Scollick v. Narula ( 2022 )


Menu:
  • UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    ANDREW SCOLLICK,
    ex rel. UNITED STATES OF AMERICA,
    Plaintiff-Relator,
    Case No. 1:14-cv-01339-RCL
    Vv. RE ~
    aa
    VIJAY NARULA, et al., u a los
    Defendants. "faye C. Foatete,
    a Se @, f-
    MEMORANDUM OPINION
    Plaintiff-relator Andrew Scollick brought this case under the False Claims Act (“FCA”),
    alleging an elaborate plot by thirteen defendants to defraud the federal government by posing as
    service-disabled veteran-owned small businesses (“SDVOSB”) to obtain set-aside contracts.’
    Second Am. Compl., ECF No. 298. Before this Court are twelve motions for summary judgment.
    Plaintiff-relator moves for partial summary judgment? against Centurion Solutions Group, LLC
    (“CSG”) and Amar Gogia, ECF No. 329; against Optimal Solutions and Technologies, Inc.
    (“OST”), Vijay Narula, and Ajay Madan, ECF No. 330; against Hanover Insurance Company
    (“Hanover”), Hudson Insurance Company (“Hudson”), Centennial ‘Surety Associates, Inc.
    (“Centennial”), and Michael Schendel, ECF No. 331; and against Neil Parekh, ECF No. 332. OST,
    Narula, and Madan in response move for summary judgment against the plaintiff-relator. ECF No.
    337. CSG and Gogia similarly move for summary judgment against the plaintiff-relator, ECF No.
    1! While plaintiff-relator’s second amended complaint originally included fifteen defendants, all claims against
    defendant Nitin Mehta have been dismissed, ECF No. 340, and defendant Melvin Goodweather has settled claims
    against him, ECF No. 304.
    2 Plaintiff-relator did not move for summary judgment on the conspiracy claim; the amount of civil penalties owed;
    the statutory fees and costs awardable under FCA; the false claims count against Hudson, Hanover, Centennial, and
    Schendel; and a few specific false claims allegations (those related to OST and KGCI, Inc. and the HUBZone
    contracts). See ECF No. 329-1 at 3 n.2; ECF No. 330-1 at 3 n.2; ECF No. 331-1 at 40.2; ECF No. 332-1 at 4n.2.
    I
    338, as do Parekh, ECF No. 341, and Mehta, ECF No. 342. The three insurance companies also
    move for summary judgment against the plaintiff-relator. See ECF Nos. 334 (Hanover’s motion
    for summary judgment), 335 (Hudson’s motion for summary judgment), & 328 (Centennial and
    Schendel’s motion for summary judgment). Finally, Hudson moves for partial summary judgment
    on its crossclaims for indemnification against crossclaim defendants CSG, Citibuilders, LLC
    (“Citibuilders”), CB Construction Group, Inc. (“CB”), Gogia, and Parekh. ECF No. 336.
    For the reasons explained below, the Court will DENY plaintiff-relator’s motions for
    summary judgment, ECF Nos. 329, 330, 331, & 332; DENY OST, Narula, and Madan’s motion
    for summary judgment against plaintiff-relator, ECF No. 337; DENY CSG and Gogia’s motion
    for summary judgment against plaintiff-relator, ECF No. 338; DENY Parekh’s motion for
    summary judgment against plaintiff-relator, ECF No. 341; GRANT Centennial and Schendel’s
    motion for summary judgment against plaintiff-relator, ECF No. 328; GRANT Hanover’s motion
    for summary judgment against plaintiff-relator, ECF No. 334; GRANT Hudson’s motion for
    summary judgment against plaintiff-relator, ECF No. 335; GRANT Mehta’s motion for summary
    judgment against plaintiff-relator, ECF No. 342; DENY Hudson’s motion for partial summary
    judgment on its crossclaim, ECF No. 336; and DISMISS as moot Madan, Narula, and OST’s
    motions to strike, ECF Nos. 366 & 367.
    I. BACKGROUND
    The parties here have different understandings of the facts at hand—or, at least, how those
    facts should be characterized. The Court will note the areas of disagreement.
    This case features a large cast of characters. Defendant Vijay Narula is the 100% owner
    and chief executive officer of OST, an information-technology firm. P1.’s Statement of Mat. Facts
    (“P1.’s Facts”), ECF No. 330-2 J 11. OST also employs Ajay Madan as its chief operating officer.
    Id. | 33. OST is a successful company and has experience with government contracts in the
    information-technology sector. Id. ] 14. Narula is not a service-disabled veteran, and OST is not a
    service-disabled veteran-owned small business (“SDVOSB”). Jd. | 12.
    Defendant Neil Parekh was the owner of two construction companies: Citibuilders’ and
    CB Construction Group, Inc. (“CB”). Jd. 4 15. Like Narula, Parekh is not a service-disabled
    veteran. Id. 4 16. Parekh met Narula when Citibuilders renovated OST’s office space, and the two
    companies ultimately developed a subcontracting relationship. Jd. ff] 17-18. In 2010, Parekh
    moved his operations into OST’s Washington, D.C. office. Jd. {| 18. That same year, Parekh
    transitioned operations from Citibuilders to CB. Id. { 15. Plaintiff-relator Andrew Scollick was
    employed by Parekh’s companies—first Citibuilders and then CB. Jd. 19.
    A. Origins of the Alleged Plan
    In 2009, Parekh and Narula discussed the possibility of pursuing government construction
    contracts together—combining OST’s contracting experience and Parekh’s construction
    experience. Id. § 20. They even discussed forming a construction “subsidiary of OST,” run by
    Parekh, to bid on certain government contracts. Jd. 26. Parekh and Narula’s plan moved beyond
    nascent discussions, and they even reached out to bonding companies like Centennial to discuss
    the potential subsidiary. Jd. {| 25—26.
    Sometime in 2008, OST learned of a $125 million Federal Aviation Administration
    (“FAA”) SDVOSB set-aside contract known as “System Operations Management and
    Administrative Support Service” (“SOMASS”). Id. § 31. SDVOSB set-aside contracts are
    government contracts specifically set aside for companies owned by service-disabled veterans.
    3 Citibuilders, CB Construction’s predecessor, should not be confused with Citibuilders Solutions Group, LLC, a
    defendant in this case. Citibuilders Solutions Group is not at issue in any of the motions dealt with here—it was a
    SDVOSB entity that Parekh created with defendant Goodweather, who has settled. P1.’s Facts ] 226.
    3
    CSG Statement of Mat. Facts (“CSG Facts”), ECF No. 338-1 § 9. To be awarded a SDVOSB set-
    aside contract, a company must be certified as a SDVOSB. Id. Because OST was not an SDVOSB,
    Pl.’s Facts {] 12, it could not bid for the contract alone. However, Narula determined that OST
    could bid on the SOMASS project if it formed a joint venture with a qualified SDVOSB. Id. J 32.
    Of course, to do so, Narula needed to find an SDVOSB.
    Enter Amar Gogia. Defendant Gogia is a service-disabled veteran and second cousin to
    Madan, OST’s chief operating officer. Jd. 33. In late November 2009, Madan emailed Narula
    and other OST staff Gogia’s army discharge papers. Id. “He is an SDVO, and is willing to talk,”
    Madan said. ECF No. 330-6 at 2. At the end of 2009, Narula and Gogia met in OST’s offices to
    discuss contracting opportunities. Pl.’s Facts { 35. But before Narula and Gogia could pursue any
    joint contracting venture—like the SOMASS contract—they had to establish a SDVOSB. OST’s
    Resp. to Pl.’s Statement of Mat. Facts (“OST Fact Response”), ECF No. 370-1 4 35.
    B. The Creation of Centurion Solutions Group, a “SDVOSB”
    By early 2010, Gogia was working to form the new qualifying SDVOSB, Centurion
    Solutions Group, LLG (“CSG”). Pl.’s Facts § 37. Plaintiff-relator alleges that Madan and Narula
    helped form the SDVOSB: on an email thread, Gogia appears to seek significant insight from
    Narula, Madan, and two other members of OST’s staff on the new SDVOSB’s name and structure.
    Id, Madan even helped choose the name. Jd. OST also submitted filing paperwork on Gogia’s
    behalf. OST Fact Response § 37; P1.’s Facts § 40. CSG was established as a SDVOSB in 2010.
    Pl.’s Facts {| 42. Defendants dispute the allegation that they were significantly involved in CSG’s
    creation by arguing that the evidence fails to show that Narula, Madan, or other members of OST
    staff had any “decision making authority.” OST Fact Response 37.
    Also while Gogia was establishing CSG in 2009 and early 2010, Madan loaned Gogia
    $18,000. PI.’s Facts 36. In February 23, 2010, Madan sent Gogia another payment of $5,000,
    4
    which he referred to as “seed monies”—these funds, unlike the prior $18,000 loan, were deposited
    in CSG’s new bank account. Jd. { 44.
    The newly created CSG and OST formed a joint venture to bid on the SOMASS contract,
    which they were ultimately awarded. Jd. 4 46. Narula and Parekh also began to discuss how they
    could “use” an SDVOSB like CSG. Id. 9.47. Just a month after CSG’s formation, Parekh forwarded
    Narula a list of Department of Veterans Affairs (“VA”) SDVOSB set-aside contracts that he had
    “identified” and “would like to pursue.” Jd. 50. Narula put Parekh in touch with Gogia so that
    “as a team [they] could go after these opportunities.” Id. Gogia forwarded CSG’s registration
    materials to Narula. Jd. 753. In March 2010, a meeting was organized with Gogia, Parekh, Narula,
    and plaintiff-relator Scollick. Jd. After the meeting, plaintiff-relator Scollick told Gogia he would
    send him “a copy of the Ist solicitation we will be pursuing.” Jd. 4/55.
    Gogia then moved to register in the CCR and VA’s VetBiz VIP databases, databases used
    by SDVOSB contractors to bid on projects. Id. ff] 54, 56. As part of this registration process,
    Madan electronically signed an application verifying that he owned 49% of CSG and that CSG
    was majority-owned and controlled by a service-disabled veteran, as required by the VA’s
    SDVOSB regulations. Id. 4 56. A contemporaneous operating agreement shows Madan as 49%
    owner and Gogia as 51% owner of CSG. Id. 58. The VA certified CSG as SDVOSB compliant.
    OST Statement of Mat. Facts (“OST Facts”), ECF No. 337-2 77.
    C. The Parties’ Divergent Narratives on CSG’s Operational Leadership
    In 2010, CSG started bidding for SDVOSB set-aside contracts in earnest. P1.’s Facts {| 60.
    It is here where the narrative from the defendants this Court will term the “construction
    defendants” (OST, CSG, Narula, Gogia, Madan, and Parekh) sharply diverges from the plaintiff-
    relator’s narrative.*
    According to the construction defendants, Gogia was at all times in control of CSG. OST
    Facts 39. The initial Operating Agreement listed Amar Gogia as the 51% owner of CSG, and
    that agreement was only amended once—when Gogia became the 100% owner of CSG. Jd. 11 6,
    12. Any assistance that OST provided to CSG for bid proposals was solely in a mentorship
    capacity. Id. 56.
    Plaintiff-relator contests these assertions through several avenues.
    First, he points to evidence that CSG operations were directed by CB and OST. For
    example, email correspondence illustrates that CB and OST employees jointly tracked SDVOSB
    solicitations and prepared (or, at minimum, provided templates for and then reviewed) many bid
    proposals. Pl.’s Facts | 60. Other emails from CSG’s early operations indicate that Gogia was
    frustrated because the “Citibuilders guys” were “using my and Centurion’s name” to submit bids
    and that he was being “blindfolded” and “shut out” of the bidding process. Jd. 83. And neither
    party disputes that Parekh and CB staff were doing significant work for CSG, though the
    construction defendants allege that Gogia merely “delegated” certain responsibilities to Parekh.
    OST Facts ¥ 42.
    Plaintiff-relator also points to evidence that CSG, CB, and OST were often treated as the
    same company with significant staff overlap. For example, CSG’s bid proposals listed past projects
    performed by CB as evidence of CSG’s experience. PI.’s Facts 4] 248-88. In fact, one previous
    project—for Mehta Medical Group, a fictitious entity apparently owned by Parekh’s aunt,
    defendant Dr. Sobha Mehta—was repeatedly used in bid proposals, although the cost of the alleged
    * A second group of defendants, titled the “insurance defendants,” become relevant later in the narrative.
    6
    past project would change in each bid proposal. Id. {J 285, 290. CSG also never had its own office
    space—at all relevant times, CSG operated out of OST offices and did not pay any rent. OST Fact
    Resp. J 124. All office support functions were carried out by CB employees who also represented
    that they were CSG employees, though there is no evidence that CSG paid them. Pl.’s Facts {| 126.
    Furthermore, shortly after CSG was established in 2010, Parekh, Narula, and Madan began
    emailing about an “SDVOSB Operating Agreement.” Jd. 1 91. This potential operating agreement
    is much debated, as the Court will explore below: plaintiff-relator argues it is undeniable proof
    that Gogia was not the majority owner of CSG, while the construction defendants argue that this
    agreement was instead for a new SDVOSB joint entity that they never created. OST Facts 91.
    D. The Relationship Between Gogia, Parekh, and the Other Construction Defendants
    Breaks Down
    The relationship between Parekh, Narula, Gogia and Madan soon began breaking down.
    Emails illustrate that Parekh was frustrated with Gogia and was “opposed” to having him “near
    the accounting system,” Pl.’s Facts §] 185; Narula in response assured Parekh that “at the end of
    the day you are running the company/work.” Jd. J 186. In the emails, Narula reminded Parekh that
    if they were “using [Gogia’s] quall[ifications],” presumably his SDV status, he “needs to be
    compensated.” Jd. 4 187. In early 2012, Gogia emailed Narula and Madan to inform them of issues
    he found when reviewing CSG financial records, which were maintained by CB. Jd. {| 205. He
    noted that the “books . . . do not correlate to CB invoices provided.” Jd. As 2011 became 2012,
    CSG failed to pay some of its workers as Parekh refused to approve payments. Jd. J 216. In the
    midst of these financial troubles, Parekh separated from CSG. Jd. 217. Gogia remained.
    From 2010 to 2015, CSG was awarded nineteen SDVOSB set-aside contracts. Id. J 234.
    CSG never defaulted on any contracts for the VA, nor did they receive negative performance
    reviews regarding completed contracts. OST Facts § 81. Even after CSG was no longer working
    with Parekh and CB, CSG continued operations. Jd. | 52. The VA was notified of the allegations
    of fraud in this lawsuit but continued to recertify CSG as a SDVOSB at least once. Jd. 479.
    E. The Role of the Insurance Defendants
    There is another group of defendants relevant here, who the Court will refer to as the
    “Insurance defendants” (Centennial, Schendel, Hanover, and Hudson). The Miller Act requires
    government contracts over $100,000 to be bonded. Id. J 9; see 
    40 U.S.C. § 3131
    (b). This
    requirement is for all government contracts, not just SDVOSB set-aside contracts. 
    40 U.S.C. § 3131
    (b). The bonds guarantee that the contractor will comply with the terms of the contract and
    perform as required. Pl.’s Facts J 10. The insurance companies that issue the bonds do not interact
    with the government—they issue the bonds to the contractor, who then “furnishes” the required
    bonds to the federal government. 
    40 U.S.C. § 3131
    (b). Defendant Centennial, a company owned
    and run by defendant Michael Schendel, worked as a “bonding agent.” PI.’s Facts 22. Centennial
    would garner information from potential contractors, like CSG, seeking bonding, then assist
    bonding companies’ during the underwriting process. Jd. § 24. Defendants Hanover and Hudson
    were both bonding companies that provided bonds to contractors. Jd. J 23.
    Schendel and Centennial brokered the relationships between CSG and bonding companies
    Hudson and Hanover. Jd. J] 69, 149. It is undisputed that Narula and Parekh were involved with
    the bonding process for CSG, though all bonds were requested and issued in CSG’s name. Jd.
    {1 70, 73, 76 (Hanover); id. {J 158-159, 160 (Hudson). As a requirement to providing surety
    bonds for CSG’s SDVOSB set-aside contracts based on OST’s financial support, Hanover required
    an agreement to indemnify them against any loss—an indemnification agreement that OST,
    Narula, Narula’s wife, Parekh, Gogia, CB, CSG, and Centurion-OST all signed. Jd. J] 106-07.
    Hanover issued performance bonds for eight VA SDVOSB-set aside contracts. Jd. J 128. In May
    2011, Hudson started issuing bonds to CSG. Jd. f§ 149-154. Like Hanover, Hudson required
    8
    indemnity agreements to issue these bonds. OST, CSG, CB, Gogia, and Gogia’s wife all signed an
    indemnity agreement with Hudson. Id. { 157. Hudson issued performance bonds for five VA
    SDVOSB set-aside contracts. Jd. §] 160.
    It is undisputed that certain Hanover, Hudson, and even Centennial employees (including
    Schendel) seemed to think that CSG was the “construction arm of OST” and that Parekh or Narula
    owned CSG. Id. §f] 70-74, 164-65. Additionally, OST was the primary contact between “the
    bonding company” and CSG. Id. ¢ 78. Gogia met Schendel once, though Schendel could not recall
    any conversation of substance. Jd. On the other hand, it is also undisputed that there is no evidence
    on the record illustrating that Schendel, Centennial, Hanover, or Hudson were aware of the specific
    requirements of VA SDVOSB set-aside contracts.
    F. Procedural History
    In 2014, plaintiff-relator Scollick filed this complaint against CB, OST, CSG, Gogia,
    Madan, Mehta, Narula, Parekh, Hanover, Hudson, Schendel, and defendant Citibuilders Solutions
    Group, LLC. Compl., ECF No. 1. Five other named defendants are no longer in the case. See,
    e.g., ECF No. 125 (dismissing Guatam Chitnis, Anita Chitnis, and KCGI, Inc); ECF No. 122
    (dismissing Dilip Parekh); ECF No. 307 (granting stipulation of dismissal as to Melvin
    Goodweather). The second amended complaint—operative here—alleges four counts:
    Count I, submitting or causing to be submitted false or fraudulent
    claims to the United States in violation of 
    31 U.S.C. § 3729
    (a)(1)(A)
    against all defendants (the presentment claim);
    Count II, causing to be made or used false records to submit false or
    fraudulent claims to the United States in violation of 
    31 U.S.C. § 3729
    (a)(1)(B) against all defendants (the false statement claim);
    Count III, knowingly avoiding an obligation owed to the United
    States in violation of 
    31 U.S.C. § 3729
    (a)(1)(G) against defendants
    Hanover and Hudson (the reverse false claim); and
    Count IV, conspiracy to violate the FCA in violation of 
    31 U.S.C. § 3729
    (a)(1)(C) against all defendants (the conspiracy claim).
    See Second Am. Compl. { 215-60, ECF No. 298. Hudson also filed a crossclaim against OST,
    CSG, Parekh, Gogia, CB, Citibuilders, and Centennial, invoking the above-referenced
    indemnification agreements. Crossclaim Compl., ECF No. 187.
    Now, plaintiff-relator moves for partial summary judgment against all defendants but
    Citibuilders Solutions Group and Mehta, and all defendants but Citibuilders Solutions Group move
    for summary judgment. Hudson also moves for partial summary judgment against OST, CSG,
    Parekh, and Gogia on its crossclaim. ECF No. 336. Finally, Madan, Narula, and OST move to
    strike certain testimony from plaintiff-relator’s motion for partial summary judgment. ECF Nos.
    366 & 367. These fourteen motions are all ripe.
    II. LEGAL STANDARDS
    A. Summary Judgment
    When a movant “shows that there is no genuine dispute as to any material fact and the
    movant is entitled to judgment as a matter of law,” the court shall grant summary judgment. Fed. R.
    Civ. P. 56(a). A dispute about a material fact is “genuine” if the nonmovant presents evidence
    “such that a reasonable jury could return a verdict for the nonmoving party.” Anderson v. Liberty
    Lobby, Inc., 
    477 U.S. 242
    , 248 (1986). “[MJerely colorable” evidence or evidence that is not
    sufficiently probative does not create a genuine dispute of material fact. 
    Id. at 249-250
    . On a
    summary judgment motion, all inferences to be drawn from the underlying facts “must be viewed
    in the light most favorable to the party opposing the motion.” Matsushita Elec. Indus. Co. v. Zenith
    Radio Corp., 
    475 U.S. 574
    , 587 (1986). The Court’s role when deciding summary judgment
    motions is only to determine if there is a genuine dispute of material fact, not to make credibility
    determinations or weigh the evidence. Wheeler v. Georgetown Univ. Hosp., 
    812 F.3d 1109
    , 1113
    10
    (D.C. Cir. 2016). The movant is entitled to summary judgment when the nonmovant fails to make
    a sufficient showing of an essential element of her case for which she bears the burden of proof.
    Celotex Corp. v. Catrett, 
    477 U.S. 317
    , 323 (1986). When parties file cross-motions for summary
    judgment, a court views each motion separately in the light most favorable to the non-movant.
    Howard Town Ctr. Dev., LLC v. Howard Univ., 
    267 F. Supp. 3d 229
    , 236 (D.D.C. 2017).
    II. DISCUSSION
    With this sprawling cast of characters to consider, the Court will split up its major analysis
    into two groups of defendants. First, the Court will discuss the FCA and conspiracy claims against
    the construction defendants (OST, CSG, Parekh, Narula, Madan, and Gogia). Second, the Court
    will dispose of the claims against the insurance defendants (Schendel, Centennial, Hanover, and
    Hudson). After these larger discussions, the Court will decide Mehta’s separate motion for
    summary judgment and Hudson’s partial motion for summary judgment on its indemnification
    crossclaim.
    A. Whether The Construction Defendants Violated The FCA Is Genuinely Disputed
    Plaintiff-relator brings three claims against the the construction defendants: a presentment
    claim, a false-statement claim, and a claim alleging conspiracy to violate the False Claims Act.
    Second Am. Compl. §{/ 215-60. Both plaintiff-relator and the construction defendants move for
    summary judgment on these counts.” Presentment claims and false statement claims contain nearly
    identical elements, and so this Court will analyze both claims together for the purposes of this
    summary judgment motion.
    There are three elements to an FCA presentment claim: “(1) the defendant submitted a
    claim to the government, (2) the claim was false, and (3) the defendant knew the claim to be false.”
    5 Plaintiff-relator excludes certain allegations from his motion on these two counts. See, e.g., ECF No. 329 at 2 nl.
    The specifics of those exclusions are unnecessary because the Court will deny summary judgment on these counts.
    11
    United States ex. rel. Scollick v. Narula (“Scollick I’), 
    215 F. Supp. 3d 26
    , 35 (D.D.C. 2016)
    (quoting Pencheng Si v. Laogai Rsch. Found., 
    71 F. Supp. 3d 73
    , 91 (D.D.C. 2014)). Although the
    text of the FCA explicitly prohibits: only false fraudulent claims, 
    18 U.S.C. § 3729
    (a)(1)(A), a
    violation of the FCA occurs when a person “fraudulently induces the government to enter a
    contract and later submits claims for payment under that contract.” United States ex rel. Cimino v.
    Int'l Bus. Machines Corp., 
    3 F.4th 412
    , 417 (D.C. Cir. 2021). This “initial fraudulent action” taints
    all future claims. Scollick ex rel. United States v. Narula (“Scollick IIT’), No. 14-cv-1339 (RCL),
    
    2020 WL 6544734
    , at *7 (D.D.C. Nov. 6, 2020). The false statement claim has almost identical
    elements to the presentment claim, except that a false statement requires evidence that the
    defendant made a false statement “as opposed to the submission of a false claim for payment.”
    Scollick I, 215 F. Supp. 3d at 35 (quoting Pencheng Si, 71 F. Supp. 3d at 87).
    While the parties attempted to bury the issue under a mountain of paper, a simple
    conclusion cuts this Gordian knot: there are many genuine disputes of material fact. Both sides
    provide evidence about (1) whether CSG was SDVOSB eligible, (2) whether defendants had the
    required scienter for fraud, and (3) whether the OST defendants or Neil Parekh “caused” the false
    claims or statements to be made to the government. These factual disputes pit contemporaneous
    email evidence (supporting the fraud claims) against the alleged conspirators’ deposition testimony
    (swearing that their actions were above-board). Because this Court cannot evaluate credibility or
    weigh evidence at this stage, both motions for summary judgment must be denied. Wheeler, 
    812 F.3d 1109
     at 1113.
    1, Whether There Was A False Claim Or False Statement Is Genuinely Disputed
    Plaintiff-relator argues that CSG falsely held itself out as an eligible SDVOSB when
    submitting claims and statements to the government when it was in truth controlled by civilians
    with no military background. ECF No. 329-1 at 3. Key to both his presentment claim and his false
    12
    statement claim is whether CSG was an eligible SDVOSB. If so, most of plaintiff-relator’s claims
    fall apart—the claims and statements the construction defendants made to the government would
    not be false.
    To qualify as SDVOSB eligible under VA guidelines, a small business “must be
    unconditionally owned and controlled by one or more eligible veterans, service-disabled veterans,
    or surviving spouses.” 
    38 C.F.R. § 74.2
    (a) (2015).° A service-disabled veteran “owns” a small
    business when at least 51% of the concern (company) is “unconditionally and directly” owned by
    him. 
    38 C.F.R. § 74.3
    (a) (2015). Similarly, a service-disabled veteran “controls” a small business
    when he conducts both “the day-to-day management and long-term decision-making authority.”
    
    38 C.F.R. § 74.4
    (a) (2015). To control a small business, a service-disabled veteran must “hold the
    highest officer position” and must have “managerial experience of the extent and complexity”
    needed to run the company. 
    38 C.F.R. § 74.4
    (c)(1), (2) (2015).
    The construction defendants point to the initial Operating Agreement for CSG—which
    listed that Gogia was 51% owner—as evidence that CSG was SDVOSB eligible. See, e.g., ECF
    No. 331-1 at 11. While plaintiff-relator acknowledges this fact, he also points to emails between
    the construction defendants discussing potential equity splits or profit sharing, all of which would
    entitle Gogia to far less than 51% of the assets. ECF No. 330-1 at 10-11.
    For example, an email thread between Parekh and Narula discussed a potential “SDVOSB
    Operating Agreement” that would entitle Gogia to, at most, 25% of profits. Pl.’s Facts { 91.
    Multiple defendants stated under oath that this email referred to a new, separate entity. See OST
    Facts J 90—93. But additional emails sent around the time period betray this characterization and
    6 The eligibility regulations which were in place between 2010 and 2015 are controlling in this case. The VA and
    Small Business Association SDVOSB programs subsequently merged their two regulatory schemes. See National
    Defense Authorization Act for Fiscal Year 2017, Pub. L. No. 114-328, 
    130 Stat. 2658
     (2016).
    13
    indicate that this new operating agreement was for CSG itself. For example, a week later Parekh
    sent an email stating that he and Narula “really need to come to an agreement on the CSG
    operations agreement soon.” PI.’s Facts § 92 (emphasis added). That same week, Madan emailed
    Gogia that he was “thinking about a comp plan” that would allow him to “get more of [Gogia’s]
    time” and pay Gogia a salary. Jd. { 93. Madan mentioned going over various “models.” Jd. This
    context supports plaintiff-relator’s contention that the potential “SDVOSB Operating Agreement,”
    which included proposed compensation models, was for CSG itself.
    Emails aside, plaintiff-relator provides more evidence that Gogia was not the majority-
    owner of CSG. A document titled “Compiled Financial Statement for Period Ending December
    31, 2010” lists two equity partners for CSG: one holding $18,668 and one holding $210,000. Jd.
    1 144.’ As plaintiff-relator points out, Madan paid CSG $211,000 in August 2010 but has
    repeatedly denied this was an investment and insisted it was an interest-free loan. Jd. The financial
    statement, however, again belies this statement and indicates that the $211,000 was instead an
    investment.
    All told, there is a material dispute as to whether CSG was majority-owned by Gogia, the
    only eligible service-disabled veteran. But there is another dispute as well: whether CSG was
    controlled by Gogia, as required by VA regulations. See 
    38 C.F.R. § 74.2
    (a).
    The back-and-forth between the construction defendants and plaintiff-relator over who
    truly controls CSG demonstrates why summary judgment is inappropriate here. As plaintiff-relator
    tells it, Gogia played almost no meaningful role in CSG. ECF No. 330-1 at 8. CSG was operated
    7 The OST defendants argue that this document is inadmissible for lack of foundation. ECF No. 370-1 q 144. The
    nonmovant is not required to produce evidence that would be admissible at trial—all that is necessary is for the
    evidence to be “capable of being converted into admissible evidence.” Gleklen v. Democratic Cong. Campaign
    Comm., Inc., 
    199 F.3d 1365
    , 1369 (D.C. Cir. 2000). The Court believes it likely that plaintiff-relator could establish
    foundation at trial for this document, which was apparently provided to the bonding defendants on behalf of CSG.
    14
    out of OST’s offices. Pl.’s Facts J 124. Parekh and Narula primarily controlled CSG’s operations.
    
    Id.
     § 89-93. And Gogia did not contribute to bidding on SDVOSB proposals for at least the first
    few years. Id. In emails, Gogia complains about not being in kept in the loop:
    I am only writing this to you. This has built up. A while back, I was
    told to come meet and greet CitiBuilders—instead, at the meeting I
    was told who my new partners were. Since then I’ve been
    intentionally shut out, which may have been ok if somebody had told
    me about it. That last meeting with [Narula] caught me off guard
    and does not make me feel comfortable. Still, I could bear being
    locked out because I was told Citibuilders had experience and knew
    what they were doing. These are serious flaws in this bid. The only
    two things I ever heard about it were a surprise call from the VA
    contracting officer, and now this. Yet, the VA response is addressed
    to me, with Centurion’s name—reflecting on the reputation we’re
    trying to build. Please forgive the tone—tell the Citibuilders guys to
    stop using my and Centurion’s name if these are the results we're
    going to be receiving. I want to move forward and believe this will
    work, and apologize if I am being over the top. Maybe \’m missing
    the big picture, but it’s because I’ve been blindfolded. How do I
    make sure I don’t get another email like this?
    Pl.’s Facts J 83 (emphases added). Madan, in his response, noted that “[they] ha{d] submitted some
    bids already” but that Gogia “ha[d] not been maliciously shut out.” Jd. 4 84. Instead, Gogia was
    “shut out for convenience.” Jd. Still, he reminded Gogia that “everyone has the same goals.” Jd.
    Other emails cited by plaintiff-relator further support Gogia’s lack of control. For example,
    in one email from Parekh to Narula, Parekh appears to give orders regarding what Gogia “need[s]
    his focus to be on” in 2010 and 2011. Jd. 9 92. Other emails show Narula and Parekh discussing
    Gogia’s role in CSG, id. §J 185-86, with Narula telling Parekh “at the end of the day you [Parekh]
    are running the company/work.” Jd. { 186. While the construction defendants attempt to play these
    off as “vague” statements, ECF No. 370-1 9186, this Court finds that they support plaintiff-
    relator’s contention that Gogia was not really in control of CSG.
    Still, there is countervailing evidence indicating that Gogia did control CSG at all relevant
    times, as defendants claim. ECF No. 337-1 at 14. To start, Gogia attests—under oath—that at all
    15
    times he controlled CSG. See OST Facts 39, 50. Madan similarly claims that OST was never
    involved in preparing any CSG VA bids proposals, id. 55, despite email evidence to the contrary,
    PI.’s Facts {| 83. The construction defendants also cite a narrative of CSG’s creation that Gogia
    drafted in 2012 and emailed to Narula in 2013— before any allegations of fraud. ECF No. 337-10.
    According to this narrative, all that Gogia did was delegate back-office management to Parekh.
    ECF No. 337-1 at 23. The evidence on both sides is sufficient to raise a genuine dispute of material
    fact as to whether Gogia controlled CSG and thus whether CSG was eligible for SDVOSB status.®
    In a final argument, the OST defendants maintain that plaintiff-relator has failed to provide
    evidence that the claims were false because there is no evidence that the alleged misrepresentations
    were material to the VA’s decision to pay claims to CSG. ECF No. 337-1 at 40-43. But, as this
    Court has previously explained, Scollick II, 
    2020 WL 6544734
    , at *9, this showing is not required.
    Plaintiff-relator is proceeding on a theory of fraudulent inducement—that the claims CSG
    submitted to the governinent for its work were false because CSG used fraud to enter the original
    contract— so he need only to prove two things: (1) that the fraud caused the government to enter
    8 The construction defendants also allege that any support OST gave to CSG was formally approved of by the
    government under a mentor-protégé agreement. ECF No. 337-1 at 15. This argument fails. To start, the government-
    approved mentor-protégé agreement between CSG and OST that the construction defendants tout was for FAA
    contracts. See ECF 337-5. The FAA Mentor-Protégé Program exists to encourage firms to assist SDVOSBs in
    performing F'AA contracts. See The FAA Mentor-Protégé Program, Federal Aviation Administration, available at
    https://sbo.faa.gov/mentorprotege.cfm. But all the allegations in the current complaint relate to contracts with the VA,
    so whether the amount of support OST gave CSG was appropriate for FAA contracts is irrelevant. The construction
    defendants’ follow-up argument that the FAA “explicitly permitted CSG to use the mentorship assisted provided by
    OST in support of other contracts with other government agencies” is disingenuous. ECF No. 337-1 at 16. The cited
    FAA approval letter states:
    This approval does not constitute authorization to proceed with work contained in
    the Mentor-Protégé Agreement until the approved agreement is incorporated into
    an FAA contract. However, this does not preclude [OST] from mentoring to
    {CSG] on other government contracts.”
    ECF No. 337-6. Just because parties are not precluded from taking certain actions does not mean they are expressly
    permitted to. If OST wanted to support CSG performing VA contracts, there is a separate VA Mentor-Protégé program
    with a separate approval process they could have applied to. See 
    48 C.F.R. § 819.7101
    . They did not do so. The FAA
    Mentor-Protégé agreement is irrelevant.
    16
    into the contract; and (2) that the fraud was material. United States ex rel. Cimino v. Int'l Bus.
    Machines Corp., 
    3 F.4th 412
    , 422 (D.C. Cir. 2021). Fraud is material if it “capable of influencing
    the government's decision to enter into a contract.” 
    Id. at 423
     (emphasis added). Because VA
    SDVOSB set-aside contracts can only be awarded to SDVOSB-eligible companies, the facts
    indicating that construction defendants fraudulently represented CSG as SDVOSB-eligible to
    receive these contracts sufficiently proves both causation and materiality. Despite defendants’
    argument, plaintiff-relator need not also prove that the fraud was material to the VA’s later decision
    to pay.
    Reviewing all the evidence cited above, this Court finds a genuine dispute exists as to
    whether CSG was SDVOSB eligible. Because CSG repeatedly certified itselfas SDVOSB eligible
    when submitting VA bid proposals, a reasonable jury could find that they submitted false claims
    or statements to the government. This genuine dispute of fact allows the construction defendants
    to survive plaintiff-relator’s motions for partial summary judgment against them. But because the
    construction defendants also move for summary judgment, which plaintiff-relator can only survive
    by making a sufficient showing of all essential elements for which he bears the burden of proof,
    Celotex Corp., 477 U.S. at 323, this Court will proceed to the second element of a presentment or
    false statement claim—scienter.
    2. Whether Construction Defendants Knowingly Submitted A False Claim or
    Statement To The Government Is Genuinely Disputed
    Next, the court turns to scienter. A false statement or claim is made or submitted knowingly
    when a defendant (1) has actual knowledge of the claim’s falsity, (2) acts in deliberate ignorance,
    or (3) acts in reckless disregard. Scollick I, 215 F. Supp. 3d at 35. Plaintiff-relator alleges that the
    construction defendants had actual knowledge of the falsity of the claims and statements.
    17
    Evidence supports the notion that the construction defendants had actual knowledge that
    CSG was not SDVOSB eligible and were fraudulently representing it as such. For example, in an
    email between Narula and Madan, Narula stated, “[W]e have the formalities completed with CSG.
    Also, who are the owners and officers on the papers?” P1.’s Facts 4 54 (emphasis added). In another
    email, Gogia asked Madan and Narula to create documentation of ownership because he was
    “bidding on a job which requires ‘evidence’ of [his] 51% ownership of CSG.” Id. 4] 57. Gogia
    added these scare quotes himself. In response, the defendants immediately created a new Operating
    Agreement that same day to provide this “evidence.” Jd. 4 58. In another email, Narula emailed
    Parekh and asked him to “call me to discuss how we can use the SDVO-SB. The company name is
    Centurion Group, LLC.” Jd. 51 (emphasis added). And when Gogia complained about being kept
    out of the loop, Madan reminded him that “everyone ha[d] the same goals.” Id. J 84. Plaintiff-
    relator also provided evidence that the construction defendants plainly treated CSG as part of a
    “team” as opposed to its own country: Parekh and Narula identified SDVOSB projects to bid on
    and then sent them to Gogia so that “as a team [they] c[ould] go after these opportunities.” Jd. q
    50. Finally, there are repeated examples of the construction defendants referencing the fact that
    Gogia was allowing them to “use his quals.” Jd. { 187; see id. J 91, 94-95.
    These facts, alone, are enough to raise a triable issue of fact regarding whether the
    construction defendants had actual knowledge of the fraud they were allegedly committing—
    passing off CSG as a SDVOSB-eligible company to secure prime VA projects. Because this
    evidence supports a theory of actual knowledge, construction defendants’ argument that they
    merely thought OST was providing FAA-approved support to CSG is unpersuasive here.
    The construction defendants also argue that because CSG was audited and recertified by
    the VA, plaintiff-relator cannot establish actual knowledge. ECF No. 337-1 at 33, ECF No. 338-1
    18
    at 12. This is incorrect. The allegation here is that the construction defendants worked together to
    lie to the government and falsely hold CSG out as a SDVOSB-eligible company. “|G]overnment
    approval or certification cannot be used as a shield from liability, especially where that approval
    or certification was gained through fraudulent means.” United States v. Honeywell Int’l Inc., 
    502 F. Supp. 3d 427
    , 459 (D.D.C. 2020), motion to certify appeal granted, No. 08-cv-0961 (PLF),
    
    2021 WL 2493382
     (D.D.C. June 18, 2021).
    As the construction defendants point out, “scienter is often a fact-intensive matter to
    resolve.” ECF No. 337-1 at 34. That is the case here, and summary judgment is unwarranted.
    3. Whether The Construction Defendants Presented False Claims Or Statements To
    The Government Is Genuinely Disputed
    Finally, plaintiff-relator must provide evidence showing that the construction defendants
    submitted a claim or false statement to the government. “Presentment and false statement claims
    can rest on a theory of direct presentment/making of false statements or indirect
    presentment/making of false statements.” Scollick I, 
    2017 WL 3268857
    , at *5. Direct presentment
    or false statement claims are simple—all that is required is that the defendant in question actually
    submitted the false claims. United States ex rel. Tran v. Comput. Scis. Corp., 
    53 F. Supp. 3d 104
    ,
    127 (D.D.C. 2014). But to succeed on a theory of indirect presentment or false statements, the
    defendants must have caused the submission of false claim or statement. Scollick I, 215 F. Supp.
    3d at 39.
    The Court starts with the direct-presentment claims. Defendant Gogia applied to the VA to
    qualify CSG as a SDVOSB, and the VA certified CSG as an SDVOSB after receiving this
    application. See ECF No. 337-8 at 2. Both Madan and Gogia signed a verification form in which
    they affirmed that CSG was at least 51% owned and controlled by Gogia. P1.’s Facts J 56. Because
    plaintiff-relator has provided sufficient evidence that CSG was not SDVOSB-eligible, this
    19
    representation that CSG was SDVOSB-eligible would qualify as a false statement. And because
    any subsequent SDVOSB contracts awarded to CSG would be “procured by fraud,” any claims
    CSG submitted for payment would be “false or fraudulent.” United States ex rel. Bettis v.
    Odebrecht Contractors of Cal., Inc., 
    393 F.3d 1321
    , 1326 (D.C. Cir. 2015). CSG was awarded
    nineteen VA SDVOSB set-aside contracts, submitted claims for all of them, and was ultimately
    paid $7,003,693.11 by the United States. PI.’s Facts 234-35. Parekh and Gogia both signed the
    claim payment requests. Jd. { 235. So, under a direct-presentment theory, plaintiff-relator’s claim
    survives summary judgment.
    Moving to a theory of indirect presentment, a defendant causes a false statement or claim
    to be made when his conduct was “at least a substantial factor in causing, if not the but-for cause
    of, submission of false claims.” United States v. Toyobo Co., Ltd., 
    811 F. Supp. 2d 37
    , 48 (D.D.C.
    2011). Courts have recognized indirect presentment or false statement claims where a non-
    submitting party was the “driving force behind an allegedly fraudulent scheme” or agreed to take
    “certain critical actions in furtherance of the fraud.” Tran, 53 F. Supp. 3d at 127. Ultimately, the
    court must evaluate the “degree to which [a party] was involved in the scheme that results in the
    actual submission.” Scollick I, 215 F. Supp. at 39 (quoting Tran, 53 F. Supp. 3d at 127).
    Evidence—in addition to that discussed above, see Parts IJ.A.1 and III.A.2, supra—
    indicates that Madan, Parekh, Narula, and OST were intimately involved with the bid proposal and
    submittal process. Gogia, Parekh, Narula, and Madan were all on email threads regarding the
    “construction pipeline,” identified certain SDVOSB-set-aside contracts, and asked Narula to
    decide on what projects to pursue. See ECF No. 330-7 at 15-16. Sujana Pathak, an OST employee,
    created a bid-proposal template for CSG to use, id. at 27, and met with plaintiff-relator and Gogia
    to assist in bid proposals, id. at 38-39. Other OST employees assisted with additional edits to bid
    20
    proposals, including designing cover pages. P1.’s Facts {| 65. Parekh himself emailed Gogia to tell
    him what types of SDVOSB-set-aside projects to look for. ECF No. 330-7 at 49. Finally, OST was
    the “primary contact between” the insurance defendants, who assisted with necessary bonding, and
    CSG. Pl.’s Facts J 78. Based on this evidence, a reasonable jury could find that Parekh, Narula,
    Madan, and OST took “critical actions in furtherance of the fraud.” Tran, 53 F. Supp. 3d at 127.
    So, in short, Plaintiff-relator has sufficiently raised a direct- and indirect- presentment
    claim and a false-statement claim against these defendants. These claims must proceed to trial.
    B. The Construction Defendants’ Conspiracy Claim Contains Genuine Disputes
    Plaintiff-relator also alleged that the construction defendants conspired to violate the FCA.
    AFCA conspiracy claim requires (1) an agreement to make false or fraudulent claims that (2) each
    member of the alleged conspiracy joined where (3) at least one conspirator knowingly committed
    an overt act in furtherance of the conspiracy. Scollick I, 215 F. Supp. 3d at 36. There must also be
    an underlying violation of the FCA (which the court found was genuinely disputed in Part TILA,
    supra).
    The critical issue for this conspiracy claim is whether there is evidence demonstrating that
    construction defendants agreed to violate the FCA. The answer is plainly yes. Gogia emailed
    Madan and Narula for “evidence” (scare quotes his own) of his ownership of CSG to bid on jobs.
    Pl.’s Facts 57. Narula and Parekh discussed “chow we can use the SDVO-SB.” Id. 9 51. Narula
    and Madan discussed the “formalities” they completed and who would be the “owners and officers
    [of CSG] on the papers” Jd. | 54. Gogia complained to Madan about being shut out and stated to
    “tell the Citibuilders guys to stop using my and Centurion’s name” if they were going to receive
    bad results (not to stop altogether), at which point Madan assured him that while “we have
    9 Only the construction defendants move for summary judgment on the conspiracy claim, so the Court will construe
    all facts in favor of plaintiff-relator in its analysis.
    21
    submitted some bids already,” presumably without Gogia’s awareness, “everyone has the same
    goals.” Id. 84.
    There is more evidence of the construction defendants’ plan, too. In November 2009,
    Madan emailed Gogia’s army discharge papers to Narula and other OST staff, letting them know
    that Gogia was “SDVO” and “willing to talk.” ECF No. 330-6 at 2. In late 2009, Narula and Gogia
    held a meeting in OST’s offices to discussing SDVOSB contracting opportunities. P1.’s Facts q
    35. At the same time, 2009 and early 2010, Madan suddenly loaned Gogia $18,000, id. 36, though
    Madan testified that money was for “personal expenses” and that this money was not to set up a
    fraudulent SDVOSB, ECF No. 370-1 436. Whatever the reason for the payment, by J anuary 2010
    Narula, Madan, and Gogia were on an email thread with a CPA, establishing CSG and choosing a
    name. ECF No. 330-6 at 112-17. This evidence is sufficient to raise a triable question of whether
    there was an agreement to defraud the FCA that Narula, Madan, Parekh, Gogia, CSG, and OST
    agreed to defraud the government by submitting false claims and statements. Accordingly, this
    Court will not grant summary judgment to the construction defendants on the conspiracy claim.
    C. The Insurance Defendants Are Entitled To Summary Judgment On All Claims
    The claims brought against the insurance defendants—Hudson, Hanover, Centennial, and
    Schendel—are a different story. The construction defendants could not have filed the allegedly
    fraudulent bid proposals without surety bonds and performance bonds, which Centennial provided
    as “agent and attorney-in-fact for [Hudson] and [Hanover].” Scollick I, 215 F. Supp. 3d at 33. This
    Court previously allowed plaintiff-relator to proceed with presentment and false statement claims
    against the insurance defendants based on a theory of indirect presentment: that while they did not
    directly present false claims or make false statements to the government, their actions led to the
    submission of false claims. United States ex rel. Scollick v. Narula (“Scollick IP’), No. 14-cv-1339
    (RCL), 
    2017 WL 3268857
    , at *14 (D.D.C. July 31, 2017). The Court also allowed plaintiff-relator
    22
    to proceed with a reverse false-claim and conspiracy claim against the insurance defendants. 
    Id.
     at
    #15. Now, with the benefit of a summary judgment record, the Court concludes that no reasonable
    jury could find for the plaintiff-relator on these claims.
    Plaintiff-relator brings presentment and false statement claims against Centennial,
    Schendel (Centennial’s president), Hudson, and Hanover relating to government contracts
    awarded to defendant CSG. Second Am. Compl. 4 215-242. Plaintiff-relator brings two further
    claims: a conspiracy claim against all defendants, 
    id.
     {J 245-260, and a reverse false claim
    violation, pursuant to 
    31 U.S.C. § 3729
    (a)(1)(C), against defendants Hudson and Hanover, Second
    Am. Compl. 79 241-244. A reverse false claim is “any fraudulent conduct that results in no
    payment to the government when a payment is obligated.” Pencheng Si, 71 F. Supp. 3d at 88
    (quoting Hoyte v. Am. Nat'l Red Cross, 
    518 F.3d 61
    , 63 n.1 (D.C. Cir. 2008) (internal quotation
    marks omitted). It occurs whenever a person “knowingly makes, uses, or causes to be made or
    used, a false record or statement material to an obligation to pay or transmit money or property to
    the Government, or knowingly conceals or knowingly and improperly avoids or decreases an
    obligation to pay or transmit money or property to the Government.” 
    31 U.S.C. § 3729
    (a)(1)(G).
    As plaintiff-relator points out, the “most important issue running through all [these claims]
    is the knowledge possessed by the [i]nsurance [d]efendants.” ECF No. 331-1 at 24. But plaintiff-
    relator has produced no evidence permitting a reasonable jury to find that the insurance defendants
    had knowledge of the construction defendants’ fraud—“that they were fraudulently asserting status
    as SDVOSBs.” Scollick II, 
    2017 WL 3268857
    , at *14. Because such knowledge is an essential
    element of ail of the claims brought against the insurance defendants, the Court must grant
    summary judgment in their favor. See Celotex Corp., 
    477 U.S. at 323
    .
    23
    In the context of the FCA, “knowledge” requires either “actual knowledge,” “acting in
    deliberate ignorance,” or “act[ing] in reckless disregard.” United States ex rel. K & R Ltd. P’ship
    v. Mass. Hous. Fin. Agency, 
    530 F.3d 980
    , 983 (D.C. Cir. 2008) (citing 
    31 U.S.C. § 3729
    (b)).
    Actual knowledge is “subjective knowledge,” while deliberate ignorance is “the kind of willful
    blindness from which subjective intent can be inferred” and reckless disregard is “an extension of
    gross negligence, or gross-negligence-plus.” United States v. Speqtrum, Inc., 
    113 F. Supp. 3d 238
    ,
    249 (D.D.C. 2015) (quoting United States ex rel. Hockett v. Columbia/HCA Healthcare Corp., 
    498 F. Supp. 2d 25
    , 57 (D.D.C. 2007)). Again, while scienter is “often a fact-bound inquiry,” summary
    judgment is appropriate when plaintiff provides no evidence to support a finding of knowledge on
    an FCA claim, since knowledge is an essential element of the claim. Hockett, 113 F. Supp. 3d at
    57-8.
    In his complaint, plaintiff-relator alleged that the insurance defendants “obtained facts that
    [they] knew or should have known violated the government’s contracting requirements” and
    “concealed those facts” from the government. Second Am. Compl. 4 204. He alleges that the
    insurance defendants, after touring OST’s offices, knew that CSG was a “shell company.” Jd.
    fj 182-83. Plaintiff-relator argued that if the insurance defendants had done their due diligence,
    must have known that Citibuilders and CSG were fraudulently asserting statuses as SDVOSBs. Jd.
    q 194.
    At the summary judgment stage, however, plaintiff-relator’s evidence of knowledge
    falters. No evidence suggests that the insurance Anew the bids were fraudulent. Accord Scollick I,
    215 F. Supp. 3d at 33-34. There is only evidence that the insurance defendants knew the details
    of the bid proposals and some details of the ownership of CSG. See, e.g., Pl.’s Facts §] 70, 102,
    105, 259. This is insufficient to proceed on a theory of actual knowledge.
    24
    Actual knowledge is not required to maintain an FCA claim, however—deliberate
    indifference or reckless disregard also suffice. United States ex rel. K & R Ltd. P’ship, 
    530 F.3d at 983
    . Plaintiff-relator argues that the insurance defendants recklessly disregarded the truth about
    the construction defendants’ fraud, averring that “[a]ll that was required to have full knowledge of
    the fraud was for the [i]Jnsurance [d]efendants to take the actual knowledge they possessed and
    apply it to the ownership and control regulations applicable to all VA SDVOSB set-aside
    contracts.” ECF No. 331-1 at 29. But this no “simple step,” 
    id.,
     for the insurance defendants. This
    would impose a significant duty on third party insurers to familiarize themselves with VA
    regulations before bonding companies. It is a significant leap in terms of liability. Without facts
    indicating that the insurance defendants knew of the specific SDVOSB requirements, this Court
    will not impose an affirmative duty on insurance and bonding companies to double-check the
    government’s verification.
    Plaintiff-relator argues that the insurance defendants did have a duty to familiarize
    themselves with the VA SDVOSB requirements. ECF No. 331-1 at 29. But the cases he cites are
    inapplicable. In the first, Heckler v. Community Health Services, the Supreme Court broadly stated
    that participants in Medicare have a duty to “familiarize [themselves] with the legal requirements
    for cost reimbursements” because of the general rule that those who “deal with the Government
    are expected to know the law.” 
    467 U.S. 51
    , 63 (1984). But Heckler did not involve questions of
    fraud—the government in that case was allowed to recover funds improperly paid because of
    defendant’s misunderstanding of federal regulations, but the Supreme Court did not impute
    fraudulent intent on the defendants based on their error. 
    Id. at 63-64
    .
    And while there is no doubt that participants in federal programs must familiarize
    themselves with the requirements, the insurance defendants are not “participants” in the federal
    25
    VA SDVOSB program—te construction defendants are. It is the construction defendants who
    are obligated to familiarize themselves with the SDVOSB regulations, because they are dealing
    with and seeking payment from the federal government. For when a defendant is “responsible for
    day-to-day operations, long-term planning, lease and build-out negotiations, personnel, and legal
    and accounting oversight” of a company, he has a duty to “be familiar with the legal requirements
    for obtaining reimbursement . . . [from the government], and to ensure that the [company] was run
    in accordance with all laws.” United States v. Mackby, 
    261 F.3d 821
    , 828 (9th Cir. 2001). This
    duty has always been on the company dealing with the federal government.
    Plaintiff-relator has cited no cases—and the Court can find none—that place this obligation
    on a third-party insurer or bond underwriter. Cf United States v. Speqtrum, Inc., 
    113 F. Supp. 3d 238
    , 240 (D.D.C. 2015) (holding that a company that submitted Medicaid claims could be liable
    because its owner was either aware of the fraud or acted with “reckless disregard); United States
    ex rel. Ervin & Assocs., Inc. v. Hamilton Sec. Grp., Inc., 
    370 F. Supp. 2d 18
    , 41 (D.D.C. 2005)
    (holding that a contractor which submitted false statements related to a note sale had a duty to
    discover potential errors before submitting to the government).
    Plaintiff-relator repeatedly references insurance defendants’ “FCA-imposed duty” to make
    additional inquiries when they encounter “red flags of . . . possible fraud.” See, e.g., ECF No. 359
    at 15-16; ECF No. 360 at 4, 13. But plaintiff-relator fails to acknowledge that without affirmative
    knowledge of SDVOSB regulations or requirements, the facts in question would not raise red flags.
    And while plaintiff-relator argues that the SDVOSB regulations are “simplistic,” ECF No. 359 at
    15, the purported simplicity of the regulations are irrelevant. Plaintiff-relator has tried to construct
    a duty out of thin air: that it “should be incumbent on [the insurance defendants] . . . to have a basic
    familiarity with the concepts behind the SDVOSB regulations.” ECF No. 359 at 16. But plaintiff-
    26
    relator cannot point to any court recognizing this third-party burden for bonding companies, which
    ensure all federal contracts—not just SDVOSB-eligible ones.
    When this Court allowed the claims against the insurance defendants to proceed in Scollick
    II, plaintiff-relator had alleged that the insurance defendants “concealed ne facts from the
    government” that would have revealed the fraud and conducted a tour of OST’s offices which
    should have revealed that CSG “was a shell company.” Scollick IT, 
    2017 WL 3268857
    , at *14. But
    plaintiff-relator’s facts now include no mention of this tour or an awareness that CSG or Centennial
    were “shell” companies. Instead, the facts are closer to what this Court originally dismissed in
    Scollick I. The fact that the insurance defendants “knew the content of the bid proposals” does not
    mean the insurance defendants “knew the content” was fraudulent. Scollick I, 
    2017 WL 3268857
    ,
    at *14 (quoting Scollick I, 215 F. Supp. 3d at 41).
    In sum, plaintiff-relator has failed to proffer evidence that the insurance defendants knew
    of the SDVOSB requirements nor any support for the notion that they had a duty to familiarize
    themselves with those requirements. Because knowledge is a required element of every claim
    against the insurance defendants, this Court will GRANT summary judgment for the insurance
    defendants on all claims.!°
    D. Shobha Mehta Is Entitled To Summary Judgment
    Defendant Dr. Shobha Mehta represents a small part of the purported conspiracy. Plaintiff-
    relator alleges that she assisted CSG when it falsified parts of CB’s past performance as its own.
    Dr. Mehta allegedly asserted in “satisfaction surveys and phone calls that [the] work had been done
    10 Because the Court is granting summary judgment for the insurance defendants, it will only briefly address the
    argument that the public disclosure bar prohibits plaintiff-relator’s claims against the insurance defendants. ECF No.
    335-1 at *23. A court shall dismiss an action if the same allegations or transactions in the claim were publicly
    disclosed, “unless opposed by the [g]overnment.” 
    31 U.S.C. § 3730
    (e)(4)(A). The government here opposed. any
    dismissal based on the public disclosure bar. See ECF No. 350. Accordingly, the public disclosure bar does not warrant
    dismissal here. See United States ex rel. Scutellaro v. Capitol Supply, Inc., No. 10-cv-1094 (BAH), 
    2017 WL 1422364
    ,
    at *12 (D.D.C. Apr. 19, 2017)
    27
    [by CSG] and was ‘exceptional’ or ‘outstanding.’” Scollick I, 
    2017 WL 3268857
    , at *9. Because
    CSG had not done work at Dr. Mehta’s office (instead, CB had performed work), this statement
    was allegedly false. Beyond the false statement claim, plaintiff-relator also maintained a
    conspiracy claim against Dr. Mehta, alleging that one of the CSG conspirators approached her and
    convinced her to submit materially false performance questionnaires. 
    Id.
    Now, Dr. Mehta moves for summary judgment. ECF No. 342. Though she moves pro se,
    the crux of her argument is clear: there were never any phone calls with government contractors
    verifying CSG’s work. Jd. at 5; ECF No. 392 at 2. She never received a VA performance survey
    questionnaire from any government officer. ECF No. 392 at 2. She never verified any false
    information provided in any CSG bid proposals. Jd.
    Plaintiff-relator points to two pieces of evidence as proof that Dr. Mehta either made false
    statements or caused false statements to be submitted. Both are far too scrawny to shoulder the
    heavy weight he places on them. First, plaintiff-relator argues that because Dr. Mehta’s phone
    number was listed as a reference on one bid proposal, the Court could infer that government
    contracting officers did, in fact, contact Dr. Mehta. ECF No. 361 at 9. But this argument piles
    inference on inference—the Court would need to infer that the government contractor chose to call
    references, that the contractor called Dr. Mehta, that Dr. Mehta picked up the phone, and that Dr.
    Mehta gave false statements to the government contractor. This kind of conjecture is
    impermissible. See United States v. Ross, 
    92 U.S. 281
    , 283 (1875) (terming “inferences from
    inferences” to be “nothing more than conjectures”).
    Second, plaintiff-relator points to the fact that Dr. Mehta admitted she “authorized Parekh
    to fill out a performance questionnaire, which she then signed and returned to Parekh.” ECF No.
    361 at 8. That much is true—as Dr. Mehta explained, and plaintiff-relator does not dispute, Parekh
    28
    asked Dr. Mehta certain questions about her satisfaction with him and his workers over the phone,
    then filled out a questionnaire and sent it to her to sign. ECF No. 361 {| 10. The questionnaire was
    in fact a VA performance questionnaire that referenced CSG, not CB. /d. To plaintiff-relator, this
    is enough to prove not only that Dr. Mehta caused false statements to be submitted to the
    government, but that she was involved in a conspiracy to violate the FCA. But the facts on the
    record illustrate that Dr. Mehta was unaware that this performance questionnaire was for the VA.
    ECE No. 361-1 at 30-31. She believed that “Neil and his workers” were “survey[ing] how happy
    [she] was with the work.” Jd. One signature on a form that all parties agree Dr. Mehta did not fill
    out personally is not sufficient to establish liability.
    In sum, despite plaintiff-relator’s protests to the contrary, ECF No. 361 at 7, Dr. Mehta is
    right: there is no evidence that Mehta knowingly submitted false statements. Because plaintiff-
    relator has failed to make a sufficient showing of an essential element of his case—namely,
    whether Dr. Mehta knowingly submitted a false performance questionnaire or gave false
    verification of CSG’s work to a government officer when called—Dr. Mehta’s motion for
    summary judgment will be GRANTED. Celotex Corp., 
    477 U.S. at 323
    .
    E. Hudson’s Partial Motion For Summary Judgment Will Be Denied
    At last, the Court will turn to Hudson’s crossclaim for indemnification. As a condition of
    issuing surety bonds on CSG’s behalf, Hudson required CSG, Citibuilders, CB, OST, Gogia, and
    Parekh to indemnify Hudson against losses, costs, and expenses incurred by Hudson as a result of
    issuing any bonds. ECF No. 336-1 at 2. Now, Hudson moves for partial summary judgment against
    OST, CSG, Gogia, and Parekh to enforce that agreement with respect to the losses and costs
    incurred here. Id. at 9. CSG and Gogia opposed, ECF No. 369, as did OST, ECF No. 365, and
    Hudson replied, ECF No. 376. Parekh did not respond.
    29
    In the General Indemnity Agreement (“GIA”) at issue, crossclaim defendants CSG, OST,
    Gogia, and Parekh agreed to pay Hudson for costs “incurred by [Hudson] by reason of having
    executed any Bond.” ECF No. 336-5 at 2. In Hudson’s view, its claim tums purely on interpretation
    of this phrase. ECF No. 336-1 at 9. Because CSG, OST, Gogia, and Parekh executed the GIA, and
    because Hudson’s argues its liability here “arises from its issuance of the Hudson Bonds,” Hudson
    demands indemnification. Jd. at 10. This Court disagrees.
    Parties in the District of Columbia!! are free to enter indemnification contracts like the
    GIA. Parker v. John Moriarty & Assocs., 
    189 F. Supp. 3d 38
    , 43 (D.D.C. 2016). But that is not
    the end of the inquiry: the D.C. Court of Appeals has explained that an indemnity provision should
    “not be construed to permit an indemnitee to recover for his [or her] own negligence unless the
    court is firmly convinced that such an interpretation reflects the intention of the parties.” W.M.
    Schlosser Co. v. Md. Drywall Co., 
    673 A.2d 647
    , 653 (D.C. 1996) (quoting United States v.
    Seckinger, 
    397 U.S. 203
    , 211 (1970) (alteration in original)). If a party expects to “shift
    responsibility for its negligence” then the “mutual intention of the parties to this effect should
    appear with clarity from the face of the contract.” Jd. The question a court must ask is whether the
    contract provision in question “clearly reflects such a purpose.” Jd. If there is ambiguity as to
    whether the contract intended to provide the type of protection in question, the standard is not
    satisfied. Parker, 189 F. Supp. 3d at 43.
    The alleged scienter in this case is greater—Hudson is accused not of negligence but of
    willfully contributing to a fraudulent conspiracy. Accordingly, to grant Hudson’s summary
    judgment motion here, the Court must determine that the GIA unambiguously and clearly reflects
    the parties’ intent to shift liability for Hudson’s own knowing and willful acts. If the contract is “at
    '! While the GIA lacks a choice of law provision, parties agree that District of Columbia law applies. See ECF No.
    365 at4n.1.
    30
    all ambiguous” on this point, “this standard is not satisfied.” Rivers & Bryan, Inc. v. HBE Corp.,
    
    628 A.2d 631
    , 635 (D.C. 1993). And if the standard is not satisfied, summary judgment must be
    denied.
    The GIA here indemnifies Hudson for all costs “incurred by [Hudson] by reason of having
    executed any Bond.” ECF No. 336-5 at 2 (emphasis added). The Court finds that this language
    does not clearly represent an intent to indemnify Hudson for any and all actions, even the knowing
    illegal acts alleged in plaintiff-relator’s complaint. Costs incurred for allegedly committing illegal
    acts are arguably not costs incurred by “reason” of having executed a bond. To put it another way,
    it is Hudson’s allegedly fraudulent acts beyond the bond, not the execution of the bond itself, that
    incurred costs in that scenario. Though this Court is ultimately dismissing the claims against
    Hudson, plaintiff-relator alleged that Hudson was an active participant in the fraud and knowingly
    continued to issue bonds despite being aware that CSG was not SDVOSB-eligible. Given this
    ambiguity regarding whether these acts are covered by the GIA, the Court cannot say there is no
    genuine dispute that the contract provision “clearly reflects such a purpose.” W.M. Schlosser Co.,
    
    673 A.2d at 653
    .
    In deciding this, the Court rejects the argument Hudson raises in its reply—that OST, CSG,
    and Gogia’s express denial of the existence of fraud in their motions for summary judgment cannot
    be reconciled with their argument that Hudson cannot seek indemnity here. ECF No. 376 at 4. This
    misstates the crossclaim defendants’ arguments. Crossclaim defendants do not argue that Hudson
    actually committed any illegal acts. Instead, they argue that the costs incurred in this litigation
    came “by reason of” plaintiff-relator’s accusations of Hudson’s own willful fraud, not the act of
    executing the CSG bond, and the GIA is ambiguous as to whether such costs are covered. ECF
    31
    No. 365 at 3. This Court agrees. Accordingly, Hudson’s motion for partial summary judgment will
    be DENIED.
    F. Madan, Narula, And OST’s Motions To Strike Portions Of Plaintiff-Relator’s
    Motion For Partial Summary Judgment Will Be Dismissed As Moot
    Madan, Narula, and OST finally move to strike portions of plaintiff-relator’s motion for
    partial summary judgment, ECF Nos. 366 & 367. Specifically, they move to strike the declaration
    of Benjamin Ward. ECF No. 366 at 1. Plaintiff-relator opposes this motion. ECF No. 385. Because
    this Court’s analysis that there is a genuine dispute of material fact regarding the construction
    defendants is not altered by the inclusion or exclusion of Ward’s testimony, the Court will
    DISMISS this motion to strike AS MOOT.
    IV. CONCLUSION
    Plaintiff-relator and the construction defendants present a tangled web of facts and
    conflicting characterizations that can only be resolved by a jury. Accordingly, this Court will:
    ¢ GRANT Centennial and Schendel’s motion, ECF No. 328, for
    summary judgment against plaintiff-relator and DISMISS all claims
    against Centennial and Schendel;
    ¢ DENY plaintiff-relator’s motion, ECF No. 329, for partial summary
    judgment against CSG and Gogia;
    ¢ DENY plaintiff-relator’s motion, ECF No. 330, for partial summary
    judgment against OST, Narula, and Madan;
    ¢ DENY plaintiff-relator’s motion, ECF No. 331, for partial summary
    judgment against Centennial, Schendel, Hanover, and Hudson;
    e DENY plaintiff-relator’s motion, ECF No. 332, for partial summary
    judgment against Parekh;
    ¢ GRANT Hanover’s motion, ECF No. 334, for summary judgment
    against plaintiff-relator and DISMISS all claims against Hanover;
    ¢ GRANT Hudson’s motion, ECF No. 335, for summary judgment
    against plaintiff-relator and DISMISS all claims against Hudson;
    32
    e DENY Hudson’s motion, ECF No. 336, for partial summary
    judgment on its crossclaims for indemnification;
    e DENY OST, Narula, and Madan’s motion, ECF No. 337, for
    summary judgment against plaintiff-relator;
    e DENY CSG and Gogia’s motion, ECF No. 338, for summary
    judgment, against plaintiff-relator;
    e DENY Parekh’s motion, ECF No. 341, for summary judgment
    against plaintiff-relator;
    e GRANT Mehta’s motion, ECF No. 342, for summary judgment
    against plaintiff-relator and DISMISS all claims against Mehta; and
    e DISMISS AS MOOT Madan, Narula, and OST’s motion, ECF
    Nos. 366 & 367, to strike portions of the record.
    A separate Order will be filed with this memorandum opinion.
    Date: July /# , 2022 “eres CQ Konbeli
    Hon. Royce C. Lamberth
    United States District Judge
    33