belongs in the Court of Federal Claims because the con-
    tracts are with the United States. The United States then
    argued successfully in the Court of Federal Claims that
    the contracts are not with the United States. This is not
    only a classic exemplar of judicial estoppel, but the juris-
    dictional ruling of the Court of Federal Claims is incor-
    rect, for the contracts are indeed with the United States,
    and subject to the Tucker Act.
    I do not know how the merits would have been decid-
    ed, had they been litigated. With the court’s ruling today,
    however, all paths to judicial resolution appear to be
    closed. This is not the process envisioned by President
    Lincoln, his words carved at the entrance to this court-
    house: “It is as much the duty of government to render
    prompt justice against itself in favor of citizens as it is to
    administer the same between private individuals.”
    10              NORMANDY APARTMENTS, LTD.   v. UNITED STATES
    I respectfully dissent.