  • Filed 2/5/14
    CERTIFIED FOR PARTIAL PUBLICATION*
    IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
    FIRST APPELLATE DISTRICT
    DIVISION FIVE
    THE UTILITY REFORM NETWORK,
    Petitioner,                                           A138701
    PUBLIC UTILITIES COMMISSION,                                  (Cal. P.U.C. Dec.
    No. 12-12-035)
    Respondent;
    PACIFIC GAS AND ELECTRIC COMPANY
    et al.,
    Real Parties in Interest.
    _______________________________________
    INDEPENDENT ENERGY PRODUCERS
    ASSOCIATION et al.,
    Petitioners,                                          A139020
    PUBLIC UTILITIES COMMISSION,                                  (Cal. P.U.C. Dec.
    No. 13-04-032)
    Respondent;
    PACIFIC GAS AND ELECTRIC COMPANY
    et al.,
    Real Parties in Interest.
    _______________________________________/
    In 2012, Pacific Gas and Electric Company (PG&E) filed an application with the
    California Public Utilities Commission (the Commission) seeking approval of an
    *
    Pursuant to California Rules of Court, rules 8.1105(b) and 8.1110, this opinion is
    certified for publication with the exception of part V.
    1
    agreement by which PG&E would acquire a new gas-fired power plant in Oakley
    California (the Oakley Project). A principal issue in the application proceedings was
    whether there was a need for the Oakley Project. The need was said to arise in part from
    California’s efforts to obtain a greater percentage of its energy from renewable sources,
    thus requiring additional conventional electrical generating capacity to cope with
    fluctuations in supply due to the intermittent nature of wind and solar power.
    As evidence of this claimed need, PG&E presented a declaration from an
    executive of the California Independent System Operator (the CAISO) and a petition the
    CAISO had filed with a federal agency. Neither the CAISO executive nor the authors of
    the petition testified in the Commission’s proceedings. Because of their hearsay nature,
    the administrative law judge (ALJ) presiding over the application case ruled these
    materials could not be used as evidence of the need for the Oakley Project. She later
    issued a proposed decision recommending denial of PG&E’s application.
    The Commission did not adopt the ALJ’s decision, and its decision approving
    PG&E’s application expressly relied on these hearsay materials in finding the Oakley
    Project is needed. The Utility Reform Network (TURN), Western Power Trading Forum
    (WPTF), and Independent Energy Producers Association (IEP), which had participated in
    the application proceedings, sought rehearing before the Commission. Among other
    arguments, they claimed the Commission had violated their substantial rights by relying
    on hearsay evidence the ALJ had ruled could not be used as proof of need for the Oakley
    Project and that the Commission’s decision was unsupported by substantial evidence.
    After the Commission denied their applications for rehearing, they filed petitions for
    writs of review under Public Utilities Code section 1756, subdivision (a).1
    In the published portion of our opinion, we conclude the Commission’s finding of
    need is unsupported by substantial evidence, because it relies on uncorroborated hearsay
    materials the truth of which is disputed and which do not come within any exception to
    the hearsay rule. Under established California law, such uncorroborated hearsay
    1
    All further undesignated statutory references are to the Public Utilities Code.
    2
    evidence does not constitute substantial evidence to support an administrative agency’s
    finding of fact. Because the remaining evidence in the record fails to support the
    Commission’s finding of need, the decisions must be annulled.
    FACTUAL AND PROCEDURAL BACKGROUND
    The Oakley Project approval process has been the subject of at least three
    Commission proceedings extending over several years. We will explain those
    proceedings in summary fashion and limit our factual statement to matters relevant to the
    issues presented in the petitions before us.
    The Initial Application for the Oakley Project
    Under the Commission’s biennial procurement review process, investor-owned
    electric utilities (IOUs) such as PG&E must submit long-term procurement plans
    (LTPPs) that serve as the basis for utility procurement activities. (See § 454.5, subd. (a);
    Order Instituting Rulemaking to Establish Policies and Cost Recovery Mechanisms for
    Generation Procurement and Renewable Resource Development (Cal. P.U.C., Jan 22,
    2004) Dec. No. 04-01-050 [2004 Cal. PUC LEXIS 28 at pp. *11-12].) In a 2007
    decision, the Commission approved PG&E’s 2006 LTPP, and among other things,
    directed PG&E to issue a request for offers (RFO) “to obtain contracts for 800 to 1,200
    MW [megawatts] of new operationally flexible and dispatchable capacity by 2015.”
    PG&E issued the RFO in 2008. It later submitted an application to the
    Commission for approval of a proposed purchase and sale agreement (PSA) for the
    Oakley plant. In 2010, the Commission issued a decision denying approval for the
    Oakley Project. (Decision on Pacific Gas and Electric Company’s 2008 Long-Term
    Request for Offer Results and Adopting Cost Recovery Ratemaking Mechanisms (Cal.
    P.U.C., July 29, 2010) Dec. No. 10-07-045 [2010 Cal. PUC LEXIS 289 at p. *1]
    (hereafter D. 10-07-045).) In that decision, the Commission chose to “deny the Oakley
    Project at this time” and made a factual finding that the project was not needed. (Id. at
    pp. *60, 79.) Nevertheless, the Commission believed Oakley had “numerous beneficial
    attributes,” so it allowed PG&E to resubmit the application subject to various conditions.
    (Id. at p. *60.) Among other conditions, the Commission stated PG&E could resubmit
    3
    the application “[i]f the final results from the CAISO Renewable Integration Study
    demonstrate[] that, even with the projects approved by the Commission, there are
    significant negative reliability risks from integrating a 33% Renewable Portfolio
    Standard.”2 (Id. at p. *61.)
    The Commission’s Approval of the Oakley Project Is Annulled
    PG&E modified the Oakley PSA to address D. 10-07-045, and then submitted a
    petition for modification of that decision. Acting sua sponte, the Commission treated the
    petition for modification as an application for approval of the project. (Decision
    Authorizing Pacific Gas and Electric Company to Enter Into a Purchase and Sale
    Agreement with Contra Costa Generating Station LLC (Cal. P.U.C., Dec. 16, 2010) Dec.
    No. 10-12-050 [2010 Cal. PUC LEXIS 457, at p. *2] (hereafter D. 10-12-050).) A
    number of parties, including TURN and WPTF, filed comments opposing PG&E’s
    petition for modification, arguing that a new application, not a petition for modification,
    was the correct procedural vehicle for bringing the Oakley Project back for Commission
    consideration. (Id. at p. *7.) Although the Commission agreed with this procedural
    objection, it went on to consider PG&E’s filing as an application. (Id. at pp. *11-12.) It
    concluded that the benefits of the amended Oakley Project justified approval of the
    amended PSA. (Id. at pp. *19-20, 23.) After the Commission denied various parties’
    applications for rehearing, TURN sought writ review of D. 10-12-050 and the
    Commission’s decision denying rehearing, D. 11-05-049.
    In The Utility Reform Network v. Public Utilities Commission (Mar. 16, 2012,
    A132439) [nonpub. opn.] (TURN I), we annulled D. 10-12-050 and D. 11-05-049.3 We
    2
    The Renewable Portfolio Standard (RPS) is part of California’s effort to attain a target
    of generating 33 percent of its total retail sales of electricity from renewable energy
    resources by the end of 2020. (§§ 399.11, subd. (a), 399.12, subd. (i).)
    3
    Citation of our prior, unpublished opinion does not violate California Rules of Court,
    rule 8.1115(a) because “[w]e . . . cite the decision to explain the factual background of
    the case and not as legal authority.” (Pacific Gas & Electric Co. v. City and County of
    San Francisco (2012) 
    206 Cal. App. 4th 897
    , 907, fn. 10.)
    4
    held the Commission could not treat PG&E’s petition for modification as a new
    application because the Commission had failed to follow its own rules of practice and
    procedure. (TURN I, at pp. 11-21.) We concluded the Commission’s failure to proceed
    in the manner required by law had prejudiced the parties to the proceeding, and we
    therefore set aside the Commission’s decisions. (Id. at pp. 1-2, 20-21, 24-26.)
    Proceedings on PG&E’s Renewed Application
    Shortly after issuance of our decision in TURN I, PG&E filed with the
    Commission a new application for approval of the amended Oakley PSA. On May 21,
    2012, PG&E submitted prepared testimony in support of its application. The testimony
    addressed the need for and benefits of the Oakley Project, and it referred to a petition the
    CAISO had filed with the Federal Energy Regulatory Commission (FERC) seeking a
    waiver to prevent the retirement of the Sutter Energy Center (the Sutter Waiver Petition).
    PG&E asserted that the CAISO had supported the Sutter Waiver Petition with testimony
    describing CAISO studies that had “identified a need for new flexible generation capacity
    resources in 2017-2018 in order to integrate intermittent renewable resources.”4 PG&E
    relied in particular upon the declaration of CAISO Executive Director of Market Analysis
    and Development, Mark Rothleder (the Rothleder Declaration). In his declaration,
    Rothleder stated that using certain assumptions, the CAISO’s analysis had concluded
    “there will be a shortage or gap of 3,570 MW for meeting system-wide capacity needs in
    California by the end of 2017. This shortage would pose significant challenges to the
    reliable operation of the [CAISO] grid.” According to Rothleder, CAISO was concerned
    about the problem caused by integration of renewable energy resources, “especially given
    the retirement of thousands of MWs of once-through cooling (OTC) units.”
    On May 25, 2012, the commissioner assigned to PG&E’s application, Michael R.
    Peevey, issued his “Scoping Memo and Ruling” for the proceedings (the Scoping Memo).
    4
    Renewable energy resources, such as wind and solar power, are “intermittent” because
    they fluctuate naturally. To cite an obvious example, the availability of solar power is
    affected by the rising and setting of the sun and by cloud cover.
    5
    (See § 1701.1, subd. (b).) Among the issues identified in the Scoping Memo was the
    need for the Oakley Project. The Scoping Memo asked: “Is the Oakley PSA barred or
    authorized pursuant to D. 07-12-052, which requires all UOG [utility-owned generation]
    to be selected through a competitive process unless it is needed to meet a specific, unique
    reliability issue? This issue includes consideration of whether the Oakley project will
    meet a specific, unique reliability issue.” (Italics added; fn. omitted.) A separate issue
    laid out in the Scoping Memo was whether the CAISO had “issued its final report on its
    renewable resource integration study demonstrating significant negative reliability risks
    from integrating a 33% [RPS.]” (Fn. omitted.) The Scoping Memo stated that the first
    issue—the need for the Oakley Project—was one of fact and was contested by the parties.
    Commissioner Peevey therefore determined evidence was required and scheduled
    evidentiary hearings.
    In addition to its prepared testimony, PG&E asked the Commission to take official
    notice of decisions of the California Energy Commission (CEC) and the Bay Area Air
    Quality Management District (the District) regarding each agency’s review of elements
    of the Oakley Project. After submission of PG&E’s prepared testimony, the parties
    conducted discovery and responded with their own prepared testimony. PG&E, in turn,
    submitted rebuttal testimony that included a copy of the entire Sutter Waiver Petition.
    On August 14, 2012, the Commission’s Division of Ratepayer Advocates (DRA)
    filed a motion to strike portions of PG&E’s prepared and rebuttal testimony on the
    grounds that the identified portions consisted of “hearsay or double hearsay statements by
    representatives of the . . . CAISO, which have been submitted to prove the truth of the
    matter asserted therein: namely, that new system resources are needed to support system-
    wide operational flexibility needs beginning in 2017-2018.” The documents subject to
    DRA’s motion to strike included both the Rothleder Declaration and the Sutter Waiver
    Petition.
    Evidentiary Rulings
    On the first day of the evidentiary hearings, the presiding ALJ granted PG&E’s
    motion for official notice of the documents from the CEC and the District, but only “for
    6
    the limited purpose of supporting the testimony that’s already been given[.]” With
    respect to the Rothleder Declaration and the Sutter Waiver Petition, the ALJ granted
    DRA’s motion to strike in part, stating, “Regarding all the other attachments which refer
    to the . . . CAISO . . . , at issue in this case is whether the [CAISO] has issued a final
    determination, a final report, a final result, . . . and PG&E may offer evidence toward this
    issue. [¶] And these documents . . . on the issue of whether these very documents alone
    or in total satisfy the requirement, that requirement of D10-07-045, this evidence goes to
    that and is not – for that purpose it’s appropriate. [¶] I will not allow . . . this evidence
    . . . to be used for the purpose of proving on this record the truth of the matter asserted;
    that is, for proving that there is a system reliability need or . . . for the purpose of proving
    that what [the CAISO] says is true, or that the Commission should find on the basis of
    what the [CAISO] says that . . . what the [CAISO] says is true. [¶] The [CAISO’s]
    statements are not binding on the Commission, and in that way they are not judicially
    noticeable authority. And they are subject to dispute. They are being challenged before
    the [Commission]. [¶] And so again, I will not strike the attachments, but I will strike the
    testimony that does cite to those attachments for purposes of the truth.”
    During the course of the evidentiary hearings, the ALJ explained she would allow
    consideration of the CAISO materials for the purpose of showing whether the CAISO
    had reached a final determination on the issue of significant negative reliability risks, but
    not for the purpose of showing that the Oakley Project would meet a specific, unique
    reliability issue, i.e., whether there was a need for the Oakley Project. At one point, when
    DRA’s counsel told the ALJ that her proposed cross-examination was seeking
    information about PG&E’s claim that there was a residual need for flexible energy
    resources that could only be met by the Oakley Project, the ALJ stated, “I don’t want this.
    I don’t want hearsay evidence used for that issue, . . . because we can’t litigate that
    because we don’t have the [CAISO] here. [¶] [T]hat’s why I struck a lot of testimony
    from PG&E because it was using the third party statements for the truth of the matter
    7
    asserted. [¶] We cannot use the third party documentation for that. The third party
    documentation is for whether there’s a final [CAISO] report.”5
    The Proposed Decisions
    After briefing from the parties, the ALJ filed a proposed decision recommending
    denial of PG&E’s application. She found there was insufficient evidence of a specific,
    unique reliability need for the Oakley Project. The ALJ rejected PG&E’s reliance on
    various CAISO statements, including the Sutter Waiver Petition. She concluded PG&E’s
    use of the evidence violated her rulings and noted that because the CAISO was not a
    party to the proceedings, “there ha[d] been no opportunity to probe its out-of-record
    statements in the context of the specific issues presented here.”
    The ALJ’s proposed decision also relied on the fact that both the CAISO and
    PG&E were parties to a settlement in a separate Commission proceeding in which they
    had stipulated that “‘[t]he resource planning analyses presented . . . do not conclusively
    demonstrate whether or not there is need to add capacity for renewable integration
    purposes through the year 2020, the period to be addressed during the current LTPP
    cycle[.]’” In its decision approving the settlement in that proceeding, the Commission
    explained the parties had agreed to defer determination of the utilities’ future need for
    additional generation. (Decision on System Track I and Rules Track III of the Long-Term
    Procurement Plan Proceeding and Approving Settlement (Cal. P.U.C., April 19, 2012)
    Dec. No. 12-04-046 [2012 Cal. PUC LEXIS 192, at p. *8] (Decision Approving
    Settlement).)6 The Commission quoted the parties’ settlement agreement, which
    expressed the settling parties’ “‘general agreement that further analysis is needed before
    any renewable integration resource need determination is made.’” (Ibid.) In determining
    5
    Despite the obvious importance of the CAISO’s findings to the issues litigated in this
    proceeding, the CAISO elected not to become a party. It appears PG&E may have asked
    the CAISO to submit testimony, but the CAISO declined to do so.
    6
    On July 8, 2013, PG&E filed a request that we take judicial notice of several
    Commission decisions, as well as a document from the Commission’s records and an
    ALJ decision. We grant the request with respect to exhibits A through S, which are
    copies of Commission decisions. (Evid. Code, § 452, subd. (c).) We deny as moot the
    request as to exhibits T and U.
    8
    the reasonableness of the settlement, the Commission looked at the whole record and
    found “clear evidence . . . that additional generation is not needed by 2020, so there is
    record support for deferral of procurement.” (Id. at p. *11.)
    Assigned Commissioner Peevey issued a proposed alternate decision
    recommending approval of the Oakley PSA. The proposed alternate decision relied on
    the Sutter Waiver Petition and statements from CAISO’s chief executive officer as
    evidence that “retirement of OTC plants and integration of the 33% RPS by 2020 creates
    the potential for a significant reliability risk.”
    The Commission’s Decision
    In Decision No. 12-12-035 (the Oakley Decision), the full Commission adopted
    the proposed alternate decision and approved the amended Oakley PSA. The
    Commission referred to the ALJ’s ruling allowing the CAISO materials into the record
    only for limited purposes but noted that hearsay evidence is admissible in Commission
    proceedings. (Oakley Decision, p. 18.) It therefore chose to accord the CAISO studies
    and statements PG&E had introduced “less weight than we would for a CAISO study that
    was subject to cross examination in a Commission proceeding.” (Id. at pp. 18-19.) The
    Commission did not accept as true the CAISO’s conclusion that there would be a
    shortfall of 3,750 MW by 2018, but following the alternate decision, it concluded the
    CAISO’s findings were persuasive evidence demonstrating significant negative reliability
    risks from integrating a 33% RPS. (Id. at pp. 19, 37.)
    The Rehearing Decision
    IEP sought rehearing of the Oakley Decision, as did TURN and WPTF. In their
    applications, the parties contended the Commission had improperly relied on hearsay
    evidence for its finding of significant reliability risk. The applicants also argued the
    Commission had failed to preserve the substantial rights of the parties and had not
    proceeded in the manner required by law when it relied on hearsay evidence despite the
    ALJ’s ruling precluding use of the CAISO materials as evidence of need. (See Cal. Code
    Regs., tit. 20, § 13.6(a) (Rule 13.6(a)) [“Although technical rules of evidence ordinarily
    need not be applied in hearings before the Commission, substantial rights of the parties
    9
    shall be preserved.”].) Furthermore, the applicants claimed the Commission’s decision
    was not supported by substantial evidence.
    In Decision No. 13-04-032 (the Rehearing Decision), the Commission addressed
    the parties’ applications. It explained that in the Oakley Decision, it had intended to
    overrule the ALJ’s evidentiary ruling and could thus rely on the Rothleder Declaration
    and the Sutter Waiver Petition to demonstrate the need for the Oakley Project.
    (Rehearing Decision, p. 5.) Because it had not expressly overruled the ALJ, however, the
    Commission acknowledged it had “generated some confusion.” (Ibid.) The Commission
    explained it had “reviewed the ALJ’s ruling, and decided not to follow it.” (Id. at p. 6.)
    It therefore modified its earlier decision to make it expressly clear it was overruling the
    ALJ’s ruling regarding the use of the Rothleder Declaration and the Sutter Waiver
    Petition. (Id. at pp. 22-23.) It further ruled that the substantial rights of the parties had
    been preserved, because the parties had been given the opportunity to challenge the
    substance of the Rothleder Declaration and the Sutter Waiver Petition through their own
    testimony and through data requests to PG&E. (Id. at pp. 7-8.)
    The Commission also reasoned that its rules of practice and procedure permitted it
    to rely on hearsay evidence for the truth of the matter asserted. (Rehearing Decision,
    p. 6.) Under Rule 13.6(a), “‘the Commission allows admissions of hearsay although it is
    given less weight than other evidence. In general, hearsay in administrative proceedings
    is admissible if a responsible person would rely upon it in the conduct of serious affairs,
    regardless of its possible inadmissibility in civil actions.’” (Rehearing Decision, at p. 6.)
    Moreover, the Commission asserted, hearsay evidence is accepted in Commission
    proceedings when supported by other evidence, and administrative agencies are permitted
    to rely upon it. (Id. at p. 7.) Since the Rothleder Declaration and Sutter Waiver Petition
    had been submitted to FERC under penalty of perjury, the Commission found the Sutter
    Waiver Petition was “an analysis upon which [it] could reasonably rely in conducting
    [its] affairs.” (Ibid.) In addition to the Sutter Waiver Petition, the Commission cited
    statements from reports issued by the CEC and the District on the Oakley Project as the
    10
    basis for its finding of a “significant negative reliability risk from integrating a 33%
    [RPS] by 2020[.]” (Id. at p. 14.)
    After considering and rejecting all of the parties’ other arguments, the
    Commission denied the applications for rehearing. (Rehearing Decision, at pp. 22-23.)
    The Petitions for Review
    On May 20, 2013, TURN filed a petition for writ of review of the Commission’s
    decisions in this court. (§ 1756, subd. (a).) That same day, IEP and WPTF filed a
    combined petition for writ of review in the Court of Appeal for the Third Appellate
    District. On June 18, 2013, the Supreme Court ordered the latter proceeding transferred
    to this court. We consolidated the petitions on our own motion.
    DISCUSSION
    Petitioners raise a number of challenges to the Commission’s decisions. They
    devote the greater part of their briefing to their claim that the Commission failed to
    preserve the substantial rights of the parties because it relied on the Rothleder Declaration
    and the Sutter Waiver Petition to support the finding of need for Oakley Project despite
    the ALJ’s ruling that this evidence could not be used for that purpose. (See
    Rule 13.6(a).) They argue this prejudiced them because they were unable to challenge
    the claims made in these materials through cross-examination. In addition, they assert
    that if they had known the Commission would rely on these materials for the purpose of
    demonstrating the need for the Oakley Project, they would have presented their own
    evidence on that issue during the hearings.
    As we explain, we conclude we need not resolve petitioners’ procedural
    challenges. Even if we assume the Commission’s procedures sufficiently preserved the
    substantial rights of the parties, we do not find substantial evidence to support its finding
    that the Oakley Project is needed to meet a specific, unique reliability risk. Before
    addressing the issue of substantial evidence, we explain why writ review is appropriate
    and outline the scope of our review of the Commission’s decisions.
    11
    I.     Propriety of Writ Review
    Any party aggrieved by an order or decision of the Commission may petition for a
    writ of review from the Court of Appeal or the Supreme Court. (§ 1756, subd. (a).)
    “Where, as here, ‘writ review is the exclusive means of appellate review of a final order
    or judgment, an appellate court may not deny an apparently meritorious writ petition,
    timely presented in a formally and procedurally sufficient manner, merely because, for
    example, the petition presents no important issue of law or because the court considers
    the case less worthy of its attention than other matters.’ [Citation.] We are not, however,
    ‘compelled to issue the writ if the [Commission] did not err . . . .’ (Pacific Bell v. Public
    Utilities Com. (2000) 
    79 Cal. App. 4th 269
    , 282, fn. omitted.)” (PG&E Corp. v. Public
    Utilities Com. (2004) 
    118 Cal. App. 4th 1174
    , 1193.) We need not issue the writ “if the
    petitioning party fails to present a convincing argument for annulment of the
    [Commission’s] decision.” (Pacific Bell v. Public Utilities 
    Com., supra
    , 79 Cal.App.4th
    at p. 272.)
    In accordance with this standard, after considering the briefing and exhibits
    submitted by the parties, we concluded the petitions appeared meritorious. We therefore
    granted the writ petitions and gave notice of our intent to decide the matter on the record
    provided, unless a party promptly filed an objection or a request for oral argument.
    Having received no such objection or request, we deem the matter submitted.
    II.    Standard of Review
    Section 1757 delimits the scope of our review of Commission decisions. (§ 1757,
    subd. (a).) In this case, the petitioners’ challenges require us to determine whether: (1)
    the Commission has proceeded in the manner required by law and (2) the findings in its
    decision are supported by substantial evidence in light of the whole record. (§ 1757,
    subd. (a)(2), (4).)
    In assessing whether the Commission proceeded in the manner required by law
    (§ 1757, subd. (a)(2)), “we are mindful that ‘[t]here is a strong presumption of validity of
    the [C]ommission’s decisions . . . .’ [Citation.]” (Utility Consumers’ Action Network v.
    Public Utilities Com. (2010) 
    187 Cal. App. 4th 688
    , 697.) The Commission’s
    12
    interpretation of its own rules and regulations “is entitled to consideration and respect by
    the courts.” (Southern Cal. Edison Co. v. Public Utilities Com. (2000) 
    85 Cal. App. 4th 1086
    , 1096.) We will not interfere with the Commission’s choice of procedures “absent a
    manifest abuse of discretion or an unreasonable interpretation of the statutes governing its
    procedures[.]” (Pacific Bell v. Public Utilities 
    Com., supra
    , 79 Cal.App.4th at p. 283.) In
    addition, if we conclude the Commission has failed to proceed in the manner required by
    law, we will annul its decision only if that failure was prejudicial. (See Southern
    California Edison Co. v. Public Utilities Com. (2006) 
    140 Cal. App. 4th 1085
    , 1106.)
    Under section 1757, subdivision (a)(4), we apply “familiar principles to review for
    substantial evidence.” (SFPP, L.P. v. Public Utilities Commission (2013) 
    217 Cal. App. 4th 784
    , 794.) We must consider all relevant evidence in the record, but it is for
    the Commission to weigh the preponderance of conflicting evidence. (Ibid.) “The ‘in
    light of the whole record’ language means that the court reviewing the agency’s decision
    cannot just isolate the evidence supporting the findings and call it a day, thereby
    disregarding other relevant evidence in the record. [Citation.] Rather, the court must
    consider all relevant evidence, including evidence detracting from the decision, a task
    which involves some weighing to fairly estimate the worth of the evidence.” (Lucas
    Valley Homeowners Assn. v. County of Marin (1991) 
    233 Cal. App. 3d 130
    , 141-142
    (Lucas Valley).) We may reverse the Commission’s decision only if, based on the
    evidence before the Commission, no reasonable person could reach the conclusion it did.
    (SFPP, L.P. v. Public Utilities 
    Commission, supra
    , 217 Cal.App.4th at p. 794.)
    III.   Hearsay Evidence Is Admissible in Commission Proceedings But Cannot Be the
    Sole Support for a Finding of Disputed Fact.
    The parties agree that the Rothleder Declaration and the Sutter Waiver Petition are
    hearsay evidence.7 (Evid. Code, § 1200, subd. (a) [defining hearsay evidence]; Re
    Pacific Gas and Electric Company (1986) 23 Cal.P.U.C.2d 352, 354 [“Documentary
    evidence that is introduced for the purpose of proving the matter stated in the writing is
    7
    Neither the Commission nor PG&E claims these documents fall within an exception to
    the hearsay rule.
    13
    hearsay per se because the document is not a statement by a person testifying at the
    hearing.”].) The parties also agree that, as a general matter, hearsay evidence is
    admissible in Commission proceedings. In addition, although they disagree about the
    significance of petitioners’ lack of opportunity to cross-examine Rothleder or other
    CAISO officials, there is no dispute that the statements contained in the CAISO materials
    were not tested by cross-examination in this proceeding.
    Consequently, the issue before us is a narrow one. May the Commission base a
    finding of fact solely upon hearsay evidence where the truth of the extra-record
    statements is disputed? The answer is no.
    A.    Standards Governing the Admission and Weight of Hearsay Evidence in
    Commission Proceedings
    The Commission’s proceedings are governed by its rules of practice and
    procedure, “and in the conduct thereof the technical rules of evidence need not be
    applied.” (§ 1701, subd. (a); Rule 13.6(a).) The Commission’s own precedent
    establishes that hearsay evidence is admissible in its proceedings. (See, e.g.,
    Investigation on the Commission’s Own Motion Into the Fitness of the Officers,
    Directors, Owners and Affiliates of Clear World Communications Corporation
    (Cal.P.U.C., June 16, 2005) Dec. No. 05-06-033 [2005 Cal. PUC LEXIS 221, at p. *81]
    (Clear World Communications); Re Landmark Communications, Inc. (1999) 84
    Cal.P.U.C.2d 698, 701 (Landmark Communications).) Administrative agencies like the
    Commission are given more latitude to consider hearsay testimony than are courts (ibid.),
    in part because “factfinders in administrative proceedings are more sophisticated than a
    lay jury[.]” (Re Pacific Gas and Electric 
    Company, supra
    , 23 Cal.P.U.C.2d at p. 354.)
    “The Commission generally allows hearsay evidence if a responsible person
    would rely upon it in the conduct of serious affairs.” (Landmark 
    Communications, supra
    ,
    84 Cal.P.U.C.2d at p. 701.) The Commission may rely to some extent even on unverified
    prepared testimony, at least when it is submitted in anticipation of sworn oral testimony,
    and when due consideration is given to the fact that the sponsor of the testimony has not
    been subjected to cross-examination. (Re American Telephone and Telegraph Company
    14
    (1994) 54 Cal.P.U.C.2d 43, 49.) Hearsay evidence is given less weight, however, and if
    evidence is objectionable on hearsay grounds, “the Commission weighs it accordingly
    when all of the evidence in the case is reviewed.” (Landmark 
    Communications, supra
    ,
    84 Cal.P.U.C.2d at p. 701.)
    B.      Uncorroborated Hearsay Evidence Is Insufficient to Support a Finding of
    Fact.
    “The admissibility and substantiality of hearsay evidence are different issues.”
    (Gregory v. State Bd. of Control (1999) 
    73 Cal. App. 4th 584
    , 597.) As the California
    Supreme Court has explained, “mere admissibility of evidence does not necessarily
    confer the status of ‘sufficiency’ to support a finding absent other competent evidence.”
    (Daniels v. Department of Motor Vehicles (1983) 
    33 Cal. 3d 532
    , 538, fn. 3, italics added
    (Daniels).) “There must be substantial evidence to support . . . a board’s ruling, and
    hearsay, unless specially permitted by statute, is not competent evidence to that end.”
    (Walker v. City of San Gabriel (1942) 
    20 Cal. 2d 879
    , 881 (Walker), overruled on another
    ground in Strumsky v. San Diego County Employees Retirement Assn. (1974) 
    11 Cal. 3d 28
    , 37, 44.)
    California decisions adhere to the so-called “residuum rule,” under which the
    substantial evidence supporting an agency’s decision must consist of at least “a residuum
    of legally admissible evidence[.]”8 (1 Witkin, Cal. Evidence, supra, § 60, p. 72.) A
    version of the rule has been codified in this state’s Administrative Procedure Act, which
    provides: “Hearsay evidence may be used for the purpose of supplementing or
    explaining other evidence but over timely objection shall not be sufficient in itself to
    support a finding unless it would be admissible over objection in civil actions.” (Gov.
    Code, § 11513, subd. (d), italics added.)
    This provision of the Administrative Procedure Act does not apply to hearings
    before the Commission, and the agency has never expressly adopted the rules embodied
    8
    Witkin calls hearsay falling within an exception to the hearsay rule “competent
    hearsay.” (1 Witkin, Cal. Evidence (5th ed. 2012) Introduction, § 67, p. 80.)
    “Incompetent hearsay” is hearsay evidence that would not be admissible over objection in
    a civil action. (See 
    id., § 68,
    at p. 81.)
    15
    in that statute. (§ 1701, subd. (b); Re Pacific Gas and Electric 
    Company, supra
    , 23
    Cal.P.U.C.2d at p. 354.) The Commission’s decisions nevertheless follow the general
    rule stated in Government Code section 11513, subdivision (d) and articulated by the
    California Supreme Court in cases such as 
    Walker, supra
    , 
    20 Cal. 2d 879
    . For example,
    in Clear World 
    Communications, supra
    , 2005 Cal. PUC LEXIS 221, at page *81, the
    Commission noted that “[w]hile hearsay is admissible in our administrative hearings, it
    cannot be the basis for an evidentiary finding without corroboration where the truth of the
    out-of-court statements is at issue. (Gov. Code § 11513(d).)” Consequently, hearsay is
    admissible in Commission proceedings, but it “may not be solely relied upon to support a
    finding[.]”9 (Re Communication TeleSystems International (1996) 66 Cal.P.U.C.2d 286,
    292, fn. 8.) Thus, like the California courts, the Commission has followed the residuum
    rule.
    The residuum rule, and the California cases applying it, have been the subject of
    forceful criticism. (Collins, Hearsay and the Administrative Process: A Review and
    Reconsideration of the State of the Law of Certain Evidentiary Procedures Applicable in
    California Administrative Proceedings (1976) 8 Sw.U. L.Rev. 579, 591-598, 607-615.)
    The rule was abandoned in the federal courts after the United States Supreme Court’s
    decision in Richardson v. Perales (1971) 
    402 U.S. 389
    . (See, e.g., Johnson v. United
    States (D.C. Cir. 1980) 
    628 F.2d 187
    , 190 [“We have rejected a per se approach that
    brands evidence as insubstantial solely because it bears the hearsay label.”].) Thus, in a
    case upon which the Commission relies, the United States Court of Appeals for the
    District of Columbia Circuit rejected as unsupported the claim “that uncorroborated and
    untested testimony and hearsay testimony cannot constitute substantial evidence.”
    9
    The Commission does not appear to have concluded it may base a finding of fact solely
    upon uncorroborated hearsay evidence that does not fall within an exception to the
    hearsay rule. (See Re Investigation into Possible Overassessment by the State Board of
    Equalization of Property Owned by Commission-regulated Utilities (1998) 80
    Cal.P.U.C.2d 685, 697, fn. 1 [declining to decide the question]; cf. Re Pacific Gas and
    Electric 
    Company, supra
    , 23 Cal.P.U.C.2d at p. 354 [“We . . . have not reached the
    question of whether documentary evidence, standing alone, would provide legally
    sufficient evidence of a disputed fact necessary to support our decision.”].)
    16
    (Echostar Communications Corp. v. F.C.C. (D.C. Cir. 2002) 
    292 F.3d 749
    , 753
    (Echostar).)
    As the foregoing discussion of California law makes clear, however, the
    Commission’s reliance on Echostar is necessarily misplaced. Unlike federal law, under
    California statutory and decisional law, as well as the Commission’s own decisions,
    uncorroborated hearsay cannot constitute substantial evidence to support an agency’s
    decision absent specific statutory authorization.10 
    (Daniels, supra
    , 33 Cal.3d at pp. 536-
    537; accord, In re Lucero L. (2000) 
    22 Cal. 4th 1227
    , 1244 [citing Walker with
    approval].) This means that even if it was proper for the Commission to consider and
    rely upon the Rothleder Declaration and the Sutter Waiver Petition over the petitioners’
    procedural objections, its finding that the Oakley Project is needed cannot rest on those
    materials alone. Having clarified that this hearsay evidence may not serve as the sole
    factual basis for the Commission’s finding, we now consider whether there is other
    competent, substantial evidence to support the Commission’s decision.
    10
    Since the Commission’s own precedent holds that uncorroborated hearsay is
    insufficient to support a finding of disputed fact, it does not appear to claim it possesses
    such specific statutory authorization. We note that in response to petitioners’ procedural
    arguments, the Commission and PG&E have relied on the following language of
    section 1701, subdivision (a): “No informality in any hearing, investigation, or
    proceeding or in the manner of taking testimony shall invalidate any order, decision or
    rule made, approved, or confirmed by the commission.”
    The California Supreme Court has required very explicit statutory authorization
    before permitting an agency’s reliance on uncorroborated hearsay. For example, hearings
    in workers’ compensation cases are governed by Labor Code section 5709, which
    provides: “No informality in any proceeding or in the manner of taking testimony shall
    invalidate any order, decision, award, or rule made and filed as specified in this division.
    No order, decision, award, or rule shall be invalidated because of the admission into the
    record, and use as proof of any fact in dispute, of any evidence not admissible under the
    common law or statutory rules of evidence and procedure.” (Italics added.) In Daniels,
    the court suggested that even this very broad statutory language “does not necessarily
    sanction sole reliance on uncorroborated hearsay.” 
    (Daniels, supra
    , 33 Cal.3d at p. 539,
    fn. 4.) We need not definitively resolve the issue, as the Commission’s own rulings
    preclude reliance on uncorroborated hearsay to support a finding of fact.
    17
    IV.    The Commission’s Finding of Need Is Unsupported By Substantial Evidence.
    Petitioners contend the Commission’s finding of need for the Oakley Project is
    unsupported by substantial evidence. They concede hearsay evidence is admissible
    before the Commission, but they argue that the Rothleder Declaration and the Sutter
    Waiver Petition lack the “‘satisfactory indicia of reliability’” that make reliance on
    hearsay evidence appropriate. (See Rehearing Decision, at p. 7, quoting 
    Echostar, supra
    ,
    292 F.3d at p. 753.) In addition, they assert there is no corroborating evidence to support
    the Commission’s finding that “the integration of the 33% RPS and phase-out of [OTC]
    plants creates the potential for a significant reliability risk before 2020.”
    In response, both the Commission and PG&E set forth lists of evidence they
    contend supports the Commission’s finding of need. In accordance with our standard of
    review, we will examine the cited evidence in light of all relevant evidence in the record.
    (Lucas 
    Valley, supra
    , 233 Cal.App.3d at p. 142.)
    A.     The Evidence Cited by the Commission
    We begin with the evidence upon which the Commission expressly relied.11 To
    support the finding of need, the Oakley Decision cited only the Sutter Waiver Petition
    and a statement by the CAISO’s Chief Executive Officer, Steve Berberich. (Oakley
    Decision, pp. 17-19.) Acknowledging their hearsay nature, the Commission gave these
    materials “reduced weight,” but it adjudged them to be “persuasive evidence” of the
    existence of a significant reliability risk. (Id. at pp. 18-19; see SFPP, L.P. v. Public
    Utilities 
    Commission, supra
    , 217 Cal.App.4th at p. 794 [Commission may weigh value of
    conflicting evidence].)
    11
    The Commission’s identification of the evidence upon which it relied in making
    findings of fact is helpful for purposes of judicial review, but there is no requirement that
    its decisions “contain a complete summary of all proceedings and evidence leading to the
    decision.” (Toward Utility Rate Normalization v. Public Utilities Com. (1978) 
    22 Cal. 3d 529
    , 540.) Our statutory standard of review requires us to evaluate the findings in the
    decision “in light of the whole record.” (§ 1757, subd. (a)(4).) We therefore consider all
    record evidence, even if it was not specifically cited by the Commission.
    18
    Petitioners argue these hearsay materials are particularly unreliable based on a
    number of factors. Since the Commission has already recognized the materials are
    hearsay and has accorded them reduced weight, we need not determine whether they
    should be given even less weight because of the factors petitioners raise.12 As explained
    in part III.B., ante, unless the CAISO materials are corroborated by other competent
    evidence, they do not constitute substantial evidence to support the Commission’s
    decision. Thus, whatever evidentiary weight is due the CAISO materials, they cannot
    alone support the Commission’s finding of need for the Oakley Project. 
    (Daniels, supra
    ,
    33 Cal.3d at p. 538, fn. 3; Clear World 
    Communications, supra
    , 2005 Cal. PUC LEXIS
    221, at p. *81.)
    As further support for the Commission’s finding of need, the Rehearing Decision
    cited a passage from the District’s Final Determination of Compliance for the Oakley
    Project. (Rehearing Decision, at p. 14.) The District stated: “The proposed facility will
    . . . provide energy-efficient electric generation capacity using new conventional
    generation technology, with operational flexibility to efficiently address grid fluctuations
    due to the intermittent nature of renewable generation such as wind and solar.” This
    statement, however, says only that the Oakley facility would provide generation capacity
    to address general grid fluctuations due to the intermittent nature of renewable energy
    sources. It does not address the actual question posed in the Scoping Memo, which was
    “whether the Oakley project will meet a specific, unique reliability issue.” (Italics
    added.) Moreover, the District’s passing statement was made in the context of its
    analysis of “how the facility will comply with applicable air quality regulatory
    requirements[.]” The District was not analyzing the issue of need for the Oakley
    Project,13 and its statement therefore does not support the Commission’s finding on that
    12
    Since we do not reach this issue, we deny as moot IEP’s June 21, 2013 request for
    judicial notice.
    13
    Indeed, while PG&E’s prepared testimony cited this passage from the District’s
    determination, it did so only in the chapter of its testimony addressing the Oakley
    Project’s development and construction status, not in the chapter addressing the issue of
    need.
    19
    issue. (See City of Los Angeles v. Public Utilities Commission (1972) 
    7 Cal. 3d 331
    , 349
    & fn. 11 (City of Los Angeles) [evidence did not support increase in cost of service where
    it addressed only cost of establishing new service in one city but not costs in cities where
    service was already established].)
    The Rehearing Decision also quoted from the CEC’s final permit decision on the
    Oakley Project. (Rehearing Decision, p. 14.) After acknowledging the intermittent
    nature of wind and solar power, the CEC noted, “in order to rely on such intermittent
    sources . . . , utilities must have available other, nonrenewable generating resources . . .
    that can fill the gap when renewable generation decreases. . . . [¶] [The Oakley Project]
    is likely to serve as an important firming source for intermittent renewable resources in
    support of California’s RPS and [greenhouse gas] goals.” The CEC explained, however,
    that its “siting process is not intended to determine market need for power plants. That
    determination is made by the [Commission], which, in December 2010 approved the
    [PSA] between the Applicant and PG&E for the [Oakley] Project.” The CEC thus
    disclaimed any intention to determine whether the Oakley Project was needed, referring
    instead to the Commission’s approval of the Oakley PSA in D. 10-12-050, the decision
    we annulled in TURN I. In light of these limitations, the CEC’s statement does not
    constitute substantial evidence to support the Commission’s determination of need. (Cf.
    City of Los 
    Angeles, supra
    , 7 Cal.3d at p. 340 [where sole support for Commission
    decision was earlier decision annulled by Supreme Court, decision under review could
    not be sustained].)
    B.     Other Evidence
    In its answer, the Commission points to the testimony of a PG&E witness as
    support for the claim that “the Oakley Project can provide a significant contribution to the
    integration of the 33% RPS.” First, although the Commission has provided us with some
    excerpts of the reporter’s transcript, the cited testimony does not appear to be among
    them. Second, testimony about whether the Oakley Project can contribute to meeting a
    possible need does not support the claim that the need itself exists. The remaining
    evidence cited in the Commission’s answer addresses issues other than the Scoping
    20
    Memo’s question about whether the Oakley Project is needed to address a specific,
    unique reliability issue. We find no support for the finding of need in this evidence.
    PG&E’s answer lists other items of evidence to support the Commission’s finding
    of need, evidence not cited in the Commission’s own answer. Much of the evidence
    simply refers to or relies on the CAISO’s assessment of need. For example, the rebuttal
    testimony submitted by the Coalition of California Utility Employees and California
    Unions for Reliable Energy states, “The period during which there are fears that
    reliability needs may occur that a 2020 power plant cannot meet, according to the
    [CAISO], is every year from 2013 through 2019[.]” (Italics added.) The testimony
    makes no definitive statement that there will be reliability needs, but makes projections
    about “post-2016 Sutter costs” “if there are reliability needs in 2020 or before[.]” (Italics
    added.)
    PG&E also cites its own testimony concerning the possible effect of the retirement
    of the San Onofre Nuclear Generation Station14 and nonrenewal of the licenses for its
    Diablo Canyon nuclear power plant. But this testimony is based in significant part on the
    possibility that licenses for the latter plant will not be renewed in 2024 and 2025. PG&E
    claimed only that if its Diablo Canyon plant is not relicensed, there will be a greater need
    for new generation sources in Northern California.
    PG&E also directs us to various attachments to DRA’s testimony. Some of these
    are simply slides from a CAISO presentation showing how electrical generating capacity
    varies over the course of a day. They are thus both hearsay and unresponsive to the
    question of need. Another is a data response from PG&E concerning the Oakley
    Project’s effect on the retirement of OTC facilities. It also fails to address the issue of
    need for the Oakley Project. Yet another is testimony PG&E and other utilities provided
    in the Commission’s 2010 LTPP proceeding, but as explained earlier, in that proceeding
    14
    Citing an online news release, rather than material in the Commission’s record, PG&E
    tells us that Southern California Edison has announced plans to retire this plant. Even if
    we assume this is a fact subject to judicial notice, PG&E has not requested judicial notice
    of it.
    21
    PG&E joined a settlement in which it agreed that further analysis would be needed
    “‘before any renewable integration resource need determination is made.’” (Decision
    Approving 
    Settlement, supra
    , 2012 Cal. PUC LEXIS 192, at p. *8.) Finally, PG&E also
    cites a DRA cross-examination exhibit that consists of Rothleder’s testimony in a
    separate Commission proceeding. This testimony does not appear to be sworn and is
    hearsay in any event. Furthermore, Rothleder states that the CAISO “recommends that
    the Commission’s assessment of the need for new system resources to meet renewable
    integration needs should take place in this docket during calendar year 2013 with a
    decision on system needs by December 2013.” (Italics added.) Given that
    recommendation, this testimony would hardly seem to support a finding of need in this
    proceeding.
    In sum, the materials identified by PG&E are either themselves based on CAISO’s
    hearsay analysis or do not address the issue of need for the Oakley Project. They
    therefore cannot serve to corroborate the hearsay materials upon which the Commission
    relied to support its finding of need. Because the Commission’s finding is based upon
    uncorroborated hearsay evidence, and the truth of the CAISO’s extra-record statements is
    disputed, the finding cannot be sustained. (Clear World 
    Communications, supra
    , 2005
    Cal. PUC LEXIS 221, at p. *81; Cleancraft, Incorporated v. San Diego Gas and Electric
    Company (1983) 11 Cal.P.U.C.2d 975, 984 [party’s claim could not rest on “the hearsay
    opinions of unavailable experts”].)
    V.    TURN Has Not Demonstrated the Commission Failed to Proceed in the Manner
    Required by Law in Refusing to Apply the Requirements of D. 12-04-046
    Retroactively.
    TURN contends the Commission failed to proceed in the manner required by law
    when it determined that the requirements for UOG procurement announced in the
    Decision Approving Settlement (D. 12-04-046) did not apply to PG&E’s application in
    this proceeding. (See § 1757, subd. (a)(2).) Briefly summarized, in the Decision
    Approving Settlement, the Commission determined that “UOG procurement will be done
    through the certificate of public convenience and necessity (CPCN) process.” (Decision
    Approving 
    Settlement, supra
    , 2012 Cal. PUC LEXIS 192, at p. *46.) As the Oakley
    22
    Decision explains, “D. 12-04-046 bars UOG unless it is needed to meet the utility’s
    authorized procurement due to a failed RFO.” (Oakley Decision, p. 8.) The Commission
    declined to apply the requirements of that decision to the proposed Oakley PSA,
    however, because the decision had been adopted after PG&E filed its application in this
    proceeding. (Ibid.) Although TURN contends this was legal error, we conclude it has
    failed show the Commission committed a manifest abuse of discretion. (Pacific Bell v.
    Public Utilities 
    Com., supra
    , 79 Cal.App.4th at p. 283.)
    Initially, we observe that the argument in TURN’s petition differs somewhat from
    the one it made in its application for rehearing before the Commission. (See § 1732 [“No
    . . . person shall in any court urge or rely on any ground not so set forth in the application
    [for rehearing]”].) There, TURN and WPTF conceded that “the failure to comply with
    the policy adopted in D. 12-04-046 may not represent legal error per se[.]” Nevertheless,
    they submitted that the Commission should have applied the requirements of that
    decision “as a matter of policy[.]” Given TURN’s “shifting theories,” we question
    whether this argument is properly before this court. (See Utility Consumers’ Action
    Network v. Public Utilities 
    Com., supra
    , 187 Cal.App.4th at p. 704.)
    Even if this argument is properly before us, TURN’s petition does not adequately
    explain what interests are prejudiced by the alleged error. (See Southern California
    Edison Co. v. Public Utilities 
    Com., supra
    , 140 Cal.App.4th at p. 1106.) Perhaps more
    important, TURN’s application for rehearing admits that this issue concerns a matter of
    policy. Where the Commission’s decision is not “legally compelled” but rather involves
    a choice between competing policies, this court is not at liberty to interfere with it. (See
    SFPP, L.P. v. Public Utilities 
    Commission, supra
    , 217 Cal.App.4th at p. 798.) We
    therefore reject TURN’s argument.
    23
    DISPOSITION
    Commission decision D. 12-12-035, as modified by D. 13-04-032, is annulled.
    _________________________
    Jones, P.J.
    We concur:
    _________________________
    Needham, J.
    _________________________
    Bruiniers, J.
    24
    Robert E. Finkelstein for petitioner The Utility Reform Network.
    Goodin, MacBride, Squeri, Day & Lamprey LLP, Robert A. Goodin, Brian T. Cragg,
    Suzy Hong, Megan Somogyi, for petitioner Independent Energy Producers Association.
    Douglass & Liddell, Daniel W. Douglass, for petitioner Western Power Trading Forum.
    Paul Clanon, Frank Lindh, Helen W. Yee, Jack M. Mulligan for respondent Public
    Utilities Commission.
    Charles Middlekauf for real parties in interest Pacific Gas and Electric Company.
    Latham & Watkins LLP, James L. Arnone and Laura A. Godfrey, for real parties in
    interest Pacific Gas and Electric Company and Contra Costa Generating Station, LLC.
    25