    DIVISION ONE
    STATE OF CALIFORNIA
    ASOKA JAYAWEERA et al.,                                             D065800
    Plaintiffs, Cross-defendants and
    Appellants,
    (Super. Ct. No. CIVDS1014086)
    v.
    JUSTIN J. LANSBERG et al.,
    Defendants, Cross-complainants and
    Respondents.
    APPEAL from a judgment and order of the Superior Court of San Bernardino
    County, Bryan F. Foster, Judge. Affirmed.
    Asoka Jayaweera and Shantha K. Jayaweera, in pro. per.
    Stern & Goldberg and Alan N. Goldberg for Cross-complainants and Respondents
    Justin J. Lansberg and Stephanie Lansberg.
    Asoka Jayaweera and Shantha K. Jayaweera appeal the judgment denying them
    relief on their first amended complaint for quiet title and interference with easement, and
    granting relief to defendants Justin Lansberg and Stephanie Lansberg1 on their cross-
    complaint for quiet title, declaratory and injunctive relief, and the order awarding
    attorney fees to the Lansbergs.
    The Jayaweeras contend there was insufficient evidence to support the trial court's
    ruling regarding their causes of action, and the court erroneously awarded the Lansbergs
    attorney fees. We affirm.
    FACTUAL AND PROCEDURAL BACKGROUND
    The Jayaweeras' First Lawsuit Regarding the Easement
    The Jayaweeras own real property located on Alpen Drive, Lake Arrowhead, San
    Bernardino County, California (lot 264). The Lansbergs own adjoining property on
    Alpen Drive (lot 263).
    In 2001, the Jayaweeras sued Lake Arrowhead Building Company (LABC), which
    previously owned lot 263, for injunctive relief and damages. They alleged in their first
    amended complaint that a "roadway easement" existed on lot 263, providing access to lot
    264. In 2001, the Jayaweeras discovered LABC "constructed or caused to be constructed
    a residential building structure over the road easement . . . or over the paved road which
    is or was believed to be located on said road easement which has for at least ten (10)
    years provided an access to the [Jayaweeras' property]." The Jayaweeras sought
    exemplary damages "because [LABC] proceeded to construct the residence over the top
    1      We sometimes refer to the parties by their first names to avoid confusion, and not
    out of disrespect.
    2
    of the easement and/or paved road which has served as the access for the easement and
    did demolish and remove the roadway with willful and conscious disregard of [the
    Jayaweeras'] rights."
    Settlement Agreement
    In 2003, the Jayaweeras and LABC settled the first lawsuit, and the Jayaweeras
    signed an agreement stating: "LABC will construct an asphalt paved 4[-]foot wide
    bicycle and foot path on the Private Road Easement located on Lot 263. The path will
    connect [the Jayaweeras'] existing asphalt driveway with the existing asphalt road on Lot
    262. The construction will include a retaining wall and will be as level as possible as
    allowed by the typography [sic]. LABC will obtain all required ingress and egress rights
    and all required permits."
    The settlement agreement is critical to the present case; therefore, we quote it at
    length:
    "In exchange for the parties hereto, and each of them, do hereby for themselves
    and their executors, legal successors, assigns, agents, employees, officers, directors, co-
    owners and shareholders release and absolutely discharge each other party hereto and
    their respective executors, legal successors, assigns, agents, employees, officers,
    directors, co-owners and shareholders of and from any and all claims, demands, damages,
    debts, liabilities, accounts, obligations, costs, expenses, actions and causes of action of
    every kind or nature, whatsoever, whether known or unknown, suspected or unsuspected,
    which they, and each of them, have or hold, or at anytime heretofore had, owned or held,
    against the other parties hereto, and each of them, so that no party hereto shall have any
    3
    claim of any nature or kind whatsoever arising out of any or all of the matters, facts,
    events or occurrences alleged or referred to, or arising out of the transaction that resulted
    in the DISPUTE, or otherwise." [¶] . . . "The parties hereto, and each of them, are aware
    of the fact that it is their respective intentions in accepting the consideration provided for
    herein that this Agreement shall be effective as a full and final accord and satisfaction
    and settlement of, and as a bar to each and every claim, demand, debt, account,
    reckoning, liability, obligation, cost, expense, lien, action and cause of action, heretofore
    referred to and released, which the parties hereto have, may have, or have had, against the
    other party in connection with the DISPUTE. Each party hereto acknowledges that he
    has been informed by his own attorney, and that he is familiar with Section 1542 of the
    Civil Code of the State of California which provides as follows: [¶] A GENERAL
    RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR DOES NOT
    KNOW OR SUSPECT TO EXIST IN HIS FAVOR AT THE TIME OF EXECUTING
    THE RELEASE, WHICH, IF KNOWN BY HIM, MUST HAVE MATERIALLY
    AFFECTED HIS SETTLEMENT WITH THE DEBTOR." [¶] . . . The parties hereto,
    and each of them, hereby waive and relinquish all rights and benefits they have or may
    have under Section 1542 . . . In connection with such waiver and relinquishment, the
    parties hereto, and each of them, acknowledge that they are aware that they or their
    attorneys may hereafter discover facts different from or in addition to those which they or
    their attorneys now know or believe to be true with respect to the DISPUTE, but that it is
    their intention that this Agreement remain in effect as a full and complete general release,
    notwithstanding any such different or additional facts." [¶] "The provisions of this
    4
    Agreement shall be deemed to extend to the benefit of (in addition to each of the parties
    hereto) each and all of the principals, officers, directors, agents, executors, employees
    and attorneys of each of the parties hereto, and to the benefit of the parent, subsidiary,
    and affiliated companies of the parties hereto and the officers, directors, agents,
    employees, and attorneys of each such parent, subsidiary and affiliate company, and their
    respective legal successors and assigns."
    The Jayaweeras' Present Lawsuit
    In 2011, the Jayaweeras filed the operative first amended complaint for quiet title
    and interference with easement, alleging: "This action concerns and affects title to and
    [the Jayaweeras'] right to use an interest in real property situated in the County of San
    Bernardino, State of California, consisting of a recorded private road easement serving
    [the Jayaweeras'] property, as shown in the map for Tract 7074, Arrowhead Woods Tract
    Number 103, recorded in the official records of the County of San Bernardino, State of
    California, in Map Book 91, pages 12 through 18, inclusive, which [the Jayaweeras] are
    informed and believe and based thereon allege was recorded on or about May 6, 1964.
    Such easement burdens the northerly 20 to 30 feet of [the Lansbergs'] property."
    Without referring to the settlement agreement, the Jayaweeras allege "[t]he subject
    easement has not been abandoned, nor have [they] voluntarily relinquished any right to
    the use and enjoyment of the subject easement."
    Regarding their cause of action for quiet title, the Jayaweeras alleged: "In or about
    late 2007, [the Lansbergs] constructed improvements on their property consisting of
    staircases, ramps, landings, and/or decking which encroached into, over and upon the
    5
    subject easement, interfering with [the Jayaweeras'] use and enjoyment thereof. [The
    Jayaweeras] are informed and believe and based thereon allege that such construction
    was undertaken without obtaining appropriate and necessary permits, without the
    approvals of the applicable building officials, without prior notice to [the Jayaweeras],
    and was done without [the Jayaweeras'] permission or consent. [The Jayaweeras] are
    further informed and believe and based thereon allege that the County of San Bernardino
    has issued to [the Lansbergs] a citation and/or notice to correct the unpermitted
    construction. [The Jayaweeras] are informed and believe that [the Lansbergs] have failed
    to comply with same."2
    In their second cause of action, the Jayaweeras alleged the Lansbergs "willfully
    and intentionally interfered with [the Jayaweeras'] use and enjoyment of the subject
    easement . . . by erecting and maintaining improvements thereon which encroach onto the
    easement and preventing or otherwise interfering with [the Jayaweeras'] reasonable use of
    and access across such easement."
    2      In 2004, the court denied LABC's motion to enforce the settlement, ruling:
    "[LABC] did not comply with its obligations pursuant to the agreement, 1) to construct
    the bikeway out of asphalt; 2) to construct a bikeway which is four feet wide; 3) connect
    [the Jayaweeras'] driveway with the easement on Lot 263; 4) to place such bikeway on
    the private road easement on Lot 263." Jayaweera admitted at trial that after the
    agreement was signed, he did not take legal action to ensure LABC complied with the
    settlement agreement.
    6
    The Lansbergs' Cross-Complaint
    The Lansbergs filed a cross-complaint alleging causes of action for quiet title and
    declaratory and injunctive relief. They alleged their house "sits on a steep incline, and
    the bottom two stories of the house are below the level of Alpen Drive. A level driveway
    connects Alpen Road to the third story of [their] house. A three-story staircase connects
    [their] front walk on the ground floor of the house to the driveway at street level." The
    Lansbergs further alleged the Jayaweeras' claimed road easement exists between their
    two houses where the staircase was built, and the Jayaweeras "seek to grade the steep
    incline and construct a road adjacent to [the Lansbergs'] home, underneath their driveway
    and in the location where the staircase lies."
    The Lansbergs alleged they were unaware of the existence of the claimed road
    easement; it was not disclosed on their title report when they purchased their property,
    and any easement was extinguished by abandonment or by end of necessity. The
    Lansbergs specifically refer to the agreement as having resolved the prior lawsuit, noting
    that "no easement was recorded on title to the Lansberg Property as part of that
    settlement."
    The Lansbergs sought injunctive relief, alleging that if the Jayaweeras' claim for a
    roadway easement were granted, it would "cause grave and irreparable injury to [the
    Lansbergs] in that they will lose use of their staircase, have grading done and have a road
    built immediately in front of their house and underneath their driveway in a manner
    which could render the entire hill unstable."
    7
    Asoka Jayaweera's Trial Testimony
    At the one-day bench trial, Asoka represented plaintiffs and was the sole witness
    for his side. His testimony relied on the following documents introduced into evidence: a
    copy of the settlement agreement in the first lawsuit, a recorded tract map, the Lansbergs'
    grant deed, and various photographs of the stairways built on the Lansbergs' property.
    The court questioned Asoka regarding his understanding of the settlement
    agreement's terms. Asoka replied as follows: "I was not going to dispute that case
    anymore for them building over the road because I realized I did not have a recorded
    right to that easement. It wasn't used, but it was not the recorded easement." The court
    clarified, "[P]rescriptive easement. You gave up the right to that easement that wasn't
    recorded but just from one you believe you got from the use; correct?" Asoka replied,
    "Right. Yes, your Honor." Asoka explained that in exchange LABC was required to
    build a bike path but never completed it, adding, "There was no time limit, and if they
    don't build it, I can build it, and they have to give up the money they had to put in as a
    bond to the court."
    The court asked Asoka to identify the "expressed easement" at issue in this case.
    Asoka referred to a tract map that states, "BSL private road easement." He testified the
    Lansbergs "built a large staircase structure that completely obstructs any use of the
    easement. For me to even walk on it I have to duck under their staircases. There are
    about four of their stairways going across the easement."
    On cross-examination, Asoka testified that in his first lawsuit he had alleged he
    had the right to a recorded roadway easement and a separate prescriptive roadway
    8
    easement. He also admitted he had described the recorded roadway easement in the same
    terms in both lawsuits. Asoka stated he knew about the recorded easement's existence
    since at least 1999, but he had taken no steps to develop it, in part because it would be
    costly.3
    Asoka described the recorded easement as being a hill, and stated that for it to be
    useable to ride a bicycle, the pathway that was part of the settlement would have to be
    built. Asoka stated he had ridden his bicycle on lot 263 "maybe four, five times," but he
    had not driven a vehicle over the hill. Asoka testified he did not "absolutely need" the
    road easement because he has a direct path on Alpen Drive to his property.
    On cross-examination, defense counsel asked Asoka: "Now, as I understand the
    staircase it does not interfere with anybody walking on . . . the pathway, does it?" Asoka
    responded: "When you say pathway, we are talking about the pathway that's supposed to
    be on the recorded easement. There's nothing that can go on the recorded easement.
    There is no pathway on the recorded easement. The pathway that the [LABC] built was
    not on the recorded easement." When pressed, Asoka admitted the stairways did not
    interfere with the pathway, which he described as a "small skirt outside the building but
    not in the recorded easement. On the small skirt, about three feet wide with many angles,
    you can walk. Mostly it's hugging . . . the house, but that is not the pathway. That is not
    where the pathway is supposed to be."
    3     The court made a finding that "to put a road in there it would be a substantial
    expense, if it was possible at all."
    9
    The parties stipulated that if Shantha Jayaweera had testified, she would have
    stated: "[S]he has no knowledge of any of the facts alleged in the action; had no
    knowledge of any of the filing of the prior action against LABC; that [Asoka] Jayaweera
    signed the settlement agreement in the prior action on her behalf. She has never used the
    Lansberg property for any purpose. And . . . [the Jayaweeras] cannot afford to build a
    road across the Lansberg property."
    Defense Trial Testimony
    John Wurm, LABC's attorney in the first lawsuit, drafted the settlement
    agreement. He was called as a witness for the Lansbergs, and testified the issue in the
    first lawsuit involved two easements: "a roadway easement as provided in the tract map
    and also . . . a prescriptive type easement." Attorney Wurm testified that in entering into
    the settlement agreement, LABC's intent was "to preserve [the Jayaweeras'] easement
    rights over lots 262, 261 and 260. So in other words [the Jayaweeras] still would have
    whatever rights they had for ingress and egress on the private road easement as existed
    prior to the settlement. What the settlement modified was that instead of perhaps
    vehicular rights over [lot] 263, now the [Jayaweeras] only had rights for bicycle and
    pedestrian access. And the LABC built a concrete pathway approximately four feet wide
    to accommodate the pedestrian and bicycle access." Attorney Wurm added: "[T]he
    private road easement which was recorded by the tract map prior to the settlement
    agreement was replaced by an easement for . . . pedestrian and bicycle access on a four-
    foot wide concrete pathway that went underneath the parking deck driveway. And I
    believe it was within the previously recorded private road easement and that the
    10
    settlement was intended to be that [the Jayaweeras were] giving up all other rights except
    the pathway."
    On cross-examination, Attorney Wurm testified that the house LABC built on lot
    263 did not obstruct the recorded easement: "[LABC] built up to the recorded easement
    and then the private—and then the parking deck driveway spanned the recorded easement
    suspended in the air from the residence to Alpen Drive." He testified LABC's motion to
    enforce the settlement was denied because the pathway was made out of concrete instead
    of asphalt.
    Justin Lansberg testified that in 2007, he and Stephanie Lansberg bought lot 263
    from Dan Dorf and Stella Dorf. When the Lansbergs were in the process of purchasing
    the property, they learned there was a walkway easement on the property. Justin testified
    in reference to photographic evidence that: "There is a pathway that runs across the
    length of the property and conforms roughly to the boundaries of the house, and that was
    what was told to [me] was the walkway that had been constructed specifically because of
    the settlement and it exists." Further, the stairways did not interfere with the use of the
    pathway. Justin, who is taller that Asoka, had walked the pathway numerous times
    without hitting his head, and his children had ridden scooters on it a few times. Justin
    testified his hired builders did not obtain the proper permit before building the
    stairways.4 Justin understood that in the present case, the Jayaweeras were seeking to
    4      The Jayaweeras submitted into evidence a September 2008 "notice of action on
    real property" issued by the San Bernardino County Recorder, stating that "unlawful
    conditions" existed on the Lansbergs' property, and requiring the Lansbergs to obtain a
    11
    build a vehicle-ready road under the Lansbergs' driveway because the Jayaweeras claim
    that area as their private road easement.
    Closing Arguments
    Asoka Jayaweera argued that the Jayaweeras had a "recorded expressly granted
    easement," which they had not abandoned. The court told him that in its view, this case
    turned on "whether or not there was an agreement [for the Jayaweeras to] basically accept
    a walking path as opposed to a driving road in the prior litigation and whether or not you
    have waived rights to enforce that." The court also told Asoka that a recorded easement
    "can be lost, however, if there is some action taken by the subservient tenant to—that
    somehow interferes with the potential use of that area that is adverse." The court next
    asked Asoka, "And doesn't the construction of the driveway of the garage [effectively]
    prevent it from its use?" Asoka responded, "It did not because we had plans drawn up.
    There was a height of more than 12 feet from the highest part of the access to the garage
    from the ground level. The lowest was about four feet, but all the engineers have said . . .
    you can build a road there. Sure, it may be costly, but you can build a road there. [¶]
    And so I haven't shown any intent to abandon that easement." Asoka added, "All
    [Lansbergs'] arguments rest on [is] this fact that [the easement has] not been used; it's
    steep; it's not necessary; and initially it's not recorded. So all those are not necessary for
    me to preserve that easement. I may keep it like that for a hundred years. I don't have to
    do anything with it. It does not go away from the recording."
    permit for stairs built without permit, provide proof of abandonment of easement, obtain
    required permits, call for inspections, obtain final approval, and pay all enforcement fees
    due.
    12
    Defense counsel argued the evidence showed the Jayaweeras had "at best an
    expressed easement by implication. There's no express grant." The court asked defense
    counsel, "If I conclude that, in fact, there was an easement—a road easement that existed
    and that as a result of the first case that, in fact, there was a settlement in which the case
    can act as a transportation of the road easement into a bicycle foot path easement, how
    does that affect your argument?" Defense counsel replied, "[I]t would extinguish the
    easement shown on the tract map because there is no road easement. All they have is a
    contractual claim against LABC to enforce an easement for a walkway. [The Lansbergs
    have] never interfered with that. I mean, the walkway is there. They have not said don't
    walk on my property. So they've not done anything to interfere with that, but there's no
    recorded easement."
    Defense counsel further argued: "The fact is [the Jayaweeras] agreed to settle
    [their] claims in the underlying case in exchange for a pathway that [they] could ride on a
    bike and include a retaining wall. [Asoka's] testimony was [the pathway was] done not to
    his satisfaction. He wanted it all on the recorded easement. What's important about that
    is he wanted it all on recorded easement shows that it was an exchange for the record
    easement because why would you put a retaining wall and a pathway on the recorded
    easement unless you were giving up the right to put a vehicle on that roadway? It makes
    no sense. [¶] If you wanted to preserve a roadway easement, he would put it off the
    roadway, but he didn't, and that was their agreement."
    The court asked defense counsel: "How do [the Lansbergs] get around the fact
    that in [the] settlement agreement there's specific language that says this is not interfering
    13
    with that easement?" Defense counsel replied: "Well, if we took that to mean all of [the
    Jayaweeras'] easement rights, then they settled nothing because the lawsuit was only
    about [their] easement rights." The court added, "I have some problems with the
    language [of the agreement]."
    The court noted: "But the pathway . . . as actually built did not infringe on the
    area that was encompassed by the easement as recorded." This exchange ensued:
    "[Defense counsel]: Well, it is, parts of it as you see in that diagram.
    "The Court: Very small part.
    "[Defense counsel]: Yes, parts of it, but it went around the end of the house which
    is the only place it could go.
    "The Court: I understand that, but it didn't go into the area where [the Jayaweeras]
    wanted it on the easement itself which is—
    "[Defense counsel]: You know, that was their agreement. . . . [¶] I mean the
    agreement doesn't make a lot of sense. It's ambiguous. It's not clear. But what is clear is
    that it was a release of all claims because if you look throughout of it [sic], it's clear they
    released all claims in this action. And I mean, it talks about in paragraph four it is a full
    and final accord, [Civil Code section] 1542 waiver."
    "The Court: But there's no indication in the settlement agreement that [the parties
    will] file anything that would extinguish the recorded easement.
    "[Defense counsel:] They didn't even mention they would record this document.
    "The Court: I understand."
    14
    Defense counsel added, "And then there was a [contention] that LABC did not
    comply. But how do we impact on that? And I don't think we impact on that. It's not a
    recorded title, recorded document, and that's the whole point of transfer of real property.
    They should have recorded something if that's what they were intending to convey. [¶] I
    mean, they both had counsel so . . . nobody paid attention and nobody did anything when
    there was a failure to comply."
    Defense counsel also argued in relation to the trial evidence that the Jayaweeras
    had lost their right to any easement either by abandonment or by a lack of necessity.
    The Court's Rulings Against the Jayaweeras
    The court denied the Jayaweeras' claim for a roadway easement as set forth in the
    first amended complaint, ruling: "[T]he alleged easement does not exist and . . . the
    [Lansbergs] are the owners of the subject property free and clear not encumbered with the
    alleged easement effective as of the date of the filing of the cross-complaint. [¶] The
    Court declares that the [Lansbergs] are entitled to the full use and enjoyment of the
    Lansberg Property, further, that there is no recorded easement in favor of the Jayaweera
    Property for a road burdening the Lansberg Property and any easement for a road
    burdening the Lansberg Property has been extinguished."
    The final judgment is in accord with the court's ruling: "The Plaintiffs, the
    Jayaweeras, have not established the First Cause of Action for Quiet Title to a Recorded
    Easement or the Second Cause of Action for Interference with Easement alleged in the
    First Amended Complaint." The court denied the Jayaweera's request for an injunction
    and damages. The judgment states: "The Lansbergs have established the First Cause of
    15
    Action for Quiet Title, the Second Cause of Action for Declaratory Relief and the Third
    Cause of Action for Injunctive Relief alleged in their Cross-Complaint. . . . [¶] . . . the
    Lansbergs[] shall have Judgment confirming that the alleged easement claimed by . . . the
    Jayaweeras, does not exist and that the Cross-Complainants are the owners of the
    Lansberg Property free and clear and not encumbered with the alleged easement effective
    as of the date of the filing of the Cross-Complaint. [¶] The Court declares that: (a) the
    [Lansbergs] are entitled to the full use and enjoyment of the Lansberg Property; (b) that
    there is no recorded easement in favor of the Jayaweera Property for a road burdening the
    Lansberg Property; and (c) any easement for a road burdening the Lansberg Property has
    been extinguished."
    The court denied the Jayaweeras' motion for a statement of decision as untimely.
    It denied their motion for reconsideration as presenting no new facts or issues. The court
    denied the Jayaweeras' new trial motion, finding the verdict was supported by sufficient
    evidence and there were no irregularities in the proceedings.
    DISCUSSION
    I.
    A.
    Because the trial court did not prepare a statement of decision, the Jayaweeras
    contend its ruling failed to define the type of easement that was created and existed on lot
    263 due to the filing of the tract map; ascertain whether the easement was properly
    recorded; resolve what easement rights were extinguished or how they were
    extinguished; and decide whether any easement rights existed on the Lansbergs' property
    16
    following the parties' settlement agreement. They further contend, "The Trial court is
    without any basis, reasoning, or expressed statement of decision as to what evidence he
    used, to conclude that the settlement agreement transported the road easement into a
    bicycle foot path easement." The Jayaweeras contend they always had a recorded
    easement, which could not be extinguished by the settlement agreement.
    In denying the Jayaweeras' posttrial request for a statement of decision, the court
    stated: "The trial was less than eight hours in length. The request has to be made before
    submission of the matter for decision pursuant to [Code of Civil Procedure section 632
    and Rules of Court, Rule No. 3.1590]. So I don't intend to do a statement of decision."
    The Jayaweeras do not challenge the correctness of the trial court's ruling that they
    failed to timely request a statement of decision, and they provide no citation to the record
    and applicable law to support their claims the court's ruling was insufficiently detailed.
    Therefore, we regard all of the Jayaweeras' challenges to the language of the court's
    ruling as forfeited. We address the Jayaweeras' arguments regarding the sufficiency of
    the evidence, and turn to the record to verify whether substantial evidence supports the
    trial court's decision.
    Applicable Law
    "The doctrine of implied findings requires the appellate court to infer the trial
    court made all factual findings necessary to support the judgment. [Citation.] The
    doctrine is a natural and logical corollary to three fundamental principles of appellate
    review: (1) a judgment is presumed correct; (2) all intendments and presumptions are
    indulged in favor of correctness; and (3) the appellant bears the burden of providing an
    17
    adequate record affirmatively proving error." (Fladeboe v. American Isuzu Motors Inc.
    (2007) 
    150 Cal.App.4th 42
    , 58.) "Securing a statement of decision is the first step, but is
    not necessarily enough, to avoid the doctrine of implied findings. Litigants must also
    bring ambiguities and omissions in the statement of decision's factual findings to the trial
    court's attention—or suffer the consequences." (Id. at p. 59.)
    "Settlement agreements . . . are construed under the same rules that apply to any
    other contract." (In re Tobacco Cases I (2010) 
    186 Cal.App.4th 42
    , 47.) "Interpretation
    of a contract, including resolution of any ambiguity, is solely a judicial function.
    [Citation.] The primary goal of contract interpretation is to give effect to the mutual
    intent of the parties." (Villacres v. ABM Industries, Inc. (2010) 
    189 Cal.App.4th 562
    , 598
    (Villacres).) When possible, we glean the parties' intent solely from the written
    provisions of the contract. (Ibid.) "Specific language must be interpreted in context and
    with regard to its intended function and the structure of the agreement as a whole."
    (Ibid.) The interpretation of an unambiguous contract is a matter of law for this court's
    independent determination. (State Farm Fire & Casualty Co. v. Lewis (1987) 
    191 Cal.App.3d 960
    , 963.)
    Analysis
    We preliminarily note that the Jayaweeras had the burden of proving they owned
    the claimed recorded easement. (Evid. Code, § 500; Beck Development Co. v. Southern
    Pacific Transportation Co.(1996) 
    44 Cal.App.4th 1160
    , 1205 ["Accordingly, in order for
    the plaintiff to prevail the record must contain sufficient evidence to support a finding in
    its favor on each and every element which the law requires to support recovery.
    18
    [Citation.] No matter how overwhelming the proof of some elements of a cause of
    action, a plaintiff is not entitled to a judgment unless there is sufficient evidence to
    support all of the requisite elements of the cause of action."].) But the Jayaweeras did not
    submit into evidence their recorded grant deed or any other recorded grant or reservation
    of easement for the benefit of lot 264 over lot 263, despite claiming they had a recorded
    easement over lot 263. Accordingly, we conclude the Jayaweeras failed to make out their
    cause of action for a recorded easement.
    B.
    Nevertheless, we have a separate basis for affirming the trial court's ruling. We
    imply from the court's comments at trial that it relied on the settlement agreement in
    concluding the Jayaweeras' right to a claimed roadway easement was extinguished in
    favor of the four-foot pathway. We conclude the settlement agreement supports the
    court's finding. In light of the fact the parties intended final resolution of their dispute
    over the easement on lot 263, paragraph No. 3 of the agreement provides the sole means
    of redress, requiring LABC to build a retaining wall and a pathway to allow bicycle and
    pedestrian access over an easement located on Lot 263 that would connect the
    Jayaweeras' driveway to an existing asphalt road on Lot 262. Justin testified the pathway
    and retaining wall were built and it was walkable. Asoka testified a pathway was built,
    and the stairways did not interfere with his ability to walk on the pathway. The parties
    stipulated Shantha had not used the pathway. Therefore, we conclude the retaining wall
    and pathway were built in response to the Jayaweeras' first lawsuit and pursuant to the
    settlement agreement.
    19
    To the extent the Jayaweeras seek to support their claim they did not abandon the
    easement by relying on LABC's apparent failure to build the pathway according to the
    agreement's specific terms and the fact that the San Bernardino County Recorder
    requested the Lansbergs provide proof of abandonment, those issues are immaterial for
    our resolution of this case. Neither matter vitiated the parties' intent to resolve their
    dispute through the agreement, whose expansive terms extinguished the Jayaweeras' right
    to a claimed roadway easement as alleged in the present lawsuit. We note the Jayaweeras
    had separate remedies in the superior court for the Lansbergs' failure to obtain the permit
    to build the stairs, and for any failure by LABC to build the pathway according to the
    agreement's terms. But there is no indication in this record that the Jayaweeras pursued
    those remedies.
    The Jayaweeras have released all claims to additional easements over lot 263. The
    settlement agreement unambiguously states: "[T]his Agreement shall be effective as a
    full and final accord and satisfaction and settlement of, and as a bar to each and every
    claim, demand, debt, account, reckoning, liability, obligation, cost, expense, lien, action
    and cause of action, heretofore referred to and released, which the parties hereto have,
    may have, or have had, against the other party in connection with the DISPUTE."
    II.
    The Jayaweeras contend a Declaration of Restrictions (the Declaration) did not
    provide a proper basis for the court to grant attorney fees because the parties did not sue
    on the Declaration, and the lawsuits did not involve contractual matters. They further
    contend the Declaration expired in December 2010, and the attorney fee motion was
    20
    brought in 2012. Finally, they contend the settlement agreement is not a proper basis for
    the fee award because the Lansbergs were not a party to it.
    The Lansbergs respond the Jayaweeras' initial complaint was filed in October
    2010, therefore, the Declaration provides a proper basis for an attorney fee award,
    notwithstanding that the actual fee motion was heard in 2012. They further argue the
    settlement agreement provided a separate basis for the attorney fee award.
    At trial, the Jayaweeras did not dispute the amount of fees sought or who was the
    prevailing party by citing to the record evidence or applicable law. They merely claimed
    that the Declaration was not a proper basis for the award, pointing out the Declaration
    had not been admitted as a trial exhibit or with the attorney fees motion. They also
    claimed the attorney fee request violated California's Anti-SLAPP laws.5 The court ruled
    the lawsuit was brought under the Declaration, which provided a basis for the Lansbergs
    to be awarded $82,171.25 in attorney fees.
    Analysis
    We need not address the parties' arguments regarding the applicability of the
    Declaration's attorney fee provision because we affirm the court's ruling on a different
    basis. We review the correctness of a trial court's result, not its rationale. (Howard v.
    Thrifty Drug & Discount Stores (1995) 
    10 Cal.4th 424
    , 443; [" 'We uphold judgments if
    they are correct for any reason, "regardless of the correctness of the grounds upon which
    the court reached its conclusion." ' "]
    5     The Jayaweeras do not renew this claim regarding an anti-SLAPP violation and
    we do not consider it.
    21
    We conclude the settlement agreement's attorney fee provision applies in this case
    because although the Lansbergs were not the defendants in the first lawsuit, the
    agreement states that its terms extend to the parties' successors and assigns. Therefore,
    under Civil Code section 1717, the agreement was binding on the Jayaweeras and the
    Lansbergs, and it provided a proper basis for the attorney fee award.6
    DISPOSITION
    The judgment and order are affirmed. Justin Lansberg and Stephanie Lansberg are
    awarded costs on appeal.
    O'ROURKE, J.
    WE CONCUR:
    McCONNELL, P. J.
    McDONALD, J.
    6       Civil Code section 1717, subdivision (a) states: "In any action on a contract,
    where the contract specifically provides that attorney's fees and costs, which are incurred
    to enforce that contract, shall be awarded either to one of the parties or to the prevailing
    party, then the party who is determined to be the party prevailing on the contract, whether
    he or she is the party specified in the contract or not, shall be entitled to reasonable
    attorney's fees in addition to other costs." (See Reynolds Metals Co. v. Alperson (1979)
    
    25 Cal.3d 124
    , 128-129 [interpreting Civil Code section 1717].)
    22
    