  • Filed 9/12/13 Rideau v. Stewart Title of California CA4/1
    NOT TO BE PUBLISHED IN OFFICIAL REPORTS
    California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
    publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
    or ordered published for purposes of rule 8.1115.
    COURT OF APPEAL, FOURTH APPELLATE DISTRICT
    DIVISION ONE
    STATE OF CALIFORNIA
    EARL B. RIDEAU et al.,                                              D061497
    Plaintiffs and Appellants,
    v.                                                         (Super. Ct. No.
    37-2010-00096274-CU-BC-CTL)
    STEWART TITLE OF CALIFORNIA, INC.,
    Defendant and Respondent.
    APPEAL from a judgment of the Superior Court of San Diego County, Jay
    Bloom, Judge. Reversed; judgment directed.
    Dennis R. Delahanty, a Prof. Corp. and Dennis R. Delahanty for Plaintiffs and
    Appellants.
    Best Best & Krieger LLP, Robert J. Hanna, Kira L. Klatchko and Shannon M.
    Erickson for Defendant and Respondent.
    I.
    INTRODUCTION
    Earl B. Rideau and Marina Rideau (the Rideaus) entered into an agreement with a
    developer, BGJB de Mexico, S. de R.L. de C.V. (BGJB), to purchase a condominium in a
    building to be constructed in Mexico. The Rideaus deposited $239,700 toward the
    purchase price with an escrow company, defendant Stewart Title of California (Stewart
    Title). The escrow instructions provide in relevant part:
    "ESCROW HOLDER is authorized and instructed to release funds
    as instructed by SELLER . . . without further authorization from
    BUYERS; said funds to be disbursed by California Fund Control to
    pay direct costs, commissions and construction costs only.
    California Fund Control and SELLER have in place, an agreement
    where California Fund Control inspects the project site and
    authorizes payment of construction costs to contractor, sub-
    contractors and suppliers according to a pre-approved voucher
    control system."
    Stewart Title released the Rideaus' deposit, together with the deposits of other
    purchasers, to entities other than California Fund Control, including to BGJB. BGJB
    failed to construct the condominium building, and neither Stewart Title nor BGJB
    returned the Rideaus' deposit.
    The Rideaus brought this action against Stewart Title. Among other claims, the
    Rideaus brought causes of action for breach of contract and negligence in which they
    alleged that Stewart Title had breached the escrow instructions by releasing their
    deposited funds to entities other than California Fund Control. The trial court held a
    bench trial, interpreted the escrow instructions, and concluded that, "[Stewart Title] had
    2
    no obligation to send funds to [California Fund Control]." The court entered a judgment
    in favor of Stewart Title on all of the Rideaus' claims.
    On appeal, the Rideaus claim that the trial court misinterpreted the escrow
    instructions and erred in failing to find that Stewart Title breached the escrow instructions
    by releasing their funds to entities other than California Fund Control. With respect to
    their negligence claim, the Rideaus argue that Stewart Title breached its duty "to comply
    with the [Escrow Instructions]. . . ."
    We conclude that the most reasonable interpretation of the escrow instructions is
    that they implicitly required Stewart Title to release the Rideaus' funds only to California
    Fund Control. In light of this interpretation, we conclude that Stewart Title breached the
    escrow instructions by releasing the Rideaus' funds to entities other than California Fund
    Control and that the Rideaus were entitled to judgment in their favor on their breach of
    contract claim. However, we conclude that the Rideaus cannot prevail on their tort claim
    for negligence based on Stewart Title's breach of contractual duties. We reverse the
    judgment and direct the trial court to enter a new judgment in favor of the Rideaus on
    their breach of contract claim and in favor of Stewart Title on the Rideaus' remaining
    causes of action.
    3
    II.
    FACTUAL AND PROCEDURAL BACKGROUND
    A.     The first amended complaint
    In March 2011, the Rideaus filed a first amended complaint against Stewart Title
    and GJL, S. de R.L. de C.V., a Mexican corporation (GJL).1 In the operative complaint,
    the Rideaus alleged that on or about May 2, 2007, they entered into a written agreement
    (Purchase Agreement) with BGJB, a Mexican corporation, for the purchase of a
    condominium in a building to be constructed, called "The Falls" (the Project). The
    Project was to be built in the city of Playas de Rosarito, Mexico.
    The Rideaus alleged that they entered into this agreement based upon the
    assurances of Shane Delmer, a salesperson for the Project. According to the Rideaus,
    Delmer told them that their deposits for the purchase of the condominium would be held
    in an escrow account with Stewart Title, in the United States. The Rideaus further
    alleged that "Stewart Title would distribute the funds to a fund control company [that]
    would periodically inspect the project and release the funds on an 'as work is done' basis
    utilizing a pre-approved voucher system . . . ."
    The Rideaus claimed that a few days after entering in the Purchase Agreement,
    they delivered Sale Escrow Instructions (Escrow Instructions), together with an initial
    deposit of $5,000, to Stewart Title. According to the Rideaus, they read and reviewed the
    Escrow Instructions and concluded that the instructions were consistent with Delmer's
    representations concerning the manner by which their deposits would be released. The
    1      GJL is not a party to this appeal.
    4
    Rideaus alleged that on or about June 13, 2007, they wired $234,700—the balance of
    their required deposit toward the purchase of the condominium, to Stewart Title.
    The Rideaus further alleged that, "Although [BGJB] failed to enter into an
    agreement with California Fund Control, defendant Stewart Title failed to request and
    obtain further instructions from [the Rideaus] and [BGJB] as to the disposition of the
    deposited funds and instead released the deposited funds to [BGJB] or its principals."
    The Rideaus also claimed that BGJB failed to commence construction of the Project and
    that BGJB would be unable to commence construction in the foreseeable future due to a
    lack of funding.
    In a negligence cause of action, the Rideaus alleged that Stewart Title negligently
    failed to: (1) determine whether BGJB had entered into an agreement with California
    Fund Control; (2) to inform the Rideaus regarding the lack of a fund control agreement;
    (3) to release the deposited funds only to California Fund Control; and (4) to request
    further instructions from BGJB and the Rideaus concerning the release of the deposited
    funds if release of the funds to California Fund Control was not possible. The Rideaus
    further alleged:
    "Plaintiffs were damaged in that they would not have deposited the
    funds into escrow or would have demanded the immediate return of
    the funds to them had they known no agreement for the
    disbursement of the funds by California Fund Control had been
    consummated; the deposited funds were not paid over by Stewart
    Title to California Fund Control or a similar company that would
    ensure that the deposited funds were used to pay 'direct costs,
    commissions and construction costs only' as provided for in
    the . . . Escrow Instructions; and the Condominium would [sic] not
    be constructed and thus the deposited funds will not be applied to the
    sale price of the Condominium."
    5
    The Rideaus alleged that Stewart Title had refused to return their deposits and that
    they had suffered damages in the amount of $239,700 as a result of Stewart Title's
    negligence.
    In a breach of contract cause of action, the Rideaus incorporated by reference their
    previous allegations and contended that Stewart Title had failed to perform its obligations
    as set forth in the Escrow Instructions. The Rideaus alleged that Stewart Title's breach of
    the Escrow Instructions had damaged them in the amount of $239,700—the amount of
    their deposits.2
    B.     The court trial
    After the parties waived their right to a jury trial, the trial court held a bench trial
    on the Rideaus' first amended complaint.
    1.      The Rideaus' evidence
    Section IV of the Escrow Instructions provides:
    "RELEASE OF FUNDS: From BUYERS['] deposit in escrow,
    ESCROW HOLDER is authorized and instructed to release funds as
    instructed by SELLER, upon receipt of this signed instruction from
    all principals and clearance of BUYERS['] funds, without further
    authorization from BUYERS; said funds to be disbursed by
    California Fund Control to pay direct costs, commissions and
    construction costs only. California Fund Control and SELLER have
    in place, an agreement where California Fund Control inspects the
    project site and authorizes payment of construction costs to
    2       Although not at issue in this appeal, the Rideaus also brought causes of action for
    fraud (third cause of action) and breach of fiduciary duty (fourth cause of action) against
    Stewart Title, and a third party beneficiary breach of contract claim against Stewart Title
    and GJL (fifth cause of action) based on an alleged agreement between GJL and Stewart
    Title (the GJL Agreement). The Rideaus alleged that in the GJL Agreement, "Stewart
    Title agreed to pay . . . 50% of the [Rideaus'] deposited funds to GJL, and GJL agreed to
    pay [the Rideaus] the total amount of the deposited funds . . . ."
    6
    contractor, sub-contractors and suppliers according to a pre-
    approved voucher control system. The undersigned BUYERS and
    SELLER hereby acknowledge that they are aware that Stewart Title,
    its officers and employees make no warranty or representation of
    any kind or nature, either express or implied, as to the ownership or
    condition of title to the property described in this escrow, nor as to
    the conditions of this escrow will have been complied with nor will
    any document be filed for recording in connection therewith. We,
    the undersigned, hereby hold Stewart Title harmless from any
    loss or damage which may be sustained by reason of the above
    disbursement instruction, and for the failure of any of the
    conditions of this escrow, and for the recovery of said money so
    released, and agree to defend you against any claims whatsoever
    arising from [sic] and [sic] any attorneys fee, expenses or costs
    incident thereto." (Emphasis in original.)
    The Rideaus presented evidence that they deposited $239,700 with Stewart Title
    pursuant to the Escrow Instructions, that Stewart Title distributed the Rideaus' funds to
    entities other than California Fund Control, and that Stewart Title had not returned the
    Rideaus' deposits.
    Earl Rideau also testified concerning his interpretation of the Escrow Instructions,
    as follows:
    "[I]t was my understanding that the seller . . . according to the
    [E]scrow [I]nstructions would instruct the escrow company to
    release funds. And then those funds were to be released to
    California Fund Control. California Fund Control was the only one
    mentioned in the escrow instructions who actually disburses funds.
    There's no mention . . . of the funds being disbursed by the escrow
    company to the seller or else the fund control is a moot point. [¶]
    You're not going to get the developer to give the money back to the
    fund control so that they could in turn give the money back to the
    developer. That's irrational. That's illogical. So I took it at face
    value."
    7
    The Rideaus also offered in evidence Delmer's affidavit.3 Delmer testified in
    relevant part:
    "During 2007, I was employed as an onsite salesperson for [the
    Project]. . . . [¶] Typically, during the sales process with a buyer I
    would explain how purchases would be conducted. . . . I would
    specifically point out that the transaction would require that funds be
    placed into escrow with Stewart Title Company. I would then
    explain that there would be a voucher system through California
    Fund Control to pay for the construction of the project and related
    costs of the project. I would explain these procedures to make the
    potential buyers feel more comfortable in purchasing real estate in a
    foreign country."
    The Rideaus offered in evidence the Purchase Agreement between the Rideaus
    and BGJB, which provides in relevant part:
    "All deposits shall be made payable to Stewart Title. The deposits
    shall be withheld and released by Stewart Title in accordance with
    the terms of the Escrow Contract.
    "Also, the parties agree that the release of the payment of the PRICE
    by Stewart Title shall be made in accordance with the Construction
    Supervision and Resource Management Contract entered into by (in
    process) and [BGJB], through which said company will instruct
    Stewart Title to release the PRICE that the BUYERS progressively
    pays under this Contract and the progress of the construction of the
    Unit."
    The Rideaus also presented the expert testimony of Judy Lydick, an escrow officer
    and consultant to escrow companies. Lydick offered her opinion concerning what the
    Escrow Instructions required of an escrow officer in order for the officer to comply with
    the standard of care in the escrow industry. Lydick testified in part:
    3     The trial court admitted Delmar's affidavit without objection pursuant to an
    agreement between the parties.
    8
    "The escrow instructions are created in a format that an escrow
    officer really has to choose which portion of those escrow
    instructions they're going to abide by. [¶] If I were to receive this
    . . . instruction, the first thing I would do, [is] cease . . . sending out
    the money until it was clear as to whether the money is to be
    released to anyone the seller delegated for the money to go to or
    whether the money's going to the California Fund Control."
    Lydick also stated that, in her opinion, the Escrow Instructions were "misleading"
    if the parties intended to permit Stewart Title to release the deposited funds to BGJB.
    The Rideaus also presented the expert testimony of Jeff Katzer, a real estate broker
    and former chief executive officer of a bank that specialized in construction lending, who
    testified concerning the use of voucher and fund control systems in the construction
    finance industry. Katzer testified in relevant part as follows:
    "One of the primary components to a construction loan which is
    tantamount [sic] to the success of the completion of the project is
    that [the] lender enters into a fund control . . . within their own bank,
    if they have the facilities to have that system in place, or [they] will
    contract with [a] third party independent fund control company.
    That company then will evaluate from the cost breakdown and create
    stages of disbursements. Those stages of disbursements will be
    funded under a voucher system or completion of those stages by
    elements of, say, foundation, grading, electrical, things of that
    nature.
    "Once those agreements are in place and the voucher system is in
    place, the lender then will, upon request of the developer for specific
    funds to meet a specific line item, those funds will then be released
    to the fund control. Fund control will inspect the property.
    Determine that they've met the line item component, where the
    money went to that contractor or subcontractor [sic] or material
    provider. And, in fact, lien releases were in place. Without that
    happening, the moneys can go sideways. Developers can get ahead
    of the project. [The] project may not be finished on time or
    sufficient funds remaining in the loan account to complete the
    project."
    9
    2.      The defense
    Stewart Title presented the expert testimony of Donna Grosso, an escrow officer
    and manager of an escrow company. Grosso testified concerning whether Stewart Title
    had met the standard of care for performing escrow services. Grosso stated that she
    interpreted the Escrow Instructions as permitting Stewart Title to release the buyers'
    funds upon the seller's instruction, without further limitation. Grosso further testified that
    language pertaining to California Fund Control in the Escrow Instructions was "a thing
    between the buyer and the seller."
    C.        The trial court's statement of decision
    The trial court issued a statement of decision in which it found for Stewart Title on
    all of the Rideaus' causes of action. With respect to the Rideaus' breach of contract cause
    of action, the trial court noted that the Rideaus claimed that Stewart Title had breached
    the Escrow Instructions in numerous ways, including "failing to release the [Rideaus]
    funds to California Fund Control." With respect to the Rideaus' contention that Stewart
    Title was required to release their funds only to California Fund Control, the trial court
    stated:
    "[I]t is claimed the funds should have been released to [California
    Fund Control]. However, without any mechanism for such funding,
    it is unclear to the court how this should have been done. In
    addition, as noted above,[4] the [Escrow Instructions] did not require
    4     The trial court apparently was referring to a portion of its statement of decision in
    which it stated the following:
    "[The Rideaus'] argument assumes [Stewart Title] was to release the
    funds upon instruction by the seller and then disburse the funds to
    [California Fund Control] under the [Escrow Instructions]. . . .The
    10
    [Stewart Title] to release funds to [California Fund Control]. It said
    the funds were to be disbursed by California Fund Control."
    With respect to the Rideaus' breach of contract claim, the trial court stated the
    following:
    "Also, if the [Escrow Instructions are] read with consideration of the
    language as well as the custom and practice in the industry as
    indicated by the defense expert, there is no breach of the [Escrow
    Instructions]. The first part of Section IV [of the Escrow
    Instructions] indicates the escrow holder is authorized and instructed
    to release funds as instructed by seller upon receipt of the signed
    [Escrow Instructions] from all principals and clearance of buyers'
    funds without further authorization from the buyers. This clause
    clearly required the escrow company to release the funds upon order
    of the seller without any instruction from the buyer. The next clause
    indicating said funds are to be disbursed by [California Fund
    Control] does not relate to the escrow company. It states the funds
    are to be distributed by California Fund Control[.]
    "According to the uncontradicted testimony of the defense expert,
    this clause deals with the obligations between the buyer, seller, and
    creditors. It has nothing to do with the escrow company."
    In addition to finding in favor of Stewart Title on the Rideaus' breach of contract
    cause of action, the trial court found in favor of Stewart Title on the Rideaus' causes of
    action for negligence, breach of fiduciary duty, and fraud. The court also found that the
    Rideaus were not entitled to prevail on their breach of contract claim premised on the
    GJL Agreement.
    [Escrow Instructions] state[] that the funds are to be disbursed by
    [California Fund Control]. It does not state [Stewart Title] was to
    send the funds to California Fund Control. Thus, [Stewart Title] had
    no obligation to send funds to [California Fund Control]."
    11
    D.     The judgment and the appeal
    A few weeks after issuing its statement of decision, the trial court entered
    judgment in favor of Stewart Title. The Rideaus timely appealed from the judgment.
    III.
    DISCUSSION
    A.     Stewart Title breached the Escrow Instructions by releasing the Rideaus' funds to
    entities other than California Fund Control
    The Rideaus claim that the trial court erred in failing to find that Stewart Title
    breached the Escrow Instructions by releasing their funds to entities other than California
    Fund Control. Resolution of the Rideaus' claim requires that we interpret the Escrow
    Instructions.
    1.       Standard of review
    We must first determine the appropriate standard of review to apply in
    interpreting the Escrow Instructions. In People v. Paredes (2008) 
    160 Cal.App.4th 496
    ,
    507, this court discussed the applicable law governing this determination:
    " '[T]he "interpretation of a contract is subject to de novo review
    where the interpretation does not turn on the credibility of extrinsic
    evidence." ' [Citations.] 'In contrast, "[i]f the parol evidence is in
    conflict, requiring the resolution of credibility issues, we would be
    guided by the substantial evidence test. [Citation.]" [Citation.]' "
    (Id. at p. 507.)
    12
    In this case, both parties contend that this court should apply the de novo standard
    of review on appeal.5 We agree that, as Stewart Title states in its brief, the trial court's
    "conclusions, as expressed in the Statement of Decision, were based on the plain
    language of the [Escrow] Instructions," and that the de novo standard of review therefore
    applies on appeal.
    We acknowledge that the trial court stated that the testimony of Grosso,
    concerning the "custom and practice in the industry," supported the court's interpretation
    of the Escrow Instructions. However, our review of the record reveals that Grosso's
    testimony was not based on extrinsic evidence of the custom and practice in the escrow
    industry that might be "admissible to interpret the written words" of the Escrow
    Instructions. (Hayter Trucking, Inc. v. Shell Western E&P, Inc. (1993) 
    18 Cal.App.4th 1
    ,
    20.) Rather, Grosso's opinion was based on her own interpretation of the Escrow
    Instructions. Grosso stated that her opinion was based on her "read[ing] . . . of the
    escrow instructions," and a review of her testimony makes clear that such testimony was
    based on an examination of the language of the Escrow Instructions. (See e.g., "[w]e had
    a paragraph here that say's we're authorized and instructed to release funds as instructed
    by seller"; "[i]t says 'From buyers' deposit in escrow, escrow holder is authorized and
    instructed to release funds as instructed by the seller"; "if the seller instructed us to
    5      The Rideaus argue, "The interpretation of the . . . Escrow Instructions presents a
    question of law for the appellate court to determine anew." Stewart Title argues,
    "[I]nterpretation of a contract is reviewed independently on appeal . . . . .The [Escrow]
    Instructions here . . . are clear on their face, and it was not necessary for the trial court to
    admit, or rely on, nor did the trial court admit or rely on, extrinsic or parole evidence to
    interpret them."
    13
    disburse to California Fund Control, we would do so. But all the instructions state here
    [is] it comes from the seller"; "[y]ou have a semicolon after 'buyers' which starts a new
    thought process.")
    Even assuming that Grosso's testimony was admissible for the purpose of
    interpreting the Escrow Instructions (but see Summers v. A.L. Gilbert Co. (1999) 
    69 Cal.App.4th 1155
    , 1180 ["[e]xpert opinion on the legal interpretation of contracts has . . .
    been found to be inadmissible"]), it is clear that a proper interpretation of the Escrow
    Instructions does not turn on the credibility of Grosso's testimony. Thus, we conclude
    that the parties are correct that the de novo standard of review applies. (See People v.
    Paredes, supra, 160 Cal.App.4th at p. 507.)
    2.      Governing law
    a.     The duties of an escrow holder
    In Summit Financial Holdings, Ltd. v. Continental Lawyers Title Co. (2002) 
    27 Cal.4th 705
     (Summit), the Supreme Court described the duties of an escrow holder as
    follows:
    " 'An escrow involves the deposit of documents and/or money with a
    third party to be delivered on the occurrence of some condition.'
    [Citations.] An escrow holder is an agent and fiduciary of the parties
    to the escrow. [Citations.] The agency created by the escrow is
    limited—limited to the obligation of the escrow holder to carry out
    the instructions of each of the parties to the escrow. [Citations.] If
    the escrow holder fails to carry out an instruction it has contracted to
    perform, the injured party has a cause of action for breach of
    contract. [Citation.]" (Id. at p. 711.)
    "An escrow holder has an implied obligation to do all of the things normally done
    by an escrow agent which were not expressly excluded by the escrow instructions.
    14
    [Citation.] Upon the escrow holder's breach of an instruction that it has contracted to
    perform or of an implied promise arising out of the agreement with either party, the
    injured party acquires a cause of action for breach of contract. ([Citation]; Claussen v.
    First American Title Guaranty Co. (1986) 
    186 Cal.App.3d 429
    , 435 [(Claussen)].) As
    noted in Claussen, supra, at page 436, '. . . some escrow instructions may be implicit in
    the express instructions given. (Gordon v. D & G Escrow Corp. (1975) 
    48 Cal.App.3d 616
    , 621-623 [(Gordon)]—escrow instructions implicitly required proceeds of sale to be
    paid to both sellers.) In the event of a conflict or apparent error in instructions, the
    escrow holder is obliged to take corrective steps before obeying questionable instructions.
    [Citations.]' " (Kirk Corp. v. First American Title Co. (1990) 
    220 Cal.App.3d 785
    , 807.)
    b.      Principles of contract interpretation
    "Escrow instructions are interpreted under the rules applicable to contracts."
    (Claussen, supra, 186 Cal.App.3d at p. 437.)
    The general principles of contract interpretation are well established:
    " ' "The fundamental rules of contract interpretation are based on the
    premise that the interpretation of a contract must give effect to the
    'mutual intention' of the parties. 'Under statutory rules of contract
    interpretation, the mutual intention of the parties at the time the
    contract is formed governs interpretation. [Citation.] Such intent is
    to be inferred, if possible, solely from the written provisions of the
    contract. [Citation.] The "clear and explicit" meaning of these
    provisions, interpreted in their "ordinary and popular sense," unless
    "used by the parties in a technical sense or a special meaning is
    given to them by usage" [citation], controls judicial interpretation.
    [Citation.]' . . ." [Citation.]' [Citation.]" (Minich v. Allstate Ins. Co.
    (2011) 
    193 Cal.App.4th 477
    , 485.)
    15
    In addition, and of particular relevance to this case, is the following statutory rule
    of contract interpretation:
    "The whole of a contract is to be taken together, so as to give effect
    to every part, if reasonably practicable, each clause helping to
    interpret the other." (Civ. Code, § 1641.)
    This principle is embodied in case law in numerous formulations, all of which
    guide our interpretation of the Escrow Instructions. (See e.g., Jones v. Jacobson (2011)
    
    195 Cal.App.4th 1
    , 18 ["We must view the language of a contract as a whole, avoiding a
    piecemeal, strict construction approach"]; Sprinkles v. Associated Indem. Corp. (2010)
    
    188 Cal.App.4th 69
    , 82 [" '[t]he character of a contract is not to be determined by
    isolating any single clause or group of clauses' "]; In re Quantification Settlement
    Agreement Cases (2011) 
    201 Cal.App.4th 758
    , 799 ["[E]ven if one provision of a
    contract is clear and explicit, it does not follow that that portion alone must govern its
    interpretation; the whole of the contract must be taken together so as to give effect to
    every part"]; Advanced Network, Inc. v. Peerless Ins. Co. (2010) 
    190 Cal.App.4th 1054
    ,
    1063 (Advanced Network) [" 'We must give significance to every word of a contract,
    when possible . . .' "]); Hayden v. Robertson Stephens, Inc. (2007) 
    150 Cal.App.4th 360
    ,
    367 [" 'A construction rendering some words surplusage is to be avoided' "].)
    3.      The Escrow Instructions implicitly required Stewart Title to release the
    Rideaus' funds only to California Fund Control
    a.     The Escrow Instructions
    The Escrow Instructions provide in relevant part:
    "RELEASE OF FUNDS: From BUYERS['] deposit in escrow,
    ESCROW HOLDER is authorized and instructed to release funds as
    16
    instructed by SELLER, upon receipt of this signed instruction from
    all principals and clearance of BUYERS['] funds without further
    authorization from BUYERS; said funds to be disbursed by
    California Fund Control to pay direct costs, commissions and
    construction costs only. California Fund Control and SELLER have
    in place, an agreement where California Fund Control inspects the
    project site and authorizes payment of construction costs to
    contractor, sub-contractors and suppliers according to a pre-
    approved voucher control system."
    b.     The most reasonable interpretation of the Escrow Instructions is that
    they implicitly require that, upon instruction from seller, the escrow
    holder release the buyers' funds to California Fund Control for
    disbursement by California Fund Control
    The signed Escrow Instructions clearly and unambiguously permitted Stewart
    Title to release the Rideaus' funds upon an instruction from BGJB and clearance of the
    Rideaus' funds. Further, reading the instruction as a whole, as we must (Civ. Code,
    § 1641), the Escrow Instructions implicitly authorized Stewart Title to release the
    Rideaus' funds to only one entity—California Fund Control.
    To begin with, in the same sentence in which the Escrow Instructions authorize
    Stewart Title to release the Rideaus' funds, the instructions state that "said funds" would
    be disbursed by California Fund Control. California Fund Control could not disburse
    "said funds" without having received those funds. Further, the disbursement clause of the
    sentence pertaining to California Fund Control is separated from the remainder of the
    sentence pertaining to Stewart Title's release of the funds by only a semicolon. A
    semicolon is used to separate parts of a sentence that "are too closely connected to be
    made into separate sentences." (Bryan A. Garner, A Dictionary of Modern Legal Usage
    (2d Ed. 1995) p. 717.) By using a semicolon and the phrase "said funds," the text and
    17
    grammar of the Escrow Instructions indicate that Stewart Title was authorized, upon
    BGJB's instruction, to release the Rideaus' funds to California Fund Control.
    The structure of the Escrow Instructions supports this interpretation. The
    references to California Fund Control appear in Section IV of the Escrow Instructions,
    entitled "RELEASE OF FUNDS"—the portion of the instructions that expressly imposes
    duties on Stewart Title. Further, Stewart Title's contention that it was authorized to
    "release funds as instructed by BGJB" without any limitation, would render the bulk of
    this section surplusage because if Stewart Title were authorized to release the funds to
    any entity merely upon BGJB's instruction, there would be no reason to include any of
    the language in the Release of Funds section pertaining to California Fund Control.
    An interpretation rendering such a large portion of the Release of Funds section of
    the Escrow Instructions surplusage should be avoided. (See National City Police
    Officers' Assn. v. City of National City (2001) 
    87 Cal.App.4th 1274
    , 1279 ["An
    interpretation which renders part of the instrument to be surplusage should be avoided"].)
    Rather, we should interpret that portion of the Escrow Instructions authorizing Stewart
    Title to "release funds as instructed by SELLER," in light of the remainder of the
    sentence, which provides, "said funds to be disbursed by California Fund Control. . . ."
    (See In re Quantification Settlement Agreement Cases, supra, 201 Cal.App.4th at p. 799.)
    Further, "In determining the meaning of a written instrument, we are permitted to
    consider not only its language, but also ' "the circumstances under which [it] was made
    and the matter to which it relates." ' " (See PV Little Italy, LLC v. MetroWork
    Condominium Assn. (2012) 
    210 Cal.App.4th 132
    , 152.) Our interpretation of the Escrow
    18
    Instructions fully comports with the purpose for which the principals to an escrow
    agreement would use a fund control agent. A fund control agent is used to ensure that
    funds intended for the construction of real property are actually and properly used by the
    owner-builder to construct that property. (See e.g., Summit, 
    supra,
     27 Cal.4th at p. 713
    ["a lender agreed to fund an owner-builder's construction of homes, and to ensure that the
    loan funds would actually be used to pay the construction costs, the lender deposited the
    funds with the plaintiff fund control agent"].)
    The Escrow Instructions expressly provided that the fund control agent (California
    Fund Control) would "inspect[] the project site and authorize[] payment of construction
    costs to contractor, sub-contractors and suppliers according to a pre-approved voucher
    control system." In order for a fund control agent to perform this function, it is essential
    that the fund control agent receive the funds that it is to disburse for the payment of
    construction costs. The Rideaus' interpretation of the Escrow Instructions is fully
    consistent with this purpose: upon instruction from BGJB, the escrow holder was
    authorized and instructed to release the Rideaus' funds to California Fund Control for
    disbursement by California Fund Control to pay direct costs, commissions and
    construction costs.
    In contrast, Stewart Title's interpretation of the Escrow Instructions to the effect
    that, upon BGJB's instruction, it was authorized to release the funds to any entity that
    BGJB selected—including BGJB itself—is completely inconsistent with the purpose of
    having a funds control agent disburse the funds. We can think of no reason, and neither
    the trial court nor Stewart Title has offered any, as to why principals to an escrow
    19
    agreement who intended to use a fund control agent to disburse funds for a construction
    project, would intend to permit the escrow holder to release funds directly to entities
    other than the fund control agent. As noted above, the entire raison d'être of a fund
    control agent is to act as an intermediary between those funding a construction project
    and those building the project. To put it simply, a fund control agent cannot disburse a
    project's funds if the builder directs the disbursal of the funds instead.
    Stewart Title's contention that references in the Escrow Instructions pertaining to
    California Fund Control implicates only BGJB's duty to the Rideaus not only fails to
    make practical sense, it is also in conflict with the fact that this language appears in the
    Escrow Instructions, which describe and control Stewart Title's release of the funds
    deposited into escrow.6
    6       Although not material to our decision in light of the applicable de novo standard of
    review, we disagree with the trial court's statement that, "According to the uncontradicted
    testimony of the defense expert, th[e] clause [pertaining to California fund Control in the
    Escrow Instructions] deals with the obligations between the buyer, seller and creditors."
    (Italics added.)
    The Rideaus' expert testified on this subject as follows:
    "If . . . the intent, was to release the money to the seller, then I would
    eliminate all verbiage regarding the California Fund Control because
    that is misleading. If the money was to be paid to the seller or
    someone the seller wanted, all that wording about California Fund
    Control would be out . . . and the [Escrow Instructions] would read
    that the moneys were to be paid to the seller or someone delegated
    by the seller. And then all the information about California Fund
    Control shouldn't be there. It's misleading. It gives [the Rideaus] a
    false feeling of security."
    20
    Contrary to Stewart Title's contention, its interpretation finds no support in the
    Purchase Agreement. As noted previously, the Purchase Agreement provides in relevant
    part:
    "[T]he parties agree that the release of the payment of the PRICE by
    Stewart Title shall be made in accordance with the Construction
    Supervision and Resource Management Contract entered into by (in
    process) and [BGJB], through which said company will instruct
    Stewart Title to release the PRICE that the BUYERS progressively
    pays under this Contract and the progress of the construction of the
    Unit."
    We reject Stewart Title's suggestion that this provision "unequivocally stated that
    BGJB would instruct Stewart Title to release funds." To begin with, the reference to
    "said company" in the provision is ambiguous, and may reasonably be read to refer to the
    company with which BGJB would enter into a Construction Supervision and Resource
    Management Contract, rather than to BGJB itself. In any event, even if "said company"
    is interpreted as referring to BGJB, the provision is fully consistent with our
    interpretation of the Escrow Instructions that Stewart Title was authorized, upon BGJB's
    instruction, to release the Rideaus' funds to California Fund Control. Moreover, the
    provision expressly states that "the release of the payment of the PRICE by Stewart Title
    shall be made in accordance with the Construction Supervision and Resource
    Management Contract." (Italics added.) It is undisputed that BGJB never entered into a
    Construction Supervision and Resource Management Contract (i.e. a fund control
    agreement). It is thus clear that Stewart Title did not release the Rideaus' deposits "in
    accordance with" a fund control agreement. This provision of the Purchase Agreement
    21
    therefore does not support Stewart Title's contention that it complied with the Escrow
    Instructions.
    3.       Stewart Title breached the Escrow Instructions
    It is undisputed that Stewart Title released the Rideaus' funds in the amount of
    $239,700 to entities other than California Fund Control.7 In light of our interpretation of
    the Escrow Instructions provided above, the release of the Rideaus' funds to entities other
    than California Fund Control constituted a breach of the instructions.
    Accordingly, we conclude that the trial court erred, as a matter of law, in entering
    judgment in favor of Stewart Title on the Rideaus' breach of contract cause of action.
    B.     The judgment may not be affirmed on the basis of the exculpatory provisions in the
    Escrow Instructions
    Stewart Title contends that the judgment may be affirmed based on the following
    provisions in the Escrow Instructions:
    "The undersigned BUYERS and SELLER hereby acknowledge that
    they are aware that Stewart Title, its officers and employees make no
    warranty or representation of any kind or nature, either express or
    implied, as to the ownership or condition of title to the property
    described in this escrow, nor as to the conditions of this escrow will
    have been complied with nor will any document be filed for
    recording in connection therewith. We, the undersigned, hereby
    hold Stewart Title harmless from any loss or damage which may
    be sustained by reason of the above disbursement instruction,
    7      For example, during his opening statement at trial, Stewart Title's counsel stated:
    "There were disbursements. We will show money was disbursed
    pursuant to the seller's instructions, and that those funds went to the
    contractor. Everyone, I think, assumed they would go to California
    Fund Control. They did not. And the developer later said that they
    were incapable of obtaining the loan, and unfortunately, they had
    used the money."
    22
    and for the failure of any of the conditions of this escrow, and
    for the recovery of said money so released, and agree to defend
    you against any claims whatsoever arising from [sic] and [sic]
    any attorneys fee, expenses or costs incident thereto." (Emphasis
    in original.)
    Stewart Title argues that it contended in the trial court that these provisions "stated
    that Stewart Title would be held harmless from any losses caused by distributing funds in
    accord with the [Escrow] Instructions." (Italics added.) Similarly, on appeal, Stewart
    Title contends that "the Rideaus agreed that Stewart Title would not be held liable for any
    'loss or damage' for disbursing monies in accord with the [Escrow] Instructions." (Italics
    added.) Stewart Title also contends, "The hold-harmless clause did not absolve Stewart
    Title from wrongdoing or negligence. Instead, the clause protected Stewart Title for
    complying with the [Escrow] Instructions. . . ." (Italics added.)
    We concluded in parts III.A.2 and III.A.3, that Stewart Title breached the Escrow
    Instructions in the manner by which it released the Rideaus' funds. In light of Stewart
    Title's acknowledgement that the exculpatory provisions in the Escrow Instructions do
    not "absolve Stewart Title from wrongdoing," and apply, if at all, only in the event that
    Stewart "compl[ied] with the [Escrow] Instructions," and released funds "in accord with
    the [Escrow] Instructions" (italics added), the judgment may not be affirmed on the basis
    of these provisions.8
    8       In its statement of decision, the trial court expressed its view that the exculpatory
    provisions in the Escrow Instructions likely could not be enforced to insulate Stewart
    Title from liability:
    "[Stewart Title] also alleges that it is not liable because of the hold
    harmless clause in the escrow instructions. Although the court does
    23
    C.     The Rideaus are not entitled to reversal of the judgment on their negligence cause
    of action
    The Rideaus claim that the trial court erred in ruling in Stewart Title's favor on
    their negligence cause of action. In support of this contention, the Rideaus argue that
    Stewart Title breached its duty "to comply with the [Escrow Instructions] . . . ." This
    argument fails because a plaintiff may not prevail on a tort cause of action for negligence
    based on the defendant's breach of contractual duties, in the absence of an independent
    violation of tort law. (Money Store Investment Corp. v. Southern California Bank (2002)
    
    98 Cal.App.4th 722
    , 731 (Money Store).) As the Money Store court explained:
    "In essence, the Money Store alleges the [escrow holder] breached a
    duty to it by failing to perform as specified in the Money Store's
    instructions.
    not have to reach this issue here, it does not appear the hold harmless
    clause would insulate [Stewart Title] from liability. See Diaz v.
    United California Bank (1977) 
    71 Cal.App.3d 161
    , 171 [(Diaz)];
    Akin v. Business Title Corp. (1968) 
    264 Cal.App.2d 153
    , 157
    [(Akin)]."
    In Akin, the court applied Tunkl v. Regents of University of California (1963) 
    60 Cal.2d 92
     (Tunkl), and concluded, on public policy grounds, that "that the exculpatory
    clause before us cannot relieve the escrow company from liability." (Akin, supra, 264
    Cal.App.2d at p. 159; see also Diaz, supra 71 Cal.App.3d at p. 171 [citing Akin and Tunkl
    and stating, "Where the public interest is affected the exculpatory clause will be held
    invalid"].)
    We need not determine whether the exculpatory provisions in this case could
    validly be enforced to exculpate Stewart Title for liability for breaching the Escrow
    Instructions, since Stewart Title does not contend that the provisions should be
    interpreted in such a fashion.
    24
    " 'The Supreme Court has rejected the transmutation of contract
    actions into tort actions "in favor of a general rule precluding tort
    recovery for noninsurance contract breach, at least in the absence of
    violation of 'an independent duty arising from principles of tort law'
    [citation] other than the bad faith denial of the existence of, or
    liability under, the breached contract." [Citation.]' [Citation.] As
    alleged, the Money Store's cause of action for negligence would be
    subject to summary adjudication because it does not state a
    negligence cause of action apart from its contract cause of action."
    (Id. at pp. 731-732.)
    In a separate one-sentence section of their brief, the Rideaus also contend that they
    are entitled to reversal of judgment on their negligence cause of action because Stewart
    Title "fail[ed] to disclose its on-going relationship with [BGJB], the fact that [BGJB]]
    was its client, that it met with [BGJB] on several occasions, yet never once spoke to the
    Rideaus." The Rideaus fail to present any legal argument or authority in support of this
    contention. Accordingly, we deem the contention forfeited. (See, e.g., People ex rel.
    Reisig v. Acuna (2010) 
    182 Cal.App.4th 866
    , 879 [" 'An appellate brief "should contain a
    legal argument with citation of authorities on the points made. If none is furnished on a
    particular point, the court may treat it as [forfeited], and pass it without consideration.'
    [Citation.]" [Citation.]' "].)
    25
    IV.
    DISPOSITION
    The judgment is reversed and the matter is remanded to the trial court. On
    remand, the trial court shall enter a new judgment in favor of the Rideaus on their breach
    of contract cause of action and in favor of Stewart Title on the remaining causes of action
    in the first amended complaint, in a manner consistent with this opinion. The trial court
    may also conduct any further ancillary proceedings that it deems necessary in order to
    enter the judgment. The Rideaus are entitled to costs on appeal.
    AARON, J.
    WE CONCUR:
    McCONNELL, P. J.
    O'ROURKE, J.