M&S Industrial Co., Inc. v. Allahverdi , 427 Ill. Dec. 90 ( 2018 )


Menu:
  •                                           
    2018 IL App (1st) 172028
    FIRST DISTRICT
    FOURTH DIVISION
    August 9, 2018
    No. 1-17-2028
    M&S INDUSTRIAL CO., INC.,                                      )    Appeal from the Circuit Court
    )    of Cook County.
    Plaintiff-Appellant,                                    )
    )
    v. 	                                                           )
    )    No. 15 L 8359
    FRED ALLAHVERDI d/b/a Pars Auto Repair,                        )
    )
    Defendant-Appellee.	                                    )    The Honorable
    )    John P. Callahan,
    )    Judge, presiding.
    JUSTICE BURKE delivered the judgment of the court, with opinion.
    Justices McBride and Gordon concurred in the judgment and opinion.
    OPINION
    Plaintiff M&S Industrial Co., Inc. (M&S), appeals the dismissal of its complaint against
    defendant Fred Allahverdi arising out of injuries sustained when the roof of Allahverdi’s
    building uplifted during a wind storm and struck nearby power lines, resulting in an electrical
    surge that damaged M&S’s property. The circuit court dismissed the complaint on grounds that
    M&S’s claim was barred by the statute of limitations applicable to construction negligence (735
    ILCS 5/13-214(a) (West 2012)). Based on our determination that section 13-214(a) of the Code
    of Civil Procedure (Code) applies to M&S’s claim and that, as a matter of law, the four-year
    limitations period expired before M&S filed suit, we affirm.
    ¶ 1	                                         I. BACKGROUND
    1-17-2028
    ¶2          M&S filed its initial complaint on August 14, 2015. M&S alleged that Allahverdi
    operated an automobile sales and service business on his property and that he or his employees
    negligently left a large overhead dock door open during unsafe weather conditions—severely
    high winds—in Chicago on October 27, 2010. Due to the high winds, a portion of the roof of
    Allahverdi’s building detached and struck nearby power lines that serviced M&S’s building.
    M&S alleged that the resulting electrical surge damaged M&S’s property, namely, computer
    numerical control machines, which M&S uses to manufacture sophisticated metal components
    for the defense industry.
    ¶3          M&S later filed a second amended complaint that alleged in pertinent part:
    “4. On October 27, 2010, ALLAHVERDI was personally aware of a
    significant and hazardous structural defect present on the *** location, to wit:
    an improperly installed and maintained roof which was not structurally sound,
    not constructed in accordance with industry standards and not attached to the
    main structure of the building. ALLAHVERDI’s knowledge was based on his
    role as a contractor in the construction of the structure at the *** location,
    when and where the roof was built.
    ***
    6. On October 27, 2010, in the middle of this windstorm and despite the
    dangerous wind conditions, employees of ALLAHVERDI left a large
    overhead dock door on the *** location open to the exterior environment.
    7. As a result of this opening exposing the interior of the *** location to
    the windstorm and the inability of the roof to resist uplift forces because it was
    improperly installed and maintained, not constructed in accordance with
    -2­
    1-17-2028
    industry standards, and not attached to the main structure, a portion of the
    building’s roof detached from the building and struck a nearby power supply
    line ***.”
    ¶4          In addition, the complaint alleged that Allahverdi “owed a duty of care to exercise
    ordinary care to avoid injury and damage” and to “mitigate unsafe conditions on the property”
    and he breached this duty
    “a. By failing to replace the structurally unsound roof, and/or
    b. By failing to secure the roof to the main structure of the building; and/or
    c. By allowing the roof of the property *** to be installed and maintained
    in such dangerous condition.”
    ¶5          Alternatively, the complaint pled that Allahverdi owed a duty of care under the building
    code regulations and breached this duty. The complaint alleged that, as a result of the occurrence,
    Allahverdi was issued a citation for building code violations by the City of Chicago on October
    28, 2010.
    ¶6          Allahverdi filed a motion under section 2-619 of the Code (id. § 2-619) to dismiss the
    second amended complaint asserting that causation was too attenuated to be foreseeable. The
    circuit court granted this motion with prejudice.
    ¶7          M&S filed a motion to reconsider and vacate the dismissal. The parties submitted
    additional briefing and supplemental authority. M&S filed the affidavit and report of Dennis
    McCann, an engineering consultant hired by M&S in March 2016 to perform an engineering
    analysis of the roof of Allahverdi’s building. McCann averred that he inspected the interior of
    Allahverdi’s roof on March 26, 2016. McCann averred that the deck panels of the roof were not
    attached to the steel roof joists of the building, in violation of building code requirements, and
    -3­
    1-17-2028
    that, had the roof been attached properly, it should have been able to resist the strong winds on
    October 27, 2010. Further, McCann averred that the defects he observed were not readily
    observable except upon close inspection.
    ¶8             In Allahverdi’s response, he asserted, inter alia, that plaintiff’s second amended
    complaint was barred by the four-year statute of limitations applicable to claims of construction
    negligence (id. § 13-214(a)).
    ¶9             In its reply, M&S argued that the motion to dismiss should be denied as it involved
    questions of fact and section 13-214(a) did not apply because it was not raising a claim of
    construction negligence. Rather, it was suing Allahverdi for maintaining a hazardous condition
    on his land of which Allahverdi was aware. Alternatively, M&S argued that the discovery rule
    applied to toll the construction statute of limitations because it could not have discovered the
    defective roof until it hired McCann in March 2016 to examine Allahverdi’s building using a
    scissor lift and high-intensity lights.
    ¶ 10           Following a hearing April 12, 2017, the circuit court allowed submission of additional
    materials and permitted Allahverdi to amend his prior motion to dismiss to add a statute of
    limitations argument under 2-619(a)(5) of the Code based on section 13-214(a). Allahverdi
    contended that the discovery rule did not apply because the alleged injury was caused by a
    sudden, traumatic event—the windstorm that blew the roof onto the power lines—and thus the
    claim accrued on October 27, 2010.
    ¶ 11           After oral arguments on July 19, 2017, the circuit court entered an order granting both
    M&S’s motion to reconsider and Allahverdi’s amended motion to dismiss under section 2­
    619(a)(5). The court held that M&S’s claim was a construction negligence claim and 13-214(a)
    applied. It further held that the injury sustained was a sudden traumatic event placing M&S on
    -4­
    1-17-2028
    notice of a cause of action as of October 27, 2010, and the discovery rule did not apply. The
    court dismissed the second amended complaint with prejudice. M&S filed a timely notice of
    appeal.
    ¶ 12                                             II. ANALYSIS
    ¶ 13                                         A. Standard of Review
    ¶ 14             Whether a claim is barred by the statute of limitations “is a matter properly raised by a
    section 2-619 motion to dismiss.” Porter v. Decatur Memorial Hospital, 
    227 Ill. 2d 343
    , 352
    (2008). When reviewing a 2-619 motion to dismiss, we “must interpret all pleadings and
    supporting documents in the light most favorable to the nonmoving party” and take as true all
    well-pleaded facts and reasonable inferences derived therefrom. 
    Id.
     “It is well settled that our
    review of a section 2-619 dismissal is de novo.” 
    Id.
     Similarly, “[t]he applicability of a statute of
    limitations to a cause of action presents a legal question we review de novo.” Travelers Casualty
    & Surety Co. v. Bowman, 
    229 Ill. 2d 461
    , 466 (2008).
    ¶ 15                            B. Construction Negligence Statute of Limitations
    ¶ 16             M&S maintains on appeal that the circuit court erred in holding that section 13-214(a)
    applies because its claim sounds in premises liability, not construction negligence. M&S asserts
    that its complaint sought to hold Allahverdi liable based on a landowner’s duty to exercise
    reasonable care to prevent and mitigate dangerous conditions on his property and alleged that he
    was aware of the dangerous condition—the improperly attached roof—because he served as a
    contractor in the construction of the roof and he breached his duty by failing to fix the dangerous
    condition and/or failed to maintain his property in accordance with the Chicago Building Code.
    ¶ 17             Allahverdi contends that the trial court correctly applied section 13-214(a) as M&S’s
    claims are all based on the initial construction of the roof and his activity as the contractor and
    -5­
    1-17-2028
    installer, despite M&S’s attempts to plead around construction negligence. Allahverdi argues
    that application of section 13-214(a) depends not on the status of the defendant as property
    owner or construction professional but upon the activity of the defendant.
    ¶ 18           Section 13-214(a) provides:
    “(a) Actions based upon tort, contract or otherwise against any person for
    an act or omission of such person in the design, planning, supervision,
    observation or management of construction, or construction of an
    improvement to real property shall be commenced within 4 years from the
    time the person bringing an action, or his or her privity, knew or should
    reasonably have known of such act or omission.” 735 ILCS 5/13-214(a) (West
    2012). 1
    ¶ 19           “[O]ur supreme court has held that the four-year statute of limitations relating to
    construction matters protects only certain enumerated activities, specifically, ‘the design,
    planning, supervision, observation or management of construction.’ ” 15th Place Condominium
    Ass’n v. South Campus Development Team, LLC, 
    2014 IL App (1st) 122292
    , ¶ 48 (quoting
    People ex rel. Skinner v. Hellmuth, Obata & Kassabaum, Inc., 
    114 Ill. 2d 252
    , 259 (1986)).
    ¶ 20           Our courts have explained that section 13-214 is meant to “protect activity rather than
    status.” Ryan v. Commonwealth Edison Co., 
    381 Ill. App. 3d 877
    , 885 (2008) (interpreting
    section 13-214(b)). “[O]ne must look to the specific activity in question rather than” the status of
    the defendant in determining application of the statute. 
    Id.
     at 885 (citing Skinner v. Anderson, 38
    1
    We note that many of the cases cited by the parties and discussed below involve interpretation of
    section 13-214(b), the construction statute of repose, which contains identical language, i.e., “in the
    design, planning, supervision, observation or management of construction, or construction of an
    improvement to real property.” 735 5/13-214(b) (West 2012). “[B]ecause of the identical language in
    sections 13-214(a) and 13-214(b), the cases concerning section 13-214(b) are pertinent to this issue.”
    Morietta v. Reese Construction Co., 
    347 Ill. App. 3d 1077
    , 1081 (2004).
    -6­
    1-17-
    2028 Ill. 2d 459
     (1967)). “It is not enough that the party seeking the protection of the statute is a
    landowner. [Citation.] A landowner is only protected by the statute if he or she engages in the
    enumerated activities.” Trtanj v. City of Granite City, 
    379 Ill. App. 3d 795
    , 801 (2008).
    ¶ 21          In Ryan, the plaintiff challenged the grant of summary judgment for the defendant
    electrical utility company, contending that section 13-214(b) was inapplicable to his claim. Ryan,
    381 Ill. App. 3d at 882. The plaintiff alleged that the defendant negligently failed to perform its
    ongoing maintenance duties, which increased the severity of an explosion that injured the
    plaintiff while he was performing maintenance work on a circuit breaker. Id. at 878-79. The
    defendant had installed and set up the electrical system over 10 years before the accident. Id. at
    882. The plaintiff contended that section 13-214(b) did not apply because the defendant’s
    ongoing maintenance duties as a supplier of power were at issue, and not the “design, planning,
    supervision, observation, or management” of the electrical system. (Internal quotation marks
    omitted.) Id. This court held that
    “even though a design professional receives the protection of the statute of repose for
    design and installation-related activities, it does not receive protection for other activities
    that are not within the purview of the statute. Such other activities include manufacturing
    and sales, as well as breach of duty by one who undertakes inspection and maintenance
    duties ***.” Id. at 887.
    The Ryan court held that the defendant electric company “had a specific duty to maintain its
    equipment,” which derived “from its capacity as the power supplier and not from its status as
    installer of the system.” Id. at 888. Although the defendant electric company installed the system,
    the court recognized that the theory of recovery was predicated upon its alleged failure to
    -7­
    1-17-2028
    discover and repair defects in its power system as the supplier, and these maintenance-related
    claims did not fall within the scope of the construction statute of repose. Id. at 889.
    ¶ 22           In support, the Ryan court cited with approval the Third District case MBA Enterprises,
    Inc. v. Northern Illinois Gas Co., 
    307 Ill. App. 3d 285
     (1999). There, the plaintiff alleged that a
    defect in the original design and construction of a gas pipe led to an explosion and the pipe
    system had been constructed more than 10 years prior; the plaintiff alleged that the defendant gas
    company negligently inspected, operated, and maintained the defective pipe system, which it
    used on a daily basis to sell and supply gas to the hotel, where the explosion occurred. 
    Id.
     at 286­
    87. The court concluded that the gas company, as a supplier that operated the system daily in
    order to provide a utility service involving a dangerous commodity to the plaintiff, was under an
    “ongoing duty of care to operate and maintain the gas system in a safe manner.” 
    Id.
     at 288 (citing
    Metz v. Central Illinois Electric & Gas Co., 
    32 Ill. 2d 446
     (1965) (gas is a dangerous commodity
    and those who handle it must exercise a commensurate level of care)). The court found the
    construction-related claims were barred by section 13-214(b), but the plaintiff’s negligent
    maintenance claims survived as the plaintiff alleged that the gas company violated an ongoing
    duty to operate the gas system in a safe manner. Id. at 287-90.
    ¶ 23	          On appeal, M&S relies on Ryan and MBA Enterprises and attempts to distinguish two
    First District cases that Allahverdi cites on appeal and which the Ryan court criticized: O’Brien
    v. City of Chicago, 
    285 Ill. App. 3d 864
     (1996), and CITGO Petroleum Corp. v. McDermott
    International, Inc., 
    368 Ill. App. 3d 603
     (2006). In O’Brien, a fatal accident occurred involving a
    median. The court found that the defendant city engineered and designed the reconstruction of
    the roadway, and this qualified as an “improvement” within the meaning of section 13-214(b).
    O’Brien, 285 Ill. App. 3d at 869. The plaintiff argued that section 13-214(b) did not apply
    -8­
    1-17-2028
    because it was not claiming defective design, but, rather, that the defendant negligently operated,
    maintained, repaired, and altered the median and failed to alleviate the dangerous condition in
    negligently maintaining the “ ‘existing barrierless median.’ ” Id. at 870. This court held that the
    claim was, in essence, a design defect claim that the defendant “created and maintained a
    dangerous condition,” i.e., the existing median. Id. The plaintiff did not allege that the defendant
    had taken any recent affirmative action that increased the dangerousness of the roadway but that
    it failed to correct a dangerous condition it created in the reconstruction project, which had
    occurred more than 10 years prior. Id. Thus, the claim was barred by the construction statute of
    repose. Id.
    ¶ 24          In CITGO, 368 Ill. App. 3d at 604, the third-party pipefitting manufacturer plaintiff
    brought a claim for negligent maintenance, inspection, and operation of an oil refinery where a
    fire occurred against the former owner of the refinery. The defendant had installed the pipes at
    issue more than 10 years before, when the refinery was constructed. Id. The court held that
    because the plaintiff’s allegations of negligent maintenance of the piping system were based on
    defective pipefitting that was allegedly installed when the refinery was constructed, the claim
    was barred by section 13-214(b). Id. at 609. The court in CITGO criticized MBA Enterprises on
    grounds that it carved “out an exception that was not intended when the legislature enacted the
    statute” and, although the plaintiff’s claims in MBA Enterprises were fashioned as “failure to
    maintain” claims, they were essentially based on a defective product installed at the time the gas
    system was constructed. Id.
    ¶ 25          The Ryan court criticized O’Brien and CITGO on grounds that they protected “an
    installer regardless of the fact that the installer has an independent duty to inspect and maintain
    the property at issue, if its breach of duty consists of the failure to discover and correct a design
    -9­
    1-17-2028
    defect.” Ryan, 381 Ill. App. 3d at 883-84. In relying on Ryan and MBA Enterprises on appeal,
    M&S contends that a landowner can be independently liable for negligent maintenance of a
    dangerous condition even if the landowner participated in construction of defective
    improvements to property. We conclude that the present case is distinguishable from MBA
    Enterprises and Ryan. Both cases involved utility suppliers of hazardous substances that, in
    addition to their duties as installers, also had heightened and ongoing duties to inspect and
    maintain the equipment through which they sold and transmitted their utilities daily. As the Ryan
    court specifically observed, “[i]t is well established that power suppliers have an ongoing duty to
    inspect and maintain the equipment through which that power is transmitted.” Id. at 888. The
    duty of care to safely inspect and maintain their equipment imposed on the utilities stemmed
    from their role as a utility supplier using equipment to deliver the product, and not from its status
    as the original installer of the piping system.
    ¶ 26          Here, in contrast, M&S’s claim involves a defectively constructed roof, a single event
    that does not entail the daily provision of a dangerous utility to a customer. Much like in O’Brien
    and CITGO, M&S’s claim is, at its core, a claim of defect in design and construction, regardless
    of how M&S characterizes Allahverdi’s acts and omissions. A review of M&S’s amended
    complaint, supporting documents, and arguments before the circuit court demonstrates that M&S
    focuses on Allahverdi’s acts in construction of the roof. M&S’s amended complaint alleged that
    Allahverdi was aware of the “improperly installed and maintained roof which was not
    structurally sound, not constructed in accordance with industry standards and not attached to the
    main structure of the building. Allahverdi’s knowledge was based on his role as a contractor in
    the construction of the structure ***.” M&S alleged that, as a result of the “improperly installed
    and maintained” roof, which was “not constructed in accordance with industry standards, and not
    - 10 ­
    1-17-2028
    attached to the main structure,” the roof detached during the wind storm. M&S alleged that
    Allahverdi failed to replace the unsound roof, secure it to the structure, and allowed the roof to
    be installed and maintained in a dangerous condition.
    ¶ 27          The report and affidavit of plaintiff’s expert McCann echoes these allegations. M&S
    argued before the circuit court that the cause “was what I just read in [McCann’s] report *** that
    the negligence was the failure to attach and maintain that roof properly in violation of the
    building code and in violation of the building standards.” M&S observed that the report also
    identified differences between Allahverdi’s roof “as-constructed” and the architectural drawings,
    observing that there was
    “no record of design changes approved by the architect in the permit file
    suggesting that these chang[es] were made during construction. The
    combination of unapproved design changes, building permit file which
    contained a building violation notice requiring the owner to post the name of
    the general contractor, and leftover building materials at the site suggests that
    the owner may have acted as general contractor for construction of the subject
    building. It is likely that many of the observed deficiencies are a result of an
    inexperienced owner acting as a general contractor or self performing work.”
    ¶ 28          M&S argued before the circuit court that “the negligence was the failure to properly
    maintain a roof that the defendant knew was not attached. If he had corrected the failure to attach
    the roof at any time prior to this accident, again, we wouldn’t be here.” M&S asserted that the
    opening of the dock door was “the precipitating event, but it was not the cause. The cause was
    what I just read in the report *** that the negligence was the failure to attach and maintain that
    roof properly in violation of the building code and in violation of the building standards.” M&S
    - 11 ­
    1-17-2028
    reiterated that opening the dock door “was not the negligent act that’s been alleged in the
    complaint” and that Allahverdi “has never responded to the assertion that it was the failure to
    attach the roof that was the negligent act.”
    ¶ 29           M&S’s various assertions that Allahverdi failed to “maintain” the roof amount to
    different permutations of the same fundamental claim: that Allahverdi initially improperly
    constructed the roof. M&S’s bare allegation that Allahverdi failed to “maintain” the roof is
    unsupported by further fact allegations. The amended complaint does not indicate that Allahverdi
    subsequently made attempts to maintain or repair the roof after its initial construction. M&S’s
    amended complaint clearly alleged that Allahverdi actually participated in the construction of the
    improvement (the roof) and that this faulty construction was to blame for the roof uplifting in the
    wind. As such, M&S’s claim encompasses the activities set forth in section 13-214(a).
    ¶ 30           In determining that section 13-214(a) applies to M&S’s claim, we note that Allahverdi
    cites Wright v. Board of Education of the City of Chicago, 
    335 Ill. App. 3d 948
     (2002), on
    appeal. In Wright, 335 Ill. App. 3d at 949-50, the plaintiff sued after tripping on a step at a school
    that was built decades before and that had remained unchanged. The court found the plaintiff’s
    negligence action was barred by the construction statute of repose as the school did not have any
    ongoing duties to maintain or repair the step by redesigning or reconstructing it to comply with
    current code and it was not in disrepair. Id. at 957. Imposing a duty to improve on the defendant
    “would defeat the stated purpose of the construction statute of repose, that being the insulation of
    participants in the construction process from defending against stale claims.” Id. at 958. The
    Wright court distinguished MBA Enterprises on grounds that the latter case involved an “ongoing
    duty of care related to the presence of explosive gasses in the instrumentality at the heart of that
    case.” Id. at 957.
    - 12 ­
    1-17-2028
    ¶ 31           M&S asserts that its cause of action is distinct from Wright because the roof presented an
    innately dangerous condition or instrumentality, like the gas pipes in MBA Enterprises.
    However, similar to the plaintiff in Wright, M&S is merely attempting to plead around the defect
    in the initial construction of the roof, a claim that is subject to section 13-214(a).
    ¶ 32           M&S further argues that The Lombard Co. v. Chicago Housing Authority, 
    221 Ill. App. 3d 730
     (1991), upon which the circuit court relied, is distinguishable from the present case. In
    Lombard, the plaintiff sued the defendant landowner for breach of contract. Id. at 731-32. The
    court found that section 13-214 was applicable because the plaintiff alleged that the defendant
    failed to approve or reject shop drawings, thereby becoming involved in the “planning,
    supervision and management of the construction project.” Id. at 735. The court held that “section
    13-214 applies by its terms to all persons engaged in construction-related activities.” Id. M&S
    contends that Lombard is inapplicable here because Allahverdi is independently liable for
    maintaining a hazardous condition on his property. As the Lombard court observed, in reviewing
    a motion to dismiss, “the court must look to the allegations of fact contained in the complaint to
    determine whether the particular activities the landowner has purportedly engaged in or failed to
    engage in, as the case may be, fall within the purview of the statute.” Id. at 735. Here, as stated,
    the activities set forth in the complaint fell within the purview of section 13-214(a).
    ¶ 33                                            C. Discovery Rule
    ¶ 34           M&S next contends that even if the construction negligence limitation period in section
    13-214(a) applies, dismissal was improper under the discovery rule because the date the claim
    accrued was a question of fact. According to M&S, it could not have known that the damage was
    “wrongfully caused” until M&S hired an engineer to inspect the roof in March 2016 and
    discovered that the roof was not attached to the structure of Allahverdi’s building.
    - 13 ­
    1-17-2028
    ¶ 35          Allahverdi responds that M&S had sufficient information for a reasonable person to be
    put on notice as of the date of the occurrence on October 27, 2010, that the damage may have
    been wrongfully caused and further inquiry was necessary.
    ¶ 36          As stated, section 13-214(a) provides that the four-year limitation period on construction
    negligence claims is triggered when the party “knew or should reasonably have known of such
    act or omission.” 735 ILCS 5/13-214(a) (West 2012). This “discovery rule” “tolls the statute of
    limitations until the plaintiff knows or reasonably should know it has been injured and that this
    injury was wrongfully caused.” Swann & Weiskopf, Ltd. v. Meed Associates, Inc., 
    304 Ill. App. 3d 970
    , 975 (1999) (citing Knox College v. Celotex Corp., 
    88 Ill. 2d 407
    , 415 (1981); County of
    Du Page v. Graham, Anderson, Probst & White, Inc., 
    109 Ill. 2d 143
    , 153-54 (1985)). “At that
    point, the plaintiff has an obligation to conduct further inquiries to determine whether it has an
    actionable claim.” 
    Id.
     (citing Nolan v. Johns-Manville Asbestos, 
    85 Ill. 2d 161
    , 171 (1981)). The
    purpose of the discovery rule is to “ameliorate the potentially harsh effect of a mechanical
    application of the statute of limitations that would result in it expiring before a plaintiff even
    knows of his cause of action.” Henderson Square Condominium Ass’n v. LAB Townhomes, LLC,
    
    2015 IL 118139
    , ¶ 52.
    ¶ 37          “While the time at which a party knows or should reasonably know of both an injury and
    that it was wrongfully caused is generally a question of fact for the fact finder [citation], where it
    is apparent from the undisputed facts that only one conclusion can be drawn, the question
    becomes one of law for the court [citation].” Freeport Memorial Hospital v. Lankton, Ziegele,
    Terry & Associates, Inc., 
    170 Ill. App. 3d 531
    , 535 (1988) (affirming dismissal of the plaintiff’s
    negligent design and construction action under section 2-619 as untimely filed (citing Knox, 
    88 Ill. 2d at 416
    , and Witherell v. Weimer, 
    85 Ill. 2d 146
    , 156 (1981))).
    - 14 ­
    1-17-2028
    ¶ 38          Here, the facts known to M&S are not disputed. Based on M&S allegations, it learned
    that its property had been damaged and what caused that damage on October 27, 2010. That is,
    part of Allahverdi’s roof uplifted in high winds and landed on nearby power lines, causing a
    power surge that damaged M&S’s machines. The president of M&S went to the site of the
    electrical lines shortly after and took photographs of the roofing materials near the electrical
    lines. Allahverdi was also present and he pointed at the roofing materials and informed the
    president of M&S that it happened when his employee opened the dock door. At that point, M&S
    undoubtedly knew that it sustained damage caused by Allahverdi’s roof detaching and crashing
    into the power lines.
    ¶ 39          M&S contends, however, that it did not know the damage was “wrongfully caused” at
    that point and it did not discover the wrongful cause until almost six years later, in March 2016,
    when it hired McCann to investigate. M&S argues that the fact that the roof decking was not
    properly attached to the building structure was only discoverable upon close inspection.
    ¶ 40          As our supreme court has made clear, “the term ‘wrongfully caused’ does not require
    knowledge of negligent conduct or the existence of a cause of action.” 
    Id.
     (citing Knox, 
    88 Ill. 2d at 416
    ). A plaintiff need not have “ ‘knowledge of a specific defendant’s negligent conduct or
    knowledge of the existence of a cause of action’ ” before the limitations statute is triggered.
    (Emphasis omitted.) Castello v. Kalis, 
    352 Ill. App. 3d 736
    , 744 (2004) (quoting Young v.
    McKiegue, 
    303 Ill. App. 3d 380
    , 388 (1999)). As such, “[t]he law is well settled that once a party
    knows or reasonably should know both of his injury and that it was wrongfully caused, ‘the
    burden is upon the injured person to inquire further as to the existence of a cause of action.’ ” 
    Id.
    (quoting Witherell, 
    85 Ill. 2d at 156
    ). See Nolan, 
    85 Ill. 2d at 171
     (“[O]nce it reasonably appears
    that an injury was wrongfully caused, the party may not slumber on his rights.”).
    - 15 ­
    1-17-2028
    ¶ 41          Here, M&S reasonably should have suspected possible wrongful causation and, at a
    minimum, should have been compelled to inquire further when its neighbor’s roof uplifted in the
    wind and hit the power lines, causing damage to its property. In that regard, two cases in
    particular assist us in determining that the limitations period began to run on the date
    Allahverdi’s roof detached and caused the damage.
    ¶ 42          In AXIA, Inc. v. I.C. Harbour Construction Co., 
    150 Ill. App. 3d 645
    , 648 (1986), an
    office building began to leak shortly after construction was completed in 1978, and the building
    owner notified the architect and general contractor of the leaks within a year. Four years later,
    the building owner hired a consultant to determine the cause of the leaks, and the consultant
    concluded that design and construction deficiencies were to blame. Id. at 648-49. The building
    owner instituted suit in 1984, but it was dismissed as being time-barred. Id. at 649-50. On appeal,
    the building owner argued, similar to M&S’s argument here, that its action did not accrue until
    the consultant issued its report, as it had no knowledge of the real cause of the problem until
    then. Id. at 650. However, the court rejected this argument and found that the limitations period
    was triggered when the building owner notified the contractor of the water leakage issue within
    one year of completion of the building. Id. at 651. This “indicate[d] that it possessed the requisite
    amount of information necessary to further inquire whether the problem was actionable.” Id.
    ¶ 43          Also helpful to our analysis is Swann & Weiskopf, Ltd., 
    304 Ill. App. 3d 970
    . There, the
    plaintiff was hired for design services and the plaintiff retained the defendant subcontractor to
    design a storm water removal system, which experienced flooding problems shortly after the
    project was completed. Id. at 972. The plaintiff contended on appeal that its complaint was not
    time-barred because it did not discover its claim against the subcontractor until the subcontractor
    acknowledged the defective design approximately five years after the project’s completion. Id. at
    - 16 ­
    1-17-2028
    974. This court held that the plaintiff “possessed enough information ‘to inquire further’ about”
    the allegedly defective design when the plaintiff was notified of the flooding problems and sent
    its project manager and the subcontractor to investigate. Id. at 976.
    ¶ 44	          In a similar fashion, M&S had an obligation to conduct further inquiries when its
    president discovered that the damage was caused when part of Allahverdi’s roof blew off and hit
    the power lines during the windstorm and Allahverdi informed her that the roof uplifted when
    the dock doors were opened. At the least, M&S was placed on notice that further inquiry was
    necessary. See Castello, 352 Ill. App. 3d at 745. That M&S was placed under a burden as of
    October 27, 2010, to further investigate rings especially true considering that it filed suit months
    before it received the engineering report. M&S filed its lawsuit against Allahverdi on August 14,
    2015. The report of its engineering expert was issued on March 26, 2016. Thus, M&S filed its
    complaint seven months before it claims it was capable of knowing that the damage was
    wrongfully caused. This demonstrates that while it may not have known exactly why the roof
    detached before McCann issued his report, it nevertheless knew the damage had been wrongfully
    caused. See McCormick v. Uppuluri, 
    250 Ill. App. 3d 386
    , 391-92 (1993) (holding that, as a
    matter of law, the statute of limitations on the plaintiff’s medical malpractice claim began
    running on the date he filed his first lawsuit because the plaintiff “must have had sufficient
    information concerning his injury and its cause for plaintiff to have instituted suit. Even if
    plaintiff did not, we must impute it to plaintiff. To hold otherwise in this case would make a
    mockery of the court system.”); see also 155 Harbor Drive Condominium Ass’n v. Harbor Point
    Inc., 
    209 Ill. App. 3d 631
    , 644 (1991) (upholding the trial court’s ruling that, as a matter of law,
    the plaintiff knew of its injury and that it was wrongfully caused when it filed its initial lawsuit,
    with respect to other defendants subsequently added to the litigation).
    - 17 ­
    1-17-2028
    ¶ 45          We find that the cases cited by M&S on appeal entail circumstances distinguishable from
    the present case. In Henderson Square, 
    2015 IL 118139
    , ¶ 54, the plaintiffs experienced minor
    water leakage in their condominium units in 2007 and 2008, and had repairs done, but the leaks
    persisted. The plaintiffs eventually engaged an engineer and contractor to investigate and
    undertake invasive testing in 2009, and they learned once the walls were opened up that the units
    had been so poorly constructed that they would have to be reconstructed. 
    Id.
     The plaintiffs also
    learned in 2009 that the defendants had made false representations concerning the construction.
    
    Id.
     The defendants argued that the limitations period began running when the plaintiffs first
    knew there was water leaking into the units. Id. ¶ 55. Our supreme court held that the date of
    discovery was a question of fact precluding dismissal under section 2-619. Id. The court
    observed that “it is possible that the minor repairs in the present case, coupled with the limited
    nature of the water infiltration experienced, was enough to reasonably delay plaintiffs’ hiring of
    professional contractors to open up the wall and to discover the latent defects.” Id. ¶ 59.
    ¶ 46          Next, in Graham, 109 Ill. 2d at 153-54, our supreme court held that a question of fact
    existed as to when the plaintiff county had the requisite knowledge to trigger the limitations
    period where the county became aware of moisture problems on the exterior walls of a county
    building constructed in 1974 but did not file suit until 1982. The county informed the architect of
    the moisture problems in 1974 and also of cracks in masonry walls and foundation that occurred
    over time, and the architect suggested certain causes (which were not actionable) and repairs,
    which were attempted over the years. Id. at 148-49. The court held that the county was aware of
    the moisture problem in 1974, but “it is impossible to state, as a matter of law, that this
    knowledge was sufficient to trigger the running of the limitations period. It is possible that the
    - 18 ­
    1-17-2028
    suggestions of the architect and the resulting repairs were adequate to keep a reasonable person
    from investigating further.” Id. at 154.
    ¶ 47          Lastly, in Society of Mount Carmel v. Fox, 
    31 Ill. App. 3d 1060
    , 1060-61 (1975), the
    plaintiffs sued their architect for the faulty design of a school. The plaintiffs noticed cracks and
    defects in the building more than five years before filing their complaint, but the defendant
    architects assured the plaintiffs that the defects were merely “maintenance problems.” Id. at
    1060. The plaintiffs argued that the limitations period did not begin to run until they obtained a
    contractor’s report sometime later, which concluded that the cracks were the result of a design
    defect. Id. at 1061. Based on (1) the plaintiffs’ assertion that they neither knew nor had any way
    of knowing of the design defect and they did not discover it until the contractor’s report, (2) the
    defendants’ assurances that the cracks were merely maintenance issues, and (3) that there was no
    evidence in the record that would show that plaintiffs knew of the alleged defective design of the
    building as the cause of the defects prior to 1969, the court reversed the summary judgment
    holding in favor of defendant and held the discovery date was the date the plaintiffs received the
    report informing them of the design defects, and not when they first observed the cracks in the
    building. Id. at 1061-63.
    ¶ 48          There are crucial differences between the above cases and the present circumstances.
    Henderson Square, Graham, and Fox all involve damage that occurred incrementally over time.
    They also entailed repairs that were made over time that initially appeared to remedy the
    problems. In contrast, the damage in the present case occurred suddenly during high winds. The
    present case does not involve any minor repairs performed over time that seemed to fix the issue.
    Additionally, M&S’s cases involved circumstances where the defendants made certain
    representations that hindered or delayed discovery of the cause of the damage and their
    - 19 ­
    1-17-2028
    responsibility for it. Here, in contrast, there was no evidence of any representations by
    Allahverdi after the incident on October 27, 2010, which could have deterred M&S from
    investigating further into the cause of the damage. There are no allegations that Allahverdi
    attempted to hide the cause of the accident or made false representations. Indeed, shortly after
    the incident, he informed M&S’s president that his roof detached during the windstorm after the
    dock door of his building was opened.
    ¶ 49          We note that M&S contends that the circuit court erred in applying the “sudden traumatic
    event” rule to this case as its application is limited to personal injury actions. We need not
    address whether to apply this rule here, however, because we have concluded that the application
    of the discovery rule here involves a question of law given the undisputed facts. That is,
    regardless of the application the “sudden traumatic event” rule, only one conclusion can be
    drawn from the undisputed facts in the present case—that the limitations period was triggered at
    the time the roof of Allahverdi’s building detached and caused damage to M&S’s property. In
    any event, Allahverdi’s point is well taken under the circumstances of this case. Allahverdi cites
    this rule in arguing that the limitations period began running on the date the damage occurred
    because the injury here was sudden and traumatic and not hidden, insidious, or chronic like a
    slow water leak or a cracking foundation, as in the cases relied upon by M&S.
    ¶ 50                                         III. CONCLUSION
    ¶ 51          For the reasons stated above, we affirm the circuit court’s decision to grant Allahverdi’s
    motion to dismiss pursuant to section 2-619(a)(5) of the Code. The parties’ briefs adequately
    relay their respective contentions and adequately respond thereto, indicating that oral argument
    would not further our consideration of this appeal.
    ¶ 52          Affirmed.