Sierra Club v. McCarthy , 61 F. Supp. 3d 35 ( 2014 )


Menu:
  •                              UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    ___________________________________
    )
    SIERRA CLUB,                          )
    )              Civil Action No. 01-1537 (PLF)
    Plaintiff,               )              (consolidated with
    )              Civil Action No. 01-1548
    v.                             )              Civil Action No. 01-1558
    )              Civil Action No. 01-1569
    GINA McCARTHY, Administrator,         )              Civil Action No. 01-1578
    U.S. Environmental Protection Agency, )              Civil Action No. 01-1582
    )              Civil Action No. 01-1597)
    1
    Defendant.               )
    ___________________________________ )
    MEMORANDUM OPINION AND ORDER
    This matter is before the Court on Sierra Club’s motion to enforce this Court’s
    Orders of March 31, 2006 and January 20, 2011. 2 Sierra Club alleges that the Environmental
    Protection Agency (“EPA”) has failed to promulgate emission standards for certain sources of
    three hazardous air pollutants as required under Section 112(c)(6) of the Clean Air Act and this
    Court’s Order. Sierra Club asks the Court to declare that EPA has failed to undertake these
    nondiscretionary actions, and to establish dates certain for EPA’s proposal and finalization of
    new standards for specified sources with respect to the three pollutants.
    EPA opposes the motion, arguing that it has fulfilled its obligations under the Act
    and the Order, and that Sierra Club simply is dissatisfied with the substance of the standards that
    1
    Pursuant to Rule 25(d) of the Federal Rules of Civil Procedure, the Court
    substitutes as defendant the current EPA Administrator, Gina McCarthy, for former
    Administrator Lisa P. Jackson.
    2
    The Court’s 2011 Order reiterated the terms of Paragraph 3 of its 2006 Order,
    concerning EPA’s obligations under Section 112(c)(6) of the Clean Air Act, but the 2011 Order
    extended the deadline for EPA’s compliance with those terms. For simplicity, the Court will
    refer singularly to its “Order,” although, more precisely, Sierra Club seeks to enforce both the
    2006 and 2011 orders.
    EPA already has established. EPA contends that such substantive review lies within the
    exclusive jurisdiction of the United States Court of Appeals for the District of Columbia Circuit,
    and that this Court therefore lacks subject matter jurisdiction to entertain Sierra Club’s request
    for relief. Intervenor Coalition for Clean Air Implementation (“Intervenor”) has filed a response
    in further support of EPA’s opposition to Sierra Club’s motion.
    Upon consideration of the parties’ and Intervenor’s arguments, the relevant legal
    authorities, and pertinent portions of the record, the Court will grant Sierra Club’s motion in part
    and deny it in part. 3
    I. BACKGROUND
    On July 16, 2001, Sierra Club filed seven different complaints against EPA under
    the citizen suit provision of the Clean Air Act. Sierra Club v. Johnson, 
    444 F. Supp. 2d 46
    , 51
    (D.D.C. 2006). The complaints each sought relief for EPA’s failure to discharge a different
    aspect of its regulatory duties under the Act. 
    Id. The cases
    were consolidated on June 20, 2002,
    and then stayed while the parties sought mediation. 
    Id. The parties
    engaged in settlement
    negotiations until early 2005, when they filed cross-motions for summary judgment. 
    Id. EPA did
    not contest liability. Sierra Club v. Jackson, No. 01-1537 (PLF), 
    2011 WL 181097
    , at *3
    (D.D.C. Jan. 20, 2011). Instead, EPA conceded that it had failed to promulgate standards for
    sources of hazardous air pollutants by the required statutory deadline of November 15, 2000, for
    Clean Air Act Sections 112(c)(3), 112(k)(3)(b), and 112(c)(6). 
    Id. It is
    the third of these,
    3
    The papers reviewed in connection with the pending motion include: Sierra
    Club’s Memorandum in Support of the Motion to Enforce (“Pl.’s Mot. to Enforce”) [Dkt. No.
    158-1]; Sierra Club’s Proposed Order (“Pl.’s Proposed Order”) [Dkt. No. 158-2]; EPA’s
    Memorandum in Opposition to Sierra Club’s Motion to Enforce (“Def.’s Opp.”) [Dkt. No. 166];
    Intervenor’s Opposition to Sierra Club’s Motion to Enforce (“Intervenor’s Opp.”) [Dkt. No.
    165]; and Sierra Club’s Reply in Support of the Motion to Enforce (“Pl.’s Reply”) [Dkt. No.
    167].
    2
    Section 112(c)(6) — which requires EPA to “assur[e] that sources accounting for not less than
    90 per centum of the aggregate emissions of [seven hazardous air pollutants] are subject to
    standards under subsection (d)(2) or (d)(4) of [Section 112 of the Act]” — that is the subject of
    Sierra Club’s instant motion to enforce. 4
    On March 31, 2006, the Court issued an Order stating in relevant part that, by
    December 15, 2007, “EPA shall promulgate emission standards assuring that source categories
    accounting for not less than ninety percent of the aggregate emissions of each of the hazardous
    air pollutants enumerated in Section 112(c)(6) [of the Act] are subject to emission standards
    under Section 112(d)(2) or (d)(4).” Order at 3 (Mar. 31, 2006) [Dkt. No. 80]; see also Sierra
    Club v. 
    Johnson, 444 F. Supp. 2d at 59-60
    (explaining reasoning underlying the Order). From
    2006 to 2010, the Court granted a number of EPA’s motions to extend the deadlines of the
    March 31, 2006 Order, all without Sierra Club opposition. Sierra Club v. Jackson, 
    2011 WL 181097
    , at *1. In December 2010, EPA sought an extension of the deadline to April 13, 2012,
    but Sierra Club opposed that request. 
    Id. In an
    Order issued on January 20, 2011, the Court
    denied EPA’s request for an extension until April 13, 2012, but extended the deadline to
    February 21, 2011. Order at 3 (Jan. 20, 2011) [Dkt. No. 149].
    In March of 2011, EPA issued a brief determination notice (“Determination”)
    stating that it had fulfilled its duty to promulgate the emission standards required under Clean
    Air Act Section 112(c)(6). 76 Fed. Reg. 15308/1 (Mar. 21, 2011). In the Determination, EPA
    4
    The seven hazardous air pollutants — or “HAPs” — specified in Section
    112(c)(6) are the following: alkylated lead compounds, polycyclic organic matter,
    hexachlorobenzene, mercury, polychlorinated biphenyls, 2,3,7,8-tetrachlorodibenzofurans and
    2,3,7,8-tetrachlorodibenzo-p-dioxin. 42 U.S.C § 7412(c)(6). As already noted and as described
    infra at page 6, Sierra Club maintains that EPA has yet to set standards for sources accounting
    for 90 percent of the aggregate emissions of three of these pollutants. The Court also notes that
    the references in Section 112(c)(6) to standards under subsections 112(d)(2) or 112(d)(4)
    implicate further requirements as to the stringency of standards for the seven enumerated HAPs.
    See generally Desert Citizens Against Pollution v. EPA, 
    699 F.3d 524
    , 525-28 (D.C. Cir. 2012).
    3
    provided a link to a docket it had established, which contains a technical memorandum. See 
    id. (referencing Docket
    ID No. EPA-HQ-OAR-2004-0505 at www.regulations.gov). The
    memorandum describes the actions the agency has taken that, in its view, satisfy in full the
    requirements placed upon it by Section 112(c)(6). 
    Id. (citing “Emission
    Standards for Meeting
    the 90 Percent Requirement Under Section 112(c)(6) of the Clean Air Act,” EPA-HQ-OAR-
    2004-0505-0006 (Feb. 18, 2011) (“Technical Memo”) [Dkt. No. 166-1]). The Technical Memo
    also features a table listing a number of final rules — issued as long ago as the early 1990s, and
    as recently as 2011 — which, according to EPA, operate in concert to fulfill its statutory duty to
    assure that sources of the seven HAPs specified in Section 112(c)(6) are subject to emission
    standards with respect to those pollutants. See Technical Memo at Appendix II; see also Def.’s
    Opp. at 7-8, 11 (discussing the Technical Memo). As the D.C. Circuit has explained, some of
    these rules cited by EPA were promulgated “in an express effort to satisfy [EPA’s] § 112(c)(6)
    obligations,” while others were issued “with no reference to § 112(c)(6).” Sierra Club v. EPA,
    
    699 F.3d 530
    , 532 (D.C. Cir. 2012).
    Sierra Club challenged EPA’s Determination in the court of appeals, arguing first
    that the substance of the Determination was arbitrary and capricious, and second that the
    Determination was procedurally invalid for failure to comply with notice and comment
    requirements. Sierra Club v. 
    EPA, 699 F.3d at 532
    . The Circuit held that the Determination
    constituted a legislative rulemaking, which requires notice and comment. 
    Id. at 534-35.
    Because
    EPA did not adhere to the notice and comment procedural requirements, the court vacated the
    Determination and remanded to EPA to follow those procedures. 
    Id. at 531,
    535. The panel
    emphasized, however, that it did “not reach Sierra Club’s arguments on the substance of the
    Determination or express the slightest opinion as to their merit.” 
    Id. at 534.
    Subsequently, EPA
    4
    appears to have abandoned any intention to reissue its Determination. See Pl.’s Mot. to Enforce
    at 12 (stating that counsel for EPA informed Sierra Club by telephone on April 17, 2013, that the
    agency does not intend to undertake any further action with respect to Section 112(c)(6)); see
    generally Def.’s Opp. (declining to refute Sierra Club’s assertion on this point). As a result,
    Sierra Club has filed the instant motion seeking to enforce this Court’s Order, which, it contends,
    remains unfulfilled with respect to three of the seven HAPs enumerated in Section 112(c)(6).
    II. DISCUSSION
    A. Legal Standard on a Motion to Enforce
    “District courts have the authority to enforce the terms of their mandates.”
    Flaherty v. Pritzker, No. 11-0660 (GK), 
    2014 WL 642658
    , at *2 (D.D.C. Feb. 19, 2014). “The
    exercise of this authority is ‘particularly appropriate’ when a case returns to a court on a motion
    to enforce the terms of its mandate to an administrative agency.” 
    Id. (quoting Int’l
    Ladies’
    Garment Workers’ Union v. Donovan, 
    733 F.2d 920
    , 922 (D.C. Cir. 1984)). The Court should
    grant a motion to enforce if a “prevailing plaintiff demonstrates that a defendant has not
    complied with a judgment entered against it.” Heartland Hosp. v. Thompson, 
    328 F. Supp. 2d 8
    ,
    11 (D.D.C. 2004). But if a plaintiff “has received all relief required by that prior judgment, the
    motion to enforce [should be] denied.” 
    Id. Included within
    “a court’s power to administer its
    decrees is the power to construe and interpret the language of the judgment.” 
    Id. at 11-12
    (citing
    SEC v. Hermil, Inc., 
    838 F.2d 1151
    , 1153 (11th Cir. 1988)).
    B. Analysis
    “[T]he Clean Air Act contains an ‘unusual, bifurcated jurisdictional scheme’ that
    divides jurisdiction between the federal district and circuit courts.” Sierra Club v. Jackson, 813
    
    5 F. Supp. 2d 149
    , 156 (D.D.C. 2011) (quoting Sierra Club v. Thomas, 
    828 F.2d 783
    , 794 (D.C.
    Cir. 1987)). Under the Act, a person may bring suit in district court against the EPA
    Administrator for an alleged failure to perform a nondiscretionary act or duty, and the district
    court has jurisdiction “to order the Administrator to perform such act or duty,” as well as to
    “compel . . . agency action unreasonably delayed.” 42 U.S.C. § 7604(a). By contrast, “judicial
    review of final action by the EPA Administrator rests exclusively in the appellate courts.” Envt’l
    Def. v. Leavitt, 
    329 F. Supp. 2d 55
    , 63 (D.D.C. 2004) (citing 42 U.S.C. § 7607(b)(1)). Thus,
    whereas the substance of agency action already undertaken is reviewable only by an appropriate
    court of appeals, EPA’s failure to take nondiscretionary action is a matter within the purview of a
    district court. And, “[a]s a logical matter, [the Clean Air Act’s] grant of jurisdiction to the
    District Courts to order EPA to perform a nondiscretionary duty must presuppose the District
    Courts’ jurisdiction to determine whether such duties have been performed in the first place.”
    Sierra Club v. Whitman, No. 00-2206 (JMF), 
    2002 WL 393069
    , at *4 (D.D.C. Mar. 11, 2002),
    Report and Recommendation adopted in relevant part in Sierra Club v. Whitman, No. 00-2206
    (CKK), Memo. Op. at 5-8 (D.D.C. July 10, 2002).
    Sierra Club casts its motion in terms of a purported failure to act on EPA’s part,
    arguing that the agency has not set any emission standards for one Section 112(c)(6) pollutant,
    hexachlorobenzene (“HCB”), and that it has set standards for two others, polychlorinated
    biphenyls (“PCBs”) and polycyclic organic matter (“POM”), for sources that do not account for
    ninety percent of the aggregate emissions of these pollutants. Pl.’s Mot. to Enforce at 2. EPA
    counters that it already has satisfied its obligations under Section 112(c)(6) and this Court’s
    Order. Def.’s Opp. at 10-13 (citing Technical Memo and declarations of EPA official). EPA
    contends that Sierra Club simply is dissatisfied with the substance of the standards that EPA has
    6
    issued, and that Sierra Club asks the Court to intrude into the exclusive jurisdiction of the court
    of appeals. 
    Id. at 14-17.
    Intervenor echoes this argument, distinguishing “district court review
    of EPA’s failure to act [from] review of EPA’s failure to act appropriately,” and accusing Sierra
    Club of seeking the latter, which is reserved to the D.C. Circuit. Intervenor Opp. at 7.
    This Court, in its 2006 Order and Opinion, acknowledged the limits of its
    jurisdiction in the context of Sierra Club’s challenge. While the Court clearly had — and has —
    the authority to order EPA to promulgate emission standards assuring compliance with the 90
    percent emission requirements of Section 112(c)(6) by a date certain, “it is beyond this Court’s
    authority to tell EPA how (as opposed to when) it must fulfill its duties under Section 112(c)(6).”
    Sierra Club v. 
    Johnson, 444 F. Supp. 2d at 59-60
    ; see also Sierra Club v. Jackson, 
    2011 WL 181097
    , at *7 (quoting Sierra Club v. Browner, 
    130 F. Supp. 2d 78
    , 90 (D.D.C. 2001)).
    But as the D.C. Circuit emphasized in its recent decision, EPA had “assured [this
    Court] that [EPA’s issuance of the Determination], like any other final agency action, would be
    subject to review in [the court of appeals].” Sierra Club v. 
    EPA, 699 F.3d at 532
    . This Court’s
    2006 Order was premised on that assurance. See Sierra Club v. 
    Johnson, 444 F. Supp. 2d at 59-60
    . As the court of appeals now has explained, however, EPA’s issuance of the
    Determination with no opportunity for notice and comment failed to honor the terms of its
    representations to this Court, upon which the Order was based. Sierra Club v. 
    EPA, 699 F.3d at 534-35
    . The court therefore vacated the Determination and stated that “[its] vacatur will require
    EPA, consistent with the district court’s deadline order, to entertain and respond to [Sierra
    Club’s] claims about the necessary scope and stringency of the standards.” 
    Id. at 533
    (emphases
    added). In other words, because this Court’s Order remains unfulfilled, EPA therefore must
    initiate a process of notice and comment rulemaking before it either reissues its Determination or
    7
    takes other appropriate action after considering the comments submitted. 5 And it falls to this
    Court — which still holds jurisdiction to compel EPA to act — to enforce the terms of this
    mandate.
    EPA maintains that the terms of this Court’s Order — that the agency “shall
    promulgate emission standards” assuring regulation of 90 percent of the aggregate emissions of
    Section 112(c)(6) HAPs — have been satisfied by EPA’s issuance of numerous rules over the
    past two decades, some specifically linked to the Section 112(c)(6) pollutants and others silent as
    to them, but all of which “effectively (even if indirectly) control the relevant [HAPs].” Def.’s
    Opp. at 16; see also Technical Memo. EPA further contends that this Court in 2006 did not
    actually order the agency to issue the Determination notice; in EPA’s view, it “voluntarily
    published” the Determination. Def.’s Opp. at 6-7. As the decision of the court of appeals
    demonstrates, however, EPA’s position does not represent a fair reading of this Court’s Order
    and Opinion. See Sierra Club v. 
    EPA, 699 F.3d at 534
    (noting that “in the deadline suit before
    the district court, EPA based its successful response on the premise that [the] Determination
    would both issue and be a final agency action reviewable in [the D.C. Circuit]” (emphasis
    added)). In order for the court of appeals to review the substantive validity of EPA’s
    Determination — which is not a simple announcement, but is, rather, an action from which
    “legal consequences will flow,” 
    id. — the
    Determination must be put forth in a manner “that will
    render EPA’s legal and technical decisions more transparent and thereby facilitate substantive
    review.” Id.; see also 
    id. at 535
    (“Because the Determination manifests a new yet final agency
    position on [EPA’s] compliance with § 112(c)(6), it is a legislative rulemaking subject to
    5
    As Sierra Club correctly points out, see Pl.’s Reply at 12, the court of appeals’
    conclusion on this point was essential to its holding that the asserted procedural injury was
    redressable, thus giving Sierra Club standing to bring its petition for review. See Sierra Club v.
    
    EPA, 699 F.3d at 533
    .
    8
    [5 U.S.C.] § 553’s notice-and-comment requirements.”); Int’l Union, United Mine Workers of
    America v. Mine Safety & Health Admin., 
    407 F.3d 1250
    , 1259 (D.C. Cir. 2005) (describing the
    purposes of notice and comment, which include providing “affected parties an opportunity to
    develop evidence in the record to support their objections to the rule and thereby enhance the
    quality of judicial review”).
    The Court therefore concludes that its Order remains unsatisfied. That Order
    obligated EPA to take action by a date certain to ensure its compliance with Section 112(c)(6), in
    a manner reviewable by the court of appeals. EPA elected to do so by articulating its substantive
    legal and technical decisions in the Determination. But as the D.C. Circuit has held, EPA’s
    issuance of that Determination was procedurally invalid. Sierra Club v. 
    EPA, 699 F.3d at 534-35
    . In accordance with the court of appeals’ vacatur of EPA’s Determination and its
    “remand to EPA to fulfill [] notice-and-comment requirements,” 
    id. at 535
    — as well as the
    Circuit’s view as to the continuing effect of this Court’s deadline Order — the Court directs EPA
    to initiate a process of notice and comment rulemaking before it reissues or, after consideration
    of the comments submitted, reconsiders or modifies its Determination. Any such final action
    must include a statement explaining its basis, and EPA also must respond to the comments that it
    receives. See 
    id. at 533
    (stating that EPA must “entertain and respond” to Sierra Club’s claims
    concerning the alleged inadequacy of the regulation of Section 112(c)(6) HAPs); see also
    Louisiana Federal Land Bank Ass’n, FLCA v. Farm Credit Admin., 
    336 F.3d 1075
    , 1079 (D.C.
    Cir. 2003) (noting that “an agency must respond to those ‘comments which, if true, . . . would
    require a change in [the] proposed rule’” (quoting American Mining Congress v. EPA, 
    907 F.2d 1179
    , 1188 (D.C. Cir. 1990)) (omission and alteration in original)). 6
    6
    The Court recognizes that this directive does not afford Sierra Club the full relief
    that it seeks. See Pl.’s Proposed Order. But this Court previously declined to craft a remedy that
    9
    Because neither party has yet had the opportunity to express a view on an
    appropriate schedule for the notice and comment process that EPA must initiate, the Court will
    further direct the parties to meet and confer in an effort to agree upon such a schedule. In the
    event that EPA and Sierra Club are unable to reach an agreement, the Court will set a schedule
    after receiving the views of the parties.
    III. CONCLUSION
    For the foregoing reasons, it is hereby
    ORDERED that Sierra Club’s Motion to Enforce [Dkt. No. 158] is GRANTED
    IN PART and DENIED IN PART; it is
    DECLARED that EPA has failed to comply with this Court’s 2006 Order
    [Dkt. No. 80], as amended by this Court’s 2011 Order [Dkt. No. 149]; it is
    FURTHER ORDERED that EPA shall initiate a process of notice and comment
    rulemaking before its reissues, reconsiders, or modifies its Determination; it is
    FURTHER ORDERED that the parties shall meet and confer in an effort to agree
    upon a schedule for EPA’s initiation and completion of this process; and it is
    FURTHER ORDERED that on or before August 15, 2014, the parties shall file a
    joint status report informing the Court of any such agreement, or, if no agreement is reached,
    proposing a schedule for briefing on the question of an appropriate timeline for EPA’s actions.
    SO ORDERED.
    /s/__________________________
    PAUL L. FRIEDMAN
    DATE: July 25, 2014                                   United States District Judge
    would dictate to EPA the precise manner in which to satisfy its duties under Section 112(c)(6),
    see Sierra Club v. 
    Johnson, 444 F. Supp. 2d at 59-60
    , and it again declines to do so.
    10