Ashland LLC v. Samuel J. Heyman 1981 Continuing Trust for Lazarus S. Heyman ( 2018 )


Menu:
  •                    IN THE SUPERIOR COURT OF THE STATE OF DELAWARE
    ASHLAND LLC, INTERNATIONAL                              )
    SPECIALTY PRODUCTS INC., ISP                            )
    ENVIRONMENTAL SERVICES INC.,                            )
    AND ISP CHEMCO LLC,                                     )
    )
    Plaintiffs/Counterclaim              )
    Defendants,                          )
    )
    v.                                     ) C.A. No. N15C-10-176 CCLD EMD
    )
    THE SAMUEL J. HEYMAN 1981                               )
    CONTINUING TRUST FOR LAZARUS                            )
    S. HEYMAN, et al.,                                      )
    )
    Defendants/Counterclaim              )
    Plaintiffs.
    Submitted: February 19, 2018
    Decided: June 21, 2018
    Upon Defendant the Heyman Parties’ Motion to Dismiss Count III of the Second Amended
    Complaint
    DENIED
    Christopher Viceconte, Esquire, Gibbons P.C., Wilmington, Delaware, and Michael R. Griffinger,
    Esquire, William S. Hatfield, Esquire, and Camille V. Otero, Esquire, Gibbons P.C., Newark, New
    Jersey. Attorneys for Ashland LLC, International Specialty Products, Inc., ISP Environmental
    Services, Inc., and ISP Chemco LLC
    Kevin G. Abrams, Esquire, John M. Seaman, Esquire, and April M. Ferraro, Esquire, Abrams &
    Bayliss LLP, Wilmington, Delaware, and Andrew J. Rossman, Esquire, Jonathan B. Oblak, and
    Sylvia E. Simson, Esquire, Quinn Emanuel Urquhart & Sullivan, LLP, New York, New York.
    Attorneys for The Samuel J. Heyman 1981 Continuing Trust for Lazarus S. Heyman, et al.
    DAVIS, J.
    I. INTRODUCTION
    This breach of contract case stemming from environmental liability allocation is assigned
    to the Complex Commercial Litigation Division of the Court. Plaintiffs1 Ashland LLC,
    1
    Plaintiff Chemco is a subsidiary of Plaintiff ISP. Plaintiff IES is a subsidiary of Plaintiff Chemco.
    International Specialty Products, Inc. (“ISP”), ISP Environmental Services Inc. (“IES”), and ISP
    Chemco LLC (“Chemco,” collectively with all other plaintiffs “Ashland”) filed the declaratory
    judgment and breach of contract case against Heyman Defendants—The Heyman Seller
    Defendants, The Heyman Trust Defendants, and Linden Property Holdings LLC (“LPH”
    collectively with all other defendants “Heyman Defendants”).
    On October 26, 2017, Ashland filed a second amended complaint (the “Second Amended
    Complaint”) against the Heyman Defendants. The Second Amended Complaint included a claim
    for fraud as Count III. Heyman Defendants filed a Motion to Dismiss Count III (the “Motion”).
    Ashland filed their Answering Brief in Opposition to Defendants/Counterclaim Plaintiffs’
    Motion to Dismiss Count III of the Second Amended Complaint (the “Opposition”). Heyman
    Defendants filed their Reply Brief in Further Support of Heyman Parties’ Motion to Dismiss
    Count III of the Second Amended Complaint (the “Reply”).
    For the reasons set forth below, the Court DENIES the Motion.
    II. RELEVANT FACTS2
    The property involved in this civil action is located at 4000 Road to Grasselli, Linden,
    New Jersey (the “Linden Property”).3 The Linden Property has a chemical manufacturing
    history. From 1919 to 1991, non-parties GAF Corporation and GAF Chemicals Corporation
    owned and operated the Linden Property.4 GAF Corporation and GAF Chemicals Corporation
    2
    Unless otherwise indicated, the facts provided in this Opinion are the facts alleged in the Second Amended
    Complaint filed by Ashland. For purposes of the Motion, the Court must view the Second Amended Complaint’s
    alleged facts in a light most favorable to Ashland. See, e.g., Cent. Mortg. Co. v. Morgan Stanley Mortg. Capital
    Holdings LLC, 
    27 A.3d 531
    , 536 (Del. 2011); Doe v. Cedars Acad., LLC, 
    2010 WL 5825343
    , at *3 (Del. Super. Oct.
    27, 2010).
    3
    2d Am. Compl. ¶ 32.
    4
    
    Id. ¶ 33.
    2
    discovered extensive contamination at the Linden Property during the 1970s-80s.5 The Heyman
    Defendants have owned GAF Corporation and GAF Chemicals Corporation since the 1980s.6
    On June 16, 1989, GAF Chemicals Corporation and the New Jersey Department of
    Environmental Protection (“NJDEP”) entered into an Administrative Consent Order (the
    “ACO”) regarding environmental contamination and cleanup at the Linden Property. 7 The ACO
    made GAF Chemicals Corporation and “its principals, directors, officers, agents, successors,
    [and] assignees . . .” responsible for environmental remediation until the NJDEP gave GAF
    written notice it satisfied the ACO.8
    In 1991, the Heyman Defendants incorporated ISP as a subsidiary of GAF Chemicals
    Corporation and incorporated IES as ISP’s subsidiary.9 GAF Chemicals Corporation then
    transferred ownership of the Linden Property to IES.10 The parties agree that IES became the
    entity responsible for the ACO. In 1996, the Heyman Defendants spun off ISP (and IES) from
    GAF Chemicals Corporation.11
    In 2006, Chemco executed an Administrative Consent Order Amendment (the “Amended
    ACO”) with the NJDEP.12 The Amended ACO did not replace the ACO. Instead, the Amended
    5
    
    Id. ¶ 34.
    6
    
    Id. ¶ 35.
    7
    
    Id. ¶ 37.
    See also Compl. Ex. B.
    8
    See Ex. B. at pp. 18, 22.
    9
    2d Am. Compl. ¶¶ 38–39.
    10
    
    Id. ¶ 40.
    11
    
    Id. ¶ 42.
    12
    
    Id. ¶ 45.
    See also Compl. Ex. C, ¶ 4.
    3
    ACO supplemented and became a part of the ACO.13 The Amended ACO expressly provided
    that IES would continue to comply with the terms of the ACO.14
    In 2005 and 2007, the NJDEP sent letters advising the Heyman Defendants how to
    address off-site contamination remediation efforts.15 The letters stated that the remedial efforts
    were not complete and LPH did not have a fully implemented cleanup.16 Specifically, the 2005
    NJDEP letter states:
    The Remedial Action Workplan and Remedial Action Report have addressed
    specific on-site remedial actions. The Department remains committed to the
    investigation, remediation and restoration of off-site impacts that have resulted
    from historic discharges by GAF/ISP. The comments contained in this letter do not
    address GAF/ISP requirements (pursuant to the Spill Act, Technical Requirements
    for Site Remediation and the 1989 ACO) to expedite the resolution of these off-site
    discharges. GAF/ISP must address these discharges through submissions required
    by these regulatory requirements as well as several correspondences (including but
    not limited to NJDEP letter to James Bizarro, GAF dated October 6,
    1995)[emphasis added].17
    The Heyman Defendants’ outside environmental counsel had a copy of the 2005 NJDEP Letter.
    Ashland never received the 2005 or 2007 NJDEP Letters until discovery for this litigation.18
    The Sale and Closing
    In April 2011, counsel for the Heyman Defendants responded to a series of questions
    asked by Ashland (“2011 Responses”).19 In the April 2011 Responses, the Heyman Defendants
    13
    Compl. Ex. C at ¶ 9 (“This ACO Amendment is intended to supplement the existing 1989 ACO. The provisions
    of this ACO Amendment shall become part of the 1989 ACO. The 1989 ACO, as amended, shall remain in full
    force and effect and [IES] shall continue to comply with the 1989 ACO.”). See also 
    id. at ¶
    15 (“By the execution of
    this ACO Amendment, NJDEP does not release any person from any liabilities or obligations such person may have
    pursuant to any other applicable authority, nor does NJDEP waive any of its rights or remedies pursuant thereto.”).
    See also 2d Am. Compl. ¶¶ 48–49.
    14
    2d Am. Compl. ¶¶ 48-49.
    15
    
    Id. ¶ 110.
    16
    
    Id. ¶ 111.
    17
    
    Id. ¶ 113.
    18
    
    Id. ¶ 112.
    19
    
    Id. ¶¶ 92-93.
    4
    discussed the groundwater No Further Action Letter.20 The Heyman Defendants did not mention
    that any on-site or off-site remediation work remained outstanding.21
    After receiving the 2011 Responses, the Parties engaged in a conference call (“2011
    Conference Call”).22 The April 2011 Conference Calls led Ashland to believe that all remedial
    measures were taken regarding the Linden Property. Based on the representations made in the
    April 2011 Conference Calls, Ashland agreed to the liability provision. Ashland contends the
    Heyman Defendants hid relevant documents from Ashland. Ashland alleges that the hidden
    documents “would have disclosed material information relating to the environmental condition
    and status of the [Linden Property] . . . .”23
    In May 2011, Ashland acquired ISP, IES, and Chemco from the Heyman Defendants for
    $3.2 billion.24 This was done through a Stock Purchase Agreement, dated as of May 31, 2011
    (the “SPA”) between the Heyman Defendants (as the “Seller Parties”) and Ashland (as the
    “Buyer”).25 The Heyman Defendants wanted to retain the Linden Property. So, on August 23,
    2011, immediately after the SPA closed, IES conveyed the Linden Property back to the Heyman
    Defendants for one dollar.26 Defendant LPH operates the Linden Property.27
    The SPA set out the parties’ respective obligations regarding the Linden Property. SPA
    Section 2(e) to Schedule 5.19 of the SPA28 states:
    In connection with the Linden Transfer, the Seller Parties shall assume all
    Liabilities to the extent related to or arising from or existing at the Linden Property,
    including Liabilities arising under or relating to (i) Environmental Laws, provided
    20
    
    Id. 21 Id.
    ¶ 94.
    22
    
    Id. ¶ 96.
    23
    
    Id. ¶ 204.
    24
    
    Id. ¶ 51.
    25
    
    Id. ¶¶ 51-52.
    26
    
    Id. ¶ 60.
    27
    
    Id. ¶ 58.
    28
    Any further reference to SPA Sections 2 and 4 of Schedule 5.19 of the SPA will omit reference to Schedule 5.19
    and will be as “SPA Section 2_” or SPA Section 4_.”
    5
    that such Liabilities shall not include any off-site migration or disposal of
    Hazardous Materials from the Linden Property prior to the Closing, any claims or
    damages associated with any off-site migration or disposal of Hazardous Material
    from the Linden Property prior to the Closing, and for the avoidance of doubt, any
    off-site contamination of soils, groundwater or sediments, any third party superfund
    sites including the Newark Bay Complex, any natural resources damages or
    exposure claims relating to operations or discharges prior to Closing,…or (v) the
    Linden Transfer (including any Liabilities to the extent arising by virtue of the
    delivery of a limited warranty deed, but excluding any Liabilities arising out of or
    relating to fraudulent conveyance or similar liability), in each case, other than as
    set forth in the provision in clause (i) above, whether arising before, on or after the
    Closing Date (the “Linden Excluded Liabilities”).29
    SPA Section 2(f) also discusses the Linden Property transaction—specifically the
    “Linden Transfer”30—and states:
    In connection with the Linden Transfer, the Seller Parties shall be responsible, at
    their sole cost and expense, for compliance, if applicable, with any requirements of
    the Industrial Site Recovery Act (“ISRA”) and, if ISRA applies to the Linden
    Transfer, Seller Parties shall (i) within five (5) Business Days after execution of
    this Agreement, make any required filings or notifications (such as a General
    Information Notice, as defined under ISRA) to the [NJDEP], and (ii) use reasonable
    best efforts to, prior to closing, make all other filings, undertake all other measures,
    including where required undertaking any site investigation or Remedial Action
    required by ISRA. In addition, the [SPA] Seller Parties shall use reasonable best
    efforts to amend any consent decree or other binding agreement with any
    Governmental Entity relating to the Linden Excluded Liabilities, and to replace or
    substitute any related financial assurance (including any bond or letter of credit), to
    include the name of the Linden Transferee following the Linden Transfer and, if
    permitted by NJDEP, to remove the name of ISP or any of the Companies
    therefrom.31
    Paragraph 2 of the Contribution Agreement mirrors SPA Section 2(e).32 That is, LPH,
    whose membership interests were transferred from Ashland to the Heyman Defendants, became
    responsible for:
    All liabilities to the extent related to or arising form or existing at the Linden
    Property, including Liabilities arising under or relating to (a) Environmental Laws
    (provided that such Liabilities shall not include any off-site migration or disposal
    29
    Compl. Ex. A, p. 14. (emphasis in original).
    30
    The “Linden Transfer” is defined in SPA Section 2(a). See Compl. Ex. A, p. 14.
    31
    
    Id. 32 Defs.’
    Countercls. ¶ 51.
    6
    of Hazardous Materials from the Linden Property prior to the Closing, any claims
    or damages associated with any off-site migration or disposal of Hazardous
    Material from the Linden Property prior to the Closing, and for the avoidance of
    doubt, any off-site contamination of soils, groundwater or sediments, any third
    party superfund sites including the Newark Bay Complex, any natural resources
    damages or exposure claims relating to operations or discharges prior to Closing).33
    SPA Section 3.26 is a No Other Representations or Warranties Provision. Section 3.26 states:
    Except for the representations and warranties contained in this Agreement, none of
    the Seller Parties nor any of their respective Affiliates (including the Companies),
    nor any of their respective stockholders, trustees, directors, officers, employees,
    Affiliates, advisors, members, fiduciaries, agents or representatives, nor any other
    Person has made or is making any other representation or warranty of any kind or
    nature whatsoever, oral or written, express or implied, with respect to the Seller
    Parties, their respective Affiliates, the Business, the Companies, the Shares, this
    Agreement or any Ancillary Agreement or the Transactions, including any relating
    to the financial condition, results of operations, assets or Liabilities of any of the
    foregoing entities. Except for the representations and warranties contained in this
    Agreement and other than for fraud, (a) each Seller Party disclaims, on behalf of
    itself, and its Affiliates (including the Companies), any other representations or
    warranties, whether made by any of the Seller Parties, any of their respective
    Affiliates (including the Companies), any of their respective stockholders, trustees,
    directors, officers, employees, Affiliates, advisors, members, fiduciaries, agents or
    representatives or any other Person, . . .
    On June 3, 2011, an attorney prepared a memorandum (the “ISRA Memorandum”)
    discussing the implications of New Jersey law relating to the properties acquired under the SPA.
    Specifically, the ISRA Memorandum states:
    The Linden NJ property owned by ISP Environmental Services, Inc. is vacant land.
    Although at one time it was the location of an operating chemical plant, operations
    ceased there in approximately 1991. A filing under ISRA for the cessation of
    operations was made prior to that time, and in 2002, NJDEP approved a site wide
    Remedial Action Workplan, which was fully implemented. A No Further Action
    Letter was issued for the soils on the site and it is anticipated that a No Further
    Action Letter will be issued shortly for the ground water.
    Once the filing was made for the cessation of operations at the Linden site, and the
    site was shut down, and the NJDEP approved a site wide Remedial Action
    Workplan, the facility is no longer considered an industrial establishment for ISRA
    purposes pursuant to N.J.A.C. 7:26B-1.4. Attached hereto are the comments to the
    33
    
    Id. 7 adoption
    N.J.A.C. 7:26B-1.4 published at 29 N.J.R. 4913(a) clarifying that it is the
    NJDEP’s policy that after the issuance of a Remedial Action Workplan, the
    property is no longer an industrial establishment for purposes of ISRA.34
    The parties closed on the SPA on August 23, 2011.
    The Heyman Defendants’ “Reasonable Best Efforts”
    On July 18, 2011, prior to closing on the SPA, IES notified NJDEP of the pending
    Linden Property transfer, and advised NJDEP that IES (or any ISP affiliate) would not be
    associated with the Linden Property after August 25, 2011.35 The letter did not advise NJDEP
    that LPH was required to become a party on the ACO and that IES was to be removed.36
    Subsequent to closing, LPH performed affirmative duties under the ACO. It replenished
    the outstanding letter of credit.37 LPH made payments to New Jersey to comply with its portion
    of the ACO.38 In addition, LPH applied for Remedial Action Permits (“RAPs”) for soil and
    groundwater at the Linden Property.39 On February 17, 2012, NJDEP issued RAPs for soil and
    groundwater at the Linden Property to LPH only.40 IES is not mentioned in either RAP.41
    On July 3, 2012, LPH’s Environmental Compliance manager requested from NJDEP a
    full satisfaction compliance letter.42 LPH did not mention IES, ISP, or Chemco in its letter.43
    On December 23, 2013, NJDEP denied LPH’s full compliance request.44 NJDEP’s letter
    34
    Mot., Ex. 9.
    35
    2d Am. Compl. ¶ 62; see also Compl., Ex. D.
    36
    2d Am. Compl. ¶ 63.
    37
    See 
    id. at ¶
    ¶ 62, 64.
    38
    
    Id. ¶ 68.
    39
    
    Id. 40 Id.
    ¶ 69 (“The reference site name on that permit and on correspondence from NJDEP forwarding the permit to
    LPH on that date is ‘Linden Property Holdings LLC/Former GAF Chemical Corporation Site.’”).
    41
    
    Id. ¶ 70.
    42
    
    Id. ¶ 74.
    43
    
    Id. 44 Id.
    ¶ 75.
    8
    specifically required an investigation, ecological risk assessment, and remediation of off-site
    contamination.45
    On January 21, 2014, LPH again requested a full satisfaction letter from NJDEP.46 LPH
    also mentioned, purportedly for the first time, that IES transferred the Linden Property to LPH,
    and LPH had taken over on-site responsibilities.47 LPH also alleged that IES was responsible for
    any off-site remediation pursuant to the ACO.48
    On February 7, 2014, LPH’s in-house counsel advised Ashland that additional remedial
    work, including an ecological risk assessment, remained.49 Ashland contends this is the first
    time the Heyman Defendants advised Ashland that off-site work remained. Ashland contends
    that Heyman Defendants had been aware of the off-site requirements since 2007.50
    Ashland responded on February 18, 2014.51 Ashland requested that, pursuant to the SPA,
    LPH: (i) amend the ACO to add LPH as a party; (ii) obtain NJDEP approval to remove IES from
    that ACO; (iii) obtain an extension of the statutory deadline to complete remediation
    investigations; and (iv) complete all work necessary to comply with the ACO.52 Ashland also
    requested that, pursuant to the SPA, the Heyman Defendants copy Ashland on all future
    correspondence and submissions to the NJDEP.53 The Heyman Defendants did not seek an
    extension of the statutory deadline to complete work. So, Ashland retained a Licensed Site
    Remediation Professional (“LSRP”).54 On March 19, 2014, Ashland’s LSRP submitted a
    45
    
    Id. 46 Id.
    ¶ 83.
    47
    
    Id. 48 Id.
    49
    
    Id. ¶ 85.
    50
    
    Id. 51 Id.
    ¶ 90.
    52
    See 
    id. 53 See
    id.
    54
    Id. 
    ¶ 91.
    9
    Remedial Investigation Complete Timeframe Extension Form, and obtained an extension of the
    statutory deadline to complete remedial work.55
    On April 9, 2014, LPH wrote to the NJDEP. LPH argued that, under the SPA, it agreed
    to assume on-site liabilities and Ashland assumed off-site liabilities under the ACO.56 Further,
    LPH contended that all on-site remediation was complete.57 On December 18, 2014, the NJDEP
    informed LPH that: a) its liabilities were not limited to on-site, and b) it was obligated to
    complete a remedial investigation pursuant to the Spill Act and N.J.S.A. 58:10B-1.3 as the
    property owner.58
    On July 23, 2015, the Office of the Attorney General of New Jersey advised LPH that its
    $7,744,000 remediation source established in 2011 was solely “a replacement of the [remediation
    funding source] originally required by the ACO for remediation of the entire site, including
    remediation of offsite contamination.”59 The Office of the Attorney General advised that the
    NJDEP was authorized to draw upon the $7,744,000 remediation source to complete remediation
    of the off-site liabilities.60 Concurrently, the NJDEP sent Ashland and GAF (and its successors)
    a Demand for Stipulated Penalties for the parties’ collective failure to comply with the ACO.61
    The Litigation
    Ashland filed their complaint (the “Complaint”) against the Heyman Defendants on
    October 20, 2015. The Complaint sought a declaratory judgment for: (i) breach of contract –
    against Heyman Defendants; (ii) breach of implied covenant of good faith and fair dealing –
    against Heyman Defendants; (iii) unjust enrichment – against Heyman Defendants; (iv) cost
    55
    
    Id. ¶ 126.
    56
    
    Id. ¶ 88.
    57
    See 
    id. 58 See
    id. ¶ 93.
    
    59
    
    Id. ¶ 94.
    60
    
    Id. 61 Id.
    ¶ 109.
    10
    recovery and contribution under the Spill Act – against LPH; and (v) unjust enrichment – against
    LPH.
    Ashland filed an amended complaint (the “First Amended Complaint”) on December 3,
    2015. The First Amended Complaint alleged the same five causes of action asserted in the
    Complaint. The claims relate to purported obligations of the Heyman Defendants in connection
    with SPA Schedule 5.19 and purported responsibility for the investigation, remediation, and
    cleanup costs regarding environmental contamination of the Arthur Kill, an off-site location.
    Neither the Complaint nor the First Amended Complaint mentions the ISRA Memorandum.
    On January 6, 2016, the Heyman Defendants filed their Answer to the Complaint and
    Counterclaims. The Counterclaims assert six causes of action related to the same off-site
    liabilities associated with the LPH Property. Counts II and III of the Counterclaims are (i)
    Breach of Contract and (ii) Declaratory Judgment – Breach of Contract claims asserted by the
    SPA Seller Successor Parties and RFH against Ashland in light of Ashland’s purported breach of
    Section 2(e) of Schedule 5.19 of the SPA. Counterclaim Count V alleged liability under the Spill
    Act.
    On October 26, 2017, Ashland filed its Second Amended Complaint. The Second
    Amended Complaint seeks: (1) declaratory judgment for breach of contract; (2) breach of the
    implied covenant of good faith and fair dealing; (3) fraud; (4) unjust enrichment against
    Heyman; (5) cost recovery and contribution under the Spill Act; and (6) unjust enrichment
    against LPH. The Second Amended Complaint is fifty-eight pages long and contains two
    hundred and thirty-six allegations.
    11
    On November 15, 2017, the Heyman Defendants filed the Motion. On December 18,
    2017, Ashland filed the Opposition. On January 9, 2018, the Heyman Defendants filed the
    Reply.
    On February 19, 2018, the Court held a hearing (the “Hearing”) on the Motion,
    Opposition, and Reply. The Court took the matter under advisement.
    III. PARTIES’ CONTENTIONS
    A.       THE SECOND AMENDED COMPLAINT COUNT III
    Count III alleges that the Heyman Defendants made fraudulent misrepresentations and/or
    omissions of fact regarding the environmental condition and remediation of the Linden
    Property.62     Ashland alleges that Heyman Defendants: (i) made misleading statements and/or
    omissions of fact in the Pre-SPA Representations/Omissions, notwithstanding a duty to make a
    full and fair disclosure; (ii) made false representations of fact when they provided the ISRA
    Memorandum on June 3, 2011, which misrepresented that NJDEP approved a “site-wide” Redial
    Action Workplan and that Workplan was fully implemented; and (iii) purposefully withheld
    documents from Ashland that showed NJDEP had not approved a site-wide Remedial Action
    Workplan, the ACO was not complete because cleanup was not fully implemented, and there
    were significant unmet obligations under the ACO.63 Ashland contends that the Heyman
    Defendants’ misrepresentation and omission occurred prior to execution of the SPA and in the
    period between execution of the SPA and closing.64
    62
    2d Am. Compl. ¶¶ 92-121.
    63
    
    Id. ¶ 199-201.
    64
    See, e.g., 
    Id. ¶¶ 93-97
    and ¶¶ 101-107.
    12
    B.      MOTION
    The Heyman Defendants argue that: (i) Ashland cannot allege a fraud claim premised on
    the ISRA Memorandum after the SPA was executed; (ii) Ashland cannot sustain any fraud claim
    premised on extra-contractual omissions; (iii) Ashland’s fraud claim must be dismissed because
    it is inconsistent with its contractual allegations; and (iv) Ashland’s fraud claim must fail because
    the damages are duplicative of its breach of contract damages.
    C.      OPPOSITION
    Ashland argues that: (i) the fraud claim is timely; (ii) Heyman Defendants attempt to
    insert facts outside the second amended complaint; (iii) Count III is adequately pled; (iv) the
    SPA permits a fraud claim based upon extra-contractual representations; and (v) Count III is pled
    in the alternative to the breach of contract claim.
    IV. STANDARD OF REVIEW
    A.      12(B)(6) FAILURE TO STATE A CLAIM UPON WHICH RELIEF CAN BE GRANTED
    Upon a motion to dismiss, the Court (i) accepts all well-pleaded factual allegations as
    true, (ii) accepts even vague allegations as well-pleaded if they give the opposing party notice of
    the claim, (iii) draws all reasonable inferences in favor of the non-moving party, and (iv) only
    dismisses a case where the plaintiff would not be entitled to recover under any reasonably
    conceivable set of circumstances.65 However, the court must “ignore conclusory allegations that
    lack specific supporting factual allegations.”66
    65
    See Central Mortg. Co. v. Morgan Stanley Mortg. Capital Holdings LLC, 2
    27 A.3d 531
    , 536 (Del. 2011); Doe v.
    Cedars Academy, No. 09C-09-136, 
    2010 WL 5825343
    , at *3 (Del. Super. Oct. 27, 2010).
    66
    Ramunno v. Crawley, 
    705 A.2d 1029
    , 1034 (Del. 1998).
    13
    B.      9(B) FRAUD PLED WITH PARTICULARITY
    Under Superior Court Civil Rule 9(b), a plaintiff must plead fraud and negligence with
    particularity.67 “The purpose of [Rule 9(b)] is to apprise the adversary of the acts or omissions
    by which it is alleged that a duty has been violated.”68 To plead fraud or negligence with the
    particularity required by Rule 9(b), a plaintiff must include the “time, place, contents of the
    alleged fraud or negligence, as well as the individual accused of committing the fraud” or
    negligence.69
    As a preliminary matter, the Court finds that the Second Amended Complaint has
    pleaded fraud with sufficient particularity.
    V. DISCUSSION
    A.      FRAUD AND STATUTE OF LIMITATIONS
    To plead a claim of fraud, plaintiff must show:
    (1) a false representation, usually one of fact . . .; 2) the defendant's knowledge or
    belief that the representation was false, or was made with reckless indifference to
    the truth; 3) an intent to induce the plaintiff to act or to refrain from acting; 4) the
    plaintiff's action or inaction taken in justifiable reliance upon the representation;
    and 5) damage to the plaintiff as a result of such reliance.70
    In Delaware, there are three types of fraud: “(1) false statements represented as truth; (2) active
    concealment of facts which prevents the other party from discovering them; and (3) silence in the
    face of a duty to speak.”71
    67
    Super. Ct. Civ. R. 9(b).
    68
    Mancino v. Webb, 
    274 A.2d 711
    , 713 (Del. Super. 1971).
    69
    See TrueBlue, Inc., v. Leeds Equity Partners IV, LP, 
    2015 WL 5968726
    , at *6 (Del. Super. Sept. 25, 2015) (quoting
    Universal Capital Mgmt., Inc. v. Micco World, Inc., 
    2012 WL 1413598
    , at *2 (Del. Super. Feb. 1, 2012)).
    70
    Hauspie v. Stonington Partners, Inc., 
    945 A.2d 584
    , 586 (Del. 2008) (quoting Gaffin v. Teledyne, Inc., 
    611 A.2d 467
    , 472 (Del.1992)).
    71
    DRR, L.L.C. v. Sears, Roebuck & Co., 
    949 F. Supp. 1132
    , 1137 (D. Del. 1996).
    14
    The statute of limitations for fraud in Delaware is three years.72 “The statute of
    limitations begins to run when a plaintiff’s claim accrues, which occurs at the moment of the
    wrongful act. . . .”73 For fraud, the statute of limitations begins to run when the fraud is
    “successfully perpetrated.”74
    The statute of limitations may toll when premised on an inherently unknowable injury.
    However, tolling only applies “in certain narrowly carved out limited circumstances when the
    facts at the heart of the claim are so hidden that a reasonable plaintiff could not timely discover
    them.”75 The statute of limitations is tolled “where the injury is inherently unknowable and the
    claimant is blamelessly ignorant of the wrongful act and the injury complained of.”76 The Court
    will consider if there were “red flag[s] that clearly and unmistakably would have led a prudent
    person of ordinary intelligence to inquire” and obtain discovery relating to the claim.77
    If tolled, the statute of limitations begins to run “upon the discovery of facts constituting
    the basis of the cause of action or the existence of facts sufficient to put a person on inquiry
    which, if pursued, would lead to the discovery of such facts.”78 “These facts must usually be
    observable or objective factors that would alert laymen to the problem.”79 However, the mere
    existence of documents accessible to the public will not automatically preclude tolling.80
    72
    
    10 Del. C
    . § 8106; see also SPA § 9.8 stating that Delaware law governs; Pivotal Payments Direct Corp. v. Planet
    Payment, Inc., 
    2015 WL 11120934
    , at *3 (Del. Super. Dec. 29, 2015) (stating that “the general rule is that the forum
    state’s statute of limitations applies.”).
    73
    Airport Bus. Ctr. V LLLP v. Sun Nat. Bank, 
    2012 WL 1413690
    , at *7 (Del. Super. Mar. 6, 2012).
    74
    Playtex, Inc. v. Columbia Cas., 
    1993 WL 390469
    , at *3 (Del. Super. Sept. 20, 1993).
    75
    AM Gen. Hldg. LLC v. Renco Grp., Inc., 
    2016 WL 4440476
    , at *13 (Del. Ch. Aug. 22, 2016).
    76
    Island Farm, Inc. v. Master Sidlow & Assocs., P.A., 
    2007 WL 2758775
    , at *2 (Del. Super. Sept. 20, 2007)
    (internal quotations omitted).
    77
    Coleman v. Price WaterhouseCoopers LLC, 
    854 A.2d 838
    , 843 (Del. 2004).
    78
    
    Id. at 842.
    79
    Island Farm, 
    2007 WL 2758775
    , at *2.
    80
    See Boyce v. Blenheim at Bay Pointe, LLC, 
    2014 WL 8623125
    , at *3 (Del. Super. Dec. 30, 2014).
    15
    Superior Court Civil Rule 15(c)(2) allows, under certain circumstances, a subsequently
    asserted claim to relate back to the date of the original pleading. When the original complaint
    filed in the case gave notice to the defendant of all the facts which will be relied upon at the trial,
    the claim arises from the same occurrence described in the original complaint, and the plaintiff
    will rely on the same operative facts, then the amendment will relate back to the date of the
    original pleading.81 To relate back to the original pleading, the determinative factor is whether
    the defendant should have had notice from the original pleadings that the plaintiff’s new claim
    may have been asserted against the defendant.82
    For Count III, Ashland alleges the fraud occurred between April and the closing of the
    SPA. Absent tolling, any fraud claim is barred as of August 23, 2014. This case was filed on
    October 20, 2015—outside the three-year statute of limitations. Ashland filed the Second
    Amended Complaint on October 26, 2017—which is the first time Ashland asserts the fraud
    claim. Therefore, Ashland’s fraud claim is barred unless it was tolled.
    In this case, Ashland contends that the Heyman Defendants made statements about the
    Linden Property that indicated NJDEP would not require any additional remediation efforts with
    respect to that property. Based on those representations, Ashland entered into SPA. Although
    the 2005 and 2007 NJDEP letters were matters of public record, Ashland alleges it did not
    conduct an inquiry into the property based on the representations made by the Heyman
    Defendants.83 Ashland did not fully perform independent environmental due diligence on the
    Linden Property. Ashland, instead, relied upon responses made by the Heyman Defendants to
    81
    See Rogers v. Delaware Power & Light Co., 
    95 A.2d 842
    (Del. 1953); see also Oakes v. Gilday, 
    351 A.2d 85
    (Del. Super. 1976) (the amended pleading must arise out of the same conduct, transaction or occurrence set forth in
    the original pleading to relate back).
    82
    Bissell v. Papastavros’ Assocs. Medical Imaging, 
    626 A.2d 856
    (Del. Super. 1993).
    83
    See Playtex, 
    1993 WL 390469
    , at *5 (“The requirement of diligence is only meaningful . . . when facts exist that
    would excite the inquiry of a reasonable person . . . Due diligence is not required in the abstract. Plaintiffs are not
    under a duty continually to scout around to uncover claims which they have no reason to suspect they might have.”).
    16
    specific inquiries sent by Ashland. Based on those answers, Ashland believed there were no
    outstanding requirements by the NJDEP regarding the Linden Property. In addition, Ashland
    alleges that the Heyman Defendants took affirmative steps to conceal from Ashland any
    documents that would reveal the material misrepresentations or omissions, including the
    withholding of letters from NJDEP sent in 2005 and 2007, shipping of documents related
    environmental regulatory documents regarding the Linden Property to outside vendors and ISP’s
    outside environmental counsel without notifying Ashland, concealing the existence of related
    documents in a warehouse in Bellville, New Jersey.84 In addition, LPH communicated with
    NJDEP after August 25, 2011 but did not notify Ashland of these communications and potential
    liability until February 7, 2014.85 As alleged, these facts are sufficient to support a claim that the
    statute of limitations was tolled until sometime from December 23, 2013—the date Ashland
    received a letter from the NJDEP stating that the Linden Property was not in compliance with the
    ACO.86
    However, the fraud claim is still time barred unless it relates back to the original
    Complaint. Ashland does not allege fraud in the original Complaint. In fact, Ashland first
    asserts its fraud claim in the Second Amended Complaint which Ashland filed on October 26,
    2017. The Court finds that the original Complaint sufficiently put the Heyman Defendants on
    notice of a potential fraud claim. In the original Complaint, Ashland asserts that the Heyman
    Defendants withheld documents, including the 2005 and 2007 NJDEP Letters.87
    84
    See, e.g., 2d Am. Compl. ¶¶ 111, 113-117, 120, and 121.
    85
    See, e.g., 
    Id. ¶¶ 65-68.
    86
    See id (discussing Bordon v. Paul Revere Life Ins. Co., 
    935 F.2d 370
    (1st Cir. 1991)) (stating “that the prior back
    complaint was inherently unknowable in view of the information provided on the application . . . [plaintiff] made no
    mention of back problems in response to questions on the application designed to elicit such information.”).
    87
    Compl. ¶ 66-67.
    17
    While the original Complaint does not mention the April 2011 Conference Calls leading
    to the execution of the SPA, the original Complaint does discuss LPH’s actions in dealing with
    NJDEP between closing and December 23, 2013 without informing Ashland of these actions.
    The original Complaint and the First Amended Complaint filed on December 3, 2015 do not
    mention the ISRA Memorandum or the April 2011 Conference Calls. Although Ashland did not
    mention the ISRA Memorandum of April 2011 Conference Calls in the first two complaints,
    these statements related to the same transaction and occurrence involving the omission of the
    2005 and 2007 NJDEP Letters raised earlier. Therefore, under Rule 15(c)(2), Ashland can rely
    on the ISRA Memorandum or the April 2011 Conference Calls.
    Ashland also argues that the concealment of the ISRA Memorandum further
    demonstrates the fraud by the Heyman Defendants as part of a continuing fraud. The Heyman
    Defendants’ failure to disclose the ISRA Memorandum furthers Ashland’s tolling argument.
    Had the ISRA Memorandum properly been disclosed, Ashland contends that it would have
    contradicted statements made during the Conference Call about no outstanding environmental
    liability.
    B.         ISRA MEMORANDUM AFTER THE SPA IS EXECUTED
    i. Ashland received ISRA Memorandum after execution of the SPA
    A plaintiff cannot rely on a misrepresentation made after the parties executed an
    agreement for a fraudulent inducement claim. Fraudulent statements made after the execution of
    an agreement “relate to the performance of the contract, not the inducement of the contractual
    relationship.88 Statements made after the formation of the contract “are better addressed by
    applicable contract law.”89 In fact, this Court has stated “[a] claim for fraudulent inducement
    88
    Abbot Labs. v. Owens, 
    2014 WL 8407613
    , at *8-9 (Del. Super. Sept. 15, 2014).
    89
    Brasby v. Morris, 
    2007 WL 949485
    , at *7-8 (Del. Super. Mar. 29, 2007).
    18
    accrues when the fraudulent statements were made, which must be on or before the date when
    the parties entered into the contract.”90
    The SPA is dated May 31, 2011.91 The ISRA Memorandum is dated June 3, 2011.92 It
    appears that Ashland could not have received a draft of the ISRA Memorandum before they
    signed the SPA. Further, Ashland has not contended that the ISRA Memorandum was part of
    negotiations and only executed a few days after the SPA. Because a party many not rely on
    information provided after a contract is executed to maintain a fraudulent inducement claim,
    Ashland should not be allowed to pursue their fraud claim relating to the ISRA Memorandum
    alone. However, Ashland does allege it relied on the ISRA Memorandum in the time between
    execution of the SPA and closing. As such, it appears that the ISRA Memorandum is part of the
    alleged continuing fraud. Ashland argues that Heyman Defendants told a partial truth and hid
    contradictory information. As alleged, the ISRA Memorandum further supports the alleged
    fraud because it gave Ashland incorrect and incomplete information that furthered the
    information provided during the Conference Call. Although the ISRA Memorandum could not
    be the sole basis of the fraud claim, the ISRA Memorandum is relevant in relation to the
    omissions and statements made during the Conference Call.
    90
    Pivotal Payments Direct Corp. v. Planet Payment, Inc., 
    2015 WL 11120934
    , at *4 (Del. Super. Dec. 29, 2015).
    91
    Mot., Ex. 4.
    92
    Mot., Ex. 9.
    19
    ii. ISRA Memorandum contained SPA Seller Parties’ Opinion
    Generally, opinions cannot form the basis of a claim for fraud.93 The “mere expressions
    of opinion as to probable future events cannot be deemed fraud or misrepresentation.”94
    However, a claim for fraud may be appropriate if one “provide[s] a false representation of one’s
    opinion.”95 Additionally, “even an opinion may rise to the level of a misstatement of fact.”96
    Particularly where the person rendering an opinion has “special or superior knowledge.”97
    The mere fact that a material statement is in the form of an opinion . . . is not
    necessarily conclusive as to whether it must be treated as such, or whether it can be
    regarded as a representation of fact, because an opinion may carry with it the
    implication that the maker is aware of facts that support or justify that opinion.
    Where a recipient does not know the facts, he may justifiab[ly] rely upon [the]
    implied assertions and recover on the basis of a misrepresentation of implied fact.98
    But, “[w]hether or not [a] sales agents expressed ‘opinions’ or outright misleading facts is a
    question of fact, and cannot be determined on a Motion to Dismiss.”99
    The ISRA Memorandum states that “in 2002, NJDEP approved a site wide Remedial
    Action Workplan, which was fully implemented. A No Further Action Letter was issued for the
    soils on the site and it is anticipated that a No Further Action Letter will be issued shortly for the
    ground water.”100 The Heyman Defendants’ counsel prepared the ISRA Memorandum for
    Ashland. The ISRA Memorandum seems to explain the possible implications of New Jersey’s
    ISRA statute regarding the transfer of property, including the Linden Property. The statements
    93
    See BAE Sys. N.A. Inc. v. Lockheed Martin Corp., 
    2004 WL 1739522
    , at *7 (Del. Ch. Aug. 3, 2004); Trenwick
    Am. Litig. Tr. v. Ernst & Young, L.L.P., 
    906 A.2d 168
    , 209 (Del. Ch. 2006), aff'd sub nom. Trenwick Am. Litig. Tr. v.
    Billett, 
    931 A.2d 438
    (Del. 2007) (finding that “statements of expectation or opinion about the future of the company
    and the hoped for results of business strategies . . . are generally not actionable under Delaware law”).
    94
    Mentis v. Delaware Am. Life Ins. Co., 
    1999 WL 744430
    , at *7 (Del. Super. July 28, 1999), on reargument, 
    1999 WL 1240818
    (Del. Super. Nov. 5, 1999) (citing Biasotto v. Spreen, 
    1997 WL 527956
    (Del. Super. July 30, 1997)).
    95
    BAE Sys., 
    2004 WL 1739522
    , at *7 n.50.
    96
    Tam v. Spitzer, 
    1995 WL 510043
    , at *8 (Del. Ch. Aug. 17, 1995).
    97
    
    Id. 98 RHA
    Constr., Inc. v. Scott Engr., Inc., 
    2013 WL 3884937
    , at *3 (Del. Super. July 24, 2013).
    99
    Mentis, 
    1999 WL 744430
    , at *7.
    100
    Mot., Ex. 9.
    20
    made in the ISRA Memorandum may consist of opinion, however, the statements about the
    Linden Property appear to be sufficiently definite to be a fact or a fact relied on to form the
    opinions contained in the ISRA Memorandum. As such, this is a question of fact not appropriate
    to decide on a motion.
    C.      EXTRA-CONTRACTUAL OMISSIONS
    i. Ashland can rely on omissions to advance its fraud claim
    Omissions cannot support a claim for fraud in the absence of a fiduciary relationship. In
    a transactional setting between two equally represented and sophisticated parties, no such
    relationship exists. “Because a party in an arms’ length contractual setting begins the process
    without any affirmative duty to speak, any claim of fraud in an arms’ length setting necessarily
    depends on some form of representation.”101 “A fraud claim in that setting cannot start from an
    omission.”102 In fact, “[a]bsent a special relationship, a party is under no duty to disclose ‘facts
    of which he knows the other is ignorant’ even if ‘he further knows the other, if he knew of them,
    would regard [them] as material in determining his course of action in the transaction in
    question.”103
    However, “if a party in an arms’ length negotiation chooses to speak, then it cannot
    lie.”104 “[O]nce a party speaks, it also cannot do so partially or obliquely such that what the
    party conveys becomes misleading.”105 Further, a party may need to disclose information “in
    order to prevent statements actually made from becoming misleading.”106
    101
    Prairie Capital III, L.P. v. Double E Hldg. Corp., 
    132 A.3d 35
    , 52 (Del. Ch. 2015).
    102
    
    Id. 103 Id.
    (quoting Prop. Assoc. 14 v. CHR Hldg. Corp., 
    2008 WL 963048
    , at *6 (Del. Ch. April 10, 2008));
    Restatement (Second) of Torts § 551 cmt. a.
    104
    
    Prairie, 132 A.3d at 52
    (citing Stephenson v. Capano Dev., Inc., 
    462 A.2d 1069
    , 1074 (Del. 1983)).
    105
    
    Id. 106 Stephenson,
    462 A.2d 1074
    .
    21
    “A party may use external sources of information to plead that a contractually identified
    fact was false or misleading, but a party cannot point to extra-contractual information and escape
    the contractual limitation by arguing that the extra-contractual information was incomplete.”107
    Therefore, for an arms’ length deal, “contractual provisions that identify the representations on
    which a party exclusively relied define the universe of information that is in play for purposes of
    a fraud claim.”108
    During the April 2011 Conference Call, Heyman Defendants represented that “a barrier
    wall had been installed and a pump-and-treat remedy was in place.”109 The Heyman Defendants
    “further represented that reserves were in place for 20 years of operation and maintenance of
    completed remedial measures.”110 Ashland contends that the Heyman Defendants did not
    mention “any ongoing on-site or off-site remediation, or any one-site or off-site remediation that
    107
    
    Prairie, 132 A.3d at 52
    .
    108
    Id; see also FdG Logistics LLC v. A&R Logistics Hldgs., Inc., 
    131 A.3d 842
    , 859 (Del. Ch. 2016) (quoting Abry
    Partners V, L.P. v. F & W Acq. LLC, 
    891 A.2d 1032
    , 1057 (Del. Ch. 2006)) (stating there is a “need to strike an
    appropriate balance between holding sophisticated parties to the terms of their contracts and simultaneously
    protecting against the abuses of fraud.”); TrueBlue, Inc. v. Leeds Equity Partners IV, LP, 
    2015 WL 5968726
    , at *6
    (Del. Super. Sept. 25, 2015) (Integration clauses “must clearly state that the parties disclaim reliance upon extra-
    contractual statements.”). In balancing the public policy against fraud with the ability of sophisticated parties to
    contract for integration clauses, Delaware Courts have:
    consistently [ ] respected the law's traditional abhorrence of fraud in implementing this reasoning.
    Because of that policy concern, we have not given effect to so-called merger or integration clauses
    that do not clearly state that the parties disclaim reliance upon extra-contractual statements. Instead,
    we have held, as in Kronenberg, that murky integration clauses, or standard integration clauses
    without explicit anti-reliance representations, will not relieve a party of its oral and extra-contractual
    fraudulent representations. The integration clause must contain “language that ... can be said to add
    up to a clear anti-reliance clause by which the plaintiff has contractually promised that it did not
    rely upon statements outside of the contract's four corners in deciding to sign the contract.” This
    approach achieves a sensible balance between fairness and equity—parties can protect themselves
    against unfounded fraud claims through explicit anti-reliance language. If parties fail to include
    unambiguous anti-reliance language, they will not be able to escape responsibility for their own
    fraudulent representations made outside of the agreement's four corners.
    
    Abry, 891 A.2d at 1058-59
    (quoting Kronenberg v. Katz, 
    872 A.2d 568
    , 592–93 (Del. Ch. 2004)).
    109
    2d Am. Compl. ¶ 97.
    110
    
    Id. 22 would
    be required going forward.”111 Ashland understood the Heyman Defendants
    representations to mean that there “were no significant unmet environmental liabilities associated
    with the [Linden Property].”112
    At the Hearing, Ashland noted that it asked for information about the remediation efforts
    of the Property. The Heyman Defendants told Ashland to look at the data room for any
    information. There were no documents indicating that further action was needed for the
    Property. Because information was missing from the data room and statements made during the
    Conference Call, Ashland relied upon those omissions and statements when it entered into the
    SPA.
    Ashland sufficiently pleaded the fraud claim and may rely upon the omissions and the
    Conference Call in its case. These omissions and representations are sufficient for a fraud claim.
    Based on the allegations, the Heyman Defendants could not provide a half-truth during the due
    diligence process of the SPA. Heyman Defendants reliance on the merger clause of the SPA
    fails as well. Ashland argues that Heyman Defendants made representations during the
    Conference Calls that indicated there was no outstanding liability for the Property. Then,
    Ashland searched the data room and did not find contradictory evidence. The 2005 and 2007
    NJDEP Letters were not included in the data room. Then, after the parties executed the SPA, but
    before closing, Heyman Defendants provided the ISRA Memorandum that further indicated there
    was no outstanding liability for the Property. Based on this claim, Ashland may rely upon the
    Conference Calls, the omissions of the NJDEP Letters from the data room, and the ISRA
    Memorandum in the face of the merger clause in the SPA to further the fraud claim.
    111
    
    Id. 112 Id.
    ¶ 98.
    23
    ii. Ashland properly pleaded the omissions and statements during the Conference Call
    with particularity
    Under Superior Court Civil Rule 9(b), a plaintiff must plead fraud and negligence with
    particularity.113 “The purpose of [Rule 9(b)] is to apprise the adversary of the acts or omissions
    by which it is alleged that a duty has been violated.”114 To plead fraud or negligence with the
    particularity required by Rule 9(b), a plaintiff must include the “time, place, contents of the
    alleged fraud or negligence, as well as the individual accused of committing the fraud” or
    negligence.115
    Ashland sufficiently pleads fraud under Rule 9(b) relating to the April 2011 Conference
    Calls. During the April 2011 Conference Call, Heyman Defendants represented that “a barrier
    wall had been installed and a pump-and-treat remedy was in place.”116 The Heyman Defendants
    “further represented that reserves were in place for 20 years of operation and maintenance of
    completed remedial measures.”117 Ashland contends that the Heyman Defendants did not
    mention “any ongoing on-site or off-site remediation, or any one-site or off-site remediation that
    would be required going forward.”118 Ashland understood the Heyman Defendants
    representations to mean that there “were no significant unmet environmental liabilities associated
    with the [Linden Property].”119
    Ashland sufficiently pleads fraud under Rule 9(b) relating to the April 2011 Conference
    Calls and undisclosed information.
    113
    Super. Ct. Civ. R. 9(b).
    114
    Mancino v. Webb, 
    274 A.2d 711
    , 713 (Del. Super. 1971).
    115
    See TrueBlue, Inc., 
    2015 WL 5968726
    , at *6 (quoting Universal Capital Mgmt., Inc. v. Micco World, Inc., C.A.
    No. N10C-07-039-RRC, 
    2012 WL 1413598
    , at *2 (Del. Super. Feb. 1, 2012)).
    116
    2d Am. Compl. ¶ 97.
    117
    
    Id. 118 Id.
    119
    
    Id. ¶ 98.
    24
    Ashland sufficiently pleaded reliance upon April 2011 Conference Calls and the 2005
    and 2007 NJDEP Letters. The April 2011 Conference Calls led Ashland to believe that all
    remedial measures were taken regarding the Linden Property. As such, Ashland agreed to the
    liability provisions contained in the SPA based on those representations. Further, based on the
    representations made in the April 2011 Conference Calls, and lack of the hidden documents,
    Ashland agreed to the liability provision. The 2005 and 2007 NJDEP Letters “would have
    disclosed material information relating to the environmental condition and status of the [Linden
    Property] . . . .”120
    D.      ASHLAND’S FRAUDULENT INDUCEMENT CLAIM, PLEADED IN THE ALTERNATIVE, IS NOT
    INCONSISTENT WITH THE CONTRACTUAL ALLEGATIONS
    Delaware Superior Court Rule 8(e)(2) allows a plaintiff to “set forth two or more
    statements of a claim or defense alternately or hypothetically, either in one count or defense or in
    separate counts or defenses. . . . The party may also state as many separate claims or defenses as
    the party has regardless of consistency. All statement shall be made subject to the obligations set
    forth in Rule 11.”
    “A fraud claim can be based on representations found in a contract, however, ‘where an
    action is based entirely on a breach of the terms of a contract between the parties, and not on a
    violation of an independent duty imposed by law, a plaintiff must sue in contract and not in
    tort.’”121 A plaintiff “cannot bootstrap” a claim for a breach of contract into a claim of fraud
    merely by alleging that a contracting party never intended to perform its obligations” or “simply
    120
    
    Id. ¶ 204.
    121
    ITW Glob. Investments Inc. v. Am. Indus. Partners Capital Fund IV, L.P., 
    2015 WL 3970908
    , at *6 (Del. Super.
    June 24, 2015) (citing Ameristar Casinos, Inc. v. Resorts Int’l Hldg., LLC, 
    2010 WL 1875631
    , at *11 (Del. Ch. June
    24, 2010)).
    25
    by adding the term fraudulently induced to a complaint.”122 Essentially, a fraud claim alleged
    contemporaneously with a breach of contract claim may survive, so long as the claim is based on
    conduct that is separate and distinct from the conduct constituting breach.”123 Allegations that
    are focused on inducement to contract are ‘separate and distinct’ conduct.”124
    In this case, Ashland did not explicitly state that their breach of contract and Count III are
    pleaded in the alternative. However, Ashland has conceded that they pleaded their breach of
    contract and fraud claims in the alternative. Further, Ashland alleges that the Heyman
    Defendants made false representations or omissions prior to entering into the SPA.
    E.      DUPLICATIVE DAMAGES
    “Delaware courts have consistently held that to successfully plead a fraud claim, the
    allegedly defrauded plaintiff must have sustained damages as a result of a defendant’s [allegedly
    fraudulent] action. . . . [T]he damages allegations may not simply rehash the damages allegedly
    caused by the breach of contract.”125 “Failure to plead separate damages is an independent
    ground for dismissal.”126 However, the “mere addition of punitive damages . . . is not enough to
    distinguish it from the contract damages.”127
    Ashland argues that the damages are distinct. The damages relating to the breach of
    contract are based on the loss of bargaining power. For breach of contract, Ashland seeks
    declarations that the Heyman Defendants must: (1) conduct all environmental investigation and
    remediation efforts required by NJDEP at the Property; (2) add themselves or LPH to the ACO;
    122
    Furnari, 
    2014 WL 1678419
    , at *8 (quoting Narrowstep Inc. v. Onstream Media Corp., 
    2010 WL 5422405
    , at
    *15 (Del. Ch.2010)).
    123
    Furnari, 
    2014 WL 1678419
    , at *8.
    124
    ITW Glob., 
    2015 WL 3970908
    , at *6 (quoting Osram Sylvania Inc. v. Townsend Ventures, LLC, 
    2013 WL 6199554
    , at *16–17 (Del. Ch.2013)).
    125
    Cornell Glasgow, LLC v. La Grange Props. LLC, 
    2012 WL 2106945
    , at *8-9 (Del. Super. June 6, 2012).
    126
    EZLinks Golf, LLC v. PCMS Datafit, Inc., 
    2017 WL 1312209
    , at *6 (Del. Super. Mar. 13, 2017) as corrected
    (Mar. 1, 2017).
    127
    
    Id. 26 (3)
    request that NJDEP remove IES, ISP, and any other ISP affiliates from the ACO; (4) comply
    with ISRA; (5) reimburse Ashland for all costs and penalties incurred in connection with the
    cleanup of the Property; and (6) immediately undertake all environmental investigation and
    remediation efforts of the Property necessary to comply with the ACO, ISRA, and New Jersey
    law.
    However, the fraud damages are calculated to restore the status quo. Ashland seeks
    compensatory damages in the amount Ashland expended for investigative and remediation
    activities at the Property in addition to punitive damages. Ashland concedes that Count III is
    pleaded in the alternative to the breach of contract claim. Since the claims are pleaded in the
    alternative, the claims “would never co-exist at final judgment and are, therefore, not
    duplicative.”128
    In this case, Ashland’s damages for breach of contract and fraud appear duplicative.
    Although claims may co-exist if the damages are distinct in the two counts, here, the fraud
    damages for the investigative and remediation activities at the Linden Property is subsumed in
    the breach of contract claim. Further, Ashland does not explicitly seek recession of the contract
    based on any fraudulent statements or omissions.
    However, the breach of contract claim and fraud claim are pleaded in the alternative.129
    Ashland alleges that the Heyman Defendants misled Ashland prior to the execution of the SPA,
    128
    Opp. at 35.
    129
    Modern Mgt. Co. v. Wilson, 
    997 A.2d 37
    , 44 (D.C. App. 2010) (“Here, Wilson sought alternative recovery under
    several different statutes for the appellants' conduct, specifically asserting that the transaction was an
    unconscionable loan or, in the alternative, if the jury decided that the transaction was not a loan, a fraudulent sale.
    Therefore, the trial court did not err in refusing to require Wilson to elect her remedies prior to trial.”); Countrywide
    Home Loans, Inc. v. Thitchener, 
    192 P.3d 243
    , 248 (Nev. 2008) (“While plaintiffs are permitted to plead alternative
    or different theories of relief based on the same facts, plaintiffs may not recover more than their “total loss plus any
    punitive damages assessed.” Here, although the verdict form instructed the jury to ‘award the total amount of the
    Plaintiffs' damages without awarding any duplicative damages’ and contained separate categories of damages
    corresponding to each of the Thitcheners' surviving claims—breach of contract, negligence, trespass, and
    conversion—the record shows that the jury failed to heed this instruction.”).
    27
    hid information from Ashland, and then sent a misleading document after the execution of the
    SPA. These allegations go beyond a simple breach of contract claim were the Heyman
    Defendants did not intend to comply with the terms of the SPA. Therefore, the breach of
    contract claim and fraud claim are different at this stage in litigation. The Heyman Defendants
    may later readdress the alternative pleadings.
    VI. CONCLUSION
    The Court has been actively involved in this civil action.130 As presented to date, the
    Court sees an arms’-length contractual transaction negotiated by sophisticated parties who were
    represented by attorneys. The Linden Property transaction is not the most material aspect of the
    SPA.131 While alleging claims for fraud and unjust enrichment and alike, both parties constantly
    refer to the SPA to support their claims. The parties, rightfully, rely on the pleading
    requirements and legal standards of the Superior Court Civil Rules to assert their causes of
    action. The Court continues to believe, however, that focused discovery on the contractual
    issues would allow for summary resolution of the claims asserted in this civil action.132
    For the reasons stated above, the Court DENIES the Motion.
    IT IS SO ORDERED
    /s/ Eric M. Davis
    Eric M. Davis, Judge
    cc:     File&ServeXpress
    130
    See Ashland LLC v. The Samuel Heyman 1981 Continuing Trust, C.A. No. N15C-10-176 EMD CCLD, 
    2017 WL 1216788
    (Del. Super. March 31, 2017); Ashland LLC v. The Samuel Heyman 1981 Continuing Trust, C.A. No.
    N15C-10-176 EMD CCLD, 
    2017 WL 1224506
    (Del. Super. March 30, 2017); Ashland LLC v. The Samuel Heyman
    1981 Continuing Trust, C.A. No. N15C-10-176 EMD CCLD, 
    2017 WL 1191099
    (Del. Super. March 29, 2017).
    131
    Under the SPA, Ashland acquired ISP, IES and Chemco from the Heyman Defendants for $3.2 billion. 2d Am.
    Compl. ¶ 51.
    132
    See, e.g., Ashland LLC, 
    2017 WL 1191099
    , at *6-7.
    28
    29