Metro Holdings One, Llc, Exproman, Inc., and Quaker Sales & Distribution v. Flynn Creek Partner, Llc , 2014 Ind. App. LEXIS 643 ( 2014 )


Menu:
  • FOR PUBLICATION
    ATTORNEYS FOR APPELLANTS,                   ATTORNEYS FOR APPELLEE:
    METRO HOLDINGS and EXPROMAN:
    SCOTT S. MORRISON
    ANDREW W. HULL                              Krieg DeVault LLP
    DANIEL K. BURKE                             Carmel, Indiana
    Hoover Hull LLP
    Indianapolis, Indiana                       LIBBY Y. GOODKNIGHT
    Krieg DeVault LLP
    ATTORNEYS FOR APPELLANT,                    Indianapolis, Indiana
    QUAKER SALES & DISTRIBUTION, INC.
    THOMAS F. BEDSOLE
    MAGGIE L. SMITH
    RACHEL M. SCHAFER                                        Dec 30 2014, 9:00 am
    Frost Brown Todd LLC
    Indianapolis, Indiana
    IN THE
    COURT OF APPEALS OF INDIANA
    METRO HOLDINGS ONE, LLC,                    )
    EXPROMAN, INC., and QUAKER                  )
    SALES & DISTRIBUTION,                       )
    )
    Appellants-Defendants,                )
    )
    vs.                            )       No. 32A01-1309-PL-374
    )
    FLYNN CREEK PARTNER, LLC,                   )
    )
    Appellee-Plaintiff.                   )
    APPEAL FROM THE HENDRICKS SUPERIOR COURT
    The Honorable Mark A. Smith, Judge
    Cause No. 32D04-1204-PL-39
    December 30, 2014
    OPINION – FOR PUBLICATION
    PYLE, Judge
    STATEMENT OF THE CASE
    In this consolidated appeal, we are called upon to address a contract dispute
    between parties at the summary judgment level. Here, the contract is a real estate
    purchase agreement between sophisticated business entities—Appellants-Defendants
    Metro Holdings One LLC (“Metro Holdings”); Exproman, Inc. f/k/a Exxcel Project
    Management (“Exproman”) (collectively, “Metro”); and Quaker Sales & Distribution,
    Inc. (“Quaker”)1 on one side and Appellee-Plaintiff Flynn Creek Partners, LLC (“Flynn
    Creek”) on the other side.           The purchase agreement required the buyer, Metro, to
    purchase two contiguous parcels of real estate from the seller, Flynn Creek, on two
    separate closing dates.
    The purchase and closing of the second property parcel is at issue in this appeal.
    On the day of the scheduled closing on the second parcel, Metro—relying on a term of
    the purchase agreement—sent Flynn Creek a notice, indicating that Flynn Creek had
    failed to satisfy certain closing conditions and invoking the sixty-day period for Flynn
    Creek to satisfy the disputed closing conditions. Flynn Creek—also relying on a term of
    the purchase agreement—responded by sending Metro a letter, asserting that Metro had
    defaulted in its performance under the purchase agreement by failing to purchase the
    second property parcel. Thereafter, Metro—relying on yet another term of the purchase
    1
    Quaker was the original party to the purchase agreement but assigned its rights and obligations under the
    agreement to Exproman on the same day it signed the purchase agreement. Exproman later assigned its
    rights to Metro Holdings.
    2
    agreement—sent Flynn Creek a letter, stating that it was electing to terminate the
    purchase agreement due to the presence of wetlands on the second property parcel.
    Ultimately, Flynn Creek filed a suit for breach of contract against Metro and
    Quaker based upon Metro’s failure to purchase and close on the second property parcel.
    Flynn Creek sought specific performance of the purchase agreement or an alternative
    remedy of damages for its breach of contract claim. Metro counterclaimed, arguing that
    Flynn Creek had repudiated or anticipatorily breached the purchase agreement. After the
    parties filed cross-motions for summary judgment,2 the trial court granted Flynn Creek’s
    motion for summary judgment (finding, in relevant part, that Metro had breached the
    purchase agreement by failing to purchase the second property parcel and that Flynn
    Creek was entitled to specific performance of the purchase agreement) and denied
    Metro’s cross-motion for summary judgment.
    Metro now appeals, challenging the trial court’s grant of summary judgment on
    Flynn Creek’s breach of contract claim and request for specific performance and the trial
    court’s denial of its repudiation claim. Metro’s main appellate argument is that Flynn
    Creek, as a seller in this real estate transaction, was not entitled to the equitable remedy
    of specific performance where an adequate remedy at law existed. Additionally, Metro
    argues that the trial court erred by denying summary judgment on its repudiation claim.
    Because our Indiana Supreme Court has explained that specific performance is an
    available remedy to a seller of real property even though the seller may have action at law
    and because the parties included a specific provision in their contract that Flynn Creek
    2
    Quaker did not file a summary judgment motion but did attend the summary judgment hearing.
    3
    had the right to specific performance upon a default by Metro, we affirm the trial court’s
    grant of summary judgment on Flynn Creek’s breach of contract claim and request for
    specific performance. Additionally, because Metro did not show on summary judgment
    that Flynn Creek’s actions constituted a clear or absolute statement that Flynn Creek was
    repudiating or anticipatorily breaching the Purchase Agreement, we affirm the trial
    court’s denial of summary judgment on Metro’s repudiation claim.
    We affirm.
    ISSUE
    We consolidate the issues presented and restate the issue on appeal as:
    Whether the trial court erred by granting Flynn Creek’s motion for
    summary judgment and denying Metro’s cross-motion for summary
    judgment.
    FACTS3
    We first point out that many of the facts designated as evidence in this summary
    judgment proceeding are subject to a trial court order excluding them from public access.
    3
    We note that Metro’s Statement of the Issues, Statement of the Case, and Statement of the Facts are not
    in compliance with our Appellate Rules. Most notably, Metro’s Statement of the Case contains argument
    and does not “briefly describe the nature of the case, the course of proceedings relevant to the issues
    presented for review, and the disposition of these issues by the trial court[.]” See App. R. 46(A)(5). We
    direct counsel’s attention to Appellate Rules 46(A)(4)-(A)(6), relating to the required content for an
    Appellant’s Statement of the Issues, Statement of the Case, and Statement of the Facts. Contrary to
    Appellate Rule 50, Metro has failed to include “pleadings and other documents from the Clerk’s Record .
    . . that are necessary for resolution of the issues raised on appeal[,]” including Flynn Creek’s summary
    judgment filings and designated evidence. See App. R. 50(A)(2)(f). Additionally, neither party included
    a copy of Metro’s answer to Flynn Creek’s complaint or a copy of Flynn Creek’s answer to Metro’s
    counterclaim in its Appendix. Finally, Metro has improperly included in its Appendix pleadings that
    were struck from the record by the trial court (i.e., Metro’s Supplemental Brief in Support of Summary
    Judgment, Metro’s Second Supplemental Designated Evidence, and Metro’s Reply in Support of its
    Motion to Correct Error). Metro does not challenge the trial court’s orders to strike these pleadings but
    has, nevertheless, included these pleadings in its Appendix contrary to Appellate Rule 50. As these were
    not part of the record below, we will not review them on appeal. We remind Metro that compliance with
    our Appellate Rules ensures that our appellate review of the issues is not impeded.
    4
    As such, portions of the parties’ appendices are filed on green paper and marked as
    “confidential” or “not for public access.” See Ind. Admin. R. 9. We have attempted to
    exclude such matters from this opinion. However, to the extent such matters are included
    in this opinion, we deem such information to be essential to the resolution of the litigation
    or appropriate to further the establishment of precedent or the development of the law.
    See Admin. R. 9(G)(3); 9(G)(4)(c)(ii)(B),(C).
    Before addressing the relevant facts, we pause briefly to review the parties on
    appeal. This appeal involves a real estate purchase agreement between seller, Flynn
    Creek, and purchaser, Quaker, who assigned its rights as purchaser to Exproman, who
    then later assigned its rights to Metro Holdings. Flynn Creek is a joint venture between
    Midwest Logistics Partnership, a Holladay Properties’ subsidiary, and Airwest Partners, a
    Denison Properties’ subsidiary.       Metro Holdings and Exproman are real estate
    construction firms and development companies owned by F. Douglas Reardon
    (“Reardon”) and are headquartered in Ohio. Metro Holdings was formed to “develop,
    design and build [a distribution] facility for Quaker.” (Appellee’s App. 1121). Quaker is
    a Delaware corporation and is a subsidiary of Pepsico.
    In 2006, a representative from Pepsico approached Flynn Creek about obtaining
    property so it could build a distribution facility for Quaker’s use. On March 12, 2007,
    Flynn Creek entered into a real estate purchase agreement (“Purchase Agreement”) with
    Quaker. Under the Purchase Agreement, Quaker agreed to purchase from Flynn Creek
    approximately 106 acres of real estate located in the Ameriplex Business Park in Marion
    County and Hendricks County.
    5
    The Purchase Agreement provided that Quaker would purchase the real estate in
    two different phases. In the first phase, Quaker was to purchase approximately seventy-
    six acres of land (“Phase 1 Property”) for $6.84 million. Quaker planned to build a one-
    million-square-foot Gatorade distribution facility on the Phase 1 Property, and Exproman
    was the proposed developer of the project.4
    In the second phase, Quaker was to purchase the remaining acres (“Phase 2
    Property”), which abutted the Phase 1 Property, for a base amount of $750,000 plus an
    additional amount per net acre depending on the date of the closing for the Phase 2
    Property. Here, the additional amount was set at $88,000 per net acre because Metro
    Holdings, pursuant to an option in the Purchase Agreement, twice extended the closing
    date for the Phase 2 Property. Thus, the total purchase price for the Phase 2 Property was
    approximately $3.4 million.
    In regard to conditions of performance and closing on the Phase 2 Property, which
    are at issue in this appeal, the Purchase Agreement contained the following relevant
    provisions:
    4. Conditions of Performance. All of the items in this Section 4 shall be
    completed and/or satisfied on or before [April 15,] 2007 (the “Due
    Diligence Period”),[5] and Purchaser’s obligations under this Agreement
    shall be contingent upon the timely and complete satisfaction of the
    following conditions precedent or waiver thereof by Purchaser, in writing:
    4
    Exproman, as the developer of the Quaker project, assisted Quaker in its negotiations of the Purchase
    Agreement.
    5
    Section 4 of the Purchase Agreement provided that the Due Diligence Period ended on March 31, 2007,
    but, in an initial addendum to the Purchase Agreement (Addendum #1), the parties extended the end of
    the Due Diligence Period to April 15, 2007.
    6
    (a) Survey. Seller has provided Purchaser with a survey of the real
    estate. Purchaser shall update the Survey in accordance with
    ALTA/ACSM minimum detail land survey requirements (said
    survey, as updated hereinafter referred to as the “Survey”). The
    updated Survey shall: (i) be certified to Purchaser, Seller, Title
    Company and any other party designated by Purchaser; (ii) be as of a
    current date and by an Indiana registered land surveyor; (iii) show no
    items which would adversely affect Purchaser’s ownership or
    intended use of the Real Estate; (iv) reflect the boundaries of the
    [Phase 1 Property] and the [Phase 2 Property]; (v) calibrate the
    [Phase 1 Property] so it is exactly 76 Gross Acres, with the balance
    of the Real Estate being the [Phase 2 Property]; and (vi) reflect all
    existing easements, rights-of-way, roadways, floodways and flood
    hazard areas located within the boundaries of each of the [Phase 1
    Property] and the [Phase 2 Property] . . . .
    (b) Title. Fee simple, marketable title to the [Phase 1 Property] and
    the [Phase 2 Property] shall be conveyed by Seller to Purchaser at
    the Phase 1 Closing and the Phase 2 Closing, respectively, subject
    only to (collectively, the “Permitted Exceptions”): (i) current, non-
    delinquent taxes and assessments; (ii) those defects, covenants,
    conditions, easements, liens, encumbrances and restrictions and
    other matters of record set forth in the Title Commitment (as
    hereinafter defined) to which Purchaser does not object pursuant to
    this Section 4 or, if Purchaser objects thereto, Purchaser thereafter
    waives such objection, in writing, and (iii) those items reflected in
    the Survey to which Purchaser does not object pursuant to this
    Section 4 or, if Purchaser objects thereto, Purchaser thereafter
    waives such objection, in writing. As soon as reasonably practicable
    after the Execution Date, Seller, at Purchaser’s cost and expense,
    shall deliver to Purchaser a title insurance commitment issued by
    Title Company covering the [Phase 1 Property] and the [Phase 2
    Property] (each, a “Title Commitment” and, collectively, the “Title
    Commitments”). In each of the Title Commitments, Title Company
    shall agree to insure in the name of Purchaser and for the full amount
    of the [Phase 1 Property] Purchase Price and the [Phase 2 Property]
    Purchaser Price, good indefeasible, and marketable fee simple title to
    the [Phase 1 Property] and the [Phase 2 Property], respectively,
    subject only to the Permitted Exceptions. If the Survey and/or the
    Title Commitments reveal any exceptions to title, defects or other
    matters Purchaser finds objectionable, in its sole discretion
    (collectively, “Objections”), Purchaser shall have ten (10) business
    days after receiving the later of the Title Commitments and the
    7
    Survey to provide Seller with written notice of such Objections. If
    Seller is unable to cure all Objections to the satisfaction of
    Purchaser, in its sole discretion, within ten (10) business days after
    receiving notice thereof from Purchaser, and it gives Purchaser
    written notice of such, then Purchaser may take any one or more of
    the following actions: (iv) by written notice to Seller, give Seller
    additional time to cure such Objections to the satisfaction of
    Purchaser, in its sole discretion; (v) waive such Objections, in
    writing, and proceed with the transaction contemplated herein, in
    which such case such exceptions, defects and/or other matters shall
    be deemed Permitted Exceptions; or (vi) terminate this Agreement
    by giving written notice to Seller. If Seller fails to notify Purchaser
    pursuant to this Subsection 4(b) of its inability to cure the
    Objections, then it shall be deemed that Seller has elected to cure
    such Objections to the satisfaction of Purchaser in its sole discretion.
    At each Closing, Seller shall cause Title Company to issue to
    Purchaser a Form B-1970 ALTA Owner’s Policy of Title Insurance
    in conformity with the Title Commitment covering the [Phase 1
    Property] and the [Phase 2 Property], respectively including any
    endorsements Purchaser deems necessary (each, a “Title Policy”
    and, collectively, the “Title Policies”). Seller shall pay the
    premiums for the issuance of each of the Title Policies and Purchaser
    shall pay the cost of any endorsements it desires to such Title
    Policies.
    *****
    (e) Wetlands Delineation Study. Purchaser, at its cost and expense,
    may conduct or have conducted any wetland delineation study of the
    Real Estate, to determine whether there are any wetlands on the Real
    Estate under the jurisdiction of the Army Corps of Engineers. In the
    event that wetlands are discovered on the Real Estate, at Purchaser’s
    election, this agreement shall terminate and Purchaser shall receive
    an immediate refund of the earnest money, together with any interest
    earned thereon, or Purchaser may proceed with the purchase and
    receive a reduction of the per acre price to the extent of any
    delineated wetlands located on the [Phase 2 Property].
    In the event Purchaser terminates this Agreement by written notice to Seller
    prior to the expiration of the Due Diligence Period, Purchaser shall receive
    an immediate refund of the Earnest Money together with any interest
    earned thereon.
    *****
    8. Conditions to Closing. All of the items in this Section 8 shall be
    completed and/or satisfied on or before each Closing Date, and Purchaser’s
    8
    obligations under this Agreement shall be contingent upon the timely and
    complete satisfaction of each of the following conditions precedent
    (collectively, the “Closing Conditions”) or the waiver thereof by Purchaser,
    in writing:
    *****
    (b) Real Estate. The Real Estate shall be in compliance with the
    provisions hereof and Title Company shall be irrevocably and
    unconditionally prepared to issue to Purchaser each Title Policy
    covering the [Phase 1 Property] or the [Phase 2 Property], as
    applicable, with liability in the full amount of the [Phase 1 Property]
    Purchase Price or the [Phase 2 Property] Purchase Price,
    respectively, showing Purchaser in title thereto, subject only to the
    Permitted Exceptions.
    *****
    (f) Later Title Objections. Other than the Permitted Exceptions, no
    additional matters affecting title to the Real Estate shall have arisen
    on or before each Closing (“Later Title Objections”).
    *****
    9. Non-Satisfaction of Closing Conditions. If all of the Closing
    Conditions contained in Article 8 do not exist at or are not satisfied by each
    Closing Date, Purchaser may, in addition to and not in limitation of
    Purchaser’s other rights and remedies hereunder, elect to either: (a)
    consummate the transaction contemplated in this Agreement; (b) extend the
    applicable Closing Date for one or more further periods of time in order for
    Seller or Purchaser to satisfy any outstanding Closing Conditions; or (c)
    after written notice to Seller of the non-satisfaction of a Closing Condition
    and the failure of Seller to satisfy the same within [sixty (60)] days[6] of
    receipt of such notice, receive a return of the Earnest Money together with
    any interest earned thereon and any Extension Fee, following which this
    Agreement shall terminate and none of the parties hereto shall have any
    further duties, liabilities or obligations to one another hereunder.
    (App. 102, 104, 106, 107).
    Additionally, the Purchase Agreement contained the following provisions in the
    event that either party defaulted on its obligations under the agreement in regard to the
    Phase 2 Property:
    6
    Section 9 of the Purchase Agreement provided that the Seller had ninety (90) days to satisfy upon
    written notice from the Purchaser; however, in Addendum #1, the parties decreased the time for Seller’s
    satisfaction to sixty (60) days.
    9
    14.  Purchaser’s Default After Phase 1 Closing. IF, AFTER THE
    PHASE 1 CLOSING, PURCHASER DEFAULTS IN THE
    PERFORMANCE OF ITS OBLIGATIONS UNDER THIS AGREEMENT
    WITH RESPECT TO THE PURCHASE OF THE [Phase 2 Property] AND
    FAILS TO CURE SUCH DEFAULT WITHIN TEN (10) DAYS AFTER
    WRITTEN NOTICE FROM SELLER TO PURCHASER SPECIFYING
    SUCH DEFAULT, SELLER MAY SEEK ANY REMEDY PROVIDED
    BY EQUITY OR LAW, INCLUDING THE RIGHT OF SPECIFIC
    PERFORMANCE, OR TERMINATE THIS AGREEMENT AND
    RECEIVE THE EARNEST MONEY AS LIQUIDATED DAMAGES.
    15.    Seller’s Default. If Seller fails to cure within ten (10) days after
    written notice from Purchaser to Seller: (a) a default in the performance of
    any of its obligations under this Agreement; or (b) a breach of any of
    Seller’s representations and warranties hereunder, then Purchaser may: (i)
    terminate this Agreement and receive a return of the Earnest Money
    together with any interest earned thereon and any Extension Fee; (ii) bring
    legal action against Seller for out of pocket damages incurred by Purchaser
    during the Due Diligence Period; or (iii) pursue specific performance of
    this Agreement.
    (App. 109) (capitalization in original). The Purchase Agreement also provided that the
    prevailing party in any legal action brought in connection with the Purchase Agreement
    was entitled to reasonable attorney fees and court costs.
    Finally, the Purchase Agreement contained the following provision regarding
    construction of the agreement:
    30.    Construction. This Agreement is the product of negotiation by the
    parties hereto and shall be deemed to have been drafted by such parties.
    This Agreement shall be construed in accordance with the fair meaning of
    its provisions and its language shall not be strictly construed against, nor
    shall ambiguities be resolved against, either party.
    (App. 112).
    On March 12, 2007, the same day as entering into the Purchase Agreement, Flynn
    Creek and Quaker also executed an addendum to the Purchase Agreement (“Addendum
    10
    #1”). Addendum #1 modified certain provisions of the Purchase Agreement, including a
    provision that related to Quaker’s assignment of its rights under the Purchase Agreement
    to another party. Specifically, Paragraph 8 of Addendum #1—which amended Section 20
    of the Purchase Agreement—provided, in relevant part, that Quaker could assign the
    Purchase Agreement to Exproman (or any other entity formed by Exproman and directed
    by Reardon as managing partner) provided that Exproman assumed Quaker’s obligations
    under the Purchase Agreement in writing. Quaker also agreed that—after assigning its
    rights to Exproman—it would be “secondarily liable” for “any claims” or obligations
    under the Purchase Agreement after Flynn Creek had “exhausted all legal and equitable
    rights and remedies available” to Flynn Creek against Exproman or any assignee.
    (Appellee’s App. 1095).
    Also on March 12, 2007, Quaker and Exproman entered into an “Assignment and
    Assumption of Purchase Agreement” (“First Assignment”), wherein Quaker assigned all
    its rights, title, and interest under the Purchase Agreement to Exproman, who assumed all
    Quaker’s obligations under the Purchase Agreement.
    On May 1, 2007, Escrow & Title Services, LLC (“the Title Company”) provided
    Exproman with title commitments for the Phase 1 Property and for the Phase 2 Property
    (“March 2007 Title Commitments”), both of which had an effective date of March 6,
    2007. On May 14, 2007, Exproman sent a letter to Flynn Creek and its attorney, listing
    various objections to the 2007 Title Commitment for the Phase 2 Property (“May 2007
    11
    Objection Letter”) “[p]ursuant to Section 4(b) of the Purchase Agreement[.]”7 (App.
    162). Flynn Creek provided no notice to Exproman that it was unable to cure these
    objections; thus, pursuant to Section 4(b) of the Purchase Agreement, Flynn Creek was
    “deemed” to have “elected to cure” the objections “to the satisfaction of” Exproman.
    (App. 103).
    Also in May 2007, Exproman received the results of a wetlands study, which
    indicated that there were wetlands on the Phase 2 Property. The wetlands consisted of
    two areas, one measuring 0.02 acres and the other measuring 0.09 acres.
    On June 5, 2007, Exproman and Metro Holdings entered into an “Assignment and
    Assumption Agreement” (“Second Assignment”) wherein Exproman assigned all its
    rights and interests to the Purchase Agreement to Metro Holdings, who assumed all of
    Exproman’s obligations under the Purchase Agreement.8
    On June 18, 2007, Flynn Creek and Metro Holdings held a closing on the Phase 1
    Property. After the closing on the Phase 1 Property, Metro Holdings built a 1,119,195
    square-foot building, which it finished in December 2007 and leased to Quaker for use as
    a Gatorade distribution facility. Apparently the lease included an option for Quaker to
    later expand the lease to the Phase 2 Property where Metro would build an expansion
    onto the distribution facility for Quaker’s use. As Metro Holdings was constructing the
    7
    Exproman also sent an objection letter to the Title Commitment for the Phase 1 Property, but those
    objections are not at issue in this appeal.
    8
    This Second Assignment was signed by Reardon as President of Exproman for the assignor and as
    Manager of Metro Holdings for the assignee.
    12
    facility on the Phase 1 Property, it moved 60,000 cubic yards of dirt from the Phase 1
    Property onto the Phase 2 Property for later use as fill dirt.9
    As for the closing on the Phase 2 Property, the Purchase Agreement set the closing
    date on Phase 2 Property for March 30, 2010; however, it also contained a provision that
    the closing date could be extended to March 30, 2011 and to March 30, 2012 for a
    specified extension fee. Metro Holdings ultimately paid the two separate extension fees
    and twice extended the closing date. Pursuant to the terms of the Purchase Agreement,
    Metro Holdings paid Flynn Creek $45,000.00 to extend the March 2010 closing date to
    March 2011 and $65,000.00 to extend the March 2011 closing date to March 2012. The
    Purchase Agreement made no provision to extend the closing date on the Phase 2
    Property past March 30, 2012.10 When Metro Holdings paid the extension fees, it did not
    mention any title or wetland issues with the Phase 2 Property.
    At the end of 2011, Quaker apparently informed Metro Holdings that it was not
    going to exercise its option to expand the distribution facility onto the Phase 2 Property.
    On February 24, 2012, the Title Company provided Metro Holdings with an
    updated title commitment for the Phase 2 Property (“2012 Updated Title Commitment”),
    which had an effective date of February 22, 2012. Then, on March 27, 2012, Metro
    Holdings received a final updated title commitment.
    9
    In order to move the dirt onto the Phase 2 Property, Metro entered into a “Dirt Storage Agreement” with
    Flynn Creek in September 2007.
    10
    Specifically, the Purchase Agreement provided that the “Purchaser shall purchase the [Phase 2
    Property] on or before March 30, 2012, and Purchaser shall provide a notice to Seller of Purchaser’s
    intent to purchase the [Phase 2 Property] (“Purchaser’s Notice”) in accordance with Section 8 herein.”
    (App. 98).
    13
    On the day of the scheduled March 30, 2012 closing on the Phase 2 Property,
    Metro Holdings’s attorney faxed a letter to Flynn Creek and its attorney (“Metro’s March
    30, 2012 Notice Letter”). In this letter, Metro Holdings asserted that Flynn Creek had not
    met certain closing conditions as required by the Purchase Agreement. Specifically, the
    letter provided as follows:
    Pursuant to Section 9 of the Purchase Agreement, Purchaser hereby notifies
    Seller that the Closing Conditions referenced in Sections 8(b) and 8(f) do
    not exist at and are not satisfied as of the Closing Date for the [Phase 2
    Property]. Therefore, pursuant to Section 9(c) of the Purchase Agreement,
    Seller shall have sixty (60) days after the date hereof to satisfy such Closing
    Conditions.
    (Appellee’s App. 1338).       Metro Holdings made no mention of any problem with
    wetlands.
    That same day, Flynn Creek went to the title company for the scheduled closing
    and took a deposition of a title agent to establish that it was ready to close on the Phase 2
    Property. Thereafter, Flynn Creek sent a letter (“Flynn Creek’s March 30, 2012 Notice
    of Default”) to both Metro Holdings and Quaker, asserting as follows:
    This is to provide the Purchaser with notice under Section 14 of the
    Purchase Agreement that Purchaser has defaulted in the performance of its
    obligation under the Purchase Agreement concerning its failure to purchase
    the [Phase 2 Property] pursuant to the “Phase 2 Closing” on or before
    March 30, 2012. Seller reserves all of its rights and remedies under the
    Purchase Agreement and applicable law.
    (Appellee’s App. 1114).
    On April 3, 2012, Metro Holdings sent Flynn Creek a letter, indicating that it was
    going to terminate the Purchase Agreement because of the presence of wetlands on the
    14
    Phase 2 Property (“Metro’s April 2012 Termination Letter”). Metro Holdings’s letter
    provided as follows:
    Pursuant to Section 4 “Conditions of Performance” of the Purchase
    Agreement, Purchaser’s obligations under the Purchase Agreement,
    including its obligation to purchase the [Phase 2 Property], are contingent
    on the timely satisfaction of each of the conditions precedent more
    particularly described in Section 4 or the waiver of each by Purchaser, in
    writing. Purchaser did not complete the wetlands delineation survey
    referenced in Section 4(e) of the Purchase Agreement until May 1, 2007
    (“the Wetlands Delineation Study”). Therefore, the condition precedent set
    forth in Section 4(e) of the Purchase Agreement was neither completed and
    satisfied nor completed or satisfied on or before April 15, 2007, and
    Purchaser has not waived such condition precedent, in writing or otherwise.
    As set forth in the Wetlands Delineation Study (a copy of the first
    five (5) pages thereof is attached for your reference), Purchaser discovered
    that wetlands do exist on the Real Estate, more specifically, they exist on
    the [Phase 2 Property]. Pursuant to the second sentence of Section 4(e),
    Purchaser hereby elects to terminate the Purchase Agreement and receive
    an immediate return of the earnest money, together with any interest earned
    thereon (collectively, the “Refund Amount”). Please instruct the Title
    Company to immediately wire transfer the Refund Amount to Purchaser[.]
    (App. 205-06; Appellee’s App. 1344-45).11
    On April 9, 2012, Flynn Creek sent Metro Holdings a letter, acknowledging
    receipt of Metro’s March 30, 2012 Notice Letter and Metro’s April 2012 Termination
    Letter and indicating that the two letters were inconsistent. In its letter, Flynn Creek
    disputed that Sections 8(b) and 8(f) were not satisfied and indicated that it “remain[ed]
    ready, willing and able to close” on the Phase 2 Property. (App. 215).
    The following day, on April 10, 2012, Flynn Creek filed a complaint against
    Metro Holdings, Exproman, and Quaker, alleging that Metro had breached the Purchase
    11
    We note that this letter was contained in one of the not-for-public-access volumes of Appellants’
    Appendix and placed on green paper but was contained in a regular volume of Appellee’s Appendix and
    placed on white paper.
    15
    Agreement by failing to purchase the Phase 2 Property. In its complaint, Flynn Creek
    sought specific performance of the Purchase Agreement and noted that the Purchase
    Agreement contained a provision that specific performance could be granted to Flynn
    Creek, as seller, if Metro, as purchaser, defaulted in its performance under the Purchase
    Agreement. Alternatively, Flynn Creek sought damages for Metro’s alleged breach of
    contract. Specifically, Flynn Creek sought damages for “the full purchase price that was
    to be paid by [Metro] under the Purchase Agreement on March 30, 2012.” (Appellee’s
    App. 1068). Flynn Creek also sought, pursuant to terms of the Purchase Agreement,
    interest and reasonable attorney fees.
    Thereafter, on May 30, 2012, Metro Holdings sent the following letter to Flynn
    Creek and its attorney (“Metro’s May 2012 Termination Letter”):
    As you know, the parties are in litigation with respect to the
    Purchase Agreement, and the parties’ respective positions and actions may
    be subject to judicial challenge. As you also know, by letter dated April 3,
    2012, Purchaser terminated the Purchase Agreement as a result of the
    failure of the Conditions of Performance set forth in Section 4(e) of the
    Purchase Agreement. Without waiving the efficacy of the termination on
    the grounds set forth in that letter, Purchaser hereby provides additional and
    independent grounds for termination of the Purchase Agreement.
    On March 30, 2012, pursuant to Section 9 of the Purchase
    Agreement, Purchaser notified Seller that the Closing Conditions
    referenced in Section 8(b) and 8(f) of the Purchase Agreement did not exist
    at and were not satisfied as of the Closing Date for the [Phase 2 Property].
    Therefore, pursuant to Section 9(c) of the Purchase Agreement, as amended
    in the Addendum to Real Estate Purchase Agreement dated March 12, 2007
    [Addendum #1], Purchaser notified Seller that it had sixty (60) days to
    satisfy the Closing Conditions.
    The sixty-day cure period expired yesterday, May 29, 2012, and
    Seller has failed or refused to satisfy the deficient Closing Conditions.
    Accordingly, pursuant to Section 9(c) of the Purchase Agreement,
    16
    Purchaser hereby notifies Seller that the Purchase Agreement is hereby
    terminated for failure of Closing Conditions 8(b) and 8(f) and demands that
    Seller return to Purchaser the Earnest Money ($250,000.00) and any
    Extension Fees ($110,000.00), together with any interest earned thereon
    (the “Refund Amount”).
    For the reasons set forth in this termination notice, please instruct the
    Title Company to immediately wire transfer the Refund Amount to
    Purchaser.
    (App. 217-18; Appellee’s App. 1340, 1342).12
    On June 18, 2012, Metro filed a counterclaim against Flynn Creek and later filed
    an amended counterclaim on February 21, 2013. In its amended counterclaim, Metro
    raised two counts, both alleging that Flynn Creek had breached the Purchase Agreement.
    In its first breach of contract count, Metro argued that Flynn Creek had breached the
    Purchase Agreement by failing to return the earnest money and extension fees after
    Metro had terminated the Purchase Agreement under Sections 4(e) and 9, and it sought
    the return of $250,000.00 in earnest money and $110,000.00 in extension fees plus
    attorney fees and costs.        In the second count, Metro argued that Flynn Creek had
    breached under paragraph eight of Addendum #1 to the Purchase Agreement because
    Flynn Creek had sued Quaker without first exhausting all of its legal rights and remedies
    against Metro.13
    12
    We note that this letter was contained in one of the not-for-public-access volumes of Appellants’
    Appendix and placed on green paper but was contained in a regular volume of Appellee’s Appendix and
    placed on white paper.
    13
    As for Quaker’s involvement in the lawsuit, Quaker filed a motion to dismiss Flynn Creek’s complaint,
    which was denied by the trial court. Thereafter, Quaker filed a counterclaim against Flynn Creek and a
    cross-claim for indemnity against Metro Holdings and Exproman. Flynn Creek then filed a motion to
    dismiss Quaker’s counterclaim, which the trial court denied. Quaker then filed a motion for a separate
    trial, which the trial court granted.
    17
    Thereafter, Flynn Creek and Metro filed cross-motions for summary judgment,
    responses to each other’s cross-motions for summary judgment, and replies in support of
    their respective motions for summary judgment. As part of the summary judgment
    proceedings, both Metro and Flynn Creek filed motions to exclude certain documents
    from public access and requested that they be filed under seal. The trial court granted
    both parties’ motions to exclude.
    In Flynn Creek’s motion for summary judgment, it asserted that it was entitled to
    summary judgment on its claim of specific performance and on the first count of Metro’s
    breach of contract counterclaim.    Flynn Creek argued that Metro had breached the
    Purchase Agreement because it did not purchase and close on the Phase 2 Property on
    March 30, 2012. Flynn Creek focused the majority of its summary judgment argument
    on its contention that Metro had breached the contract by improperly terminating the
    Purchase Agreement on April 3, 2012. Flynn Creek asserted that Metro’s asserted reason
    for terminating the Purchase Agreement (i.e., the presence of wetlands) was not timely
    raised under the terms of the Purchase Agreement. Flynn Creek further claimed that
    Metro was barred, by the doctrines of laches and estoppel, from terminating the Purchase
    Agreement based on the presence of wetlands. In regard to a remedy, Flynn Creek
    contended that it was entitled to specific performance based on Metro’s breach, whether
    or not it had an adequate remedy at law. Flynn Creek asserted that it was entitled to
    specific performance because the parties included language in the Purchase Agreement—
    specifically, Section 14—that allowed Flynn Creek the option to seek the remedy of
    specific performance.
    18
    As for Metro’s cross-motion for summary judgment, Metro sought summary
    judgment on Count 1 of its counterclaim against Flynn Creek and “[a]lternatively” sought
    partial summary judgment on Flynn Creek’s specific performance claim. (App. 36). As
    it did in its amended complaint, Metro argued that Flynn Creek had breached the
    Purchase Agreement by failing to return Metro’s earnest money and extension fees.
    Additionally, Metro asserted that Flynn Creek had failed to satisfy certain closing
    conditions—specifically, the conditions set out in Sections 8(b) and 8(f)—contained in
    the Purchase Agreement,14 which it asserted were conditions precedent to Metro’s
    obligation to purchase and close on the Phase 2 Property on March 30, 2012. Metro also
    argued that Flynn Creek had “anticipatorily repudiated” its obligations under the
    Purchase Agreement on March 30, 2012 by holding a purported closing on the Phase 2
    Property after Metro informed it of the unsatisfied closing conditions and then by
    insisting on Metro’s performance despite the allegation that Flynn Creek had failed to
    satisfy the closing conditions. (App. 37). In other words, Metro argued that Flynn Creek
    repudiated its obligations under the Purchase Agreement, which in turn, extinguished
    Metro’s obligation under the Purchase Agreement to purchase the Phase 2 Property.
    14
    Metro argued that Flynn Creek had failed to satisfy Sections 8(b) and 8(f), both of which required
    Flynn Creek to ensure that the Title Company was prepared to issue a title policy for the Phase 2 Property
    that was in conformity with the Title Commitment. Metro asserted that Flynn Creek failed to satisfy
    Section 8(b) because the 2012 Updated Title Commitment was “materially different” than the 2007 Title
    Commitment (i.e., the inclusion of “Special Exception 7” regarding an exclusion of title insurance
    coverage for public roads to the real estate) and that Flynn Creek would not have been able to ensure that
    the title policy was in conformity with the 2007 Title Commitment. (App. 54). Additionally, Metro
    asserted that Flynn Creek had failed to satisfy Section 8(f) because there was a “Later Title Objection,”
    which was not permitted under the Purchase Agreement. More specifically, Metro contended that there
    was a county road (CR 1075 E) running along the Phase 2 Property that was apparently or mistakenly not
    entirely vacated.
    19
    Metro also argued that, even in the event that the trial court were to deny its
    summary judgment motion, it was entitled to summary judgment on Flynn Creek’s
    equitable specific performance claim because the designated evidence “conclusively
    establishe[d]” that Flynn Creek, as a real estate vendor, had an adequate remedy at law
    (i.e., “money damages”) and, thus, was not entitled to specific performance. (App. 37).
    Metro argued that Flynn Creek had an adequate remedy at law because it could sell the
    Phase 2 Property and recover the money damages for the difference between the current
    market value or sale price and the amount that Metro would have paid under the Purchase
    Agreement.15 Additionally, Metro argued that Flynn Creek was not entitled to specific
    performance because it had failed to establish that it was in substantial compliance with
    the precise terms of the Purchase Agreement.16 Metro acknowledged that Section 14 of
    the Purchase Agreement allowed Flynn Creek to seek specific performance, but it argued
    that Flynn Creek still needed to meet its burden on summary judgment to establish the
    elements necessary to obtain such relief.
    On March 20, 2013, the trial court held a hearing on the cross-motions for
    summary judgment. During the hearing, Metro requested the trial court to enter findings
    and conclusions pursuant to Trial Rule 52.
    15
    Metro asserted that Flynn Creek had received an unsolicited offer for the Phase 2 Property.
    16
    Metro argued that Flynn Creek could not show that it had substantially complied with closing
    conditions 8(b) and 8(f). In Metro’s response in opposition to Flynn Creek’s summary judgment motion,
    Metro added another argument of why Flynn Creek could not show that it had substantially complied
    with the terms of the Purchase Agreement; this time, Metro argued that Flynn Creek had failed to comply
    with the closing conditions because a county road had not been fully vacated.
    20
    On May 13, 2013, the trial court entered findings of fact and conclusions thereon
    and then entered final judgment pursuant to Trial Rule 54(B) in favor of Flynn Creek.
    Specifically, the trial court concluded that Metro had breached the Purchase Agreement
    by failing to purchase the Phase 2 Property on March 30, 2012.                      The trial court
    concluded, in part, that Metro could not rely on its attempt to terminate the Purchase
    Agreement on April 3, 2012 as a justification for not purchasing the Phase 2 Property.
    The trial court determined the termination was not proper under the plain language of
    Section 4(e) of the Purchase Agreement because Metro had failed to comply with this
    section’s requirement that it procure the wetlands study and provide written notice of the
    termination to Flynn Creek prior to the end of the Due Diligence Period (April 15, 2007).
    The trial court also concluded that Metro’s reliance on its April 3, 2012 termination
    notice was barred by laches and estoppel.
    Thus, the trial court granted Flynn Creek’s motion for summary judgment on its
    claims of breach of contract and specific performance; ordered Metro to “specifically
    perform and purchase the Phase II property in accordance with the Purchase Agreement
    within thirty (30) days[;]” denied Metro’s motion for summary judgment in its entirety;
    entered judgment against Metro and in favor of Flynn Creek on Count I of Metro’s
    counterclaim; and, pursuant to the relevant provision of the Purchase Agreement,
    awarded reasonable attorney fees, costs, and interest to Flynn Creek.17
    17
    The trial court then set the attorney fee issue for a hearing. The trial court later entered an order
    temporarily staying the attorney fee issue and hearing pursuant to an agreed order submitted by the
    parties.
    21
    Thereafter, on May 29, 2013, Metro filed a motion to correct error and a motion to
    stay the judgment. In its motion to correct error, Metro argued that the trial court had
    erred by granting summary judgment on Flynn Creek’s claim for specific performance
    and requested the trial court to vacate its summary judgment order in favor of Flynn
    Creek on its breach of contract claim.
    While Metro’s motion to correct error was pending, Quaker commenced an
    appeal.18 (See Docket for Quaker Sales & Distribution v. Flynn Creek Partners, LLC,
    Appellate Cause 32A05-1306-PL-279). On June 12, 2013, Quaker filed, with this Court,
    both a notice of appeal and a motion to remand pursuant to Appellate Rule 37(A). On
    June 17, 2013, this Court granted Quaker’s motion to remand, dismissed Quaker’s appeal
    without prejudice, and remanded to the trial court for further proceedings. This Court’s
    order also provided that “if any of the trial court’s forthcoming ruling is adverse” to
    Quaker, then Quaker could file “a new notice of appeal [and] raise the issues it would
    have raised in this appeal along with any new issues created by the trial court on
    remand.” (See Docket for Quaker Sales & Distribution v. Flynn Creek Partners, LLC,
    Appellate Cause 32A05-1306-PL-279).
    On July 12, 2013, the trial court held a hearing on Metro’s motion to correct error
    and motion to stay the judgment.19 Subsequently, on August 8, 2013, the trial court
    entered an order denying Metro’s motion to correct error and granting its motion to stay
    18
    The record on appeal does not reveal the order that Quaker was appealing.
    19
    According to the chronological case summary, Quaker was not present at this July hearing.
    22
    the judgment pending appeal. In its order, the trial court also ruled that “[a]ll other
    requests for relief not specifically ordered herein [were] deemed denied.” (App. 35).
    On September 3, 2013, Metro filed a notice of appeal and commenced this appeal
    under appellate cause number 32A01-1309-PL-374 (“Cause 374”). Thereafter, on
    September 5, 2013, Quaker filed a notice of appeal and commenced a separate appeal
    under appellate cause number 32A01-1309-PL-376 (“Cause 376”).20 On September 24,
    2013, Metro filed a motion to consolidate Quaker’s appeal with Metro’s appeal. On
    September 27, 2013, this Court granted Metro’s consolidation motion and transferred all
    filings from Cause 376 to Cause 374 and ordered that Cause 376 be closed. Quaker,
    however, did not filed an appellate brief nor did it file any pleading indicating that it was
    joining in Metro’s appellate arguments. We now turn to Metro’s appellate arguments.21
    DECISION
    Metro appeals the trial court’s order granting Flynn Creek’s motion for summary
    judgment and denying Metro’s cross-motion for summary judgment in this contract
    action.
    Where a trial court enters specific findings and conclusions when granting a
    motion for summary judgment, as the trial court did in this case, the entry of specific
    20
    In its notice of appeal, Quaker indicated that it was appealing the trial court’s May 13, 2013 summary
    judgment order and its August 8, 2013 order denying the motion to correct error.
    21
    During the appellate briefing process, Metro filed a motion to exclude its Appendix Volumes V and VI
    from public access, and Flynn Creek filed a motion to exclude its Appendix Volume III from public
    access. Our Court granted Flynn Creek’s motion and granted Metro’s motion in part, indicating that
    Metro could exclude public access to the documents in Appendix V and VI that the trial court had already
    deemed to be confidential. Additionally, Metro filed a motion for oral argument, which we deny by
    separate order entered contemporaneously with the handdown of this opinion.
    23
    conclusions does not alter the nature of our review. Rice v. Strunk, 
    670 N.E.2d 1280
    ,
    1283 (Ind. 1996). We are not bound by the trial court’s specific conclusions of law. 
    Id. They merely
    aid our review by providing us with a statement of reasons for the trial
    court’s actions. 
    Id. When reviewing
    a trial court’s order denying summary judgment, we apply the
    same standard as that used in the trial court. Kopczynski v. Barger, 
    887 N.E.2d 928
    , 930
    (Ind. 2008). Summary judgment is appropriate only where the designated evidence
    shows “that there is no genuine issue as to any material fact and that the moving party is
    entitled to judgment as a matter of law.” Ind. Trial Rule 56(C). The moving party “bears
    the initial burden of making a prima facie showing that there are no genuine issues of
    material fact and that it is entitled to judgment as a matter of law.” Gill v. Evansville
    Sheet Metal Works, Inc., 
    970 N.E.2d 633
    , 637 (Ind. 2012).           “[T]he party seeking
    summary judgment has the initial burden of proving the absence of a genuine issue of
    material fact as to an outcome-determinative issue. Only then must the non-movant come
    forward with contrary evidence demonstrating the existence of genuine factual issues that
    should be resolved at trial.” Kroger Co. v. Plonski, 
    930 N.E.2d 1
    , 9 (Ind. 2010) (citing
    Jarboe v. Landmark Cmty. Newspapers of Ind., Inc., 
    644 N.E.2d 118
    , 123 (Ind. 1994),
    reh’g denied). “Like the trial court, we construe all evidence and resolve all doubts in
    favor of the non-moving party, so as to avoid improperly denying him his day in court.”
    Miller v. Dobbs, 
    991 N.E.2d 562
    , 564 (Ind. 2013) (internal citation omitted).
    “To prevail on a claim for breach of contract, the plaintiff must prove the
    existence of a contract, the defendant’s breach of that contract, and damages resulting
    24
    from the breach.” Haegert v. Univ. of Evansville, 
    977 N.E.2d 924
    , 937 (Ind. 2012). The
    parties do not dispute that the Purchase Agreement was an enforceable contract. Instead,
    they both moved for summary judgment, alleging that the other party had defaulted under
    or breached certain provisions of the Purchase Agreement. Thus, this summary judgment
    turns, in part, on contract interpretation and the meaning of certain provisions of the
    Purchase Agreement.
    “Summary judgment is especially appropriate in the context of contract
    interpretation because the construction of a written contract is a question of law.” TW
    Gen. Contracting Servs., Inc. v. First Farmers Bank & Trust, 
    904 N.E.2d 1285
    , 1287–88
    (Ind. Ct. App. 2009) (citing Colonial Penn Ins. Co v. Guzorek, 
    690 N.E.2d 664
    , 667 (Ind.
    1997)), reh’g denied. “The ultimate goal of any contract interpretation is to determine
    the intent of the parties when they made the agreement.” Citimortgage, Inc. v. Barabas,
    
    975 N.E.2d 805
    , 813 (Ind. 2012), reh’g denied. To do so, “we begin with the plain
    language of the contract, reading it in context and, whenever possible, construing it so as
    to render each word, phrase, and term meaningful, unambiguous, and harmonious with
    the whole.” 
    Id. A court
    should construe the language of a contract so as not to render
    any words, phrases, or terms ineffective or meaningless. Hammerstone v. Ind. Ins. Co.,
    
    986 N.E.2d 841
    , 846 (Ind. Ct. App. 2013).
    Here, the trial court found, and the parties do not dispute, that the language of the
    Purchase Agreement was unambiguous.              When the language of a contract is
    unambiguous, we may not look to extrinsic evidence to add to, vary, or explain the
    instrument but must determine the parties’ intent from the four corners of the instrument.
    25
    Univ. of S. Ind. Found. v. Baker, 
    843 N.E.2d 528
    , 532 (Ind. 2006). “[C]onstruction of the
    terms of a written contract is a pure question of law for the court, reviewed de novo.”
    Harrison v. Thomas, 
    761 N.E.2d 816
    , 818 (Ind. 2002). “We will reverse a summary
    judgment based on the interpretation of a contract if the trial court misapplies the law.”
    Bhd. Mut. Ins. Co. v. Michiana Contracting, Inc., 
    971 N.E.2d 127
    , 131 (Ind. Ct. App.
    2012), reh’g denied, trans. denied.
    We are called upon to determine whether the trial court properly granted summary
    judgment in this contract dispute between two sophisticated business entities. The crux
    of this case is whether Metro breached the terms of the Purchase Agreement, and if so,
    whether Flynn Creek is entitled to seek specific performance for that breach.
    On appeal, Metro primarily challenges the trial court’s determination that Flynn
    Creek was entitled to specific performance, secondarily challenges the trial court’s
    determination that Metro breached the Purchase Agreement, and then makes a tertiary
    challenge to the trial court’s determination that Flynn Creek did not repudiate the
    Purchase Agreement. We, however, will review each issue in logical order.
    Breach
    We will first address Metro’s argument that the trial court erred by granting
    summary judgment on Flynn Creek’s breach of contract claim against Metro.
    It is undisputed that, pursuant to the terms of the Purchase Agreement, Metro (as
    assignee purchaser) had an obligation to purchase and close on the Phase 2 Property by
    March 30, 2012. It is also undisputed that Metro did not purchase the Phase 2 Property
    by or on March 30, 2012. Instead, Metro sent a letter—Metro’s March 30, 2012 Notice
    26
    Letter—invoking Section 9 of the Purchase Agreement, informing Flynn Creek that it
    had failed to satisfy certain closing conditions, and telling Flynn Creek that it had sixty
    days to satisfy these conditions. Three days later, Metro sent another letter—Metro’s
    April 2012 Termination Letter—stating that it was terminating the Purchase Agreement
    under Section 4 of the Purchase Agreement because there were wetlands on the Phase 2
    Property and because Metro, itself, had failed to comply with a condition precedent of the
    Purchase Agreement when it did not complete a wetlands survey prior to the Due
    Diligence Period of April 15, 2007.
    As it did on summary judgment, Flynn Creek focuses on Metro’s breach by
    attempting to terminate the Purchase Agreement and contends that Metro’s attempt to
    terminate the Purchase Agreement based on the presence of wetlands and its refusal to
    purchase the Phase 2 Property constituted a breach because it was contrary to the plain
    language of the Purchase Agreement.22
    Section 4(e) of the Purchase Agreement contained the following provision
    addressing Metro’s ability to terminate the agreement based on the presence of wetlands:
    4. Conditions of Performance. All of the items in this Section 4 shall be
    completed and/or satisfied on or before [April 15,] 2007 (the “Due
    Diligence Period”), and Purchaser’s obligations under this Agreement shall
    be contingent upon the timely and complete satisfaction of the following
    conditions precedent or waiver thereof by Purchaser, in writing:
    *****
    (e) Wetlands Delineation Study. Purchaser, at its cost and expense,
    may conduct or have conducted any wetland delineation study of the
    22
    Flynn Creek contends that it is unnecessary to review whether Metro’s March 30, 2012 letter
    constituted a breach if this Court determines that Metro improperly terminated the Purchase Agreement
    on April 3, 2012. The trial court’s order addressing the breach claim focuses primarily on the April 2012
    termination, and so too will we.
    27
    Real Estate, to determine whether there are any wetlands on the Real
    Estate under the jurisdiction of the Army Corps of Engineers. In the
    event that wetlands are discovered on the Real Estate, at Purchaser’s
    election, this agreement shall terminate and Purchaser shall receive
    an immediate refund of the earnest money, together with any interest
    earned thereon, or Purchaser may proceed with the purchase and
    receive a reduction of the per acre price to the extent of any
    delineated wetlands located on the [Phase 2 Property].
    In the event Purchaser terminates this Agreement by written notice to Seller
    prior to the expiration of the Due Diligence Period, Purchaser shall receive
    an immediate refund of the Earnest Money together with any interest
    earned thereon.
    (App. 102, 104).
    The trial court determined, based on the plain language of this provision, that
    Metro had breached the Purchase Agreement when it attempted to terminate the
    agreement based on the presence of wetlands and avoid its obligation to purchase the
    Phase 2 Property. The trial court made the following relevant conclusions regarding
    Metro’s breach:
    4.      Metro procured the wetlands report too late to be able to object to
    the closing on the Phase II property based on wetlands, and then was too
    late in notifying Flynn Creek of the alleged wetlands to avoid closing based
    on wetlands. The plain language of the Purchase Agreement required
    Metro to conduct the wetlands study before April 15, 2007 if it chose to
    conduct a wetlands study as part of its due diligence. If Metro did so, and
    certain wetlands were discovered on the Real Estate that made Metro wish
    to terminate the Purchase Agreement, Metro was then required to provide
    written notice of termination to Flynn Creek “prior to the expiration of the
    Due Diligence Period,” i.e., April 15, 2007. Here Metro failed to do either.
    Metro did not conduct the wetlands Due Diligence before April 15, 2007
    (the wetlands report was not even ordered until April 24, 2007 and then not
    delivered until late May, 2007). Nor did Metro then provide written notice
    of an objection based on the wetlands consultant’s report before the
    expiration of the Due Diligence Period, April 15, 2007. The first written
    notice by Metro to Flynn Creek that it sought to terminate the Purchase
    Agreement due to wetlands was on April 3, 2012.
    28
    *****
    7.     Metro’s inaction prevents Metro from terminating the Purchase
    Agreement based upon a wetlands report Metro had in its possession and
    had internally discussed since May 2007. Metro’s inaction worked to the
    detriment of Flynn Creek, who continued to hold the Phase II property for
    Metro, while Flynn Creek was led to believe that Metro would close on the
    Phase II property by March 30, 2012. Flynn Creek did not have
    independent knowledge of the alleged wetlands on the Phase II property
    prior to April 3, 2012 until Metro finally advised Flynn Creek of the
    potential wetlands and terminated on that date.
    8.     The plain language of Section 4(e) of the Purchase Agreement does
    not allow Metro to terminate only the purchase of the Phase II property if
    wetlands are located on the Phase II property, but rather Metro can only
    terminate the entire Purchase Agreement, or alternatively, Metro may
    proceed and receive a reduction of the per acre price. Metro’s action in
    terminating the Phase II purchase only, instead of proceeding with a price
    reduction, is contrary to the express language of the Purchase Agreement.
    (App. 11-14).
    Based on the plain language of the Purchase Agreement, we agree with the trial
    court’s conclusion that Metro could not rely on its attempt to terminate the Purchase
    Agreement on April 3, 2012 as a justification for not purchasing the Phase 2 Property.
    Indeed, the plain language of Section 4(e) of the Purchase Agreement required Metro to
    procure the wetlands study and provide written notice of the termination to Flynn Creek
    prior to the end of the Due Diligence Period (April 15, 2007) in order to terminate the
    Purchase Agreement based on wetlands. Metro did not do so.
    Furthermore, as Flynn Creek correctly asserts, “Metro implicitly concedes it
    breached the Purchase Agreement by terminating the contract on April 3, 2012 based on
    possible wetlands” because Metro did not specifically challenge the trial court’s ruling on
    appeal. We agree with Flynn Creek. Metro, in its initial appellate brief, does not directly
    29
    challenge the trial court’s conclusion that Metro’s attempt to terminate the Purchase
    Agreement based on the presence of wetlands on April 3, 2012 constituted a breach.
    Instead, Metro asserts that the “wetlands issue” was “not relevant” to summary judgment.
    (Metro’s Br. 39). Metro contends that “even if Metro’s April 3 termination letter based
    upon wetlands could be construed as a breach of contract on the part of Metro,” such
    breach would be “irrelevant” because Flynn Creek breached first and, therefore, Metro’s
    attempt to terminate was merely a “subsequent breach[.]” (Metro’s Br. 40). Metro
    argues that Flynn Creek repudiated the Purchase Agreement when it sent its March 30,
    2012 letter—in which Flynn Creek notified Metro that it had defaulted under the
    Purchase Agreement by not purchasing the Phase 2 Property and invoked its rights and
    remedies under Section 14 of the Purchase Agreement based on Metro’s default—and
    contends that “Metro’s obligations under the Purchase Agreement were discharged the
    moment Flynn Creek repudiated.” (Metro’s Br. 39). In other words, Metro attempts to
    deflect the blame for its failure to purchase the Phase 2 Property from itself and, instead,
    divert the blame to Flynn Creek by arguing that Flynn Creek repudiated the Purchase
    Agreement.
    “Repudiation of a contract must be positive, absolute, and unconditional in order
    that it may be treated as an anticipatory breach.” Angelone v. Chang, 
    761 N.E.2d 426
    ,
    429 (Ind. Ct. App. 2001). “Because the doctrine of anticipatory repudiation represents a
    harsh remedy, the requirement that the repudiating statement be clear and absolute is a
    strict one.” 
    Id. Indeed, “[w]here
    two contracting parties differ as to the interpretation of
    a contract or as to its legal effects, an offer to perform in accordance with his own
    30
    interpretation made by one of the parties is not in itself an anticipatory breach.” Eden
    United, Inc. v. Short, 
    573 N.E.2d 920
    , 929 (Ind. Ct. App. 1991) (quoting A. CORBIN,
    CORBIN ON CONTRACTS § 973 at 961-62 (One Vol. Ed. 1952)), reh’g denied, trans.
    denied.
    The trial court rejected Metro’s argument and determined that Flynn Creek’s had
    not repudiated or anticipatorily breached the Purchase Agreement. Specifically, the trial
    court concluded:
    12.    Flynn Creek’s actions on March 30, 2012 including attending and
    transcribing the scheduled March 30, 2012 closing and Flynn Creek’s
    March 30, 2012 letter to Metro reserving all of its rights and remedies
    under the Purchase Agreement does not constitute anticipatory repudiation
    under Indiana law. It is clear that Metro itself did not treat Flynn Creek’s
    actions on March 30, 2012 as anticipatory repudiation because only four (4)
    days later Metro terminated the Purchase Agreement. These actions are
    inconsistent with the position or belief that Flynn Creek had anticipatorily
    repudiated the Purchase Agreement earlier on March 30, 2012.
    (App. 29).
    We agree with the trial court’s conclusion. The designated evidence reveals that
    after Metro gave its last minute notice that it was not going to attend the closing and
    purchase the Phase 2 Property, Flynn Creek notified Metro that it had defaulted and—
    invoking Section 14 of the Purchase Agreement—stated that it was reserving its rights
    and remedies for such default. Metro, as summary judgment movant on this repudiation
    claim, has not shown that such action constituted a clear or absolute statement that Flynn
    Creek was repudiating or anticipatorily breaching the Purchase Agreement. Indeed, the
    record tends to show that Flynn Creek was acting pursuant to the terms of the Purchase
    Agreement.
    31
    Here, the terms of the Purchase Agreement required Metro to purchase the Phase 2
    Property by March 30, 2012. Metro failed to do so and then improperly attempted to
    terminate the Purchase Agreement. Based on these actions, the trial court concluded that
    Metro had breached its contract with Flynn Creek and then granted summary judgment to
    Flynn Creek and denied Metro’s cross-motion for summary judgment. Because Metro
    has not shown that the trial court erred, we affirm the trial court’s grant of summary
    judgment to Flynn Creek on its breach of contract claim and the trial court’s denial of
    summary judgment to Metro on its anticipatory breach claim.
    Specific Performance
    Metro contends that the trial court erred by granting summary judgment to Flynn
    Creek on its claim for specific performance.
    “The grant of specific performance directs the ‘performance of a contract
    according to the precise terms agreed upon, or substantially in accordance therewith.’”
    Salin Bank & Trust Co. v. Violet U. Peden Trust, 
    715 N.E.2d 1003
    , 1007 (Ind. Ct. App.
    1999) (quoting Strauss v. Yeager, 48 Ind.App. 448, 460, 
    93 N.E. 877
    , 882 (1911)), trans.
    denied. In regard to our review of a trial court order of specific performance, we have
    explained that:
    The decision whether to grant specific performance is a matter within the
    sound discretion of the trial court. The judgment of the trial court is given
    deference because an action to compel specific performance sounds in
    equity. It is a matter of course for the trial court to grant specific
    performance of a valid contract for the sale of real estate. To be enforced
    by specific performance, a contract for the sale of real estate need only be
    reasonably definite and binding as to its material terms. A party seeking
    specific performance of a real estate contract must prove that the contract
    32
    obligations of that party have been substantially performed or that an offer
    to do so has been made.
    Humphries v. Ables, 
    789 N.E.2d 1025
    , 1034 (Ind. Ct. App. 2003) (internal citations
    omitted).
    Here, the Purchase Agreement contained the following provision addressing Flynn
    Creek’s ability to obtain specific performance:
    14.  Purchaser’s Default After Phase 1 Closing. IF, AFTER THE
    PHASE 1 CLOSING, PURCHASER DEFAULTS IN THE
    PERFORMANCE OF ITS OBLIGATIONS UNDER THIS AGREEMENT
    WITH RESPECT TO THE PURCHASE OF THE [Phase 2 Property] AND
    FAILS TO CURE SUCH DEFAULT WITHIN TEN (10) DAYS AFTER
    WRITTEN NOTICE FROM SELLER TO PURCHASER SPECIFYING
    SUCH DEFAULT, SELLER MAY SEEK ANY REMEDY PROVIDED
    BY EQUITY OR LAW, INCLUDING THE RIGHT OF SPECIFIC
    PERFORMANCE, OR TERMINATE THIS AGREEMENT AND
    RECEIVE THE EARNEST MONEY AS LIQUIDATED DAMAGES.
    (App. 109) (capitalization in original) (emphasis added). In its summary judgment order,
    the trial court made the following conclusions regarding specific performance:
    17.   Specific performance may be ordered for a seller of real
    estate. Humphries v. Ab[le]s, 
    789 N.E.2d 1025
    , 1034 (Ind. [Ct.] App.
    2003); Migatz v. Stieglitz, 
    166 Ind. 361
    , 
    77 N.E. 400
    (1906). Specific
    performance is not only limited to purchasers of real estate. 
    Id. 18. Specific
    performance may also be ordered notwithstanding
    that damages could be awarded to the party seeking specific performance.
    
    Humphries, 789 N.E.2d at 1034
    and 1036 n.11; Walcis v. Kozacik, 
    156 N.E. 589
    (Ind. [Ct.] App. 1927).
    19.    Whether to order specific performance is a matter for this
    Court’s sound discretion. Kessler [sic] v. Marshall, 
    792 N.E.2d 893
    , 897
    (Ind. [Ct.] App. 2003)[, reh’g denied, trans. denied].
    20.    Paragraph 14 of the Purchase Agreement states in capital
    letters that Flynn Creek “may seek any remedy provided by equity or law,
    including the right of specific performance . . . .” The terms of this
    33
    provision are clear and unambiguous, and thus should be applied. 
    Stout, 677 N.E.2d at 1064
    . When the contract at issues allows specific
    performance as the Purchase Agreement does in this instance specific
    performance may be applied. 
    Humphries, 789 N.E.2d at 1035-36
    .
    (App. 31-32) (emphasis in original).
    Metro argues that the “trial court’s threshold error was its conclusion that specific
    performance may be awarded to the seller of real estate ‘notwithstanding that damages
    could be awarded to the party seeking specific performance.’” (Metro’s Br. 18) (citing
    App. 31 at ¶ 18). Metro asserts that the trial court “departed from case law and equitable
    maxims that specific performance is not available where remedies at law are adequate[,]”
    and it cites to this Court’s opinion in Kesler. (Metro’s Br. 16).
    Flynn Creek counters that the trial court properly granted it summary judgment on
    its claim for specific performance because it was permitted by both Indiana law and the
    Purchase Agreement. In regard to case law, Flynn Creek asserts that “[i]t has been the
    law for over 100 years that specific performance is available to sellers in real estate
    transactions.” (Flynn Creek’s Br. 37) (citing Migatz, 
    77 N.E. 400
    ; Humphries, 
    789 N.E.2d 1025
    ; and Salin, 
    715 N.E.2d 1003
    ). Additionally, Flynn Creek argues the trial
    court’s grant of specific performance was proper because the Purchase Agreement
    “explicitly identifies Flynn Creek’s ‘right of specific performance’” for the Phase 2
    Property. (Flynn Creek’s Br. 41).
    Another panel of our Court has previously faced an argument similar to Metro’s
    argument that specific performance is not available to a seller of real estate if the seller
    has an adequate remedy at law. In Humphries, the trial court, after a trial, ordered
    34
    specific performance of a contract against the buyers. On appeal, the buyers argued that
    specific performance was not available as a remedy to a real estate vendor when the
    property could be resold.    The Humphries Court reviewed the case law regarding
    awarding specific performance to a vendor:
    It is true that the number of cases in Indiana in which a vendor has
    been awarded specific performance of a contract is rather small. In addition
    to Ridenour [v. France, 
    442 N.E.2d 716
    (Ind. Ct. App. 1982)], this court
    addressed the propriety of an award of specific performance to a vendor in
    Salin Bank & Trust Co. v. Violet U. Peden Trust, 
    715 N.E.2d 1003
    (Ind. Ct.
    App. 1999), trans. denied. At issue was whether the vendor was entitled to
    specific performance because she failed to complete her obligations
    according to the requirements set forth in an option to purchase certain real
    property. This court determined that the vendor was effectively relieved of
    her performance of a condition of the contract because the purchaser had
    defectively performed its duty under the contract. 
    Id. at 1008.
    Because the
    vendor had been relieved of her duty to perform under the contract, we held
    that the trial court was within its discretion in awarding specific
    performance of the contract to the vendor. 
    Id. One of
    the earliest cases to address whether a vendor could be
    awarded specific performance of a contract for the sale of real property was
    Migatz v. Stieglitz, 
    166 Ind. 361
    , 
    77 N.E. 400
    (1906). In awarding specific
    performance of a real estate contract to the vendor, our Supreme Court
    stated:
    “The equitable doctrine is that the enforcement of contracts
    must be mutual, and, the vendee being entitled to specific
    performance, his vendor must likewise be permitted in equity
    to compel the acceptance of his deed and the payment of the
    stipulated consideration. This remedy is available, although
    the vendor may have an action at law for the purchase
    
    money.” 166 Ind. at 364
    , 77 N.E. at 401.
    We have found no law which changes this time honored principle.
    Indeed, vendors traditionally have qualified for the remedy of specific
    performance of a real estate contract after a purchaser’s breach. See 14
    James H. Backman, POWELL ON REAL PROPERTY § 81.04[1][a] (2003).
    While the reasons for awarding specific performance to vendors may be
    less compelling than the reasons for awarding specific performance to
    35
    purchasers following a vendor’s breach, the remedy is available
    nonetheless. 
    Id. Humphries, 789
    N.E.2d at 1035.           Additionally, the Humphries Court noted the
    importance of the fact that the parties had “agreed that specific performance was an
    acceptable and valid remedy” available to the vendor when they included terms in the
    contract regarding the vendors’ option of seeking an “equitable” remedy. 
    Id. at 1035-36.
    After explaining that “[c]ontracts, when entered into freely and voluntarily, w[ould] be
    enforced by the courts,” the Humphries Court explained that it would “not invalidate a
    remedy for which the Sellers [had] contracted” and held that the trial court did not abuse
    its discretion by ordering specific performance of the contract. 
    Id. at 1036.
    Despite this case law, Metro relies on Kesler—which was decided after
    Humphries—to argue that specific performance was not available to Flynn Creek. In
    Kesler, the trial court, following a bench trial, granted specific performance of a real
    estate purchase agreement, ordering a buyer to purchase the real estate. On appeal,
    another panel of this Court held that the trial court’s judgment that the seller was entitled
    to specific performance was “clearly erroneous” because the seller had not made the
    requisite showing that he had substantially performed the contract or had offered to do so.
    
    Kesler, 792 N.E.2d at 896
    . Additionally, the Kesler Court pointed out that “[o]ur courts
    generally will not exercise equitable powers when an adequate remedy at law exists” and
    explained that “[w]here substantial justice can be accomplished by following the law, and
    the parties’ actions are clearly governed by rules of law, equity follows the law.” 
    Id. at 897.
    The Court then determined that “none of the [trial] court’s findings support[ed] the
    36
    conclusion that monetary damages would be insufficient to fully compensate” the seller
    and stated that the seller “could have kept [the buyer’s] earnest money and terminated the
    contract, or resold the property and held [the buyer] liable for the difference between the
    actual sale price and the price under the contract.” 
    Id. As a
    result, the Kesler Court held
    that “under these circumstances,” the trial court abused its discretion by ordering the
    buyer to specifically perform the contract. 
    Id. (citing to
    out-of-state case law).
    Unlike Kesler, where there was no contract provision allowing for specific
    performance, here, the parties’ Purchase Agreement included specific language providing
    that Flynn Creek had “the right” to specific performance. “‘Indiana courts recognize the
    freedom of parties to enter into contracts and, indeed, presume that contracts represent
    the freely bargained agreement of the parties.’” 
    Haegert, 977 N.E.2d at 937
    (quoting
    Fresh Cut Inc. v. Fazli, 
    650 N.E.2d 1126
    , 1129 (Ind. 1995)). “[W]hen the terms of a
    contract are drafted in clear and unambiguous language, we will apply the plain and
    ordinary meaning of that language and enforce the contract according to those terms.” 
    Id. Thus, we
    must apply and enforce the terms of the Purchase Agreement to this summary
    judgment before us. See 
    id. Here, the
    terms of the parties’ Purchase Agreement allowed for Flynn Creek, upon
    default by Metro, to choose a remedy at law or equity, and the parties agreed that Flynn
    Creek’s equitable remedy included “the right” to specific performance. After Metro did
    not perform its obligation to purchase the Phase 2 Property, Flynn Creek chose to seek an
    equitable remedy and chose to assert its right to specific performance. We will not
    invalidate a remedy for which the parties have contracted. See 
    Humphries, 789 N.E.2d at 37
    1036. Based on the language contained in the four corners of the Purchase Agreement,
    we conclude that the trial court did not err by granting summary judgment to Flynn Creek
    on its claim for specific performance.23
    Affirmed.
    FRIEDLANDER, J., and MATHIAS, J., concur.
    23
    If not for the specific language in the Purchase Agreement establishing a right to specific performance,
    Flynn Creek, as the summary judgment movant, would have been required to make the requisite showing
    to obtain specific performance as a matter of law. See 
    Humphries, 789 N.E.2d at 1034
    (“A party seeking
    specific performance of a real estate contract must prove that the contract obligations of that party have
    been substantially performed or that an offer to do so has been made.”); 
    Gill, 970 N.E.2d at 637
    (explaining that the moving party on summary judgment “bears the initial burden of making a prima facie
    showing that there are no genuine issues of material fact and that it is entitled to judgment as a matter of
    law”); see also Ind. Trial Rule 56(C).
    38