Hampton v. Cty. of San Diego ( 2013 )


Menu:
  • Filed 7/26/13
    CERTIFIED FOR PUBLICATION
    COURT OF APPEAL, FOURTH APPELLATE DISTRICT
    DIVISION ONE
    STATE OF CALIFORNIA
    RANDALL KEITH HAMPTON et al.,                   D061509
    Plaintiffs and Appellants,
    v.                                      (Super. Ct. No.
    37-2010-00101299-CU-PA-CTL)
    COUNTY OF SAN DIEGO,
    Defendant and Respondent.
    APPEAL from a judgment of the Superior Court of San Diego County, Timothy
    B. Taylor, Judge. Affirmed.
    Thorsnes Bartolotta McGuire, John F. McGuire, Ian C. Fusselman and Benjamin I.
    Siminou for Plaintiffs and Appellants.
    Thomas E. Montgomery, County Counsel, and Christopher J. Welsh, Deputy
    County Counsel, for Defendant and Respondent.
    I.
    INTRODUCTION
    In November 2009, a vehicle that Randall Keith Hampton was driving collided
    with another vehicle at an intersection in Valley Center. Hampton and his wife sued the
    driver of the other vehicle as well as the County of San Diego (County).1 The Hamptons
    brought claims against the County for dangerous condition of public property (Gov.
    Code, § 835 et seq.)2 (fourth cause of action) and loss of consortium (third cause of
    action). The County moved for summary judgment on the ground that the Hamptons'
    claims were barred by the affirmative defense of design immunity. The trial court
    granted the County's motion. On appeal, the Hamptons claim that the court erred in
    granting the County summary judgment. We affirm.
    II.
    FACTUAL AND PROCEDURAL BACKGROUND
    A.     The Hamptons' complaint
    In their cause of action claiming dangerous condition of public property, the
    Hamptons alleged that the County had duties to "properly and safely plan, design, build,
    construct, operate, manage, maintain, direct, control, sign and supervise the roadways at
    the intersection of Cole Grade Road and Miller Road in the County of San Diego," and
    that the County breached these duties by "providing . . . inadequate sight distance for
    1      The County is the only respondent in this appeal.
    2     Unless otherwise specified, all subsequent statutory references are to the
    Government Code.
    2
    vehicular traffic approaching Miller Road from Cole Grade Road as well as for traffic
    pulling out from Miller Road onto Cole Grade Road . . . creating a defective and
    dangerous condition for motorists and traffic." The Hamptons further alleged:
    "As a proximate result, Defendant ROBERT PAUL CULLEN [the
    other driver involved in the accident] was unable to see the plaintiff
    as the plaintiff pulled out from Miller Road onto Cole Grade Road
    and the plaintiff RANDALL KEITH HAMPTON was unable to see
    Defendant ROBERT PAUL CULLEN as defendant approached this
    intersection while driving on Cole Grade Road[,] causing their
    vehicles to collide at this intersection. As a proximate result of
    Defendants' conduct, Plaintiff sustained the injuries and damages as
    herein alleged."
    In a loss of consortium cause of action, the Hamptons alleged that Randall Keith
    Hampton had been unable to perform "necessary duties as a husband and the work and
    services usually performed in the support . . . of the family," due to the County's conduct.
    B.     The County's motion for summary judgment
    1.      The County's motion
    The County filed a motion for summary judgment and/or adjudication on the
    ground that the affirmative defense of design immunity applied to bar the Hamptons'
    claims against the County. In a supporting brief, the County noted that in order to
    establish the defense of design immunity, a public entity is required to establish three
    elements: 1) a causal relationship between the plan or design and the accident;
    2) discretionary approval of the plan or design prior to construction; and 3) substantial
    evidence supporting the reasonableness of the plan or design.
    3
    The County contended that the causal connection element was met based on the
    Hamptons' allegation that the intersection at which the collision occurred constituted a
    dangerous condition. With respect to the discretionary approval element, the County
    stated that the County had approved plans for improvements to the intersection in 1995,
    prior to the construction of those improvements in 1998. Finally, the County argued that
    the declaration of Robert Goralka, a licensed engineer, demonstrated the reasonableness
    of the plans for the intersection. The County also maintained that the Hamptons would
    be unable to demonstrate changed conditions resulting in a loss of design immunity,
    arguing that the Goralka declaration "establishes that the physical configuration of the
    intersection was the same when this accident occurred as it was in 1998 when the
    improvement project was completed."
    The County supported its motion with two "Road Review[s]"3 pertaining to the
    intersection, engineering documents entitled "Plans for Construction of Cole
    Grade/Miller Road Interim Intersection Improvements [(Plans)]," and Goralka's
    declaration, among other items.
    In his declaration, Goralka stated that he is the County's traffic engineer and that
    his current duties involved managing various aspects of traffic operations on County
    roads. Goralka further stated that a 1989 Road Review noted that the sight distance from
    Miller Road looking south on Cole Grade Road was less than desirable due to a "hump"
    3      The Road Reviews were generated by the County's Department of Public Works
    and identified various traffic conditions near the intersection and offered
    recommendations for improving such conditions.
    4
    in Cole Grade Road. The Road Review recommended lowering the crest on Cole Grade
    Road south of the Miller Road intersection to obtain additional sight distance at the
    intersection.
    Goralka stated that he had reviewed the Plans and noted the following with respect
    to their approval:
    "The[] [P]lans consist of road cross-section diagrams, profiles, and
    striping plans. . . . Prior to actual construction[,] the [Plans] were, on
    March 3, 1995[,] signed by David Solomon, a licensed civil engineer
    and traffic engineer who served as Deputy County Engineer and was
    in charge of the County . . . Design Engineering Section. As the
    person in charge of the County's Design Engineering Section, he had
    been delegated by the County Board of Supervisors, through the
    Director of the Department of Public Works, discretion and authority
    to approve plans such as [the Plans]. After the project was
    completed, 'as built' plans were approved and signed by John
    Bidwell, a licensed civil engineer who served as Senior Civil
    Engineer of the County's Design Engineering Section on April 13,
    1998."
    Goralka described the purpose of the Plans as follows:
    "The [Plans] called for the lowering of the crest on Cole Grade
    Road, just south of the Miller Road intersection. The effect of
    lowering the crest is to improve intersection sight distance for the
    users of westbound Miller Road who look to view northbound traffic
    on Cole Grade Road as they are preparing to enter the intersection.
    The 'as-built' plans confirm that the crest of Cole Grade Road was
    lowered by several feet. The plans called for widening of both Cole
    Grade and Miller Roads, at their intersection to accommodate a left
    turn pocket on both northbound and southbound Cole Grade Road
    for vehicles turning west, and east respectively onto Miller Road.
    The as-built plans confirm that this feature of the project was
    constructed."
    With respect to the issue of sight distance at the intersection in the wake of the
    improvements, Goralka stated the following:
    5
    "I have reviewed the [1999 Road Review] regarding Cole Grade
    Road. . . . In this Road Review, which is after the intersection
    improvement project, the reviewer notes that sight distance for
    westbound traffic is not adequate from 10 feet behind the limit line
    on Miller Road at the intersection with Cole Grade Road. This is a
    measurement typically used in designing new roads, and it does not
    mean that the County failed to provide reasonable sight distance for
    existing, previously constructed roads such as the intersection of
    Miller Road and Cole Grade Road. My usual manner of gauging
    operational sight distance from a side street at an intersection such as
    this, and the manner I have usually seen used by those working for
    the County, is to measure back from the prolongation of the painted
    edge of [the] lane line, not the limit line. In this instance, the edge of
    the lane line is several feet in front of the limit line. As a practical
    matter, a driver on westbound Miller Road who creeps forward from
    the limit line but has not yet crossed into the oncoming travel lane is
    able to gain more sight distance to the left, looking for traffic on
    northbound Cole Grade Road. This results in 'operational' sight
    distance."
    Goralka also stated that, in his opinion, the Plans are reasonable.
    "The [Plans] are reasonable. The configuration of the intersection
    shown in the plans provides adequate operational sight distance for a
    driver who creeps forward from the limit line. Having viewed the
    site in person, I can say that the operational sight distance provided
    between westbound Miller Road and northbound Cole Grade Road is
    adequate. The plans did not achieve a more desirable amount of
    sight distance sought when a new intersection is being designed
    from scratch in an open area. But the project did achieve operational
    sight distance, which is a reasonable improvement when, as here,
    there are design constraints including roadways already in place that
    are near the crest of a hill and an embankment with existing
    utilities."
    2.      The Hamptons' opposition
    The Hamptons filed an opposition in which they argued that the County was not
    entitled to summary judgment based on the affirmative defense of design immunity
    because the County failed to establish as a matter of law the "discretionary approval" and
    6
    "reasonable design" elements of the defense.4 The Hamptons based their opposition
    primarily on the contention that the Plans disregarded the County's "own methodology
    for measuring sight distance." In support of this contention, the Hamptons stated that the
    Plans failed to provide either adequate "design sight distance" or "operational sight
    distance."5
    The Hamptons noted that although the parties agreed that the County's design sight
    distance standard had not been met,6 the parties disputed whether the Plans achieved
    sufficient operational sight distance under County guidelines. The Hamptons maintained
    that in stating that operational sight distance at the intersection was adequate, the
    County's expert, Goralka, "fail[ed] to follow the County['s] protocol for measuring sight
    distance." The Hamptons argued that Goralka failed to base his calculation of
    operational sight distance on measurements derived "from the edge of the pavement" as
    4       The Hamptons did not dispute that the County had established the first element of
    its design immunity defense, namely, the existence of a causal relationship between the
    Plans and the accident.
    5       The Hamptons argued that "[t]he purpose of providing design sight distance is to
    allow a driver intending to enter the intersection with sufficient time to decide whether it
    is safe to enter." The Hamptons contended that "[t]he purpose of providing 'operational'
    sight distance is to allow a party sufficient time to perceive and then stop before
    impacting a vehicle in the intersection."
    6       Although the County agreed that the design sight distance standard had not been
    met, the County contended that this standard applied only to the design of new
    intersections, and that operational sight distance standards applied to improvements made
    to existing intersections.
    7
    required under County protocol, and that he had instead improperly measured from "the
    edge of the lane."7
    With respect to the discretionary approval element, the Hamptons argued that "the
    Plans are silent as to sight distance," and that the County thus failed to "provide[]
    evidence that the deviations from design standards . . . were approved or even
    considered." In addition, the Hamptons argued that any approval of the Plans was
    necessarily unreasonable in light of the fact that the plans deviated from County sight
    distance standards.
    The Hamptons also argued that the County's failure to maintain the intersection
    had resulted in changed conditions that precluded the application of the County's design
    immunity defense. Specifically, the Hamptons maintained that plant growth along an
    embankment on Cole Grade Road south of Miller Road further reduced the already
    inadequate sight distance at the intersection provided for in the Plans.
    The Hamptons supported their motion with various documents and the declaration
    of Edward Stevens, a licensed civil engineer who has significant traffic engineering
    experience. In his declaration, Stevens stated that an embankment runs along the east
    side of Cole Grade Road as it approaches Miller Road and that this embankment limits
    sight distance for westbound traffic on Miller Road looking south toward northbound
    traffic on Cole Grade Road. Stevens further stated that the Plans do not depict the
    7      It is undisputed that since there is a difference of several feet between the edge of
    the pavement and the edge of the lane of traffic at the intersection at which the accident
    occurred, a sight distance measurement taken relative to the pavement edge yields less
    sight distance than one taken from the edge of the lane line.
    8
    embankment and that as a result, it is not possible to determine from the Plans the actual
    sight distance at the intersection. Stevens stated that although the County standard for
    design sight distance requires at least 550 feet of sight distance at the intersection and the
    County standard for operational sight distance requires at least 388 feet, actual design
    sight distance at the intersection was only 214 feet and operational sight distance was
    only 323 feet.
    Stevens stated the following with respect to Goralka's declaration as to the
    adequacy of sight distance at the intersection:
    "The standards set out by the County of San Diego . . . require that
    design and operational sight distance be measured backwards from
    the prolongation of the curb or gutter line or edge of the pavement,
    not from the edge lane line. The Declaration of Robert Goralka
    suggests that satisfactory operational sight distance exists at the
    si[te]. However, Mr. Goralka does not use the standard adopted by
    the County of San Diego for measuring sight distance. Further, Mr.
    Goralka's methodology is not generally accepted in the traffic
    engineering community as an appropriate means of measuring
    design or operational sight distance."
    Stevens contended that because of the lack of information pertaining to sight
    distance in the Plans, "the engineer approving the Plans could not have exercised
    discretionary approval of the sight distance." In addition, Stevens maintained that given
    the inadequacies in the Plans pertaining to sight distance, "there is no basis upon which a
    traffic engineer could have reasonably approved the Plans."
    Stevens attached various documents to his declaration, including two County
    engineering drawings, numbered DS-20A and DS-20B. The drawings are marked, "San
    Diego County Design Standard[s]" and are entitled, "Clear Space Easement Type A" and
    9
    "Clear Space Easement Type B," respectively. The drawings appear to depict easements
    necessary to achieve adequate "corner sight distance"8 at two different shaped
    intersections. Both documents also contain an identical table that lists the "minimum
    corner intersection sight distance" in feet for various "design speed[s]." The table states
    that for a design speed of 50 miles per hour (MPH), 500 feet of corner intersection sight
    distance is required, and that when the design speed increases to 60 MPH, 600 feet of
    sight distance is required.
    Stevens also included a document that contains several tables. One table, entitled,
    " 'Corner' Sight Distance on Level Roadways," repeats the corner sight distance
    information discussed in the previous paragraph, and includes a notation that states the
    following: "Corner sight distance measured from a point on the minor road at least 10
    feet from the edge of the major road pavement and measured from a height of eye of 3.5
    feet on the minor road to a height of object of 4.25 feet on the major road. (See Count[y]
    . . . Public Road Standards Drawings DS-20A and DS-20B)." Another table is entitled,
    " 'Operational' Stopping Sight Distance on Level Roadways," and contains a note that
    states, "Operational [Sight] Distance Measured from a point on the minor road 8 feet
    from the edge of pavement. (Distance from the front of the vehicle to the driver's eye is
    nearly always 8 ft [citation].) Measured from a height of eye of 3.5 feet on the minor
    road to a height of object of 3.5 feet on the major road [citation]."
    8      It appears from the record that the terms "design sight distance" and "corner sight
    distance" are used interchangeably.
    10
    3.     The County's reply
    The County filed a reply in which it reiterated its argument that Goralka's
    declaration established the existence of discretionary approval of the Plans prior to
    construction. With respect to the reasonableness of the Plans, the County argued that the
    fact that "experts disagree on the best approach to the sight distance problem" did not
    establish a lack of "substantial evidence to support the reasonableness of the approach
    actually followed by the County."
    Specifically, the County argued that " 'operational' rather than 'design' criteria
    appl[y] to an intersection of existing roadways," such as the intersection at issue. The
    County also contended, "The way that operational sight distance at this intersection was
    measured is consistent with the County's practices, where the edge of the lane used by
    oncoming traffic is several feet in front of the limit line, thereby allowing drivers on
    westbound Miller Road plenty of room to safely creep forward and look both ways before
    reaching the oncoming lane and crossing into the intersection." The County further
    argued that when operational sight distance is measured in this manner, the Plans provide
    for adequate sight distance. Finally, the County argued that any growth in plants on the
    embankment along Cole Grade Road did not constitute a relevant changed condition
    since even with such growth, the embankment does not reduce the operational sight
    distance of a reasonable driver who creeps forward beyond the limit line and checks for
    oncoming traffic prior to entering the intersection.
    11
    In support of its reply, the County lodged a portion of the deposition testimony of
    its retained expert, Arnold A. Johnson. In the deposition, Johnson testified that a County
    document entitled "Service Request Guidelines Si[ght] Distance at Intersection" states,
    "Sight distance is measured 8 feet back from the prolongation of the curb or 8 feet back
    from an edge line." (Emphasis added.) The County also lodged a portion of Stevens's
    deposition in which Stevens acknowledged that if Hampton had pulled his vehicle to a
    point forward of the limit line on Miller Road just before entering the lane of traffic on
    Cole Grade Road, "Cullen's vehicle would be within his view if it was within 550 feet of
    the intersection. . . ."
    C.      The trial court's ruling
    The trial court held a hearing on the motion. At the conclusion of the hearing, the
    court took the matter under submission. Four days later, the trial court issued an order
    granting the County's motion for summary judgment. The court ruled that the County
    had established its design immunity affirmative defense as a matter of law. In reaching
    this conclusion, the court reasoned in part:
    "Defendant County has shown that no material issues of fact exist to
    overcome the County's statutory entitlement to design immunity. As
    is made clear by the Goralka Declaration . . . the [Plans] were
    approved by Deputy County Engineer David Solomon, a licensed
    civil engineer and traffic engineer on [March 3, 1995]. He was in
    charge of the County of San Diego Design [E]ngineering Section.
    As the person in charge of that Section, he had been delegated by the
    County Board of Supervisors, through the Director of the
    Department of Public Works, to have discretion and authority to
    approve such plans. This bespeaks sufficient discretion to entitle the
    County to invoke design immunity, as a matter of law. The court
    finds that the Goralka declaration is of solid evidentiary value and
    inspires confidence in the conclusions expressed.
    12
    "Further, . . . (as built) Drawings were signed off on by John
    Bidwell, a licensed civil engineer who served as Senior Civil
    Engineer of the County's Design Engineering Section on [April 13,
    1998]. [Citation.] Defendant County has satisfied the three
    elements necessary to show the County's entitlement to design
    immunity by substantial evidence . . . . Typically, the opinion of a
    civil engineer as to the reasonableness of the design constitutes the
    'substantial evidence' that is necessary to support the design
    immunity defense. [Citation.]
    "The fact that Plaintiffs have an expert, Ed Stevens, who disagrees
    with the County's witness, is of no consequence. It does not matter
    whether the evidence of reasonableness is disputed, as the statute
    provides immunity even when the public entity's substantial
    evidence of the reasonableness of its design is contradicted by the
    opposing party's traffic engineer. [Citations.]
    "The court finds that there is substantial evidence upon which a
    reasonable public employee could have adopted the plan or design
    which gave rise to the 1998 modifications to Cole Grade Road near
    the subject intersection. . . . Further the court determines that
    plaintiff has failed to offer material admissible evidence of
    significant changed physical conditions since 1988 rendering the
    subject intersection dangerous (let alone that the County had prior
    notice of same). There is no material triable issue of fact on this
    contention. The County is entitled to Judgment as a matter of law."9
    The trial court subsequently entered judgment in favor of the County.
    D.    The Hamptons' appeal
    The Hamptons timely appealed from the judgment.
    9       The trial court also sustained numerous objections that the County made to
    Stevens's declaration, including portions of his declaration described above. On appeal,
    the Hamptons contend that the trial court erred in sustaining those objections, contending
    that the "propriety of [the County's] objections turns on this court's view of the law on
    design immunity." We need not consider the propriety of the trial court's evidentiary
    rulings, because even assuming that all of Stevens's declaration was admissible, for the
    reasons that follow, we conclude that the trial court properly granted the County's motion
    for summary judgment.
    13
    III.
    DISCUSSION
    The trial court properly granted the County's motion for summary judgment
    A.     The trial court properly determined that the County established, as a matter of
    law, the affirmative defense of design immunity
    The Hamptons contend that the trial court erred in concluding that the County
    established, as a matter of law, the affirmative defense of design immunity.
    1.     Governing law
    a.     The law governing summary judgment
    A moving party is entitled to summary judgment when the party establishes that it
    is entitled to the entry of judgment as a matter of law. (Code Civ. Proc., § 437c, subd.
    (c).) A defendant may make this showing by demonstrating that the plaintiff cannot
    establish one or more elements of all of his causes of action, or that the defendant has a
    complete defense to each cause of action. (Towns v. Davidson (2007) 
    147 Cal.App.4th 461
    , 466.)
    In reviewing a trial court's ruling on a motion for summary judgment, the
    reviewing court makes " 'an independent assessment of the correctness of the trial court's
    ruling, applying the same legal standard as the trial court in determining whether there
    are any genuine issues of material fact or whether the moving party is entitled to
    judgment as a matter of law. [Citations.]' [Citation.]" (Trop v. Sony Pictures
    Entertainment, Inc. (2005) 
    129 Cal.App.4th 1133
    , 1143.)
    14
    b.     General principles of law governing the affirmative defense of
    design immunity
    In Cornette v. Department of Transp. (2001) 
    26 Cal.4th 63
    , 69 (Cornette), the
    Supreme Court explained the purpose of the design immunity defense as follows:
    "The rationale for design immunity is to prevent a jury from second-
    guessing the decision of a public entity by reviewing the identical
    questions of risk that had previously been considered by the
    government officers who adopted or approved the plan or design.
    [Citation.] ' " '[T]o permit reexamination in tort litigation of
    particular discretionary decisions where reasonable men may differ
    as to how the discretion should be exercised would create too great a
    danger of impolitic interference with the freedom of decision-
    making by those public officials in whom the function of making
    such decisions has been vested.' " [Citation.]' [Citation.]" (Id. at
    p. 69.)
    Section 830.6, which codifies the defense of design immunity, provides in relevant
    part:
    "Neither a public entity nor a public employee is liable under this
    chapter for an injury caused by the plan or design of a construction
    of, or an improvement to, public property where such plan or design
    has been approved in advance of the construction or improvement by
    the legislative body of the public entity or by some other body or
    employee exercising discretionary authority to give such approval or
    where such plan or design is prepared in conformity with standards
    previously so approved, if the trial or appellate court determines that
    there is any substantial evidence upon the basis of which (a) a
    reasonable public employee could have adopted the plan or design or
    the standards therefor or (b) a reasonable legislative body or other
    body or employee could have approved the plan or design or the
    standards therefor."
    "In other words, a public entity claiming design immunity must establish three
    elements: (1) a causal relationship between the plan or design and the accident; (2)
    discretionary approval of the plan or design prior to construction; and (3) substantial
    15
    evidence supporting the reasonableness of the plan or design. [Citations.]" (Cornette,
    
    supra,
     26 Cal.4th at p. 69.)
    The discretionary approval element may be resolved as an issue of law if the
    material facts pertaining to the element are undisputed. (Grenier v. City of
    Irwindale (1997) 
    57 Cal.App.4th 931
    , 940 (Grenier).) The element "simply means
    approval in advance of construction by the legislative body or officer exercising
    discretionary authority." (Ramirez v. City of Redondo Beach (1987) 
    192 Cal.App.3d 515
    ,
    526 (Ramirez).) "A detailed plan, drawn up by a competent engineering firm, and
    approved by a city engineer in the exercise of his or her discretionary authority, is
    persuasive evidence of the element of prior approval." (Grenier, supra, at pp. 940-941.)
    The third element, substantial evidence supporting the reasonableness of plan or
    design always presents a question of law. (See Cornette, 
    supra,
     26 Cal.4th at
    p. 72 ["Section 830.6 clearly makes the resolution of the third element of design
    immunity, the existence of substantial evidence supporting the reasonableness of the
    adoption of the plan or design, a matter for the court, not the jury."].) Further, the statute
    provides immunity when there is any substantial evidence of reasonableness, even if
    contradicted. (Grenier, supra, 57 Cal.App.4th at p. 940.)
    2.     Application
    The Hamptons contend that the trial court erred in concluding that the County
    established the elements of discretionary approval of the Plans and substantial evidence
    supporting the reasonableness of the Plans. We consider each element in turn.
    16
    a.     Discretionary approval
    The County presented undisputed evidence that a licensed civil and traffic
    engineer working for the County, David Solomon, approved the Plans prior to the
    construction of the improvements. The Plans consist of construction documents that
    include various drawings, including details of the intersection at which the accident
    occurred. The Plans themselves indicate that they have been "approved by" Solomon.
    The County also presented undisputed evidence both that Solomon had the discretionary
    authority to approve the Plans, and that a licensed engineer working for the County
    approved and signed "as built" plans after construction of the improvements. This
    evidence demonstrates the discretionary approval element, as a matter of law. (See, e.g.,
    Laabs v. City of Victorville (2008) 
    163 Cal.App.4th 1242
    , 1263 (Laabs) [evidence that an
    engineer employed by a public entity "reviewed and approved" construction plans
    established discretionary approval element as a matter of law]; Grenier, supra, 57
    Cal.App.4th at p. 941 [concluding that City established discretionary approval element as
    a matter of law where "plans were prepared by Saguchi, a civil engineer, and approved by
    Alvarado, the city engineer, after review"]; Ramirez, supra, 192 Cal.App.3d at p. 525
    [concluding discretionary approval element demonstrated as a matter of law where "the
    City's engineer, along with the engineers and other officials of the county who were
    recognized as being competent in the design of highways, approved the design before it
    was adopted by the City"].)
    17
    In arguing that the trial court erred in concluding that the County established the
    discretionary approval element, the Hamptons cite two cases, Levin v. State of
    California (1983) 
    146 Cal.App.3d 410
     (Levin), and Hernandez v. Department of
    Transp. (2003) 
    114 Cal.App.4th 376
     (Hernandez). The Hamptons argue, "Levin and
    Hernandez teach that where, as here, there is evidence the design at issue violated the
    public entity's own standards, the public entity cannot establish the second element of
    design immunity—discretionary approval—unless it shows that the engineer who
    approved the plans (1) knew it was substandard, (2) elected to disregard the standard, and
    (3) had the authority to do so." We agree that Levin and Hernandez support this
    proposition. (Levin, supra, at p. 418 [concluding that state failed to establish
    discretionary approval of plans because state failed to show that the public employee who
    approved plans decided to "to ignore the standards [pertaining to placement of a
    guardrail] or considered the consequences of the elimination of the eight feet shoulder"];
    Hernandez, supra, at p. 388 [concluding triable issue of fact existed as to discretionary
    approval element because there was "[c]onflicting evidence . . . presented in the trial
    court as to whether the off-ramp design at issue in this case deviated from the applicable
    guardrail standards and, if so, whether that deviation was knowingly approved by the
    responsible Caltrans authorities"].) However, for reasons we explain below, we do not
    find either decision persuasive in this regard, and we therefore decline to follow Levin or
    Hernandez with respect to the nature of the evidence that the governmental entity must
    present to establish the discretionary approval element.
    18
    In Levin, Dr. Marcia Levin was killed in an automobile accident that occurred
    when she tried to avoid a head-on collision with a drunk driver who had illegally crossed
    the double yellow line, into Levin's lane. (Levin, supra, 146 Cal.App.3d at p. 414.)
    Levin was "driving at a lawful speed, and in a reasonable manner, and tried to avoid the
    collision swerving to her right, but went over a steep embankment into the channel from
    which the embankment had been excavated." (Ibid.) Levin's car overturned and she
    drowned. (Id. at p. 415.) Levin's family members sued the state and brought a cause of
    action for wrongful death. (Id. at p. 413.) The state filed a motion for summary
    judgment based on the defense of design immunity, which the trial court granted. (Ibid.)
    On appeal, the Levins contended that the trial court erred in granting the state's
    motion for summary judgment. (Levin, supra, 146 Cal.App.3d at pp. 413-414.) After
    outlining the elements of the design immunity defense, and concluding that the causal
    relationship element of design immunity had been established (id. at pp. 415- 417), the
    Levin court noted that the discretionary approval element was "the major focus of the
    contentions on this appeal." (Id. at p. 417.) With respect to this element, the Levin court
    observed that the changes to Route 37 had been approved by a person named J. A.
    Legarra, a state deputy highway engineer who had the authority to approve such changes.
    The Levin court also noted that the record contained evidence that another state engineer
    had "considered the placement of a median barrier and exterior guardrails, but concluded
    that neither was advisable on this particular stretch of Highway 37." (Id. at p. 418.)
    Despite the existence of this evidence, the Levin court concluded that the state had not
    established the discretionary approval element of its design immunity defense, reasoning:
    19
    "The state has not challenged the existence and application of
    the . . . guardrail standards. [The state's evidence does] not mention
    them or the degree of the steep slope created by the embankment,
    which was created by the 1974 construction. There was no evidence
    that Legarra had discretionary authority to disregard the standards.
    "As our Supreme Court pointed out in Cameron v. State of
    California (1972) 
    7 Cal.3d 318
    , 326 [(Cameron)], the rationale of
    the design immunity defense is to prevent a jury from simply
    reweighing the same factors considered by the governmental entity
    which approved the design. An actual informed exercise of
    discretion is required. The defense does not exist to immunize
    decisions that have not been made. Here, as in Cameron, supra, the
    design plan contained no mention of the steep slope of the
    embankment. The state made no showing that Legarra, who alone
    had the discretionary authority, decided to ignore the standards or
    considered the consequences of the elimination of the eight feet
    shoulder. It follows that the state also failed to establish the second
    element of the defense." (Id. at p. 418, italics added; accord
    Hernandez, supra, 114 Cal.App.4th at p. 388 [applying Levin and
    concluding that triable issues of fact existed as to discretionary
    approval element of design immunity defense in light of conflicting
    evidence as to whether off-ramp design at issue in case deviated
    from applicable standards and, if so, whether deviation was
    knowingly approved,] italics added.)
    We respectfully disagree with Levin and Hernandez to the extent they suggest that
    a public entity attempting to establish the discretionary approval element of a design
    immunity defense must establish an exercise of informed discretion, and that evidence
    that the public entity failed to adhere to standards pertaining to an element of a design
    plan constitutes evidence of a lack of discretionary approval of the design. The text of
    section 830.6, from which the discretionary approval element is derived, does not contain
    any requirement of informed discretion. (See Alvis v. County of Ventura (2009) 
    178 Cal.App.4th 536
    , 552 (Alvis) ["[S]ection 830.6 does not state the approval must be
    knowing or informed. A court may not rewrite a statute to make it conform to a
    20
    presumed intent that is not expressed."].) Nor does the relevant statutory text require the
    presentation of evidence demonstrating that the design conformed to relevant standards.
    On the contrary, the statute provides that the discretionary element may be established
    either by evidence of appropriate discretionary approval or evidence that the plan
    conformed with previously approved standards. (§ 830.6 ["Neither a public entity nor a
    public employee is liable under this chapter for an injury caused by the plan or design . . .
    where such plan or design has been approved . . . by some . . . employee exercising
    discretionary authority to give such approval or where such plan or design is prepared in
    conformity with standards previously so approved," italics added].)
    The Supreme Court's decision in Cameron, supra, 
    7 Cal.3d 318
    , the sole case that
    the Levin court cites in its analysis of the discretionary approval element,10 does not
    support a requirement that the design conform to previously approved standards. In
    Cameron, plaintiffs suffered injuries in an automobile accident that occurred after the
    driver of the vehicle in which they were traveling lost control of the vehicle while
    negotiating a curve on a highway. (Cameron, supra, at p. 321.) The plaintiffs brought a
    cause of action against the state alleging that it "failed in its duty to keep the highway in a
    safe condition in that the curve was so improperly graded or banked that an automobile
    could not negotiate the curve even though going at a lawful speed." (Id. at p. 322.) The
    trial court concluded that the state established as a matter of law all of the elements of its
    10     Levin, supra, 
    146 Cal.App.3d 410
     is the only relevant authority that the Hernandez
    court cited with respect to this issue. (See Hernandez, supra, 114 Cal.App.4th at pp. 385-
    388.)
    21
    design immunity defense. (Id. at p. 322, fn. 3.) On appeal, the Supreme Court agreed
    with the plaintiffs "that the design immunity conferred by Government Code section
    830.6 is inapplicable since the design plan approved . . . did not specify the degree of
    superelevation [on the curve] and since it was the improper superelevation which
    constituted the dangerous condition causing the accident." (Id. at p. 322.)
    Cameron does not support the Levin court's interpretation of the discretionary
    approval element because the holding in Cameron was premised not on an analysis of the
    element of discretionary approval, but on the court's analysis of an entirely different
    element of the design immunity defense, namely, the requirement that there be a causal
    relationship between the plan and the accident. In Cameron, the court determined that a
    causal relationship was lacking because the plan did not contain the design feature (a
    superelevated curve) that plaintiffs alleged was the cause of the accident. (Cameron,
    supra, 7 Cal.3d at p. 326 [concluding that because the "superelevation as . . . constructed
    did not result from the design or plan introduced into evidence[,] . . . there was no basis
    for concluding that any liability for injuries caused by this uneven superelevation was
    immunized by section 830.6," fn. omitted, italics added].)
    In addition, while the Levin court was correct in noting that the Cameron court
    observed that the rationale of the design immunity defense is to prevent a jury from
    simply reweighing the same factors considered by the governmental entity that approved
    the design (Levin, supra, 146 Cal.App.at p. 418, citing Cameron, supra, 7 Cal.3d at
    p. 326), the Cameron court merely stated that this rationale would not be served by
    providing immunity for a lawsuit based on the existence of a project design that is
    22
    unrelated to the accident. In contrast, permitting a jury to reweigh the reasonableness of
    a project design that is related to the accident, as in Levin and as in this case,11 would
    permit a jury to simply reweigh the same factors already considered by the governmental
    entity, in contravention of the rationale for design immunity.
    On a related point, the Levin court's statement in arguing that a public entity must
    demonstrate that its employee's approval was informed (Levin, supra, 146 Cal.App.3d at
    p. 418), conflates the third element of design immunity—the reasonableness of the
    design, with the second—discretionary approval of the plans. This conflation is
    significant, because while conflicting evidence as to the discretionary approval element
    would require that a public entity's motion for summary judgment premised on design
    immunity be denied (Grenier, supra, 57 Cal.App.4th at p. 940), conflicting evidence as to
    the reasonableness of the design would not (ibid.).
    Finally, the determination of the nature of the evidence necessary to satisfy this
    element in Levin and Hernandez is in conflict with numerous decisions in which courts
    have held that the discretionary approval element is satisfied by proof that the plans were
    11      In Levin, as noted above, the court concluded that the causal relationship element
    of design immunity had been established. (Levin, supra, 146 Cal.App.3d at pp. 415-417.)
    In this case, the Hamptons did not dispute in the trial court or in this court that the County
    established the existence of a causal relationship between the design and the accident.
    Thus, we need not consider whether any alleged inadequacy of sight distance at the
    intersection as built was unrelated to the design plans, as was the case with the
    superelevated curve at issue in Cameron. (See Cameron, supra, 7 Cal.3d at p. 326.)
    Further, nothing we say in this opinion is contrary to the Cameron court's holding that
    evidence that a plan omitted the condition that is the alleged cause of the accident may
    defeat a showing of a causal relationship, since that element is not in dispute in this case.
    (Ibid.)
    23
    approved by a public employee having discretionary authority to effectuate such
    approval. (See e.g., Becker v. Johnston (1967) 
    67 Cal.2d 163
    , 172-173 (Becker); Laabs,
    supra, 163 Cal.App.4th at p. 1263; Grenier, supra, 57 Cal.App.4th at p. 941; Ramirez,
    supra, 192 Cal.App.3d at p. 525.) For example, in Becker, supra, at pages 172-173, the
    Supreme Court cited the following evidence pertaining to the discretionary approval
    element of the design immunity defense at issue in that case:
    "The record in this case contains a copy of the plans of the
    intersection here involved, as recorded by the Recorder of
    Sacramento County in State Highway Map Book 3. Such plans on
    their face indicate that on July 11, 1927, they were approved by
    F.W. Hazelwood, Division Engineer, Division III; Fred Quinn,
    Engineer, Surveys and Plans; and R.W. Morton, State Highway
    Engineer; and, further, that the work was completed in 1929 in
    accordance with the plans."
    The Becker court held that this evidence, when considered in connection with evidence
    pertaining to the reasonableness of the design plan, established, as a matter of law, the
    public entity's design immunity defense. (Id. at p. 173.)
    As discussed above, in this case, the evidence that the County presented pertaining
    to the discretionary approval of the Plans is similar to that presented in Becker and in
    numerous other cases in which courts have concluded that a public entity demonstrated
    the discretionary approval element as a matter of law. Accordingly, we conclude that the
    trial court properly determined that in presenting undisputed evidence that a licensed civil
    and traffic engineer employed by the County approved the Plans prior to construction,
    that this engineer had the discretionary authority to approve the Plans, and that another
    licensed engineer employed by the County approved and signed the "as built" plans after
    24
    construction of the improvements, the County demonstrated the discretionary approval
    element of its design immunity defense as a matter of law.
    b.      Substantial evidence of the reasonableness of the Plans
    The Hamptons also contend that the trial court erred in concluding that the County
    presented substantial evidence supporting the reasonableness of the plans.
    i.     Additional relevant law
    As discussed above, a public entity claiming a design immunity defense must
    present substantial evidence supporting the reasonableness of the plan or design.
    (Cornette, supra, 26 Cal.4th at p. 69.) "In order to be considered substantial, the
    evidence must be of solid value, which reasonably inspires confidence. [Citations.]"
    (Arreola v. County of Monterey (2002) 
    99 Cal.App.4th 722
    , 757.) "The task for the trial
    court is to apply the deferential substantial evidence standard to determine whether any
    reasonable [public] official could have approved the challenged design. [Citation.] If the
    record contains the requisite substantial evidence, the immunity applies, even if the
    plaintiff has presented evidence that the design was defective. [Citation.]" (Ibid.) In
    Ramirez, supra, 
    192 Cal.App.3d 515
    , the court explained the rationale for this standard,
    as follows:
    "The statute does not require that property be perfectly designed,
    only that it be given a design which is reasonable under the
    circumstances. By deciding on a 'reasonableness' standard, the
    Legislature intended that government officials be given extensive
    leeway in their decisions concerning public property.
    25
    "A governmental entity. . . is entitled to rely on what is apparently
    competent advice in making legislative decisions. The fact that on
    hindsight that advice may prove to have been flawed is not a basis
    for imposing liability on the governmental entity." (Id. at p. 525.)
    Therefore, " ' "[A]s long as reasonable minds can differ concerning whether a
    design should have been approved, then the governmental entity must be granted
    immunity." [Citation.]' [Citation.]" (Sutton v. Golden Gate Bridge, Highway &
    Transportation Dist. (1998) 
    68 Cal.App.4th 1149
    , 1158.)
    "The fact of approval by competent professionals can, in and of itself, establish the
    reasonableness element. (See, e.g., Ramirez[, supra,] 192 Cal.App.3d at p. 526.)"
    (Higgins v. State of California (1997) 
    54 Cal.App.4th 177
    , 187 (Higgins).) However,
    "[t]ypically, 'any substantial evidence' consists of an expert opinion as to the
    reasonableness of the design, or evidence of relevant design standards. [Citations.]"
    (Laabs, supra, 163 Cal.App.4th at pp. 1263-1264, italics added.)
    ii.     Application
    It is undisputed that the Plans were approved by a licensed civil and traffic
    engineer. As this court recognized in Compton v. City of Santee (1993) 
    12 Cal.App.4th 591
    , this fact supports a finding of reasonableness. (Id. at p. 597 ["First, the design of the
    Magnolia Avenue Bridge was supervised by R. J. Massman, county engineer. This
    factor, alone, probably suffices to establish immunity."].) In addition, Goralka's
    declaration in which he stated that "[t]he [Plans] are reasonable," constitutes additional
    evidence of the reasonableness of the plans. (Laabs, supra, 163 Cal.App.4th at pp. 1263-
    1264 [substantial evidence of the reasonableness of a design may be demonstrated by an
    26
    expert's opinion]; see also Hefner v. County of Sacramento (1988) 
    197 Cal.App.3d 1007
    ,
    1015 (Hefner) ["Ordinarily, the opinion of a civil engineer as to the reasonableness of a
    design constitutes 'any' substantial evidence sufficient to support a design immunity
    defense under section 830.6"].)
    Contrary to the Hamptons' contention that Goralka's declaration is "perhaps the
    charter example of conclusory expert testimony," Goralka provided a reasoned
    explanation for his conclusion that the operational sight distance at the intersection is
    adequate. Goralka explained that it was reasonable for the engineer to anticipate that a
    reasonable driver on westbound Miller Road would move slowly past the limit line on
    Miller Road in order to gain adequate sight distance to the left, prior to entering the
    intersection with Cole Grade Road. That Goralka's explanation is reasonable finds
    support in case law:
    "The practice of stopping at a limit line and then 'creeping' forward
    to a point of visibility has long been recognized as 'practical' under
    California law. [Citation.] There are many reasons why a limit line
    would be placed where visibility of oncoming traffic might be
    impaired. Troll[e]y or railroad tracks could require the limit line to
    be set back from the intersection. Or (as anyone who has driven in
    San Francisco would understand), many times the limit line is placed
    below the crest of a steep hill to avoid a pedestrian crosswalk,
    requiring the driver to cross the limit line before he or she can tell
    whether it is safe to proceed further." (Hefner, supra, 197
    Cal.App.3d at p. 1016.)
    The Hamptons' presentation of conflicting expert testimony as to the
    reasonableness of the Plans does not demonstrate that the County failed to present
    substantial evidence of their reasonableness. (See, e.g., Grenier, supra, 57 Cal.App.4th
    at p. 941 ["That a plaintiff's expert may disagree does not create a triable issue of fact," as
    27
    to the existence of substantial evidence of the reasonableness of a design]; Higgins,
    supra, 54 Cal.App.4th at p. 186 [same]; Compton, supra, 12 Cal.App.4th at pp. 596-597
    [same].)
    The Hamptons' citation to Levin, supra, 146 Cal.App.3d at page 418, also does not
    support reversal. While the Levin court concluded that the testimony of the state's expert
    witness in that case did not constitute substantial evidence of the reasonableness of the
    design plan, the Levin court reached this conclusion in part because there was undisputed
    evidence that the design at issue did not meet applicable standards. (Ibid. ["The state has
    not challenged the existence and application of the above quoted guardrail standards"].)
    In contrast, in this case, the County maintains that the intersection complied with all
    applicable County guidelines for sight distance. The County supported this argument in
    the trial court with expert testimony that the intersection provides adequate sight distance,
    when such distance is probably measured under County standards. (See pt. II.B.3., ante.)
    Under these circumstances, the fact that the Hamptons' expert concluded otherwise does
    not preclude summary judgment. For example, in Compton, supra, 
    12 Cal.App.4th 591
    ,
    the plaintiff presented an "expert's testimony that the 'sight distances' were below
    recommended standards," and argued that "this testimony raises an issue of fact as to
    whether the design was reasonable." (Id. at p. 596.) This court rejected plaintiff's
    argument, reasoning:
    28
    "The problem with this argument is that it does not focus on the key
    determination to be made in a design immunity case. The issue is not
    whether the trial court or jury could find the design unreasonable
    based on conflicting evidence, but whether there is any reasonable
    basis on which a reasonable public official could initially have
    approved the design." (Id. at pp. 596-597; accord Grenier, supra, 57
    Cal.App.4th at pp. 938, 940-942 [concluding City presented
    substantial evidence of the reasonableness of a design
    notwithstanding plaintiff's expert testimony that design failed to
    meet various applicable standards].)
    Further, the Levin court's conclusion that the state had failed to present substantial
    evidence of the reasonableness of the design at issue in that case was premised in part on
    the fact that "the record reveals a conflict between Levin's experts and the state's as to the
    reasonableness of the design." (Levin, supra, 146 Cal.App.3d at p. 418.) However, as
    noted above, the law is well established that "section 830.6 provides immunity even if the
    evidence of reasonableness is contradicted." (Alvis, supra, 178 Cal.App.4th at p. 554.)
    We therefore decline to follow the reasoning of Levin in this respect.
    In sum, the trial court properly concluded that there is substantial evidence in the
    record that the Plans are reasonable.
    3.      Conclusion
    Contrary to the Hamptons' counsel's suggestion at oral argument, we do not hold
    that a public entity is entitled to design immunity any time an employee with authority
    signs off on a plan and another employee/engineer attests that the plan is reasonable. To
    begin with, as noted previously, the Hamptons did not dispute in the trial court or in this
    court that the County established a causal relationship between the Plans and the
    accident. Thus, while "section 830.6 does not immunize for liability caused independent
    29
    of design," we have no occasion to consider the potential application of this principle in
    this case. (Alvis, supra, 178 Cal.App.4th at p. 550, citing Cameron, supra, 7 Cal.3d at
    pp. 328-329.) With respect to the discretionary approval element, we conclude that the
    trial court properly determined that the County presented evidence establishing that an
    employee with discretionary authority approved the Plans for the redesign of the
    intersection at issue, and that nothing more is required to establish the second element of
    design immunity. Finally, we conclude that the County presented substantial evidence of
    the reasonableness of the Plans by offering expert testimony that the intersection provides
    adequate sight distance when such distance is properly measured under the applicable
    County guideline. Accordingly, we conclude that the trial court properly determined that
    the County established, as a matter of law, the affirmative defense of design immunity.
    B.     The trial court properly determined that there is no triable issue of fact
    with respect to the Hamptons' contention that changed circumstances
    resulted in a loss of design immunity
    The Hamptons maintain that the trial court erred in concluding that they failed to
    demonstrate a triable issue of fact with respect to their contention that changed
    circumstances at the intersection resulted in a loss of design immunity.
    1.     Governing law
    In order to defeat the County's motion for summary judgment on the ground of
    loss of design immunity, the Hamptons bore the burden of producing evidence sufficient
    to demonstrate a triable issue of fact with respect to the following three elements: (1) the
    plan or design has become dangerous because of a change in physical conditions; (2) the
    public entity had actual or constructive notice of the dangerous condition thus created;
    30
    and (3) the public entity had a reasonable time to obtain the funds and carry out the
    necessary remedial work to bring the property back into conformity with a reasonable
    design or plan, or the public entity, unable to remedy the condition due to practical
    impossibility or lack of funds, had not reasonably attempted to provide adequate
    warnings. (Laabs, supra, 163 Cal.App.4th at p. 1268.)
    2.     Application
    The Hamptons contend that they established the existence of a triable issue of fact
    with respect to whether the County lost any applicable design immunity based on the
    existence of an "accumulation of additional foliage on the embankment which further
    limited sight distance looking south from Miller Road." We are not persuaded.
    To begin with, we disagree that any changes in the physical topography of the
    embankment constituted evidence that the design for the intersection had become
    dangerous. It is undisputed that the embankment does not impede operational sight
    distance for a westbound driver on Miller Road looking south on Cole Grade Road who
    is within eight feet of the edge of lane of traffic on Cole Grade Road regardless of any
    overgrowth.12 Further, as discussed above, the County presented evidence that it was
    reasonable for an engineer to design the intersection using operational sight distance
    12      The County's retained expert testified that the embankment had no effect on sight
    distance when a driver is "within 8 feet of the edge line," and stated "the embankment is
    not a factor, in my opinion." The Hamptons' expert, Edward Stevens, was asked during
    his deposition, "[I]f Mr. Hampton had pulled forward and just before entering—the front
    of his vehicle would enter and cross into that through lane, if he had looked left, Mr.
    Cullen's vehicle would be within his view if it was within 550 feet of the intersection,
    correct?" Stevens responded, "That's true."
    31
    calculations measured from this location. (See pt. II.B.3., ante.) Thus, any changes in
    the physical condition of the embankment do not constitute evidence of a dangerous
    condition.
    With respect to the notice element, the Hamptons cite a 2008 "County of
    San Diego - Department of Public Works Traffic Engineer Request." This one-page
    handwritten document appears to pertain to a citizen's request that an "Adopt-A-Road"
    sign be placed on Miller Road. The document recommends removing Miller Road from
    the Adopt-A-Road availability list on the grounds that the "majority of the road is
    curvilinear," and there are "limited roadsides[13] due to vegetation being overgrown and
    [the] embankment." The document does not refer to the intersection in question, and
    clearly does not demonstrate the existence of a triable issue of fact with respect to
    whether the County had actual or constructive notice of a dangerous condition created by
    the purported changed condition. Finally, the Hamptons do not discuss the third element
    of loss of design immunity, pertaining to funding, in their brief.
    Accordingly, we conclude that the Hamptons failed to demonstrate that the trial
    court erred in determining that there is no triable issue of fact with respect to the
    Hamptons' contention that changed circumstances resulted in a loss of design immunity.
    13      The handwriting on the document makes this word difficult to read, but it appears
    to state "roadsides."
    32
    IV.
    DISPOSITION
    The judgment is affirmed. The Hamptons are to bear costs on appeal.
    AARON, J.
    WE CONCUR:
    NARES, Acting P. J.
    O'ROURKE, J.
    33
    

Document Info

Docket Number: D061509

Filed Date: 7/26/2013

Precedential Status: Precedential

Modified Date: 10/30/2014