Gulf Restoration Network v. Zinke ( 2020 )


Menu:
  •                                 UNITED STATES DISTRICT COURT
    FOR THE DISTRICT OF COLUMBIA
    _______________________________________
    )
    GULF RESTORATION NETWORK, et al.,                 )
    )
    Plaintiffs,            )
    )
    v.                                        )
    )
    DAVID BERNHARDT, in his official capacity )
    as Secretary of the United States Department      )
    1
    of the Interior, et al.,                          )
    )   Civil Action No. 18-1674 (RBW)
    Defendants,            )
    )
    and                              )
    )
    AMERICAN PETROLEUM INSTITUTE,                     )
    et al.,                                           )
    )
    Intervenor-Defendants. )
    _______________________________________)
    MEMORANDUM OPINION
    The plaintiffs, Gulf Restoration Network, Sierra Club, and the Center for Biological
    Diversity (collectively, the “plaintiffs”), filed this civil action for declaratory and injunctive relief
    against the United States Department of the Interior (the “Department”); David Bernhardt, in his
    official capacity as the Secretary of the Interior (the “Secretary”); Casey Hammond, in his
    official capacity as the Acting Assistant Secretary of Land and Minerals Management; and the
    Bureau of Ocean Energy Management (“BOEM”) (collectively, the “federal defendants”),
    “challeng[ing] the [allegedly] unlawful decisions by [the federal defendants] . . . to hold Offshore
    Lease Sale[] 250 [(‘Lease Sale 250’)] and [Offshore Lease Sale] 251 [(‘Lease Sale 251’)] in the
    Gulf of Mexico in reliance on arbitrary environmental analyses” pursuant to the National
    1
    Casey Hammond is substituted for Joseph R. Ballash as the proper party defendant pursuant to Federal Rule of
    Civil Procedure 25(d).
    Environmental Policy Act (“NEPA”), 42 U.S.C. §§ 4321–4370m-12 (2018), and the
    Administrative Procedure Act (“APA”), 5 U.S.C. §§ 701–706 (2018). Complaint for
    Declaratory and Injunctive Relief (“Compl.” or the “Complaint”) ¶ 1. The American Petroleum
    Institute (“API”) and Chevron U.S.A. Inc. (“Chevron”) (collectively, the “intervenor-
    defendants”) join the federal defendants in defending this action. Currently pending before the
    Court are (1) the Plaintiffs’ Motion for Summary Judgment and Request for a Hearing (“Pls.’
    Mot.”), (2) the Federal Defendants’ Cross-Motion for Summary Judgment and Opposition to
    Plaintiffs’ Motion for Summary Judgment (“Fed. Defs.’ Mot.”), (3) the American Petroleum
    Institute’s Cross-Motion for Summary Judgment (“API’s Mot.”), and (4) Chevron U.S.A. Inc.’s
    Cross-Motion for Summary Judgment (“Chevron’s Mot.”). Upon careful consideration of the
    parties’ submissions,2 the Court concludes for the following reasons that it must deny the
    plaintiffs’ motion for summary judgment and grant the federal defendants’ and the intervenor-
    defendants’ (collectively, the “defendants”) cross-motions for summary judgment.
    2
    In addition to the filings already identified, the Court considered the following submissions in rendering its
    decision: (1) the Motion of the American Petroleum Institute for Leave to Intervene as a Defendant (“API’s Mot. to
    Intervene”); (2) the Defendants’ Answer to Plaintiffs’ Complaint (“Fed. Defs.’ Answer”); (3) Chevron U.S.A. Inc.’s
    Motion to Intervene in Support of Defendants (“Chevron’s Mot. to Intervene”); (4) the [Proposed] Answer,
    Defenses, and Affirmatives Defenses of Defendant-Intervenor American Petroleum Institute (“API’s Answer”);
    (5) Chevron U.S.A. Inc.’s Proposed Answer, Defenses, and Affirmative Defenses to Plaintiffs’ Complaint for
    Declaratory and Injunctive Relief (“Chevron’s Answer”); (6) the Plaintiffs’ Memorandum in Support of Their
    Motion for Summary Judgment (“Pls.’ Mem.”); (7) the Memorandum of the American Petroleum Institute in
    Opposition to Plaintiffs’ Motion for Summary Judgment, and in Support of Its Cross-Motion for Summary
    Judgment (“API’s Mem.”); (8) Chevron U.S.A. Inc.’s Memorandum of Points and Authorities in Support of Cross-
    Motion for Summary Judgment and Opposition to Plaintiffs’ Motion for Summary Judgment (“Chevron’s Mem.”);
    (9) the Plaintiffs’ Opposition to Federal Defendants’ and Intervenor-Defendants’ Cross-Motions for Summary
    Judgment and Reply in Support of Plaintiffs’ Motion for Summary Judgment (“Pls.’ Reply”); (10) the Federal
    Defendants’ Reply in Support of Their Cross-Motion for Summary Judgment (“Fed. Defs.’ Reply”); (11) the Reply
    Memorandum of the American Petroleum Institute in Support of Its Cross-Motion for Summary Judgment (“API’s
    Reply”); (12) Chevron U.S.A. Inc.’s Reply in Support of Cross-Motion for Summary Judgment (“Chevron’s
    Reply”); and (13) the Appendix of Administrative Record Citations (“AR”).
    2
    I.     BACKGROUND
    A.     Statutory and Regulatory Background
    1.      The NEPA
    Congress enacted the NEPA for the purpose of “promot[ing] efforts which will prevent or
    eliminate damage to the environment and biosphere[.]” 42 U.S.C. § 4321; see also
    id. § 4371.
    To advance these objectives, the NEPA provides that a federal agency shall include, inter alia,
    in every recommendation or report on . . . major [f]ederal actions significantly
    affecting the quality of the human environment, a detailed statement by the
    responsible official on—(i) the environmental impact of the proposed action,
    (ii) any adverse environmental effects which cannot be avoided should the proposal
    be implemented, [and] (iii) alternatives to the proposed action[.]
    Id. § 4332(C).
    This statement is commonly referred to as an environmental impact statement
    (“EIS”). See Oceana v. Bureau of Ocean Energy Mgmt., 
    37 F. Supp. 3d 147
    , 151 (D.D.C. 2014).
    The pertinent regulations implemented pursuant to this provision of the NEPA require the
    agency to prepare a programmatic EIS in certain circumstances. See 40 C.F.R. § 1508.25. A
    supplement to the programmatic EIS is required when either “the agency makes substantial
    changes in the proposed action that are relevant to environmental concerns[,]”
    id. § 1502.9(c)(1)(i),
    or “[t]here are significant new circumstances or information relevant to
    environmental concerns and bearing on the proposed action or its impacts[,]”
    id. § 1502.9(c)(1)(ii).
    Where NEPA analysis is required, its role is primarily information-forcing . . . . It
    is now well-established that [the] NEPA imposes only procedural requirements on
    federal agencies with a particular focus on requiring agencies to undertake analyses
    of the environmental impact of their proposals and actions. It is equally clear that
    [the] NEPA does not impose a duty on agencies to include in every EIS a detailed
    explanation of specific measures which will be employed to mitigate the adverse
    impacts of a proposed action.
    3
    Indian River Cty., Fla. v. U.S. Dep’t of Transp., 
    945 F.3d 515
    , 522 (D.C. Cir. 2019). Thus,
    “because [the] NEPA’s requirements are ‘essentially procedural,’ the statute does ‘not mandate
    particular substantive environmental results.’ Instead, [the] NEPA ‘focus[es] Government and
    public attention on environmental effects of proposed agency action.’”
    Id. at 522–23
    (fourth
    alteration in original) (citation omitted) (quoting Theodore Roosevelt Conservation P’ship v.
    Salazar, 
    661 F.3d 66
    , 68 (D.C. Cir. 2011)). The NEPA requirements “simply . . . ensure that the
    agency has adequately considered and disclosed the environmental impacts of its actions.”
    Id. at 523
    (alteration in original) (quoting WildEarth Guardians v. Jewell, 
    738 F.3d 298
    , 308 (D.C. Cir.
    2013)).
    2.     The Outer Continental Shelf Lands Act
    “The Outer Continental Shelf is an area of submerged lands, subsoil, and seabed that lies
    between the outer seaward reaches of a state’s jurisdiction and that of the United States.” Ctr.
    for Biological Diversity v. U.S. Dep’t of the Interior, 
    563 F.3d 466
    , 472 (D.C. Cir. 2009). The
    Outer Continental Shelf Lands Act (“OCSLA”), 43 U.S.C. §§ 1331–1356b (2018), “establishes a
    procedural framework under which [the] [Department] may lease areas of the [Outer Continental
    Shelf] for purposes of exploring and developing the oil and gas deposits of the [Outer
    Continental Shelf’s] submerged lands.”
    Id. The OCSLA’s
    mandate that [the] [Department] manage mineral leases in the Outer
    Continental Shelf encompasses four distinct stages of regulatory responsibility:
    (1) formulation of a five year leasing plan by the Department . . . ; (2) lease sales;
    (3) exploration by lessees; [and] (4) development and production. Each stage
    involves separate regulatory review[,] and it is well established that [the] NEPA’s
    requirements apply of their own force to each stage of the OCSLA regulatory
    process.
    Ctr. for Biological Diversity v. Zinke, 
    260 F. Supp. 3d 11
    , 18 (D.D.C. 2017) (fourth and fifth
    alterations in original) (citation and internal quotation marks omitted). Relevant to this case,
    4
    “during the lease-sale stage, [the] [Department] solicits bids and issues leases for particular
    offshore leasing areas.” Ctr. for Biological 
    Diversity, 563 F.3d at 473
    (citing 43 U.S.C.
    § 1337(a)).
    B.     Factual Background
    1.      The Parties
    The plaintiffs are three environmental non-profits and networks, see Compl. ¶¶ 13–15;
    cf. Fed. Defs.’ Answer ¶¶ 13–15; API’s Answer ¶¶ 13–15; Chevron’s Answer ¶¶ 13–15, and the
    federal defendants are the agencies and officials charged with administering lease sales under the
    OCSLA, see Compl. ¶¶ 17–20; Fed. Defs.’ Answer ¶¶ 17–20; API’s Answer ¶¶ 17–20;
    Chevron’s Answer ¶¶ 17–20. Specifically, (1) the Department is “the federal department with
    authority, through the Secretary, under [the] OCSLA to hold lease sales for oil and gas rights on
    the Outer Continental Shelf and to issue leases[,]” Compl. ¶ 19; cf. Fed. Defs.’ Answer ¶ 19;
    API’s Answer ¶ 19; Chevron’s Answer ¶ 19; (2) the Secretary “is the chief officer of the
    Department . . . charged with overseeing the proper administration and implementation of the . . .
    OCSLA[,]” Compl. ¶ 17; cf. Fed. Defs.’ Answer ¶ 17; API’s Answer ¶ 17; Chevron’s Answer
    ¶ 17; (3) the BOEM “is the federal agency within the Department . . . to which the Secretary has
    delegated authority under [the] OCSLA to hold lease sales for oil and gas rights on the Outer
    Continental Shelf[,]”
    id. ¶ 20;
    cf. Fed. Defs.’ Answer ¶ 20; API’s Answer ¶ 20; Chevron’s
    Answer ¶ 20; and (4) the Assistant Secretary of Land and Minerals Management “is the official
    to whom the Secretary delegated authority to sign records of decision to hold lease sales under
    [the] OCSLA[,]”
    id. ¶ 18;
    cf. Fed. Defs.’ Answer ¶ 18; API’s Answer ¶ 18; Chevron’s Answer
    ¶ 18. API is a “trade association of the oil and natural gas industry[,]” whose “members are
    deeply engaged in the exploration for and development of offshore oil and gas resources as
    5
    leaseholders, lease operators, and service companies, including in the Gulf of Mexico.” API’s
    Mot. to Intervene at 2. Chevron “conducts operations in the [Outer Continental Shelf] in the
    Gulf of Mexico and has participated in a number of lease sales, including the [l]ease [s]ales
    challenged in the Complaint.” Chevron’s Mot. to Intervene at 4.
    2.      Lease Sales 250 and 251
    In November 2016, the Department began developing the 2017–2022 Five Year Outer
    Continental Shelf Leasing Program (the “2017–2022 program”), which proposed “a schedule of
    [eleven] potential lease sales in four [Outer Continental Shelf] planning areas[,] [including] ten
    sales in the [Gulf of Mexico] Program Area.” AR 4269. Lease Sales 250 and 251, the subjects
    of the plaintiffs’ legal challenge, were included in the 2017–2022 program proposed lease sale
    schedule. See AR 4269. On January 19, 2017, the Department approved the 2017–2022
    program. See Record of Decision for the 2017–2022 Outer Continental Shelf Oil and Gas
    Leasing Program Final Programmatic Environmental Impact Statement; MMAA104000, 82 Fed.
    Reg. 6643, 6643 (Jan. 19, 2017). The BOEM prepared three EISs in connection with Lease
    Sales 250 and 251: (1) the Outer Continental Shelf Oil and Gas Leasing Program: 2017–2022
    Final Programmatic EIS (the “Programmatic EIS”), see AR 14,242–15,179, which was issued in
    November 2016, see AR 14,242; (2) the Gulf of Mexico OCS Oil and Gas Lease Sales:
    2017–2022 Gulf of Mexico Lease Sales 249, 250, 251, 252, 253, 254, 256, 257, 259, and 261
    Final Multistate EIS (the “Multistate EIS”), see AR 5417–7274, which was issued in March
    2017, see AR 5419; and (3) the Gulf of Mexico OCS Lease Sale Final Supplemental
    Environmental Impact Statement 2018 (the “Supplemental EIS”), see AR 15,471–16,365, which
    was issued in December 2017, see AR 15,473. “The Supplemental EIS tier[ed] from and
    update[d] the . . . Multistate EIS[] and incorporate[d] by reference all of the relevant material in
    6
    the . . . Multistate EIS.” AR 15,475. The BOEM considered the information in the EISs and
    subsequently decided to proceed with Lease Sales 250 and 251. See AR 1635–42, 16,891–99.
    The then-Assistant Secretary of Land and Minerals Management issued the record of decision
    for Lease Sale 250 on February 8, 2018, see AR 1642, and the record of decision for Lease Sale
    251 on June 28, 2018, see AR 16,899. Lease Sale 250 was held on March 21, 2018, see AR
    1642, and Lease Sale 251 was held on August 15, 2018, see AR 16,899. The plaintiffs take issue
    with certain aspects of the EISs that the BOEM relied upon in making its decision to hold Lease
    Sales 250 and 251, namely, (1) the no action alternative, (2) the Bureau of Safety and
    Environmental Enforcement (“BSEE”) safety rules, and (3) the royalty rate. See Pls.’ Mem. at
    23–45. The Court will discuss each in turn.
    a.     The No Action Alternative
    The Supplemental EIS “contains analyses of the potential environmental impacts that
    could result from a proposed regionwide lease sale in the Gulf of Mexico as scheduled in the
    2017–2022 . . . program[,]” AR 15,551, to “inform decisions for . . . [L]ease [S]ales [250 and
    251] scheduled in 2018[,]” AR 15,552. The Supplemental EIS contains an alternatives section
    “outlining the alternatives that [were] considered for th[e] environmental analysis.” AR 15,553.
    The alternatives section includes five alternatives: Alternatives A, B, C, D, and E. See AR
    15,553–60 (discussing Alternatives A to E). Relevant to the plaintiffs’ challenge are
    Alternatives A and E. “Alternative A [ ] allow[s] for a proposed regionwide lease sale
    encompassing all three planning areas within the [United States] portion of the Gulf of Mexico
    [Outer Continental Shelf][,]” AR 15,553, while Alternative E (the “no action alternative”) is “the
    cancellation of a single proposed [Gulf of Mexico] lease sale within the 2017–2022 [ ]
    [p]rogram[,]” AR 15,559. The no action alternative states:
    7
    The opportunity for development of the estimated oil and gas that could have
    resulted from a proposed action (i.e., a single proposed lease sale) or alternative to
    the proposed action, as described above, would be precluded or postponed to a
    future lease sale. Any potential environmental impacts resulting from a proposed
    lease sale would not occur. Activities related to previously issued leases and
    permits (as well as those that may be issued in the future under a separate decision)
    related to the [Outer Continental Shelf] Oil and Gas Program would continue. If a
    lease sale were to be cancelled, the resulting development of oil and gas would most
    likely be postponed to a future lease sale; therefore, the cumulative level of [Outer
    Continental Shelf] oil- and gas related activity would only be reduced by a small
    percentage, if any. Therefore, the cancellation of a proposed lease sale would not
    significantly change the environmental impacts of overall [Outer Continental Shelf]
    oil- and gas-related activity.
    AR 15,559–60.
    b.      The BSEE Safety Rules
    In 2016, the BSEE3 implemented two offshore safety regulations: (1) the Oil and Gas and
    Sulphur Operations in the Outer Continental Shelf—Blowout Preventer Systems and Well
    Control rule (the “Well Control Rule”), which “focuses on blowout preventer and well-control
    requirements,” Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Blowout
    Preventer Systems and Well Control, 81 Fed. Reg. 25,887, 25,888 (Apr. 29, 2016), and (2) the
    Oil and Gas and Sulphur Operations on the Outer Continental Shelf—Oil and Gas Production
    Safety Systems rule (the “Production Safety Rule”), which “amend[ed] and update[ed] the
    regulations regarding oil and natural gas production safety on the Outer Continental Shelf[,]” Oil
    and Gas and Sulphur Operations on the Outer Continental Shelf—Oil and Gas Production Safety
    Systems, 81 Fed. Reg. 61,833, 61,834 (Sept. 7, 2016) (collectively, the “safety rules”).
    On December 29, 2017, the BSEE proposed to amend the Production Safety Rule “to
    amend, revise, or remove current regulatory provisions that create[d] unnecessary burden on
    stakeholders while maintaining or advancing the level of safety and environmental protection.”
    3
    The BSEE is a bureau within the Department, separate from the BOEM, which “is responsible for lease operations,
    safety, and enforcement.” AR 27,101.
    8
    Oil and Gas and Sulphur Operations on the Outer Continental Shelf—Oil and Gas Production
    Safety Systems—Revisions, 82 Fed. Reg. 61,703, 61,703 (Dec. 29, 2017). The BSEE finalized
    the amendments to the Production Safety Rule on September 28, 2018, which became effective
    on December 27, 2018. See Oil and Gas and Sulphur Operations on the Outer Continental
    Shelf—Oil and Gas Production Safety Systems, 83 Fed. Reg. 49,216, 49,216 (Sept. 28, 2018)
    (“Revised Production Safety Rule”). On May 11, 2018, the BSEE proposed to amend the Well
    Control Rule to “revise requirements for well design, well control, casing, cementing, real-time
    monitoring [ ], and subsea containment” “to ensure safety, while correcting errors and reducing
    certain unnecessary regulatory burdens imposed under the existing regulations.” Oil and Gas
    and Sulphur Operations in the Outer Continental Shelf—Blowout Preventer Systems and Well
    Control Revisions, 83 Fed. Reg. 22,128, 22,218 (May 11, 2018). The BSEE finalized the
    amendments to the Well Control Rule on May 15, 2019, which became effective on July 15,
    2019. See Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Blowout
    Preventer Systems and Well Control Revisions, 84 Fed. Reg. 21,908, 21,908 (May 15, 2019)
    (“Revised Well Control Rule”). The BOEM “conducted its [ ] [EISs] with the 2016 . . .
    Production Safety [ ] Rule and the 2016 Well Control Rule in place[,]” AR 4133, despite the fact
    that it was “aware of the changing regulations under a new administration[,]” AR 16,347 (in
    response to a public comment on the draft Supplemental EIS regarding the BSEE’s proposed
    amendments to the Well Control and Production Safety Rules, stating that the “BOEM [was]
    aware of changing regulations under a new administration[,]” but that “the analysis conducted
    for the 2018 lease sale was performed under the current 2017–2022 [ ] [p]rogram” and “[t]he
    information used to conduct these analyses was the best available information at that time”).
    After the amendments to the Production Safety and Well Control Rules were proposed, but
    9
    before they were finalized, the “BOEM [ ] determined that the proposed changes to the 2016 . . .
    Production Safety [] Rule and the 2016 Well Control . . . Rule d[id] not change the conclusions
    of the . . . Supplemental EIS because the changes to the rules leave critical safety provisions
    intact.” AR 4133.
    Additionally, in February 2017, the United States Government Accountability Office
    (“GAO”) issued a report evaluating “[thirty-two] high-risk areas[,]” HIGH-RISK SERIES:
    Progress on Many High-Risk Areas, While Substantial Efforts Needed on Others, U.S. Gov’t
    Accountability Office (Feb. 2017), https://www.gao.gov/assets/690/682765.pdf (the “GAO
    report”),4 including the “management of federal oil and gas resources[,]” AR 27,101
    (capitalization removed). The GAO report stated that the BSEE “had undertaken various reform
    efforts since its creation in 2011, but had not fully addressed deficiencies in its investigative,
    environmental compliance, and enforcement capabilities identified by investigations after the
    Deepwater Horizon incident.”5 AR 27,102. Specifically, the GAO report found that the
    “BSEE’s ongoing restructuring has made limited progress in enhancing its enforcement
    capabilities” because the “BSEE has not developed procedures with criteria to guide how it uses
    enforcement tools—such as warnings and fines—which are among the goals of [the] BSEE’s
    restructuring[.]” AR 27,103. “To address risk of the effectiveness of [the] BSEE’s
    investigations, . . [the GAO] recommended that [the] BSEE complete policies outlining the
    responsibilities of investigations, environmental compliance, and enforcement programs, and
    4
    The Court takes judicial notice of the full GAO report, which is published on the GAO’s website, as the
    administrative record contains only excerpted portions of the report. See Farrell v. Tillerson, 
    315 F. Supp. 3d 47
    , 54
    n.3 (D.D.C. 2018) (Walton, J.) (“[C]ourts in this jurisdiction have frequently taken judicial notice of information
    posted on official public websites of government agencies.” (alteration in original) (quoting United States ex rel.
    Groat v. Boston Heart Diagnostics Corp., 
    255 F. Supp. 3d 13
    , 24 n.7 (D.D.C. 2017) (Walton, J.)).
    5
    “On April 20, 2010, the Deepwater Horizon drilling rig exploded in the Gulf of Mexico, resulting in [eleven]
    deaths, serious injuries, and the largest marine life oil spill in [United States] history.” AR 27,101.
    10
    update and develop procedures to guide them.” AR 27,104. In response to concerns raised in a
    public comment on the draft Supplemental EIS by the plaintiffs regarding the effectiveness of the
    BSEE’s purportedly “insufficient regulatory oversight of the offshore oil and gas industry[,]” AR
    16,347, the BOEM responded that the GAO’s “report concerning [the] BSEE’s operations are
    outside the scope of th[e] Supplemental EIS because [the] BSEE’s operations are outside of the
    leasing process.” AR 16,346–47.
    c.      The Royalty Rate
    In March 2008, the BOEM set the royalty rate for “[Gulf of Mexico] leases in all water
    depths . . . [at] 18.75%.” AR 10. On June 27, 2017, the then-Acting Assistant Secretary of Land
    and Minerals Management “set the royalty rate for [Gulf of Mexico] leases situated in less than
    200 meters of water at 12.5% [ ] for [ ] lease sale[s] and maintain[ed] the royalty rate for leases
    situated in 200 meters of water and deeper at 18.75[%] [ ].” AR 9. Although “the lower royalty
    rate in shallow water [was] expected to increase activity[,]” AR 10, the BOEM represented that
    “given that shallow water comprises a small percentage of aggregate [Gulf of Mexico]
    production, leasing activity, and revenues, the aggregate impacts of this change are expected to
    be minimal[,]” AR 7. Despite the change in the royalty rate for shallow waters, the EISs
    prepared by the BOEM, including the Supplemental EIS, which was issued in December 2017
    after the royalty rate change, see AR 15,473, forecasted lease sale activity using the higher
    18.75% royalty rate, cf. AR 4132. In response to a concern raised by one of the plaintiffs
    regarding “the reduction of the royalty rate from 18.75% to 12.5% for leases situated in water
    depths less than 200 meters[,]” AR 16,580, the BOEM thereafter “reanalyzed the forecasted oil
    and gas exploration, discovery, development, and production activity expected from a proposed
    sale lease following the reduction in royalty rates from 18.75% to 12.5% for leases in water 200
    11
    meters or less[,]” AR 4132. The “BOEM [ ] verified the activity level in any forecasted year
    resides well within the margin of error taken into account” in the Supplemental EIS and
    “determined that the impact analysis conducted in the . . . Supplemental EIS, and documents
    from which it tiered, remain[ed] valid[,] even assuming some leases [were] issued with a 12.5%
    shallow water royalty rate.” AR 4132. The BOEM based its conclusion on an evaluation by the
    BOEM’s Office of Resource Evaluation, “us[ing] a series of spreadsheet-based models to
    estimate the range of anticipated oil and natural gas production volumes and associated levels of
    exploration, development[,] and decommissioning activity on a per lease sale basis.” AR 16,581.
    The spreadsheet-based models utilized “[h]istorical lease sale specific leasing activity and trends,
    number of discoveries, discovery volumes and production volumes, drilling activity and trends,
    platform installations and decommissioning activity, oil and gas prices[,] and activity costs[,]”
    and “[t]he resulting forecast [was] analyzed and compared to actual historical data to [e]nsure
    that historical precedent and recent trends [we]re reflected in each activity forecast.” AR 16,581.
    3.      This Litigation
    On July 16, 2018, shortly after the record of decision for Lease Sale 251 was issued, see
    AR 16,899 (indicating that the record of decision for Lease Sale 251 was issued on June 28,
    2018), the plaintiffs initiated this civil action against the federal defendants, see Compl. at 1.
    The intervenor-defendants subsequently moved to intervene in support of the federal defendants,
    and the Court granted both of their motions to intervene. See Order at 13 (Dec. 7, 2018), ECF
    No. 35. The plaintiffs thereafter filed their motion for summary judgment, see generally Pls.’
    Mot., and the federal defendants and the intervenor-defendants filed their cross-motions for
    summary judgment, see generally Fed. Defs.’ Mot.; API’s Mot.; Chevron’s Mot. These motions
    are the subjects of this Memorandum Opinion.
    12
    II.     STANDARD OF REVIEW
    “A party is entitled to summary judgment “if the movant shows that there is no genuine
    dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Fed.
    R. Civ. P. 56(a).
    The “NEPA lack[s] a specific statutory review provision and, consequently, challenges
    alleging violations of th[is] statute are brought pursuant to the APA.” Am. Wild Horse
    Campaign v. Bernhardt, __ F. Supp. 3d __, __, Civ. Action No. 18-1529 (BAH), 
    2020 WL 736772
    , at *6 (D.D.C. Feb. 13, 2020); see Indian River 
    Cty., 945 F.3d at 527
    (explaining that
    “judicial review under . . . [the NEPA] is governed by the APA” because the NEPA does not
    “suppl[y] a private right of action”). In the APA context, summary judgment is the mechanism
    for deciding whether, as a matter of law, an agency action is supported by the administrative
    record and is otherwise consistent with the APA standard of review. See, e.g., Citizens to
    Preserve Overton Park, Inc. v. Volpe, 
    401 U.S. 402
    , 415–16 (1971), abrogated on other grounds
    by Califano v. Sanders, 
    430 U.S. 99
    (1977). But, due to the limited role a district court plays in
    reviewing the administrative record, the typical summary judgment standards set forth in Federal
    Rule of Civil Procedure 56 are not applicable. See Stuttering Found. of Am. v. Springer, 498 F.
    Supp. 2d 203, 207 (D.D.C. 2007). Rather, “[u]nder the APA, it is the role of the agency to
    resolve factual issues to arrive at a decision that is supported by the administrative record,
    whereas ‘the function of the district court is to determine whether or not as a matter of law the
    evidence in the administrative record permitted the agency to make the decision it did.’”
    Id. (quoting Occidental
    Eng’g Co. v. Immigration & Naturalization Serv., 
    753 F.2d 766
    , 769–70
    (9th Cir. 1985)). In other words, “when a party seeks review of agency action under the APA,
    the district judge sits as an appellate tribunal[,]” and “[t]he entire case on review is a question of
    13
    law.” Am. Bioscience, Inc. v. Thompson, 
    269 F.3d 1077
    , 1083 (D.C. Cir. 2001) (internal
    quotation marks omitted).
    The APA “sets forth the full extent of judicial authority to review executive agency
    action for procedural correctness.” Fed. Commc’ns Comm’n v. Fox Television Stations, Inc.,
    
    556 U.S. 502
    , 513 (2009). It requires district courts to “hold unlawful and set aside agency
    action, findings, and conclusions” that are “arbitrary, capricious, an abuse of discretion, or
    otherwise not accordance with law[.]” 5 U.S.C. § 706(2)(A). However, “the scope of review
    under the arbitrary and capricious standard is narrow and a [district] court will not substitute its
    judgment for that of the agency.” Motor Vehicles Mfrs. Ass’n of U.S., Inc. v. State Farm Mut.
    Auto Ins. Co., 
    463 U.S. 29
    , 43 (1983) (internal quotation marks omitted); see Citizens to
    Preserve Overton 
    Park, 401 U.S. at 416
    (“Although this inquiry into the facts is to be searching
    and careful, the ultimate standard of review is a narrow one.”). Nonetheless, “the agency must
    examine the relevant data and articulate a satisfactory explanation for its action including a
    ‘rational connection between the acts found and the choice made.’” State Farm Mut. Auto. Ins.
    
    Co., 463 U.S. at 43
    (quoting Burlington Truck Lines v. United States, 
    371 U.S. 156
    , 168 (1962)).
    A district court must uphold an agency decision “so long as the agency ‘engaged in reasoned
    decisionmaking and its decision is adequately explained and supported by the record.’” Clark
    Cty., Nev. v. Fed Aviation Admin., 
    522 F.3d 437
    , 441 (D.C. Cir. 2008) (quoting N.Y. Cross
    Harbor R.R. v. Surface Transp. Bd., 
    374 F.3d 1177
    , 1181 (D.C. Cir. 2004)).
    III.    ANALYSIS
    The plaintiffs argue that summary judgment should be awarded to them because the
    BOEM (1) “irrationally and unlawfully assumed that the same environmental effects would
    occur even if it did not hold the lease sales[,]” Pls.’ Mem. at 23 (capitalization removed), and
    14
    (2) “failed to rationally assess the effects of the lease sales on the environment[,]”
    id. at 32
    (capitalization removed). The federal defendants counter that summary judgment should be
    awarded to the defendants because (1) the “BOEM complied with 40 C.F.R. § 1502.14 by
    considering the alternative of no action[,]” Fed. Defs.’ Mem. at 8 (capitalization removed), and
    (2) the “BOEM took a hard look at the effects of the lease sales on the environment, as required
    by [the] NEPA[,]”
    id. at 12.
    The intervenor-defendants join the federal defendants’ arguments,
    see API’s Mem. at 6–10; Chevron’s Mem. at 3–11, and further argue that summary judgment
    should be awarded to the defendants because, even if the plaintiffs prevail on their claims, they
    “have failed to show the appropriate balance of equities and public interests necessary to
    establish an entitlement to the vacatur or injunctive relief they seek[,]” API’s Mem. at 13; see
    Chevron’s Mem. at 12.
    The Court will first address whether the BOEM satisfied its obligations under the NEPA.
    Specifically, the Court will consider (1) whether the BOEM considered a true no action
    alternative and (2) whether the BOEM took a hard look at the effects of Lease Sales 250 and 251
    on the environment. Then, if the Court concludes that the BOEM did not satisfy its NEPA
    obligations, the Court will address whether the plaintiffs have established that they are entitled to
    the relief that they seek.
    A.      Whether the BOEM Considered a True No Action Alternative
    The plaintiffs argue that the federal defendants “irrationally and unlawfully assumed that
    the same environmental effects would occur even if it did not hold the lease sales[,]” Pls.’ Mem.
    at 23 (capitalization removed), because the “BOEM failed to evaluate a true no action alternative
    by assuming the same leases and resulting development would occur in the future[,]”
    id. at 25
    (capitalization removed), and “irrationally assumed that future leasing would result in the same
    15
    effects under the no action alternative[,]”
    id. at 27
    (capitalization removed). The federal
    defendants respond that the “BOEM’s explanation [in the no action alternative] is consistent with
    its historical experience regarding reasonably foreseeable activities in the Gulf of Mexico”
    because it accounts for the facts that “leases issued under prior sales will continue to have
    impacts and periodic lease sales will likely occur in the foreseeable future.” Fed. Defs.’ Mem. at
    8–9.
    An EIS “should present the environmental impacts of the proposal and the alternatives of
    comparative form [(the ‘alternatives section’)], thus sharply defining the issues and providing a
    clear basis for choice among options by the decisionmaker and the public.” 40 C.F.R. § 1502.14.
    The alternatives section “is at the heart of the [EIS].”
    Id. The alternatives
    section must
    “[i]nclude the alternative of no action.”
    Id. § 1502.14(d).
    The Council on Environmental Quality[6] has provided some guidance as to what
    the [n]o [a]ction [a]lternative discussion should include: [I]n instances involving
    federal decisions on proposals for projects[,] [n]o action . . . would mean the
    proposed activity would not take place and the resulting environmental effects from
    taking no action would be compared with the effects of permitting the proposed
    activity or an alternative activity to go forward. Where a choice of no action by the
    agency would result in predicable actions by others, this consequence of the no
    action alternative should be included in the analysis. For example, if denial of
    permission to build a railroad to a facility would lead to construction of a road and
    increased truck traffic, the EIS should analyze this consequence of the no action
    alternative.
    Hammond v. Norton, 
    370 F. Supp. 2d 226
    , 241 (D.D.C. 2005) (fifth, sixth, and eighth alterations
    in original) (internal quotation marks omitted).
    As the federal defendants correctly note, another member of this Court, when
    “[p]resented with nearly identical language and explanations” in a supplemental EIS issued by
    6
    The Council on Environmental Quality “promulgates regulations, binding on all federal agencies, to implement the
    procedural provisions of the. . . []NEPA[].” National Environmental Policy Act Regulations; Incomplete or
    Unavailable Information, 51 Fed. Reg. 15,618, 15,618 (Apr. 25, 1986).
    16
    the BOEM regarding a proposed lease sale in the Gulf of Mexico, rejected the plaintiffs’ exact
    argument. Fed. Defs.’ Mem. at 10 (citing 
    Oceana, 37 F. Supp. 3d at 172
    ). In Oceana, the no
    action alternative at issue explained that “the cancellation of the proposed lease sale would not
    significantly change the environmental impacts of overall [Outer Continental Shelf] activity”
    because the resulting development of oil and gas would most likely be postponed to a future
    sale[,]” and “therefore, the overall level of [Outer Continental Shelf] activity in the [Central
    Planning Area] would only be reduced to a small percentage, if 
    any.” 37 F. Supp. 3d at 172
    .
    The court in Oceana therefore concluded that the “BOEM did consider a true no action
    alternative as mandated by [the] NEPA, and that its analysis was reasonable.”
    Id. The court
    explained that the “NEPA requires the agency to use the ‘rule of reason,’”
    id. (quoting Nevada
    v.
    Dep’t of Energy, 
    457 F.3d 78
    , 93 (D.C. Cir. 2006)), and that the Council on Environmental
    Quality “encourages agencies to include in the no action alternatives analysis situations where a
    choice of no action by the agency would result in predictable actions by others[,]”
    id. (internal quotation
    marks omitted). The court concluded that the BOEM’s “recogni[tion] that even if it
    cancelled th[at] lease sale, another lease sale in the same area would likely eventually go
    forward” was reasonable because “the Central Planning Area of the Gulf of Mexico is a hotbed
    for oil and gas leases generally” and the “BOEM is statutorily tasked with developing the [Outer
    Continental Shelf].” Id.; see
    id. at 172
    n.24 (reasoning that “[i]t [was] [ ] very likely that even if
    th[at] particular lease was cancelled, another lease in the same area would likely present the same
    environmental risks, albeit further into the future” because the “BOEM ha[d] already
    implemented another [five]-year Leasing Program . . . for the Central Planning Area of the Gulf
    of Mexico”).
    17
    Here, like the Oceana court, this Court concludes that the “BOEM did consider a true no
    action alternative as mandated by [the] NEPA, and that its analysis was reasonable.”
    Id. at 172.
    As a preliminary matter, the Court agrees with the federal defendants’ position that the no action
    alternatives at issue in Oceana and in this case are “nearly identical.” Fed. Defs.’ Mem. at 10.
    Compare 
    Oceana, 37 F. Supp. 3d at 171
    –72 (“Alternative D is the cancellation of the proposed
    [Central Planning Area] lease sale. The opportunity for development of . . . gas that could have
    resulted from the proposed lease sale would be precluded or postponed. Any potential
    environmental impacts resulting from the proposed lease sale would not occur or would be
    postponed . . . . [T]he resulting development of oil and gas would most likely be postponed to a
    future sale; therefore, the overall level of [Outer Continental Shelf] activity in the [Central
    Planning Area] would only be reduced to a small percentage, if any. Therefore, the cancellation
    of the proposed lease sale would not significantly change the environmental impacts of overall
    [Outer Continental Shelf] activity.” (internal quotation marks omitted)), with AR 15,559–60
    (“Alternative E is the cancellation of a single proposed [Gulf of Mexico] lease sale within the
    2017–2022 [ ] [p]rogram. The opportunity for development of the estimated oil and gas that
    could have resulted from a proposed action (i.e., a single proposed lease) or alternative to the
    proposed action[] . . . would be precluded or postponed to a future lease sale . . . . If a lease sale
    were to be cancelled, the resulting development of oil and gas would most likely be postponed to
    a future lease sale; therefore, the cumulative level of [Outer Continental Shelf] oil- and gas-
    related activity would only be reduced by a small percentage, if any. Therefore, the cancellation
    of a proposed lease sale would not significantly change the environmental impacts of overall
    [Outer Continental Shelf] oil- and gas-related activity.”).
    18
    This Court, like the Oceana court, finds that the BOEM’s conclusion that “[i]f a lease sale
    were to be cancelled, the resulting development of oil and gas would most likely be postponed to
    a future lease sale” and “the cumulative level of [Outer Continental Shelf] oil- and gas-related
    activity would only be reduced by a small percentage, if any[,]” AR 15,559–60, is reasonable,
    considering that that (1) “the Gulf of Mexico is a hotbed for oil and gas leases generally[,]”
    
    Oceana, 37 F. Supp. 3d at 172
    ; (2) the “BOEM is statutorily tasked with developing the [Outer
    Continental Shelf][,]” id.; and (3) “[i]t is [ ] very likely that even if th[e] particular lease[s] [at
    issue] w[ere] cancelled, []other lease[s] in the same area would likely present the same
    environmental risks, albeit further into the future[,]”
    id. at 172
    n.24, because “multiple future
    lease sales [in the Gulf of Mexico] are scheduled under the existing [ ] [2017–2022] [p]rogram
    developed pursuant to 43 U.S.C. § 1344[,]” Fed. Defs.’ Reply at 4 n.5; see AR 4269 (2017–2022
    program proposed lease sale schedule reflecting “ten [proposed lease] sales [between 2017 and
    2022] in the [Gulf of Mexico] Program Area”).
    The plaintiffs’ counterarguments are unavailing. The plaintiffs first argue that the
    holding in Oceana “was based on an incorrect interpretation of [the] OCSLA that it ‘mandates’
    [the] BOEM to ‘implement lease sales[,]’” and that the “OCSLA mandates no such thing.” Pls.’
    Mem. at 27 (quoting 
    Oceana, 37 F. Supp. 3d at 174
    ). The OCSLA “requires the Secretary . . . to
    maintain a comprehensive oil and gas leasing program to implement the policies of the
    [OCSLA].” Energy Action Educ. Found. v. Andrus, 
    516 F. Supp. 90
    , 93 (D.D.C. 1980). While
    the plaintiffs are correct that the OCSLA does not mandate the approval of every proposed lease
    sale, see Kerr-McGee Corp. v. Watt, 
    517 F. Supp. 1209
    , 1210 (D.D.C. 1981) (“The
    implementing regulations for the [OCSLA] provide that “[t]he United States reserves the right to
    reject any and all bids received for any tract, regardless of the amount offered.” (quoting 43
    19
    C.F.R. § 3316.5(b)), it is instructive that Congress declared when it enacted the OCSLA that its
    policy objective was that “the [O]uter Continental Shelf . . . should be made available for
    expeditious and orderly development, subject to environmental safeguards[,]” 43 U.S.C.
    § 1332(3). And, because “expeditious and orderly development” of the Outer Continental Shelf
    is a core tenet of the OCSLA,
    id., it was
    not unreasonable for the Oceana court to accept the
    BOEM’s representations in the no action alternative at issue in that case that “even if [a]
    particular lease sale was cancelled, another lease in the same area would likely present the same
    environmental risks, albeit further into the future.” 
    Oceana, 37 F. Supp. 3d at 172
    n.24.
    Accordingly, it is also not unreasonable for this Court to accept the BOEM’s representations in
    the no action alternative at issue in this case that “the cancellation of [the] proposed lease sale[s]
    would not significantly change the environmental impacts of overall [Outer Continental Shelf]
    oil-and gas-related activity” because “the resulting development of oil and gas would most likely
    be postponed to a future lease sale[.]” AR 15,559–60.
    The plaintiffs next argue that the “BOEM did not evaluate how holding the proposed
    lease sales would compare with delaying the effects until later in time[] when the lease sale
    offerings, demand and supply, and lease bidding patterns will [be] different[,]” Pls.’ Mem. at 29,
    and that other “[c]ourts have rejected similar environmental analyses when the agency relied on
    faulty assumptions about its no action alternative in the face of differing future conditions[,]”
    id. at 30
    (citing N.C. Wildlife Fed’n v. N.C. Dep’t of Transp., 
    677 F.3d 596
    (4th Cir. 2012); Ctr. for
    Biological Diversity v. U.S. Dep’t of the Interior, 
    623 F.3d 633
    (9th Cir. 2010)). In North
    Carolina Wildlife Federation, the Fourth Circuit concluded that the agencies “failed to take the
    required hard look at environmental consequences[,]” as required under the NEPA, because they
    relied on certain data that included underlying assumptions “without disclosing the data’s
    20
    underlying assumptions” and “falsely respond[ed] to public 
    concerns[.]” 677 F.3d at 605
    . The
    North Carolina Wildlife Federation court did not state that agencies could not rely upon data if it
    included certain underlying assumptions, see
    id. (not reaching
    the question of “whether [the]
    NEPA permit[ted] the [a]gencies to use [ ] [the] data”); it merely stated that such data could not
    be relied upon if the underlying assumptions were not disclosed to the public in the EIS, see
    id. at 604–05
    (“When relevant information ‘is not available during the [impact statement] process
    and is not available to the public for comment[,] . . . the [impact statement] process cannot serve
    its larger informational role, and the public is deprived of its opportunity to play a role in the
    decision-making process.’” (alterations in original) (quoting N. Plains Res. Council v. Surface
    Transp. Bd., 
    668 F.3d 1067
    , 1085 (9th Cir. 2011)). In Center for Biological Diversity, the Ninth
    Circuit concluded that the agency did “not conduct[] the ‘hard look’ that [the] NEPA 
    requires[,]” 623 F.3d at 646
    , because it assumed that the environmental consequences of mining the land at
    issue would be the same regardless of whether the land was publicly or privately owned, despite
    a law imposing different land use requirements on publicly versus privately owned land, see
    id. at 643.
    The Court finds that the plaintiffs’ reliance on the North Carolina Wildlife Federation and
    Center for Biological Diversity cases is misplaced and that those cases are distinguishable from
    this case. Unlike the underlying assumptions relied upon by the agencies in North Carolina
    Wildlife Federation, which were not disclosed in the EIS, 
    see 677 F.3d at 605
    , here, the
    underlying assumption that the effects of holding the lease sales now, as opposed to sometime in
    the future, are virtually the same was disclosed in the Supplemental EIS, cf. AR 15,584 (stating
    that the projected effects of holding a lease sale are calculated “over the [fifty]-year analysis
    period of 2017–2066”). Moreover, unlike the underlying assumptions in Center for Biological
    21
    Diversity, which were flatly at odds with controlling statutory authority, 
    see 623 F.3d at 643
    ,
    here, the “BOEM [ ] did not make an incorrect assumption, but rather acknowledged a practical
    reality of the OCSLA statutory scheme[,]” 
    Oceana, 37 F. Supp. 3d at 174
    ; see
    id. (“[T]he OCSLA
    mandates that the Secretary, who delegates authority to [the] BOEM, implement lease
    sales of the [Outer Continental Shelf]. As such, regardless of th[ese] particular lease[s] going
    forward, in all likelihood, another one eventually will [be implemented] in . . . the Gulf of
    Mexico.” (citation omitted)). Moreover, despite the BOEM’s acknowledgment that projected
    effects of holding a proposed lease sale “do not predict future oil and gas activities with absolute
    certainty[,]” the BOEM’s projections are “the best assumptions and estimates of a set of future
    conditions that are considered reasonably foreseeable and suitable for presale impact analyses”
    because “they were formulated using historical information and current trends in the oil and gas
    industry[,]” AR 15,580.
    Accordingly, the Court concludes that the BOEM considered a true no action alternative.
    B.     Whether the Federal Defendants Took a Hard Look at the Effects of the Lease Sales
    on the Environment
    The plaintiffs next argue that the BOEM “failed to rationally assess the effects of the
    lease sales on the environment[.]” Pls.’ Mem. at 32 (capitalization removed). Specifically, they
    argue that the BOEM’s reliance on safety rules promulgated by the BSEE was arbitrary and
    capricious because the “BOEM knew at the time that [the Department] was repealing substantial
    portions of these reforms, largely erasing the safety gains[,]” Pls.’ Mem. at 32, and the “BSEE’s
    enforcement and inspection programs are anything but rigorous[,]”
    id. at 40.
    They further argue
    that the BOEM’s use of the 18.75% royalty rate was arbitrary and capricious because the “use of
    the inaccurately higher royalty rate arbitrarily and capriciously skewed [the BOEM’s] estimated
    levels of development and production lower, impeding a full and fair discussion of the potential
    22
    effects of the lease sales[,]”
    id. at 42
    (internal quotation marks omitted), and because the BOEM
    “attempted to paper over [its] erroneous effects analysis at the last minute before Lease Sale 251
    in the [r]ecord of [d]ecision[,]”
    id. The federal
    defendants respond that the “BOEM was not
    required to consider proposed amendments to rules[,]” Fed. Defs.’ Mem. at 14, and that,
    “[r]egardless, the proposed amendments d[id] not propose to eliminate safety and environmental
    regulations[,]”
    id. at 16.
    They further argue that the BOEM’s use of the 18.75% royalty rate and
    failure to supplement the EIS with that information was not arbitrary and capricious because “the
    reduction was not a ‘substantial change in the proposed action’ or a ‘significant new
    circumstance’ that would require supplementation of an EIS under the Council on Environmental
    Quality Regulations.”
    Id. at 25
    (quoting 40 C.F.R. § 1502.9(c)). The Court will address each of
    the plaintiffs’ arguments in turn.
    1.      Whether the BOEM’s Reliance on the BSEE’s Safety Rules was Arbitrary
    and Capricious
    The plaintiffs argue that the BOEM’s reliance in the Supplemental EIS on the BSEE’s
    safety rules was arbitrary and capricious because the BOEM “knew at the time [it was preparing
    the Supplemental EIS] that [the Department] was repealing large portions of these reforms,
    largely erasing the safety gains[,]” Pls.’ Mem. at 32, and because the GAO report purportedly
    found that the “BSEE’s enforcement and inspection programs [were] anything but rigorous[,]”
    id. at 40,
    and “[w]hen commenters confronted [the] BOEM with the incongruity between its
    analyses and the [GAO] report, [the] BOEM expressly declined to even consider the report[,]”
    id. at 40–41.
    The federal defendants respond that the “BOEM was not required to consider
    proposed amendments to rules[,]” Fed. Defs.’ Mem. at 14, and that, “[r]egardless, the proposed
    amendments d[id] not propose to eliminate safety and environmental regulations[,]”
    id. at 16.
    23
    The Court first addresses whether the BOEM’s reliance on the BSEE’s rules was
    arbitrary and capricious in light of the fact that the Department was purportedly “repealing large
    portions of these reforms[.]” Pls.’ Mem. at 32. As to this point, the plaintiffs argue that the
    “BOEM did not ‘use the best available’ information’ when it completed the Supplemental EIS
    and issued the Records of Decision in Lease Sales 250 and 251” because the Department
    “already had proposed the Production Safety [ ] [Rule] [r]epeals in the Federal Register and had
    submitted proposed repeals of the Well Control Rule to the Office of Management and
    Budget[,]” Pls.’ Reply at 19–20, and that “[o]nce the repeals were proposed, it became irrational
    for [the] BOEM to presume that [ ] [the Department] would not repeal at least some portions of
    the [ ] [Well Control and Production Safety] Rules[,]”
    id. at 21
    (emphasis added). However,
    contrary to the plaintiffs’ argument, it is an
    established point of law that proposed regulations . . . have no legal effect. By
    design, rulemaking—proposed rules, followed by notice and comment, leading to
    final rules—is a process of graduated decision-making resulting in final
    regulations. It would make little sense for [ ] [a] court to short-circuit the process
    by giving effect to what were merely meant to be proposed regulations.
    Sweet v. Sheahan, 
    235 F.3d 80
    , 87 (2d Cir. 2000) (citations omitted); see United States v.
    Springer, 
    354 F.3d 772
    , 776 (8th Cir. 2004) (“A major purpose of formal rulemaking is to ensure
    that agencies gather as much relevant information before promulgating final rules that will have
    the force and effect of law. For this reason, an agency that exercises its discretion to propose a
    rule has no duty to promulgate its proposal as a final rule. Thus, it is well-settled ‘that proposed
    regulations . . . have no legal effect.’” (quoting 
    Sweet, 235 F.3d at 87
    )).
    The omission of speculative information from an environmental impact statement
    prepared at the lease sale stage is permissible; however, an environmental impact
    statement which is incomplete due to the omission of ascertainable facts, or the
    inclusion of erroneous information, violates the disclosure requirement of 42
    U.S.C. § 4332(2)(C). The rule of reason requires that consideration be given to
    24
    practical limitations on the agency’s analysis, such as the information available at
    the time.
    Wilderness Soc’y v. Salazar, 
    603 F. Supp. 2d 52
    , 60–61 (D.D.C. 2009) (citation and internal
    quotation marks omitted).
    Here, as the federal defendants correctly note, see Fed. Defs.’ Mem. at 15 n.5, the
    BSEE’s rules that the BOEM relied on in its Supplemental EIS were still in effect when the
    Supplemental EIS was issued, compare AR 15,473 (indicating that the Supplemental EIS was
    issued in December 2017), with Revised Production Safety Rule, 83 Fed. Reg. at 49,216
    (finalized on September 28, 2018), and Revised Well Control Rule, 84 Fed. Reg. at 21,908
    (finalized on May 15, 2019). Therefore, it was not arbitrary and capricious for the BOEM to
    issue a Supplemental EIS that did not take into account proposed amendments to the BSEE’s
    rules because the BSEE “ha[d] no duty to promulgate its propos[ed] [rules] as [ ] final rule[s]”
    and the BSEE’s proposed rules “ha[d] no legal effect” at the time the Supplemental EIS was
    issued. 
    Springer, 354 F.3d at 776
    ; see Nance v. Envtl. Protection Agency, 
    645 F.2d 701
    , 708
    (9th Cir. 1981) (“[W]here the effect of legislation on future agency action is unclear, and the
    passage of the legislation is not assured until after all action preliminary to the agency rendering
    a final decision has been taken, and the time has passed during which the agency would normally
    be required to render that final decision, it was not arbitrary and capricious for the agency to
    approve a proposed change in air quality standards that did not take account of pending
    legislation.”).
    The Court next addresses whether the BOEM’s reliance on the BSEE’s rules was
    arbitrary and capricious in light of the GAO report purportedly finding that the “BSEE’s
    enforcement and inspection programs [were] anything but rigorous.” Pls.’ Mem. at 40. As a
    preliminary matter, “an agency may properly base its evaluation of environmental impacts on the
    25
    assumption that other specialized agencies with jurisdiction will enforce permits and related
    mitigation measures according to the law.” Okanogan Highlands All. v. Williams, No. CIV. 97-
    806-JE, 
    1999 WL 1029106
    , at *4 (D. Or. Jan. 12, 1999) (citing No GWEN All. of Lane Cty.,
    Inc. v. Aldridge, 
    855 F.2d 1380
    , 1386–87 (9th Cir. 1988); City & Cty. of San Francisco v.
    United States, 
    615 F.2d 498
    , 501 (9th Cir. 1980)); see Moapa Band of Paiutes v. U.S. Bureau of
    Land Mgmt., No. 2:10-CV-02021-KJD, 
    2011 WL 4738120
    , at *7 (D. Nev. Oct. 6, 2011) (“[The
    agency] also assumed in its determination that regulatory agencies charged with permit
    enforcement would ensure compliance with the permit requirements. This assumption is
    reasonable.” (citing Oknogan Highlands All., 
    1999 WL 1029106
    , at *4)), aff’d, 546 F. App’x
    655 (9th Cir. 2013). Moreover, to the extent that the plaintiffs argue that the GAO report casts
    doubt on the “assumption that . . . [the BOEM] will enforce . . . mitigation measures according to
    the law[,]” Okanogan Highlands All., 
    1999 WL 1029106
    , at *4, the Court rejects this argument.
    Contrary to the plaintiffs’ suggestion otherwise, the GAO report does not suggest that the BSEE
    is not performing its enforcement duties at all; it merely suggests that there is room for
    improvement of the BSEE’s existing policies. Cf. AR 27,102 (acknowledging that the BSEE
    “had undertaken various reform efforts since its creation in 2011, but had not fully addressed
    deficiencies in its investigative, environmental compliance, and enforcement capabilities
    identified by investigations after the Deepwater Horizon incident” (emphasis added)). This case
    is thus distinguishable from Friends of Back Bay v. United States Army Corps of Engineers, the
    case on which the plaintiffs rely, see Pls.’ Mem. at 40 (citing 
    681 F.3d 581
    , 589 (4th Cir. 2012)).
    In Friends of Back Bay, the agency issued a finding of no significant impact and issued a permit
    authorizing channel dredging. 
    See 681 F.3d at 583
    , 586. The agency’s finding of no significant
    26
    impact7 and issuance of the permit was “conditioned on [a]dequate funding for the enforcement
    of the [no-wake zone][,]” despite the fact that the agency was aware that funding for enforcement
    was neither available not had been allocated.
    Id. at 585.
    The court concluded that the agency’s
    finding of no significant impact was arbitrary and capricious because, “[a]bsent any reasonable
    basis to conclude, that[] . . . the [no-wake zone] was being adequately enforced or its efficacy
    was otherwise assured, the concept thereof as discussed within the [environmental assessment]
    was a logical nullity.”
    Id. at 589;
    see
    id. (stating that
    the court was “unable to divorce the
    [agency’s] demonstrably incorrect assumption of an effective [no-wake zone] from [the
    agency’s] ultimate conclusion that no EIS need be prepared”). Here, simply because the GAO
    report identified areas for needed improvement within the BSEE does not render the BOEM’s
    underlying assumption when it relied on the BSEE’s rules that the BSEE would perform its
    duties to be “demonstrably incorrect[,]”
    id., and “even
    given the [BSEE’]s] past [enforcement]
    failures, this Court will not presume that the [BSEE] would have necessarily failed to comply
    with [ ] [enforcement] requirements for future projects[,]” Sierra Forest Legacy v. U.S. Forest
    Serv., 
    652 F. Supp. 2d 1065
    , 1090 n.13 (N.D. Cal. 2009) (citing Sierra Club v. Penfold, 
    857 F.2d 1307
    , 1319 (9th Cir. 1988)); see Sierra 
    Club, 857 F.2d at 1319
    (“It would be a mistake for us to
    assume that because an [environmental assessment] was inadequate in the past, [the] [agency]
    will not comply with [the] NEPA in the future.”).
    7
    “As an integral underpinning of the . . . []NEPA[], an EIS must be devised in connection with every
    recommendation or report on proposals for . . . major [f]ederal actions significantly affecting the quality of the
    human environment.” Friends of Back 
    Bay, 681 F.3d at 584
    (fourth alteration in original) (internal quotation marks
    omitted). “To determine whether a particular action meets the threshold of significantly affecting environmental
    quality, federal agencies are required to draft an [e]nvironmental [a]ssessment [ ], which is a concise public
    document designed to provide sufficient evidence and analysis for determining whether to prepare an [EIS] or a
    finding of no significant impact[.]”
    Id. (fourth alteration
    in original) (internal quotation marks omitted). “When an
    agency relies on [ ] a mitigated [finding of no significant impact], it may avoid preparing an EIS.”
    Id. at 587.
    27
    Accordingly, the Court concludes that the BOEM’s reliance on the BSEE’s safety
    regulations was not arbitrary and capricious.
    2.      Whether the BOEM’s Use of the 18.75% Royalty Rate was Arbitrary and
    Capricious
    The plaintiffs next allege that the “BOEM stated that it presumed an 18.75% shallow-
    water royalty rate when it estimated activity levels, despite the fact that [the Department] had
    reduced that rate to 12.5% explicitly to increase bidding and lease activity.” Pls.’ Mem. at 42.
    They argue that the BOEM’s use of the 18.75% royalty rate was arbitrary and capricious because
    the “use of the inaccurately higher royalty rate arbitrarily and capriciously skewed [the BOEM’s]
    estimated levels of development and production lower, impeding a full and fair discussion of the
    potential effects of the lease sales[,]”
    id. (internal quotation
    marks omitted), and the BOEM
    “attempted to paper over [its] erroneous effects analysis at the last minute before Lease Sale 251
    in the Record of Decision[,]”
    id. The federal
    defendants respond that the BOEM’s use of the
    18.75% royalty rate, rather than a 12.5% royalty rate, and failure to include a discussion of the
    12.5% royalty rate in the Supplemental EIS was not arbitrary and capricious because “the
    reduction was not a ‘substantial change in the proposed action’ or a ‘significant new
    circumstance’ that would require supplementation of an EIS under the Council on Environmental
    Quality Regulations[,]” Fed. Defs.’ Mem. at 25 (quoting 40 C.F.R. § 1502.9(c)), and that the
    “BOEM’s decision not to add a discussion of the [royalty] rate change [from 18.75% to 12.5%]
    to the [ ] Supplemental EIS [was] well within the rule of reason[,]”
    id. The Supreme
    Court has explained that under the rule of reason, “an agency need
    not supplement an EIS every time new information comes to light after the EIS is
    finalized.” Rather, “a supplemental EIS must be prepared” only when a new action
    will affect the quality of the environment “in a significant manner or to a significant
    extent not already considered.” Courts must also defer to the agency’s “informed
    discretion about whether to prepare a supplemental EIS because it requires
    “substantial agency expertise.” That said, “courts should not automatically defer
    28
    to the agency’s express reliance on an interest in finality without carefully
    reviewing the record and satisfying themselves that the agency has made a reasoned
    decision based on its evaluation of the significance—or lack of significance—of
    the new information.”
    Stand Up for Cal.! v. U.S. Dep’t of Interior, 
    410 F. Supp. 3d 39
    , 57 (D.D.C. 2019) (citations
    omitted) (quoting Marsh v. Or. Nat. Res. Council, 
    490 U.S. 360
    , 373, 374, 376–77, 378 (1989)).
    “The overarching question is whether an EIS’s deficiencies are significant enough to undermine
    informed public comment and informed decisionmaking.” Sierra Club v. Fed. Energy Reg.
    Comm’n, 
    867 F.3d 1357
    , 1368 (D.C. Cir. 2017).
    In evaluating an agency’s decision not to prepare a supplemental EIS, courts
    employ a two-step inquiry. First, the court must evaluate whether the agency took
    a hard look at the proffered new information. Next, if the agency did take a hard
    look, the court must then determine whether the agency’s decision not to prepare a
    supplemental EIS was arbitrary or capricious.
    Chem. Weapons Working Grp. v. U.S. Dep’t of Def., 
    655 F. Supp. 2d 18
    , 34–35 (D.D.C. 2009)
    (citations and internal quotation marks omitted).
    As to the first step of this inquiry, “whether the [BOEM] took a hard look at the proffered
    new information[,]”
    [w]hen applying the hard look test, courts may consider whether the agency obtains
    opinions from its own experts, obtains opinions from experts outside the agency,
    gives careful scientific scrutiny, and responds to all legitimate concerns that are
    raised. If the agency does take a hard look at new information and concludes the
    information is insignificant, the agency should provide a reasoned explanation for
    this conclusion.
    Id. at 35
    (citation and internal quotation marks omitted). “The determination as to whether
    information is either new or significant ‘requires a high level of technical expertise’; thus, [the
    Court] ‘defer[s] to the informed discretion of the [agency].” Blue Ridge Envtl. Def. League v.
    Nuclear Reg. Comm’n, 
    716 F.3d 183
    , 197 (D.C. Cir. 2013) (quoting 
    Marsh, 490 U.S. at 377
    ).
    29
    Here, in response to a concern raised by one of the plaintiffs regarding “the reduction of
    the royalty rate from 18.75% to 12.5% for leases situated in water depths less than 200 meters[,]”
    AR 16,580, the BOEM considered the issue and concluded that
    any increase in activity would be minimal and that the range of anticipated
    production volumes and activity-level estimates that appear in the 2017–2022 . . .
    [p]rogram, . . . []EIS[][,] and supplemental EIS specific to . . . Lease Sale[s] 250
    and 251 for leases to be awarded and anticipated to be awarded in water depths less
    than 200 meters remain current[,]
    AR 16,580–81. This conclusion was based on an evaluation by the BOEM’s Office of Resource
    Evaluation, “us[ing] a series of spreadsheet-based models to estimate the range of anticipated oil
    and natural gas production volumes and associated levels of exploration, development[,] and
    decommissioning activity on a per lease sale basis.” AR 16,581. The spreadsheet-based models
    utilized “information regarding “[h]istorical lease sale specific leasing activity and trends,
    number of discoveries, discovery volumes and production volumes, drilling activity and trends,
    platform installations and decommissioning activity, oil and gas prices[,] and activity costs[,]”
    and “[t]he resulting forecast [was] analyzed and compared to actual historical data to [e]nsure
    that historical precedent and recent trends [we]re reflected in each activity forecast.” AR 16,581.
    Here, the BOEM “obtain[ed] [an] opinion[] from its own expert[],” Chem. Weapons
    Working 
    Grp., 655 F. Supp. 2d at 35
    , the Office of Resource Evaluation, see AR 16,581, which
    is qualified to offer the opinion it provided, see Resource Evaluation Program, U.S. Dep’t of the
    Interior Bureau of Ocean & Energy Mgmt., https://www.boem.gov/oil-gas-energy/resource-
    evaluation (last visited Apr. 21, 2020) (explaining that the “Resource Evaluation Program [ ]
    support[s] all BOEM program areas, both energy and non-energy, through critical technical and
    economic analysis” and is responsible for, inter alia, “[a]nalyzing Geological and Geophysical
    data in order to determine the volume and the nature of potential hydrocarbon accumulations, the
    30
    volume of reserves[,] and production characteristics of discovered [Outer Continental Shelf] oil
    and gas fields[]” and “[d]eveloping and updating computer models for evaluation of the
    economic value of [Outer Continental Shelf] hydrocarbon resources”).8 Such reliance is
    permissible under the hard look test. See Chem. Weapons Working 
    Grp., 655 F. Supp. 2d at 35
    (stating that “agencies, particularly those dealing with technical and scientific matters, are
    entitled to rely on the views of their own experts, ‘so long as the experts are qualified and
    express a reasonable opinion[]’” (quoting Sabine River Auth. v. U.S. Dep’t of Interior, 
    951 F.2d 669
    , 678 (5th Cir. 1992)); see also
    id. at 43
    (“Although an agency should consider the public’s
    concerns, provided the agency responds to legitimate concerns, it may rely upon its own experts
    in making procedural decisions.” (citing Hughes River Watershed Conservancy v. Johnson, 
    165 F.3d 283
    , 288 (4th Cir. 1999)). The BOEM “t[ook] a hard look at [the] new information and
    conclude[d] the information was insignificant,” id.; see AR 16,580–81 (stating that the BOEM’s
    “analyses of the impact that reducing the royalty rate from 18.75% to 12.5% . . . in the . . .
    []EIS[] and Supplemental EIS specific to . . . Lease Sale[s] 250 and 251 . . . remain current”),
    and also “provide[d] a reasoned explanation for this conclusion[,]” Chem. Weapons Working
    
    Grp., 655 F. Supp. 2d at 35
    , see AR 16,581 (explaining that a reduction in the royalty rate does
    not affect the analysis because “[s]eventy years of exploration and production activity in the
    shallow water areas of the Gulf [of Mexico] has depleted much of the area reserves and the
    opportunity for undiscovered resources is limited to relatively small accumulations that require
    little activity to exploit the resource”). The Court therefore concludes that the BOEM “took a
    hard look at the proffered new information[,]” Chem. Weapons Working 
    Grp., 655 F. Supp. 2d at 24
    , and will proceed to the second step of the inquiry.
    8
    As the Court previously explained, see Part 
    I.B.2.b, supra
    , the Court may take judicial notice of information posted
    on the official websites of government agencies.
    31
    As to the second step of the inquiry, “whether the [BOEM’s] decision not to prepare a
    supplemental EIS was arbitrary or capricious[,]”
    id. at 35,
    “[a]lthough review [of the decision]
    must be ‘searching and careful,’ the [C]ourt must not substitute its own judgment for that of the
    agency[,]”
    id. (quoting Johnson
    , 165 F.3d at 287), and because the BOEM “is making
    predictions, within its area of special expertise, . . . [w]hen examining this kind of scientific
    determination, as opposed to simple findings of fact, a reviewing court must generally be at its
    most deferential[,]” Balt. Gas & Elec. Co. v. Nat. Res. Def. Council, Inc., 
    462 U.S. 87
    , 103
    (1983). Here, the “BOEM [ ] reanalyzed the forecasted oil and gas exploration, development,
    and production activity expected from [ ] [L]ease [S]ale 251 following the reduction of royalty
    rates from 18.75% to 12.5% in waters 200 meters or less” and concluded that “[t]he forecasted
    scenario [in the Supplemental EIS], based originally on 18.75% royalty rates, remain[ed] valid”
    because “[a]ny additional activity that could occur as a result of the change in royalty rate in
    shallow water [was] still expected to be within the range of foreseeable activity scenario under
    which the analysis was performed.” AR 4132. The Court concludes that “[g]iven this history of
    [ ] reassessment, [the BOEM’s] actions cannot be said to have been based on a ‘clear error of
    judgment[,]’” Chem. Weapons Working 
    Grp., 655 F. Supp. 2d at 44
    (quoting Overton 
    Park, 401 U.S. at 416
    ), which “follows other courts’ decisions to uphold agency discretion in this area[,]”
    Stand Up for 
    Cal.!, 410 F. Supp. 3d at 59
    ; see, e.g., Nat’l Comm. for the New River v. Fed.
    Energy Reg. Comm’n, 
    373 F.3d 1323
    , 1330 (D.C. Cir. 2004) (“[T]he [agency’s determination
    that the new information was not significant enough to warrant preparation of a supplement to
    the [draft EIS][] is entitled to deference.” (citing 
    Marsh, 490 U.S. at 375
    –76)). Accordingly, the
    Court concludes that the Supplemental “EIS’s deficiencies are [not] significant enough to
    undermine informed public comment and informed decisionmaking[,]” Sierra 
    Club, 867 F.3d at 32
    1368, and that the BOEM’s failure to supplement the Supplemental EIS with the 12.5% royalty
    rate was not arbitrary and capricious, see City of Olmsted Falls, Ohio v. Fed. Aviation Admin.,
    
    292 F.3d 262
    , 274 (D.C. Cir. 2002) (explaining that “[a] supplemental EIS is only required
    where new information provides a seriously different picture of the environmental landscape”
    and concluding that the agency’s decision not to supplement the EIS was not arbitrary and
    capricious where “there simply [was] not significant new information, and the landscape [was]
    unchanged” (internal quotation marks omitted)).
    Because the Court has concluded that the BOEM has satisfied its obligations under the
    NEPA and the plaintiffs are not entitled to the relief that they seek, the Court will deny the
    plaintiffs’ motion for summary judgment and grant the federal defendants’ and the intervenor-
    defendants’ cross-motions for summary judgment.9
    IV.      CONCLUSION
    For the foregoing reasons, the Court concludes that the BOEM did not act arbitrarily and
    capriciously in preparing the no action alternative, by relying on the BSEE’s safety rules, or by
    choosing not to supplement the Supplemental EIS with the 12.5% royalty rate. Therefore, the
    Court will deny the plaintiffs’ motion for summary judgment and grant the federal defendants’
    and the intervenor-defendants’ cross-motions for summary judgment.
    SO ORDERED this 21st day of April, 2020.10
    REGGIE B. WALTON
    United States District Judge
    9
    Because the Court concludes that the plaintiffs are not entitled to the relief they seek, the Court need not address
    the parties’ arguments regarding the appropriateness of the plaintiffs’ requested remedies.
    10
    The Court will contemporaneously issue an Order consistent with this Memorandum Opinion.
    33
    

Document Info

Docket Number: Civil Action No. 2018-1674

Judges: Judge Reggie B. Walton

Filed Date: 4/21/2020

Precedential Status: Precedential

Modified Date: 4/21/2020

Authorities (29)

Califano v. Sanders , 97 S. Ct. 980 ( 1977 )

sabine-river-authority-and-texas-water-conservation-association , 951 F.2d 669 ( 1992 )

Amer Bioscience Inc v. Thompson, Tommy G. , 269 F.3d 1077 ( 2001 )

marcus-l-nance-v-environmental-protection-agency-northern-cheyenne , 645 F.2d 701 ( 1981 )

Hammond v. Norton , 370 F. Supp. 2d 226 ( 2005 )

Chemical Weapons Working Group v. United States Department ... , 655 F. Supp. 2d 18 ( 2009 )

Theodore Roosevelt Conservation Partnership v. Salazar , 661 F.3d 66 ( 2011 )

Clark County v. Federal Aviation Administration , 522 F.3d 437 ( 2008 )

Motor Vehicle Mfrs. Assn. of United States, Inc. v. State ... , 103 S. Ct. 2856 ( 1983 )

Citizens to Preserve Overton Park, Inc. v. Volpe , 91 S. Ct. 814 ( 1971 )

Marsh v. Oregon Natural Resources Council , 109 S. Ct. 1851 ( 1989 )

Baltimore Gas & Electric Co. v. Natural Resources Defense ... , 103 S. Ct. 2246 ( 1983 )

Energy Action Education Foundation v. Andrus , 516 F. Supp. 90 ( 1980 )

Sierra Forest Legacy v. United States Forest Service , 652 F. Supp. 2d 1065 ( 2009 )

Northern Plains Resource Council, Inc. v. Surface ... , 668 F.3d 1067 ( 2011 )

National Committee for the New River, Inc. v. Federal ... , 373 F.3d 1323 ( 2004 )

City and County of San Francisco, a Municipal Corporation v.... , 615 F.2d 498 ( 1980 )

UNITED STATES OF AMERICA, — v. JACKIE RAE SPRINGER GREGORY ... , 354 F.3d 772 ( 2004 )

Federal Communications Commission v. Fox Television ... , 129 S. Ct. 1800 ( 2009 )

Wilderness Society v. Salazar , 603 F. Supp. 2d 52 ( 2009 )

View All Authorities »