PCB Productions v. MJC America CA2/4 ( 2014 )


Menu:
  • Filed 6/4/14 PCB Productions v. MJC America CA2/4
    NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
    California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
    publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
    or ordered published for purposes of rule 8.1115.
    IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
    SECOND APPELLATE DISTRICT
    DIVISION FOUR
    PCB PRODUCTIONS, INC.,                                                  B242443
    Plaintiff and Appellant,                                       (Los Angeles County
    Super. Ct. No. LC090187)
    v.
    MJC AMERICA, LTD., et al.,
    Defendants and Appellants.
    APPEALS from a judgment and orders of the Superior Court of Los Angeles
    County, James A. Kaddo, Judge. Affirmed in part and reversed in part.
    Reed Smith, Margaret M. Grignon, Anne M. Grignon; Cohon & Pollak, Jeffrey M.
    Cohon, Howard A. Pollak and Henry Nicholls for Plaintiff and Appellant.
    Horvitz & Levy, Lisa Perrochet, Robert H. Wright; Yoka & Smith, Christopher E.
    Faenza and Christopher P. Leyel for Defendants and Appellants.
    Plaintiff and appellant PCB Productions, Inc. (PCB) sustained damages from a fire
    in its sound studio. After determining that the fire was caused by a small table fan that
    had overheated and ignited, PCB sued the fan’s manufacturer (defendant and respondent
    MJC America, Ltd. [MJC]) and retailer (defendant and respondent Fry’s Electronics, Inc.
    [Fry’s]) for breach of warranty and strict product liability. The jury found defendants
    liable under both theories and awarded PCB $6.2 million in damages, including almost
    $5.5 million for the cost of recreating its lost original compositions and sound samples.
    During posttrial proceedings, the trial court granted defendants’ motion for new
    trial on the ground the evidence was insufficient to support the verdict. The trial court’s
    reasons for concluding the jury should have reached a different verdict were that:
    (1) PCB failed to prove that the fire was caused by a design or manufacturing defect in
    the fan; (2) the jury mistakenly applied the consumer expectation test rather than the risk-
    benefit test; and (3) the jury applied the wrong measure of damages. After granting the
    motion for new trial, the trial court denied the motion for judgment notwithstanding the
    verdict (JNOV) as moot.
    PCB appealed from the new trial order; defendants filed a protective cross-appeal
    from both the judgment and the order denying the motion for JNOV. For the reasons
    discussed below, the new trial order is reversed, the judgment is reinstated and affirmed,
    and the order denying the motion for JNOV is affirmed.
    BACKGROUND
    PCB produces digital soundtracks and audio for motion pictures, television, video
    games, and other media. PCB’s credits include the Call of Duty series of video games,
    Transformers, Lord of the Rings, the Spiderman series, the X-Men series, and the Guitar
    Hero video game series.
    PCB’s two sound studios, Studio A and Studio B, are located in a separate wing of
    PCB president Keith Arem’s home. Studio B, where the fire occurred, was built with
    thick concrete walls, steel doors, fire retardant materials, insulated vents, sound traps, and
    2
    special filters to remove dust from the room. Studio B also had a special air conditioning
    system that was designed to keep cool air flowing onto the computers.
    The computers and other essential studio equipment were kept in a cabinet or
    console near a wall. Arem noticed that the air behind the computers was not circulating
    and decided to purchase a fan that could be placed behind the cabinet.
    In June 2008, Arem went to a Fry’s store and told the salesperson that he was
    looking for a fan that could be used on a continuous basis to circulate the air behind the
    computer console in the sound studio. The salesperson told Arem that the table fan
    manufactured by MJC had a “thermostat or a way to shut itself off so it wouldn’t
    overheat.” The salesperson also told Arem that the fan’s “safety motor” would turn the
    fan off “if it ever got too hot” or if the blades became obstructed. Based on the
    salesperson’s representations regarding the fan’s safety features, Arem purchased the fan
    made by MJC.
    Arem placed the fan on the floor behind the computer console and plugged it into
    an electrical outlet on a separate circuit from the recording equipment. Arem, who is a
    self-described “neat freak,” testified that he regularly maintained the area behind the
    computer console.
    PCB used the fan on a nonstop basis for about three or four months until the fire
    occurred sometime during the weekend of October 25, 2008. No one was present when
    the fire broke out. Arem and his family were away on vacation and the studio was closed
    for a four-day weekend. Pursuant to PCB’s standard practices, the PCB employee
    (Matthew Lemberger) who closed the studio on the Wednesday before the fire testified
    that he turned off all of the equipment in the room except the fan.
    The fire damaged all of the equipment in Studio B, including the fan, large mixing
    consoles, analog audio compressors, keyboard samplers, synthesizers, sound processors,
    computers, hot swap drawers, and more than 15 backup devices. The fire also destroyed
    the only copies of PCB’s original compositions and sound samples.
    On July 15, 2010, PCB sued MJC and Fry’s for breach of warranty and strict
    product liability, claiming the fan was defective because, contrary to the ordinary
    3
    consumer’s expectations, the fan overheated and caught on fire. PCB alleged that
    defendants had: (1) breached express and/or implied warranties that the fan was safe; and
    (2) provided a fan that was defective under the consumer expectation test because it
    failed to perform as safely as an ordinary consumer would have expected it to perform.
    PCB sought compensation for property damage, lost profits, lost original compositions,
    and lost original sound samples.
    I.     Causation
    As to causation, the issue was whether the fan caused the fire, or whether the fire
    started elsewhere and spread to the fan. It was undisputed that the area with the greatest
    fire damage—and therefore, the area where the fire most likely began—was the area
    behind the computer console where the fan was located.
    Douglas Bennett, an electrical engineer, testified as PCB’s causation expert.
    Bennett testified that based on his examination of the electrical equipment that was
    damaged in the fire, the only evidence of arcing (i.e., beading or globules of melted
    copper that survived the fire) was on the service cord inside the fan’s motor housing.
    This evidence led Bennett to conclude that the fan’s motor overheated and started a fire
    inside the fan’s motor housing. As the fire melted the insulation on the fan’s service
    cord, the copper conductors came into contact and created arcing inside the motor
    housing. By the time the fire spread along the service cord outside the motor housing, the
    circuit breaker had interrupted the flow of electricity, which precluded further arcing
    elsewhere along the cord. Bennett testified that because the motor overheated and started
    a fire, the fan was “unsafe” and “defective.”
    Mack Quan, a mechanical engineer, testified as defendants’ causation expert.
    Quan testified that he could not tell by looking at the fan’s damaged service cord (which
    had been removed from the damaged motor housing) whether arcing had occurred on the
    portion of the cord that was inside or outside the motor housing. According to Quan:
    “There was no way to discern whether that damage, this beading, occurred on the outside
    4
    or the inside because the length of the cord that goes inside the fan varies to some
    degree[.]”
    Quan testified that because the fire could have been caused by something
    unrelated to a defect in the fan—such as a damaged cord, dust or debris in the fan, or a
    bad connection at the outlet—he could not identify the cause of the fire. In Quan’s
    opinion, the discovery of beading on the fan’s service cord did not rule out the possibility
    that arcing had occurred elsewhere in the room.
    II.    Design Defect
    Before trial, PCB submitted a jury instruction on the consumer expectation test for
    establishing a design defect. CACI No. 1203, as given to the jury, stated: “PCB
    Productions, Inc. claims the fan’s design was defective because the fan did not perform as
    safely as an ordinary consumer would have expected it to perform. To establish this
    claim, PCB Productions, Inc. must prove all of the following: [¶] 1. That Defendants
    manufactured and sold the fan; [¶] 2. That the fan did not perform as safely as an ordinary
    consumer would have expected it to perform when used or misused in an intended or
    reasonably foreseeable way; [¶] 3. That PCB Productions, Inc. was harmed; and [¶]
    4. That the fan’s failure to perform safely was a substantial factor in causing PCB
    Productions, Inc.’s harm.”
    Consistent with PCB’s reliance on the consumer expectation test, which generally
    does not permit expert testimony on the issue of ordinary consumer expectations (Soule v.
    General Motors Corp. (1994) 
    8 Cal. 4th 548
    , 563 (Soule)), Bennett provided no expert
    testimony on the fan’s design or safety features and whether those features were
    adequate. Bennett testified that because he was not asked to analyze the fan’s design, he
    did not perform a design analysis and had no opinion regarding the adequacy of the fan’s
    design.
    5
    Because PCB was relying solely on the consumer expectation test, it elected not to
    request a risk-benefit instruction for establishing a design defect (CACI No. 1204).1
    Based on Bennett’s expert testimony that the fire was caused when the fan overheated
    and ignited, PCB’s theory was that the existence of a design defect could be reasonably
    inferred under the consumer expectation test because, under the circumstances, no
    ordinary consumer would have expected the fan to overheat and catch on fire.
    During trial, defendants moved to exclude CACI No. 1203, the consumer
    expectation test instruction. Defendants’ theory was that under the circumstances, the
    issue of design defect cannot fairly be resolved by referring to the expectations of an
    ordinary consumer.
    PCB opposed the motion to exclude CACI No. 1203, which the court took under
    submission.
    Consistent with its view that the consumer expectation test was not applicable to
    this case, defendants presented Quan’s expert testimony regarding the merits of the fan’s
    design. Quan testified that the fan was properly designed according to industry standards
    1       CACI No. 1204, “Strict Liability—Design Defect—Risk-Benefit Test—Essential
    Factual Elements—Shifting Burden of Proof,” provides:
    “[Name of plaintiff] claims that the [product]’s design caused harm to [name of
    plaintiff]. To establish this claim, [name of plaintiff] must prove all of the following:
    “1. That [name of defendant] [manufactured/distributed/sold] the [product];
    “2. That [name of plaintiff] was harmed; and
    “3. That the [product]’s design was a substantial factor in causing harm to [name
    of plaintiff].
    “If [name of plaintiff] has proved these three facts, then your decision on this
    claim must be for [name of plaintiff] unless [name of defendant] proves that the benefits
    of the [product]’s design outweigh the risks of the design. In deciding whether the
    benefits outweigh the risks, you should consider the following:
    “(a) The gravity of the potential harm resulting from the use of the [product];
    “(b) The likelihood that this harm would occur;
    “(c) The feasibility of an alternative safer design at the time of manufacture;
    “(d) The cost of an alternative design; [and]
    “(e) The disadvantages of an alternative design; [and]
    “[(f) [Other relevant factor(s)].]”
    6
    because of its heat protection system known as impedance protection.2 Quan explained
    that because industry standards require small motor fans of this type to have only one
    form of heat protection, no additional system (such as a thermal fuse or reset switch) was
    necessary in this case. Quan testified that during testing of a similar fan, he was able to
    run the fan on a continuous basis for five months without mishap.
    After both parties rested, the trial court overruled defendants’ objection to the
    CACI No. 1203 instruction on the consumer expectation test, which was the only design
    defect instruction given to the jury. Because the jury was not given the CACI No. 1204
    instruction on the risk-benefit test, it was not asked to choose between the consumer
    expectation and risk-benefit tests.
    III.     Breach of Warranty
    In support of its breach of warranty claim, PCB relied on Arem’s testimony
    regarding the salesperson’s assurances that the fan had a thermostat or safety motor that
    would turn the fan off before it overheated or if its blades became obstructed. PCB also
    relied on the wording on the box in which the fan was sold. The word “safe” appeared
    numerous times on the box, which referred to the fan’s “[p]owerful yet safe” “smart
    safety motor.” In addition, PCB relied on the owner’s manual, which also touted the
    fan’s safety. Although the manual warned that a fire could occur if the fan was not used
    in accordance with the manual, it did not warn against running the fan on a continuous
    basis.
    2      Quan testified that impedance protection works by increasing the resistance of the
    fan’s electrical wires as the temperature increases. The increased resistance limits the
    amount of electrical current that runs through the wires, thus preventing the motor from
    overheating.
    7
    The jury was given instructions on express warranty (CACI No. 1230) 3 and
    implied warranty of merchantability (CACI No. 1231).4
    IV.    Damages
    PCB requested damages of more than $11 million, consisting of: (1) $562,584.67
    for property damage (which was stipulated to by the parties); (2) $590,566 for lost
    3       CACI No. 1230, “Express Warranty—Essential Factual Elements,” as given to the
    jury, provided:
    “PCB Productions, Inc. claims that it was harmed by the fan because defendants
    represented, either by words or actions, that the fan was safe but the fan was not as
    represented. To establish this claim, PCB Productions, Inc. must prove all of the
    following:
    “1. That defendants made a statement of fact received by PCB Productions, Inc.
    that the fan was safe;
    “2. That the fan did not perform as stated;
    “3. That PCB Productions, Inc. took reasonable steps to notify defendants within
    a reasonable time that the fan was not as represented, whether or not defendants received
    such notice;
    “4. That PCB Productions, Inc. was harmed; and
    “5. That the failure of the fan to be as represented was a substantial factor in
    causing PCB Productions, Inc.’s harm.”
    4      CACI No. 1231, “Implied Warranty of Merchantability—Essential Factual
    Elements,” as given to the jury, provided:
    “PCB Productions, Inc. also claims that it was harmed by the fan that it bought
    from defendants because the fan did not have the quality that a buyer would expect. To
    establish this claim, PCB Productions, Inc. must prove all of the following:
    “1. That PCB Productions, Inc. bought the fan from defendants;
    “2. That, at the time of purchase, defendants were in the business of selling these
    goods;
    “3. That the fan was not fit for the ordinary purposes for which such goods are
    used;
    “4. That PCB Productions, Inc. took reasonable steps to notify defendants within
    a reasonable time that the fan did not have the expected quality;
    “5. That PCB Productions, Inc. was harmed; and
    “6. That the failure of the fan to have the expected quality was a substantial factor
    in causing PCB Productions, Inc.’s harm.”
    8
    profits; (3) $3,895,000 for the cost of recreating the lost original compositions; and
    $6,299,000 for the cost of recreating the lost original sound samples.
    A.     Original Compositions
    According to Arem’s testimony, all of the multitracks of PCB’s original
    compositions were destroyed in the fire. The multitracks were valuable to PCB because
    they were used to produce new works. It would take several years for PCB to “recreate
    that music and then re-release it.”
    According to PCB’s music industry expert, David Fisher, it is possible to
    determine the fair market value of registered compositions based on past royalty
    earnings. However, only a few of PCB’s lost original compositions were registered.
    Fisher explained that it would be difficult to determine the fair market value of PCB’s
    unregistered compositions, because “you can’t price a song.”
    B.     Sound Samples
    According to Arem’s testimony, all of PCB’s original sound samples, which were
    created over a 25-year period, were also destroyed in the fire. Arem testified that PCB’s
    lost sound samples were unlike the generic sounds that can be purchased on the internet.
    Arem testified that he “frequently” traveled to various locations in order to record
    different sounds. For example, Arem went to Bali and “hired an entire temple full of
    performers to do the Kecak Monkey dance.” He directed, recorded, and developed those
    samples into the individual sound samples that he later used in film scores. He explained
    that although people would say, “Oh, there’s a Kecak Monkey Dance that we recorded on
    a sound library,” those sounds “would be different than ours, the way that I would record
    the sounds, the way that I would direct the sounds, the way I would process the sounds.”
    He testified that even if he could purchase a commercial sound library, it would not
    contain the same sounds and would not “sound at all the way that we would want our
    sounds to sound.”
    9
    C.     Jury Instructions
    Based on the unique nature of PCB’s lost original compositions and sound
    samples, PCB requested that the jury be given Special Instruction No. 1 on the
    replacement cost measure of damages. Special Instruction No. 1, titled “Loss or
    Destruction of Personal Property Where Its Market Value is Uncertain,” stated:
    “Although the general rule is that the measure of damage for the loss or destruction of
    personal property is the value of the property at the time of such loss or destruction,
    where that value is uncertain, the plaintiff may establish the value of the personal
    property with evidence of replacement cost of the personal property, including the cost to
    produce the personal property, the amount of time expended in producing the personal
    property.”
    Defendants submitted a fair market value instruction (CACI No. 3903K), titled
    “Loss or Destruction of Personal Property (Economic Damage),” which stated: “To
    recover damages for the destruction [of PCB Productions, Inc.’s Music Library,] PCB
    Productions, Inc. must prove the fair market value of the Music Library just before the
    harm occurred. [¶] ‘Fair market value’ is the highest price that a willing buyer would
    have paid to a willing seller, assuming: [¶] 1. That there is no pressure on either one to
    buy or sell; and [¶] 2. That the buyer and seller are fully informed of the condition and
    quality of the Music Library.”
    During trial, defendants moved to exclude PCB’s Special Instruction No. 1. PCB
    opposed the motion, which the court took under submission. After the parties rested, the
    court overruled defendants’ objection. The court instructed the jury on both the fair
    market value (CACI No. 3903K) and replacement cost (Special Instruction No. 1)
    measure of damages. Accordingly, the jury was allowed to decide which measure of
    damages—replacement cost or fair market value—was applicable to the lost original
    compositions and sound samples.
    10
    V.         Jury Verdict
    After less than a day of deliberations, the jury returned a special verdict in which it
    awarded more than $6.2 million in damages to PCB.5 In its responses to the special
    verdict questions, which are set forth below, the jury voted nine to three on questions 1
    through 4 and 6, and voted twelve to zero on questions 5 and 8. The jury did not answer
    question 7, which was inapplicable in light of its other responses.
    “1.        Did MJC America, LTD. and/or Fry’s Electronics, Inc. manufacture and distribute
    a fan which was defective because it failed to perform as safely as an ordinary customer
    would have expected?
    “ X          Yes                 _____ No
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    “2.        Was MJC America, LTD. and/or Fry’s Electronics, Inc.’s manufacture and
    distribution of a fan which was defective because it failed to perform as safely as an
    ordinary customer would have expected, a substantial factor in causing harm to PCB[]
    Production[s], Inc?
    “ X          Yes                 _____ No
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    “3.        Did MJC America, LTD. and/or Fry’s Electronics, Inc. breach a warranty to PCB
    Productions, Inc.?
    “ X          Yes                 _____ No
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    5      On March 21, 2012, the matter was submitted to the jury, which deliberated from
    3:12 p.m. to 4:20 p.m. that day. On March 22, 2012, the jury resumed its deliberations at
    9:30 a.m. After a noon recess, the jury returned its verdict at 1:44 p.m. that day.
    11
    “4.        Was MJC America, LTD. and/or Fry’s Electronics, Inc.’s breach of a warranty to
    PCB Productions, Inc., a substantial factor in causing harm to PCB[] Production[s], Inc.?
    “ X          Yes                 _____ No
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    “5.        What are PCB Productions, Inc.’s damages? Do not reduce the damages based on
    the fault, if any, of PCB Productions, Inc.
    “Property Damage:                                  $ 562,584.67                     (This amount has already been
    agreed to by the parties)
    “Lost profit:                                      $ 200,389.80
    “Lost original compositions:                       $ 210,000
    “Lost sound samples:                               $5,250,000
    “TOTAL                                             $6,222,974.47
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    “6.        Did PCB Productions, Inc. misuse the fan in a way that was so highly
    extraordinary that it was not reasonably foreseeable to MJC America, LTD. and/or Fry’s
    Electronics, Inc.?
    “          Yes                       X      No
    “If your answer to question 6 is yes, then answer question 7. If you answered no, insert
    the number zero next to PCB Production[s], Inc.’s name in question 8.
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    12
    “8.    What percentage of responsibility for PCB Production[s], Inc.’s harm do you
    assign to:
    “MJC America, LTD. or Fry’s Electronics: ___________%
    “PCB Productions, Inc.[:]                             0      %
    “TOTAL                                       100%”
    VI.    Defendants’ Motions for New Trial and JNOV
    Defendants filed posttrial motions for new trial and JNOV based on erroneous
    instructions and excessive damages.
    A.     Defendants Argued That the Consumer Expectation Test Instruction Was
    Inapplicable as a Matter of Law
    In their motion for new trial, defendants contended the consumer expectation test
    instruction was inapplicable as a matter of law because, given the inability of PCB’s
    expert to identify a defect in the fan that caused the fire, the ordinary consumer would
    lack sufficient knowledge to form any expectations regarding the minimum safety
    features of a fan. Defendants argued: “The issue before the court is straightforward: If
    plaintiff’s own electrical engineering expert cannot describe what defect in the fan
    caused the fire, how can a lay juror be expected to make such a determination?
    Because the ordinary consumer would not have sufficient knowledge to form
    expectations of a safe design for the fan to be used as plaintiff used it here, the court’s use
    of the consumer expectation test was an error in law.” Defendants argued that the
    erroneous instruction was prejudicial because, in light of the nine-to-three liability vote,
    the jury was likely to have reached a different result under the risk-benefit test.
    In their motion for JNOV, defendants similarly argued that the consumer
    expectation test instruction was improper as a matter of law. They contended that under
    the risk-benefit test, PCB failed to meet its initial burden of showing that its injury was
    proximately caused by the design of the fan. They asserted that “[b]ecause plaintiff’s
    13
    expert did not identify a design defect, and plaintiff presented no other evidence to show
    how the fan’s design injured plaintiff, plaintiff failed to carry its burden and defendants
    are entitled to judgment.”
    B.     Defendants Argued That Special Instruction No. 1’s Replacement Cost
    Measure of Damages Was Erroneous as a Matter of Law
    In their motion for new trial, defendants contended that Special Instruction No. 1’s
    replacement cost measure of damages was erroneous as a matter of law. Defendants
    argued that because the lost original compositions and sound samples have an
    ascertainable market value, California law requires the amount of damages to be based on
    fair market value. Defendants argued that the jury’s award for lost compositions and
    sound samples was excessive. Defendants pointed out that PCB could have registered its
    original compositions and presented evidence of past earnings on royalties. Defendants
    asserted that PCB’s sound samples have a market value because many of the sounds were
    purchased as a “box set” or as pre-installed samples.
    In their motion for JNOV, defendants similarly contended that fair market value
    rather than replacement cost was the correct measure of damages for the loss of personal
    property. Defendants argued that JNOV should be granted as to the 683 lost original
    compositions and 42,060 lost sound samples because, in light of PCB’s failure to present
    any evidence of their fair market value, PCB was precluded from recovering any
    damages as to those items.
    C.     PCB Opposed the Motions for New Trial and JNOV, Arguing the
    Instruction on the Consumer Expectation Test Was Proper; That Liability
    Was Properly Based on the Breach of Warranty Findings; That
    Replacement Cost Damages Were Properly Awarded Under Special
    Instruction No. 1
    In opposition to the motions for new trial and JNOV, PCB argued the instruction
    on the consumer expectation test was proper, there was no legal error, and there was
    14
    sufficient evidence to support the verdict. PCB contended the consumer expectation test
    is applicable where a fan, during normal usage, overheats and catches on fire. Under
    such circumstances, an ordinary consumer is qualified to know that the fan failed to meet
    minimum safety standards.
    In addition, PCB argued the liability verdict was properly supported by the jury’s
    alternative breach of warranty finding, which defendants did not mention in their motions
    for new trial and JNOV.
    Finally, PCB contended the jury properly awarded replacement cost damages
    under Special Instruction No. 1. (Citing Kimes v. Grosser (2011) 
    195 Cal. App. 4th 1556
    ;
    Zvolanek v. Bodger Seeds, Ltd. (1935) 
    5 Cal. App. 2d 106
    ; Willard v. Valley Gas & Fuel
    Co. (1915) 
    171 Cal. 9
    [disapproved on another ground in Showalter v. Western P. R. Co.
    (1940) 
    16 Cal. 2d 460
    , 465-467].) PCB argued that Fisher’s and Arem’s testimony
    supported the jury’s finding that there was no readily ascertainable market value for the
    lost original compositions and sound samples, which PCB would have to reproduce in
    order to create original works for motion pictures, video games, and other media. Under
    Special Instruction No. 1, the use of the replacement cost measure of damages was
    appropriate and the award, which was less than the amount requested, was not excessive.
    VII.   The Order Granting a New Trial
    The trial court granted the motion for new trial. We quote the order in full
    because its language is relevant to our determination that the motion was granted on the
    single ground that the evidence was insufficient to support the verdict. The order stated:
    “The motion for new trial is granted.
    “The law regarding new trial is found in CCP 657. That section reads in pertinent
    part, ‘A new trial shall not be granted upon the ground of insufficiency of the evidence to
    justify the verdict or other decision . . . unless after weighing the evidence the court is
    convinced from the entire record, including reasonable inferences therefrom, that the
    court or jury clearly should have reached a different verdict or decision.’
    15
    “In the instant case the jury clearly should have reached a different verdict or
    decision for three reasons. First, Plaintiff never showed a design or manufacturing defect
    in the table fan. Second, the jury mistakenly applied the consumer expectation test for
    determining a design or manufacturing defect, instead of the risk benefit test. Third, the
    amount of damages awarded was excessive. As a result, Defendants were prejudiced.
    “a)    Evidence of Product Design or Manufacturing Defect:
    “Plaintiff presented little or no evidence showing that the design or manufacture of
    the product was defective. He could not describe what defect in the fan caused the
    fire. Plaintiff’s expert said only that the motor [overheated] because it was
    defective, and it was defective because it overheated. Such circumlocution did not
    explain the product’s defect in design or manufacture.
    “b)    consumer expectation test vs. risk benefit test:
    “The consumer expectation test was the wrong test to apply under the facts of this
    case because an ordinary consumer would have no basis for forming any safety
    assumptions about the design or manufacture of the lightweight table fan when
    used for some 3,000 hours [nonstop] in a [commercial] setting to cool a space
    overheated by electronic equipment.
    “1.    Under the risk benefit test that should have been applied here,
    Plaintiff had the burden to show that its injury was proximately
    caused by the fan’s design or manufacture. However, Plaintiff’s
    expert could not identify any defect in the fan.
    “a.    If plaintiff’s own electrical engineering expert could
    not describe what defect in the fan [caused] the fire,
    how can a lay juror be expected to make such a
    determination?
    16
    “c)        The excessive Damage Award:
    “The damages awarded for lost compositions and sound samples were excessive.
    The jury applied the wrong measure of damages, using replacement cost instead of
    fair market value.
    “1.        Fair Market Value:
    “Plaintiff’s music business expert, David Fisher, testified that the
    proper measure of damages for musical works is fair market value.
    He said royalties are tracked by Broadcast Music, Inc. (‘BMI’), and
    the American [Society] of Composers, Authors and Publishers
    (‘ASCAP’) based on past earnings. However, Plaintiff presented no
    evidence of these.
    “2.        Replacement cost:
    “The only figures the jury heard regarding value of the lost works
    was the cost to replace them, so they mistakenly believed that
    replacement cost[] was the proper measurement of the damages,
    which led to a clearly erroneous result.
    “a.        There was evidence of 683 compositions and 42,060
    sound samples, and the jury awarded $5.46 million to
    replace these.
    “d)        The result was prejudicial because it was reasonably probable that a result
    more favorable to Defendants would have been reached in the absence of
    the error.
    “. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    17
    “The Motion for Judgment [Notwithstanding] The Verdict is moot by virtue of the
    above ruling.”
    VIII. The Appeal and Cross-appeal
    Plaintiff timely appealed from the order granting a new trial. (Code Civ. Proc.,
    § 904.1, subd. (a)(4).) Defendants timely cross-appealed from both the judgment and the
    order denying the motion for JNOV. (Code Civ. Proc., § 904.1, subd. (a)(1), (4).)6
    DISCUSSION
    I.     The Order Granting a New Trial Must Be Reversed Because It Fails to
    Comply With the Mandatory Statutory Requirements
    In the following sections, we (1) discuss the mandatory statutory requirements for
    a new trial order; (2) determine that the trial court granted a new trial on the sole ground
    that the evidence was insufficient to support the verdict; and (3) conclude that the trial
    court’s stated reasons for finding that the jury should have reached a different verdict
    were legally erroneous.
    A.     The Mandatory Statutory Requirements
    We begin by noting that “courts have no inherent power to grant a new trial:
    ‘[t]he right to a new trial is purely statutory.’ (Fomco, Inc. v. Joe Maggio, Inc. [(1961)]
    
    55 Cal. 2d 162
    , 166.) Because the right to a new trial ‘finds both its source and its
    limitations in the statutes . . . , the procedural steps prescribed by law . . . are mandatory
    6      While the appeal was pending, we received notice that MJC had filed a petition for
    bankruptcy in the United States Bankruptcy Court for the Central District of California
    pursuant to Chapter 11 of the United States Bankruptcy Code on December 10, 2013
    (case No.: 2:13-bk-39097-SK). On February 25, 2014, we issued an order staying all
    proceedings in this matter. After we were informed of the bankruptcy court’s March 12,
    2014 order approving a stipulation for relief from the automatic stay (11 U.S.C. § 362),
    we vacated the order staying all proceedings and scheduled oral argument.
    18
    and must be strictly followed.’ (Mercer v. Perez (1968) 
    68 Cal. 2d 104
    , 118, citation
    omitted, italics added; see Pacific Trends Lamp & Lighting Products, Inc. v. J. White Inc.
    (1998) 
    65 Cal. App. 4th 1131
    , 1135.)” (In re Marriage of Herr (2009) 
    174 Cal. App. 4th 1463
    , 1471.)
    Code of Civil Procedure section 657 (section 657) allows the court to grant a new
    trial on all or part of the issues “for any of the following causes, materially affecting the
    substantial rights of such party: [¶] . . . [¶] 5. Excessive or inadequate damages. [¶]
    6. Insufficiency of the evidence to justify the verdict or other decision, or the verdict or
    other decision is against law. [¶] 7. Error in law, occurring at the trial and excepted to by
    the party making the application.”
    When the court grants a new trial, section 657 requires that the court specify not
    only the ground(s) upon which the motion is granted, but also the reason(s) for granting a
    new trial upon each ground stated. Section 657 prohibits the court from granting a new
    trial on the ground of insufficient evidence or excessive damages, “unless after weighing
    the evidence the court is convinced from the entire record, including reasonable
    inferences therefrom, that the court or jury clearly should have reached a different verdict
    or decision.” (§ 657.)
    Generally, an appellate court must affirm the new trial order “if it should have
    been granted upon any ground stated in the motion, whether or not specified in the order
    or specification of reasons.” (§ 657.) However, an appellate court may not affirm a new
    trial order on the ground of insufficient evidence or excessive or inadequate damages,
    unless such ground is stated in the order granting the motion. (Ibid.) Where a new trial is
    granted on the ground of insufficient evidence or excessive or inadequate damage, “it
    shall be conclusively presumed” on appeal “that said order as to such ground was made
    only for the reasons specified in said order or said specification of reasons, and such
    order shall be reversed as to such ground only if there is no substantial basis in the record
    for any of such reasons.” (Ibid.)
    19
    A new trial order is reversible if the trial court based the order “‘exclusively upon
    an erroneous concept of legal principles applicable to the cause.’” (Rickley v. County of
    Los Angeles (2004) 
    114 Cal. App. 4th 1002
    , 1008-1009.)
    B.     The Trial Court Granted a New Trial on the Sole Ground That the
    Evidence Was Insufficient to Support the Verdict
    We conclude the court granted a new trial on the sole ground that the evidence
    was insufficient to support the verdict. We base our conclusion on the opening
    paragraphs of the order.
    The first paragraph of the order quotes the following language from section 657
    regarding insufficiency of the evidence: “A new trial shall not be granted upon the
    ground of insufficiency of the evidence to justify the verdict or other decision . . . unless
    after weighing the evidence the court is convinced from the entire record, including
    reasonable inferences therefrom, that the court or jury clearly should have reached a
    different verdict or decision.”
    The second paragraph of the order lists three reasons why the jury clearly should
    have reached a different verdict: “In the instant case the jury clearly should have reached
    a different verdict or decision for three reasons. First, Plaintiff never showed a design or
    manufacturing defect in the table fan. Second, the jury mistakenly applied the consumer
    expectation test for determining a design or manufacturing defect, instead of the risk
    benefit test. Third, the amount of damages awarded was excessive. As a result,
    Defendants were prejudiced.” The new trial order then discusses each of the three
    reasons in paragraphs “a,” “b,” and “c.”
    Based on the opening paragraphs and the language of the order as a whole, we
    conclude the new trial was granted on a single ground: insufficiency of the evidence to
    support the verdict. We construe the remainder of the order as a statement of reasons
    why the jury clearly should have reached a different verdict. Those reasons do not
    constitute additional grounds for granting a new trial.
    20
    Admittedly, the order is somewhat ambiguous in at least two respects. In the
    following sections, we explain why, notwithstanding the ambiguous language of the
    order, the court did not grant a new trial on the grounds of excessive damages or
    instructional error.
    1.       The Court Did Not Grant a New Trial on the Ground of Excessive
    Damages
    In listing the reasons why the jury should have reached a different verdict, the
    order stated that the amount of damages was excessive. Because excessive damages is a
    ground for granting a new trial (§ 657, subd. (5)), the parties contend that a new trial was
    granted on the additional ground of excessive damages. We disagree with this contention
    in light of paragraph “c” of the order.
    In paragraph “c” of the order, the court tied its statement regarding excessive
    damages to the jury’s use of the wrong measure of damages, stating: “The damages
    awarded for lost compositions and sound samples were excessive. The jury applied the
    wrong measure of damages, using replacement cost instead of fair market value.” The
    court then made two additional statements: (1) although PCB could have provided
    evidence of fair market value based on royalty earnings, PCB failed to produce such
    evidence; and (2) the only evidence that PCB provided as to the value of the lost works
    was the “cost to replace them, so [the jury] mistakenly believed that replacement costs
    was the proper measurement of the damages, which led to a clearly erroneous result.”
    By awarding damages of $210,000 and $5.25 million for the lost compositions and
    sound samples, the jury implicitly adopted PCB’s view, as set forth in Special Instruction
    No. 1, that the market value of the lost compositions and sound samples was uncertain
    and, therefore, a replacement cost measure of damages was appropriate. In granting a
    new trial on damages, the court did not find the jury’s award exceeded the replacement
    cost of the lost compositions and sound samples. Instead, the court found the award was
    excessive because the jury applied the wrong measure of damages. We therefore
    conclude the court was not granting a new trial on the ground of excessive damages, but
    21
    was explaining why the jury should have reached a different verdict by applying a
    different measure of damages.
    2.      The Court Did Not Grant a New Trial on the Ground of Instructional
    Error
    In listing the reasons why the jury should have reached a different verdict, the
    order stated that the jury applied the wrong test for design defect. Because the jury was
    following the consumer expectation test instruction that was given by the trial court,
    defendants contend that the motion for new trial was granted on the additional ground of
    instructional error. Defendants argue that the trial court properly granted a new trial
    because of instructional error in applying the consumer expectation test to the question of
    designing a fan that is to be used in a professional sound studio to cool electronic
    equipment.
    However, we find no mention of instructional error in the new trial order. The
    order does not state that the court erred in instructing the jury. On the contrary, the order
    states that the jury erred in applying the wrong design defect test. We therefore conclude
    that the court did not grant a new trial on the ground of instructional error.
    Moreover, even assuming the trial court found it had erred in giving the consumer
    expectation test instruction, we would disagree. In our view, the consumer expectation
    test instruction was proper under the settled facts of this case.
    As the Supreme Court explained in Soule: “In some cases . . . , ‘ordinary
    knowledge . . . as to . . . [the product’s] characteristics’ (Rest.2d Torts . . . , § 402A, com.
    i., p. 352) may permit an inference that the product did not perform as safely as it should.
    If the facts permit such a conclusion, and if the failure resulted from the product’s design,
    a finding of defect is warranted without any further proof. The manufacturer may not
    defend a claim that a product’s design failed to perform as safely as its ordinary
    consumers would expect by presenting expert evidence of the design’s relative risks and
    benefits.” 
    (Soule, supra
    , 8 Cal.4th at p. 566, fn. omitted.) The court further stated: “For
    example, the ordinary consumers of modern automobiles may and do expect that such
    22
    vehicles will be designed so as not to explode while idling at stoplights, experience
    sudden steering or brake failure as they leave the dealership, or roll over and catch fire in
    two-mile-per-hour collisions. If the plaintiff in a product liability action proved that a
    vehicle’s design produced such a result, the jury could find forthwith that the car failed to
    perform as safely as its ordinary consumers would expect, and was therefore defective.”
    (Id. at p. 566, fn. 3.)
    In this case, PCB’s evidence of causation, which was accepted by the jury and is
    not at issue on appeal, showed that the fan had overheated and caught on fire while being
    used in a reasonably foreseeable manner. We conclude that under these settled facts, the
    ordinary consumer could form a reasonable minimum safety expectation that the fan
    would not overheat and catch on fire. (See 
    Soule, supra
    , 8 Cal.4th at p. 566.) The
    consumer expectation test instruction was therefore appropriate under the established
    facts of this case.
    C.      The Trial Court’s Stated Reasons for Finding the Jury Should Have
    Reached a Different Verdict Were Legally Erroneous
    Our review of the order granting a new trial is limited to the ground of
    insufficiency of the evidence that is specified in the order. Section 657 mandates that in
    an appeal from an order granting a new trial on the ground of insufficient evidence, “it
    shall be conclusively presumed that said order as to such ground was made only for the
    reasons specified in said order or said specification of reasons, and such order shall be
    reversed as to such ground only if there is no substantial basis in the record for any of
    such reasons.” (§ 657.)
    We conclude the trial court’s stated reasons for granting a new trial based on
    insufficient evidence were legally erroneous.
    23
    1.    PCB Was Not Required to Show a Design or Manufacturing Defect
    Under a Risk-Benefit Theory on Which the Jury Was Not Instructed
    As its first reason for granting a new trial based on insufficient evidence, the trial
    court stated that PCB’s expert witness Bennett did not identify the design or
    manufacturing defect that caused the fire. Bennett, the trial court noted, “said only that
    the motor [overheated] because it was defective, and it was defective because it
    overheated. The circumlocution did not explain the product’s defect in design or
    manufacture.”
    As PCB correctly contends, the trial court’s remarks are relevant to the risk-
    benefit theory of design defect on which the jury was not instructed. Under the consumer
    expectation test instruction that was given, if the jury found that the fan overheated and
    caught on fire, it could find that the fan did not perform as safely as the ordinary
    consumer would expect, and was therefore defective. (See 
    Soule, supra
    , 8 Cal.4th at
    p. 566.) Accordingly, the trial court’s remarks concerning Bennett’s expert testimony do
    not reflect on the sufficiency of the evidence to support a verdict under the consumer
    expectation test instruction that was given.
    On appeal, it is our obligation to review “the sufficiency of the evidence to support
    a verdict under the law stated in the instructions given, rather than under some other law
    on which the jury was not instructed. (Null v. City of Los Angeles (1988) 
    206 Cal. App. 3d 1528
    , 1535.) . . . The jury’s responsibility is to decide factual issues and return a verdict
    in accordance with the law as instructed by the court. 
    (Null, supra
    , at p. 1534; Richmond
    v. Dart Industries, Inc. (1987) 
    196 Cal. App. 3d 869
    , 877.)” (Bullock v. Philip Morris
    USA, Inc. (2008) 
    159 Cal. App. 4th 655
    , 674-675.) We thus find the trial court’s first
    reason—that PCB failed to prove the existence of a design or manufacturing defect under
    the risk-benefit test—to be legally erroneous because the jury was not instructed on the
    risk-benefit test.
    24
    2.      The Jury Did Not Err in Failing to Apply a Risk-Benefit Test
    As its second reason for granting a new trial based on insufficient evidence, the
    trial court stated that the jury had applied the “wrong test.” It faulted the jury for
    applying the consumer expectation test because “an ordinary consumer would have no
    basis for forming any safety assumptions about the design or manufacture of the
    lightweight table fan when used for some 3,000 hours [nonstop] in a [commercial] setting
    to cool a space overheated by electronic equipment.” It stated that “[u]nder the risk
    benefit test that should have been applied here, Plaintiff had the burden to show that its
    injury was proximately caused by the fan’s design or manufacture. However, Plaintiff’s
    expert could not identify any defect in the fan.” It pointed out that “[i]f plaintiff’s own
    electrical engineering expert could not describe what defect in the fan [caused] the fire,
    how can a lay juror be expected to make such a determination?”
    As previously discussed, however, the jury did not err in applying the consumer
    expectation test, which was the sole design defect instruction given to the jury. Under the
    consumer expectation test, the question “whether a product’s design and performance met
    the informed expectations of the ordinary consumer is a question distinct from, even if
    derivative of, the factual issues of what that design was and how it functioned.”
    (Bresnahan v. Chrysler Corp. (1995) 
    32 Cal. App. 4th 1559
    , 1568-1569.) PCB’s decision
    to present no expert testimony regarding a design defect in the fan was intentional
    because PCB was not relying on the risk-benefit test. “Risk-benefit weighing is not a
    formal part of, nor may it serve as a ‘defense’ to, the consumer expectations test. 
    (Soule, supra
    , 8 Cal.4th at p. 566.)” (Id. at p. 1569.) Because PCB’s expert was not asked to
    analyze the design of the fan, the inference drawn by the trial court—that PCB’s expert
    could not identify a defect—was erroneous.
    3.      The Jury Did Not Err in Applying Special Instruction No. 1, Which
    Permitted an Award Based on Replacement Cost
    As its third reason for granting a new trial based on insufficient evidence, the trial
    court stated that “[t]he jury applied the wrong measure of damages, using replacement
    25
    cost instead of fair market value.” The trial court also stated that PCB’s failure to register
    its original compositions, present evidence of past royalty income, or provide any
    evidence of fair market value had caused the jury to “mistakenly believe[] that
    replacement cost[] was the proper measurement of the damages, which led to a clearly
    erroneous result.”
    We do not agree that the jury applied the wrong measure of damages. According
    to Special Instruction No. 1, the jury was allowed to decide whether the market value of
    the lost original compositions and sound samples was uncertain. We conclude that
    PCB’s failure to provide evidence of market value did not preclude its recovery of
    replacement costs.
    PCB provided substantial evidence that the lost original compositions and sound
    samples were of special value to the owner. As to the sound samples, Arem explained
    that because the sounds were uniquely directed, recorded, and developed over the course
    of 25 years and at diverse locations around the world, he could not replace them by
    simply purchasing a commercial sound library. He stated that even if he could purchase
    such a library, it would not meet his standards and would have to be altered to suit his
    commercial needs. As to the original compositions, Fisher explained that it would be
    difficult to measure the fair market value of the unregistered compositions (which
    comprised the vast majority of the compositions) because “you can’t price a song.”
    Arem testified that without the multitracks of the original compositions, PCB could not
    use the compositions to produce new works.
    Based on Fisher’s and Arem’s testimony, a jury could reasonably find that the lost
    compositions and sound samples had a peculiar value to PCB that was legally
    compensable even if the lost compositions and sound samples had no market value. (See
    Civ. Code, § 3333 [“For the breach of an obligation not arising from contract, the
    measure of damages, except where otherwise expressly provided by this code, is the
    amount which will compensate for all the detriment proximately caused thereby, whether
    it could have been anticipated or not”]; Evid. Code, § 823 [“the value of property for
    26
    which there is no relevant, comparable market may be determined by any method of
    valuation that is just and equitable”].)
    Kimes v. 
    Grosser, supra
    , 
    195 Cal. App. 4th 1556
    , is instructive. That case involved
    an injured cat, which the owner (Kimes) conceded had no market value. Kimes sued his
    neighbor (Grosser) to recover veterinary and other expenses that were incurred to care for
    the cat after it was allegedly shot by Grosser. When Grosser successfully moved to
    exclude evidence of expenses in excess of the cat’s market value, which was negligible,
    Kimes effectively conceded the cat had no market value that would justify the expenses
    of a trial. In Kimes’s appeal from the judgment of dismissal entered on his failure to
    prosecute, the appellate court reversed. The appellate court held that because Kimes was
    “not plucking a number out of the air for the sentimental value of damaged property,” but
    was seeking “to present evidence of costs incurred for [the cat’s] care and treatment by
    virtue of the shooting,” the evidence of Kimes’s veterinary and other expenses was
    admissible as proof of compensable damages. (Id. at p. 1561.) In support of its decision,
    the court cited Civil Code section 3333 and Evidence Code section 823. (Id. at pp. 1561-
    1562.)
    In this case, the replacement cost measure of damages provided a just and rational
    way of compensating PCB for the loss of its original compositions and sound samples.
    As the court in Kimes stated, “where the property has no market value, the general rule
    limiting recovery to the loss of that value cannot apply, because it would invariably
    preclude any recovery. In such cases, the property’s value ‘“must be ascertained in some
    other rational way, and from such elements as are attainable.”’ [Citation.]” 
    (Kimes, supra
    , 195 Cal.App.4th at p. 1561.) We therefore find the trial court’s third reason—that
    the jury erroneously applied the replacement cost measure of damages—to be legally
    erroneous.
    27
    D.     The New Trial Motion Failed to Challenge the Breach of Warranty Verdict
    PCB contends that because the jury’s breach of warranty verdict was unchallenged
    by the motion for new trial, the trial court erred in granting a new trial on that issue. We
    conclude that PCB is correct.
    The order is not sustainable as an order granting a new trial on the breach of
    warranty claim, because the order does not include a specification of reasons for granting
    a new trial as to that issue. “An order granting a new trial in which the trial court sets out
    adequate reason[s] for finding the verdict wrong on only one issue of several submitted to
    the jury, is erroneous. To grant a new trial in such a situation, the trial court must
    adequately specify reasons why the evidence is insufficient on all issues presumably
    found by the jury to support the verdict.” (Previte v. Lincolnwood, Inc. (1975) 
    48 Cal. App. 3d 976
    , 987.)
    II.    The Cross-appeal Lacks Merit
    When an order granting a new trial is reversed, the judgment will be reinstated
    automatically. (Stevens v. Parke, Davis & Co. (1973) 
    9 Cal. 3d 51
    , 63.) We therefore
    address defendants’ cross-appeal from the judgment and the order denying the motion for
    JNOV.
    In their cross-appeal from the judgment, defendants contend that if this court
    “reverses the trial court’s order granting a new trial, the original judgment should
    nonetheless be reversed and a new trial granted by this court, for the reasons set forth in
    the respondents’ brief.” However, it is unclear what defendants are arguing. If their
    contention is merely that the motion for new trial was properly granted, we have already
    considered and rejected that contention above. If they are claiming that it was erroneous
    to instruct the jury on the consumer expectation test, they have failed to discuss why the
    error was prejudicial in light of the jury’s breach of warranty verdict, which requires no
    finding of a design defect. To the extent they are arguing the damages award was
    excessive, we have addressed that contention above.
    28
    In their cross-appeal from the order denying the motion for JNOV, defendants
    contend they are entitled to partial JNOV on PCB’s design defect claim. We conclude
    the contention lacks merit because there is no explanation as to why the denial of a partial
    JNOV was prejudicial in light of the jury’s breach of warranty verdict, which requires no
    finding of a design defect.
    DISPOSITION
    The order granting a new trial is reversed. The order denying defendants’ motion
    for judgment notwithstanding the verdict is affirmed. The judgment is reinstated and
    affirmed. PCB is entitled to recover its costs on appeal.
    NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
    EDMON, J.*
    We concur:
    WILLHITE, Acting P. J.
    MANELLA, J.
    *Judge of the Los Angeles Superior Court, assigned by the Chief Justice pursuant to
    article VI, section 6 of the California Constitution.
    29
    

Document Info

Docket Number: B242443

Filed Date: 6/4/2014

Precedential Status: Non-Precedential