- 1 2 3 4 5 6 UNITED STATES DISTRICT COURT 7 NORTHERN DISTRICT OF CALIFORNIA 8 9 10 CALIFORNIA DEPARTMENT OF TOXIC SUBSTANCES CONTROL, 11 No. C 19-01116 WHA Plaintiff, 12 v. 13 ORDER APPROVING DEE M. MCLEMORE TRUST, et al., PROPOSED CONSENT 14 DECREE Defendants. 15 16 17 INTRODUCTION 18 In this civil action to compensate the California Department of Toxic Substances Control 19 for costs incurred in the cleanup of a polluted plot of land, the Department and the landowner 20 have reached an accord. The proposed consent decree being fair, reasonable, and serving the 21 intent of the statute, the motion for its approval, to the following extent, is GRANTED. 22 STATEMENT 23 A prior order details our facts (Dkt. No. 61). In brief, this action centers around the 24 contamination of real property in Oakland. Between 1972 and 2005, defendant Hard Chrome 25 Engineering, Inc. operated a metal and chromium-plating business on the plot, which involved 26 cleaning baths for machine parts, mechanical stripping by sandblasting and grinding, and 27 plating baths which used chromic and sulfuric acid. Other chemicals used onsite included 1 During operations, Hard Chrome deposited hazardous substances directly into the ground or 2 emitted them into the air (and around the plot) via an exhaust hood. 3 Hard Chrome originally leased the land from Dee M. McLemore, but began leasing the 4 land from our defendant, the Dee M. McLemore Trust, in about 1988. Upon Mr. McLemore’s 5 death in 1992, his surviving spouse, Cheryl Plato McLemore, became a co-trustee and the 6 designated beneficiary of the trust. 7 In 2005, the California Department of Toxic Substances Control executed an Imminent 8 and Substantial Endangerment Determination and Consent Order that required the Trust to 9 investigate and remediate the release of hazardous substances at and from the Hard Chrome 10 Engineering real property. In 2008, however, Ms. McLemore informed the Department that 11 the trust could no longer comply with the I&SE Order, allegedly due to insufficient assets. The 12 Department took over the investigation and remediation. It approved a removal action 13 workplan in 2012 and began physical on-site construction of a remedy in 2013. As of 14 September 30, 2020, the Department has expended $3,541,975.74 (including interest and legal 15 fees) on the cleanup effort. 16 In February 2019, the Department sued for reimbursement under the Comprehensive 17 Environmental Response Compensation and Liability Act (CERCLA), 42 U.S.C. § 9601 et 18 seq. Following limited motion practice, the undersigned referred the parties to Magistrate 19 Judge Kandis Westmore for mediation. Following several sessions, the parties reached an 20 agreement. After the appropriate public comment period, the Department moves for approval 21 of the proposed consent decree. This order follows unopposed briefing by the Department and 22 is appropriate for disposition on the papers. 23 ANALYSIS 24 A consent decree under CERCLA must be fair, reasonable, and consistent with the Act’s 25 objectives. Fairness includes both a procedural component, probing the candor, openness, and 26 balance of the bargaining process, and a substantive component, which ensures the 27 apportionment of liability according to some rational basis. Reasonability probes the technical 1 for the realities of litigation. The final prong guarantees that the settlement accords with 2 Congress’s objective, expedient and efficient cleansing of our environment. Arizona v. City of 3 Tucson, 761 F.3d 1005, 1010–12 (9th Cir. 2014); United States v. Cannons Eng’g Corp., 899 4 F.2d 79 (1st Cir. 1990). 5 The relevant portions of the proposed settlement are as follows. The trust will liquidate 6 both its real and non-real property assets. Of the non-real assets, the trust will pay to the 7 Department $1,450,000 plus the portion of proceeds in excess of $1,750,000. The trust will 8 also sell the plot at issue and pay to the Department the net sale proceeds up to $300,000, plus 9 half the proceeds above that mark if the sale exceeds $400,000. Before sale, the executors of 10 the trust will record a land-use covenant that will: (i) limit the use of the plot to commercial or 11 industrial uses, with appropriate oversite by the Department in the interest of public health; (ii) 12 bar interference with continued Department cleanup activity at the plot; (iii) restrict use of 13 groundwater at the plot; and (iv) require maintenance of the existing foundation and interior 14 concrete floor to contain any remaining hazardous substances. Both the trust and future 15 owners of the plot may negotiate with the Department to update these restrictions in the future, 16 as needed. The proposal rates as fair and reasonable, and advances Congress’s intent. 17 First, the proposed settlement indicates no procedural defect. Magistrate Judge Kandis 18 Westmore oversaw the parties’ mediation efforts. Both the Department and the Trust were 19 represented by counsel. The Department published the proposed settlement for public 20 comment from October 27 until December 2, 2020, and received none. 21 Second, the proposed settlement is substantively fair because it is “based upon, and 22 roughly correlated with, some acceptable measure of comparative fault, apportioning liability 23 among the settling parties according to rational (if necessarily imprecise) estimates of how 24 much harm each [potentially responsible party] has done.” That is to say, the settlement is 25 based on both a rational estimate of the cleanup costs involved and rational allocation of fault 26 between the parties. More care would be required in approving the allocation of liability 27 between many parties, whose actual fault still remains hazy, though CERCLA ultimately 1 imposes strict liability on site owners or operators and places the burden on those defendants to 2 allocate fault between them. Arizona, 761 F.3d at 1011–12. 3 Ours, however, is a simple case. We have two relevant defendants, the trust, which 4 owned the land, and Hard Chrome, which actually polluted it. Here, too, we have not just an 5 estimate of future cleanup costs but the Department’s actual bill, $3,541,975.74 (including 6 interest and legal fees), incurred in cleaning the plot. The trust’s payment under the settlement, 7 which hovers just north of $1,750,000, accounts for about half of that cleanup bill, leaving a 8 fair fifty-fifty split of the publicly-fronted cost for our two defendants (the Department has 9 moved for a default judgment against Hard Chrome for its share). 10 Third, the proposed settlement is reasonable. It accounts for public costs already 11 expended and imposes land-use restrictions to ensure the efficacy of the Department’s 12 continued cleanup efforts, prevent use of contaminated water, contain the pollution below a 13 robust concrete foundation, and prohibit the land from being used for residential purposes, all 14 in the name of public safety. The Department is not entitled to the sort of deference the 15 Environmental Protection Agency would be afforded here. Nevertheless, this order does afford 16 a measure of deference to the Department’s expertise in this subject matter and, thus, its 17 determination that these land-use restrictions will, in fact, protect the public health. Certainly 18 no party has appeared to argue otherwise. Id. at 1013–14. 19 The proposed settlement also accounts for the realities of our circumstances. Though the 20 settlement only reimburses half the public cost of the cleanup, the total public bill here exceeds 21 the value of the trust assets, including the plot itself. In fact, the proposed settlement payment 22 accounts for approximately eighty percent of the trust assets, once liquidated. The proposed 23 settlement strikes a balance between reimbursing the public and leaving adequate assets in the 24 trust to support Ms. McLemore. Protracted litigation would only siphon those funds away 25 from both the public and Ms. McLemore. 26 Fourth, the proposed settlement furthers CERCLA’s purpose, to enable federal and state 27 governments to cleanse the environment of hazardous waste at pace and to ensure those 1 public resources through prolonged litigation. Our proposed settlement puts this dispute to rest 2 after just over two years and holds the landowner responsible for the hazardous conduct that 3 occurred there. BNSF v. United States, 556 U.S. 599, 602 (2009); Arizona, 761 F.3d at 1011. 4 CONCLUSION 5 For the foregoing reasons, approval of the proposed consent decree is GRANTED. 6 7 8 IT IS SO ORDERED. 9 10 11 Dated: August 3, 2021 Pee (12 { A □ WILLIAM ALSUP UNITED STATES DISTRICT JUDGE © 15 16 = 17 Z 18 19 20 21 22 23 24 25 26 27 28
Document Info
Docket Number: 3:19-cv-01116
Filed Date: 8/3/2021
Precedential Status: Precedential
Modified Date: 6/20/2024