Eco Tour Adventures, Inc. v. Jewell , 249 F. Supp. 3d 360 ( 2017 )


Menu:
  •                              UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    ECO TOUR ADVENTURES, INC.,
    Plaintiff,
    Civil Action No. 14-2178 (BAH)
    v.
    Judge Beryl A. Howell
    RYAN ZINKE, in his official capacity as
    Secretary of the Interior, et al.
    Defendants.
    MEMORANDUM OPINION
    The plaintiff, Eco Tour Adventures, Inc. (“Eco Tour”), a Wyoming-based small business,
    seeks rescission of two concession contracts for cross-country ski touring services in Grand
    Teton National Park (“the disputed contracts”) that were awarded to two incumbent
    concessioners, despite a ruling from the U.S. Court of Federal Claims (“CFC”) holding that the
    incumbents’ proposals were improperly considered by the National Park Service (the “NPS”).
    See Eco Tour Adventures, LLC v. United States (“Eco Tour I”), 
    114 Fed. Cl. 6
    , 40 (2013)
    (determining that “NPS acted arbitrarily and capriciously in concluding that [incumbent
    concessioners’] proposals were responsive” and, as a result, plaintiff “was prejudiced”). Despite
    the CFC’s ruling, NPS subsequently proceeded to award the disputed contracts to the
    incumbents, prompting the plaintiff to initiate this lawsuit against the Secretary of the Interior,
    the Department of the Interior, the Director of the National Park Service, and the National Park
    Service (collectively, “the defendants” or “NPS”), under the Administrative Procedure Act
    (“APA”), 5 U.S.C. §§ 500 et seq., requesting declaratory and injunctive relief, including
    requiring NPS to award the contracts to plaintiff. Compl. at 27-28 (Prayer for Relief), ECF No.
    1
    1. 1 The parties have now filed cross motions for summary judgment. Pl.’s Mot. Summ. J.,
    (“Pl.’s Mot.”), ECF No. 24; Defs.’ Cross-Mot. Summ. J. (“Defs.’ Mot.”), ECF No. 27. For the
    reasons outlined below, the plaintiff’s motion for summary judgment is granted with respect to
    its request for declaratory relief finding that NPS violated the APA, but denied without prejudice
    in all other respects, subject to supplemental briefing consistent with this Memorandum Opinion,
    and NPS’s cross-motion for summary judgment is denied.
    I.       BACKGROUND
    The background to this case is described in detail in the CFC decision holding that NPS
    “acted arbitrarily and capriciously” and in breach of “the implied contract for bids to be fairly
    and honestly considered,” when the agency, by its conduct, thwarted the plaintiff’s “substantial
    chance” to receive the disputed contracts, Eco Tour 
    I, 114 Fed. Cl. at 43
    , as well as this Court’s
    Memorandum Opinion denying the defendants’ motion to dismiss in this case, Eco Tour
    Adventures, Inc. v. Jewell (“Eco Tour II”), 
    174 F. Supp. 3d 319
    (D.D.C. 2016). This factual and
    procedural history as relevant to the pending motions is summarized below.
    A.        NPS PROSPECTUS AND EVALUATION OF PLAINTIFF’S BID AS
    “BEST PROPOSAL”
    In December 2012, NPS issued a prospectus soliciting proposals for three ten-year
    concession contracts, only two of which, GRTE024-13 (“Contract 24”) and GRTE032-13
    (“Contract 32”), are at issue in this case, 2 to provide guided cross-country ski touring services in
    Grand Teton National Park. Admin. Record (“AR”) 5–210 (Prospectus, dated December 20,
    2012, issued by NPS Intermountain Region). 3 The prospectus “included detailed instructions
    1
    Pursuant to Federal Rule of Civil Procedure 25(d), the Court substitutes as defendant the current Secretary
    of the Interior, Ryan Zinke, for former Secretary Sally Jewell.
    2
    The plaintiff did not submit a bid for the third contract, GRTE025-13.
    3
    The complete administrative record (“AR”) totals 1491 pages comprised of: (1) 1420 pages from the record
    before the CFC, Notice Supp. Filing, ECF No. 23; and (2) 71 pages of supplemental material concerning events that
    occurred after the termination of the CFC case, with Bates stamps prefaced with “000,” Certified List of AR, ECF
    2
    setting forth the protocol for submitting proposals and the selection factors to be used by the NPS
    to evaluate proposals.” Eco Tour 
    I, 114 Fed. Cl. at 14
    . These factors included: the offeror’s
    commitment to “protecting, conserving, and preserving resources of the park area”; the offeror’s
    commitment to “providing necessary and appropriate visitor services at reasonable rates”; the
    background and experience of the offeror; the “financial capability of the offeror to carry out its
    proposal”; and the offeror’s “proposed minimum franchise fee.” AR 43–57 (Prospectus
    outlining the identical selection factors for Contracts 24 and 32).
    At the time of this solicitation, the services under Contract 24 were being provided by
    Jackson Hole Mountain Resort (“JHMR”) and under Contract 32 by Hole Hiking Experience
    (“HHE”), both of which, as incumbent concessioners, were designated by NPS as “preferred
    offerors,” a designation the plaintiff does not contest. AR 24 (Prospectus, noting that NPS “has
    determined the [] existing Concessioners are qualified contracts and therefore the existing
    Concessioners are Preferred Offerors for the new Contracts”). Under NPS regulations, this
    designation allows preferred offerors a “right of preference,” which allows them to match any
    better offer from a new bidder so long as they initially “submit a responsive proposal to th[e]
    Prospectus” that satisfies the minimum requirements established by the NPS. AR 24
    (Prospectus, citing 36 C.F.R. § 51).
    The plaintiff was founded in 2008 and provides “auto-based interpretative tours into
    Grand Teton and Yellowstone national parks.” AR 730 (Letter, dated March 20, 2013, from
    Taylor Phillips, plaintiff’s President, to John Wessels, Regional Director, NPS Intermountain
    Region). Hoping to expand its business, the plaintiff submitted bids for Contracts 24 and 32.
    No. 13. Excerpts from the AR, totaling 1081 pages, were submitted to this Court. See Notice of Filing Appendix
    Containing Excerpts from the AR, Ex. 2, AR Part A (containing excerpts from pages 1-883), ECF No. 32-2, and Ex.
    3, AR Part B (containing excerpts from pages 884-1420; 00011-00083), ECF No. 32-3.
    3
    AR 724–1093. An evaluation panel, convened from March 25, 2013 to April 5, 2013,
    determined that the plaintiff submitted proposals with the highest cumulative score for both
    contracts. AR 1272–1302 (undated Panel Evaluation Summary for Contract 24); AR 1317-1342
    (undated Panel Evaluation Summary for Contract 32); see also AR 1188 (Letter, dated June 20,
    2013, from Regional Director, NPS Intermountain Region to Taylor Phillips, plaintiff’s
    President, stating “[y]our proposal has been evaluated as the best proposal for” Contract 24); AR
    1189 (same for Contract 32).
    For Contract 24, NPS received timely proposals from Eco Tour, JHMR, and two other
    offerors. AR 1277 (Panel Evaluation Summary for Contract 24 listing Eco Tour, JHMR, and
    two redacted names as offerors). The panel reviewed each proposal against a total of 12 primary,
    secondary and subsidiary selection factors, as laid out in the prospectus, and assigned a score for
    each factor. AR 1277. Eight of the plaintiff’s twelve responses were rated “excellent” or “very
    good” and, of the remaining four responses, two were rated “good” and two were rated “fair.”
    AR 1278–1302 (Panel Evaluation Summary). In contrast, JHMR’s responses received no
    “excellent” or “very good” ratings, but only seven “good” and five “fair” ratings. 
    Id. In fact,
    the
    plaintiff’s score on each factor was higher than JHMR’s score, with the exception of selection
    factor three, for which both received a score of 2.5. AR 1277. Based on the plaintiff’s better
    evaluations, the plaintiff’s total evaluation score for Contract 24 was 20.5 (out of a total 27),
    which was seven points higher than JHMR’s, at 13.5. AR 1277.
    For Contract 32, NPS received timely proposals from Eco Tour, HHE, and two other
    offerors. AR 1317 (Panel Evaluation Summary for Contract 32 listing Eco Tour, HHE, and two
    redacted names as offerors). Again, nine of the plaintiff’s twelve responses, were rated
    “excellent” or “very good” and, of the remaining three responses, two were rated “good” and one
    4
    was rated “fair.” AR 1318–42. In contrast, HHE’s responses received no “excellent” ratings,
    with four “very good,” three “good” and five “fair” ratings. 
    Id. Similar to
    the evaluation for
    Contract 24, the plaintiff received a higher score than the incumbent in every category, except
    for selection factor three, for which both received a 2.5. AR 1317. The plaintiff’s total
    evaluation score for Contract 32, was 21.5 (out of a total 27), which was six points higher than
    HHE’s, at 15.5. AR 1317.
    The evaluation panel noted a number of deficiencies in both JHMR and HHE’s proposals,
    largely related to the fourth primary selection factor regarding “The Financial Capability of the
    Offeror To Carry Out its Proposal.” AR 1294 (Contract 24); AR 1334 (Contract 32). JHMR, the
    panel noted, failed to submit “a current balance sheet” or “a current credit report,” provided
    incomplete or inconsistent answers “on the Initial Investment form,” and failed to submit “a bank
    statement as requested . . . .” AR 1295–98. HHE, the panel noted, submitted incomplete annual
    financial reports, failed to provide any explanation for the balance sheet it provided, and made
    “numerous mistakes” on some of the required forms. AR 1337, 1339. These omissions
    prompted the panel to express “concern[] with the financial position of the Offeror [HHE].” AR
    1336.
    On June 20, 2013, NPS sent letters to the plaintiff, JHMR, and HHE informing the
    companies of the panel evaluations. The plaintiff learned that its “proposal ha[d] been evaluated
    as the best proposal for this opportunity; however, in accordance with 36 C.F.R. § 51.26, the
    preferred offeror, whom the Director has determined to be eligible to exercise a right of
    preference to the award of the contract, [would] have the opportunity to match the terms of [its]
    proposal.” AR 1188 (Letter, dated June 20, 2013, from John Wessels, Regional Director,
    Intermountain Region to the plaintiff). The incumbent concessioners were told that “[a]lthough
    5
    the panel determined your proposal to be responsive to the minimum requirements of the
    Prospectus, the panel did not find your proposal to be the best proposal submitted for this
    solicitation.” AR 1190–92 (Letter, dated June 20, 2013, from NPS to JHMR); AR 1193–95
    (Letter, dated June 20, 2013, from NPS to HHE). Notwithstanding the finding of the NPS
    Regional Director that the incumbents’ proposals were “responsive to the minimum requirements
    of the Prospectus,” AR 1190, 1193, these letters detailed “items” that each incumbent was
    required to “expand on . . . to bring the quality of your response up to the level of the best
    proposal,” AR 1192, 1195. JHMR, for example, was told by the Regional Director to submit a
    current balance sheet, credit report and bank statement, and HHE was told to submit a complete
    set of financial statements, to clarify its revenue and expense projections, a corrected Pro Forma
    without “mathematical errors,” and “a current bank statement with a list of current liabilities,”
    since HHE had failed to submit a balance sheet that corresponded with the bank statement it
    submitted, as required by the prospectus. 
    Id. Despite the
    cited defects in their bid proposals, the NPS Regional Director told the
    incumbents that they were “eligible to exercise the right of preference for the award of the new
    Concession Contract” under 36 C.F.R. § 51.32, assuming that they provided the information
    missing from their bids and committed to matching the “elements of [the] better offer” submitted
    by the plaintiff. AR 1190–92; AR 1193–94. 4 The incumbents quickly agreed to match the terms
    4
    In describing these letters, NPS states that “[t]he June 2013 letters to Jackson Hole and Hole Hiking did not
    reflect a final decision by the Regional Director that [their] submissions were ‘responsive.’” Defs.’ Mem. Supp.
    Cross-Mot. Summ. J. & Opp’n Pl.s’ Mot. Summ. J (“Defs.’ Opp’n”) at 5, ECF No. 27-1. This characterization
    conflicts with the quoted language of the actual letters, which expressly told both incumbent concessioners that their
    proposals were “responsive to the minimum requirements of the Prospectus.” AR 1190–94. In fact, the author of
    the letters conceded that “much of the language used in this letter could be interpreted to mean that [he] had made
    final determinations on these issues,” but he nonetheless indicated that he had not read the proposals or the panel
    evaluations at the time he signed the letters, nor did he intend the letters “to represent [his] final decision as to
    whether the proposals were responsive.” Defs.’ Mot., Ex. 3, Decl. of John Wessels, dated August 13, 2013
    (“Wessels Decl.”), ¶¶ 11, 14, ECF No. 27-3.
    6
    of the plaintiff’s better offer. AR 1204–07 (Letter, dated June 28, 2013, from JHMR to NPS);
    AR 1400–01 (Letter, dated July 8, 2013, from HHE to NPS).
    The plaintiff also responded to the NPS letter and raised concern over NPS’s reliance on
    its regulation at 36 C.F.R. § 51.32 because “it appears that at least one of the preferred offerors
    failed to submit a responsive proposal” and, therefore, that incumbent would “ha[ve] no right of
    preference, under 36 C.F.R. § 51.31, and ha[ve] no right to match [the plaintiff]’s proposal. ”
    AR 1242 (Letter, dated July 3, 2013, from plaintiff to Chief of Concessions, NPS Intermountain
    Region). NPS disagreed, citing the definition of a “responsive proposal” from 36 C.F.R. § 51.3,
    AR 1244–45 (Letter, dated July 10, 2013, from Chief of Concessions, NPS Intermountain
    Region to plaintiff’s attorney), and expressing the view that any omitted information in the
    incumbents’ proposals was “not considered material” and “the lack of quality and omissions
    were reflected in lower scores,” AR 1267–68 (Letter, dated July 29, 2013, from Chief of
    Concessions, NPS Intermountain Region to plaintiff).
    B.      PLAINTIFF’S CHALLENGE BEFORE CFC
    The plaintiff promptly brought a challenge before the CFC to NPS’s determination that
    the incumbent concessioners’ proposals were responsive, claiming that the incumbent
    concessioners’ failure to include all information required by the prospectus rendered their
    proposals not “responsive” within the meaning of the governing NPS regulation at 36 C.F.R. §
    51.3, and that NPS acted arbitrarily and capriciously, and breached its implied contractual
    obligation to consider bids fairly and honestly, by allowing the incumbents to match the better
    terms proposed in the plaintiff’s bids, despite the incumbents unresponsive proposals. Eco Tour
    
    I, 114 Fed. Cl. at 23
    –24. The plaintiff sought injunctive and declaratory relief in the form of a
    remand directing NPS to review its decisions that the incumbents’ proposals were responsive and
    that the incumbents were entitled to review proprietary information in the plaintiff’s proposal in
    7
    order to match plaintiff’s better terms, and also sought reimbursement for the costs incurred in
    preparing its bids for the disputed contracts, attorneys’ fees, and litigation costs. 
    Id. at 19.
    On
    August 19, 2013, the CFC stayed the case “based on NPS’s assertion that the source-selection
    authority had not rendered final decisions with respect to the award of the disputed contracts.”
    
    Id. at 18
    n.8.
    C.       NPS FINDING OF “RESPONSIVE PROPOSALS” BY INCUMBENTS
    Although the June 20, 2013 NPS letters to the plaintiff and incumbent concessioners
    expressly stated that the plaintiff offered the “best proposal” and the incumbents’ proposals,
    which omitted specific items required by the prospectus, were nonetheless “responsive,” only
    after the CFC had stayed the plaintiff’s challenge, did the NPS take steps to formalize these
    findings with an explanation. Specifically, on August 30, 2013, the NPS Chief of Concessions,
    Intermountain Region, recommended that the Acting Director of the Intermountain Region
    officially find that the plaintiff had submitted the “best proposal” and, while acknowledging that
    the incumbent concessioners “did not provide all of the information requested in the Prospectus,”
    that the Acting Director also find “that all [] of the proposals [submitted] are responsive.” AR
    1273 (Memorandum, dated August 30, 2013, from Chief of Concessions to Acting Director,
    Intermountain Region for Contract 24); AR 1312–51 (same for Contract 32). 5 Regarding
    Contract 24, the recommendation noted that JHMR’s bid did not contain the requested balance
    sheet, credit report, or bank statement, AR 1305–06, and had incomplete information as to
    anticipated purchases, AR 1306. Nevertheless, these omissions were deemed “immaterial”
    because “the panel was able to evaluate the proposal” without the required documents, AR 1306.
    5
    John Wessels left his position as the Regional Director of NPS’s Intermountain Region during the
    consideration of the bid proposals for the disputed contracts. Defs.’ Mot., Ex. 4, Decl. of Jennifer Parker, dated July
    28, 2016 (“Parker Decl.”) ¶ 23 n.3, ECF No. 27-4.
    8
    Regarding Contract 32, the NPS Chief of Concessions acknowledged that HHE’s bid “did not
    contain some of the information requested by the [NPS],” since HHE filed incomplete annual
    financial reports and “ambiguous” current liability information on its balance sheets,” AR 1345,
    but, similarly to the recommendation for Contract 24, recommended finding that HHE’s
    omissions or mistakes were immaterial, and therefore HHE’s bid was “responsive.” AR 1345. 6
    The Acting Regional Director approved the recommendation, AR 1273 (Memorandum,
    dated August 30, 2013, from Chief of Concessions to Acting Director, NPS Intermountain
    Region, bearing acting director’s signature approving proposed responsiveness findings for
    Contract 24); AR 1313 (same for Contract 32). Following this approval, on September 4, 2013,
    the Chief of Concessions recommended finding that both incumbents “ha[d] amended [their]
    proposal[s] to match the better terms and conditions of the best proposal,” thus requiring that the
    incumbents be awarded the disputed contracts under § 51.32. AR 1352–59 (Source Selection
    Memorandum, dated September 4, 2013, from Chief of Concessions to Acting Director,
    Intermountain Region for Contract 24); AR 1384–1420 (Source Selection Memorandum, dated
    September 4, 2013, from Chief of Concessions to Acting Director, Intermountain Region for
    Contract 32). These recommendations were likewise accepted by the Acting Director for the
    NPS Intermountain region, as reflected by that Acting Director’s signature on the source
    selection recommendation memoranda. AR 1353 (Source Selection Memorandum signed by
    Acting Director for Contract 24); AR 1385 (same for Contract 32).
    6
    This memorandum from the NPS Chief of Concessions did not include other information provided by the
    evaluation panel or set out in the Regional Director’s June 20, 2013 letter to HHE, including that HHE’s proposal
    contained “numerous mistakes on the Pro Forma income statement,” failed to provide a balance sheet corresponding
    to the bank statement, AR 1195 (Letter, dated June 20, 2013, from John Wessels, Regional Director, NPS
    Intermountain Region, to HHE), and failed to raise the panel’s concern “with the financial position of” HHE, AR
    1336 (Panel Evaluation Summary for Contract 32).
    9
    D.     THE CFC DECISION
    The CFC subsequently lifted the stay based on NPS’s notice that, consistent with the
    August 30 and September 4, 2013 memoranda, the “source-selection authority had [] rendered
    final decisions with respect to the award of the disputed contracts, [and] on September 4, 2013,
    decided to award the disputed contracts to the incumbent concessioners.” Eco Tour II, 114 Fed.
    Cl. at 18. Then, on November 26, 2013, the CFC issued its decision granting judgment in the
    plaintiff’s favor, finding that the incumbents had excluded material information from their initial
    proposals, which were therefore unresponsive within the meaning of 36 C.F.R. § 51.3, and that
    the incumbents therefore were ineligible for the opportunity to match the better terms offered by
    the plaintiff. 
    Id. at 42
    n. 18 (noting that sealed version of opinion was issued on November 26,
    2013 “direct[ing] the entry of final judgment in favor of plaintiff” but deferring entry of that
    judgment pending final disposition of plaintiff’s “bid preparation costs”). In particular, the CFC
    disagreed with the recommendations in the August 30, 2013 memoranda and instead concluded
    that “each of the NPS’s materiality determinations, as well as its resulting responsiveness
    determinations, was arbitrary, capricious, and an abuse of discretion.” 
    Id. at 23;
    33–34.
    Moreover, because the plaintiff had “submitted responsive proposals that received the highest
    cumulative scores of any of the proposals received by NPS,” the CFC concluded that NPS’s
    arbitrary and capricious actions were prejudicial since the plaintiff “demonstrated a ‘substantial
    chance’ that it would have received the disputed contracts if not for the Park Services’ arbitrary
    and capricious responsiveness determination with regard to the proposals of [the incumbents].”
    
    Id. at 43.
    Although the CFC was clear that the plaintiff’s bids were not fairly considered by NPS,
    the CFC determined that it lacked jurisdiction to provide the equitable and declaratory relief
    requested by the plaintiff. 
    Id. at 21,
    42; see also Eco Tour 
    II, 174 F. Supp. 3d at 325
    –29.
    10
    Specifically, because the disputed concession contracts were not “procurement contracts” for
    purposes of the Tucker Act, 28 U.S.C. § 1491, Eco Tour 
    I, 114 Fed. Cl. at 21
    , the CFC held that,
    after considering conflicting authority on the issue, it lacked jurisdiction to award the plaintiff
    equitable relief, and thus the plaintiff could recover at the CFC only the costs incurred for its
    initial bid. 
    Id. at 41–42.
    Consequently, the CFC denied the plaintiff’s requested remand to the
    agency because doing so was perceived to “tread[] . . . into the realm of injunctive relief,” 
    id. at 42.
    Thereafter, upon consideration of the parties’ stipulation regarding the plaintiff’s costs
    stemming from its unsuccessful bids for the disputed contracts, J. Stip. Re: Money Damages
    Owed Under December 12, 2013 Op. & Order & J. Request For Entry of J., Eco Tour I, No. 13-
    cv-532-LJB (Fed. Cl. April 15, 2014), ECF No. 58, the CFC entered judgment, on April 17,
    2014, in favor of the plaintiff and awarded $36,250 in bid preparation costs, Judgment, Eco Tour
    I, No. 13-cv-532-LJB (Fed. Cl. April 17, 2014); see also Eco Tour 
    II, 174 F. Supp. 3d at 322
    –23.
    E.       PLAINTIFF’S NON-LITIGATION EFFORTS TO OBTAIN REVIEW OF
    DISPUTED CONTRACTS AWARDS
    After the CFC’s judgment was entered, but before the disputed concession contracts with
    the incumbent concessioners were executed, the plaintiff engaged in multiple steps short of
    expensive litigation to remedy the denial of the contracts to the plaintiff. Pl.’s Mot. Ex. A,
    Second Decl. of Taylor Phillips, plaintiff’s President and owner, dated May 30, 2016 (“Phillips
    Second Decl.”) ¶ 14, ECF 24-1 (stating that plaintiff “was unable to afford the expense of further
    litigation against the federal government” after the CFC ruling “due in large part to the very
    illegal action at issue in this matter”). 7 These steps included trying to enlist the assistance of the
    7
    As support for their pending motions, the parties rely on declarations that are not in the AR. These
    declarations may nevertheless be considered since, as the D.C. Circuit has recognized, extra-record evidence may be
    used “in cases where relief is at issue.” Esch v. Yeutter, 
    876 F.2d 976
    , 991 (D.C. Cir. 1989). The issue of injunctive
    relief is generally not raised in the administrative proceedings below and, consequently, “there usually will be no
    administrative record developed on these issues.” Steven Sark & Sarah Wald, Setting No Records: The Failed
    Attempts to Limit the Record in Review of Administrative Actions, 36 Admin. L. Rev. 333, 345 (1984). Thus, “it will
    11
    Wyoming congressional delegation, which efforts prompted congressional inquiries requiring
    NPS to explain its actions. See, e.g., AR 00012–14 (Letters, dated June 20, 2014, from Regional
    Director, NPS Intermountain Region to Wyoming Congresswoman Cynthia Lummis and
    Wyoming Senators John Barrasso and Michael B. Enzi, summarizing “the decisions the [NPS]
    has made related to” plaintiff). The plaintiff also attempted “extensive and lengthy efforts to
    persuade NPS to comply with the law.” Pl.’s Mem. Supp. Mot. Summ. J. (“Pl.’s Mem.”), at 9,
    ECF No. 24.
    On June 20, 2014, NPS rejected the plaintiff’s proposal “to forego payment” on the CFC
    judgment “in exchange for a contract,” indicating that “this is not possible as the [CFC] entered
    judgment against the United States . . . .” AR 00011 (Letter, dated June 20, 2014, from Regional
    Director, NPS Intermountain Region to plaintiff’s President). NPS further stated its plan, having
    “carefully considered all possible resolutions,” to “fully comply with the [CFC’s] decision and
    pay your bid preparation costs and a negotiated amount for your attorney fee.” 
    Id. While acknowledging
    that plaintiff was “very passionate about this matter and [was] disappointed with
    the outcome,” the agency offered, apparently by way of consolation, that “the [CFC]’s decision
    has resulted in policy changes to strengthen proposal requirements and evaluation procedures.”
    
    Id. Explanation of
    the specific “policy changes” that NPS has adopted are not entirely clear from
    the record. NPS informed the Wyoming congressional delegation by letter sent that same day,
    that though “NPS did not always consider an offeror’s failure to produce one of many financial
    documents requested in the prospectus as a material failure that would render the proposal
    often be necessary for a court to take new evidence to fully evaluate” claims “of irreparable harm . . . and [claims]
    that the issuance of the injunction is in the public interest.” 
    Id. Further, “there
    is nothing improper in receiving
    declarations that ‘merely illuminate[] reasons [for the agency’s actions] obscured but implicit in the administrative
    record.’” Clifford v. Pena, 
    77 F.3d 1414
    , 1418 (D.C. Cir. 1996) (quoting Appeal of Bolden, 
    848 F.2d 201
    , 207
    (D.C. Cir. 1988)); see also Camp v. Pitts, 
    411 U.S. 138
    , 141-43 (1973) (holding courts may “obtain from the
    agency, either through affidavits or testimony . . . additional explanation of the [contemporaneous] reasons for the
    agency decision”). To the extent the declarations provide such illumination, the Court properly considers them.
    12
    unresponsive, . . . [i]n the future, NPS may be required to determine an offer ineligible for
    consideration if the offeror fails to provide all financial information required by the prospectus.”
    AR 00012-14 (Letters from Regional Director, NPS Intermountain Region to the Wyoming
    congressional delegation). Less than a month later, on July 16, 2014, NPS executed Contract 24
    and Contract 32 with JHMR and HHE, respectively. AR 00022, 00056.
    F.      THE INSTANT LAWSUIT
    After “locat[ing] counsel who would agree to take [the case] on a pro bono basis because
    it could not afford additional litigation,” Pl.’s Opp’n to Defs.’ Cross-Mot. and Reply to Defs.’
    Opp’n to Pl.’s Mot. Summ. J. (“Pl.’s Opp’n”) at 40, ECF No. 28, the plaintiff filed the instant
    action, alleging that NPS violated the APA by misinterpreting and misapplying its own
    regulations, Compl. ¶¶ 47–51, despite the “clear and unequivocal terms of the regulations which
    apply” and the CFC’s “clear finding that NPS’s conduct was illegal,” 
    id. ¶¶ 2,
    4. Given the
    CFC’s view that it lacked authority to issue injunctive relief in the form of rescission of the
    disputed contracts, the plaintiff seeks injunctive and declaratory relief in this Court. 
    Id. ¶¶ 4–5
    (seeking “an order . . . declaring that the two contracts awarded to NPS’s longtime incumbent
    contractors are illegal and thus void[, as well as] an injunction requiring the defendants to . . .
    award the two contracts to Eco Tour for their full 10-year terms.”).
    NPS initially moved to dismiss the plaintiff’s complaint for lack of standing and for
    failure to state a claim, contending that the plaintiff should be precluded from pursuing equitable
    and declaratory relief having already “voluntarily elected to receive reimbursement of its bid
    preparation costs in resolving its earlier claim” and having elected to pursue relief in the CFC
    when an injunction was available in district court. Eco Tour 
    II, 174 F. Supp. 3d at 332
    –33. This
    Court rejected these arguments, finding “no substantial inconsistency between the monetary
    award the plaintiff voluntarily accepted in connection with its earlier action before the CFC and
    13
    the plaintiff’s present request for injunctive and declaratory relief in this Court.” 
    Id. at 335.
    Contrary to NPS’s claim that the plaintiff would receive a windfall if granted the award of the
    concession contracts after having received its bid costs, the Court held that “to the extent deemed
    necessary[,] any contracts awarded under this action could address any prior partial relief
    received by Eco Tour.” 
    Id. (internal quotation
    marks omitted). Moreover, the Court pointed out
    the obvious flaw in NPS’s position that the plaintiff “elected” to pursue monetary relief before
    the CFC rather than injunctive relief, noting that “NPS had not yet finalized its decision to award
    the disputed contracts to the incumbent concessioners . . . during the pendency of the
    proceedings before the CFC” and, thus, the plaintiff could not have sought an injunction at that
    time. 
    Id. at 334.
    Further, “even assuming such relief was available at the time Eco Tour initially
    filed suit in the CFC,” the Supreme Court, in a related context, had held “that parties bringing
    claims against the federal government may separately seek monetary and injunctive relief in
    sequential actions before the CFC and the district courts.” 
    Id. at 334–35
    (citing United States v.
    Tohono O'Odham Nation, 
    563 U.S. 307
    , 318 (2011)). Although “the defendants may yet
    demonstrate that the plaintiff is not entitled to relief under the APA,” the Court concluded that
    the relief available to the plaintiff from the CFC was not complete relief, and thus the plaintiff is
    not “barred entirely from seeking complete relief for the defendants’ allegedly arbitrary and
    capricious actions.” 
    Id. at 336.
    The parties’ cross motions for summary judgment are now ripe for review.
    II.    LEGAL STANDARDS
    A.      SUMMARY JUDGMENT STANDARD UNDER FEDERAL RULE OF
    CIVIL PROCEDURE 56
    Pursuant to Federal Rule of Civil Procedure 56, summary judgment may be granted when
    the court finds “that there is no genuine dispute as to any material fact and the movant is entitled
    14
    to judgment as a matter of law.” FED. R. CIV. P. 56(a), (e)(3); see Tolan v. Cotton, 
    134 S. Ct. 1861
    , 1866 (2014) (per curiam); Anderson v. Liberty Lobby, Inc., 
    477 U.S. 242
    , 247 (1986). The
    first part of the Rule 56 summary judgment standard regarding the absence of disputed material
    facts, however, is irrelevant in APA cases since “’the district judge sits as an appellate tribunal’”
    and “[t]he entire case on review is a question of law.’” Rempfer v. Sharfstein, 
    583 F.3d 860
    , 865
    (D.C. Cir. 2009) (quoting Am. Bioscience, Inc. v. Thompson, 
    269 F.3d 1077
    , 1083-84 (D.C. Cir.
    2001). As such, “the complaint, properly read, actually presents no factual allegations, but rather
    only arguments about the legal conclusion to be drawn about the agency action.” 
    Id. (quoting Marshall
    Cnty. Health Care Auth. v. Shalala, 
    988 F.2d 1221
    , 1226 (D.C. Cir. 1993)).
    Consequently, “[g]enerally speaking, district courts reviewing agency action under the APA’s
    arbitrary and capricious standard do not resolve factual issues, but operate instead as appellate
    courts resolving legal questions.” James Madison Ltd. ex rel. Hecht v. Ludwig, 
    82 F.3d 1085
    ,
    1096 (D.C. Cir. 1996); see also Lacson v. U.S. Dep’t of Homeland Sec., 
    726 F.3d 170
    , 171 (D.C.
    Cir. 2013) (noting, in APA cases, that “determining the facts is generally the agency’s
    responsibility, not ours”).
    Judicial review is limited to the administrative record, since “[i]t is black-letter
    administrative law that in an [APA] case, a reviewing court should have before it neither more
    nor less information than did the agency when it made its decision.” CTS Corp. v. EPA, 
    759 F.3d 52
    , 64 (D.C. Cir. 2014) (internal quotation marks omitted); see 5 U.S.C. § 706 (“[T]he court
    shall review the whole record or those parts of it cited by a party . . . .”); Fla. Power & Light Co.
    v. Lorion, 
    470 U.S. 729
    , 743 (1985) (noting, when applying arbitrary and capricious standard
    under the APA, “‘[t]he focal point for judicial review should be the administrative record already
    in existence . . . .’” (quoting Camp v. Pitts, 
    411 U.S. 138
    , 142 (1973))); Citizens to Pres. Overton
    15
    Park, Inc. v. Volpe, 
    401 U.S. 402
    , 420 (1971) (noting “review is to be based on the full
    administrative record that was before the [agency] at the time” of the challenged decision).
    B.     STANDARD OF REVIEW UNDER THE APA
    An agency action, finding or conclusion challenged under the APA must be set aside
    upon finding that it is “arbitrary, capricious, an abuse of discretion, or otherwise not in
    accordance with law.” 5 U.S.C. § 706(2)(A). When a challenged agency action is based on the
    application or operation of a regulation, the agency’s interpretation of its own ambiguous
    regulation is generally given substantial judicial deference. See Auer v. Robbins, 
    519 U.S. 452
    ,
    463 (1997); Drake v. F.A.A., 
    291 F.3d 59
    , 68 (D.C. Cir. 2002). Given the deference owed to
    agency’s interpretation of its own ambiguous regulation, a plaintiff challenging this
    interpretation carries a “heavy burden in advancing [that] claim.” In re Polar Bear Endangered
    Species Act Listing & Section 4(d) Rule Litig. — MDL No. 1993, 
    709 F.3d 1
    , 11 (D.C. Cir.
    2013).
    This general rule on deference has limits, however, and is unwarranted when, for
    example, the agency’s “interpretation is ‘plainly erroneous or inconsistent with the regulation.’”
    Decker v. Nw. Envtl. Def. Ctr., 
    133 S. Ct. 1326
    , 1337 (2013) (quoting Chase Bank USA, N. A. v.
    McCoy, 
    131 S. Ct. 871
    , 880 (2011)); see also Christopher v. SmithKline Beecham Corp., 132 S.
    Ct. 2156, 2166 (2012); Thomas Jefferson Univ. v. Shalala, 
    512 U.S. 504
    , 512 (1994) (“[W]e
    must defer to the [agency]’s interpretation unless an ‘alternative reading is compelled by the
    regulation’s plain language or by other indications of the Secretary’s intent at the time of the
    regulation’s promulgation.”) (internal quotation marks omitted). An agency interpretation that
    conflicts with an unambiguous regulation is “substantively invalid” because “to defer in such a
    case would allow the agency ‘to create de facto a new regulation.’” Perez v. Mortg. Bankers
    Ass'n, 
    135 S. Ct. 1199
    , 1208 (2015)(quoting Christensen v. Harris County, 
    529 U.S. 576
    , 588
    16
    (2000)); see Huerta v. Ducote, 
    792 F.3d 144
    , 153 (D.C. Cir. 2015)(noting that agency action
    “unhinged from the regulation's plain text” is not entitled to deference). Likewise, deference
    need not be accorded to the agency’s interpretation that “does not reflect the agency's fair and
    considered judgment on the matter in question,” 
    Auer, 519 U.S. at 462
    , such as when the
    agency’s interpretation is “unreasonable,” Menkes v. U.S. Dep’t of Homeland Sec., 
    637 F.3d 319
    , 343 (D.C. Cir. 2011), or “ʻwhen it appears that the interpretation is nothing more than a
    convenient litigating position, or a post hoc rationalization advanced by an agency seeking to
    defend past agency action against attack,’” Rhea Lana, Inc. v. DOL, 
    824 F.3d 1023
    , 1030-1031
    (D.C. Cir. 2016)(quoting 
    Christopher, 132 S. Ct. at 2166
    )).
    Finally, although an agency may amend or repeal its own regulations and is entitled to
    deference in interpreting ambiguous regulations, “an agency is not free to ignore or violate its
    regulations while they remain in effect.” Nat'l Envtl. Dev. Ass'ns Clean Air Project v. EPA, 
    752 F.3d 999
    , 1009 (D.C. Cir. 2014) (quoting U.S. Lines, Inc. v. Fed. Mar. Comm'n, 
    584 F.2d 519
    ,
    526 n.20 (D.C. Cir. 1978)); see also Steenholdt v. FAA, 
    314 F.3d 633
    , 639 (D.C. Cir. 2003)
    (“Federal agencies must follow their own rules, even gratuitous procedural rules that limit
    otherwise discretionary actions."). As a result, an agency’s action is “arbitrary and capricious if
    the agency fails to ‘comply with its own regulations.’” Nat'l Envtl. Dev. Ass'ns Clean Air
    Project v. 
    EPA, 752 F.3d at 1009
    (quoting Environmentel, LLC v. FCC, 
    661 F.3d 80
    , 85 (D.C.
    Cir. 2011)).
    III.   DISCUSSION
    The plaintiff argues that NPS’s decision to award the contracts to the incumbent
    concessioners was “directly contrary to explicit law” and that “NPS’s own regulations very
    clearly required NPS to award the two contracts to Eco Tour because [it] had submitted the best
    17
    proposal.” Pl.’s Mem. at 1. As relief, the plaintiff urges the Court to enter a declaratory
    judgment that “NPS violated the law, acted arbitrarily and capriciously and abused its discretion
    in awarding the contracts at issue to” the incumbent concessioners, Compl. at 27 (Prayer For
    Relief), and to grant injunctive relief by rescinding the contracts as “void as a matter of law,” and
    “directing NPS to comply with its obligations . . . and award the contracts at issue to” plaintiff,
    
    id. NPS counters
    that, under applicable regulations, the agency was “lawfully” permitted to
    “issue the contracts to the incumbent concessioners pursuant to the September 4, 2013 award
    decision.” Defs.’ Mem. Supp. Cross-Mot. Summ. J. & Opp’n Pl.’s Mot. Summ. J (“Defs.’
    Opp’n”) at 30–31, ECF No. 27-1. NPS further argues that, even if this Court rejects the agency’s
    reading of its own regulations and finds that the final award of the disputed contracts to the
    incumbent concessioners was arbitrary and capricious, the plaintiff should still be denied
    equitable relief. The NPS reasons, in a rehash of its unsuccessful motion to dismiss, that the
    plaintiff has already elected monetary damages as its remedy and, consequently, has no
    entitlement to injunctive relief. 
    Id. at 16–17,
    30–31.
    Analysis of the parties’ cross motions for summary judgment begins with the plaintiff’s
    APA challenge to NPS’s final award of the disputed contracts, and the NPS’s request to
    reconsider the denial of its prior motion to dismiss. The Court finds, consistent with the holding
    of the CFC, that NPS violated the APA in awarding the disputed contracts to the incumbent
    concessioners and, further, that NPS’s request for reconsideration is without merit. The
    plaintiff’s entitlement to injunctive relief, however, raises significant issues neither raised nor
    addressed by the parties about whether the incumbent concessioners are required parties, under
    Federal Rule of Civil Procedure 19, for the purposes of fashioning appropriate equitable relief.
    18
    A.      PERMITTING AMENDMENT TO INCUMBENT CONCESSIONERS’
    BIDS WAS ARBITRARY AND CAPRICIOUS
    The parties agree that the CFC’s holding regarding the non-responsiveness of the
    incumbents’ bid proposals is binding. Pl.’s Mem. at 12 (noting that “ruling by the CFC that the
    incumbents’ proposals were non-responsive has res judicata effect and NPS is collaterally
    estopped from trying to now re-litigate this exact same issue.”); Defs.’ Opp’n at 18 (“Defendants
    acknowledge that Eco Tour has prevailed on the merits of the claim it litigated before the CFC
    that NPS erred in treating as responsive the initial bids of the incumbent concessioners.”). The
    issue before this Court is the parties’ dispute whether, notwithstanding the CFC holding, the
    NPS’s award to the incumbent concessioners of the disputed contracts complied with applicable
    regulations. The plaintiff contends that these regulations barred the NPS from awarding the
    disputed contracts to the incumbent concessioners because “NPS cannot award the contracts to
    offerors who submitted non-responsive proposals.” Pl.’s Mem. at 11, 15–17. By contrast, NPS
    argues that “the plaintiff’s interpretation of [the] regulations . . . is not reasonable and certainly is
    not the only permissible interpretation of that regulation.” Defs.’ Reply Supp. Cross-Mot.
    Summ. J. (“Defs.’ Reply”) at 7, ECF No. 31. According to NPS, the agency was “required to
    award the contracts to the incumbent concessioners because they timely submitted amended
    proposals and their amended proposals matched the terms of [the plaintiff]’s offer.” Defs.’
    Opp’n at 21 (citing 36 C.F.R. § 51.32) (emphasis added).
    Thus, the legality under the APA of NPS’s actions in awarding the disputed contracts to
    the incumbents turns on whether the agency properly applied governing statutory provisions and
    its own regulations to permit the incumbent concessioners to amend their bid proposals in two
    ways: to make those proposals responsive and to match the plaintiff’s better offer, rather than
    19
    rejecting the non-responsive proposals. Review of the relevant regulatory framework makes
    clear that NPS’s reading of the governing statute and its own regulations is untenable.
    Overview of Relevant Statutes and NPS Regulations
    NPS’s solicitation of concession contracts is controlled by statute and in more fully
    articulated regulations. While NPS does not rely on the statute to explain its bidding process, the
    pertinent statutory language helps illuminate the plain meaning of the agency’s regulations. At
    the time of the events at issue, the National Park Service Concessions Management Act of 1998
    required the Secretary to use a competitive selection process, which included the public
    solicitation of proposals meeting the requirements of a published prospectus, to identify the best
    concession proposal. 16 U.S.C. § 5952 (1), (2). Under the Act, the minimum terms for the
    concession contract must be set out in the prospectus, along with other pertinent information
    such as the selection factors. 
    Id. § 5952(3).
    8 The consequence of failing to meet the terms of the
    prospectus is clear, with the agency instructed that “[n]o proposal shall be considered which fails
    to meet the minimum requirements as determined by the Secretary,” 
    id. § 5952(4)(A),
    and,
    similarly, requiring the Secretary to “reject any proposal, regardless of the franchise fee offered”
    that “is not responsive to the objectives of protecting and preserving resources of the unit of the
    National Park System and of providing necessary and appropriate facilities and services to the
    public at reasonable rates,” 
    id. § 5952(4)(B).
    Further, the Secretary is barred from “execut[ing] a
    concessions contract which materially amends or does not incorporate the proposed terms and
    conditions of the concessions contract as set forth in the applicable prospectus,” and if such
    8
    The statute governing NPS concession contracts was, at the time of the events at issue, codified in Title 16
    of the U.S. Code, but, in December 2014, recodified in a Title 54 for “National Park Service and Related Programs.”
    Pub. Law. 113-287, § 2(a), 128 Stat. 3093.
    20
    material amendments “are considered appropriate,” the Secretary must “resolicit offers for the
    concessions contract incorporating such material amendments or changes,” 
    id. § 5952(4)(D).
    The Act plainly disfavors giving preferential renewal right to incumbents, providing that
    “the Secretary shall not grant a concessioner a preferential right to renew a concessions contract,
    or any other form of preference to a concessions contract,” except for narrowly defined types of
    contracts in specified circumstances. 
    Id. § 5952(7)(A).
    For incumbent concession contract
    holders, the Secretary may grant a right of renewal only if the incumbent has “operated
    satisfactorily during the term of the contract” and “submitted a responsive proposal for a
    proposed new contract which satisfies the minimum requirements established by the Secretary,”
    
    id. § 5952(8)(C).
    This preferential right of renewal “shall allow a concessioner . . . the
    opportunity to match the terms and conditions of any competing proposal which the Secretary
    determines to be the best proposal . . . .” 
    Id. § 5952(7)(C).
    Consistent with the statute, NPS regulations require “a public solicitation process” for a
    concession contract, which process “begins with the issuance of a prospectus that invite[s] the
    general public to submit proposals for the contract.” 36 C.F.R. § 51.4(a). The prospectus must
    include, among other things, “the minimum requirements of the concession contract,” and “a
    statement identifying each principal selection factor for proposals . . . and secondary factors . . .
    and the weight and relative importance of the [factors] in the selection decisions.” 
    Id. § 51.5(a).
    By the time the prospectus is issued, the director is also required to have identified incumbent
    concessioners who are “preferred offerors,” which status allows them to exercise a right of
    renewal if certain conditions are met. 
    Id. § 51.28
    (“[T]he director will determine whether a
    concessioner is a preferred offeror in accordance with this part no later than the date of issuance
    of a prospectus for the applicable new concession contract.”). On expiration of the specified
    21
    period to submit proposals, NPS “appl[ies] the selection factors” to the proposals received “by
    assessing each timely proposal under each of the selection factors . . . and . . . assign[ing] a score
    that reflects the determined merits of the proposal.” 
    Id. § 51.16.
    Following evaluation and
    scoring of the proposals, “the responsive proposal with the highest cumulative point score will be
    selected by the Director as the best proposal.” 
    Id. § 51.16.
    The “concession contract will be
    awarded to the offeror submitting the best responsive proposal.” 
    Id. § 51.31.
    Importantly, the language of § 51.31 limits award of a contract to a “responsive”
    proposal, which is defined in the regulations as “a timely submitted proposal . . . [that] agree[s]
    to all the minimum requirements of the proposed concession contract and prospectus and [that]
    provide[s] the information required by the prospectus.” 
    Id. § 51.3.
    The determination of
    whether a proposal is responsive must be made “[p]rior to or as of the date of the selection of the
    best proposal.” 
    Id. § 51.13.
    The regulations are absolutely clear that the Director “must reject
    any proposal received” that “is not a responsive proposal.” 
    Id. § 51.18.
    9
    Generally, “[a]n offeror may not amend or supplement a proposal after the submission
    date.” 
    Id. § 51.15.
    Limited amendment to a bid proposal is permitted in only two circumstances.
    First, an amendment to a bid proposal after expiration of the proposal period is permitted when
    there has been “a general failure of offerors to understand particular requirements of a prospectus
    or a general failure of offerors to submit particular information required by a prospectus.” 
    Id. In that
    circumstance, the Director may permit amendment “limited to modifying particular aspects
    of proposals” with the noted deficiencies so long as “the Director provides all offerors that
    submitted proposals a similar opportunity to amend or supplement their proposals.” 
    Id. Second, an
    amendment to a bid proposal is permitted after expiration of the proposal period when “a
    9
    The prospectus published by NPS for the disputed contracts mirrors this language and makes clear that
    “[o]nly an Offeror submitting a responsive proposal is eligible to be awarded the new concession contract.” AR 27.
    22
    proposal other than the responsive proposal submitted by a preferred offeror is the best proposal
    submitted for a qualified concession contract.” 
    Id. § 51.32.
    In this second circumstance, the
    Director must “give the preferred offeror an opportunity to match the terms of the better offer.”
    
    Id. This “opportunity,”
    however, is restricted to a preferred offeror, which “must submit a
    responsive proposal . . . if the preferred offeror wishes to exercise a right of preference.” 
    Id. § 51.30.
    Thus, the preferential right to match a better offer is dependent on submission of a
    “responsive proposal,” a criterion further emphasized in yet another regulation, stating that “[i]f
    a preferred offeror fails to submit a responsive proposal, the offeror may not exercise a right of
    preference.” 
    Id. § 51.31.
    Outside of these two limited circumstances, the relevant regulations do
    not permit amendments to proposals after expiration of the specified period for bid submissions.
    
    Id. § 51.15.
    In sum, these straightforward regulations make clear that, absent a circumstance in which
    no offerors have submitted a responsive proposal or in which the incumbent concessioner has
    submitted a responsive proposal not deemed the “best,” NPS is precluded from permitting
    amendment of bids after the submission period has expired. 
    Id. § 51.15.
    Both the governing
    statute and regulations require that NPS reject non-responsive proposals, which also are
    ineligible for any preferential right of renewal.
    NPS Violated Both the Governing Statute and Regulations
    The CFC, in its thorough analysis, concluded that both incumbent concessioners’ bids
    were non-responsive, while rejecting NPS’s argument that “[the plaintiff]’s proposal suffered
    from the same defect, and should likewise be rejected as non-responsive.” Eco Tour I, 114 Fed.
    Cl. at 29–33. Due to the CFC’s ruling, NPS concedes error in its August 30, 2013 decision
    deeming the incumbents’ initial bid proposals responsive. Defs.’ Opp’n at 30. Given that the
    incumbent concessioners’ initial proposals were not responsive, NPS was required to reject the
    23
    proposals. See 16 U.S.C. 5952(4)(B); 36 C.F.R. § 51.18. Furthermore, NPS regulations
    prohibited the incumbent concessioners from amending their proposals after expiration of the
    proposal period, see 36 C.F.R. §§ 51.15, 51.32, and due to their non-responsive proposals, the
    incumbents were not entitled to a preferential right of renewal or the opportunity to amend their
    bids to meet the better offer. 16 U.S.C. § 5952 (8)(C)(ii).
    Indeed, NPS makes no effort to justify permitting such amendment based on a “general
    failure” of the bidders to submit responsive applications, as outlined in § 51.15, since the
    plaintiff submitted responsive proposals for Contracts 24 and 32. As for permitting the
    incumbents to exercise a right of preference and amend their proposals under § 51.32, the
    incumbents were not eligible to exercise any right of preference because their proposals were not
    responsive in the first instance. Despite NPS’s argument that “the Court should defer to the
    agency’s interpretation of” its own regulations, Defs.’ Reply at 9–10, such deference is owed
    only when the regulation at issue is ambiguous, 
    Decker, 133 S. Ct. at 1337
    . These regulations
    are clear.
    NPS nonetheless urges that § 51.32 should be read to permit incumbents to amend their
    proposals to make them responsive to a prospectus. Defs.’ Opp’n at 16; see also 
    id. at 21
    (citing
    § 51.32 as “requir[ing]” NPS “to award the contracts to the incumbent concessioners because
    they timely submitted amended proposals and their amended proposals matched the terms of Eco
    Tour’s offer.”). As support, NPS cites the second sentence of this regulation, which “provides
    that ‘[i]f the preferred offeror duly amends its proposal within the time period allowed by the
    Director, and the Director determines that the amended proposal matches the better terms and
    conditions of the best proposal, then the Director must select the preferred offeror for an award
    of the contract upon the amended terms and conditions, subject to other applicable requirements
    24
    of this part.’” 
    Id. (quoting §
    51.32). NPS not only fails to address the overall restriction in the
    last clause of the sentence referring to “other applicable requirements of this part,” which
    constrains its reading of § 51.32, but also fails to address the immediately preceding sentence of
    this same subsection, which expressly limits the scope of the second sentence by restricting
    preferred offerors eligible to take advantage of the right of preference to those that have already
    submitted a responsive proposal. Specifically, the first sentence of § 51.32 states:
    “If the Director determines that a proposal other than the responsive proposal
    submitted by a preferred offeror is the best proposal submitted for a qualified
    concession contract, then the director must advise the preferred offeror of the better
    terms and conditions of the best proposal and permit the preferred offeror to amend
    its proposal to match them.”
    § 51.32 (emphasis added).
    The text of § 51.32 is unambiguous and cannot support NPS’s interpretation of the
    regulation. The first sentence of the regulation clearly limits the scope of § 51.32 to “responsive
    proposal[s] submitted by a preferred offeror,” and also limits amendments permitted by the right
    of preference to matching “the better terms and conditions of the best proposal.” Neither of
    those conditions were met here. First, the initial offers submitted by the incumbent
    concessioners were non-responsive and thus do not constitute a “responsive proposal submitted
    by a preferred offeror” under § 51.32. Second, the amendments NPS attempts to justify under
    this subsection were not limited to matching the better terms of the plaintiff’s offer, but include
    amendments to make the incumbent concessioners’ proposals responsive. By permitting such
    amendments to be made by the incumbent concessioners, NPS violated the unambiguous
    language of the relevant regulations, rendering this decision arbitrary and capricious. See Nat'l
    Envtl. Dev. 
    Ass'ns, 752 F.3d at 1009
    (holding an agency’s action is “arbitrary and capricious if
    the agency fails to ‘comply with its own regulations’” (quoting Environmentel, 
    LLC, 661 F.3d at 85
    )). Thus, even if § 51.32 were “the relevant regulation governing the contract award to the
    25
    incumbent concessioners,” Defs.’ Opp’n at 21, as NPS contends, this regulation does not
    sanction the agency’s action.
    Indeed, adoption of NPS’s proposed reading of these regulations would make §§ 51.30
    and 51.31 superfluous. If the regulations authorized the Director to allow incumbent
    concessioners to amend non-responsive proposals in order to exercise a right of preference, then
    § 51.31, which prohibits “a preferred offeror [who] fails to submit a responsive proposal” from
    “exercis[ing] a right of preference,” would have no purpose because a preferred offeror could
    always amend a proposal to make it responsive. The same reading would obviate the pre-
    requisite in § 51.30 that “[a] preferred offeror must submit a responsive proposal pursuant to the
    terms of an applicable prospectus for a qualified concession contract if the preferred offeror
    wishes to exercise a right of preference,” since the same offeror could simply amend its proposal
    at any time to meet the terms of the prospectus.
    In sum, after the CFC found the incumbents’ proposals to be non-responsive, NPS
    persisted on the path of awarding the disputed contracts to the incumbent concessioners, even
    though these awards were barred under relevant statutory provisions and regulations requiring
    rejection of the incumbents’ proposals. NPS’s decision to make final awards of the disputed
    contracts to the incumbents was “arbitrary, capricious, an abuse of discretion, or otherwise not in
    accordance with law.” 5 U.S.C. § 706(2)(A).
    NPS’s Award of Disputed Contracts Had No “Reasonable” Basis
    Even if the agency’s actions were prohibited by statute and its own regulations, NPS has
    a fallback position: the agency “had a reasonable basis to proceed with the award of the contracts
    to the incumbents following the outcome of the CFC litigation when Eco Tour accepted its bid
    preparation costs as a remedy for the erroneous responsiveness determination and when the CFC
    left undisturbed the September 4, 2013 award decision.” Defs.’ Opp’n at 20–21. In this “unique
    26
    set of circumstances,” 
    id. at 21
    , NPS suggests that no regulation, including § 51.32, “expressly
    govern[s],” id.; see also Defs.’ Reply at 9 (arguing that the regulations “do[] not contemplate the
    situation presented here”), and, thus, to avoid “the windfall that Eco Tour would obtain if it
    received the contracts in addition to its bid preparation costs,” Defs.’ Opp’n at 21, “NPS had a
    rational basis to thereafter proceed pursuant to the September 4, 2013 award determination” and
    “did not clearly violate any concession contracting procedure by proceeding in this manner,” 
    id. This convoluted
    argument is without merit for several reasons.
    First, as a threshold matter, and most notably, the predicate for this argument—namely,
    that “the CFC left undisturbed the September 4, 2013 award decision,” Defs.’ Opp’n at 21—is
    plainly wrong. This argument, which is repeated throughout NPS’s briefing, 
    id. at 3,
    13, 23–24,
    30, 31; Defs.’ Reply at 2, 3, fails because, as the plaintiff correctly points out, “the CFC decision
    in Eco Tour I completely eviscerated the fundamental and legal basis for NPS’s September 4,
    2013 selection decision.” Pl.’s Opp’n at 10. To review, the September 4, 2013 decision to
    award the contracts to the incumbents based on their amended bids rested on the August 30,
    2013 decision’s critical finding the incumbents’ initial proposals responsive, and therefore
    eligible for amendments designed to match the terms of the better offer. AR 1352, 1384 (Source
    Selection Memoranda, citing both August 30, 2013 determination of incumbents’ “responsive
    proposal[s]” and June 20, 2013 letter citing terms of “better offer”). Indeed, the CFC stayed its
    proceedings, at NPS’s request, until the agency made its final selection of concessioners, and
    then considered the plaintiff’s challenge on an expedited schedule before the disputed contracts
    were executed, to hold that “NPS violated applicable law, acted arbitrarily and capriciously, and
    abused its discretion in concluding that incumbent concessioners . . . submitted proposals that
    were ‘responsive’ to the requirements of the prospectus and in allowing them to match the better
    27
    terms of Eco Tour’s proposals for the disputed contracts.” Eco Tour I, at 11. Thus, the specific
    reasons justifying the September 4, 2013 selection decision – that the incumbents submitted
    responsive proposals and exploited the opportunity to match the plaintiff’s better terms – were
    found to be illegal. The CFC further found that “there is a substantial chance that Eco Tour
    would have been awarded the disputed contracts if not for the errors alleged in the amended
    complaint.” 
    Id. at 33,
    44.
    This CFC decision narrowly constrained NPS’s next actions: under the mandates of the
    applicable statute and regulations, at a minimum, NPS was required to reject the incumbents’
    proposals. See 16 U.S.C. § 5952(8)(B)(iii) (“The Secretary shall reject any proposal, regardless
    of the franchise fee offered, if the Secretary determines that . . . the proposal is not
    responsive…”(emphasis added)); 36 C.F.R. § 51.31 (requiring rejection of incumbent’s non-
    responsive proposal). Instead, NPS proceeded to execute the disputed contracts with the
    incumbents, notwithstanding that those contracts were predicated on a series of statutory and
    regulatory violations. 10
    Second, NPS’s contention that its regulations should somehow be deemed ambiguous and
    the disputed contract awards “rational” in the unique circumstances presented in this case is
    without merit. The governing statute and NPS regulations apply to situations, as here, where an
    incumbent concessioner has submitted a bid for a concession contract, and explicitly addresses
    10
    NPS’s criticism of the plaintiff for purportedly failing to challenge the September 4, 2013 selection
    decision only demonstrates the agency’s misunderstanding of the repercussions flowing from the CFC decision. See
    Defs.’ Opp’n at 7 (“Eco Tour did not challenge the agency's September 4, 2013 determination . . . .”); 
    id. at 16
    (“Eco
    Tour did not challenge in the CFC lawsuit, and does not directly challenge here, the September 4, 2013 award
    decisions that were the basis for the award of the contracts to the incumbent concessioners in July 2014.”). By
    successfully challenging the underlying prerequisites for the selection decision, the plaintiff needed to do no more.
    By operation of the applicable statutes and regulations, the CFC decision required rejection, not selection, of the
    incumbents’ proposals. See Pl.’s Opp’n at 11 n. 2 (explaining that “[g]iven the CFC ruling, there was no reason for
    Eco Tour to thereafter file a second lawsuit seeking to invalidate this September 4, 2013 selection decision because
    the CFC decision clearly invalidated it.”).
    28
    what must happen when the bid is either responsive or non-responsive. When an incumbent has
    submitted a non-responsive bid, that bid must be rejected. See 36 C.F.R. § 51.31. The fact that
    the regulations do not discuss what happens when a non-incumbent bidder has received some
    judicial relief is irrelevant: NPS remains bound by the regulation requiring rejection of a non-
    responsive proposal from any bidder, including incumbent concessioners. In other words, the
    purportedly unique circumstance presented in this case is merely that the CFC, rather than NPS,
    found the incumbents’ proposals to be non-responsive. This finding, at a minimum, should have
    sent NPS back to the proverbial drawing board with a new solicitation of bids, rather than
    proceeding apace to execute the disputed contracts. The fact that the CFC also held that the
    plaintiff was prejudiced and entitled to at least monetary relief—several months before NPS
    actually executed the disputed contracts—is unrelated to the regulatory bar on the agency’s
    consideration of non-responsive bids for concession contracts. See Pl.’s Opp’n at 12 (noting
    “even if Eco Tour had elected a remedy and was powerless to stop NPS from awarding the
    contracts,” this was “no excuse for NPS proceeding to award the contracts to its incumbents
    because . . . the law still prohibited any such award.”).
    Finally, NPS’s argument that its decision to award the disputed contracts to the
    incumbents was based on the fact that “Eco Tour accepted its bid preparation costs as a remedy
    for the erroneous responsiveness determination,” is unconvincing. Defs.’ Opp’n at 20–21. As
    the plaintiff correctly points out, “even if Eco Tour had elected a remedy, that action by Eco
    Tour could not possibly have converted the preferred incumbents’ non-responsive proposals into
    responsive proposals, which they had to be in order for NPS to legally award the contracts to the
    incumbents under the applicable regulations.” Pl.’s Opp’n at 2. NPS does not directly address
    this cogent position, but instead reasons that when the plaintiff accepted reimbursement of costs
    29
    incurred for its unsuccessful bids for Contracts 24 and 32, not only had the plaintiff elected a
    remedy “upon which NPS could justifiably rely,” but also “any error in the process had been
    remedied in accordance with the ruling of the CFC.” Defs.’ Opp’n at 31. As a result, in NPS’s
    view, the agency “was required to award the contracts to the incumbent concessioners because
    they timely submitted amended proposals.” 
    Id. at 21.
    NPS’s reasoning essentially asserts, in a different guise, the same election-of-remedies
    defense previously rejected by this Court in denying the agency’s motion to dismiss. See infra
    Part III.B. Among the flaws in this reasoning is that the plaintiff actually sought, as complete
    relief before the CFC, injunctive relief in the form of a remand for NPS to correct its
    responsiveness finding about the incumbents’ proposals, Eco Tour 
    I, 114 Fed. Cl. at 42
    , but the
    CFC agreed with the argument presented by NPS “that the court lacks authority to grant Eco
    Tour’s requested injunctive and declaratory relief ‘because 28 U.S.C. § 1491(b) does not apply
    to concession contracts, and 28 U.S.C. § 1491(a) provides for only monetary relief,’” Eco Tour I,
    at 39–40 (quoting from defendants’ briefing before CFC). 11 Consequently, the plaintiff was
    “precluded from obtaining injunctive and declaratory relief,” 
    id. at 42,
    and “limited to an award
    of damages in the form of bid preparation costs,” 
    id. at 40.
    The CFC’s correction of the NPS’s
    erroneous treatment of the incumbents’ proposals triggered the statutory and regulatory
    requirement of rejection of those proposals and presented NPS with two alternatives: either
    award of the contracts to plaintiff, as the best offeror, or re-solicitation of bid proposals. See
    Pl.’s Opp’n at 11 n.2 (noting that “[a]s a result of the CFC’s decision, NPS had two legal options
    11
    Ironically, having prevailed on this argument before the CFC, NPS, in an about-face, suggests now that the
    CFC had authority to issue a remand, under either 28 U.S.C. § 1491(a)(2) or USCS Claims Ct. R. 52.2(a)-(b)(1), but
    simply declined to exercise that authority. See Defs.’ Opp’n at 9 n. 8. Contrary to this characterization of the CFC’s
    holding, the CFC made its reasoning clear that it believed the plaintiff’s requested remand was “beyond the scope
    of” its authority. Eco Tour 
    I, 114 Fed. Cl. at 42
    .
    30
    going forward: (1) award the contracts to Eco Tour; or (2) cancel the solicitation.”). In any
    event, nothing in the CFC decision intimates that the errors in the bidding process were cured by
    reimbursement of the plaintiff’s costs; rather, this remedy simply addressed, at least partially, the
    prejudicial harm to the plaintiff “resulting from [NPS’s] arbitrary and capricious action.” Eco
    Tour 
    I, 114 Fed. Cl. at 43
    . Although the CFC was silent about the next steps that NPS was
    required to take to remedy the agency’s errors in considering the incumbents’ non-responsive
    proposals and allowing amendments to make the proposals responsive and to match the better
    offer, as discussed above, the applicable statute and regulations made clear that these proposals
    were ineligible for final awards. In short, any reliance by NPS on the plaintiff’s acceptance of a
    monetary award as curing any of its errors during the bid process was entirely misplaced.
    Finally, NPS’s argument still makes little sense given the chronology of events. NPS
    insists that the “final decision” to award the disputed contracts to the incumbent concessioners
    was made on September 4, 2013. Defs.’ Opp’n at 23–24. Since the plaintiff was not adjudged
    entitled to reimbursement of its costs until after that date, in November 2013, and was not
    actually reimbursed until even later, in the final judgment entered in April 2014, NPS simply
    could not have understood the plaintiff to have obtained any, let alone “complete,” relief in
    September 2013, when NPS says the award decision was made. In short, NPS cannot justify its
    decision to permit the incumbents to amend their proposals in September 2013 because the
    agency believed then that the plaintiff had received an adequate remedy for the agency’s
    violation of the APA, when the CFC did not rule until November 2013 and the plaintiff did not
    receive reimbursement for its bid costs until the following year, in April 2014.
    *       *      *
    31
    The Court holds that NPS’s decision to permit the incumbent concessioners to amend
    their non-responsive bids was contrary to the plain meaning of the relevant statute and
    regulations and, therefore, arbitrary, capricious, an abuse of discretion and contrary to law. The
    incumbents’ bid proposals were non-responsive, rendering the incumbents’ proposals ineligible
    for consideration and the incumbents’ ineligible for the opportunity to meet the better terms of
    the plaintiff’s proposal. NPS’s decision, even after the CFC held that the incumbents’ bids were
    non-responsive, to nonetheless award the disputed contracts to the incumbent concessioners was
    wrong.
    B.     NPS’S REQUEST FOR RECONSIDERATION OF DISMISSAL MOTION
    IS DENIED
    Even if the agency’s award of the disputed contracts to the incumbent concessioners is
    found to be illegal under the APA, NPS nonetheless contends this suit is precluded under the
    “election of remedies” doctrine by rehashing its previously rejected argument that the plaintiff
    has “already elected its remedy in the CFC.” Defs.’ Opp’n at 17. Specifically, NPS asks the
    Court to “reconsider its prior ruling” denying NPS’s motion to dismiss, contending that this
    ruling was predicated on two “erroneous” allegations proffered by the plaintiff, which allegations
    now at the summary judgment stage need no longer be assumed to be true. Id at 27–32. These
    two purportedly “erroneous” allegations are “that: (1) ‘the NPS had not yet finalized its decision
    to award the disputed contracts to the incumbent concessioners while the CFC action was still
    pending’ and (2) ‘to the extent deemed necessary’ any contracts awarded under this action could
    address any prior partial relief received by Eco Tour pursuant to the CFC[] lawsuit.” 
    Id. at 22
    (quoting Eco Tour 
    II, 174 F. Supp. 3d at 334
    ). The summary judgment record, however, does
    not make NPS’s argument regarding application of the “election of remedies” doctrine any more
    persuasive.
    32
    Plaintiff Did Not Delay Seeking Injunctive Relief
    The plaintiff characterizes as “completely wrong” NPS view that “its September 3, 2013
    [sic] selection decision was a final award,” Pl.’s Opp’n at 42; see also 
    id. at 4
    (“[A]t the time of
    the CFC ruling, NPS had not awarded the contracts.”), since “the final award decision was not
    made until July 16, 2014, when NPS decided not to cancel the solicitation but instead to sign the
    illegal contracts, which decision was made well after the CFC invalidated NPS’s September 4,
    2013 selection decision,” 
    id. at 39.
    According to the plaintiff, “NPS’s regulations make it very
    clear that NPS has not made a final award decision until it actually signs the contract (which it
    did on July 16, 2014),” Pl.’s Opp’n at 39 (citing NPS regulations 36 C.F.R. §§ 51.3, 51.20), and,
    consequently, the plaintiff “could not have filed an APA action prior to July 16, 2014,” 
    id. NPS counters
    that the plaintiff’s focus on the July 2014 final awards is incorrect since the plaintiff
    should have sought “injunctive relief under the APA based on the September 4, 2013 award
    decision,” while the CFC suit was pending. Defs.’ Opp’n at 23. The agency suggests that the
    plaintiff could have challenged this September 2013 source selection, for example, by
    “requesting to stay that [CFC] lawsuit before judgment was entered and seek relief in District
    Court,” 
    id. at 26,
    or “ask[ing] that [CFC] vacate, or hold in abeyance, its November 2013
    decision while Eco Tour pursued injunctive relief in District Court to address the September 4,
    2013 award decision,” 
    id. at 31.
    Regardless of which decision, the September 2013 source selection decision or the July
    2014 final award of the disputed contracts, constitutes the requisite final agency action to support
    an APA challenge, the principle thrust of NPS’s argument is that the plaintiff’s election to obtain
    the CFC’s monetary judgment delayed consideration of the plaintiff’s instant request for
    injunctive relief to either stop or to rescind the final award of the disputed contracts. Defs.’
    Opp’n at 26 (faulting the plaintiff for “delay in seeking injunctive relief in an appropriate
    33
    forum”). The plaintiff counters that “it would be unfair to find fault with the conduct of Eco
    Tour,” which acted promptly and vigorously, and also exhausted its financial resources, in filing
    a bid protest seeking an injunction in what appeared based on existing case law to be the
    appropriate forum, the Court of Federal Claims, only to have that court for the first time
    determine that it could not issue injunctive relief in a bid protest challenging an NPS concession
    contract.” Pl.’s Opp’n at 39–40.
    Even if NPS were correct that the plaintiff could have sought injunctive relief in this
    Court based on the September 2013 selection decision, Defs.’ Opp’n at 23, the agency draws the
    wrong conclusion that the plaintiff unnecessarily delayed in seeking injunctive relief. The
    plaintiff sought both monetary and injunctive relief before the CFC, Eco Tour 
    I, 114 Fed. Cl. at 11
    , and could not have known until November 2013, that the CFC accepted the agency’s
    arguments that the CFC lacked jurisdiction to issue the requested injunctive relief. Moreover, in
    view of the CFC holdings regarding the non-responsiveness of the incumbents’ proposals, the
    September 4, 2013 selection decision was a nullity since the critical bases for that decision were
    found to be arbitrary and capricious. At that point, the plaintiff had little reason to seek to enjoin
    that selection decision. Instead, under the mandates of the governing statute and regulations, if
    NPS did not award the disputed contracts to the plaintiff as the best offeror, NPS should have
    initiated a new solicitation of concession proposals, in which new solicitation the plaintiff may
    have chosen to participate, after receiving monetary reimbursement for its participation in the
    original flawed competition. If events had so transpired, the agency’s acute concern over the
    plaintiff obtaining a windfall would have been eliminated.
    The plaintiff’s goal since submission of its bid proposals was to obtain the disputed
    contracts, not a windfall monetary award. Indeed, the plaintiff beseeched the agency simply to
    34
    comply with its own regulations and offered to forgo execution of the CFC judgment in
    exchange for the disputed contracts, but NPS declined, expressing the view that it was “not
    possible” to award the contracts to the plaintiff. AR 00011 (Letter, dated June 20, 2014, from
    Regional Director, NPS Intermountain Region to plaintiff’s President, acknowledging plaintiff’s
    efforts). At bottom, NPS urges this Court to find that, after prevailing on the merits before the
    CFC, the plaintiff should have sought injunctive relief in this Court because the plaintiff should
    have anticipated and expected that NPS would ignore the clear import of the CFC’s ruling and
    proceed to violate its governing statute and its own regulations. It cannot be the case that
    disappointed bidders are expected to make that assumption of government agencies, especially in
    light of a clear court ruling. Consequently, the plaintiff cannot be expected to have filed suit in
    this Court seeking injunctive relief after the CFC’s ruling but before NPS executed the disputed
    contracts with the incumbent concessioners. NPS’s argument that the plaintiff failed to
    challenge the September 4, 2013 decision in a timely manner is rejected.
    Equitable Relief May Be Fashioned To Avoid A Windfall To the
    Plaintiff
    To bolster its argument that this Court should reconsider NPS’s selection-of-remedies
    defense, the agency next asserts that “there is no basis for Eco Tour’s representation that any
    contracts awarded in this action could provide reimbursement to NPS of the bid preparation costs
    that NPS paid to satisfy the CFC judgment,” Defs.’ Opp’n at 29; see Eco Tour II, 
    174 F. Supp. 3d
    at 335 (finding that “any contract awarded under this action c[an] address any prior partial
    relief received by Eco Tour”). As support for this assertion, NPS relies on two NPS regulations
    raised for the first time in this summary judgment briefing. Since neither of the cited regulations,
    35
    however, would bar the fashioning of equitable relief to address any potential windfall to the
    plaintiff, this argument is unavailing. 12
    The first regulation cited by NPS as precluding the use of any mechanisms to provide
    equitable relief to the plaintiff while avoiding a windfall is 36 C.F.R. §51.19. See Defs.’ Opp’n
    at 29. This regulation provides, in pertinent part: “[e]xcept for incorporating into the concession
    contract appropriate elements of the best proposal, the Director must not award a concession
    contract which materially amends or does not incorporate the terms and conditions of the
    concession contract as set forth in the prospectus.” According to NPS, amending the concession
    contract “to allow for the reimbursement to the government of the previously paid bid
    preparation costs” would amount to a material change in the contract. Defs.’ Reply at 11; see
    also Defs.’ Opp’n at 24 (citing 36 C.F.R. § 51.19). Yet, the prospectus did not actually require a
    specific franchise fee, but only required a fee of “at least” 3% of gross revenues or $500,
    whichever was greater. AR 24. As the plaintiff points out, the offered franchise fee of 4.25%
    “could be increased above what Eco Tour bid in the first year (or annually over the contracts’
    full term) to include the $36,250 in funds which NPS previously paid to Eco Tour,” by simply
    stating that the plaintiff agrees to pay the $36,250, plus the 4.5% franchise fee, which results in
    no material amendment to the prospectus or proposed contract. Pl.’s Opp’n at 16. This plan
    12
    NPS notes that it stands by its original argument that “the Court cannot order the agency to award the
    contracts to Eco Tour because the decision to award a contract is within the agency’s discretion.” Defs.’ Opp’n at
    24 n.13. While generally an agency may not be compelled to take discretionary action, see Norton v. South Utah
    Wilderness Alliance, 
    542 U.S. 55
    , 65 (2004) (when action is left to an agency's discretion, a court “has no power to
    specify what the action must be”), an exception allows such an order in the government contracting context when “it
    is clear that, but for the illegal behavior of the agency, the contract would have been awarded to the party asking the
    court to order the award.’” Delta Data Sys. Corp. v. Webster (“Delta Data”), 
    744 F.2d 197
    , 206 (D.C. Cir. 1984));
    see also LeBoeuf, Lamb, Greene & MacRae, L.L.P. v. Abraham, 
    347 F.3d 315
    , 320 (D.C. Cir. 2003) (same, quoting
    Delta Data). This is precisely the situation here. Given that NPS regulations required that the disputed contracts be
    awarded to the bidder submitting the “best” proposal, and that the plaintiff submitted the “best” proposal for both
    contracts, compared to non-responsive proposals submitted by the incumbents, but for NPS’s arbitrary and
    capricious actions, the incumbents’ proposals should have been rejected and the disputed contracts would have been
    properly awarded to the plaintiff. Consequently, the Court has the power to direct the award of the contracts, should
    the plaintiff be found entitled to such relief.
    36
    would simply return the plaintiff to the position to which it was entitled absent the agency’s
    violation of the APA, without any material amendment to “the terms and conditions of the
    concession contract,” under § 51.19. Thus, this regulation cannot be used to shield NPS from
    providing a full remedy to the plaintiff prejudiced by the agency’s invalid bidding process.
    NPS likewise cites a second regulation, titled “Simplified Concession Contracts;
    Revision,” which outlines standard terms for agency concession contracts, as barring any attempt
    to modify a proposed franchise fee. Defs.’ Reply at 11–12 & n.5. According to NPS, adjustment
    of a franchise fee is only permitted in light of “extraordinary, unanticipated changes,” a term that
    is “specifically defined in the applicable regulations and does not include reimbursing the agency
    for previously paid bid preparation costs.” 
    Id. at 12
    n.5 (citing 65 Fed. Reg. 44,894 at 44,902–
    03). The cited regulation provides “simplified versions of the standard concession contract,”
    which “serve as a guideline for the form of concession contracts used to authorize smaller
    concession operations.” 65 Fed. Reg. 44,894 at 44,894. One optional term would authorize “a
    reconsideration and possible subsequent adjustment of the franchise fee,” in the event of
    “extraordinary, unanticipated changes,” which is defined as “unanticipated changes from the
    conditions existing or reasonably anticipated before the effective date of this CONTRACT which
    have or will significantly affect the probable value of the privileges granted to the Concessioner
    by this CONTRACT.” 
    Id. at 44,903
    (capitalization in original). 13
    As an initial matter, given that the plaintiff has no contract with NPS, this language
    restricting when a franchise fee amendment would be authorized for an effective contract, is
    currently inapplicable. Furthermore, even if the cited regulation were somehow pertinent here, it
    is unhelpful to NPS. This optional contract term actually authorizes adjustments to franchise
    13
    This language is incorporated into the disputed contracts executed with the incumbent concessioners. AR
    00025-26, 00059-60.
    37
    fees, and while not explicitly referencing an adjustment to allow a bidder to reimburse judicially
    ordered bid preparation costs, the definition does not exclude it either. Tellingly, NPS does not
    actually quote any of the language defining “extraordinary, unanticipated changes” in its
    briefing, but relies entirely on its own characterization that the definition “does not include
    reimbursing the agency for previously paid bid costs.” Defs.’ Reply at 12 n.5. 14
    In sum, NPS has presented no persuasive argument based on its regulations that preclude
    conditioning the award of the injunctive relief sought by the plaintiff on repayment of the funds
    the plaintiff has already received, resolving any concerns about the plaintiff receiving a windfall.
    Accordingly, NPS’s position that the Court should reconsider its prior denial of the agency’s
    election-of-remedies defense and grant it summary judgment is rejected.
    C.       FASHIONING EQUITABLE RELIEF ABSENT INCUMBENT
    CONCESSIONERS
    The plaintiff has succeeded on the merits but that fact does not automatically entitle the
    company to injunctive relief as of right. Winter v. NRDC, Inc., 
    555 U.S. 7
    , 32 (2008) (“An
    injunction is a matter of equitable discretion; it does not follow from success on the merits as a
    matter of course.”). To demonstrate entitlement to injunctive relief, a party “must make a clear
    showing that four factors, taken together, warrant relief: [] success on the merits, [] irreparable
    harm in the absence of [injunctive] relief, a balance of the equities in its favor, and accord with
    the public interest.” League of Women Voters of the United States v. Newby, 
    838 F.3d 1
    , 6 (D.C.
    Cir. 2016) (quoting Pursuing Am.’s Greatness v. FEC, 
    831 F.3d 500
    (D.C. Cir 2016)); see also
    see also Morgan Drexen, Inc. v. Consumer Fin. Prot. Bureau, 
    785 F.3d 684
    , 694 (D.C. Cir.
    14
    NPS rejects the plaintiff’s simple solution for avoiding a windfall by conditioning any equitable relief on
    the return to NPS of the funds received as reimbursement for the plaintiff’s bid costs. Pl.’s Opp’n at 15-16. NPS
    contends without support that the CFC’s “final judgment would then become an outstanding liability of NPS” and
    returning the money would “negate the binding judgment issued by the CFC.” Defs.’ Opp’n at 25. If NPS is correct
    on this point, then structuring the plaintiff’s contractual obligations with NPS to ensure reimbursement of the funds
    would be the only option.
    38
    2015) (discussing entitlement to a permanent injunction). “If a less drastic remedy . . . [is]
    sufficient to redress [the] injury, no recourse to the additional and extraordinary relief of an
    injunction [is] warranted.” Monsanto Co. v. Geertson Seed Farms, 
    561 U.S. 139
    , 165–66
    (2010). Although the plaintiff clearly meets three factors—success on the merits, irreparable
    harm, and accord with the public interest—evaluating the balance of the equities poses a
    particular problem, as it highlights the impact that any equitable relief may have on the
    incumbent concessioners, who are not parties to this case.
    The Plaintiff Satisfies Three Factors For Injunctive Relief
    The plaintiff has prevailed on the merits of its claims before this Court, as it did before
    the CFC, and hence has met the first factor for injunctive relief. 
    See supra
    Part III.A.2. The
    plaintiff has also demonstrated that its injuries are irreparable for at least two reasons. First, the
    harm to the plaintiff is certain but difficult to value. Such harm is irreparable. CSX Transp. v.
    Williams, 
    406 F.3d 667
    , 673 (D.C. Cir. 2005) (quoting Danielson v. Local 275, 
    479 F.2d 1033
    ,
    1037 (2d Cir. 1973)); see also Bell Helicopter Textron, Inc. v. Airbus Helicopters, 
    78 F. Supp. 3d 253
    , 274–75 (D.D.C. 2015) (damages that “defy attempts at valuation” are irreparable (citing i4i
    Ltd. P’ship v. Microsoft Corp., 
    598 F.3d 831
    , 862 (Fed. Cir. 2010) (“Difficulty in estimating
    monetary damages is evidence that remedies at law are inadequate.”). A concessioner is not
    guaranteed any particular profit under the concession contract and, thus, determining the value of
    what the plaintiff has lost in profits is difficult, if not impossible.
    Second, if NPS had properly rejected the non-responsive proposals of the incumbent
    concessioners and awarded the disputed contracts to the plaintiff with the “best proposal,” the
    plaintiff would be eligible for treatment as a preferred offeror in the future in the next round of
    contracting. See 36 C.F.R. § 51.36 (“A concessioner is a preferred offeror if . . . [among other
    things], [t]he concessioner was a satisfactory concessioner during the term of its concession
    39
    contract.”). Thus, as a consequence of NPS’s improper actions, the plaintiff has been put in a
    less favorable position as a bidder for the NPS contracts than it would have been as an incumbent
    concessioner. Absent equitable relief, this injury simply will not be redressed.
    The plaintiff has also demonstrated that the public interest favors granting relief. As the
    plaintiff points out, not only is the public interest served by ensuring that “the government
    obtains the most advantageous contracts by complying with the procedures which Congress and
    applicable regulations have provided,” Pl.’s Opp’n at 27 (quoting Delta Data Sys. 
    Corp., 744 F.2d at 206
    ), but Congress has expressed a clear policy preference against rights of renewal
    absent specified, exceptional circumstances, 
    id. at 29
    (citing Circle Line-Statue of Liberty Ferry,
    Inc. v. United States, 
    76 Fed. Cl. 490
    , 491 (2007) (“Having found that true competition simply
    did not exist in the award of concession contracts, Congress reversed the renewal preference
    policy set out in [previous legislation] by directing that ‘the Secretary shall not grant a
    concessioner a preferential right to renew a concessions contract, or any other form of preference
    to a concessions contract,’” except in limited circumstances (quoting 16 U.S.C. §5952(7)). Even
    in the limited circumstances where preferential right of renewal is statutorily authorized, an
    incumbent concessioner is eligible to exercise that right “only if the concessioner has submitted a
    responsive proposal.” 16 U.S.C. §5952(8).
    Nevertheless, granting the plaintiff injunctive relief in the form of rescission of the
    disputed contracts and either an award to the plaintiff or resolicitation of proposals would, as
    NPS indicates, “be potentially disruptive to the public.” Defs.’ Opp’n at 22. NPS does not
    dispute, however, that equitable relief may be fashioned to avoid such concerns, for example, by
    “delay[ing] granting injunctive relief until after the upcoming winter season such that Eco Tour
    would begin operating in the winter season of 2017-2018.” Defs.’ Reply at 16. Consequently,
    40
    concerns over disruption of concessioner services to the public, while legitimate, may be
    adequately addressed and do not outweigh the weighty public interests in ensuring that federal
    agencies engage in fair competitive bidding processes that comport with both binding statutory
    and regulatory law and judicial rulings.
    Balance of Equities Favors the Plaintiff
    The parties vigorously dispute whether the equities at issue entitle the plaintiff to its
    requested injunctive relief. The plaintiff, having clearly succeeded on the merits, asserts its
    diligence in pursuing relief, not only before this Court, but also before the CFC and through non-
    litigation avenues, as support for the conclusion that the equities favor granting an injunction.
    Pl.’s Opp’n at 39–40 (noting that plaintiff “acted promptly and vigorously, and also exhausted its
    financial resources in pursuing relief”). In opposition, NPS raises three arguments as to why the
    equities are against the plaintiff, but each of these arguments fall short.
    First, NPS asserts that “the equities do not favor Eco Tour because it did not act
    expeditiously in seeking injunctive relief from this Court,” Defs.’ Opp’n at 22, but, as 
    discussed supra
    in Part III.B.1, NPS’s repeated argument about the plaintiff’s delayed action is unavailing.
    The cases relied upon by NPS for this assertion are inapposite. Defs.’ Opp’n at 23–26. For
    example, NPS cites Gull Airborne Instruments, Inc. v. Weinberger, 
    694 F.2d 838
    (D.C. Cir.
    1982), for the propositions that success on the merits does not necessitate an injunction, Defs.’
    Opp’n at 19, and that partial performance of a contract is a substantial factor in denial of
    injunctive relief, 
    id. at 23.
    In that case, however, the D.C. Circuit reversed the district court’s
    denial of an injunction and rejected the claim of purported delay by a contract bidder on facts
    analogous to this case. 
    Id. at 846.
    15 In Gull Airborne, a contract bidder challenged a decision by
    15
    NPS also relies on Fund for Animals v. Frizzell, 
    530 F.2d 982
    , 987 (D.C. Cir. 1975), where, a 44-delay in
    seeking an injunction was found to be “inexcusable,” warranting denial of injunctive relief. Defs.’ Opp’n at 23.
    41
    the Navy to award a contract, first by bringing a challenge directly to the Navy, then in the
    General Accounting Office, and finally in federal court. 
    Id. at 840–41.
    The district court denied
    injunctive relief, holding that the plaintiff delayed too long in filing suit in federal court, but the
    Circuit reversed, noting with approval the plaintiff’s “persistent attempts to use the
    administrative process to resolve its dispute,” recognizing that “it would be an injustice to
    unsuccessful bidders if we now penalized them merely for exhausting th[eir] administrative
    remedies,” and holding that the plaintiff’s “many attempts to receive administrative relief served
    to put the government on notice that [the plaintiff] was not sleeping on its rights.” 
    Id. at 844
    &
    n.8. Similarly, the plaintiff in this case brought suit in the CFC almost immediately after being
    informed that NPS intended to award the disputed contracts to the incumbent concessioners,
    continued to pursue relief through non-litigation means, and filed suit in this Court after its
    efforts proved unsuccessful. Under Gull Airborne, the plaintiff’s multiple actions to protect its
    interests militate in favor of injunctive relief. 16
    Unlike the plaintiff in this case, however, the plaintiff in Fund for Animals waited until after the issue was moot to
    file suit. Thus, the deciding factor in that case was not the length of the delay but the context of the delay.
    Similarly, NPS’s reliance on Open Top Sightseeing USA v. Mr. Sightseeing, LLC, Defs.’ Opp’n at 24, 26 (citing 
    48 F. Supp. 3d 87
    (D.D.C. 2014)), is misplaced. There, this Court held that a plaintiff unreasonably delayed by seeking
    a preliminary injunction “more than thirty days after the defendants began engaging in the activity the plaintiffs”
    sought to enjoin, and asked to postpone the injunction hearing indefinitely, or alternatively, for at least ninety-five
    days. 
    Id. at 90-92.
    Unlike the plaintiff in Open Top, however, as 
    explained supra
    Part III.B.1, the plaintiff did not
    delay challenging NPS’s actions.
    16
    In addition to challenging the length of time between the conclusion of the CFC proceedings and initiation
    of this suit, NPS takes issue with the order in which the plaintiff’s suits were filed. NPS argues that the plaintiff was
    required to first bring suit in the district court, and if unsuccessful in that form, [] then file in the CFC to obtain
    monetary relief.” Defs.’ Opp’n at 11 n.9 (citing United States v. Tohono O'Odham Nation, 
    563 U.S. 307
    , 318
    (2011)). NPS is wrong. The Supreme Court in Tohono O’Odham held that 28 U.S.C. §1500, which strips the CFC
    of jurisdiction over “any claim for or in respect to which” a plaintiff has a pending action in “any other court,” does
    not permit simultaneous actions in the CFC and district court regardless of relief 
    sought. 563 U.S. at 318
    (“The
    holding here precludes the CFC from exercising jurisdiction over the Nation's suit while the District Court case is
    pending.”). Since neither court has the jurisdiction to provide complete relief over certain challenges to agency
    action, the Tohono O’Odham Court sanctioned successive suits before the CFC and district court, barring statute of
    limitations issues. See 
    id. at 316–18;
    id. at 322 
    (“[A] plaintiff seeking both money damages and injunctive relief to
    remedy distinct harms arising from the same set of facts may be forced to file actions in both the CFC and federal
    district court.” (Sotomayor, J., concurring)); see also Havens v. Mabus, 
    759 F.3d 91
    , 97-98 (D.C. Cir. 2014) (noting
    that claim preclusion only bars a subsequent lawsuit “involving the same claims or cause of action” where a “final
    valid judgment on the merits” was issued by a “court of competent jurisdiction” to provide complete relief); 18B
    42
    Second, NPS argues that the plaintiff created concerns about a potential windfall through
    its litigation choices and “the equities do not favor Eco Tour because it . . . would receive a
    windfall if it was awarded the contracts.” Defs.’ Opp’n at 22. Not only has this Court now
    rejected NPS’s windfall argument twice, see Eco Tour I, 
    174 F. Supp. 3d
    at 
    336; supra
    Part
    III.B.2, but NPS fails to recognize its own contributions to creating the situation in which it is
    now mired, see Lockheed Martin Corp. v. United States, 
    833 F.3d 225
    , 240 (D.C. Cir. 2016)
    (rejecting government’s “double-payment concern” as to an agreement made with private
    contractor under the Comprehensive Environmental Response, Compensation, and Liability Act
    because “it [wa]s a problem of the government’s own making”); Crassociates, Inc. v. United
    States, 
    95 Fed. Cl. 357
    , 391 (2010) (noting that asserted harms to the government and the
    awardee were “of the [government]’s own making” and thus did not weigh heavily in injunctive
    relief analysis). Shortly after the November 2013 CFC ruling, the plaintiff offered to forgo
    payment of the CFC judgment in exchange for award of the disputed contracts to the plaintiff as
    the best offeror, a solution NPS rejected as “not possible.” AR 00011 (Letter, dated June 20,
    2014, from Regional Director, NPS Intermountain Region to plaintiff’s President). After
    rejecting the plaintiff’s proposal and rather than cancelling and resoliciting the contracts—a
    course of action that would have precluded any windfall concerns—NPS then went on to violate
    its own clear regulations and award the contracts to the incumbents. By taking this course of
    action, NPS not only inflicted irreparable injury on the plaintiff, but also unnecessarily fueled
    concern over a potential windfall to the plaintiff and contributed to a situation where the
    Charles Alan Wright, Arthur R. Miller & Edward H. Cooper, FEDERAL PRACTICE AND PROCEDURE § 4412 (3d ed.)
    (“[A] litigant should not be penalized for failing to seek unified disposition of matters that could not have been
    combined in a single proceeding.”). While the Tohono O’Odham Court did not address the order in which such
    successive suits may be brought, NPS’s argument that filing suit first in the CFC “creates the potential for a
    windfall,” Defs.’ Opp’n at 11, is no more than a rehash of its inevitable windfall argument, which this Court has
    rejected. See infra Part III.B.2.
    43
    contractual expectations of the incumbent concessioners are at risk. The agency’s decisions,
    beginning with its summary rejection of the plaintiff’s legitimate concerns over the non-
    responsiveness of the incumbents proposals in July 2013, and ending with the final awards of the
    disputed contracts to the incumbents, despite the CFC’s rulings invalidating the legal basis for
    those awards, created the current quagmire and pushes the equities more in favor of the plaintiff.
    Finally, NPS argues that disrupting the contracts “could subject the government to
    potential litigation from one or both of those concessioners, which also would be contrary to the
    public interest.” Defs.’ Reply at 16–17. This concern is purely speculative and, consequently,
    does not outweigh the concrete and real equities favoring the plaintiff. Comm. of 100 on the Fed.
    City v. Foxx, 
    87 F. Supp. 3d 191
    , 220 (D.D.C. 2015) (holding that “balance of the equities
    tip[ped] decidedly” against party whose asserted harms were “speculative at best”); Debt Buyers’
    Ass’n v. Snow, 
    481 F. Supp. 2d 1
    , 15 (D.D.C. 2006) (refusing to weigh asserted speculative harm
    in injunctive relief analysis); Tozzi v. EPA, 
    148 F. Supp. 2d 35
    , 50 (D.D.C. 2001) (weighing, “in
    balancing interest between the parties,” demonstrated harm more heavily than “speculative
    reputational and economic loss”).
    In sum, none of NPS’s arguments provide a reason to deny the plaintiff equitable relief
    and, to the contrary, NPS’s concerns about a windfall to the plaintiff and possible litigation with
    the incumbent concessioners are problems of its own making. Thus, on balance between the
    parties in this case, the equities clearly favor the plaintiff.
    Fashioning Appropriate Equitable Relief Absent Incumbent
    Concessioners and Without Detailed Proposals
    Two related concerns require discussion and supplemental briefing from the parties
    before injunctive relief may be awarded in this case: first, whether the incumbent concessioners
    must be given an opportunity to participate in this litigation and, second, specific proposals for
    44
    mitigating any adverse impact of equitable relief on the public and the incumbents. Each of
    these concerns are addressed seriatim below.
    (a) Additional Briefing Required Regarding Absent Incumbent Concessioners
    In assessing the equities for requested injunctive relief, the impact on any interested third
    parties must be considered. Chaplaincy of Full Gospel Churches v. England, 
    454 F.3d 290
    , 297
    (D.C. Cir. 2006) (explaining that party seeking preliminary injunctive relief must show, inter
    alia, “that an injunction would not substantially injure other interested parties”). Since the
    plaintiff seeks rescission of the disputed contracts, the incumbent concessioners’ substantial
    interests in those contracts are directly implicated in their absence. Yet, the parties only briefly
    mention this possible impact on the incumbent concessioners’ contractual interests, and none
    addresses whether those interests are sufficiently significant to require that the incumbents be
    joined in this action, under Federal Rule of Civil Procedure 19. For example, NPS’s limited
    discussion only asserts, without elaboration, that “invalidat[ing] the contracts . . . could harm the
    incumbent concessioners who have been performing under the contract for two years and have
    incurred costs in reliance on those contracts.” Defs.’ Opp’n at 22 (citing Defs.’ Mot., Ex. 4,
    Decl. Jennifer Parker, dated July 28, 2016 ¶ 28, ECF No. 27-4 (“Both concessioners signed their
    contracts with the understanding that they would be able to operate their business in the park for
    ten years,” and the concessioners “hire and train staff and purchase necessary supplies and
    equipment during the off season.”)). The plaintiff’s discussion is similarly brief, positing that the
    requested equitable relief “would not be unfair to [the] incumbents” because they “have actually
    benefitted by obtaining two additional years of profits,” and discounting as “mere[] speculat[ion]
    that invalidating the contracts could harm the incumbents.” Pl.’s Opp’n at 36.
    45
    The parties have not moved to join the incumbents as parties to this suit, nor have the
    incumbents sought to intervene. Nonetheless, courts have an “independent duty to raise a Rule
    19(a) issue sua sponte.” Cook v. FDA, 
    733 F.3d 1
    , 6 (D.C. Cir. 2013) (internal quotation and
    alteration omitted). Federal Rule of Civil Procedure 19 provides that “[a] person. . . must be
    joined as a party if . . . that person claims an interest relating to the subject of the action and is so
    situated that disposing of the action in the person’s absence may, as a practical matter impair or
    impede the person’s ability to protect the interest or leave an existing party subject to a
    substantial risk of incurring double, multiple, or otherwise inconsistent obligations because of the
    interest.” FED. R. CIV. P. 19(a)(1)(B)(i) (emphasis added). Rule 19 mandates that “[i]f a person
    has not been joined as required, the court must order that person be made a party.” Fed. R. Civ.
    P. 19(a)(2) (emphasis added). Thus, if the required party has not chosen to intervene, the rule
    provides that the party “who refuses to join” a case in which they are a required party may
    nevertheless be joined. 
    Id. Determining whether
    a person is a required party in a lawsuit is a fact-specific inquiry
    that can only be determined in the context of particular litigation. Rep. of Philippines v.
    Pimentel, 
    553 U.S. 851
    , 863 (2008) (“[T]he issue of joinder can be complex, and determinations
    are case specific.”). While “Rule 19 precedent is admittedly scant,” Nanko Shipping, USA v.
    Alcoa, Inc., 
    850 F.3d 461
    , *9 (D.C. Cir. 2017), in actions involving contractual rights, courts
    have frequently found that the parties to a contract are required parties within the meaning of
    Rule 19, see, e.g., Ward v. Deavers, 
    203 F.2d 72
    , 75 (D.C. Cir. 1953) (“There is a general rule
    that where rights sued upon arise from a contract all parties to it must be joined.”); Corsi v. Eagle
    Publ'g, Inc., No. 1:07-CV-02004ESH, 
    2008 WL 239581
    , at *4 (D.D.C. Jan. 30, 2008) (“[M]any
    court decisions [] have concluded that an absent contracting party. . . must be joined under Rule
    46
    19(a).” (citing cases)); 17 see also 5C Charles Alan Wright, Arthur R. Miller & Edward H.
    Cooper, FEDERAL PRACTICE AND PROCEDURE § 1613 (3d ed. 2017) (“In cases seeking
    reformation, cancellation, rescission, or otherwise challenging the validity of a contract, all
    parties to the contract probably will have a substantial interest in the outcome of the litigation
    and their joinder will be required.”); cf. Nanko Shipping, USA, 850 F.3d at *9 (finding that
    assignor of contractual rights was not a necessary party under Rule 19).
    In the event that the plaintiff is granted its requested equitable relief of rescission and
    award to the plaintiff of the disputed contracts, the incumbent concessioners’ interests in those
    contracts would be “impair[ed] or impede[d].” Yet, their contractual rights are being considered
    without their participation. While the purely legal question of whether NPS violated the APA
    may be resolved without requiring the joinder of the incumbent concessioners, see Ervin &
    Assocs., Inc. v. Dunlap, 
    33 F. Supp. 2d 1
    , 11-12 (D.D.C. 1997) (holding, in a government
    contract dispute, that the court could resolve “constitutional and statutory dispute[s]” without
    joinder of non-party contract recipients), the incumbents’ interests are inextricably bound up in
    the fashioning the appropriate relief to which the plaintiff is entitled to remedy the agency’s
    violation of the APA. Given this circumstance, the parties are directed to explain satisfactorily
    whether joinder of the absent incumbents as parties to this lawsuit is required under Rule 19 at
    this stage of the litigation. As the D.C. Circuit recently explained, this rule operates to
    “promote[] fair treatment of nonparties in certain circumstances where their interests, and
    particularly their due process rights, are at risk from litigation between others.” Nanko Shipping,
    17
    The language of Rule 19 was amended in 2007 “as a part of the general restyling of the Civil Rules . . .
    These changes are intended to be stylistic only. FED. R. CIV. P. 19 2007 advisory committee’s note. As a result, the
    words “necessary” and “indispensable,” which were used pre-2007,” have been replaced with the word “required.
    Vann v. Kempthorne, 
    534 F.3d 741
    , 745 (D.C. Cir. 2008). Since the 2007 amendments were intended to be stylistic
    only, reliance on cases from both before and after the amendments is appropriate.
    47
    USA, 850 F.3d at *7; see also White v. Univ. of Cal., 
    765 F.3d 1010
    , 1026–1027 (9th Cir.
    2014)(“Rule 19 is designed to protect ‘a party's right to be heard and to participate in
    adjudication of a claimed interest, even if the dispute is ultimately resolved to the detriment of
    that party.’” (quoting Shermoen v. United States, 
    982 F.2d 1312
    , 1317 (9th Cir. 1992)). The
    interests of the absentee incumbents may be fully represented by the NPS, which has vigorously
    argued for the status quo, see Ramah Navajo Sch. Bd. v. Babbitt, 
    1996 U.S. App. LEXIS 15760
    ,
    38–41 (D.C. Cir. 1996)(“If the nonparties’ interests are adequately represented by a party, the
    suit will not impede or impair the nonparties’ interests, and therefore the nonparties will not be
    considered ‘necessary.”), but if those incumbents should nevertheless be joined, the parties
    should address whether joinder is infeasible. Finally, “if the absentee should but cannot be
    joined, may the lawsuit nonetheless proceed ‘in equity and good conscience’” to fashion
    equitable relief? Nanko Shipping, USA, 850 F.3d at *6–7.
    While cognizant “that administrative litigation commonly inflicts drastic effects on
    absent third parties” and such “potential unfairness seems in accord with what we often tolerate,”
    National Wildlife Federation v. Burford, 
    835 F.2d 305
    , 332–333 (D.C. Cir. 1987)(J. Williams,
    concurring and dissenting), Rule 19 provides not only an avenue for the inclusion of the
    incumbent concessioners in this case, but may in fact mandate their joinder.
    (b) Additional Briefing Required Regarding Specific Form of Equitable Relief
    NPS has proposed only one solution should the plaintiff prevail on the merits of its claim
    in this lawsuit: that the plaintiff be denied injunctive relief entirely, thereby limiting this injured
    party to reimbursement for costs incurred in preparing the “best proposal” for Contracts 24 and
    32. Defs.’ Opp’n at 15–19 (arguing “there is discretion in the District Court to decline to
    consider the prayer for injunctive relief, and to leave the bidder solely to his damages remedy”
    48
    (citing M. Steinthal & Co. Inc. v. Seamans, 
    455 F.2d 1289
    , 1300 (D.C. Cir. 1970))); see also
    Nat’l Federation Fed. Emps. v. Cheney, 
    883 F.2d 1038
    , 1053 (D.C. Cir 1989) (holding that a
    successful disappointed bidder must still prove entitlement to injunctive relief (citing Scanwell
    Laboratories, Inc. v. Shaffer, 
    424 F.2d 859
    , 864 (D.C. Cir. 1970)). NPS urges that the Court be
    satisfied with the status quo, where the agency executed the disputed contracts in flagrant
    disregard of the judicial finding that the bidding process was flawed and illegal as well as its own
    governing statute and regulations, all while refusing to consider the prevailing plaintiff’s
    suggestions for alternative remedies to a monetary judgment. This result would be troubling not
    just because of the hollow victory afforded the plaintiff, but also because the message to agencies
    would be that violations of statutory provisions and regulations designed to ensure fairness in
    considering bid proposals may occur with virtual impunity, no matter the cost to the public
    denied the benefits of the “best” bid proposal by the best offeror.
    At the same time, the plaintiff likewise proposes its preferred course of action: that the
    disputed contracts should be rescinded in their entirety, the plaintiff “should be awarded the
    contracts” by this Court, and the contracts should be “for the full 10 year terms.” Pl.’s Opp’n at
    35–36. 18 To minimize the impact on the incumbent concessioners and the public, the plaintiff
    proposes only that the termination of the disputed contracts and the directed award to the
    plaintiff be delayed for a limited season. Pl.’s Opp’n at 33 (“[F]or the sake of ensuring
    uninterrupted services to the public, Eco Tour is willing to begin operating under the contracts in
    the Winter Season of 2017-2018.”). Given that visitors to the parks may have already made
    18
    The plaintiff also suggests that “[i]n the alternative to explicitly directing award of the contracts to Eco
    Tour, the Court could issue an order declaring that NPS violated the law . . . invalidating the contracts and directing
    NPS to proceed in accordance with applicable regulations set out at 36 C.F.R. § 51.31 which would mean that NPS
    must award the contracts to the best offeror, which was the plaintiff.” Pl.’s Opp’n at 35. The difference between
    directing the award to plaintiff and directing the award to the best offeror, which the parties agree was the plaintiff,
    is only one of methodology, not outcome.
    49
    reservations with the incumbent concessioners, and that the incumbents have likely incurred
    reliance costs in carrying out their obligations under the disputed contracts, the impact of
    granting the plaintiff’s requested relief may have a more significant effect than the plaintiff
    acknowledges. 19
    Beyond retention of the status quo, as the agency urges, and awarding the disputed
    contracts directly to the plaintiff after some limited time-lag, the parties offer little guidance
    regarding the fashioning of an appropriate remedy. Here, even if rescission of the disputed
    contracts is granted either immediately or at some point in the future, the Court must consider
    any changes in current circumstances over the last four years that bear on the appropriate next
    steps, including whether the agency should be directed to award the contracts to the plaintiff, or
    to reconsider the original solicitation or engage in a new solicitation of bid proposals. See, e.g.,
    Applied Bus. Mgmt. Sols., Inc. LLC v. United States, 
    117 Fed. Cl. 589
    , 609 (2014) (ordering
    reconsideration of submitted bids after setting aside contract that was awarded contrary to
    agency regulations); FirstLine Transp. Sec., Inc. v. United States, 
    100 Fed. Cl. 359
    , 401–03
    (2011) (permitting agency to choose between two courses of action that would remedy the harm
    found, and noting that “[w]hat course of action [the agency] choose to pursue after [the] contract
    award is cancelled . . . is not for this court to decide.”); Hunt Bldg. Co. v. United States, 61 Fed.
    Cl. 243, 280 (2004) (“[T]he Court does not direct the Air Force to go back to square one and
    issue a wholly new solicitation [but instead] sets aside the selection [of the awardee] and directs
    the Air Force to reassess its needs, amend the Solicitation accordingly (or not) and evaluate final
    proposal revisions consistent with that Solicitation.”); Cardinal Maint. Serv. v. United States, 
    63 Fed. Cl. 98
    , 111 (2004) (ordering resolicitation of improperly awarded contract, which “will
    19
    Local Rule 7(c) requires that “[e]ach motion and opposition shall be accompanied by a proposed order.”
    LCvR 7(c). The plaintiff, however, did not file a proposed order along with its motion for summary judgment.
    50
    enforce a process whereby bidders can be confident that the contracts on which they bid will be
    the contracts which are awarded and performed” and which “will also promote the integrity of
    the [solicitation] process by holding the government accountable for its actions.”). For example,
    has the agency made any improvements to the bidding process in the last few years that favor the
    resolicitation approach? If that approach is taken, should the incumbent concessioners be
    entitled to any preferences in any resolicitation? See, e.g., Naplesyacht.com, Inc. v. United
    States, 
    60 Fed. Cl. 459
    , 462 (2004) (noting that awardees’ contracts were “close to being
    substantially performed,” and thus declining to grant injunctive relief,” but holding that “in the
    event the [agency] decides to issue a solicitation for” a similar contract in the future, the
    incumbents were not to be afforded “any preference or advantage for having been selected for
    the [disputed contract].”). In addition, has the plaintiff’s financial condition remained
    sufficiently strong to meet the financial requirements of the original prospectus for the disputed
    contracts? In light of the potential adverse effect that rescission of the disputed contracts may
    have on pending customer reservations, for what period should the incumbent concessioners be
    permitted to continue operating under the disputed contracts? See, e.g., Red River Holdings,
    LLC v. United States, 
    87 Fed. Cl. 768
    , 798 (2009) (limiting disputed contract to a set term and
    voiding the option for the incumbent to extend the contract, after which a new solicitation was
    ordered).
    In considering the myriad forms that the equitable relief to which the plaintiff is entitled
    may take, the Court is constrained by both the limited guidance from the parties and lack of input
    from the incumbent concessioners, for example, regarding the specific harms they and their
    customers face and mechanisms available to mitigate those harms. Thus, without supplemental
    briefing, the Court is unable properly to fashion equitable relief.
    51
    IV.       CONCLUSION
    For the foregoing reasons, the plaintiff’s motion for summary judgment is granted insofar
    as the plaintiff is entitled (1) to a declaration that NPS acted arbitrarily and capriciously and
    contrary to law in awarding the disputed contracts to the incumbent concessioners, in violation of
    the APA; and (2) to equitable relief, since the plaintiff has satisfied each factor of the injunctive
    relief inquiry. Fashioning that relief, however, requires supplemental briefing from the parties
    addressing whether the incumbent concessioners should be joined as parties, under Federal Rule
    of Civil Procedure 19, and any practical considerations pertinent to the injunctive relief. The
    parties are directed to confer and, by April 28, 2017, submit jointly to the Court a proposed
    schedule for this supplemental briefing. The defendants’ cross motion for summary judgment is
    denied.
    An Order consistent with this Memorandum Opinion shall be filed contemporaneously.
    Date: April 18, 2017
    ________________________
    BERYL A. HOWELL
    Chief Judge
    52
    

Document Info

Docket Number: Civil Action No. 2014-2178

Citation Numbers: 249 F. Supp. 3d 360, 2017 WL 1386316, 2017 U.S. Dist. LEXIS 58884

Judges: Chief Judge Beryl A. Howell

Filed Date: 4/18/2017

Precedential Status: Precedential

Modified Date: 10/19/2024

Authorities (39)

Tozzi v. EPA , 148 F. Supp. 2d 35 ( 2001 )

Amer Bioscience Inc v. Thompson, Tommy G. , 269 F.3d 1077 ( 2001 )

Perez v. Mortgage Bankers Assn. , 135 S. Ct. 1199 ( 2015 )

Monsanto Co. v. Geertson Seed Farms , 130 S. Ct. 2743 ( 2010 )

Chase Bank USA, N. A. v. McCoy , 131 S. Ct. 871 ( 2011 )

United States v. Tohono O’odham Nation , 131 S. Ct. 1723 ( 2011 )

Thomas Jefferson University v. Shalala , 114 S. Ct. 2381 ( 1994 )

Christensen v. Harris County , 120 S. Ct. 1655 ( 2000 )

Decker v. Northwest Environmental Defense Center , 133 S. Ct. 1326 ( 2013 )

sidney-danielson-regional-director-of-the-second-region-of-the-national , 479 F.2d 1033 ( 1973 )

Appeal of Ethel Bolden Mary Dyer v. Blue Cross & Blue ... , 848 F.2d 201 ( 1988 )

Winter v. Natural Resources Defense Council, Inc. , 129 S. Ct. 365 ( 2008 )

Tolan v. Cotton , 134 S. Ct. 1861 ( 2014 )

Citizens to Preserve Overton Park, Inc. v. Volpe , 91 S. Ct. 814 ( 1971 )

Camp v. Pitts , 93 S. Ct. 1241 ( 1973 )

Norton v. Southern Utah Wilderness Alliance , 124 S. Ct. 2373 ( 2004 )

Steenholdt v. Federal Aviation Administration , 314 F.3d 633 ( 2003 )

Chaplaincy of Full Gospel Churches v. England , 454 F.3d 290 ( 2006 )

Rempfer v. Sharfstein , 583 F.3d 860 ( 2009 )

Vann v. Kempthorne , 534 F.3d 741 ( 2008 )

View All Authorities »