Terra Foundation for American Art v. DLA Piper LLP , 2016 IL App (1st) 153285 ( 2016 )


Menu:
  •                                                                           Digitally signed by
    Illinois Official Reports                      Reporter of Decisions
    Reason: I attest to the
    accuracy and integrity
    of this document
    Appellate Court                        Date: 2016.10.27
    14:51:01 -05'00'
    Terra Foundation for American Art v. DLA Piper LLP (US), 
    2016 IL App (1st) 153285
    Appellate Court       TERRA FOUNDATION FOR AMERICAN ART and TERRA
    Caption               MICHIGAN AVENUE PROPERTY, LLC, Plaintiffs-Appellants, v.
    DLA PIPER LLP (US), Defendant-Appellee.
    District & No.        First District, Sixth Division
    Docket No. 1-15-3285
    Filed                 August 12, 2016
    Decision Under        Appeal from the Circuit Court of Cook County, No. 15-L-001866; the
    Review                Hon. Sanjay T. Tailor, Judge, presiding.
    Judgment              Affirmed.
    Counsel on            Chapman Spingola, LLP, of Chicago (Robert A. Chapman and
    Appeal                Shannon T. Knight, of counsel), for appellants.
    Much Shelist, P.C., of Chicago (Martin J. O’Hara and Shawn M.
    Staples, of counsel), for appellee.
    Panel                 PRESIDING JUSTICE ROCHFORD delivered the judgment of the
    court, with opinion.
    Justices Hoffman and Delort concurred in the judgment and opinion.
    OPINION
    ¶1       Plaintiffs-appellants, Terra Foundation for American Art, a not-for-profit organization, and
    Terra Michigan Avenue Property, LLC (collectively referred to as Terra), brought this action
    alleging malpractice against defendant-appellee, DLA Piper LLP (US) (DLA), a law firm,
    which Terra had retained in connection with the sale of real estate. The circuit court dismissed
    Terra’s complaint finding that it was barred as a matter of law by the applicable statute of
    repose. 735 ILCS 5/13-214.3(c) (West 2014). We affirm the dismissal of Terra’s action.
    ¶2                                        I. BACKGROUND
    ¶3       In 2005, Terra agreed to sell three pieces of property located at 664, 666, and 670 North
    Michigan Avenue in Chicago (the property) to entities controlled by Prism Development Co.,
    which were later succeeded in interest by NM Project. DLA represented Terra throughout the
    negotiations for the sale, including the final closing in 2013.
    ¶4       NM Project intended to build a 40-story mixed use building (the building) on the property,
    which would include retail, office and residential parcels. As part of the sale, Terra was to
    receive an “up front” payment of $17.5 million and, upon closing, ownership of the retail and
    office parcels. NM Project would own the residential parcel.
    ¶5       Because the ultimate square footage of the retail parcel would control its potential rental
    income and its resulting economic value to Terra, NM Project’s cash payment was to be
    adjusted at the closing based on the completed size of the retail parcel (the retail parcel credit).
    On April 27, 2005, Terra and NM Project executed a term sheet that included a formula for
    determining the retail parcel credit using baseline estimates for the space of the retail parcel:
    8041 square feet for the first floor and 10,728 square feet for the second floor. Upon
    completion of the building, if the resulting rentable square footage of the first floor was less
    than the baseline estimate, NM Project would pay Terra $5500 for every square foot of reduced
    space. If the actual rentable square footage of the first floor was greater than the baseline
    estimate, Terra would pay NM Project $5500 per square foot of increased space. As to the
    second floor, if the resulting rentable square footage was less than the baseline estimate, NM
    Project would pay $800 per square foot for any such reduction. If the rentable square footage of
    the second floor was greater than the baseline estimate, Terra would owe nothing to NM
    Project for this additional square footage.
    ¶6       Consistent with Terra’s wish that the common space for the other parts or parcels of the
    building not be included in the measurement of the retail parcel, the term sheet referred only to
    the “contiguous” space of the first floor of the retail parcel and expressly excluded “the
    Common Area Parcel[1] and lobbies for the Office Parcel and Condominium/Parking Parcel
    [residential parcel] and building service areas (including, but not limited to, loadings docks,
    freight elevator lobby, mechanical space and other ‘back of the house’ space)” (exclusionary
    language) from the rentable area of the retail parcel.
    ¶7       In the several years following execution of the term sheet but before the final closing, Terra
    and NM Project entered into a series of agreements that governed the transaction (collectively
    1
    The term sheet defined the common area parcel as “[t]he common lobby, elevators, spaces, and
    shafts for the building’s plumbing, electrical, and mechanical systems and similar spaces.”
    -2-
    referred to as the agreements). These agreements included the following, none of which
    included the exclusionary language.
    ¶8         On June 21, 2005, Terra and NM Project executed a purchase agreement that, in section 9,
    set forth the formula for determining the retail parcel credit. That formula was consistent with
    the language contained in the term sheet, except that section 9 did not contain the exclusionary
    language.
    ¶9         The first amendment to the purchase agreement (first amendment), which was executed on
    May 29, 2007, provided for how the retail parcel would be measured for purposes of
    determining the retail parcel credit. Specifically, paragraph 5 of the first amendment provided
    that rentable square footage or rentable square feet was to be calculated pursuant to the
    “Standard Method for Measuring Floor Area in Office Buildings (ANSI/BOMA Z65.1-1996),
    An American National Standard Approved June 7, 1996 by American National Standards
    Institute, Inc., published by Building Owners and Managers Association International”
    (hereinafter BOMA 96). According to Terra, BOMA 96 is a method of measurement which
    would allocate a pro rata share of the common space of the building to the rentable area of the
    retail parcel unless that space was, otherwise, expressly excluded.
    ¶ 10       In March 2008, Terra and NM Project entered into a third amendment to the purchase
    agreement and other related agreements (third amendment). Section 6 of the third amendment
    required that Terra provide a letter of credit as security for any possible retail parcel credit to be
    made by Terra. To determine the amount of the line of credit, NM Project was to provide an
    estimate of the rentable square feet of the retail parcel based on the final or substantially final
    plans for the building. Terra and NM Project were then to agree on the amount, if any, Terra
    might be responsible to pay under the retail parcel credit based on those estimates. Terra would
    submit a letter of credit for that amount before construction began. However, if there was a
    dispute as to the measurement of the retail parcel, the issue was to be resolved through an
    agreed alternative dispute procedure which included arbitration.
    ¶ 11       In October 2009, Terra and NM Project executed a declaration of covenants, conditions,
    restrictions, and easements (the 2009 declaration), which defined how the rental, residential
    and office parcels were to share the building and its various components. The 2009 declaration
    was superseded by a 2012 declaration of covenants, conditions, restrictions, and easements
    (the 2012 declaration).
    ¶ 12       On March 2, 2010, NM Project and Terra entered into a letter agreement (the March 2010
    letter) that amended the purchase agreement and other related agreements. The March 2010
    letter included agreements to exclude the basement space of the building2 from both the retail
    and the office parcels, exclude a designated limited portion of the retail parcel from the rental
    square footage of the first floor and remeasure the space under the fire stairs or beams upon
    completion of the retail parcel and adjust the amount due under section 9 of the purchase
    agreement accordingly.
    ¶ 13       At different stages of the building’s development, Terra and NM Project disputed the size
    of the rentable space of the retail parcel.
    2
    The term sheet included a baseline estimate of 3000 square feet for the basement of the retail
    parcel and NM Project was to pay $300 per reduced square foot for this space. This space is not at issue
    on appeal.
    -3-
    ¶ 14        In order to determine Terra’s obligation for posting a line of credit, pursuant to the third
    amendment, in late 2010 NM Project provided Terra with its calculations of the expected
    square footage of the retail parcel based on the final plans. NM Project projected the rentable
    area for the first floor of the retail parcel to be 10,363 square feet, 2332 square feet greater than
    the baseline estimate, and therefore, NM Project contended it would be entitled to a retail
    parcel credit of $12,771,000. The rentable square feet area for the second floor of the retail
    parcel was calculated to be 12,587 square feet, which was 1859 square feet greater than the
    baseline estimate. Pursuant to the parties’ agreements, NM Project was not entitled to receive a
    credit relating to the second floor.
    ¶ 15        Terra disagreed with NM Project’s calculations, because they included an allocated share
    of the common areas for the other parcels. Terra believed that, upon completion, the first floor
    rentable area would be 7403 square feet and the second floor rentable area would be 9183
    square feet. Therefore, Terra contended NM Project would owe an additional $4,737,000 at the
    closing as the retail parcel credit.
    ¶ 16        To resolve the dispute, Terra and NM Project engaged in the agreed alternative dispute
    procedures. An October 11, 2010, arbitration award provided that, based on the final plans, the
    first floor rental space would be 8801 square feet and the second floor would be 10,363 square
    feet. Based on this award, Terra would owe NM Project in excess of $3.8 million at the closing
    as the retail parcel credit and was, therefore, required to post an appropriate line of credit
    pursuant to the third amendment.
    ¶ 17        Near the completion of the building in late 2012, NM Project determined that the final
    rentable square footage of the first floor of the retail parcel was 8857 square feet and the
    second floor was comprised of 10,450 rentable square feet. NM Project asserted that, based on
    these measurements, Terra would owe a retail parcel credit of $4,265,000 at closing.
    ¶ 18        Terra again challenged NM Project’s measurements, contending that only the contiguous
    space within the retail parcel should be measured. Terra calculated the rentable square feet of
    the first floor to be 7835 square feet, with the second floor including 8839 square feet. Using
    these measurements, Terra maintained that NM Project would owe a retail parcel credit of
    $2,643,619 at the closing.
    ¶ 19        To resolve their differences, NM Project and Terra again engaged in arbitration. On
    January 30, 2013, the arbitration panel issued an award, which provided that the BOMA 96
    calculations showed that, as constructed, the first floor rentable space included 8733 square
    feet and the second floor included 10,628 square feet. Pursuant to this award, Terra paid NM
    Project approximately $3.8 million as the retail parcel credit at the February 13, 2013, closing.
    ¶ 20        On February 23, 2015, Terra filed a legal malpractice suit against DLA, alleging
    negligence in its representation of Terra with regard to the sale. However, pursuant to a tolling
    agreement, the complaint was “deemed filed on October 7, 2014.” Terra asserted in its
    complaint that, throughout the negotiations of the agreements, it had expressed to DLA its
    concerns that the exclusionary language of the term sheet had not been included in the
    agreements.
    ¶ 21        Terra further alleged that DLA breached its duty of care by failing to advise Terra that
    using BOMA 96 would necessarily include the common areas for the other parcels in the
    measurements of the rental area of the retail space and by failing to include the exclusionary
    language of the term sheet in the agreements. Terra further alleged that had it known that the
    failure to include the exclusionary language in the agreements would result in the common
    -4-
    areas for the entire building being added into the calculation of the rentable area of the retail
    parcel, it either would not have agreed to the use of BOMA 96 or would have “insisted” on the
    inclusion of the exclusionary language. Alternatively, Terra would have “insisted” that the
    baseline estimates, which had not included the common areas, be “grossed up” to include the
    common area square footage.
    ¶ 22       Terra believed that if the measurement of the retail parcel had been calculated consistently
    with its expressed intent at the closing, NM Project would have paid Terra $2.6 million under
    the retail parcel credit provision, rather than Terra paying NM Project over $3.8 million.
    Terra’s complaint thus alleged that as a result of DLA’s negligence it had suffered damages in
    the amount of $6,449,619 (the total of what Terra paid and the amount Terra contends it was
    owed as to the retail parcel credit) and had incurred $500,000 in legal fees and costs associated
    with the arbitrations.
    ¶ 23       On April 3, 2015, DLA filed a motion, pursuant to section 2-619(a)(5) of the Code of Civil
    Procedure (Code) (735 ILCS 5/2-619(a)(5) (West 2014)), to dismiss the complaint as untimely
    under both the applicable statute of limitations (735 ILCS 5/13-214.3(b) (West 2014)) and the
    statute of repose (735 ILCS 5/13-214.3(c) (West 2014)).
    ¶ 24       On October 20, 2015, the circuit court granted the motion and dismissed the action with
    prejudice, based on the language of the statute of repose providing that a legal malpractice
    claim “may not be commenced *** more than 6 years after the date on which the act or
    omission occurred.” 
    Id.
     The court concluded that “the alleged negligence occurred when the
    First Amendment was executed [May 29, 2007]. That’s the document that contained the ***
    BOMA ‘96 as the standard for measuring the retail parcel. It did not include the exclusionary
    language that was included in the term sheet.” The circuit court then denied Terra’s oral
    motion to amend the complaint, which Terra claimed would “replead in separate counts the
    original [c]omplaint’s separate and independent acts of malpractice, including a number of
    negligent acts that occurred within the six-year repose period.” Terra timely appealed both the
    dismissal of its complaint and the circuit court’s denial of leave to file an amended complaint.
    ¶ 25                                           II. ANALYSIS
    ¶ 26       A motion to dismiss under section 2-619 of the Code “admits the legal sufficiency of the
    plaintiffs’ complaint, but asserts an affirmative defense or other matter that avoids or defeats
    the claim.” DeLuna v. Burciaga, 
    223 Ill. 2d 49
    , 59 (2006). When considering such a motion, a
    court must accept as true all well pled facts in the complaint and any reasonable inferences
    drawn therefrom. Purmal v. Robert N. Wadington & Associates, 
    354 Ill. App. 3d 715
    , 720
    (2004). Section 2-619(a)(5) more specifically allows a cause of action to be dismissed if it was
    not commenced within the time limited by law. 735 ILCS 5/2-619(a)(5) (West 2014). We
    review a dismissal under section 2-619 de novo. Peregrine Financial Group, Inc. v. Futronix
    Trading, Ltd., 
    401 Ill. App. 3d 659
    , 660 (2010).
    ¶ 27       This appeal also requires us to construe section 13-214.3 of the Code. The well recognized
    rules for such a task were recently outlined in Hendricks v. Board of Trustees of the Police
    Pension Fund, 
    2015 IL App (3d) 140858
    , ¶ 14:
    “The fundamental rule of statutory interpretation is to ascertain and give effect to the
    intent of the legislature. [Citation.] The most reliable indicator of that intent is the
    language of the statute itself. [Citation.] In determining the plain meaning of statutory
    language, a court will consider the statute in its entirety, the subject the statute
    -5-
    addresses, and the apparent intent of the legislature in enacting the statute. [Citations.]
    If the statutory language is clear and unambiguous, it must be applied as written,
    without resorting to further aids of statutory interpretation. [Citation.] A court may not
    depart from the plain language of the statute and read into it exceptions, limitations, or
    conditions that are not consistent with the express legislative intent. [Citation.]”
    We review questions of statutory construction de novo. Feltmeier v. Feltmeier, 
    207 Ill. 2d 263
    ,
    267 (2003).
    ¶ 28        Section 13-214.3 of the Code sets forth the permissible time frame for the filing of a legal
    malpractice action. First, the section includes a statute of limitations requiring that a legal
    malpractice action “be commenced within 2 years from the time the person bringing the action
    knew or reasonably should have known of the injury for which damages are sought.” 735 ILCS
    5/13-214.3(b) (West 2014). Second, the section includes a statute of repose providing that a
    legal malpractice action “may not be commenced in any event more than 6 years after the date
    on which the act or omission occurred.” 735 ILCS 5/13-214.3(c) (West 2014). Finally, the
    section includes a provision stating that if “the injury caused by the act or omission does not
    occur until the death of the person for whom the professional services were rendered,” the suit
    may be commenced within two years after the death unless letters of office are issued or the
    person’s will is admitted to probate within that two-year period. 735 ILCS 5/13-214.3(d) (West
    2014).
    ¶ 29        The dismissal of this case was based on the statute of repose. A statute of repose is intended
    to place a limit on the period of time for commencing suit “regardless of a potential plaintiff’s
    lack of knowledge of his cause of action.” (Internal quotation marks omitted.) Goodman v.
    Harbor Market, Ltd., 
    278 Ill. App. 3d 684
    , 690 (1995). As our supreme court has further
    explained:
    “In contrast to a statute of limitations, which determines the time within which a
    lawsuit may be commenced after a cause of action has accrued, a statute of repose
    extinguishes the action after a defined period of time, regardless of when the action
    accrued. [Citation.] A statute of repose is not tolled by the discovery rule. [Citation.]
    After the expiration of the repose period, ‘[t]he injured party no longer has a recognized
    right of action.’ [Citation.] A plaintiff’s right to bring an action is terminated when the
    event giving rise to the cause of action does not transpire within the period of time
    specified in the statute of repose.” Evanston Insurance Co. v. Riseborough, 
    2014 IL 114271
    , ¶ 16.
    A statute of repose, thus, “gives effect to a policy different from that advanced by a statute of
    limitations; it is intended to terminate the possibility of liability after a defined period of time.”
    Ferguson v. McKenzie, 
    202 Ill. 2d 304
    , 311 (2001).
    ¶ 30        On appeal, Terra presents several arguments to support reversal of the dismissal of its
    cause of action under the statute of repose. First, Terra contends that the statute of repose did
    not begin to run until the closing on the sale of the property on February 13, 2013, which was
    the last day of DLA’s representation as to the sale. This argument is based on Terra’s belief
    that a transactional malpractice case is treated differently under the statute of repose than a
    litigation malpractice case. In the alternative, Terra maintains that the earliest the repose statute
    could begin to run was at the time of the March 2010 letter. Finally, Terra argues that DLA’s
    negligence did not end at the time of the first amendment; rather, it continued with DLA’s
    separate failures to include the exclusionary language in each of the agreements.
    -6-
    ¶ 31       “The statute of repose in a legal malpractice case begins to run as soon as an event giving
    rise to the malpractice claim occurs, regardless of whether plaintiff’s injury has yet been
    realized.” Lamet v. Levin, 
    2015 IL App (1st) 143105
    , ¶ 20. The statute of repose may not be
    tolled merely by the continuation of the attorney-client relationship. Mauer v. Rubin, 
    401 Ill. App. 3d 630
    , 639 (2010); Lamet, 
    2015 IL App (1st) 143105
    , ¶ 23.
    ¶ 32       The well pled facts of the complaint show that Terra informed DLA of its wish that the
    common space for the other parcels not be included in the calculation of the rental area of the
    retail parcel when determining the retail parcel credit. In accordance with that desire, the term
    sheet contained the exclusionary language. Subsequently, however, the first amendment
    provided that BOMA 96 would be the method for measuring the rentable area. According to
    the complaint, BOMA 96 calculations include a pro rata share of the common spaces of the
    whole building unless the common spaces are expressly excluded. The first amendment,
    however, did not have the exclusionary language included in the term sheet. Terra alleges that
    DLA negligently failed to include the exclusionary language in the agreement to use BOMA
    96 and negligently failed to advise Terra that the pro rata share of the common space would be
    included in the rental area calculations under BOMA 96. These failures of DLA allegedly
    caused Terra to engage in arbitrations over the measurements of the retail parcel and to make
    rather than receive a retail credit payment at the closing.
    ¶ 33       We conclude that the event giving rise to Terra’s injuries occurred on May 29, 2007, when
    Terra and NM Project executed the first amendment and chose BOMA 96 as the method of
    measuring the retail parcel without the exclusionary language. Fricka v. Bauer, 
    309 Ill. App. 3d 82
    , 88 (1999) (“The plain language of the statute requires filing of the lawsuit within six
    years of the acts or omissions that form the basis for the complaint.”). The measurements of the
    rentable area under the BOMA 96 standards, without excluding the common space, resulted in
    the increases of the retail parcel space, which required Terra to engage in arbitrations to dispute
    the measurements, incur the related attorney fees and expenses and make the retail parcel
    credit payment at the closing. Terra’s asserted injuries directly flowed from DLA’s allegedly
    negligent omissions and acts as to the first amendment.
    ¶ 34       Under the statute of repose, Terra thus had until May 29, 2013, to file its malpractice suit
    against DLA, and its October 2014 complaint, therefore, was untimely. The circuit court
    properly dismissed the action. See Evanston Insurance Co., 
    2014 IL 114271
    , ¶ 16 (“After the
    expiration of the repose period, ‘[t]he injured party no longer has a recognized right of
    action.’ ”).
    ¶ 35       In considering the possible harshness of this result, we note that both the October 2010
    arbitration award, as to Terra’s obligation to post a line of credit, and the January 2013
    arbitration award, which established the retail parcel credit at the closing, were based on
    measurements of the retail parcel using BOMA 96 and indicated that Terra would be
    responsible to pay a retail parcel credit at the closing. The awards were entered before the
    expiration of the statute of repose and offered Terra an opportunity to file a timely action under
    the statute of repose against DLA. Further, the March 12, 2013, closing took place about three
    months before the running of the statute of repose, giving Terra yet another opportunity to file
    a timely suit.
    ¶ 36       Terra argues that a transactional malpractice action is treated differently from a litigation
    malpractice action under the statute of repose. According to Terra, in a transactional context,
    the statute of repose does not begin to run “until the completion of the last affirmative act of
    -7-
    representation in the matter that included the attorney’s negligence” and, in this case, that
    would be the March 2013 closing. (Emphasis added.) Terra relies on Lamet, Snyder v.
    Heidelberger, 
    2011 IL 111052
    , and Trogi v. Diabri & Vicari, P.C., 
    362 Ill. App. 3d 93
     (2005).
    We disagree with Terra.
    ¶ 37       It is true that, in applying the statute of repose to the particular facts and circumstances at
    hand, our courts have remarked as to certain differences between litigation and transactional
    matters. See, e.g., Goldstein v. DABS Asset Manager, Inc., 
    381 Ill. App. 3d 298
    , 304 (2008)
    (“In a transactional setting, the statute of repose may cut off a malpractice action before it
    accrues.”); Fricka, 309 Ill. App. 3d at 87 (where court noted that a malpractice plaintiff who is
    injured in a litigation setting will not often be impacted by the statute of repose, while the
    statute of repose may cut off suits arising in the transactional setting); Trogi, 362 Ill. App. 3d at
    98 (where the court distinguished the holding in Hester v. Diaz, 
    346 Ill. App. 3d 550
    , 554
    (2004), in part, because that case involved malpractice in the context of litigation). See also
    Union Planters Bank, N.A. v. Thompson Coburn LLP, 
    402 Ill. App. 3d 317
    , 344 (2010) (where
    court compared proof of damages in a litigation malpractice case with a transactional one).
    ¶ 38       However, the plain language of section 3-214.3 makes no distinction in its application as to
    types of malpractice. Rather, by its plain terms, the section applies to “[a]n action for damages
    based on tort, contract, or otherwise *** against an attorney arising out of an act or omission in
    the performance of professional services.” 735 ILCS 5/13-214.3(b) (West 2014). The statute
    contains no limiting language as to an “act,” or “omission,” or “performance of professional
    services,” which may form the basis of the legal malpractice action. “It is improper for a court
    to depart from the plain statutory language by reading into the statute exceptions, limitations,
    or conditions that conflict with the clearly expressed legislative intent.” Bettis v. Marsaglia,
    
    2014 IL 117050
    , ¶ 13 (citing Metropolitan Life Insurance Co. v. Hamer, 
    2013 IL 114234
    ,
    ¶ 18). We cannot read the statute of repose as having differing rules of application depending
    on whether the negligent misconduct takes place in a transactional or a litigation setting.
    Therefore, the statute of repose as to any legal malpractice case “begins to run as soon as an
    event creating the malpractice occurs, regardless of whether an injury has yet resulted so as to
    cause an action to accrue.” Mauer, 401 Ill. App. 3d at 639.
    ¶ 39       We disagree with Terra’s argument that Lamet should be considered as setting forth solely
    a “statute of repose rule for litigation malpractice.” (Emphasis in original.) The defendant in
    Lamet began representing the plaintiff in 1994 as to a dispute with his landlord. Lamet, 
    2015 IL App (1st) 143105
    , ¶ 4. The litigation covered 17 years and was settled in 2011 after the
    plaintiff learned that the claims and affirmative defenses that had been asserted against his
    landlord by the defendant on his behalf “were ‘likely indefensible.’ ” Id. ¶ 9. The plaintiff’s
    malpractice suit, which was filed in 2011, was dismissed as untimely under the statutes of
    limitations and repose. Id. ¶¶ 11, 14. On appeal, we rejected the plaintiff’s argument that the
    statute of repose began to run on June 10, 2011, when the defendant “filed his final version of
    [the] affirmative defenses.” Id. ¶¶ 19-20. We found, instead, that the statute of repose began to
    run in 1994, at the outset of the representation when the defendant failed to inform the plaintiff
    that he had no meritorious defenses, claims, or remedies, notwithstanding the defendant’s
    “later failure to correct that omission.” Id. ¶ 23.
    ¶ 40       As alleged in Terra’s complaint, the event from which Terra’s injuries flowed was the
    execution of the first amendment which contained the agreement that the method to measure
    the retail parcel was to be BOMA 96, without the exclusionary language. As in Lamet, this is
    -8-
    the event from which the injuries flowed, notwithstanding DLA’s subsequent failures to
    correct the issue prior to the closing.
    ¶ 41        The discussion in Lamet upon which Terra relies does not require a different holding in this
    case. We did say in Lamet that, in the transactional context, the overt act from which the injury
    flows “will typically be the date upon which the transaction is executed and the negligence is
    complete,” while in the litigation context the negligent act can occur before the end of
    litigation and the representation has ended. (Emphasis added.) Id. ¶ 25. Our statements, as to
    when the negligent act generally occurs in a transactional case and a litigation case, should not
    be read as a bright line rule that, in a transactional setting, the statute of repose always begins to
    run when the attorney’s representation ends.
    ¶ 42        Similarly, while in Snyder and Trogi the statute of repose was found to have been triggered
    upon a negligent act that also happened to be the last act of representation, that fact does not
    require a finding in this case that the statute of repose did not began to run until the closing,
    simply because that is when DLA’s representation of Terra as to the sale ended.
    ¶ 43        In Snyder, the plaintiff’s husband retained the defendant attorney in 1997 to prepare a deed
    conveying the marital home to the plaintiff and her husband as joint tenants with the right of
    survivorship. Snyder, 
    2011 IL 111052
    , ¶ 3. After the husband died in 2007, the plaintiff
    learned that the property was held by a trustee in a land trust and that her stepson was the sole
    beneficiary. In 2008, she brought a malpractice action against the defendant. Id. ¶¶ 2-3. The
    defendant’s motion to dismiss the plaintiff’s suit as untimely was granted. Id. ¶ 5. Before our
    supreme court, the defendant argued that the “injury” occurred not when the husband died but
    when the deed was prepared. Id. ¶ 12. The plaintiff agreed that “an injury did occur” when the
    deed was prepared but maintained that another injury occurred when the husband died and she
    did not have a surviving interest in the property. Id. The plaintiff further contended that it was
    the “last injury that determines when the limitations period began to run.” Id.
    ¶ 44        These arguments related to whether section 13-214.3(d), which allows suit to be
    commenced two years after the client’s death, applied to make the Snyder action timely and not
    the two-year statute of limitations of section 13-214.3(b), which would render the action
    untimely. A determination as to the applicability of section 13-214.3(d) turns solely on
    whether the injury caused by the malpractice occurred upon the death of the client. Id. ¶ 13
    (citing Peterson v. Wallach, 
    198 Ill. 2d 439
     (2002)). In contrast, the statute of repose does not
    run from an “injury,” but rather from an act or omission. 735 ILCS 5/13-214.3(c) (West 2014).
    ¶ 45        Thus, our supreme court concluded in Snyder that “[s]ince the injury in this case occurred
    at the time the deed was prepared and executed, the two-year limitations period contained in
    subsection (b) of the statute applies.” Snyder, 
    2011 IL 111052
    , ¶ 17. The court, however, then
    addressed the statute of repose by first noting that “[t]he period of repose in a legal malpractice
    case begins to run on the last date on which the attorney performs the work involved in the
    alleged negligence.” 
    Id.
     ¶ 18 (citing Carlen v. First State Bank of Beecher City, 
    367 Ill. App. 3d 1051
    , 1056 (2006), and Trogi, 362 Ill. App. 3d at 96). The court concluded that the statute of
    repose began to run at the time the improperly recorded deed was mailed, as that was the “last
    act of defendant’s representation.” Id. The plaintiff’s suit was, therefore, untimely. Id.
    ¶ 46        Again, we conclude that the language in Snyder that the statute of repose in that case began
    to run with the last act of representation—preparation and delivery of the deed—should not be
    read to mean that, in every transaction, the statute of repose for a malpractice action begins on
    the last day or act of representation. As we stated in Lamet, this language “was not being used
    -9-
    in Snyder to extend the period of repose. On the contrary, it was used to show that the Snyder
    plaintiff’s suit was clearly past the period of repose. The Snyder defendant’s delivery of the
    defective deed was a ‘single overt act from which subsequent damages may flow’ [citation],
    thus triggering the start of the period of repose.” Lamet, 
    2015 IL App (1st) 143105
    , ¶ 25. In this
    case, the execution of the first amendment was the last date on which DLA performed “the
    work involved in the alleged negligence” (Snyder, 
    2011 IL 111052
    , ¶ 18) and was the conduct
    from which the damages flowed (Lamet, 
    2015 IL App (1st) 143105
    , ¶ 25).
    ¶ 47       The attorney in Trogi negligently recorded a deed transferring ownership to the plaintiff
    from his daughter in the wrong county in October 1998 and mailed the improperly recorded
    deed to the plaintiff in late December 1998. Trogi, 362 Ill. App. 3d at 94. The daughter
    transferred the property to a third party in 2003, and because the prior deed was not properly
    recorded, the plaintiff’s interest in the property was extinguished. The plaintiff’s malpractice
    suit against the defendant was filed in November 2004 and was dismissed under the statute of
    repose. Id. at 94-95.
    ¶ 48       In reviewing the dismissal, the appellate court cited the holding in Frika that the attorney
    malpractice period of repose begins to run on the last date on which the attorney performs the
    work involved in the alleged negligence. Id. at 96. The dismissal in Trogi was reversed, based
    on a finding that the sending of the improperly recorded deed to the plaintiff was the
    defendant’s last act of negligence as to the improper recording of the deed, an act which
    “coincided with the termination of the attorney-client relationship.” (Emphasis added.) Trogi,
    362 Ill. App. 3d at 98. Here although it did not coincide with the termination of the
    attorney-client relationship, the last act of negligence from which the damages flowed was that
    associated with the agreement to use BOMA 96, without the exclusionary language, which
    occurred upon the execution of the first amendment by Terra and NM Project on May 29,
    2007.
    ¶ 49       Our rejection of Terra’s position—that in a transaction malpractice case the statute of
    repose does not run until the last act of representation as to the entire matter—is consistent with
    our case law that “the statute of repose is not tolled merely by the continuation of the
    attorney-client relationship” (Lamet, 
    2015 IL App (1st) 143105
    , ¶ 20 (citing Mauer, 401 Ill.
    App. 3d at 640)), nor “by the attorney’s ongoing duty to correct past mistakes” (id. (citing
    Frika, 309 Ill. App. 3d at 84)).
    ¶ 50       In the alternative, Terra argues that DLA’s “work” on the measurement of the retail parcel
    “did not end, at least, until the execution of the March 2010 [letter].” According to Terra, the
    March 2010 letter “should be considered as the last act of negligence.” As noted above, the
    March 2010 letter did include agreements as to the retail parcel and its measurements.
    However, we do not agree that the statute of repose began to run with the March 2010 letter.
    ¶ 51       As we have stated, the statute of repose in a legal malpractice case begins to run as soon as
    the event giving rise to the claim occurs (Mauer, 401 Ill. App. 3d at 639) and is not tolled
    merely by the continuation of the attorney-client relationship (id. at 640; Lamet, 
    2015 IL App (1st) 143105
    , ¶ 20; Sorenson v. Law Offices of Theodore Poehlmann, 
    327 Ill. App. 3d 706
    , 710
    (2002)). Therefore, even if DLA failed to include the exclusionary language in the March 2010
    letter, the statute of repose began to run with the execution of the first amendment in May
    2007. “[W]here there is a single overt act from which subsequent damages may flow, the
    statute begins to run on the date the defendant invaded the plaintiff’s interest and inflicted
    injury, and this is so despite the continuing nature of the injury.” Feltmeier, 
    207 Ill. 2d at 279
    .
    - 10 -
    The acts and omissions of DLA as to the drafting and execution of the first amendment gave
    rise to this claim, and the statute of repose was not tolled by any failure to include the
    exclusionary language in the March 2010 letter.
    ¶ 52       Finally, Terra argues that “DLA could and should have placed the [e]xclusionary
    [l]anguage in several post-2007 [agreements] and its failure to include the term in any of these
    documents is what proximately caused Terra’s injury.” Terra contends that this argument
    neither encroaches on the rule that continuous representation does not toll the statute of repose,
    nor can it be viewed as an argument that DLA failed to correct the omission of the exclusionary
    language in the first amendment. We disagree.
    ¶ 53       In essence, Terra argues that as its attorney for the negotiations and at the closing, DLA had
    a continuing duty to correct the injuries which flowed from the first amendment. However, the
    failure to include the exclusionary language in the agreements did not exacerbate the injuries
    which were caused by the execution of the first amendment or cause different injuries. The
    period of repose is not tolled by DLA’s subsequent failures to correct the omission of the
    exclusionary language in the first amendment. See Mauer, 401 Ill. App. 3d at 642 (ongoing
    duty to correct does not delay beginning of period of repose (citing Fricka, 309 Ill. App. 3d at
    84)).
    ¶ 54       Because we hold that Terra’s suit is time-barred under the statute or repose, we need not
    address the issue of whether the suit was untimely under the statute of limitations. See Lamet,
    
    2015 IL App (1st) 143105
    , ¶ 28 (where court declined to consider statute of limitations after
    finding the statute of repose barred the suit).
    ¶ 55       Terra next argues that the circuit court erred in denying its oral motion to amend its
    complaint to plead independent acts of malpractice as to the failure to include the exclusionary
    language in the agreements that were executed between 2007 and 2012, which would fall
    within the six-year statute of repose.
    ¶ 56       Section 2-616(a) of the Code (735 ILCS 5/2-616(a) (West 2014)), provides that “[a]t any
    time before final judgment amendments may be allowed on just and reasonable terms ***
    which may enable the plaintiff to sustain the claim for which it was intended to be brought or
    the defendant to make a defense or assert a cross claim.” The decision to grant a motion to
    amend pleadings is within the discretion of the circuit court, and a reviewing court will not
    reverse the circuit court’s decision absent an abuse of discretion. Loyola Academy v. S&S Roof
    Maintenance, Inc., 
    146 Ill. 2d 263
    , 273 (1992).
    ¶ 57       Typically, in reviewing the denial of a motion to amend, the reviewing court considers
    whether (1) the proposed amendment would cure the defective pleading, (2) the proposed
    amendment would surprise or prejudice the opposing party, (3) the proposed amendment was
    timely filed, and (4) the moving party had previous opportunities to amend. 
    Id.
     However, a
    number of courts have recognized that these so-called Loyola Academy factors “apply only to
    amendments that have been proposed prior to final judgment.” Tomm’s Redemption, Inc. v.
    Hamer, 
    2014 IL App (1st) 131005
    , ¶ 14; Hachem v. Chicago Title Insurance Co., 
    2015 IL App (1st) 143188
    , ¶ 18; Compton v. Country Mutual Insurance Co., 
    382 Ill. App. 3d 323
    , 332
    (2008) (same). After final judgment, a party has no statutory right to amend a pleading under
    section 2-616(a) of the Code; rather, a party may only amend a pleading to conform the
    pleadings to the proofs under section 2-616(c). Compton, 382 Ill. App. 3d at 332. Because in
    this case Terra only requested to amend its complaint after the trial court dismissed it with
    prejudice, under this line of authority the trial court did not err in denying that request. See
    - 11 -
    Hamer, 
    2014 IL App (1st) 131005
    , ¶ 14 (noting that “[a]fter final judgment, a plaintiff has no
    statutory right to amend a complaint and a court commits no error by denying a motion for
    leave to amend”); Hachem, 
    2015 IL App (1st) 143188
    , ¶ 18 (noting that it is well settled that
    the dismissal of a cause of action constitutes a final judgment).
    ¶ 58       Nevertheless, even if we declined to follow this line of authority and found that application
    of the Loyola Academy factors was appropriate here, we find that Terra’s proposed amendment
    to the complaint would not have cured the defect. The complaint was dismissed as time-barred
    because the statute of repose began to run at the execution of the first amendment. As we have
    found, the statute of repose was not tolled by DLA’s continued representation of Terra and its
    failure to include the exclusionary language in the agreements, including those executed
    between 2007 and 2012. The circuit court properly denied Terra’s request to amend the
    complaint.
    ¶ 59                                        III. CONCLUSION
    ¶ 60       For the reasons stated above, we find that the statute of repose barred Terra’s action for
    legal malpractice against DLA, and the proposed amendment to the complaint would not have
    cured this defect. Therefore, we affirm both the circuit court’s dismissal of the complaint with
    prejudice and its denial of leave to file an amended complaint.
    ¶ 61      Affirmed.
    - 12 -