Gordon v. 101 Ash CA4/1 ( 2024 )


Menu:
  • Filed 10/25/24 Gordon v. 101 Ash CA4/1
    NOT TO BE PUBLISHED IN OFFICIAL REPORTS
    California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
    publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
    or ordered published for purposes of rule 8.1115.
    COURT OF APPEAL, FOURTH APPELLATE DISTRICT
    DIVISION ONE
    STATE OF CALIFORNIA
    JOHN A. GORDON,                                                      D081523
    (Consolidated with D081919)
    Plaintiff and Appellant,
    v.
    (Super. Ct. No. 37-2020-
    101 ASH, LLC et al.,                                                 00028837-CU-FR-CTL)
    Defendants and Respondents.
    APPEAL from judgments of the Superior Court of San Diego County,
    Joel R. Wohlfeil, Judge. Affirmed.
    Aguirre & Severson, Michael J. Aguirre, Maria C. Severson, and Elijah
    T. Gaglio for Plaintiff and Appellant.
    Vantage Law Group and Michael H. Riney; Caldarelli Hejmanowski
    Page & Leer and Marisa Janine-Page for Defendant and Respondent
    101 Ash, LLC.
    Office of the City Attorney, Mara W. Elliot, City Attorney, and
    M. Travis Phelps, Assistant City Attorney; Schwartz Semerdjian Cauley &
    Evans, Dick A. Semerdjian and John A. Schena for Defendants and
    Respondents City of San Diego and Rolando Charvel.
    Ballard Spahr, Craig Soloman Ganz, Michael S. Myers, and Mitchell L.
    Turbenson for Defendant and Respondent Wilmington Trust, National
    Association.
    In 2016, defendant City of San Diego (the City)1 entered into a lease-to-
    own agreement (Lease) for an office building located at 101 Ash Street in
    downtown San Diego (Ash Street Property or Building). Not long after the
    City workers had moved into the Building, asbestos contamination required
    all workers to vacate the Ash Street Property. The City sued the various
    principals involved in the Lease transaction. Plaintiff John A. Gordon, a
    taxpayer, brought his own suit against the City and other principals to the
    Lease (which is the matter pending before us), alleging that the Lease
    violated the California Constitution and is thus void, and seeking
    disgorgement of payments the City had made under the Lease. After
    Gordon’s suit had commenced, the City settled its lawsuit with the various
    principals (Settlement Agreement). One of the terms of the Settlement
    Agreement was the termination of the Lease.
    On appeal, we independently conclude that the claims in Gordon’s
    operative complaint are moot because the Lease ceased to exist under the
    Settlement Agreement. We further conclude that the exceptions to the
    mootness doctrine are inapplicable; and that, without any remaining injury
    or wrong in his operative complaint, Gordon is not entitled to disgorgement of
    the rent the City paid under the Lease. We thus affirm the judgments for
    Defendants.
    1      Also named in this lawsuit is defendant Rolando Charvel, sued in his
    official capacity as the City’s chief financial officer (collectively, the City).
    2
    FACTUAL AND PROCEDURAL OVERVIEW
    A. Prelude to the Lease
    In 2014, during a review of office space leases occupied by City staff in
    downtown San Diego, the City recognized that 49 percent of its then-current
    leases would expire within the next five years, and that lease rates were then
    increasing due to demand and a lack of development of office space. As a
    result, the City began focusing on long-term solutions to control its office
    space expenses including office ownership, purportedly to “minimize the
    negative effects of being subject to real estate conditions outside the City’s
    control, with the ultimate goal of saving taxpayer’s money.” As one example
    of its focus, in March 2015, the City entered into a lease-to-own
    arrangement2 for an office building at Civic Center Plaza (CCP), located at
    1200 Third Avenue and 201 A Street. Under this arrangement, the landlord
    acquired CCP through a loan funded by the lender of CCP, and the City then
    2     Lease-to-own agreements are sometimes used by local governments to
    acquire and use real property. One of the attributes of such agreements is
    that they avoid the necessity of voter approval for such acquisitions, as
    required by article 16, section 18, subdivision (a) of the California
    Constitution, which provides in pertinent part: “No . . . city . . . shall incur
    any indebtedness or liability in any manner or for any purpose exceeding in
    any year the income and revenue provided for such year, without the assent
    of two-thirds of the voters of the public entity voting at an election to be held
    for that purpose.” (Cal. Const., art. XVI, § 18, subd. (a).) Our Supreme Court
    has concluded that a long-term, lease-to-own agreement would not violate
    this provision “so long as liability for each individual rent payment is
    contingent” on the locality’s use of the leased property during the
    corresponding rental period, or on “receipt of some additional,
    contemporaneous consideration.” (Rider v. City of San Diego (1998)
    
    18 Cal.4th 1035
    , 1047, 1049, citing Doland v. Clark (1904) 
    143 Cal. 176
    , 181.)
    3
    entered into a lease agreement with the landlord and made payments directly
    to the lender.
    B. The City’s Lease of the Ash Street Property
    Since about 2013, the City had engaged Jason Hughes as a “volunteer
    Special Assistant for Real Estate Services” and had “authorized him to advise
    [the City] on leasing strategies, negotiate with its potential landlords and
    property sellers, and represent it in negotiating the terms of any contract or
    lease for its downtown San Diego office needs.” Ultimately, Hughes’s role
    included his involvement in the events and transactions leading to the City’s
    Lease of the Ash Street Property.
    Prior to the Lease with the City, the Ash Street Property was owned
    and operated by “entities controlled” by Sandor Shapery (Shapery) and
    Douglas Manchester (Manchester), specifically, The Gas & Electric
    Headquarters Building—San Diego, L.P., and Shapery Developers Gas &
    Electric Property, L.P. (the Manchester and Shapery entities). Hughes
    engaged in “protracted negotiations” with Shapery and Manchester over the
    lease or sale of the Ash Street Property to the City. When a deal could not be
    reached, Hughes commenced negotiations with Cisterra Partners, LLC
    (Cisterra) on the City’s behalf regarding a lease-to-own plan that the City
    would approve if Cisterra could acquire the Ash Street Property.
    In July 2016 the City executed a “letter of intent with Cisterra
    expressing an intention to enter into a lease-to-own arrangement” for the Ash
    Street Property. In October 2016, Cisterra pitched the proposed transaction
    to the City Council; Hughes attended the meeting as the City’s
    representative.
    In anticipation of the Lease with the City, Cisterra created a limited
    liability company, defendant 101 Ash, LLC (Landlord). As an underlying
    4
    transaction related to the Lease, the Manchester and Shapery entities sold
    the Ash Street Property to Landlord for $72.4 million.
    To purchase the Ash Street Property from the Manchester and Shapery
    entities, Landlord borrowed $91,793,022.123 from defendant Wilmington
    Trust, National Association, as trustee for the registered certificate holders of
    the CGA Capital Credit Lease-Backed Pass-Through Trust, Series 2017-CTL-
    1, a Maryland-based provider of private capital (Lender). Landlord executed
    a promissory note in the same amount, secured in part by a “Deed of Trust,
    Security Agreement, Assignment of Leases and Rents and Fixture Filing” in
    favor of Lender. As a condition of obtaining the loan, Landlord assigned and
    granted Lender a security interest in the Lease, and directed the City to
    remit to Lender all payments of rent and all other sums the City owed under
    the Lease. The City subsequently learned that the closing transactions for
    the Ash Street Property included a transfer to Hughes (the “volunteer Special
    Assistant for Real Estate Services”) of $4.41 million from Cisterra and/or
    101 Ash LLC.
    Landlord and the City entered into the Lease in mid-November 2016.
    The City agreed to lease the Ash Street Property “as is” for a 20-year term,
    with the option to acquire the Ash Street Property from Landlord (Cisterra’s
    LLC) when the Lease ended. The Lease was authorized by San Diego
    Municipal Ordinance Number 0-20745, passed by the city council on
    November 15, 2016, and approved by then Mayor Kevin Faulconer on
    3     According to the Gordon’s complaint, “Cisterra passed $19.5 million in
    costs on to City . . . , making the total acquisition price of [the Ash Street
    Property] to the City approximately $92 million.”
    5
    November 17, 2016. The Lease was slated to become effective on January 3,
    2017, without a vote of the electorate.
    In sum, the Manchester and Shapery entities sold the Building to a
    limited liability company created by Cisterra (101 Ash, LLC, Landlord), who
    paid for the property with a loan from Lender (Wilmington Trust). 101 Ash,
    LLC then leased the Building to the City, with instructions that the City’s
    rent payments would go to Lender.
    1. Rent
    Under the Lease, the City, as Tenant, agreed to pay the base monthly
    rent of $534,726.50 as well as “Additional Rent,” which the Lease defined as
    any cost incurred by Landlord in curing any failure by the City to maintain
    the Ash Street Property under the Lease.
    Section 4(e) of the Lease provided: “Tenant hereby certifies to Landlord
    that Tenant has fully investigated options and alternatives to the lease of the
    Premises, including rental rates, terms and conditions, and has utilized the
    services of commercial real estate leasing professionals familiar with local
    market conditions and that, as of the Effective Date of this Lease, the total
    Rent during any twelve (12)-month period during the Term . . . is not in
    excess of the total fair rental value of the Premises.”
    2. Environmental
    Section 6(b) of the Lease provided that the City, at its sole expense,
    would ensure the Ash Street Property complied with all environmental laws,
    including those related to hazardous materials such as “asbestos” and
    “asbestos-containing materials and/or products.” Section 6(c) further
    provided that, if, at any time during the 20-year Lease period, “Hazardous
    Materials” were found to have been “released, placed, stored, brought onto,
    into or under the Premises” by the City (including its contractors), then the
    6
    City, at its “sole expense,” would “promptly commence and diligently
    prosecute to completion all investigation, site monitoring, containment,
    cleanup, removal, restoration or other remedial work of any kind or
    nature . . . to the extent required” under the Lease.
    Section 6(c)(ii) provided that the City would “be solely responsible for
    and to the maximum extent permitted by law [would] defend, reimburse,
    indemnify, and hold Landlord . . . harmless from and against all demands,
    claims, actions, causes of action . . . [and] losses . . . arising out of” “(A)
    Tenant’s obligations in this Lease, (B) The occurrence of any regulated
    activity at, on or under the Premises at any time, (C) Any environmental
    claim with respect to the Premises . . . , (D) The release, threatened release or
    presence of any hazardous materials at, on, under or from the premises by a
    tenant-responsible party or any third-party before or during the term of this
    Lease . . . , (E) Any remedial work required to be performed pursuant to any
    environmental law or the terms hereof . . . during the [Lease] term, or
    (F) Any matters arising under or relating to any environmental law and
    relating to the tenant or the Premises.” (Bold and all capitalization omitted.)
    3. Rent Abatement
    Section 11(a) provided for rent abatement if, prior to the termination of
    the Lease, the Ash Street Property was subject to “(i) an event of loss,
    damage or destruction, whether by fire or hazard or other casualty to all or a
    portion of the Premises . . . caused by a peril that was or should have been
    covered by insurance”; or (ii) a taking by “any actual or threatened eminent
    domain proceeding . . . by any governmental authority.”
    Section 11(i) further provided in part: “If, during any period in which,
    by reason of an event of Destruction [as defined in section 11(a)], there is
    substantial interference with the use and occupancy by Tenant of any portion
    7
    of the Premises, payments of Base Rent due hereunder with respect to the
    Premises shall be abated to the extent that the annual fair rental value of the
    portion of the Premises in respect of which there is no substantial
    interference is less than the annual Base Rent payments and Additional
    Rent, in which case rental payments shall be abated only by an amount equal
    to the difference.”
    4. Additional Provisions
    Section 13 provided that, at the end of the Lease, in consideration of
    the City’s full performance of its obligations, Landlord shall convey to the
    City fee title to the Ash Street Property.
    Section 30 provided that in return for payment of rent, Landlord would
    not do “any act to disturb, or fail to perform any act which failure results in
    the disturbance of, the peaceful and quiet occupation and enjoyment of the
    Premises” by the City.
    C. Renovation and Occupancy of the Ash Street Property
    The City did not immediately occupy the Ash Street Property once it
    took possession in January 2017. Instead, the city council authorized the
    City to engage contractors to remodel the Ash Street Property to “maximize
    the efficiency of the building.” Once completed, the City estimated the
    Building could accommodate approximately 1,100 City employees. In August
    2018, the city council authorized the expenditure of no more than
    $25,880,410 for the tenant improvements. At some point during the remodel,
    City employees began to occupy the Building.
    On August 14, 2019, the San Diego County Air Pollution Control
    District (APCD) issued a notice of violation to the City for its “[f]ailure to
    remove all Regulated Asbestos-Containing Material (RACM) from [the
    Building] being renovated before starting any activity that would break up,
    8
    dislodge, or disturb RACM. Specifically, disturbed RACM from construction
    activity was found on various floors inside the Building.” The City was given
    10 business days to correct the alleged violations or explain why it believed
    the violations were unfounded. APCD subsequently issued similar notices of
    violation to the City on January 16, 17, and 28, 2020. As a result of the
    notices of violation, APCD declared that the City had created a public
    nuisance stemming from the release of asbestos during the Building’s
    remodel.
    In late January 2020, the City removed all of its employees from the
    Ash Street Property. In September 2020, the City notified Landlord that it
    would discontinue paying rent because it could not use the Ash Street
    Property for the purposes intended “due, in part, to direct physical loss and
    damage to the premises, including from widespread and negligent
    disturbance of asbestos.” The City also stated it was investigating whether
    the Lease complied with state law, including the constitutional debt
    limitation provision in article 16, section 18, subdivision (a). (Cal. Const.,
    art. XVI, § 18, subd. (a) (Section 18(a)).)
    D. The City’s Lawsuit
    In October 2020, the City filed a lawsuit against Lender and Landlord.
    (City of San Diego v. 101 Ash, LLC et al., case No. 37-2020-00036247-CU-CO-
    CTL) (City Lawsuit).) In January 2021, Landlord and Lender filed cross-
    complaints against the City, and Lender also filed a cross-complaint against
    the City’s contractors and subcontractors, who in turn filed their own cross-
    complaints.
    In August 2021, the City filed a first amended complaint against
    Lender, Landlord, various contractors and subcontractors, and other
    defendants including Cisterra, Hughes, and Hughes Marino, Inc., a
    9
    California corporation (Hughes Marino). When the City filed its amended
    complaint, it had paid Lender 44 months of rent under the Lease, totaling
    $23,527,966.
    In its first and fourth causes of action against Cisterra, Landlord, and
    Hughes, the City alleged a violation of Government Code section 1090 et seq.
    as a result of Hughes’s purported undisclosed financial interest in the Ash
    Street transaction, including his receipt of $4.41 million from Cisterra and/or
    Landlord, and fraud/concealment, respectively. In its second and third
    causes of action against Hughes, the City alleged causes of action for
    fraud/intentional misrepresentation and breach of fiduciary duty,
    respectively. In its fifth and sixth causes of action, the City sought the return
    of all money it had paid as a result of the Lease being void under Government
    Code section 1090 et seq. and Civil Code section 1688 et seq., respectively;
    and in its seventh and eighth causes of action, the City sought declaratory
    relief and reformation of the Lease, respectively, based on Section 18(a).
    Specifically, the City in its seventh cause of action alleged that an event
    of loss, damage, or destruction had occurred on the Ash Street Property
    which “has resulted in substantial interference with the use and occupancy
    by the City of the premises, such that the City is not able to occupy any
    portion of the premises as envisioned by the . . . Lease”; that the “premises
    are therefore unusable for the purposes intended and thereby confer no value
    to the City”; that an actual controversy existed between the City, on the one
    hand, and Lender and Landlord, on the other hand, over whether the City is
    “entitled to rent abatement” under the Lease for the period it is unable to
    occupy the Ash Street Property; and that, to the extent Lender and Landlord
    continued to demand that rent be paid despite the City’s inability to use and
    occupy the Ash Street Property, the payments would be in violation of
    10
    Section 18(a) because they were “not ‘contingent on receipt of some
    additional, contemporaneous consideration, such as the [the City’s] ongoing
    use and occupancy of the building.’ ”
    In the eighth cause of action, the City sought judicial reformation of the
    Lease to the extent it did not permit rent abatement. Under that
    circumstance, the City alleged that the parties had “made a mutual mistake
    when reducing the agreement to writing in drafting an impermissibly narrow
    abatement provision,” and that the Lease therefore did “not truly express the
    intention of the parties.” The City requested the Lease be reformed to
    “include a provision that permits abatement of rent where City is not able to
    occupy the Premises as envisioned by the . . . Lease.”
    E. Settlement of the City Lawsuit and Termination of the Lease
    On July 28, 2022, Lender, Landlord, the City, and Cisterra entered into
    the Settlement Agreement resolving the City Lawsuit as to these parties.4
    As relevant here, under the Settlement Agreement the City acquired fee
    ownership of the Ash Street Property in return for a payment equal to the
    outstanding balance on the loan, which the parties then estimated to be
    about $86 million; the City agreed to take the Ash Street Property in its “as-
    is, where-is condition, without representation or warranty”; the Lease
    terminated with “no further force or effect”; and Cisterra agreed to pay the
    City $7,452,500.
    4     Although not the subject of this appeal, the City Lawsuit proceeded
    against the remaining defendants. In addition, the Settlement Agreement
    also resolved a separate suit the City had brought involving the 2015 CCP
    transaction, which suit is also not the subject of this appeal. (City of San
    Diego v. CCP 1200, LLC, et al. case No. 37-2021-00028026-CU-FR-CTL.)
    11
    F. Gordon’s Lawsuit
    Meanwhile, in August 2020 (two months prior to the City Lawsuit),
    Gordon filed the instant taxpayer action against Landlord and others
    pursuant to Code of Civil Procedure section 526a,5 alleging claims for
    fraudulent and negligent misrepresentation, and waste of public funds and
    resources. Gordon never served the original complaint.
    In December 2020, Gordon filed a first amended complaint (FAC)—the
    operative pleading in this case —against the City, Lender, and Landlord
    (Defendants). His first cause of action against Defendants sought a
    declaration that the Lease was void under Section 18(a) because it “obligated
    revenues and the payments without a contemporaneous contingent benefit of
    consideration.” His second cause of action, also premised in part on
    Section 18(a), sought a judgment “restraining and preventing any illegal
    expenditure or waste of public funds regarding [the Ash Street Property].”
    His third and fourth causes of action, against Lender and Landlord,
    respectively, sought disgorgement of public funds each received from the City
    under the Lease.
    In support of his causes of action in the FAC, Gordon alleged Landlord
    in 2016 presented to City a “Property Condition Report” for the Building.
    The report described the Building as being well-maintained and in good
    condition, with an “estimated remaining useful life of ‘at least an additional
    40 years barring any natural disasters,’ ” and requiring only an expenditure
    of “$10,000 to clean, caulk and pressure wash the exterior of the building.”
    5    Unless otherwise indicated, all further statutory references are to the
    Code of Civil Procedure.
    12
    Gordon alleged that, in fact, the Ash Street Property suffered from a
    lack of proper maintenance and/or deferred maintenance affecting safe
    occupancy; that the previous owners were aware of the deferred maintenance
    and unsafe conditions; that the Building would require extensive remediation
    and repair; that representations to the contrary Cisterra made to the City
    were knowingly false; and that the City would need to expend tens of millions
    of dollars in repairs and it would take years of work before the City could
    safely occupy the Ash Street Property. “As a result of these
    misrepresentations, the City of San Diego was in fact unable to safely occupy
    [t]he [Ash Street Property] under the [Lease].”
    Gordon further alleged that the “functional obsolescence” of the
    Building included “a need for asbestos abatement,” at an estimated cost
    between $16 million and $25 million; that in November 2014, “SDG&E
    representatives . . . disclosed to State regulators [t]he [Ash Street Property]
    had major defects,” including asbestos containment that suffered from “old
    age and lack of maintenance”; and that in 2020, outside experts hired by the
    City “confirmed that the asbestos containment, which date[d] back to original
    construction, [had] also exceeded its reasonably expected useful life
    necessitating abatement costs in excess of $20 million to make the building
    capable of safe occupancy for the next 40 years.”
    Gordon also alleged that because the Building was unusable for all
    practical purposes, and therefore the City was not receiving any actual
    consideration for the Lease, the Lease violated Section 18(a) and should be
    deemed void, and the City should be restrained from paying any further rent.
    13
    G. Summary Judgment/Adjudication
    1. Lender
    Prior to the execution of the Settlement Agreement in the City Lawsuit,
    Lender moved for summary adjudication on all of Gordon’s claims.6 The trial
    court granted the motion, ruling that the Lease was a “permissible contingent
    obligation” that satisfied Section 18(a); and that as a result, all of Gordon’s
    claims against Lender failed as a matter of law.
    2. The City
    Following execution of the Settlement Agreement, the City moved for
    summary judgment in the instant case. The trial court granted the City’s
    motion, ruling Gordon’s first and second causes of action were moot because
    his lawsuit sought to “adjudicate the validity of an agreement which has been
    terminated by the parties to that agreement.” The court rejected Gordon’s
    contention that the action was not moot because the Settlement Agreement
    itself was void, finding there was no evidence to support this contention and,
    in any event, to challenge the Settlement Agreement under Section 18(a)
    would necessarily give rise to a new action.
    The trial court also rejected Gordon’s contention that his claims against
    the City were not moot because there remained an active disgorgement claim,
    noting those claims were only against Landlord and Lender; and his
    contention that the mootness doctrine did not apply because there was a
    “ ‘reasonable expectation there will be similar lease financings that raise the
    6    Lender’s motion was for summary adjudication and not summary
    judgment because of Lender’s pending cross-complaint against the City for
    indemnification. Lender subsequently dismissed that cause of action
    pursuant to the Settlement Agreement.
    14
    same . . . Section 18 compliance issues” as the instant case, finding that claim
    to be speculative.
    3. Landlord
    In December 2022, Landlord moved for summary adjudication. Similar
    to its ruling for the City, the trial court granted Landlord’s motion in its
    entirety, finding Gordon’s first and second causes of action were moot as a
    result of the Settlement Agreement; and his fourth “cause of action” for
    disgorgement was barred because the Lease was neither unconstitutional nor
    illegal. The court thus found its ruling granting summary adjudication of all
    claims equated to an order granting summary judgment, and entered
    judgment for Landlord.
    DISCUSSION
    I.
    Summary Judgment/Adjudication
    “ ‘Summary adjudication motions are “procedurally identical” to
    summary judgment motions. [Citation.] A summary judgment motion “shall
    be granted if all the papers submitted show that there is no triable issue as to
    any material fact and that the moving party is entitled to a judgment as a
    matter of law.” [Citation.] To be entitled to judgment as a matter of law, the
    moving party must show . . . that the “action has no merit or that there is no
    defense” thereto. [Citation.] . . . Material facts are those that relate to the
    issues in the case as framed by the pleadings. [Citation.] There is a genuine
    issue of material fact if, and only if, the evidence would allow a reasonable
    trier of fact to find the underlying fact in favor of the party opposing the
    motion in accordance with the applicable standard of proof.’ ” (Duffey v.
    Tender Heart Home Care Agency, LLC (2019) 
    31 Cal.App.5th 232
    , 240–241
    (Duffey).)
    15
    “ ‘The trial court’s ruling on a motion for summary adjudication, like
    that on a motion for summary judgment, is subject to [our] independent
    review’ ” (Duffey, 
    supra,
     31 Cal.App.5th at p. 241); and we are not bound by
    the trial court’s stated reasons or rationale (Hersant v. Department of Social
    Services (1997) 
    57 Cal.App.4th 997
    , 1001 (Hersant)). We do not weigh
    evidence, but instead consider whether it creates a triable issue of fact.
    (Andrews v. Foster Wheeler LLC (2006) 
    138 Cal.App.4th 96
    , 113.)
    In reviewing summary judgment, we typically view the evidence in a
    light favorable to the losing party. (See Saelzler v. Advanced Group 400
    (2001) 
    25 Cal.4th 763
    , 768–769.) In contrast, whether a cause of action or
    action is moot involves questions of law on undisputed facts, which we review
    de novo. (See Robinson v. U-Haul Co. of California (2016) 
    4 Cal.App.5th 304
    ,
    319 (Robinson) [“Issues of justiciability, such as mootness, are generally
    reviewed de novo.”]; see also K.G. v. Meredith (2012) 
    204 Cal.App.4th 164
    ,
    174 [“Trial court rulings on mootness are reviewed de novo where . . . they
    are decided on undisputed facts.”].)
    II.
    Mootness
    A. Gordon’s First and Second Causes of Action Are Moot
    1. Guiding Principles
    It is axiomatic that courts only decide justiciable issues. (§ 1060
    [providing in part that a person “interested under a written instrument,
    excluding a will or a trust,” “who desires a declaration of his or her rights or
    duties with respect to another, or in respect to, in, over or upon property, . . . ,
    may, in cases of actual controversy relating to the legal rights and duties of
    the respective parties, bring an original action or cross-complaint in the
    superior court for a declaration of his or her rights and duties in the
    16
    premises, including a determination of any question of construction or
    validity arising under the instrument or contract” (italics added)].)
    Justiciability means the questions litigated are based on an actual
    controversy. (Wilson & Wilson v. City Council of Redwood City (2011)
    
    191 Cal.App.4th 1559
    , 1574 (Wilson & Wilson).) Mootness occurs when a
    once ripe actual controversy no longer exists due to a “ ‘change in
    circumstances.’ ” (Ibid. [noting “ ‘ripeness is not a static state’ ”].)
    “[A]lthough a case may originally present an existing controversy, if before
    decision it has, through act of the parties or other cause, occurring after the
    commencement of the action, lost that essential character, it becomes a moot
    case or question which will not be considered by the court.” (Wilson v. Los
    Angeles County Civil Service Com. (1952) 
    112 Cal.App.2d 450
    , 453
    [dismissing action challenging the validity of civil service eligibility list that
    had expired and been replaced by a new list]; see Wilson & Wilson, at p. 1574
    [the completion of a redevelopment project in the city rendered the
    landowner’s challenge to the project moot].) “Issues of justiciability, such as
    mootness, are generally reviewed de novo.” (Robinson, 
    supra,
     4 Cal.App.5th
    at p. 319.)
    2. Analysis
    As summarized ante, Gordon’s first and second causes of action are
    premised on the existence of the Lease; namely whether it satisfied the
    constitutional debt limitation in Section 18(a), and whether it constituted
    17
    waste.7 However, once Defendants’ entered into the Settlement Agreement
    in the City Lawsuit and the Lease ceased to have any “force or effect,” both
    causes of action became moot. (See San Diegans for Open Government v.
    Public Facilities Financing Authority of City of San Diego (2021)
    
    63 Cal.App.5th 168
    , 183 [the plaintiff’s challenge to a cooperation agreement
    between the city and a private party for improvements to Balboa Park was
    moot because the party terminated that agreement during the appeal];
    Pittenger v. Home Sav. & Loan Ass’n of Los Angeles (1958) 
    166 Cal.App.2d 32
    ,
    37 [the plaintiffs’ declaratory relief cause of action against the defendant who
    formerly held a note executed by the plaintiffs secured by a deed of trust,
    which the defendant transferred for full value to another mortgage company
    after the commencement of suit, mooted the plaintiffs’ action because they
    were “seek[ing] a determination of rights as against [the defendant] under a
    contractual relationship which has become nonexistent” (italics added)].)
    “When events render a case moot, the court, whether trial or appellate,
    should generally dismiss it.” (Wilson & Wilson, supra, 191 Cal.App.4th at
    p. 1574.) This is because courts are “tasked with the duty ‘ “to decide actual
    controversies by a judgment which can be carried into effect, and not to give
    opinions upon moot questions or abstract propositions, or to declare
    principles or rules of law which cannot affect the matter in issue in the case
    before it.” ’ ” (In re D.P. (2023) 
    14 Cal.5th 266
    , 276 (In re D.P.); accord, Center
    7      “An action to obtain a judgment, restraining and preventing any illegal
    expenditure of, waste of, or injury to, the estate, funds, or other property of a
    local agency, may be maintained against any officer thereof, or any agent, or
    other person, acting in its behalf, either by a citizen resident therein, or by a
    corporation, who is assessed for and is liable to pay, or, within one year
    before the commencement of the action, has paid, a tax that funds the
    defendant local agency” including “[a]n income tax.” (§ 526a, subd. (a)(1).)
    18
    for Local Government Accountability v. City of San Diego (2016)
    
    247 Cal.App.4th 1146
    , 1157 [“ ‘The policy behind a mootness dismissal is that
    “courts decide justiciable controversies and will normally not render advisory
    opinions.” ’ ”]; Jennings v. Strathmore Public etc. Dist. (1951) 
    102 Cal.App.2d 548
    , 551 [citizen’s suit to enjoin the construction of a sewer system was moot
    because a “decision as to the validity of the contracts, . . . after the work has
    been completed and after the payments have been made and where no relief,
    under the complaint could be afforded plaintiff, would be purely academic
    and would serve no useful purpose”].)
    In the instant case, Gordon’s first cause of action asks the court to
    deem the Lease void, and the second cause of action asks the court to restrain
    the City from further payments under the Lease. But as a result of the
    settlement of the City Lawsuit, the Lease terminated and the City was no
    longer obliged to make any further payments. Thus, these causes of action
    became moot upon termination of the Lease, as there is no longer any
    controversy on which “effectual relief” can be granted. (See Wilson & Wilson,
    
    supra,
     191 Cal.App.4th at p. 1574 [“The pivotal question in determining if a
    case is moot is . . . whether the court can grant the plaintiff any effectual
    relief.”]; accord, Citizens for the Restoration of L Street v. City of Fresno (2014)
    
    229 Cal.App.4th 340
    , 362 [“An appeal is moot if the appellate court cannot
    grant practical, effective relief.”].) We thus independently conclude summary
    adjudication was properly granted as to Defendants on Gordon’s first and
    second causes of action.
    19
    B. The Exceptions to the Mootness Doctrine Do Not Apply
    Gordon nonetheless contends his first and second causes of action are
    not moot because the City’s payment of the loan “ ‘in full’ ” under the
    Settlement Agreement “compounded the violation of [Section 18(a)] meant to
    protect municipal taxpayers.”
    Critically for this issue, Gordon’s FAC does not include any allegations
    that the Settlement Agreement, as opposed to the Lease, violated
    Section 18(a), nor does it appear from the record that Gordon sought to
    amend his complaint to add such allegations. (See Frittelli, Inc. v. 350 North
    Canon Drive, LP (2011) 
    202 Cal.App.4th 35
    , 41 [“In assessing the propriety of
    summary judgment, we look first to . . . [the] allegations in the operative
    complaint, which frame the issues pertinent to a motion for summary
    judgment.”]; accord, Ahn v. Stewart Title Guaranty Co. (2023) 
    93 Cal.App.5th 168
    , 181 [“the pleadings frame the issues on a motion for summary
    judgment”].) Thus, the issue of whether the Settlement Agreement violated
    Section 18(a) was not before the trial court and it is not before us.
    In support for his argument that his first and second causes of action
    are not moot because the Settlement Agreement compounded the violation
    under Section 18(a), Gordon relies on Starr v. City and County of San
    Francisco (1977) 
    72 Cal.App.3d 164
     (Starr), arguing the Court of Appeal
    there found a “settlement repayment contract violated . . . Section 18 because
    payments were not made in consideration for [the] use and occupancy of the
    premises, just as in this case.” We conclude Starr is inapposite and provides
    no meaningful guidance in our case.
    First, Starr had nothing to do with justiciability.
    Second, Starr is factually distinguishable from the instant case in that
    the settlement agreement between the San Francisco Redevelopment Agency,
    20
    and a taxpayer who challenged a financing agreement for the construction of
    a project, predated additional provisions that were added to the financing
    agreement about a year later. (Starr, supra, 72 Cal.App.3d at p. 178.) The
    Starr court concluded it was these additional provisions—and not the original
    lease between the city and the agency, or the settlement agreement between
    the agency and the taxpayer—that violated Section 18(a).8 (Starr, at p. 178.)
    Thus the settlement agreement at issue in Starr, which, in any event, was
    the result of the taxpayer’s challenge to the scope of the construction project
    and not to its financing, had absolutely nothing to do with the court’s holding
    in that case.
    Gordon alternatively contends his first and second causes of action are
    justiciable because the issue of the validity of the Lease “is likely to repeat,
    injuring taxpayers down the road.” In support, he cites Southern Counties
    Gas Co. v. Ventura Pipeline Constr., Co. (1971) 
    19 Cal.App.3d 372
     (Ventura
    Pipeline) among similar authorities.
    In Ventura Pipeline, the plaintiff utility company sought about $1,000
    in damages from the defendant for repairs the plaintiff made to underground
    pipeline installed by the defendant. The plaintiff alleged the pipeline lacked
    a protective coating as required under the parties’ contracts, causing it to
    corrode and leak natural gas; and sought declaratory relief to determine the
    8     The added provisions required the city to repay from its general funds
    that portion of the outstanding indebtedness the agency owed the United
    States Department of Housing and Urban Development (HUD) under a loan
    HUD had made to the agency that went toward the construction project.
    (Starr, supra, 72 Cal.App.3d at p. 173.) The Starr court found these
    provisions violated Section 18(a) because none of the city’s payments to HUD
    on behalf of the agency could “be credited toward the [c]ity’s rental
    obligations” under the valid project lease. (Ibid.)
    21
    parties’ respective rights. (Ventura Pipeline, supra, 19 Cal.App.3d at
    pp. 376–377.) The dispute centered on whether the superior court had
    authority to grant declaratory relief and thus retain jurisdiction of the
    matter, or whether the matter should have been transferred to what was
    then the municipal court, because the amount in controversy was less than
    $5,000. (Id. at p. 377.)
    Ventura Pipeline held the trial court acted properly in granting
    declaratory relief for the plaintiff because there was a present controversy
    between the parties regarding who was responsible for the costs to repair the
    underground pipes when they leaked. (Ventura Pipeline, supra,
    19 Cal.App.3d at p. 377.) In reaching its decision, the Ventura Pipeline court
    recognized the plaintiff had not only presented a claim for the costs to make
    repairs for corrosion damage “previously discovered, but also [for] the
    prospect, if not the likelihood, that additional incidents will continue to
    reoccur.” (Id. at p. 381.) The court noted that the defendant had installed
    “thousands of feet” of underground pipeline which could not be readily
    inspected (ibid.); that there already had been “several instances” where the
    failure to apply protective coating had caused the pipeline to leak (id. at
    p. 376); and that it typically took three to five years for gas leaks to become
    noticeable (id. at p. 379). The court thus concluded the matter was not moot,
    as it presented “ ‘a continuing controversy ripe for decision’ ” because there
    was a “ ‘reasonable expectation that the wrong [if any] will be repeated’ ” by
    future gas leaks from corroded pipeline. (Id. at p. 381.)
    The facts of Ventura Pipeline are vastly different from those in the
    instant case. Unlike here, there was substantial evidence in Ventura Pipeline
    that the “wrong”—the failure of the defendant to put a protective coating on
    thousands of feet of underground pipeline it installed—was likely to recur,
    22
    given that the plaintiff already had repaired “several” gas leaks due to
    corrosion. In contrast, there is no evidence of a “reasonable expectation” that
    the “wrong” here—a public entity subject to Section 18(a) entering into a
    leasing arrangement involving a building with significant environmental
    problems, with terms restricting rent abatement—“will be repeated.” (See
    Ventura Pipeline, supra, 19 Cal.App.3d at p. 381.) In short, allegations of
    “speculative future harm” are not “sufficient to avoid mootness.” (In re D.P.,
    supra, 14 Cal.5th at p. 278.)
    Pivoting, Gordon next contends the validity of the Lease “presents a
    question of continuing importance in local public finance,” and therefore
    requests that we exercise our “inherent discretion” to resolve that issue even
    if it is moot. Under the so-called public importance exception to the mootness
    doctrine, “ ‘[i]f an action involves a matter of continuing public interest and
    the issue is likely to recur, a court may exercise [its] inherent discretion to
    resolve that issue, even though an event occurring during its pendency would
    normally render the matter moot.’ ” (Giraldo v. Department of Corrections &
    Rehabilitation (2008) 
    168 Cal.App.4th 231
    , 259.)
    As we have stated, whether a future lease-to-own arrangement would
    violate the constitutional debt limitation provision of Section 18(a) will
    undoubtedly turn on unique facts and circumstances that have yet to occur.
    (See Giles v. Horn (2002) 
    100 Cal.App.4th 206
    , 228 [reversing as moot the
    trial court’s ruling that the County of San Diego violated the County Charter
    by hiring private contractors to provide services under a California welfare-
    to-work program because the relevant contracts had expired, and declining to
    apply the public importance exception to the mootness doctrine because the
    plaintiffs’ claim involved a “particularly factual determination that must be
    resolved on a case-by-case basis, dependent upon the specific facts of a given
    23
    situation,” and therefore it was “not one on which we would exercise our
    discretion to address on the merits, despite the fact it is moot”].) We
    therefore decline to exercise our discretion to resolve this mooted issue, as we
    are not persuaded that the issue here is a significant one that is likely to
    recur and evade review.
    III.
    Summary Adjudication Was Proper on the Third and Fourth “Causes of
    Action” for Disgorgement
    Gordon’s third and fourth causes of action against Lender and
    Landlord, respectively, seek disgorgement of money each received from the
    City under the former Lease. However, disgorgement is a remedy, not a type
    of injury or wrong: “There is a ‘basic distinction . . . between the cause of
    action (the primary right and duty, and the violation thereof) and the remedy
    or relief sought.’ (4 Witkin, Cal. Procedure (4th ed. 1997) Pleading, § 30,
    p. 92.) ‘The gravamen, or essential nature . . . of a cause of action is
    determined by the primary right alleged to have been violated, not by the
    remedy sought.’ [Citations.]” (Slovensky v. Friedman (2006) 
    142 Cal.App.4th 1518
    , 1535, 1536 (Slovensky) [concluding “[d]isgorgement of attorney’s fees is
    a remedy sought by plaintiff,” and therefore her “general prayer for ‘such
    other and further relief as the Court may deem proper’ was sufficient to plead
    entitlement to disgorgement as a remedy”].)
    Although the trial court ruled Gordon’s third and fourth causes of
    action were subject to summary adjudication because the Lease was neither
    unconstitutional nor illegal, we are “not bound by the trial court’s stated
    reasons or rationale.” (Hersant, 
    supra,
     57 Cal.App.4th at p. 1001; accord,
    Prilliman v. United Air Lines, Inc. (1997) 
    53 Cal.App.4th 935
    , 951 [“An
    appellate court is not bound by the trial court’s stated reasons, if any,
    24
    supporting its ruling; we review the ruling, not the rationale.”].) Instead, we
    independently conclude that summary adjudication was properly granted on
    these causes of action because Gordon’s first and second causes of action are
    moot, and therefore there is no remaining injury or wrong in the FAC to
    support disgorgement. (See Slovensky, 
    supra,
     142 Cal.App.4th at p. 1535.)9
    9      In light of our decision, we deem it unnecessary to address other issues
    raised by the parties, including whether (i) the Lease complied with Section
    18(a) and/or the City acted in “good faith,” for purposes of this provision,
    when it entered into the Lease; and (ii) Gordon had taxpayer standing to
    maintain this action, both at its commencement and/or after the City filed its
    own lawsuit seeking similar relief under Section 18(a). (See Wolf v. CDS
    Devco (2010) 
    185 Cal.App.4th 903
    , 916 [“A plaintiff may lose standing even
    where an actual controversy originally existed ‘but, by the passage of time or
    a change in circumstances, ceased to exist.’ ”].) Finally, we deny Gordon’s
    opposed request for judicial notice of three documents: (1) the text of
    Government Code section 1090; (2) the criminal misdemeanor complaint
    against Hughes filed in March 2023; and (3) Hughes’s resulting guilty plea,
    as we conclude none are relevant to our decision. (See Jordache Enterprises,
    Inc. v. Brobeck, Phleger & Harrison (1998) 
    18 Cal.4th 739
    , 748, fn. 6
    [declining to take judicial notice of materials that are not “necessary, helpful,
    or relevant”].)
    25
    DISPOSITION
    The judgments for the Lender, Landlord, and the City are affirmed.
    Defendants are entitled to their respective costs on appeal. (See Cal. Rules of
    Court, rule 8.278(a)(1).)
    KELETY, J.
    WE CONCUR:
    HUFFMAN, Acting P. J.
    CASTILLO, J.