Conservation Force v. Salazar , 919 F. Supp. 2d 85 ( 2013 )


Menu:
  •                             UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    CONSERVATION FORCE, et al.,
    Plaintiffs,
    Civil Action No. 10-CV-1262 (BJR)
    v.
    MEMORANDUM AND OPINION ON
    CROSS MOTIONS FOR SUMMARY
    KEN SALAZAR, et al.,
    JUDGMENT
    Defendants.
    I.      INTRODUCTION
    This matter is before the Court on cross motions for summary judgment. Plaintiffs filed
    their motion on May 17, 2012 (Dkt. No. 36, “Pls.’ Mot.”) and Defendants filed a Combined
    Opposition to Plaintiffs’ Motion for Summary Judgment and Cross-Motion for Summary
    Judgment on June 14, 2012 (Dkt. No. 40, “Defs.’ Mot.”). Plaintiffs’ filed a Combined
    Opposition to Defendants’ Motion for Summary Judgment and Reply in Support of Plaintiffs’
    Motion for Summary Judgment on August 1, 2012. (Dkt. No. 44, “Pls.’ Reply.”). Defendants
    filed their reply thereto on August 31, 2012. (Dkt. No. 48, “Defs.’ Reply.”). Both parties filed
    notices of supplemental authority. (Dkt. Nos. 47 and 51.). Having considered the parties’
    arguments, pleadings, and relevant case law, the Court finds and rules as follows:
    II.     FACTUAL BACKGROUND AND PROCEDURAL HISTORY
    Defendants Ken Salazar, Secretary of the United States Department of Interior, Daniel M.
    Ashe, Director of the United States Fish and Wildlife Service, and the United States Fish and
    Wildlife Service (collectively, the “Service” or “Defendants”), move this Court, pursuant to Fed.
    R. Civ. P. 56 for summary judgment regarding the Service’s denial of the Plaintiffs’ import
    permit applications. Likewise, Plaintiffs, Conservation Force, Steve Hornady, Barbara Lee
    1
    Sackman, Alan Sackman, Jerry Brenner, Dallas Safari Club, Houston Safari Club, African Safari
    Club of Florida, Inc., The Conklin Foundation, Grand Slam Club/Ovis, Wild Sheep Foundation,
    Sardar Naseer A. Tareen, and the Society for Torghar Environmental Protection, (collectively,
    “Plaintiffs”), also move for summary judgment pursuant to Federal Rule 56. (Second Amended
    Complaint (“SAC”), Dkt. No. 43 at ¶¶ 11- 23.) .
    Plaintiffs are sport-hunters who are willing to pay large sums of money for the right to
    hunt and kill the straight-horned markhor, a species of wild goat found in small, isolated
    populations in the mountains of Afghanistan, Pakistan, Tajikistan, Turkmenistan, and
    Uzbekistan. (SAC at ¶ 48.) The straight-horned markhor is listed as “endangered” under the
    Endangered Species Act (the “ESA”). (Id. at ¶¶ 48-49.). Plaintiffs claim that hunting markhor
    goats actually contributes to the conservation of the species. (Id. at ¶¶ 50-52.). According to
    Plaintiffs, the fact that some sport-hunters are willing to pay fees for the right to hunt the goats
    has caused local tribal chieftans to place a ban on all unauthorized hunting of the goats by locals,
    presumably to ensure the stabilization of the species’ population so that the chieftans may collect
    tourist hunting fees. (Id. at ¶¶ 51-52.). Plaintiffs allege that the goat population has increased
    significantly as a result of the hunting ban. (Id. at ¶¶ 50-51, 56.).
    Nevertheless, the markhor remains on the endangered species list, and, as such, the
    hunters are prohibited from importing their “trophies” into the United States. (Id. at ¶¶ 48-49,
    106.). Plaintiffs assert that their inability to import the goat carcasses has artificially deflated the
    revenues derived from the sport-hunting because “Americans are unwilling to pay full price to
    hunt if they are unable to bring their trophies home.” (Id. at ¶ 108.).
    Plaintiffs include four hunters who each killed a straight-horned markhor in Pakistan in
    2004, 2008 and/or 2009. (Id. at ¶¶ 12-15.). Each applied to the Service for permits to import the
    2
    carcasses into the United States, and each received an adverse decision in October 2009. (Id.).
    On July 26, 2010, Plaintiffs filed the present action challenging the denials under the
    Administrative Procedures Act (the “APA”), U.S. Constitution, and the ESA. (Id. at ¶ 4.). The
    Service moved to dismiss all claims except Plaintiffs’ permit denial claim under the APA. This
    Court granted the Service’s motion on September 2, 2011. (Dkt. No. 16 at 28.). Following the
    September 2nd Order, the only claim that remained was Plaintiffs’ allegation that the Service
    “arbitrarily and capriciously denied the import trophy permits….” (Id.). This claim is the subject
    of the cross-motions for summary judgment that are presently before the Court.
    Plaintiffs move the Court to set aside the Service’s denial of the permit applications.
    (Pls.’ Mot. at 1.). They argue that the denials were arbitrary, capricious and an abuse of
    discretion. 1 (Id.). The Service counters that Plaintiffs failed to exhaust the administrative
    remedies available to them under 
    50 C.F.R. § 13.29
    . (Defs.’ Mot. at 2.). As such, the Service
    argues, the denials do not constitute final agency action and, therefore, the remaining APA claim
    must be dismiss. (Id.). The Services further argues that even if this Court were to determine that
    Plaintiffs’ claim is judicially reviewable under the APA, the claim fails on the merits under the
    “highly deferential” arbitrary and capricious standard of review. (Id. at 2-3.). Because the Court
    finds that Plaintiffs failed to exhaust their administrative remedies, it will grant the Service’s
    motion for summary judgment and deny Plaintiffs’ cross motion.
    II.      LEGAL STANDARD
    Under the APA, a court must set aside an agency action that is “arbitrary and capricious,
    an abuse of discretion, or otherwise not in accordance with the law.” 
    5 U.S.C. § 706
    . This
    standard of review is highly deferential to the agency, so that a court need not find that the
    1
    To the extent that any other claims are raised in the Second Amended Complaint, the Court will disregard
    those claims as dismissed pursuant to the September 2, 2012 order. See also, Order Granting Motion to Dismiss
    dated July 23, 2012, Dkt. No. 42.
    3
    agency’s decision is “the only reasonable one, or even that it is the result [the court] would have
    reached had the question arisen in the first instance in judicial proceedings.” Am. Paper Inst.,
    Inc. v. Am. Elec. Power Serv. Corp., 
    461 U.S. 402
    , 422 (1983) (quoting Unemployment
    Compensation Comm’n v. Aragon, 
    329 U.S. 143
    , 153 (1946). Rather, to survive the “arbitrary
    and capricious” standard, an agency need show only that it “examine[d] the relevant data and
    articulate[d] a satisfactory explanation for its action, including a ‘rational connection between the
    facts found and the choice made.’” PPL Wallingford Energy LLC v. Fed. Energy Regulatory
    Comm’n, 
    419 F.3d 1194
    , 1198 (D.C. Cir. 2005) (quoting Motor Vehicle Mfrs. Ass’n, v. State
    Farm Mut. Auto. Ins. Co., 
    463 U.S. 29
    , 43 (1983) (internal punctuation omitted)).
    However, a court may not review a non-final agency action. Fund for Animals, Inc. v.
    United States BLM, 
    460 F.3d 13
    , 18 (D.C. Cir. 2006); Hall v. Sebelius, 
    689 F. Supp. 2d 10
    , 19
    (D.D.C. 2009) (noting that a non-final agency action is not subject to judicial review under the
    APA). An agency action is final if it “1) marks the consummation of the agency’s decision
    making process” and 2) affects the “rights or obligations … [or the] legal consequences” of the
    party seeking review. Bennett v. Spear, 
    520 U.S. 154
    , 177 (1997); Domestic Secs. v. SEC, 
    333 F.3d 239
    , 246 (D.C. Cir. 2003). Therefore, prior to reaching the merits of Plaintiffs’ claim, this
    Court must consider whether the agency’s position is final and whether it has a “direct and
    immediate effect” on the parties.
    III.    DISCUSSION
    The Service argues that Plaintiffs failed to exhaust their administrative remedies with
    respect to the remaining APA claim. It claims that Plaintiffs did not ask the Service to reconsider
    its decision to deny Plaintiffs’ permit applications, nor did Plaintiffs appeal the decision to the
    Director of the Service before instituting the present lawsuit. Therefore, the Service maintains,
    4
    the permit denials are not final agency actions within the meaning of 
    5 U.S.C. § 704
    , and this
    case must be dismissed. Plaintiffs concede that they did not seek reconsideration of the agency
    decision, but counter that they are entitled to judicial review without first pursuing an
    administrative appeal for two reasons. First, they contend that judicial review is appropriate
    because they waited until the denials were deemed “final” for administrative review purposes
    (i.e., the administrative deadline had expired after which no motion for reconsider or appeal to
    the Director could filed) before seeking the Court’s review. Pls.’ Resp. at 13. Second, they
    suggest that pursuant to Darby v. Cisneros, 
    509 U.S. 137
     (1993), exhaustion is not necessary in
    this case because the Service has not instituted a “mandatory review process” for permit denials.
    
    Id.
     For the reasons discussed below, the Court concludes that this action must be dismissed.
    Under the APA, administrative exhaustion is required when it is mandated by statute or
    agency rule. Darby, 
    509 U.S. at 146
     (the APA “limit[s] the availability of the doctrine of
    exhaustion of administrative remedies to that which the statute or rule clearly mandates”); see
    also, DSE, Inc. v. United States, 
    169 F.3d 21
    , 26-27 (D.C. Cir. 1999) (“[u]nder the APA, a party
    can seek judicial review from a final agency action without pursuing an intra-agency appeal
    unless required to do so by statute or by regulation”). Therefore, to determine whether Plaintiffs
    were required to exhaust administrative remedies before seeking judicial review, this Court must
    determine whether the applicable statute or agency regulations mandate exhaustion. See
    Jasperson v. F.B.I., 
    460 F. Supp. 2d 76
    , 86 (D.D.C. 2006).
    Here, the Service asserts that agency regulation 
    50 C.F.R. § 13.29
     mandates exhaustion
    before a plaintiff may seek judicial review of an adverse permit decision. 
    50 C.F.R. § 13.29
     sets
    forth the administrative process through which permit denials may be appealed to reach a “final
    administrative decision.” Defs.’ Mot. at 17. Under 
    50 C.F.R. § 13.29
    (a)(1), “[a]n applicant for a
    5
    permit who has received written notice of denial” may request “reconsideration of the action.”
    “A person who has received an adverse decision following submission of a request for
    reconsideration may submit a written appeal to the Regional Director,” and “the decision of the
    Regional Director or the Director shall constitute the final administrative decision of the
    Department of the Interior.” 
    50 C.F.R. § 13.29
    (e)-(f)(3) (emphasis added). The agency
    regulations further provide that parties have forty-five days within which to seek review. See
    Pls.’ Resp. at 13.
    Plaintiffs counter that the review procedure detailed in 
    50 C.F.R. § 13.29
     is not a
    mandatory process, but rather, optional. Presumably, in making this argument, Plaintiffs rely on
    the regulation’s use of the word “may”—as in a person who received an adverse decision “may
    request reconsideration” or “may submit a written appeal to the Regional Director.” 
    50 C.F.R. § 13.29
    (e)-(f)(3). The Court is not persuaded by this argument. The Secretary created a procedure
    for appealing an adverse decision. The purpose of this procedure is to provide the agency’s “top
    level” an opportunity to review the action before federal courts intervene. See Career Education,
    Inc. v. Department of Education, 
    6 F.3d 817
    , 820 (D.C. Cir. 1993) (requiring exhaustion under
    an agency regulation similar to the present regulation “in order to give the Department’s top
    level of appeal an opportunity to place an official imprimatur on the Department’s interpretation
    of its regulations before it is reviewed by a federal court”). Indeed, 
    50 C.F.R. § 13.29
     states that
    “the decision of the Regional Director or the Director shall constitute the final administrative
    decision of the [agency].” 
    Id.
     at § 13.29(f)(3). Allowing Plaintiffs to circumvent this process by
    simply not partaking in it would defeat the very purpose of the review procedure.
    Contrary to what Plaintiffs argue, Darby v. Cisneros, 
    509 U.S. 137
     (1993) does not
    compel a contrary conclusion. In Darby, the Supreme Court noted that an agency action is
    6
    “final” and “subject to judicial review” when “an aggrieved party has exhausted all
    administrative remedies expressly provided by statute or agency rule.” 
    Id. at 146
     (emphasis
    added). In other words, if the APA and/or an agency rule provides for a review process, an
    aggrieved party must exhaust that process before seeking judicial review. Here, 
    50 C.F.R. § 13.29
     expressly provides for a review process; Plaintiffs must exhaust that process before
    proceeding to federal court.
    Next, Plaintiffs argue that the agency-imposed forty-five day deadline within which an
    aggrieved party may request reconsideration and appeal has passed. Therefore, Plaintiffs
    contend, the denial decisions are now final. This argument also fails. Again, if the Court were to
    allow Plaintiffs to circumvent the agency appeal process by simply refusing to participate, it
    would defeat the very purpose of the process. See e.g. Marine Mammal Conservancy v.
    Department of Agriculture, 
    134 F.3d 409
    , 411 (D.C. Cir. 1998) (plaintiff’s failure to prosecute an
    administrative appeal “doomed” its petition to federal court even though the deadline within
    which to file the administrative appeal had expired). 2
    Lastly, Plaintiffs contend that the cases relied on by the Service are not applicable to the
    present situation. In making this argument, Plaintiffs ignore, entirely, the three relevant D.C.
    Circuit cases that the Service cites—Marine Mammal, Career Education, and Marcum. In each
    of these cases, the D.C. Circuit Court dismissed the plaintiffs’ claims because they failed to
    exhaust the administrative remedies available to them. Marine Mammal, 
    134 F.3d 409
    ; Career
    Education, 
    6 F.3d 817
    ; Marcum v. Salazar, 
    694 F.3d 123
     (D.C. Cir. 2012). Marine Mammal and
    Career Education involved regulations similar to 
    50 C.F.R. § 13.29
     and Marcum involved the
    2
    Plaintiffs also contend that had they asked for reconsideration or appeal, they “could have been trapped
    indefinitely” in the agency process. The Court is not persuaded. 
    50 C.F.R. § 13.29
     requires the “issuing officer…to
    notify the permittee of the Service’s decision within 45 days of the receipt of the request for reconsideration.” 
    Id.
     at
    § 13.29(d). Likewise, the Regional Director or Director is required to issue the “final administrative decision” within
    “45 calendar days of receipt of [an] appeal.” Id. at § 13.29(f).
    7
    same regulation. The one distinguishing factor between the present case and Marine Mammal,
    Career Education, and Marcum, is that the plaintiffs in each of those cases had initiated the
    review process and either abandoned it or pursued it simultaneously with judicial review. Here,
    Plaintiffs failed to initiate the review process altogether. However, Plaintiffs do not argue, and
    this Court does not conclude, that this distinction renders the outcome of Marine Mammal,
    Career Education, and Marcum any less applicable to the present case.
    What is more, the Service’s interpretation that 
    50 C.F.R. § 13.29
     creates a mandatory
    exhaustion requirement is neither plainly wrong nor inconsistent with the regulation. As such,
    the Service’s interpretation is entitled to a high level of deference. Thomas Jefferson Univ. v.
    Shalala, 
    512 U.S. 504
    , 512 (1994); St. Luke’s Hosp. v. Sebelius, 
    611 F.3d 900
    , 905 (D.C. Cir.
    2010) (agency’s interpretation of its own regulation is entitled to a high level of deference). An
    agency’s application of its own regulations receives “an even greater degree of deference than
    the Chevron standard,” Consarc Corp. v. U.S. Treasury Dept., 
    71 F.3d 909
    , 915 (D.C. Cir. 1995)
    and “may even hold when that interpretation first appears in the course of litigation.” Fabi
    Constr. Co. v. Sec’y of Labor, 
    508 F.3d 1077
    , 1081 (D.C. Cir. 2007), citing Auer v. Robbins, 
    519 U.S. 452
    , 462 (1997).
    In reaching this decision, the Court notes that there are some cases from outside this
    jurisdiction that suggest that only exhaustion clauses expressly mandated by statute are
    jurisdictional in nature, and that exhaustion clauses set forth in agency regulations may be
    waived or excused. See, e.g., Hill v. Houff Transfer, 
    2012 WL 5194080
     (E.D. Va. Oct. 19, 2012);
    Gordon v. Office of Personal Management, 
    2011 WL 345902
     (D. Md. Feb. 2, 2011). The Court
    finds the reasoning in these cases unpersuasive. However, even if the exhaustion requirement in
    § 13.29 was subject to waiver, the Court would decline to exercise its discretion to excuse
    8
    Plaintiffs’ failure to exhaust their administrative remedies. In this District, it is rare for a court to
    waive exhaustion. UDC Chairs Chapter, Am. Ass’n of Univ. Professors v. Bd. of Tr. of UDC, 
    56 F.3d 1469
    , 1475 (D.C. Cir. 1995) (noting that the exhaustion requirement may be waived only in
    the most exceptional circumstances). A court may exercise its discretion to excuse exhaustion
    under the following circumstances: (1) when there are no facts in dispute, (2) when the disputed
    issue is outside the agency’s expertise, or (3) when requiring exhaustion would be futile.
    Avocados Plus Incorp. v. Veneman, 
    370 F.3d 1243
    , 1247 (D.C. Cir. 2004) (noting that “the
    district court may, in its discretion, excuse exhaustion if the litigant’s interests in immediate
    judicial review outweigh the government’s interests in the efficiency or administrative autonomy
    that the exhaustion doctrine is designed to further”) (internal quotations and citations omitted).
    None of these factors exist in this case.
    Moreover the Court finds that requiring exhaustion is particularly important in this case.
    Here, the Service found that the information provided by Plaintiffs was insufficient to allow the
    Service to make an enhancement finding (i.e. a finding that sport-hunting of markhors would
    “enhance” the survival of the species—a prerequisite for allowing the import of the trophies into
    the United States). See e.g. SAC at ¶¶ 65(b), 67(a). If Plaintiffs had requested reconsideration
    and/or appealed the inferior level decision and supplemented their applications with further
    evidence, the agency may have altered the decision in some manner. Or it may not have.
    Unfortunately, because Plaintiffs failed to exhaust the administrative remedies available to them,
    it is impossible to know what the agency would have done. In addition, Plaintiffs’ complaint is
    rife with serious allegations of intra-agency inconsistencies, faulty agency review, and tampering
    with scientific conclusions. See, generally, SAC. Had Plaintiffs pursued reconsideration and
    appeal, these stark allegations would have been reviewed by higher agency authority, and
    9
    potentially resolved without judicial review. See, Career Education, 
    6 F.3d at 820
    ; see also,
    Marine Mammal, 
    134 F.3d at 412
     (“Administrative appeals permit agencies to correct mistakes
    by ‘inferior’ officers. Judicial reviews may thereby be entirely avoided”); Marcum, 694 F.3d at
    129 (holding that action was not ripe for review by the district court, nor was summary judgment
    in favor of agency ripe for review by the Court of Appeals because the agency did not take final
    action on appellants’ permit applications until the Director decided appellants’ administrative
    appeal, and this did not occur until after the district court issued its decision); Wade v. F.C.C.,
    
    986 F.2d 1433
    , 1434 (D.C. Cir. 1993) (holding that “whether a party seeks agency
    reconsideration before, simultaneous with, or after filing an appeal or petition for judicial
    review…[the party’s attempt to seek judicial review] must be dismissed as ‘incurably
    premature’”) (citations omitted).
    IV.       CONCLUSION
    For the foregoing reasons, the Court finds that Plaintiffs have failed to exhaust the
    administrative remedies available to them under 
    50 C.F.R. § 13.29
     and that such failure is fatal to
    their claim. Therefore, the Court grants the Service’s motion for summary judgment and denies
    Plaintiffs’ cross motion for summary judgment. 3 An Order consistent with this Memorandum
    Opinion is separately and contemporaneously issued this same day.
    Dated this 29th day of January 2013.
    A
    Barbara Jacobs Rothstein
    U.S. District Court Judge
    3
    Given this finding, it is not necessary for the Court to address the remainder of the parties’ arguments.
    10
    11
    

Document Info

Docket Number: Civil Action No. 2010-1262

Citation Numbers: 919 F. Supp. 2d 85, 2013 U.S. Dist. LEXIS 11569, 2013 WL 324747

Judges: Judge Barbara Jacobs Rothstein

Filed Date: 1/29/2013

Precedential Status: Precedential

Modified Date: 10/19/2024

Authorities (19)

Dmstc Sec Inc v. SEC , 333 F.3d 239 ( 2003 )

Hall v. Sebelius , 689 F. Supp. 2d 10 ( 2009 )

Unemployment Compensation Comm'n of Alaska v. Aragon , 329 U.S. 143 ( 1946 )

American Paper Institute, Inc. v. American Electric Power ... , 103 S. Ct. 1921 ( 1983 )

Darby v. Cisneros , 113 S. Ct. 2539 ( 1993 )

Thomas Jefferson University v. Shalala , 114 S. Ct. 2381 ( 1994 )

Jasperson v. Federal Bureau of Prisons , 460 F. Supp. 2d 76 ( 2006 )

Career Education, Inc., D/B/A Atds-Texas v. Department of ... , 6 F.3d 817 ( 1993 )

Motor Vehicle Mfrs. Assn. of United States, Inc. v. State ... , 103 S. Ct. 2856 ( 1983 )

Booker T. Wade, Jr. v. Federal Communications Commission , 986 F.2d 1433 ( 1993 )

Consarc Corporation and Consarc Engineering, Ltd. v. United ... , 71 F.3d 909 ( 1995 )

Bennett v. Spear , 117 S. Ct. 1154 ( 1997 )

Marine Mammal Conservancy, Inc. v. Department of Agriculture , 134 F.3d 409 ( 1998 )

DSE, Inc. v. United States , 169 F.3d 21 ( 1999 )

Avocados Plus Inc v. Veneman, Ann M. , 370 F.3d 1243 ( 2004 )

Auer v. Robbins , 117 S. Ct. 905 ( 1997 )

Udc Chairs Chapter, American Association of University ... , 56 F.3d 1469 ( 1995 )

St. Luke's Hospital v. Sebelius , 611 F.3d 900 ( 2010 )

Fund for Animals, Inc. v. U.S. Bureau of Land Management , 460 F.3d 13 ( 2006 )