Emerald Performance Materials, LLC v. The Illinois Pollution Control Board , 2016 IL App (3d) 150526 ( 2016 )


Menu:
  •                                                                               Digitally signed by
    Illinois Official Reports                        Reporter of Decisions
    Reason: I attest to the
    accuracy and integrity
    of this document
    Appellate Court                           Date: 2016.12.02
    10:21:12 -06'00'
    Emerald Performance Materials, LLC v. Illinois Pollution Control Board,
    
    2016 IL App (3d) 150526
    Appellate Court         EMERALD PERFORMANCE MATERIALS, LLC, Petitioner-
    Caption                 Appellant, v. THE ILLINOIS POLLUTION CONTROL BOARD and
    THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
    Respondents-Appellees.
    District & No.          Third District
    Docket No. 3-15-0526
    Filed                   September 2, 2016
    Decision Under          Petition for review of order of Illinois Pollution Control Board; No.
    Review                  AS-13-2.
    Judgment                Affirmed in part, reversed in part, and remanded.
    Counsel on              Thomas W. Dimond (argued) and Sarah M. Weaver, both of Ice Miller
    Appeal                  LLP, of Chicago, for appellant.
    Lisa Madigan, Attorney General, of Chicago (John P. Schmidt
    (argued), Assistant Attorney General, of counsel), for appellees.
    Panel                   PRESIDING JUSTICE O’BRIEN delivered the judgment of the court,
    with opinion.
    Justices Holdridge and Schmidt concurred in the judgment and
    opinion.
    OPINION
    ¶1        Petitioner, Emerald Performance Materials (Emerald), filed a petition seeking an
    adjustment from standards imposed by respondent Pollution Control Board (the Board)
    regarding emissions from Emerald’s manufacturing plant and water treatment facility located
    in Henry, in Marshall County. The Board granted the adjusted standard with various
    conditions. Emerald appealed the conditions. Respondent Illinois Environmental Protection
    Agency (IEPA) joins the Board in defending the conditions. We affirm in part, reverse in part,
    and remand.
    ¶2                                              FACTS
    ¶3        Petitioner Emerald Performance Materials filed a petition for an adjusted standard with
    respondent Pollution Control Board seeking an adjustment from respondent Illinois
    Environmental Protection Agency’s ammonia effluent limitations set forth in section
    304.122(b) of the Illinois Administrative Code (Code) (35 Ill. Adm. Code 304.122(b) (2002)).
    Emerald owns and operates a specialty chemical facility in Henry. The Emerald plant and a
    neighboring polyvinyl chloride (PVC) resin manufacturing plant were opened and operated by
    B.F. Goodrich from 1958 to 1993. Goodrich sold the PVC resin plant in 1993, and it was
    eventually bought by Mexichem Specialty Resins, Inc. Goodrich sold the specialty chemical
    facility to Noveon, Inc., in 2001, and Emerald bought it in 2006. The plant produces
    accelerators and antioxidants.
    ¶4        Emerald operates a wastewater treatment plant to process the wastewater from its
    operations. It also processes Mexichem’s wastewater. After treatment, the wastewater is
    eventually discharged into the Illinois River. The discharge exceeds the allowable total
    ammonia nitrogen effluent level of 3 mg/L, as set forth in section 304.122(b) of the Code (35
    Ill. Adm. Code 304.122(b) (2002)). Neither Emerald nor Mexichem uses ammonia as a raw
    material in their processes, but they do use amines, which serve as precursors to the formation
    of ammonia nitrogen. In addition, Emerald uses mercaptobenzothiasole (MBT) as a key
    intermediate in the production of accelerators. The MBT that is present in the wastewater when
    it enters the treatment plant inhibits the nitrification process through which ammonia would
    otherwise be oxidized to nitrates. Emerald is the only remaining manufacturer of MBT in the
    United States.
    ¶5        The ammonia nitrogen that is discharged into the Illinois River is formed in the wastewater
    treatment process. The wastewater is discharged into the river through a high-rate multiport
    diffuser. The plant is situated on a bluff 80 to 90 feet above the river, and the velocity with
    which the wastewater discharge enters the river through the diffuser causes rapid and
    immediate mixing. The treatment plant provides greater than 95% biological oxygen demand
    reduction. The ammonia nitrogen levels discharged into the river are generally in the range of
    23 to 150 mg/L.
    ¶6        In 1991, when Goodrich renewed its National Pollutant Discharge Elimination System
    (NPDES) permit, the permit included a new ammonia effluent limitation (35 Ill. Adm. Code
    304.122(b), amended at 
    14 Ill. Reg. 6777
     (eff. Apr. 24, 1990)). Goodrich appealed the
    ammonia standard, and the parties agreed the best avenue would be for Goodrich to seek a
    variance. In 1992, Goodrich applied for a variance, and the request was stayed while Goodrich
    researched various technologies to reduce ammonia in its discharge. The research conducted
    by Goodrich, and then Noveon, concluded in 1998 that the available treatment technologies
    -2-
    were neither economically reasonable nor technically feasible to significantly reduce the
    ammonia in the discharge so as to comply with section 304.122(b) requirements.
    ¶7         Because a variance requires eventual compliance with the standard, Noveon filed a petition
    for an adjusted standard in 2002. Following hearings, the Board determined that Noveon
    qualified for an adjusted standard under the statutory factors, and in November 2004, it granted
    Noveon’s petition, with conditions. In granting the petition, the Board found that the
    wastewater discharge from the treatment plant was fundamentally different from other
    industrial dischargers required to meet the standards in section 304.122(b); the reason the
    wastewater differed was because the MBT used in the processes inhibited nitrification of the
    ammonia in the wastewater treatment system; eleven alternative technologies reviewed by
    Noveon revealed none of them was both economically reasonable and technically feasible to
    control and/or reduce ammonia in the discharge; and there was no adverse environmental
    impact on the Illinois River from the ammonia effluent discharge.
    ¶8         The conditions imposed by the Board in the 2004 adjusted standard included a discharge
    limit of not more than a total ammonia nitrogen concentration of 155 mg/L and a seven-year
    sunset provision and the requirements that Noveon install a multiport diffuser; continue to
    investigate alternative production methods and technologies to lessen the ammonia discharge;
    submit an annual report to the IEPA setting forth the results of the investigations; research and
    propose ways to provide environmental improvements to the Illinois River in Marshall County
    (a factor the Board stated it might use in considering a future request to renew the adjusted
    standard); provide quarterly monitoring of ammonia nitrogen to demonstrate compliance with
    ammonia water quality standards; and comply with the Clean Air Act (
    42 U.S.C. § 7401
     et seq.
    (2000)), NPDES permit program, and the Board water pollution regulations.
    ¶9         After it purchased the facility in 2006, Emerald engaged in a number of projects and
    investigations to facilitate the reduction of the ammonia effluent, including the installation of
    the multiport diffuser. Emerald also conducted studies and samplings to demonstrate its
    discharge did not negatively impact the environment. Testing done quarterly from 2007 to
    2012 established the ammonia levels complied with the acute and chronic water quality
    standards for ammonia nitrogen, with the exceptions of three exceedances. In 2011 and 2012,
    Emerald collected effluent samples to test its toxicity to aquatic organisms. The results
    indicated that Emerald’s effluent met the toxicity limits and its dilution rates were in
    compliance with water quality regulations.
    ¶ 10       Emerald filed the instant petition for an adjusted standard in September 2012, seeking to
    renew the adjusted standard of 155 mg/L for ammonia granted to Noveon. Emerald proposed it
    maintain the same standard and continue to use the multiport diffuser. Although IEPA urged
    the Board to deny the petition for an adjusted standard, in June 2014, Emerald and IEPA jointly
    submitted agreed recommended conditions, including the following: (1) limiting ammonia
    nitrogen effluent to a daily maximum of 140 mg/L, (2) requiring Emerald to investigate new
    treatment technologies and evaluate implementation of new and existing technologies, and (3)
    terminating the adjusted standard in ten years.
    ¶ 11       On Emerald’s motion, the Board incorporated the record from the proceedings on
    Noveon’s petition for an adjusted standard. The Board acknowledged the treatment
    alternatives submitted with the 2002 Noveon petition and the findings of Brown and Caldwell,
    an environmental consulting firm, that there were no economically feasible treatment
    alternatives that would reliably reduce the concentration of effluent ammonia nitrogen.
    -3-
    Emerald hired Brown and Caldwell to assist in its 2012 petition by revisiting its previous work,
    investigating what, if any, changes and new technologies had occurred since then, and
    determining whether its prior conclusions remained valid. Brown and Caldwell reviewed the
    previously considered alternatives and investigated five new ones. Brown and Caldwell
    concluded the new technologies to reduce ammonia would not be as effective or economically
    viable as the previously considered options, which were found neither technologically feasible
    nor economically reasonable.
    ¶ 12       IEPA recommended to the Board that it reject Emerald’s petition for an adjusted standard.
    IEPA asserted that Emerald did not meet its burden to establish that the adjusted standard
    would not cause environmental or health harm substantially and significantly more adverse
    than those under the general regulations, citing studies noting the possible toxicity of ammonia
    to mollusks. According to IEPA, the information indicated that the effluent discharged by
    Emerald could be harming Illinois River mollusks. IEPA also asserted Emerald could
    substantially reduce ammonia at a reasonable cost. Other concerns raised by IEPA included
    Emerald’s failure to explore alternatives. IEPA proposed a 48% reduction in the ammonia
    effluent limit from 155 mg/L to 80 mg/L, if the Board granted the petition.
    ¶ 13       Emerald waived a hearing on its petition and answered questions submitted on paper from
    the Board. When asked about its environmental projects, Emerald stated that it had not
    completed any environmental projects “specifically targeted to provide environmentally
    beneficial improvements to the Illinois River” and had no plans to invest in any
    environmentally beneficial improvements. Emerald indicated it would not likely “consider
    cost-share incentives to implement or install best management practices (BMPs) for an
    environmental project.” Project costs, debt obligations, a workforce lockout, and the economic
    downturn limited the funds Emerald had for such projects. Emerald submitted that its funds
    would be more efficiently spent continuing to investigate new technologies and production
    methods. In addition, Emerald replied that it did not identify any BMPs that would be
    economically feasible or have tangible environmental benefits.
    ¶ 14       The Board also asked about a seven-year sunset provision. Emerald responded that it could
    accept a sunset provision rather than a denial of its petition for an adjusted standard, but it
    believed that an ongoing evaluation of new treatment technologies and production methods
    would better ensure the best degree of treatment than the imposition of a sunset provision.
    ¶ 15       The Board issued its order in April 2015, finding that Emerald met the requirements for an
    adjusted standard and setting the standard at 140 mg/L, with a five-year sunset provision.
    Several conditions were included in the order:
    a. continued use of the high-rate, multiport diffuser for discharge;
    b. maintain various ammonia reduction measures, including using
    ammonia reduction as a metric in the employee gain sharing plan;
    c. investigate new production methods and technologies to generate less ammonia
    and nitrification inhibitors in the discharge;
    d. investigate new treatment technologies and evaluate the implementation of new
    and existing treatment technologies;
    e. investigate and submit to IEPA three specific studies, including the use of a spray
    irrigation program;
    f. submit annual reports summarizing its activities regarding the conditions;
    -4-
    g. IEPA may petition the Board for a modified standard if the new technologies are
    economically reasonable and technically feasible;
    h. to seek renewal or modification of the adjusted standard, implementing
    agricultural BMPs within the Illinois River-Senachwine Lake Watershed to provide a
    partial reduction in the total nitrogen loading to the watershed by offsetting at least
    45% of the nitrogen represented in 841 lbs/day ammonia nitrogen based on the 30-day
    average load limit, and;
    i. operate in compliance with the Clean Air Act, its NPDES permit; the Board water
    pollution regulations; and any other applicable requirements.
    ¶ 16       In setting forth the condition requiring an agricultural BMPs offset, the Board discussed a
    draft document, titled “Illinois Nutrient Loss Reduction Strategy” (Nutrient Strategy), that was
    issued by IEPA and the Illinois Department of Agriculture in November 2014, after the Board
    had finished accepting evidence in this case. The document identified the Illinois
    River-Senachwine Lake Watershed as one of the five priority watersheds identified in the state
    for sources of nitrate-nitrogen. High concentrations of nitrate-nitrogen have an adverse impact
    downstream where the Mississippi River flows into the Gulf of Mexico. Emerald is located
    within the watershed, although the document did not identify any specific harm to the Illinois
    River in the area. The Nutrient Strategy also addressed agricultural BMPs offsets as one of the
    nutrient reduction strategies. The Board considered other factors, such as the longtime use of
    an adjusted standard by Emerald, in requiring an offset of at least 45%, consistent with the
    Nutrient Strategy’s ultimate objective of reducing nitrate-nitrogen loadings by 45%. The
    strategy aims to reduce nitrate-nitrogen load by 15% by 2025, with eventual reduction of 45%.
    In discussing the five-year sunset condition, the Board stated it “firmly concludes that Emerald
    must begin planning to offset the nitrogen loading to the Illinois River” and described the
    sunset provision as a starting point.
    ¶ 17       Emerald appealed the conditions to the First District Appellate Court (No. 1-15-1359 (July
    22, 2015)), and the case was transferred to the Third District on motion of the Board and IEPA.
    ¶ 18                                           ANALYSIS
    ¶ 19        The issues on appeal are whether the Board exceeded its authority and acted arbitrarily and
    capriciously in placing various conditions on Emerald’s adjusted standard and whether it erred
    in considering evidence outside the record.
    ¶ 20        We begin with the question of whether the Board acted improperly in placing various
    conditions on the Board’s adjusted standard. Emerald offers three ways in which it maintains
    that the Board exceeded its authority or included arbitrary and capricious conditions when it
    granted Emerald’s petition for an adjusted standard. First, Emerald argues that the Board erred
    when it preconditioned Emerald’s ability to renew or modify the adjusted standard in the future
    on Emerald’s compliance with an unattainable agricultural BMPs offset program. Second,
    Emerald challenges the requirement that Emerald include an ammonia reduction as a factor in
    its employee gain plan. Third, Emerald argues that the five-year sunset provision is improper.
    ¶ 21        The Environmental Protection Act (Act) was designed to establish a program focused on
    the restoration, protection, and enhancement of the environment and to hold responsible those
    who cause adverse effects to the environment. 415 ILCS 5/2(b) (West 2012). The Act grants
    the Board its authority and charges it with determining, defining, and implementing
    -5-
    environmental control standards and adopting rules and regulations to carry out its purpose.
    415 ILCS 5/5(b) (West 2012). The Act is to be liberally construed in order to effectuate its
    purposes. 415 ILCS 5/2(c) (West 2012). The ultimate goal of the Act is to achieve compliance
    with applicable regulations by all polluters. Monsanto Co. v. Pollution Control Board, 
    67 Ill. 2d 276
    , 287 (1977). Because the Board is responsible for administering the Act, its
    interpretation of a regulation or statute is entitled to deference. Central Illinois Public Service
    Co. v. Pollution Control Board, 
    116 Ill. 2d 397
    , 409 (1987).
    ¶ 22       The Board has the authority to grant an adjusted standard “for persons who can justify such
    an adjustment consistent with subsection (a) of Section 27 of this Act” and to impose
    conditions as “necessary to accomplish the purpose of this Act.” 415 ILCS 5/28.1(a) (West
    2012). Section 27 of the Act provides the following factors for the Board to consider in
    determining regulations and adjusted standards: “the existing physical conditions, the
    character of the area involved, including the character of the surrounding land uses, zoning
    classifications, the nature of the existing air quality, or receiving body of water, as the case may
    be, and the technical feasibility and economic reasonableness of measuring or reducing the
    particular type of pollution.” 415 ILCS 5/27(a) (West 2012).
    ¶ 23       Section 28.1 of the Act provides that where a regulation of general application does not
    include a level of justification that is required for a petitioner to qualify for an adjusted
    standard, the following factors should be used to make the determination: “(1) factors relating
    to that petitioner are substantially and significantly different from the factors relied upon by the
    Board in adopting the general regulation applicable to that petitioner; (2) the existence of those
    factors justifies an adjusted standard; (3) the requested standard will not result in
    environmental or health effects substantially and significantly more adverse than the effects
    considered by the Board in adopting the rule of general applicability; and (4) the adjusted
    standard is consistent with any applicable federal law.” 415 ILCS 5/28.1(a)(1)-(4) (West
    2012).
    ¶ 24       The Board may take notice of “matters of which the circuit courts of this State may take
    judicial notice” and “generally recognized technical or scientific facts within the Board’s
    specialized knowledge [and experience].” 5 ILCS 100/10-40(c) (West 2012); 35 Ill. Adm.
    Code 101.630. In proceedings before the Board, the parties must be notified of the use of the
    extraneous evidence and afforded an opportunity to respond. 5 ILCS 100/10-40(c) (West
    2012). An administrative agency may only take official notice of facts when they are disclosed
    and put on the record so the parties may be afforded an opportunity to be heard. Caterpillar
    Tractor Co. v. Pollution Control Board, 
    48 Ill. App. 3d 655
    , 661-62 (1977). When a
    conclusion in an administrative proceeding is influenced by evidence de hors the record, it
    cannot stand. Caterpillar Tractor Co., 48 Ill. App. 3d at 661 (quoting Des Plaines Currency
    Exchange, Inc. v. Knight, 
    29 Ill. 2d 244
    , 247 (1963)).
    ¶ 25       This court reviews whether the Board exceeded its authority and its interpretation of a
    statute de novo. E.O.R. Energy, LLC v. Pollution Control Board, 
    2015 IL App (4th) 130443
    ,
    ¶ 70; Geneva Community Unit School District No. 304 v. Property Tax Appeal Board, 
    296 Ill. App. 3d 630
    , 633 (1998). We review the conditions to determine if they were arbitrary and
    capricious. Monsanto Co., 
    67 Ill. 2d at 290-91
    .
    ¶ 26       Emerald first challenges the condition imposed by the Board that if it wants to renew or
    modify the adjusted standard, Emerald must implement agricultural best management
    practices (BMPs) within the Illinois River-Senachwine Lake Watershed to offset at least 45%
    -6-
    of the nitrogen in the ammonia effluent. According to Emerald, the Board is without authority
    to condition renewal or modification on any factors other than those set forth in sections 27(a)
    and 28.1 of the Act. Emerald also asserts that the condition itself was arbitrary and capricious,
    as it was not aligned with section 27(a) factors, would not further the purposes of the Act, and
    was beyond Emerald’s scope of responsibility.
    ¶ 27        We agree with Emerald that the Board exceeded its authority when it conditioned renewal
    of the adjusted standard on Emerald’s compliance with the agricultural BMPs offset
    requirement set forth in the condition. The Act sets forth the factors the Board is to consider
    when determining whether to grant an adjusted standard. The Board lacks the authority to add
    to or rewrite the statutory factors. E.O.R. Energy, LLC, 
    2015 IL App (4th) 130443
    , ¶ 69
    (administrative agencies are creatures of statute and have only the powers conferred on them
    by their enabling statutes). While the Board may place conditions in an adjusted standard, it
    may not impose preconditions on a petitioner’s right to renew or modify the adjusted standard.
    We consider that the offset condition improperly changes the statutory requirements and that
    the Board exceeded its authority in imposing it.
    ¶ 28        We further consider the condition to be arbitrary and capricious. Emerald maintains that
    the condition is unattainable as it was related to a regulatory program not in existence, that
    there was no evidence that the effluent Emerald discharges negatively impacts the
    environment, or that implementation of an agricultural BMPs offset was feasible and would
    result in an ammonia reduction in the discharge. Importantly, there is no connection between
    the condition and the circumstances of the local environment in Marshall County.
    ¶ 29        The Board did not analyze the offset requirement in accord with the statutory factors in
    sections 27(a) and 28.1(a) of the Act. 415 ILCS 5/27(a), 28.1(a) (West 2012). When imposing
    the condition, the Board was required to examine its technical feasibility and economic
    reasonableness. Both Emerald and IEPA questioned whether Emerald could satisfy the
    condition. Emerald noted it had a “negligible” ability to affect agricultural pollution, and it did
    not identify any BMPs to reduce nitrogen from agricultural sources. IEPA acknowledged
    whether Emerald would be able to find sufficient agricultural participants to offset its ammonia
    discharge. Based on the Board’s failure to properly consider the feasibility and reasonableness
    of the agricultural offset BMPs requirement, we consider this condition improper.
    ¶ 30        Moreover, there is no evidence that Emerald’s discharge is negatively impacting the
    environment. The Board decision stated that the effect of the discharge “will not result in
    environmental or health effects substantially or significantly more adverse than those
    considered by the Board in adopting the generally applicable effluent standard.” In granting
    the adjusted standard in 2004, the Board also found there was no environmental impact from
    Emerald’s discharge. Emerald’s NPDES permit required Emerald to conduct biomonitoring of
    two types of aquatic species, including fish and invertebrates. The results of a 2013 toxicity
    study demonstrated that Emerald met toxicity levels, as noted by the Board in its instant
    decision. Furthermore, the quarterly monitoring showed compliance with ammonia water
    quality standards.
    ¶ 31        Concerns raised by IEPA regarding mollusks in the Illinois River were based on proposed
    standards with more stringent ammonia limits designed to protect mollusks. The stricter limits
    were ultimately rejected, and IEPA’s concern regarding the mollusks is without support. If
    stricter limits were adopted in the future, Emerald’s compliance would be assured through the
    requirements in the NPDES permit, which would reflect any changed ammonia limits. The
    -7-
    record does not support that Emerald’s effluent discharge is harming the aquatic life in the
    Illinois River. Emerald has and continues to meet the clean water standards. There was no
    evidence that the discharge was having any effect on the mollusks or other aquatic life in the
    river or was any more harmful to the environment than the discharge allowed in the general
    standard. We find the record does not support the Board’s finding that the agricultural BMPs
    offset condition is needed to protect the environment.
    ¶ 32        Emerald also maintains the Board improperly used evidence outside the record in
    fashioning the condition. According to Emerald, the Board’s consideration of a draft of the
    Nutrient Strategy violated both the Board procedural rules and the Illinois Administrative
    Procedure Act. Emerald argues that the document was issued after the evidence portion of the
    proceeding concluded and that Emerald was not allowed an opportunity to be heard on and to
    respond to the evidence presented in the document.
    ¶ 33        We consider the use of the draft report improper. The Board imposed on Emerald a 45%
    reduction requirement through agricultural BMPs offset programs. The 45% requirement
    parallels the ultimate reduction goal set out in the Nutrient Strategy, a document to which
    Emerald had no opportunity to respond or address. The Nutrient Strategy was issued after
    evidence was before the Board, and the first time Emerald had knowledge of it was due to its
    use in the Board’s decision. Basic notions of fair play necessitate that Emerald have the
    opportunity to explain, challenge, or refute the facts on which the Board based this condition.
    ¶ 34        In addition, the Nutrient Strategy does not support the imposition of the condition. At oral
    argument, the discussion revealed that the draft strategy was directed at mitigating dissolved
    oxygen or nutrient problems occurring where the Mississippi River discharges into the Gulf of
    Mexico. The ammonia regulations were implemented to counter dissolved oxygen sags in the
    Illinois River. Later studies determined that the sags were primarily caused by nonpoint
    agricultural sources and not as a result of the ammonia effluent discharged by Emerald. The
    Illinois River does not include any sections that are listed as impaired as to ammonia or
    dissolved oxygen. Because the Draft Strategy was the basis for implementing it and the
    evidence does not support it, we find the condition cannot stand.
    ¶ 35        Next, Emerald argues that the Board exceeded its authority when it conditioned the
    adjusted standard on Emerald continuing to incorporate “ammonia reduction as a metric in the
    employee gain sharing plan.” Emerald asserts the Board’s action is unprecedented and that the
    inclusion of the employee bonus plan in an adjusted standard is beyond the sphere of
    environmental protection. We agree.
    ¶ 36        The Act grants the Board the authority to fashion regulations to effectuate the Act’s
    purpose of protecting the environment. We cannot find that the inclusion of the plan as a
    condition in the adjusted standard advances that purpose. There was no evidence that inclusion
    of ammonia reduction as a metric in the plan resulted in any reduction of ammonia. There was
    no information at all about the plan, its requirements, or employee participation in it other than
    a single statement in a 2010 report Emerald submitted to IEPA. In the report, Emerald stated
    that a key project with “the potential to reduce ammonia generation at the wastewater plant”
    was the continued use of ammonia reduction as a measurement in its gain sharing program.
    ¶ 37        The Board has latitude in the means it imposes to satisfy the Act’s objectives; however, the
    means must be connected in some fashion to the condition. Here, there is no evidence to
    support a connection between the gain sharing plan and the goal of ammonia reduction. This
    condition is inconsistent with the purposes of the Act. We find the Board exceeded its authority
    -8-
    when it included the gain share plan as a condition in the adjusted standard and that its use as a
    condition was arbitrary and capricious as it was not supported by any evidence.
    ¶ 38        Our last consideration is the five-year sunset provision. Emerald complains that the Board
    erred when it placed a five-year sunset provision as a condition. It submits that adjusted
    standards were meant to be indefinite in duration and not time-bound like variances.
    ¶ 39        Emerald attempts to draw a distinction between a variance and an adjusted standard,
    claiming that a reasonable interpretation of the statute informs that a variance is intended to be
    a temporary form of relief, while the relief afforded under an adjusted standard is permanent or
    indefinite in duration. 415 ILCS 5/35, 36(b) (West 2012); Environmental Protection Agency v.
    Pollution Control Board, 
    308 Ill. App. 3d 741
    , 748-49 (1999). Emerald’s assertion fails. A
    variance anticipates compliance at the end of the variance period. For that reason, the variance
    is limited to five years and cannot be renewed. In contrast, an adjusted standard allows the
    petitioner to exceed the general standard indefinitely, pursuant to the terms of the adjusted
    standard, which may include conditions, including a sunset provision.
    ¶ 40        The five-year sunset imposed here is not arbitrary and capricious, as Emerald maintains.
    An agency acts arbitrarily and capriciously if it relies on factors outside those the legislature
    intended for consideration; completely fails to consider an significant aspect of the problem; or
    provides an explanation to its decision that is so implausible or contrary to the evidence that it
    could not be based on agency expertise or result from a difference in view. Environmental
    Protection Agency, 308 Ill. App. 3d at 751.
    ¶ 41        Emerald or its predecessors have been discharging effluent that exceeds the allowable
    amount of pollution into the Illinois River for decades. The five-year sunset provision
    encourages Emerald to aggressively pursue means to reduce the amount of ammonia it
    discharges into the Illinois River or institute alternative means to alleviate the pollution. As
    technology advances and environmental concerns remain paramount, the five-year period
    allows Emerald to apply any advances to its operations in a continued attempt to reach
    compliance with the ammonia standard. The Board is charged with the authority to obtain
    compliance with the environmental standards, and a sunset provision is a viable means to
    achieve compliance and not contrary to the legislative purpose of the Act. The provision was
    imposed after the Board considered all aspects of Emerald’s inability to comply with the
    ammonia standard. The Board imposed a sunset provision on the last adjusted standard it
    issued to the Henry plant. Emerald responded to the Board that it would accept a sunset
    provision here, rather than a denial of an adjusted standard. The five-year sunset provision is
    appropriate and a valid means to inspire Emerald to attempt to comply with the pollution
    regulations. We find there was no error in a five-year sunset provision as a condition in the
    adjusted standard.
    ¶ 42                                         CONCLUSION
    ¶ 43       For the foregoing reasons, the judgment of the Pollution Control Board is affirmed in part,
    reversed in part, and the cause remanded.
    ¶ 44      Affirmed in part, reversed in part, and remanded.
    -9-
    

Document Info

Docket Number: 3-15-0526

Citation Numbers: 2016 IL App (3d) 150526

Filed Date: 12/6/2016

Precedential Status: Precedential

Modified Date: 12/6/2016