Town of Ponce Inlet v. Pacetta, LLC , 2017 Fla. App. LEXIS 8842 ( 2017 )


Menu:
  •          IN THE DISTRICT COURT OF APPEAL OF THE STATE OF FLORIDA
    FIFTH DISTRICT
    NOT FINAL UNTIL TIME EXPIRES TO
    FILE MOTION FOR REHEARING AND
    DISPOSITION THEREOF IF FILED
    THE TOWN OF PONCE INLET,
    A FLORIDA MUNICIPALITY,
    Appellant,
    v.                                               Case No. 5D14-4520
    PACETTA, LLC, A FLORIDA LIMITED
    LIABILITY COMPANY, DOWN THE
    HATCH, INC., A FLORIDA CORPORATION,
    AND MAR-TIM, INC., A FLORIDA
    CORPORATION,
    Appellees.
    ________________________________/
    Opinion filed June 16, 2017
    Appeal from the Circuit Court
    for Volusia County,
    Terence R. Perkins, Judge.
    Elliot H. Scherker and Brigid F. Cech
    Samole, of Greenberg, Traurig, P.A.,
    Miami, and Kimberly S. Mello, of Greenberg
    Traurig, P.A., Tampa, and Clifford B.
    Shepard, of Shepard, Smith & Cassady,
    P.A., Maitland, and Noah C. McKinnon, Jr.,
    and Abraham C. McKinnon, of McKinnon &
    McKinnon, P.A., Ormond Beach, for
    Appellant.
    Amy Brigham Boulris, Kenneth B. Bell and
    Lauren L. Purdy, of Gunster, Yoakley &
    Stewart, P.A., Miami, and Peter B. Heebner
    and John N. Upchurch, of Heebner,
    Baggett, Upchurch & Garthe, P.L., Daytona
    Beach, for Appellees.
    Nancy E. Stroud, Counsel for American
    Planning Association, Boca Raton, Amicus
    Curiae for Appellant.
    Mark Miller and Christina M. Martin, of
    Pacific Legal Foundation, Palm Beach
    Gardens, Amicus Curiae for Appellees.
    LAMBERT, J.
    The parties in this case make their third appearance before this court. In this
    appeal, the Town of Ponce Inlet (“Town”) appeals a multi-million-dollar second amended
    final judgment entered following a jury trial on damages arising from an inverse
    condemnation claim as well as an earlier order resulting from a bench trial on liability
    (“liability order”) that found in favor of the Appellees: Pacetta, LLC; Down the Hatch, Inc.;
    and Mar-Tim, Inc. (collectively “Pacetta”).      To explain our decision today, we first
    chronologically discuss the factual and procedural history involving these parties as well
    as the significance and intertwinement of our two earlier opinions regarding these parties.
    The Town of Ponce Inlet is a small, mostly residential community in Volusia
    County, located on the southern tip of a peninsula south of Daytona Beach. The main
    peninsula of the town is bordered to the west by the Halifax River, to the east by the
    Atlantic Ocean, and to the south by the Ponce Inlet, connecting the river to the ocean.
    There is very little commercial development in the town, other than as described by the
    trial court as “some limited retail establishments.” The primary commercial developments
    in the town are three riverfront enterprises, with Pacetta’s property being the middle of
    the three riverfront enterprises.
    The origin of the dispute between the parties began in 2003. That year, Town
    adopted a Comprehensive Land-Use Plan, which was accepted and approved by the
    2
    State of Florida. The plan created a “riverfront commercial” land-use category that placed
    limits on both the height and square footage of commercial buildings, and it also prohibited
    the construction of new marinas and the expansion of existing marinas. In January 2004,
    Town enacted a Riverfront Overlay District (“ROD”), which limited the use of dry stack
    boat storage facilities.
    In June 2004, Pacetta, through its two controlling principals, Lyder and Simone
    Johnson, purchased the first two parcels of property at issue, with parcel 1 being situated
    in the riverfront commercial zoned area and parcel 2 being located in an area zoned
    medium-density residential. The original intent for this purchase was to build a “dream
    home,” along with some possible other residential development.
    The following year, Pacetta, with encouragement from Town, decided to broaden
    its development into what the trial court described in its liability order as a “delightful
    mixed-use planned waterfront development.” However, to do so required the acquisition
    of additional properties. To that end, in August 2005, Pacetta purchased parcels 3 and
    4, and in March 2006, it purchased parcels 5–9, on which were situated the commercial
    establishments Sea Love Boat Works and the Down the Hatch restaurant. Finally, in May
    2006, Pacetta purchased parcel 10, which was zoned multi-family and permitted for
    nineteen townhouses and an equivalent number of boat slips. As a result of these
    purchases, Pacetta’s ten parcels were contiguous to each other and encompassed
    sixteen acres of land.
    Pacetta then began to prepare a plan to develop all ten parcels as a waterfront
    project to be known as the Villages of Ponce Park. As found by the trial court, Pacetta
    anticipated that “it would be entitled to build and sell a series of townhomes on the south
    end of the acreage, would be able to continue to run and expand the restaurant,” Down
    3
    the Hatch, “and would be able to build and operate a dry slip stacked storage facility on
    the north end of the property in an area historically dedicated to boat building,
    maintenance and repair.” However, Pacetta’s proposed development was not consistent
    with, and in fact was forbidden by, the Town’s 2003 Comprehensive Land-Use Plan and
    the 2004 ROD. This was significant because “[a] local comprehensive land use plan is a
    statutorily mandated legislative plan to control and direct the use and development of
    property within a county or municipality.” Citrus Cty. v. Halls River Dev., Inc., 
    8 So. 3d 413
    , 420 (Fla. 5th DCA 2009) (citing § 163.3167(1), Fla Stat. (2005); Machado v.
    Musgrove, 
    519 So. 2d 629
    , 631–32 (Fla. 3d DCA 1987)). The plan is similar to a
    constitution for all future development within the government boundary. Id. at 420-21
    (citing Machado, 519 So. 2d at 632). Where, as here, a Comprehensive Land-Use Plan
    has been adopted, “‘all development undertaken by, and all actions taken in regard to
    development orders by, governmental agencies in regard to land covered by such plan’
    must be consistent with that plan.” Id. at 421 (quoting § 163.3194(1)(a), Fla. Stat. (2005)).
    Therefore, in order to proceed with its planned waterfront development, Pacetta
    needed Town to amend its Comprehensive Land-Use Plan and to essentially relax the
    existing ROD zoning.      Town began taking necessary steps to amend its plan to
    accommodate Pacetta’s development project. In return, Town had certain requirements
    of Pacetta for the project, which were amenable to Pacetta. Pacetta invested significant
    time, effort, and money in its attempt to implement the project. As found by the trial court,
    “between June of 2004 and 2008, there does not appear to be any meaningful dispute
    that [Pacetta] and the Town had a harmonious convivial relationship that might even be
    described as pacesetting. While some cracks began to form in late 2007, the cooperation
    between [Pacetta] and the Town [toward developing this project] was unprecedented.”
    4
    What occurred in 2007 was the result of a growing movement by some of Town’s
    officials and other citizens opposing Pacetta’s project. In August 2007, Town passed an
    ordinance proposing an amendment to its town charter to allow “citizens’ initiatives . . . in
    conjunction with land actions.” On October 17, 2007, Town then passed a year-long
    moratorium on any building.      Despite the foregoing, in March 2008, Town’s council
    approved an amendment to its Comprehensive Land-Use Plan that deleted the square
    foot limits on commercial buildings and allowed both wet and dry boat storage in the
    riverfront commercial area, two requirements essential for Pacetta to proceed with the
    waterfront project. As it was required to do, Town submitted the Comprehensive Land-
    Use Plan amendment to the State of Florida Department of Community Affairs (“DCA”)
    for review.1 The DCA thereafter provided Town with its objections, recommendations,
    and comments. After the plan was modified to address the DCA’s objections, it was
    submitted back to the town council for a second reading and for final approval of the
    amendment to the Comprehensive Land-Use Plan.
    In the meantime, during the fall of 2008, an election for town council seats was
    held. The ballot also included a referendum resulting from a citizens’ initiative petition to
    amend the town charter so that land-use restrictions already in place would be elevated
    to the status of an immutable charter provision that, in this case, would effectively bar or
    1 At the time, there was a two-stage process for amending a Comprehensive Land-
    Use Plan under chapter 163, Florida Statutes. Martin Cty. v. Yusem, 
    690 So. 2d 1288
    ,
    1294 (Fla. 1997). First, the local government determines whether to transmit the proposed
    amendment for further review. Id. (citing § 163.3184(3), Fla. Stat. (1989)). If transmitted
    to the DCA, the DCA, after receiving the amendment, provides the local government with
    its objections, recommendations for modifications, and comments from any other regional
    agencies. Id. (citing § 163.3184(4), Fla. Stat. (1989)). The local government then has
    three options: (1) adopt the amendment; (2) adopt the amendment with changes; or (3)
    not adopt the amendment. Id. (citing § 163.3184(7), Fla. Stat. (1989)). Amendments to
    comprehensive plans are legislative policy decisions. Id. at 1293–94.
    5
    Pacetta’s Regulatory Taking/Inverse Condemnation Claim
    The Fifth Amendment to the United States Constitution prohibits the government
    from taking private property “for public use without just compensation.”4 The typical taking
    is accomplished through an eminent domain action, which provides for a “direct
    government appropriation or physical invasion of private property.” Lingle v. Chevron
    U.S.A. Inc., 
    544 U.S. 528
    , 537 (2005). Here, there has been no physical invasion of
    Pacetta’s property by Town. Instead, Pacetta asserted that Town’s actions resulted in an
    inverse condemnation of its properties, which is defined as “a cause of action by a
    property owner to recover the value of property that has been de facto taken by an agency
    having the power of eminent domain where no formal exercise of that power has been
    undertaken.” Ocean Palm Golf Club P’ship v. City of Flagler Beach, 
    139 So. 3d 463
    , 471
    (Fla. 5th DCA 2014) (quoting Osceola Cty. v. Best Diversified, Inc., 
    936 So. 2d 55
    , 59-60
    (Fla. 5th DCA 2006)). A regulatory taking can be either total or partial. In a “total” or “per
    se” taking, the government’s regulations effectively deny all economically beneficial or
    productive use of the property. Id. (citing Lucas v. S.C. Coastal Council, 
    505 U.S. 1003
    ,
    1015 (1992)). In a “partial” or “as-applied” taking under Penn Central Transportation Co.
    v. City of New York, 
    438 U.S. 104
     (1978), the court must evaluate: “(1) the economic
    impact of the regulation on [the property owner]; (2) the extent to which the regulation has
    interfered with distinct investment-backed expectations; and (3) the character of the
    4 The Federal Takings Clause applies to the states through the Fourteenth
    Amendment. St. Johns River Water Mgmt. Dist. v. Koontz, 
    77 So. 3d 1220
    , 1226 (Fla.
    2011), rev’d on other grounds, 
    133 S. Ct. 2586
     (2013); see also Art. X, § 6(a), Fla. Const.
    12
    charter amendment and conforming ordinance because it improperly affected five or
    fewer parcels of property.
    In Town of Ponce Inlet v. Pacetta, LLC, 
    63 So. 3d 840
     (Fla. 5th DCA 2011)
    (“Pacetta I”), this court affirmed the final summary judgment. We first addressed whether
    Pacetta’s sixteen acres of land were properly considered as ten separate parcels or one
    parcel. Pacetta I, 63 So. 3d at 840–42. Section 163.3164(16), Florida Statutes (2008),
    defined a “parcel of land” as:
    any quantity of land capable of being described with such
    definiteness that its locations and boundaries may be
    established, which is designated by its owner or developer as
    land to be used, or developed as, a unit or which has been
    used or developed as a unit.
    Pacetta took the position that although it purchased ten separate tracts or parcels of
    property, its combined property constituted one unit or one parcel of land. Pacetta I, 63
    So. 3d at 840–41.
    In affirming the summary judgment, we held that although Pacetta had purchased
    the various tracts of land from the prior owners, the summary judgment evidence filed
    clearly showed that this was a contiguous sixteen-acre parcel of land that had been
    designated by Pacetta as land to be used or developed as a single unit. Id. at 841.
    Therefore, we concluded that “[b]ecause the evidence was uncontroverted that the
    citizens’ initiative referendum affected five or fewer parcels, the trial court correctly
    determined that the referendum violated section 163.3167(12), and declared it invalid.”
    Id. at 842 (footnote omitted). As a result, the ordinance conforming the Comprehensive
    Land-Use Plan to the referendum was also invalidated. Id.
    In May 2010, Pacetta filed the instant suit. In its operative amended complaint
    filed against Town, Pacetta sought compensation for an “unconstitutional ‘taking’/inverse
    7
    Pacetta’s Federal Due Process/Equal Protection Claims
    Town argues that the trial court erred when it did not enter judgment on Pacetta’s
    due process and equal protection claims asserted under the Federal Constitution but only
    entered judgment in Town’s favor on Pacetta’s claims for substantive and procedural due
    process violations under the Florida Constitution. Town contends that Pacetta pursued
    both its state and federal constitutional claims in this state court action and that when
    Pacetta failed to present at trial any evidence of damages on either count, the trial court
    erred post-trial when it entered final judgment only on the state constitutional claims,
    despite having granted Town’s motion for directed verdict at trial. We agree.
    In count II of its operative complaint, Pacetta alleged that the various actions of
    Town denied it substantive due process and equal protection in violation of article I,
    section 9 of the Florida Constitution and the Fifth and Fourteenth Amendments of the
    United States Constitution. In count III, Pacetta asserted that the same actions of Town
    violated Pacetta’s rights to procedural due process under the same provision of the
    Florida Constitution as well as the Fourteenth Amendment and title 42, section 1983,
    United States Code. Pacetta did not seek injunctive relief on either of these two counts;
    instead, it demanded judgment for damages and a jury trial. When a party is challenging
    “a regulation, statute or land use plan as a denial of substantive or procedural due
    process, the focus is on whether there has been an invalid exercise of police power. If
    proven, the remedy is monetary damages.” Taylor, 659 So. 2d at 1170.
    Following the bench trial on liability, the court entered the now challenged liability
    order in which, among other things, it found in favor of Pacetta on its constitutional claims
    of the evidence and the law of the case provided in this opinion, a new trial on the single
    claim that a “partial” taking has occurred is necessary.
    18
    doctrine of equitable estoppel precludes a municipality from exercising its zoning power
    where the “property owner (1) [relying] in good faith (2) upon some act or omission of the
    government (3) has made such a substantial change in position or has incurred such
    extensive obligations and expenses that it would be highly inequitable and unjust to
    destroy the right he acquired.” Hollywood Beach Hotel Co. v. City of Hollywood, 
    329 So. 2d
     10, 15–16 (Fla. 1976) (quoting City of Hollywood v. Hollywood Beach Hotel Co., 
    283 So. 2d 867
    , 869 (Fla. 4th DCA 1973)).
    The trial court found in Pacetta’s favor, with minor exceptions, on all four counts.
    As to the regulatory taking/inverse condemnation claim, the court divided the sixteen
    acres into the ten separate parcels that Pacetta originally purchased and evaluated
    whether there had been a “taking” as to each individual parcel. The court found that there
    had been a “taking” as to parcels 1, 3, 4, and 10, but concluded that there had been no
    “taking” as to parcels 2, 5, 6, 7, 8, and 9. As to these latter parcels, the court found that
    under counts II and III, Pacetta was entitled to damages based on Town’s equal protection
    violation and the violation of Pacetta’s substantive and procedural due process rights.
    Lastly, the court found that Pacetta had clearly established that the actions of Town had
    inordinately burdened Pacetta’s property under the Harris Act.
    Pursuant to Florida Rule of Appellate Procedure 9.130(a)(3)(C)(viii), Town
    appealed that portion of the non-final liability order finding liability under the Harris Act.
    In Town of Ponce Inlet v. Pacetta, LLC, 
    120 So. 3d 27
     (Fla. 5th DCA 2013) (“Pacetta II”),
    Town argued that the trial court erred as a matter of law in finding that Pacetta had
    established by equitable estoppel a vested right to essentially require Town to amend its
    2003 Comprehensive Land-Use Plan so that Pacetta could develop its sixteen acres
    consistent with the proposed 2008 amendment to the plan, which initially had been
    9
    approved on first reading but was later rejected on the second reading. Pacetta II, 120
    So. 3d at 29.
    This court reversed the liability order finding Town liable to Pacetta under the
    Harris Act. Id. at 29–31. We explained that
    equitable estoppel can be invoked only when a property
    owner relies in good faith upon some government action. No
    such good faith reliance was established in this case. At the
    time    Pacetta    purchased       its   properties,    [Town’s]
    Comprehensive Land-Use Plan expressly prohibited the type
    of development which Pacetta proposed for its properties.
    Any assurances by town officials that the Comprehensive
    Plan would be amended so as to authorize Pacetta’s
    development plans could not be relied upon in good faith by
    Pacetta, since town officials lacked the authority to unilaterally
    amend the Comprehensive Land-Use Plan. See §
    163.3184(4), (15), Fla. Stat. (2009) (requiring any proposed
    change to Comprehensive Plans to be subject to approval by
    various government agencies). Recognition of a vested right
    based on assurances from town officials to amend the
    Comprehensive Land-Use Plan would also be in violation of
    public policy, in light of the public hearings and other
    government approvals required for Comprehensive Plan
    amendments.
    Id. at 30–31.
    Upon remand from Pacetta II, Town moved the trial court to reconsider its liability
    order as to the remaining counts. Town argued that the trial court’s findings of liability
    against it on all counts were solely predicated on the court’s threshold finding that Pacetta
    established a vested right to build its project in violation of the 2003 plan based upon the
    equitable estoppel doctrine and that, as a result of Pacetta II, this avenue was no longer
    viable.     The trial court, while acknowledging that its liability order was no longer
    sustainable based upon the equitable estoppel theory that was now contrary to the “law
    of the case,” nevertheless denied the motion, concluding in an unelaborated order that its
    10
    remaining findings in the liability order provided “sound support” for Pacetta on the three
    remaining counts.
    The jury trial on the issue of damages occurred in September 2014. At the close
    of Pacetta’s case-in-chief, Town moved for a directed verdict on counts II and III, arguing
    that Pacetta failed to produce any evidence of damages based on the alleged due process
    or equal protection violations. In response, Pacetta requested that, if the court was
    inclined to grant the motion, it dismiss counts II and III without prejudice, rather than
    directing a verdict in Town’s favor. The trial court declined Pacetta’s request and granted
    Town’s motion for directed verdict on both counts without qualification. The jury thereafter
    returned its verdict on the “taking” count, finding the relevant fair market value of parcels
    1 and 10 to be $18 million and the relevant fair market value of parcels 3 and 4 to be
    $1.85 million.3 After computing prejudgment interest, the court entered final judgment in
    favor of Pacetta in the amount of $30,775,248.29. As to counts II and III, the court
    receded from its earlier directed verdict ruling and entered an amended final judgment
    finding in favor of Town on Pacetta’s state constitution claims but keeping intact Pacetta’s
    federal constitutional due process and equal protection causes of action. This appeal
    followed.
    3 The jury’s determination of the parcels’ fair market values was based upon the
    fair market values as of January 17, 2007, the date on which the trial court found that the
    taking had occurred.
    11
    Pacetta’s Regulatory Taking/Inverse Condemnation Claim
    The Fifth Amendment to the United States Constitution prohibits the government
    from taking private property “for public use without just compensation.”4 The typical taking
    is accomplished through an eminent domain action, which provides for a “direct
    government appropriation or physical invasion of private property.” Lingle v. Chevron
    U.S.A. Inc., 
    544 U.S. 528
    , 537 (2005). Here, there has been no physical invasion of
    Pacetta’s property by Town. Instead, Pacetta asserted that Town’s actions resulted in an
    inverse condemnation of its properties, which is defined as “a cause of action by a
    property owner to recover the value of property that has been de facto taken by an agency
    having the power of eminent domain where no formal exercise of that power has been
    undertaken.” Ocean Palm Golf Club P’ship v. City of Flagler Beach, 
    139 So. 3d 463
    , 471
    (Fla. 5th DCA 2014) (quoting Osceola Cty. v. Best Diversified, Inc., 
    936 So. 2d 55
    , 59-60
    (Fla. 5th DCA 2006)). A regulatory taking can be either total or partial. In a “total” or “per
    se” taking, the government’s regulations effectively deny all economically beneficial or
    productive use of the property. Id. (citing Lucas v. S.C. Coastal Council, 
    505 U.S. 1003
    ,
    1015 (1992)). In a “partial” or “as-applied” taking under Penn Central Transportation Co.
    v. City of New York, 
    438 U.S. 104
     (1978), the court must evaluate: “(1) the economic
    impact of the regulation on [the property owner]; (2) the extent to which the regulation has
    interfered with distinct investment-backed expectations; and (3) the character of the
    4 The Federal Takings Clause applies to the states through the Fourteenth
    Amendment. St. Johns River Water Mgmt. Dist. v. Koontz, 
    77 So. 3d 1220
    , 1226 (Fla.
    2011), rev’d on other grounds, 
    133 S. Ct. 2586
     (2013); see also Art. X, § 6(a), Fla. Const.
    12
    governmental action.”5 Id. (quoting Leon Cty. v. Gluesenkamp, 
    873 So. 2d 460
    , 467 (Fla.
    1st DCA 2004)).
    The first step for a court in analyzing whether there has been a taking under Lucas
    or Penn Central is to “define what constitutes the relevant parcel before [it] can evaluate
    the regulation’s effect on that parcel.” Dist. Intown Props. Ltd. P’ship v. Dist. of Columbia,
    
    198 F.3d 874
    , 879 (D.C. Cir. 1999). Stated differently, the subject of the alleged taking
    must first be determined. Ocean Palm, 139 So. 3d at 468 n.7. Town argues that the
    proper analysis is to treat the sixteen acres as one whole parcel. Pacetta urges that the
    trial court correctly treated the property as ten separate parcels, as the properties were
    purchased as separate and distinct lots. Based upon the doctrine of judicial estoppel, we
    hold that the trial court erred in not treating Pacetta’s land as one parcel.
    Judicial estoppel provides that “[o]ne who assumes a particular position or theory
    in a case,” and secures court action thereby, “is judicially estopped in a later phase of that
    same case, or in another case, from asserting any . . . inconsistent position toward the
    same parties and subject matter.” In re Adoption of D.P.P., 
    158 So. 3d 633
    , 639 (Fla. 5th
    DCA 2014) (emphasis added) (citing Federated Mut. Implement & Hardware Ins. Co. v.
    Griffin, 
    237 So. 2d 38
    , 41-42 (Fla. 1st DCA 1970)). As previously discussed, in Pacetta
    I, Pacetta took the position that its entire sixteen-acre property constituted one parcel of
    land to be developed as a single unit. Having successfully defeated the citizens’ initiative
    referendum in that case based upon its position that its property was one parcel or unit,
    Pacetta is estopped from taking the diametrically opposite position here. Additionally, in
    5 There is also a fourth type of “taking,” referred to as a “land-use exaction” taking,
    that is not applicable here. See Dolan v. City of Tigard, 
    512 U.S. 374
     (1994); Nollan v.
    Cal. Coastal Comm’n, 
    483 U.S. 825
     (1987).
    13
    the operative complaint, Pacetta specifically alleged that it “is seeking development of the
    parcels as a single parcel and is thus directly impacted by [Town’s] regulations of all the
    parcels.” “When a ‘developer treats several legally distinct parcels as a single economic
    unit, together they may constitute the relevant parcel.’” Lost Tree Vill. Corp. v. United
    States, 
    707 F.3d 1286
    , 1293 (Fed. Cir. 2013) (quoting Forest Props., Inc. v. United States,
    
    177 F.3d 1360
    , 1365 (Fed. Cir. 1999)). Having determined that the subject of the alleged
    taking is one parcel, we next address whether there has been a “total” or “partial” taking
    of this parcel of property.
    “Total” Taking
    In its complaint, Pacetta alleged that Town’s actions have deprived Pacetta of all
    “economically viable beneficial use of its property since 2004,” which, pursuant to Lucas,
    Pacetta must prove for a “total” regulatory taking. See 505 U.S. at 1015. This standard
    applies to the relevant parcel as a whole because “‘[t]aking’ jurisprudence does not divide
    a single parcel into discrete segments and attempt to determine whether rights in a
    particular segment have been entirely abrogated.” Penn Cent., 438 U.S. at 130. Here,
    the trial court found that six of the ten individual parcels maintained economically
    beneficial uses. The trial evidence established that Pacetta paid significant sums of
    money for these six parcels and that whatever were the permissible uses under the 2003
    Comprehensive Land-Use Plan for these properties at the time of purchase remain intact.
    Because these six individual parcels with economic value must be considered as part of
    the larger parcel, we conclude that there has been no deprivation of all economically
    beneficial uses of the parcel, and therefore, we find that no total taking under Lucas has
    been established.
    14
    “Partial” Taking
    In its liability order, the trial court referred to the criteria enunciated in Penn Central
    that must be analyzed in determining whether a “partial” regulatory taking occurred:
    specifically, “(1) the economic impact of the regulation on the claimant; (2) the extent to
    which the regulation has interfered with distinct investment-backed expectations; and (3)
    the character of the governmental action.” Ocean Palm, 139 So. 3d at 473 (quoting
    Gluesenkamp, 873 So. 2d at 467). As previously discussed, following Pacetta II, Town
    moved the trial court to reconsider its liability order because the equitable estoppel
    predicate upon which recovery for each count was based, including the taking claim in
    count I, was determined to be inapplicable. Following a hearing, the court entered an
    order denying the motion. The court made no additional factual findings in its written
    order regarding the partial taking, determining that there were sufficient findings in its
    liability order to support finding in favor of Pacetta on this count.
    We have carefully reviewed the transcript from the hearing on Town’s motion for
    reconsideration. At no point during the hearing was an analysis of the three-pronged
    standard for finding a “partial” taking under Penn Central ever discussed. Moreover, in
    its liability order, the trial court repeatedly addressed whether there had been a “total”
    taking, with no mention of a partial taking. Additionally, the court’s analysis focused on
    whether there was a total taking of each individual parcel and misapplied the Penn Central
    standard in determining whether there was a partial or as-applied taking.                 “In an
    as-applied claim, the landowner challenges the regulation in the context of a concrete
    controversy specifically regarding the impact of the regulation on a particular parcel of
    property.” Collins v. Monroe Cty., 
    999 So. 2d 709
    , 713 (Fla. 3d DCA 2008) (citing Taylor
    15
    v. Vill. of N. Palm Beach, 
    659 So. 2d 1167
    , 1167 (Fla. 4th DCA 1995)). In that we have
    now determined that the entire sixteen acres of land is to be considered as one parcel
    and that there is no “total” taking under Lucas, we find it necessary to reverse the liability
    order and to remand for a new trial on whether there has been a “partial” taking under the
    Penn Central criteria as applied to this one sixteen-acre parcel of land.          Moreover,
    because the jury verdict awarding damages for the “taking” of separate parcels is
    premised upon the evaluation of individual parcels and the misapplication of the Penn
    Central standard, we reverse the second amended final judgment awarding damages.
    On remand, the court shall address two other issues regarding Pacetta’s partial
    taking claim. First, the court must more specifically address whether the claim is ripe.
    “[A] takings claim challenging the application of land-use regulations is not ripe unless
    ‘the government entity charged with implementing the regulations has reached a final
    decision regarding the application of the regulations to the property at issue.’” Palazzolo
    v. Rhode Island, 
    533 U.S. 606
    , 618 (2001) (quoting Williamson Cty. Reg’l Planning
    Comm’n v. Hamilton Bank of Johnson City, 
    473 U.S. 172
    , 186 (1985)). “A final decision
    by the responsible state agency informs the constitutional determination whether a
    regulation has . . . defeated the reasonable investment-backed expectations of the
    landowner to the extent that a [partial] taking has occurred.” Id.
    Town argues that the “partial” taking claim is not ripe because Pacetta failed to
    submit at least one meaningful application for developmental approval specifying its
    proposed uses for the property. See Taylor, 659 So. 2d at 1172–74. This application
    provides the land-use authority, i.e. Town, the ability “to exercise its discretion in
    considering development plans, ‘including the opportunity to grant any variances or
    waivers allowed by law.’” Collins, 999 So. 2d at 716 (quoting Palazzolo, 533 U.S. at 620–
    16
    21). We conclude that the trial court’s findings of fact in its liability order were unclear as
    to whether Pacetta had in fact submitted an application for development. Because the
    government “must arrive at a ‘final, definitive position’ on the ‘nature and extent’ of
    permitted development before a court may adjudicate the ‘constitutionality of the
    regulations that purport to limit it,’” Martin Cty. v. Section 28 P’ship, Ltd., 
    676 So. 2d 532
    ,
    538 (Fla. 4th DCA 1996) (citations omitted) (quoting Taylor, 659 So. 2d at 1173), on
    remand, the trial court shall make a specific factual determination as to whether Pacetta’s
    partial taking claim is ripe for adjudication by having submitted the requisite meaningful
    application.
    Finally, if the court finds that Pacetta did not file this application for development,
    the trial court must also address whether the “futility” exception to the ripeness doctrine
    applies.   Under certain circumstances, “where the governmental agency effectively
    concedes that any other development would be impermissible, this can negate the
    requirement of pursuing further administrative remedies and the governmental action is
    effectively treated as a final decision.” Taylor v. City of Riviera Beach, 
    801 So. 2d 259
    ,
    263 (Fla. 4th DCA 2001) (quoting City of Riviera Beach v. Shillingburg, 
    659 So. 2d 1174
    ,
    1181 (Fla. 4th DCA 1995)). Accordingly, the trial court on remand should determine
    whether Town has effectively determined that any other development of Pacetta’s
    property would be impermissible, thus causing any application by Pacetta for
    development or for an amendment to the plan to be futile.6
    6  The trial judge who presided over the liability trial, received all of the evidence
    during that twelve-day trial, and entered the liability order also subsequently granted a
    motion to disqualify himself in April 2014, which was after he denied Town’s motion to
    reconsider the liability order upon remand from Pacetta II but before the jury trial on
    damages (which was consequently held before Judge Perkins). Therefore, because the
    first judge is not available to enter an amended liability order based upon his recollection
    17
    Pacetta’s Federal Due Process/Equal Protection Claims
    Town argues that the trial court erred when it did not enter judgment on Pacetta’s
    due process and equal protection claims asserted under the Federal Constitution but only
    entered judgment in Town’s favor on Pacetta’s claims for substantive and procedural due
    process violations under the Florida Constitution. Town contends that Pacetta pursued
    both its state and federal constitutional claims in this state court action and that when
    Pacetta failed to present at trial any evidence of damages on either count, the trial court
    erred post-trial when it entered final judgment only on the state constitutional claims,
    despite having granted Town’s motion for directed verdict at trial. We agree.
    In count II of its operative complaint, Pacetta alleged that the various actions of
    Town denied it substantive due process and equal protection in violation of article I,
    section 9 of the Florida Constitution and the Fifth and Fourteenth Amendments of the
    United States Constitution. In count III, Pacetta asserted that the same actions of Town
    violated Pacetta’s rights to procedural due process under the same provision of the
    Florida Constitution as well as the Fourteenth Amendment and title 42, section 1983,
    United States Code. Pacetta did not seek injunctive relief on either of these two counts;
    instead, it demanded judgment for damages and a jury trial. When a party is challenging
    “a regulation, statute or land use plan as a denial of substantive or procedural due
    process, the focus is on whether there has been an invalid exercise of police power. If
    proven, the remedy is monetary damages.” Taylor, 659 So. 2d at 1170.
    Following the bench trial on liability, the court entered the now challenged liability
    order in which, among other things, it found in favor of Pacetta on its constitutional claims
    of the evidence and the law of the case provided in this opinion, a new trial on the single
    claim that a “partial” taking has occurred is necessary.
    18
    asserted in counts II and III, but only as to parcels 2, 5, 6, 7, 8, and 9. The court
    specifically found that Town had violated Pacetta’s constitutional rights by: (1) colluding
    with citizens’ groups in creating an “illegal charter amendment”; (2) committing a “series
    of illegal acts,” including the “illegal referendum and amendment of the Town charter to
    interfere with Pacetta” and “other conduct” involving only the Pacetta property; and (3)
    “refusing to accept applications for building projects since 2004.” 7 The court concluded
    this portion of the liability order by stating that damages, if any, on these two counts would
    be determined by a jury.
    At the jury trial, at the conclusion of Pacetta’s case-in-chief, Town moved for an
    unqualified directed verdict on both counts. The trial court inquired of Pacetta’s counsel
    why the motion should not be granted when there was no evidence presented as to any
    separate or independent damages for either count. Counsel responded that the court
    could grant Town’s motion but requested that the court do so as a “dismiss[al]” “without
    prejudice,” rather than a directed verdict, to preserve Pacetta’s ability to proceed in an
    action “unrelated to what’s going on [in the present trial].” The court granted Town’s
    motion without any of the qualifications sought by Pacetta.
    Pacetta then argued post-trial that the trial court could not adjudicate its federal
    constitutional claims because it reserved its right to assert its federal constitutional claims
    in federal court with the following allegation in its complaint:
    Reservation of Federal Rights
    89. Pacetta, by pursuing the claims herein in the State of
    Florida court, reserves its right to the disposition of the entire
    7 The trial court found in favor of Town on these two counts regarding Pacetta’s
    allegations in its complaint that Town had violated Pacetta’s due process and equal
    protection rights by “creating an ROD that impacted only Pacetta properties and by using
    serial building moratoria to deprive Pacetta of its investment-backed expectations.”
    19
    case by the state court, and preserves its access to a federal
    forum to assert its federal constitutional rights.
    This pleading is typically referred to as an “England reservation.” See England v. La.
    State Bd. of Med. Exam’rs, 
    375 U.S. 411
    , 421–22 (1964) (holding that a party may inform
    the state courts that he or she is exposing the federal claims there only for the purpose
    of complying with Government and Civic Employees Organizing Committee, CIO v.
    Windsor, 
    353 U.S. 364
     (1957), and that he or she intends, should the state courts hold
    against him or her on the question of state law, to return to the district court for disposition
    of his or her federal contentions). Nevertheless, this reservation is not absolute and is
    dependent upon the party making the reservation and not thereafter asking the state court
    to resolve the federal issue or issues that had previously been reserved. San Remo
    Hotel, L.P. v. City & Cty. of San Francisco, Cal., 
    545 U.S. 323
    , 344-46 (2005).
    Here, Pacetta pursued both its state and federal due process claims and its federal
    equal protection claim and received an unqualified finding in its favor in the liability order
    on both counts, with the court specifically stating that the issue of damages on the claims
    would be determined by the jury. At the hearing held during trial on Town’s motion for
    directed verdict, Pacetta’s counsel did not argue that it had established monetary
    damages on either count and notably made no argument that a directed verdict should
    not be entered on its federal due process and equal protection constitutional claims based
    on its “England reservation.” Under these circumstances, the failure of such proof of
    damages requires the granting of a directed verdict on all claims asserted in both counts.
    Morgan Stanley & Co. v. Coleman (Parent) Holdings Inc., 
    955 So. 2d 1124
    , 1131 (Fla.
    4th DCA 2007).
    20
    We recognize, as agreed by both parties in their briefs, that the federal court will
    make its own determination on whether Pacetta effectively preserved its right to pursue
    its federal due process and equal protections claims in federal court. Nevertheless, we
    conclude that the trial court erred in not entering final judgment in favor of Town on the
    federal constitutional claims asserted by Pacetta in counts II and III. On remand, the trial
    court is directed to enter an amended final judgment in favor of Town on those two counts,
    unqualified and not restricted to Pacetta’s state law claims, consistent with this opinion.
    Accordingly, for the reasons expressed herein, we reverse the liability order and
    the final judgment for damages in favor of Pacetta. We remand this case for a new trial
    on liability and, if thereafter appropriate, damages on count I, limited to determining
    whether a “partial” or “as-applied” taking has occurred in reference to the single relevant
    parcel, including the preliminary determination of whether such a claim is ripe in this case
    pursuant to Pacetta’s sufficient application for development or the applicability of the
    “futility” exception. We also remand for the entry of an amended final judgment in favor
    of Town on counts II and III.8
    REVERSED and REMANDED, with directions.
    SAWAYA and EVANDER, JJ., concur.
    8 Based on our ruling, we decline to address any issues raised by Town regarding
    the jury trial on damages.
    21
    

Document Info

Docket Number: Case 5D14-4520

Citation Numbers: 226 So. 3d 303, 2017 Fla. App. LEXIS 8842, 2017 WL 2605150

Judges: Lambert, Sawaya, Evander

Filed Date: 6/16/2017

Precedential Status: Precedential

Modified Date: 10/19/2024

Authorities (21)

Martin County v. Yusem , 22 Fla. L. Weekly Supp. 156 ( 1997 )

City of Hollywood v. HOLLYWOOD BEACH , 283 So. 2d 867 ( 1973 )

Forest Properties, Inc.(now Known as Rck Properties, Inc.) ... , 177 F.3d 1360 ( 1999 )

Morgan Stanley & Co. v. Coleman Holdings , 2007 Fla. App. LEXIS 4167 ( 2007 )

Lucas v. South Carolina Coastal Council , 112 S. Ct. 2886 ( 1992 )

England v. Louisiana State Board of Medical Examiners , 84 S. Ct. 461 ( 1964 )

Collins v. Monroe County , 999 So. 2d 709 ( 2008 )

Osceola County v. Best Diversified, Inc. , 2006 Fla. App. LEXIS 13412 ( 2006 )

Hollywood Beach Hotel Co. v. City of Hollywood , 329 So. 2d 10 ( 1976 )

FEDERATED MUT. IMPLEMENT & HDWE. INS. CO. v. Griffin , 1970 Fla. App. LEXIS 6071 ( 1970 )

Leon County v. Gluesenkamp , 2004 Fla. App. LEXIS 6474 ( 2004 )

Martin County v. Section 28 Partnership , 676 So. 2d 532 ( 1996 )

Taylor v. City of Riviera Beach , 801 So. 2d 259 ( 2001 )

Taylor v. Village of N. Palm Beach , 659 So. 2d 1167 ( 1995 )

Citrus County v. Halls River Development, Inc. , 2009 Fla. App. LEXIS 2273 ( 2009 )

CITY OF RIVIERA v. Shillingburg , 659 So. 2d 1174 ( 1995 )

Penn Central Transportation Co. v. New York City , 98 S. Ct. 2646 ( 1978 )

Palazzolo v. Rhode Island , 121 S. Ct. 2448 ( 2001 )

Nollan v. California Coastal Commission , 107 S. Ct. 3141 ( 1987 )

Koontz v. St. Johns River Water Management Dist. , 133 S. Ct. 2586 ( 2013 )

View All Authorities »