Womack v. Lovell , 188 Cal. Rptr. 3d 471 ( 2015 )


Menu:
  • Filed 6/15/15
    CERTIFIED FOR PUBLICATION
    IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
    FOURTH APPELLATE DISTRICT
    DIVISION THREE
    ART WOMACK,
    Plaintiff, Cross-defendant and                     G049587
    Respondent,
    (Super. Ct. No. 30-2011-00438896)
    v.
    OPINION
    DAVID ANGUS LOVELL et al.,
    Defendants, Cross-complainants and
    Appellants;
    MARK CABALLERO,
    Cross-defendant, Cross-complainant
    and Respondent.
    Appeal from a judgment of the Superior Court of Orange County, Derek W.
    Hunt, Judge. Affirmed in part, reversed in part and remanded with directions.
    Law Offices of Lenore Albert and Lenore L. Albert for Defendants, Cross-
    complainants and Appellants.
    Law Office of Mitchell B. Hannah, Mitchell B. Hannah and Hallie D.
    Hannah for Plaintiff, Cross-defendants, Cross-complainant and Respondents.
    I. INTRODUCTION
    In his rock and roll standard, “End of the Innocence,” Bruce Hornsby notes
    that “The lawyers dwell on small details.” That’s true. We have to. The devil isn’t the
    only resident in the details; sometimes truth and fairness lodge there as well.
    In this case, we address a “detail” that was lost or hidden and resulted in
    what we consider an injustice. Fortunately, as is usually the case, painstaking attention to
    other small details enables us to correct this injustice. If you dwell on small details with
    an eye to fairness, the law works well.
    Here, a homeowner sued a general contractor for allegedly shoddy and
    incomplete work in connection with a major home remodeling contract. The
    homeowner’s complaint also contained a cause of action against the general contractor’s
    license bond company, seeking to recover for the contractor’s having “grossly deviated”
    from the plans and specifications for the job. To support his action, the homeowner
    explicitly alleged in the complaint that the contractor was licensed at all times.
    For his part, the general contractor responded with a cross-complaint
    against the homeowner for unpaid work. The cross-complaint included a copy of their
    written contract which showed the contractor’s license number. To that, the homeowner
    simply filed a general denial of all allegations.
    When the case came to trial, the homeowner – contrary to the applicable
    local rule requiring plaintiffs to identify all controverted issues – did not identify
    licensure as a controverted issue. The contractor’s attorney seeing no issue, did not
    obtain a verified certificate from the Contractors’ State License Board (the License
    Board) showing the contractor was licensed at all times during his performance. But
    when the contractor was about to rest his case on the cross-complaint, the homeowner’s
    attorney made a motion for nonsuit based on the absence of such a verified certificate as
    2
    required under Business and Professions Code section 7031, subdivision (d), when the
    issue of licensure is “controverted.”1
    The trial judge was also surprised the licensure issue was raised. He hadn’t
    been expecting the issue either. He deferred immediate ruling on the homeowner’s
    nonsuit motion. As the contractor learned to his chagrin, it presently takes at least six
    days to obtain a verified certificate from the License Board even if one drives overnight
    to Sacramento to pick it up in person. While the contractor was eventually able to obtain
    a verified certificate of licensure from the License Board, he could not do so until after
    the close of the trial, in which he prevailed on his claim for unpaid work from the
    homeowner. Because no certificate of licensure could be produced, the trial judge
    reluctantly granted the homeowner’s nonsuit motion, by then denominated a motion for
    judgment notwithstanding the verdict (JNOV), and this appeal ensued.
    We reverse the judgment in favor of the homeowner, with instructions to
    the trial judge to grant judgment in favor of the general contractor as against the
    homeowner. We conclude this is one of those relatively rare cases where a party can be
    bound by a judicial admission made in an unverified complaint. (See Reichert v. General
    Ins. Co. (1968) 
    68 Cal.2d 822
    , 836-837 (Reichert) [circumstances of case justified
    holding party to admission made in unverified complaint].) Here, the judicial admission
    that the general contractor was licensed, compounded by the homeowner’s failure to
    comply with the local rule requiring identification of all controverted issues, rendered the
    question of licensure assuredly uncontroverted for purposes of section 7031. Because of
    1          “If licensure or proper licensure is controverted, then proof of licensure pursuant to this section
    shall be made by production of a verified certificate of licensure from the Contractors’ State License Board which
    establishes that the individual or entity bringing the action was duly licensed in the proper classification of
    contractors at all times during the performance of any act or contract covered by the action. Nothing in this
    subdivision shall require any person or entity controverting licensure or proper licensure to produce a verified
    certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper
    licensure shall be on the licensee.” (Italics added.)
    In this opinion all undesignated references are to the Business and Professions Code, and all
    undesignated references to any subdivision of a statute are to section 7031.
    3
    the judicial admission, the rule of Advantec Group, Inc. v. Edwin’s Plumbing Co., Inc.
    (2007) 
    153 Cal.App.4th 621
     (Advantec) does not apply.
    II. FACTS
    This litigation arises out of a 2010 Laguna Hills home remodel undertaken
    by Art Womack. Womack hired a general contractor named Aztec Sunpower (Aztec).2
    Aztec, in turn, hired a pool subcontractor, Caballero Pools and Spas (Caballero). By the
    end of 2010, the relationships had broken down to the point where litigation was
    imminent.
    Womack filed first in January 2011, his complaint alleging breach of
    contract by Aztec. His first amended complaint, filed in July 2011, alleged Aztec had
    done an incomplete and sloppy job and thus forced him to incur extra expenses to make
    things right.
    In his first amended complaint, Womack alleged twice that Aztec “at all
    times” relevant to the suit, “acted in the capacity as a licensed contractor.” The first time
    was in the standard list of parties often given at the beginning of a complaint. The second
    time was in connection with a fourth cause of action “on contractor’s license bonds”
    against American Contractors License Indemnity Company (American Contractors). In
    that cause of action Womack alleged that “upon application” by Aztec “to the Registrar
    of Contractors of the Contractor’s State License Board of the State of California for a
    contractor’s license or renewal thereof, and in accordance with the provisions of section
    7071.6 of the Business and Professions Code of State of California,” Aztec had “filed
    with the Registrar bonds issued by” American Contractors, “bond number 1000112982 in
    the sum of $12,500, conditioned upon full compliance” by Aztec “with all the provisions
    of Division 3, Chapter 9, of the Business and Professions Code of the State of California
    2       Technically, Aztec is the dba of DA Lovell Corp. We call DA Lovell Corporation “Aztec”
    because that’s how the judgment refers to it.
    4
    inuring to the benefit of any person damaged as a result of a violation of the Chapter by
    the Defendant’s licensees.” The pleading was unverified.
    About a year later, in February 2012, Aztec responded with a cross-
    complaint against both Womack and Caballero, alleging they unfairly cut Aztec out of
    the job. Aztec’s cross-complaint alleged it had been a licensed contractor continuously in
    good standing with the state contractor’s board for the past 20 years.
    In April 2012, both Womack and Caballero, represented by the same law
    firm, filed answers to Aztec’s cross-complaint. Each answer generally denied all of
    Aztec’s allegations, which necessarily included the allegation Aztec had been a licensed
    contractor at all relevant times, a small detail that went unnoticed.
    Also in April 2012, Caballero filed his own cross-complaint against Aztec,
    alleging damages arising out of its breach of contract. In contrast to Womack’s earlier
    complaint, however, Caballero’s cross-complaint did not allege Aztec was at all times a
    licensed contractor. Caballero merely alleged Aztec had “represented” itself to be a
    contractor.
    Three days before a September 30, 2013 trial date, Womack and
    Caballero’s law firm filed a “joint list of stipulated facts and controverted issues,” though
    calling it either “joint” or a “list” would be a stretch. It was not joint – certainly not in
    the sense of reflecting a document agreed to by adversarial parties. The document was
    neither signed by Aztec’s counsel nor, as far as we can ascertain, ever served on her. Nor
    was it a list. It merely stated the parties had stipulated a certain surety bond company had
    issued a bond to Aztec for a certain period and then said “All other issues are
    controverted,” without identifying any of them.
    The trial was continued, and on November 5, just before trial was about to
    begin, counsel for American Contractors (Aztec’s bonding agent) and Womack
    announced in open court (with counsel for Aztec present) that they had a settlement.
    Counsel for Womack articulated its terms for the record: They agreed that American
    5
    Contractors had “issued surety bond number 1000112982 in the amount of $12,500 to
    DA Lovell Corp., which does business as Aztec Sunpower. [¶] The bond was in effect
    from February 10th – yeah, February 5th, 2010 through March 23rd. 2012. [¶]
    American Contractors Indemnity Company agrees that if plaintiff Art Womack obtains a
    net recovery of at least $12,500 for DA Lovell Corp. [dba Aztec], that American
    Contractors Indemnity will pay to Art Womack up to $12,500 from the penal sum of the
    bond. [¶] If the net is less than $12,500, American Contractors Indemnity shall only be
    obligated to pay the net recovery, not to exceed $12,500. [¶] And the parties agree that
    the court will retain jurisdiction pursuant to CCP 664.6 to enforce this settlement.”
    Trial then proceeded, and on November 6 the issue of Aztec’s licensure
    came up late in the afternoon, soon after Aztec’s owner, D.A. Lovell, took the stand and
    began testifying as to Aztec’s licensure status. It was at that point Womack and
    Caballero’s counsel played the Advantec card, asserting the issue of licensure had been
    controverted, so there was a fatal omission in Aztec’s now-almost completed case: Aztec
    had produced no verified certificate of licensure.
    The trial judge was taken aback. He reminded defense counsel he had
    asked at the “outset” of the case whether there were any “dispositive affirmative
    defenses,” and had heard not a word about the licensure issue. The short colloquy ended
    with the judge deciding to delay ruling on the matter until sometime after the end of the
    day.
    That day Womack and Caballero’s counsel filed written briefing on the
    subdivision (d) issue. It had obviously not been worked up ad hoc over the lunch hour.
    The gravamen of the briefing was: (1) Aztec’s licensure had been “controverted” by
    virtue of the general denials filed by Womack and Caballero to Aztec’s cross-complaint;
    (2) under Business and Professions Code section 7031, subdivision (d), proof of licensure
    may be shown only by a verified certificate of licensure from the state contractor’s
    license board; (3) Aztec had failed to produce such a verified certificate (the implication
    6
    was that by this late date in the trial, Aztec was not going to be able to produce such a
    verified certificate in time)3; ergo (4) Aztec had failed to meet its burden of proof of
    showing licensure and, as the briefing put it, had to lose. “Period.”
    The next day, November 7, Aztec rested its case on the liability phase of
    trial. It is an interesting, but now academic question whether, under any circumstance,
    including optimal funding of the License Board in the best of all possible worlds, any
    contractor will ever be able to procure a verified certificate of licensure overnight. It
    certainly didn’t happen here. Rather, immediately after Aztec rested, Womack and
    Caballero’s counsel made an oral motion for nonsuit based on the brief they had filed the
    previous day.
    It appears the trial judge had not yet had time to read that brief. So he
    denied Womack and Caballero’s counsel’s request to have him rule on the issue
    “immediately.”4 Rather, he said defense counsel could argue his motion the next day. If,
    in the interim, the jury came back with an adverse verdict, the motion could be treated as
    a motion for JNOV. As it turned out, the jury did come back with a verdict in the
    liability phase of the trial – first against Womack on his complaint, then in favor of Aztec
    on its cross-complaint, finding both Womack and Caballero had breached their contracts
    with Aztec.
    Phase two, the trial on damages, remained so the jury was not dismissed.
    The next day, November 8, outside the presence of the jury, the judge entertained the
    motion. By this time there had been oral testimony Aztec was fully licensed, but there
    was no verified certificate of licensure. Aztec’s lawyer contended there had been no need
    to produce such a certificate, pointing to Womack’s first amended complaint, in which
    3          Womack and Caballero’s counsel’s briefing treated the failure to produce the certificate in the past
    tense, as if a fait accompli, even though there were still a few hours left to go on the liability phase of trial to be
    completed the next day.
    4          Womack and Caballero’s counsel pleaded: “I can’t get a ruling on that now? It’s clear. It’s
    clear.”
    7
    Womack “admitted in his pleading that [Aztec] was a licensed contractor.” The trial
    judge understood the point to be that Womack had made a judicial admission Aztec was
    so licensed. Womack and Caballero’s counsel countered by citing the Advantec case.
    While the trial judge had read the case a couple of weeks prior to the trial, he had not read
    it for that day, so he again deferred ruling on the motion.
    Four days later, on November 12, the jury returned a verdict on the
    damages issue in favor of Aztec: Womack owed Aztec $13,100, Caballero owed Aztec
    $4,340. Aztec’s counsel told the judge she had ordered a verified certificate from the
    licensing board, but it wasn’t ready yet. The trial judge correctly guessed Womack and
    Caballero’s position would be that it made no difference. As he anticipated, in open
    court, Womack and Caballero’s response to the fact that Aztec was now shown to have
    been licensed all along was, “Advantec case says that he wins anyway.”
    That day Aztec’s counsel filed opposition to Womack and Caballero’s
    earlier brief, again asserting Womack had made a judicial admission that Aztec was
    licensed. After a little more discussion, the parties agreed to resume argument two days
    later, on November 14. When the parties met again on November 14, the trial judge had
    made up his mind to grant the motion, based on Advantec.
    Aztec’s counsel once again asserted the argument Womack had made a
    judicial admission Aztec was “validly licensed.” But the trial judge expressed his
    concern that, “there’s no case on point in which that is recognized as an exception to the
    statute and the Advantec case.” He added, “I just don’t see any trend here that suggests
    that on my level, I should do that,” though he added he was “rather sympathetic to the
    argument.” The judge granted the motion, now effectively a motion for JNOV.
    Aztec wasn’t quite yet ready to throw in the towel. Someone drove to
    Sacramento on Aztec’s behalf to pick up the verified certificate ordered earlier from the
    licensing board, and, on November 22, 2013, Aztec brought an ex parte motion to
    reconsider the JNOV, or alternatively for a new trial. Aztec’s attorney presented a
    8
    declaration asserting she hadn’t had notice from any of the pleadings licensure would be
    put at issue. According to her declaration, the board takes from six to ten days to
    complete a request for such a verified certificate.
    It didn’t work. The trial judge signed a judgment in favor of both Womack
    and Caballero. A notice of appeal was timely filed.
    III. DISCUSSION
    A. Background
    Subdivision (a) of section 7031 operates to deny access to the courts to
    contractors who were not licensed at all times during their performance. (E.g., MW
    Erectors, Inc. v. Niederhauser Ornamental & Metal Works Co., Inc. (2005) 
    36 Cal.4th 412
    , 423; Hydrotech Systems, Ltd. v. Oasis Waterpark (1991) 
    52 Cal.3d 988
    , 995
    (Hydrotech); E.J. Franks Construction, Inc. v. Sahota (2014) 
    226 Cal.App.4th 1123
    ,
    1128 (E.J. Franks); Alatriste v. Cesar’s Exterior Designs, Inc. (2010) 
    183 Cal.App.4th 656
    , 665-666.) That proposition is dog bites man.
    Less well known is subdivision (d) of section 7031, which requires
    production of a verified certificate of licensure when the issue of licensure is
    controverted, and so can operate to deny even licensed contractors any compensation.
    That phenomenon is man bites dog. (See Von Esch, The Code Section That Could Cost
    You Your Construction Case (May 2012) 54 O.C. Law. 20.)
    The best illustration of this possibility – the spectre that haunted the trial
    judge here – is Advantec, supra, 
    153 Cal.App.4th 621
    . There a developer hired a
    plumber, then terminated the plumber mid-job. The developer sued for breach of
    contract. (See id. at p. 625.) The plumber cross-complained for breach of contract, and
    9
    of course alleged – it had to5 – that it was licensed. The developer filed a general denial,
    sans any “specific challenge” to the plumber’s licensure status. (Ibid.) The case went to
    jury trial, and when the plumber tried to establish licensure by his testimony, the court
    ruled that could only be accomplished by a verified certificate. The plumber’s counsel
    then requested a continuance so as to be able to obtain a certificate from the License
    Board, but the developer’s counsel already knew it would take at least two weeks, and
    told the court so. The court denied the continuance, and thereafter granted the
    developer’s nonsuit motion on the plumber’s cross-complaint based on the absence of a
    verified certificate. (Id. at pp. 625-626.) In the ensuing appeal the appellate court
    affirmed with implacable logic: First, subdivision (d) requires a verified certificate if the
    issue of licensure is controverted, a general denial controverts the material allegations of
    the complaint, the plumber’s allegation it was licensed was material, ergo the issue of
    licensure was controverted; second, the only way licensure could be proved was by
    producing a verified certificate, the plumber didn’t produce a verified certificate at trial
    so the plumber lost. (See id. at pp. 627.)
    The result was reminiscent of Sartre’s play No Exit. There was no escape
    for the hopeless protagonist. The licensure issue could not be described as “new matter”
    requiring articulation in an affirmative defense (Advantec, supra, 153 Cal.App.4th at pp.
    627-630), and, under an abuse of discretion standard, the denial of the continuance could
    hardly be said to be unreasonable, especially since the nonsuit motion came near the end
    of a jury trial that had already consumed four days (see id. at p. 631).6
    5         Subdivision (a) requires an allegation the contractor is licensed. The single sentence subdivision
    provides in its entirety: “Except as provided in subdivision (e), no person engaged in the business or acting in the
    capacity of a contractor, may bring or maintain any action, or recover in law or equity in any action, in any court of
    this state for the collection of compensation for the performance of any act or contract where a license is required by
    this chapter without alleging that he or she was a duly licensed contractor at all times during the performance of
    that act or contract, regardless of the merits of the cause of action brought by the person, except that this prohibition
    shall not apply to contractors who are each individually licensed under this chapter but who fail to comply with
    Section 7029.” (Italics added.)
    6         The Advantec court embellished that point with some dicta on the interaction between section
    7031 and equity (see Advantec, supra, 153 Cal.App.4th at pp. 630-631) to which we will return further on.
    10
    But the result in Advantec – and we do not disagree with the result or
    reasoning of the decision – is not without irony. The legislative history of section 7031,
    indicates that the potential within subdivision (d) to mislead licensed contractors into
    thinking no verified certificate was required was part of an effort by the Legislature to
    prevent licensed contractors from needlessly losing cases because a verified certificate
    could not be procured in time. That is our case.
    The history of subdivision (d) is a history of a pendulum swinging, as the
    great legal philosopher Roger Miller would say, “like a pendulum do.” Section 7031 has
    been around since 1939, when it was enacted as part of a comprehensive scheme to
    license contractors. (See Stats. 1939, ch. 37, § 1, pp. 382-395). In its original incarnation
    there were no subdivisions. It simply said that no person could “bring or maintain” any
    action for “any act or contract for which a license is required” without “alleging and
    proving” he, she or it was duly licensed at all times “during the performance” of the act
    or contract. And those key words have remained in the statute, in the form of subdivision
    (a), to this day.
    A big change came in 1989, in the form of Assembly Bill No. 841 (AB
    841). The sponsor of AB 841 was the License Board itself, and the Board’s main
    purpose was to close what the License Board considered the “loophole” of the judicially-
    recognized substantial compliance doctrine, which allowed for the possibility of recovery
    for some unlicensed work.7 The legislation took dead aim at the substantial compliance
    doctrine with a new subdivision, then subdivision (d), that sought to exclude all
    7        We quote from the Legislative Analyst’s Enrolled Bill Report of the State and Consumer Affairs
    agency dated August 29, 1989 (hereinafter Enrolled Bill Report) from the agency’s director: “Unlicensed activity is
    a major enforcement problem for the CSLB. . . . [¶] This bill, according to the sponsor, would curtail unlicensed
    contracting activities by inhibiting unlicensed contractors’ ability to secure compensation via the courts. The
    sponsor cites an apparent loophole in current law whereby unlicensed contractors have prevailed in court when
    seeking compensation for work which someone refuses to pay because the individual is unlicensed, on the rationale
    that the job was completed satisfactorily and that the unlicensed contractor had substantially complied with licensure
    requirements.” (Italics added.)
    11
    possibility of the doctrine’s application to contractor licensing actions.8 It was AB 841
    that first inserted a verified certificate requirement into section 7031 (see Stats. 1989, ch.
    369. § 1, p. 1509) as former subdivision (c).9
    But as written in the 1989 version of the statute, subdivision (c) had no “if
    controverted” clause. Rather, the requirement of a verified certificate was absolute.
    Contractors had to have a verified certificate of licensure to prove licensure, and they had
    to prove licensure to recover. The effect was that a verified certificate was required in
    every case. The theory behind the new need for a verified certification was tied to the
    overall purpose of AB 841, which was to eliminate the judicial doctrine of “substantial
    compliance.” The point of a verified certificate was to provide a bright line criterion to
    verify licensure; without such a bright line it was feared courts might find a way to
    relapse into their old ways of excusing some unlicensed activity.10
    But it didn’t take long for the doctrine of unintended consequences to rear
    its ugly head. By 1992, the need to obtain a verified certificate in every case meant waits
    of up to six months for the necessary certificate. (See Buzgheia v. Leasco Sierra Grove
    (1997) 
    60 Cal.App.4th 374
    , 391 (Buzgheia), quoting Assem. Com. Consumer Protection,
    Gov. Efficiency and Economic Dev., Analysis of Assem. Bill No. 2413 (1991-1992 Reg.
    Sess.) May 6, 1992 (1992 Assembly Consumer Protection Analysis).)
    The License Board, swamped by having gotten what it wished for in 1989,
    again sponsored an amendment to section 7031 in 1992. This was Assembly Bill No.
    2413 (AB 2413), which headed in the other direction. AB 2413 was intended to
    8         The new subdivision (d) flatly said: “The judicial doctrine of substantial compliance shall not
    apply to this section.” (Stats. 1989, ch. 369. § 1, p. 1509.)
    9         The 1989 version of subdivision (c) read as follows: “Proof of licensure pursuant to this section
    shall be made by production of a verified certificate of licensure from the Contractors’ State License Board which
    establishes that the individual or entity bringing the action was duly licensed in the proper classification of
    contractors at all times during the performance of any act or contract covered by the action.”
    10        From the Enrolled Bill Report at page 2: “Proponents argue that courts are reluctant to enforce
    existing law allowing a consumer to assert the defense of lack of licensure because it is within the Contractors State
    License Law, and they are reluctant to enforce the law because there is no standard or measure of reliance upon
    which the courts may look when verifying licensure.” (Italics added.)
    12
    ameliorate the previously absolute requirement for a certificate by adding an “if
    controverted” clause to what was still at the time an absolute requirement for a certificate
    under subdivision (c). The License Board readily acknowledged that too many licensed
    contractors had already lost their cases because they couldn’t obtain a verified certificate
    in time.11 What’s more, AB 2413 resurrected the doctrine of substantial compliance at
    least under certain limited circumstances not at issue in the case before us.12
    But there were still two major changes to be made before the verified
    certificate subdivision reached today’s version: In 1993, Assembly Bill No. 628 (AB
    628) clarified that contractors still had the burden of proving licensure and there was no
    need for persons they were suing for compensation to produce the verified certificate.
    (See Stats 1993, ch. 797, § 1, p. 4358.)13 And finally, in 2001, the verified certificate
    subdivision, formerly subdivision (c), was renumbered as subdivision (d) to make room
    for a new subdivision (b) that allows for disgorgement suits by persons who have already
    paid an unlicensed contractor. (See Stats. 2001, ch. 226, § 1, p. 2094; see also White v.
    Cridlebaugh (2009) 
    178 Cal.App.4th 506
    , 518-520 [explaining the Legislature wanted to
    11        The Buzgheia opinion helpfully provides a readily accessible swatch of the legislative history of
    AB 2413 taken from a May 1992 report of the Assembly Committee on Consumer Protection, Government
    Efficiency, and Economic Development (the Assembly Consumer Protection Committee):
    “While attorneys who represent contractors are aware they must plead licensure, many are not
    aware that a certificate from the board is necessary to prove it. [¶] The sponsor thinks that production of the
    certificate of licensure should only be required if licensure is at issue in the case. That is, if the contractor swears
    under oath that he or she was licensed, and the defendant’s attorney has determined that the contractor was not, only
    then would the contractor be required to produce a copy of the certificate of licensure. . . . The board may take up to
    6 months to issue the certificate. The sponsor states that cases involving licensure status are rare, and contractors
    are losing cases [e.g., by nonsuit] where they might otherwise prevail but for this technicality.” (Assem. Com.
    Consumer Protection, Gov. Efficiency and Economic Dev., Analysis of Assem. Bill No. 2413 (1991-1992 Reg.
    Sess.) May 6, 1992.)” (Buzgheia, supra, 60 Cal.App.4th at p. 391, italics added.)
    12        AB 2413 added language to subdivision (d) (quoted above) that allowed for an evidentiary hearing
    to allow for substantial performance in certain cases. (See Stats. 1992, ch. 229, § 1, p. 1019.) The new language
    would later be explained in MW Erectors, supra, 36 Cal.4th at pages 431-434. Suffice to say that while substantial
    compliance returned to section 7031 in a limited way, it was is no longer the “‘loophole’” it had been prior to 1989.
    (See id. at p. 430.)
    13        We repeat those two sentences from the statute; both have remained unchanged since 1993:
    “Nothing in this subdivision shall require any person or entity controverting licensure or proper licensure to produce
    a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure
    or proper licensure shall be on the licensee.”
    13
    give persons who deal with unlicensed contractors a “sword” in addition to the “shield”
    they already had].)
    Neither of the two main California Supreme Court cases explicating section
    7031 over the last 25 years, Hydrotech, supra, 
    52 Cal.3d 988
     and MW Erectors, supra, 
    36 Cal.4th 412
    , have had occasion to confront the verified certificate provision in what is
    now subdivision (d). Hydrotech was decided in the wake of the 1989 anti-substantial
    compliance amendment, and decided that an unlicensed contractor could not even sue for
    fraud as a way around the plain terms of section 7031, subdivision (a). The Hydrotech
    court noted the policy against any “compensation for unlicensed contract work” was
    intended to outweigh “‘any harshness between the parties,’” so even a party who falsely
    promises to pay an unlicensed contractor cannot be liable to that contractor. (Hydrotech,
    supra, 52 Cal.3d at p. 995, original italics omitted.) Along the way – as befits a case
    decided in the aftermath of the 1989 amendments to section 7031 – Hydrotech made it
    clear that substantial compliance was outside the pale of section 7031. (See Hydrotech,
    
    supra, at pp. 995-996
    .)
    Like Hydrotech, MW Erectors was focused on subdivision (a) of section
    7031, which has always been the core of section 7031. Subdivision (a) has always
    provided that a contractor must be licensed at all times during performance, and MW
    Erectors is a set of variations on that theme. There, a steel contractor wasn’t licensed at
    the time the contract was made, or when performance was begun, but did obtain a license
    about two weeks after performance began and most of its performance occurred while it
    was licensed. (See MW Erectors, 
    supra,
     36 Cal.4th at p. 420.) The intermediate
    appellate court read subdivision (a) to allow the steel contractor to recover for work done
    after it had obtained a license, but the Supreme Court concluded the actual language of
    subdivision (a) requires licensing at all times during performance and the Legislature did
    not intend to allow any recovery without licensure at all times during performance. (Id.
    at pp. 424-430.)
    14
    There were no judicial admissions in the MW Erectors case for the court to
    confront. There was a judicial estoppel argument, based on the idea that in related
    litigation against the owner of the project, a specialty metal contractor had “implicitly”
    represented to the owner (and the owner’s general contractor) that MW was fully
    licensed, and was thus able to obtain a settlement from the owner for amounts which
    necessarily were attributable to MW’s work. MW claimed the specialty metal contractor
    was thus estopped to assert nonlicensure in a case where MW was suing it. (MW
    Erectors, supra, 36 Cal.4th at pp. 421-422.)
    The MW Erectors court noted that neither the cross-complaint filed by the
    specialty metal contractor against the owner and its general contractor, nor its mechanic’s
    lien, contained any mention of the steel contractor’s work. However, in any event, said
    the high court, the steel contractor could not “invoke judicial estoppel for the simplest of
    reasons,” namely, subdivision (a) expressly precludes any action in law or equity. (MW
    Erectors, supra, 36 Cal.4th at p. 423.) In that regard, the MW Erectors court quoted
    Hydrotech for the proposition that the “bar of section 7031(a) applies ‘[r]egardless of the
    equities.’” (MW Erectors, 
    supra,
     36 Cal.4th at p. 423, quoting Hydrotech, 
    supra,
     52
    Cal.2d at p. 997.) Thus the MW Erectors court concluded, citing subdivision (a), that
    acceptance of MW’s judicial estoppel argument would mean that MW could “recover
    compensation for work that required a license, even if [MW] was not licensed ‘at all
    times’ during the performance of that work. (§ 7031(a).)” (MW Erectors, 
    supra,
     36
    Cal.4th at p. 423.)
    However, after emphasizing that subdivision (a) would be applied
    regardless of its harsh consequences and even if it means one party obtains an unjust
    windfall (MW Erectors, 
    supra,
     36 Cal.4th at p. 424), the court ended its judicial estoppel
    discussion with a passage that took a somewhat wider-angle view of the judicial estoppel
    15
    issue. We quote the entirety of the passage in the margin,14 but two aspects of it stand
    out. One is the qualification that “Nothing we say here is intended to authorize or
    condone abusive manipulation of the courts” – and we emphasize the words “abusive
    manipulation.” The other is that such abuse can be avoided by normal discovery and
    investigation – in that case, by the owner and its general contractor. (See ibid.) We note,
    however, that the MW Erectors court stopped short of saying discovery and investigation
    were the exclusive means by which the abusive manipulation of the courts can be
    prevented.
    B. Application
    In our case, counsel for Aztec was effectively trapped in a room with
    several doors, all locked from the outside, and in her opposition to the JNOV motion she
    tugged at all of them. And we conclude the trial judge had no choice but to keep them all
    locked – save one.
    That one is the clear statement in Womack’s complaint admitting Aztec
    was licensed, and even going so far as to sue Aztec’s license bonding company under
    section 7071.6. Valerio v. Andrew Youngquist Construction (2002) 
    103 Cal.App.4th 1264
     (Valerio) demonstrates there are times it is error for a trial court to ignore the
    impact of an admission made in a party’s pleadings, and we conclude this case was one
    of those times. In Valerio, the trial court erred in not giving effect to plaintiff’s
    admission it had signed a written contract. To the same effect is Thurman v. Bayshore
    14        This is the passage:
    “Of course, the equitable doctrine of judicial estoppel targets not only unfairness between
    individual parties, but also abuse of the judicial system itself. Nothing we say here is intended to authorize or
    condone abusive manipulation of the courts. And the law provides means of avoiding such abuse, if any occurred,
    under the circumstances alleged here. Disney and Turner [the owner and its general contractor] could have
    determined through normal discovery and investigation whether Niederhauser’s [the specialty metal contractor]
    cross-complaint and mechanic’s lien included amounts attributable to the work of an unlicensed subcontractor. For
    all that appears, the two cross-defendants did precisely that before deciding to settle with Niederhauser. On the
    other hand, if persuaded that they had no legal obligation to pay such amounts, they were free to assert the matter as
    an affirmative defense to Niederhauser’s claims.” (MW Erectors, supra, 36 Cal.4th at p. 424, fn. omitted, italics
    added.)
    16
    Transit Management, Inc. (2012) 
    203 Cal.App.4th 1112
     (Thurman) where it was held the
    trial court erred in not giving credence to admissions in an employee’s complaints that
    the employer had, indeed, been providing meal periods from a certain date.
    Womack’s complaint effectively told both the court and Aztec – twice –
    that the issue of Aztec’s licensure was not controverted for purposes of section 7031,
    subdivision (d). Under the doctrine of judicial admission, that removed the issue from
    the set of controverted issues. And if the issue of licensure was not controverted, then,
    under the plain language of section 7031, subdivision (d), there was no need on Aztec’s
    part to present a verified certificate from the License Board as part of its case.
    Womack makes two arguments against application of the doctrine of
    judicial admission here: his complaint was unverified and he denied Aztec’s licensure
    allegation in his general denial to Aztec’s cross-complaint. Under the circumstances of
    this case, though, Womack’s plain admissions in his original complaint override these
    two arguments.
    First, even unverified complaints can contain judicial admissions, as shown
    in Reichert, supra, 
    68 Cal.2d 822
    . There, the plaintiff in an insurance bad faith case
    admitted in his initial, unverified, pleading that he had filed for bankruptcy prior to filing
    his complaint. In later pleadings, however, he conveniently omitted mention of the
    bankruptcy. It didn’t work. Because he had made no attempt to show his admission of
    the bankruptcy was the product of some sort of mistake or inadvertence, he was stuck
    with the admission. (Id. at p. 837.)
    Reichert is particularly applicable to the case before us because it shows
    that a litigant cannot hide behind the lack of verification where the litigant sought to
    obtain some advantage from the original, but unverified, admission. In Reichert, the
    plaintiff admitted his bankruptcy in his original complaint hoping to finesse that fact by a
    spin on causation: As Justice Peters noted in his dissent, the plaintiff alleged the
    bankruptcy was merely part of a causal chain leading to his damages so as to prevent his
    17
    causes of action from vesting in the trustee in bankruptcy. (See Reichert, supra, 68
    Cal.2d at p. 839, fn. 1 (dis. opn. of Peters, J.) While the majority rejected that point on
    the merits, it is significant that no one questioned the propriety of treating the original
    complaint’s admission of bankruptcy as an admission. (Id. at pp. 839-841.)
    Here, as in Reichert, Womack had a tactical reason to include the admission
    of Aztec’s licensure in his original complaint. He wanted to assure recovery against
    Aztec’s contractor’s bond under section 7071.5,15 and yet to seek such assurance meant
    admitting Aztec was licensed. We are not impressed by his attempt to gain a benefit by
    alleging licensure until his settlement with Aztec’s bond company, then asserting non-
    licensure in order to scuttle his liability to Aztec.
    The second argument – the actual denial in the answer to Aztec’s cross-
    complaint – fails because of the sham pleading doctrine. Under the sham pleading
    doctrine, a pleader cannot circumvent prior admissions by the easy device of amending a
    pleading without explanation. (See Wennerholm v. Stanford Univ. Sch. of Med. (1942)
    
    20 Cal.2d 713
    , 716; Hardy v. Admiral Oil Co. (1961) 
    56 Cal.2d 836
    , 840-841; Aryeh v.
    Canon Business Solutions, Inc. (2013) 
    55 Cal.4th 1185
    , 1189, fn. 1; Larson v. UHS of
    Rancho Springs, Inc. (2014) 
    230 Cal.App.4th 336
    , 344; Hahn v. Mirda (2007) 
    147 Cal.App.4th 740
    , 751 [“The purpose of the doctrine is to enable the courts to prevent an
    abuse of process.”]; Deveny v. Entropin, Inc. (2006) 
    139 Cal.App.4th 408
    , 426 [noting
    sham pleading doctrine is not intended to prevent honest corrections of error but is to
    prevent abuse of process].) Significantly, the sham pleading rule encompasses prior
    pleadings even when made on information and belief. (See Hendy v. Losse (1991) 
    54 Cal.3d 723
    , 742-743 (Hendy).
    We think this case cries out for application of the sham pleading doctrine –
    all the more so since this case does not seem to involve an honest, above-board
    15       The statute allows for various parties injured by a licensed contractor to recover from a surety that
    has issued a bond to the contractor.
    18
    amendment of a prior statement in a complaint, but the semi-surreptitious withdrawal of
    that prior statement via a general denial in a cross-complaint. When Womack made his
    JNOV motion, he offered no factual basis to suggest his prior, unambiguous allegation
    that Aztec was licensed was somehow incorrect, or the product of mistake or
    inadvertence, or that he had somehow discovered new evidence showing the original
    allegation to have been incorrect. And, as we have pointed out above, the original
    admission carried solid indicia Womack meant it – not only because he listed a bond
    number that could only have been issued if Aztec was licensed, but because he had
    something to gain by the allegation. Trying to obtain the benefit of an easy general
    denial of a statement in a cross-complaint after one already obtained the benefit of
    affirming that statement in a complaint seems to us precisely the type of manipulative
    abuse the MW Erectors case decried.
    Finally, all doubt as to the application of the sham pleading doctrine in this
    case is removed by Womack’s failure to comply with the local rule requiring
    specification of all “controverted issues.” Recall that the MW Erectors court pointed out
    that abusive manipulation of the courts could be curtailed by normal discovery and
    investigation. Well, one of the purposes of Orange County local rule 317 is to do just
    that – prevent ambushes like the one that took place here – by flushing out all
    controverted issues prior to trial.16 Orange County Superior Court local rule 317 follows
    the salutary practice employed by most federal courts of requiring parties in civil cases to
    16        Here is the applicable language from Orange County Superior Court local rule 317:
    “An issue conference is required in all cases at least 10 days prior to the date set for trial, at which
    time the parties are to meet and confer and execute necessary documents as listed below. Plaintiff or petitioner
    must arrange the issue conference at a mutually agreeable time and location.
    “At the issue conference the parties must:
    “ ....
    “B. Stipulate to all facts amenable to stipulation.
    “[¶] . . . [¶]
    “E. Prepare a Joint List of Controverted Issues. If all the parties fail to agree that an issue is
    uncontroverted, then the issue is controverted.”
    “[¶] . . . [¶]
    “The Plaintiff or Petitioner is responsible for providing courtesy copies of the Joint Statement of
    the Case, the Joint Witness List, and the Joint List of Controverted issues.” (Italics added.)
    19
    meet and confer prior to a trial and identify what is, and what is not, controverted. The
    language of the rule does not allow for silent gamesmanship. Both parties have the duty
    to stipulate to what can be readily stipulated to, and identify what is to be controverted
    for the trial. By the time trial began, Womack was still prosecuting his complaint. The
    onus was thus on him, as plaintiff, to prepare the paperwork that stipulated to all facts
    “amenable to stipulation” and provide a “list” of identified issues, not just a coy
    “everything else is controverted” statement. And yet he never took the opportunity to
    articulate his controversion of the licensure in the very forum where he actually had a
    pre-trial duty to do so.
    IV. CONCLUSION
    We reverse and remand the judgment in favor of Womack and direct the
    trial court to enter judgment for Aztec on its cross-complaint against Womack. It is a
    different story for Caballero. He never admitted that Aztec was licensed, or sued Aztec’s
    license bond insurer. He was not the plaintiff required to facilitate an honest
    identification of controverted issues. Accordingly we affirm the defense judgment in his
    favor.
    As to appellate costs, we direct the trial court on remand to ascertain that
    portion of the appellate costs of Aztec attributable to its appeal from the judgment in
    20
    favor of Womack, and assess all those costs against Womack. As to that portion of
    appellate costs attributable to Aztec’s appeal from the judgment in favor of Caballero,
    those costs are to be borne by each side, Aztec and Caballero.
    BEDSWORTH, ACTING P. J.
    WE CONCUR:
    ARONSON, J.
    FYBEL, J.
    21
    

Document Info

Docket Number: G049587

Citation Numbers: 237 Cal. App. 4th 772, 188 Cal. Rptr. 3d 471, 2015 Cal. App. LEXIS 510

Judges: Bedsworth, Aronson, Fybel

Filed Date: 6/15/2015

Precedential Status: Precedential

Modified Date: 10/19/2024