  •                    IN THE COURT OF APPEALS OF IOWA
    No. 13-0929
    Filed August 13, 2014
    PHILIP NAEVE, MARILYNNE J. NAEVE,
    KYNDRA NAEVE WALTON, CAMILLE
    NAEVE URBAN, NAEVE FARM, INC.,
    and THE PHILIP & MARILYNNE
    NAEVE TRUST,
    Plaintiffs-Appellants,
    vs.
    HUMBOLDT COUNTY DRAINAGE
    DISTRICT #126, HUMBOLDT COUNTY
    BOARD OF SUPERVISORS and ITS
    MEMBERS, HARLEY HETT, JERRY
    HAVERLY, HARLAN HANSEN, JOHN
    M. CHRISTIANSON and CARL MATTES,
    Defendants-Appellees.
    ________________________________________________________________
    Appeal from the Iowa District Court for Humboldt County, Joel E.
    Swanson, Judge.
    Landowners appeal from the district court’s order upholding the
    establishment of a drainage district and assessments against the landowner.
    AFFIRMED.
    Camille Urban and Jonathan M. Gallagher of Brown, Winick, Graves,
    Gross, Baskerville and Schoenebaum, P.L.C., Des Moines, for appellants.
    David R. Johnson of Brinton, Bordwell & Johnson, Clarion, for appellees.
    Heard by Vogel, P.J., and Doyle and Mullins, JJ.
    2
    MULLINS, J.
    Landowners appeal from a district court decision denying their petition to
    set aside the establishment of a drainage district and to reclassify lands to
    reduce their assessment of costs. The county board of supervisors contends the
    landowners waived their arguments against the drainage district by failing to
    raise them before the board. The board also contends the classification and
    assessment are valid and should be affirmed. We affirm.
    I.     BACKGROUND FACTS AND PROCEEDINGS.
    A.     Establishment of Drainage Districts.
    “The purpose of drainage districts is to build and maintain drainage
    improvements that provide for the drainage and improvement of agricultural and
    other lands, thereby making them tillable or suitable for profitable use.” Hardin
    Co. Drainage Dist. 55, Lateral 10 v. Union Pac. R. Co., 
    826 N.W.2d 507
    , 510
    (Iowa 2013) (internal quotation and citation omitted).       “To achieve this goal,
    counties may establish a drainage district and construct whatever drainage
    improvement is necessary for the public health, convenience, or welfare.” 
    Id. County boards
    of supervisors have authority to establish and maintain
    drainage districts through the procedure set out in Iowa Code chapter 468. Two
    or more owners of the land in question must file a petition with the county auditor
    setting forth the details of the proposed drainage district, including the lands to be
    enclosed in the district. See Iowa Code §§ 468.6 and .8. The county board of
    supervisors then must, at its next session, examine and find the filed petition
    “sufficient in form and substance.” See Iowa Code § 468.10.
    3
    If the board does so, it must appoint a “disinterested and competent” civil
    engineer. 
    Id. The engineer
    must survey the lands described in the petition and
    file a report to the board setting forth the specific details of the proposed district,
    including its exact location, plans for its construction, and the probable costs.
    See Iowa Code § 468.12. Upon filing of the engineer’s report recommending the
    drainage district, the board must examine and consider the report before formally
    adopting or approving it.     See Iowa Code § 468.13.         Approval of the report
    constitutes a “tentative plan only” for the establishment of the drainage district.
    See Iowa Code § 468.14.
    The board then must set a date for a public hearing on the petition to
    establish the district not less than forty days from the date of their approval of the
    engineer’s report. 
    Id. The board
    must instruct the county auditor to provide
    notice to the owners whose land is implicated in the petition, as well as all other
    persons whom the petition may concern. 
    Id. Notice must
    be of the pendency of
    the petition, the favorable engineer’s report, and the day and hour of the hearing
    and must inform parties that all claims and objections must be “made in writing
    and filed in the office of the auditor at or before the time set” for the hearing. 
    Id. Notice must
    be given not less than twenty days prior to the date set for the
    hearing. See Iowa Code §§ 468.15-.16. Parties may waive notice by filing a
    statement to that effect with the auditor. See Iowa Code § 468.18.
    At the date and time set for hearing, the board will hear the petition and
    determine its sufficiency as to form and substance, and all objections filed
    against the establishment of the district. See Iowa Code § 468.21. If the board
    4
    determines the district is not in the public interest, it shall dismiss the petition. 
    Id. If the
    board finds the petition “complies with the requirements of law in form and
    substance,” that the district would be “conducive to the public health,
    convenience, welfare, benefit, or utility,” that the cost is not excessive, and no
    claims have been filed for damages, it may establish the district consistent with
    the engineer’s report. See Iowa Code § 468.22.
    Interested landowners may file objections or remonstrances1 to the
    establishment of the drainage district. See Iowa Code §§ 468.19, .21, and .28. If
    a majority of the interested landowners, owning in aggregate seventy-percent or
    more of the lands in question, file with the county auditor a signed remonstrance
    against the establishment of the district, the board shall dismiss the proceedings.
    See Iowa Code § 468.28. Any party failing to file a claim or objections to the
    establishment of the district “at or before the time fixed for said hearing . . . shall
    be held to have waived all objections and claims[.]” See Iowa Code § 468.19.
    Once the district has been established, the board must appoint three
    classification commissioners to determine the benefits, classify the lands, and
    apportion and assess the costs associated with the district among the various
    parties.   See Iowa Code § 468.38.           The commissioners must include one
    competent civil engineer and two landowners in the county who do not have an
    interest in any of the included lands. 
    Id. These commissioners
    must prepare
    their conclusions in a detailed report filed with the county auditor. See Iowa
    1
    A “remonstrance” is: “1. A presentation of reasons for opposition or grievance. 2. A
    formal document stating reasons for opposition or grievance. 3. A formal protest against
    governmental policy, actions, or officials.” Black’s Law Dictionary 1409 (9th ed. 2009.)
    5
    Code § 468.44. The board then must provide for notice of a public hearing to be
    served upon the interested parties in the same manner as provided for the
    establishment of the district. See Iowa Code § 468.45. At the hearing, the board
    must hear and determine all objections properly filed and may make such
    adjustments to the benefits and apportionments of cost as appear to the board to
    be just and equitable. See Iowa Code § 468.46.
    Landowners may take an appeal from the establishment of the district
    itself or the classification and assessment. See Iowa Code § 468.83. These
    appeals are effected by petition to the district court of the county wherein the
    proceeding was held. 
    Id. B. Drainage
    District Number 126.
    This case arises from the 2010 establishment of Drainage District Number
    126 in Humboldt County. Thirty years prior to the events described here, Philip
    Naeve installed drainage tile to serve his farmland in sections eleven and
    fourteen of Corinth Township in Humboldt County.               In 2010, Humboldt
    Community School District constructed a new school in section eleven. With the
    increased paved area, the county determined it needed to provide for the
    additional water run-off and sought to establish a drainage district. On July 6,
    2010, a Humboldt Community School District employee and an adjacent
    landowner filed petitions with the county auditor to establish the drainage district.
    On July 12, 2010, the Board of Supervisors found the petitions to be sufficient
    and appointed an engineer to prepare a report. The subsequent events are in
    dispute. The defendants in these actions, collectively the “Board,” assert the
    6
    Board at its September 20, 2010 meeting approved the engineer’s report, set a
    public hearing date, and directed the county auditor to serve the necessary
    notices. The Board set the hearing date for November 8th at 9:00 a.m., more
    than forty days from their approval of the engineer’s report.             The plaintiffs in
    these actions, collectively the Naeves, assert the Board only accepted the
    engineer’s report at the November 8th meeting, thus violating the chapter 468
    notice requirements. The Board published notice of the public hearing in the
    local newspaper on October 21, concededly only nineteen days before the
    hearing. It also mailed notices to the affected landowners,2 and Philip Naeve
    acknowledged in testimony that he received the notice by mail. The notice stated
    in relevant part: “[A]ll objections to the establishment of said drainage district for
    any reason, must be made in writing and filed in the office of the Humboldt
    County Auditor at, or before, the time set for such hearing, November 8, 2010, at
    9:00 o’clock a.m. in central standard time.”
    At 9:00 a.m. on November 8, at the start of the public hearing, there were
    no written objections or remonstrances on file with the county auditor.               The
    engineer explained the proposed plan. Members of the public and interested
    landowners who were present, including the Naeves, were permitted to make
    statements to the Board.          About one hour into the Board meeting, a Board
    member asked when was the time for remonstrance. The county’s drainage
    attorney advised the Board the deadline for filing a remonstrance was the start of
    the hearing and thus had passed.              The Board then voted to approve the
    2
    The record does not reflect when precisely the auditor mailed the notices.
    7
    engineer’s report for the second time. Then, Philip Naeve asked when he would
    be able to appeal the Board’s decision, to which a Board member replied, “You
    can definitely appeal it, yes.” The Board’s counsel then clarified the Naeves
    could appeal from the establishment of the district, not from the Board’s approval
    of the report. He also clarified the Naeves could appeal from the classifications
    and assessments, once the Board approved them.
    The Board recessed until 10:30 a.m. and at that time sought a final vote
    on the establishment of the drainage district. The Board took comments from the
    public in attendance. The Board then voted in favor of the establishment of the
    district. On November 23, the Naeves filed a petition requesting the district court
    set aside the Board action and declare the drainage district void.
    Pursuant to chapter 468, the Board appointed commissioners to classify
    the lands and apportion costs.      The commissioners surveyed the land and
    submitted their report. On June 6, 2011, the Board held a public hearing to
    examine and adopt the report and hear objections. The Naeves and several
    other landowners filed timely objections and appeared for the hearing. Following
    the   hearing,   the   Board   requested       the   commissioners   reexamine   the
    classifications and the public objections. The commissioners did so and returned
    to the Board concluding their original assessments were accurate.3 The Board
    thus made no alterations and adopted the commissioners’ assessments. The
    result of the assessments was that the Naeves were required to pay around
    $57,000 in costs for the establishment of the drainage district. The Naeves filed
    3
    Altogether, the Board met with the engineer and commissioners three times before
    approving the assessments.
    8
    another petition, seeking a reassessment and a reduction in their apportionment
    of costs.
    The district court consolidated the two actions (first, the petition to declare
    the drainage district void and second, the petition for reassessment) for trial. The
    Naeves raised several issues: deficiencies in the petitions to establish the district;
    deficiencies in the notice; the Board’s failure to allow a remonstrance; and the
    classification and apportionment of costs to the Naeves. The district court denied
    the petitions finding the Board substantially complied with the requirements of
    chapter 468 and correctly adopted the assessments. The court also found the
    Naeves failed to file a timely remonstrance as required under the chapter. The
    Naeves appeal from these decisions.
    II.    STANDARD OF REVIEW.
    Where a landowner affected by the establishment of a drainage district
    appeals from a board of supervisor’s decision, the action is in equity. Hicks v.
    Franklin Cnty. Auditor, 
    514 N.W.2d 431
    , 435 (Iowa 1994). Thus, our review is de
    novo. Iowa R. App. P. 6.907. Drainage statutes should be liberally construed for
    the public benefit. 
    Hicks, 514 N.W.2d at 435
    .
    III.   ANALYSIS.
    The Naeves make three arguments on appeal. First, the district court
    erred in upholding the drainage district by finding the Board substantially
    complied with the statutory requirements as to the petition, the engineer’s report,
    and notice.   In particular, the Naeves argue failure to adhere strictly to the
    statutory requirements of the notice and the engineer’s report rendered the board
    9
    without jurisdiction to establish the drainage district. Second, the district court
    erred in finding the Naeves’ remonstrance untimely. Third, the district court erred
    in finding the commissioners were appointed appropriately and that the
    commissioners used the appropriate mechanisms for the classifications and
    assessments.     The Board contends the Naeves waived their arguments on
    compliance with the statutory requirements, thus, we address the jurisdiction and
    waiver issues first. We then address the remaining arguments.
    A.     Jurisdiction and Waiver.
    The Naeves contend the alleged failure to comply with the statutory
    requirements deprived the Board of jurisdiction to establish the district. They
    allege deficiencies in the Board’s compliance with statutory requirements
    regarding notice and the engineer’s report.
    The Naeves assert generally, “[S]trict compliance, particularly in the
    formation of drainage districts, requires full adherence to each statutory
    requirement.”4 They cite Simpson v. Board of Supervisors of Kossuth County,
    
    162 N.W. 824
    (Iowa 1917), for the proposition that the board lacked jurisdiction
    based on the engineer’s report.       In Simpson, an engineer’s report failed to
    4
    The Naeves assert strict compliance with the statutory requirements is required. The
    supreme court most recently addressed the standard of compliance relating to
    establishing and maintaining drainage districts in 
    Hicks, 514 N.W.2d at 435
    , where it
    stated:
    When reviewing drainage proceedings of boards of supervisors we have
    applied three principles: the drainage statutes shall be liberally construed
    for the public benefit; strict compliance with statutory provisions is
    required to establish a drainage district, while substantial compliance is
    sufficient as to repairs or improvements; and the procedural requirements
    should be too technically construed.
    The case before us does not require a discussion or application of any particular
    standard of compliance and we decline to address it further at this time.
    10
    specify the proposed width of a certain right of 
    way. 162 N.W. at 825
    .
    Appraisers for the district estimated the width would be eighty-five feet and
    assessed damages accordingly. 
    Id. The board
    notified interested landowners,
    approved the report, and established the district. 
    Id. Later, during
    excavations,
    the engineer determined the right of way would have to be 120 feet wide. 
    Id. The board
    , upon the engineer’s recommendation and without informing the
    property owners, approved a resolution increasing the width. 
    Id. at 826.
    The
    court stated:
    The engineer appointed for the designated purpose must set forth
    in his report the exact width, boundaries, and location of the right of
    way required. . . . The report of an engineer recommending the
    proposed drainage improvement is jurisdictional, and as to such
    matters the statute is mandatory and must be strictly followed.
    
    Id. at 827.
    It further determined, “[T]he board [was] limited to the establishment
    of the improvement as recommended” and was “wholly without authority to
    appropriate the 35-foot strip in the way attempted.” 
    Id. at 826.
    Thus, boards do
    not have authority to deviate from the engineer’s report in establishing a drainage
    district without first observing the same procedural requirements for establishing
    or modifying the district. Here, there is no allegation that the board attempted to
    deviate from the engineer’s report as filed. Thus, there is no jurisdictional defect
    in the board’s action stemming from the engineer’s report.
    The Naeves further contend the Board’s failure to strictly conform to the
    statutory requirements of notice rendered it without jurisdiction to establish the
    drainage district. Indeed, our supreme court has found that failure to provide
    notice deprived boards of supervisors of jurisdiction with respect to drainage
    11
    districts. See, e.g., Minneapolis & St. L.R. Co. v. Bd. of Supervisors of Marshall
    Cnty., 
    201 N.W. 14
    , 14 (Iowa 1924). In Minneapolis, a county failed to provide
    notice to an interested landowner at the address the landowner had designated
    for such purposes. 
    Id. at 14.
    The landowner did not appear or take any part in
    the proceedings until he was notified of the assessments against him for
    establishment of the district. 
    Id. Contrary to
    the board’s arguments, our supreme
    court held this was not “merely a defective notice,” but because the board
    “entirely neglected” to notify the landowner, it had acquired no jurisdiction over
    him and the district was void. 
    Id. at 15.
    In Chicago & N.W. Ry. Co. v. Sedgwick,
    
    213 N.W. 435
    , 436 (Iowa 1927), a county board of supervisors failed to provide
    notice to a railroad’s designated agent, who did not participate in the
    proceedings. The supreme court found the board did not obtain jurisdiction over
    the railroad. 
    Id. Similarly, in
    Ioerger v. Schumacher, 
    203 N.W.2d 572
    , 573 (Iowa 1973), a
    county board of supervisors gave notice of a proposed drainage district to a
    tenant on the land, rather than its minor owners and their conservator. 
    Id. Our supreme
    court again found the board lacked jurisdiction as to the minor owners,
    and the assessment of costs was void.5 
    Id. at 576.
    Here, the alleged defects in
    notice do not rise to the same level. Although the notice was published one day
    late, the alleged deficiencies did not rise to the level of a total failure or “entire
    neglect” to notify.   The Naeves were notified of the hearing, appeared, and
    discussed the drainage district with the Board.          Their complaint is simply
    5
    This was true, notwithstanding the tenant on the land was the minors’ father. 
    Ioerger, 203 N.W.2d at 573
    .
    12
    technical; they do not complain that they were harmed in any way by the one-day
    delay. See 
    Hicks, 514 N.W.2d at 435
    (procedural requirements should not be
    too technically construed).    We reject the Naeves’ contention that the Board
    lacked jurisdiction over them based on the alleged notice deficiencies.
    The Naeves present a number of procedural and substantive defects
    arising in the course of establishing the drainage district, including defects in the
    content of the original petitions, the notice, and the engineer’s report.         They
    contend the Board was required to comply strictly with the statutory requirements
    and, having failed to do so, their decision to establish the drainage district is void.
    The Board argues the Naeves’ objections must be deemed waived pursuant to
    Iowa Code section 468.19, which states:
    Any person, company, or corporation failing to file any claim for
    damages or objections to the establishment of the district at or
    before the time fixed for said hearing, except claims for land
    required for right of way, or for settling basins, shall be held to have
    waived all objections and claims for damages.
    (Emphasis added.) By failing to file any written objections “at or before the time
    fixed” for the hearing, the Board argues, the Naeves waived any claims as to
    procedural or substantive deficiencies in the establishment of the district.
    The Naeves respond they could not have waived their objections because
    the Board’s notice was deficient in failing to inform them the consequence of
    failing to objection would be waiver. They cite Mammel v. M & P Missouri River
    Levee Dist., 
    326 N.W.2d 299
    , 302 (Iowa 1982), where our supreme court
    determined the following elements of notice are essential:
    (1) The notice must inform affected parties of the nature of the
    project.
    13
    (2) It must inform affected parties that their land is involved.
    (3) It must inform them of their right to object or file claims for
    damages and the consequences of their failure to do so.
    (4) It must inform them of the time and place of any required public
    hearing.
    (Internal citations omitted.) The Naeves assert notice was defective in failing to
    inform the landowners that objections not raised before the Board would be
    deemed waived.
    In Simpson, the appealing landowner made a number of objections before
    the board of 
    supervisors. 162 N.W. at 826
    . However, on appeal to the district
    court, he argued additional complaints about the engineer’s report not previously
    raised. 
    Id. The supreme
    court held
    Upon appeal from the order of establishment every objection urged
    against the proposed scheme of drainage may be reviewed and
    passed upon by the district court upon the hearing of such appeal,
    but only such objections as we made before the boards of
    supervisors, will be considered by the district court.
    
    Id. at 827.
    The court found, because the landowner failed to object before the
    board regarding the report, those complaints were waived. The court further
    found, had the landowner raised the objections properly, the board could have
    directed the engineer to amend his report or otherwise remedy the asserted
    defects.
    Failure to object also can result in waiver of errors in notice. In Lightner v.
    Board of Supervisors of Greene County, 
    123 N.W. 749
    , 753 (Iowa 1909), a board
    of supervisors published notice for one week rather than the required four. Our
    supreme court found with respect to an alleged defective notice, “[A]s no such
    objection was made before the Board it must be considered as waived. . . .
    14
    [W]here a notice is given, defects therein must be pointed out in the objections
    filed with the Board.” 
    Id. Such arguments
    “are waived unless they are presented
    to the proper tribunal and in the manner pointed out by statute.” 
    Id. Here, the
    Naeves were notified of the hearing, appeared, were told that time had passed
    for remonstrance, did not object to being told time had passed, and stated their
    concerns about the project to the Board. Chapter 468 and applicable case law
    are clear that failure to file an objection at or before the time fixed for the
    establishment hearing is a waiver of all objections. See Iowa Code § 468.19. It
    is not unreasonable to charge objecting landowners—who had notice—with
    knowledge of the statutory procedures. Such a charge is consistent with the
    purpose of notice, to safeguard a landowner’s right to be informed of the hearing
    and to object. The right to notice does not encompass the right to be informed of
    all one’s rights and interests in a matter.         At the time of the establishment
    hearing, there were no written objections on file with the county auditor. If there
    were any deficiencies in the petitions, engineer’s report, or notice, they should
    have been raised at that time, while the Board was able to remedy deficiencies
    by amending the petitions, ordering the engineer to amend the report, or
    continuing the hearing to provide sufficient notice. Because the Naeves did not
    raise their jurisdictional objections at the designated time, they are waived, and
    we do not address them.6 See 
    Simpson, 162 N.W. at 827
    .
    6
    The Naeves raised one notice issue orally before the Board as well as on appeal. The
    Naeves contend the auditor should have sent a copy of notice to the City of Humboldt.
    Iowa code section 468.15 does indicate, “Copy of the notice shall also be sent by
    ordinary mail . . . to the clerk or recorder of each city named in the notice[.]” The Board
    15
    B.     Remonstrance Argument.
    The Naeves contend the district court erred in finding there was no timely
    filed remonstrance at the time of the establishment hearing. The Naeves blame
    misleading statements of drainage counsel that the time for filing a remonstrance
    had passed and of a Board member that the Naeves could file an appeal later.
    The Naeves assert the Board refused to allow them to file a remonstrance, even
    though they were prepared to do so. Although the video recording of the public
    hearing reflects that drainage counsel did state the time for filing a
    remonstrance—the beginning of the hearing—had passed, nothing in the video
    shows the Board refusing to accept a prepared written remonstrance.
    Iowa Code section 468.28 provides, “If, at or before the time set for final
    hearing as to the establishment of a proposed levee, drainage, or improvement
    district. . . there shall have been filed with the county auditor. . . a remonstrance
    signed by a majority of the landowners in the district” who in aggregate own
    seventy percent or more of the land, the Board must dismiss the petitions to
    establish. At the time set for the final hearing, November 8, 2010, at 9:00 a.m.,
    no remonstrance had been filed. The Naeves did eventually file a remonstrance
    in April 2012, nearly one and a half years later.
    The Naeves further argue that the Board approved the engineer’s report
    only at the November 8 hearing. They assert this approval should have triggered
    the forty-day waiting period before they held another hearing to vote on the
    establishment of the district. See Iowa Code section 468.14. Thus the Naeves
    responds the Naeves do not have standing to assert notice was not served on other
    parties, and we agree.
    16
    argue they had until the time of that hearing to file a remonstrance.        At the
    November 8 hearing, during the 9:00 a.m. session, the Board did vote to approve
    the engineer’s report, however, the Board had already approved the report once
    before on September 20.      This is reflected in the Board’s minutes from the
    September 20 meeting. Further, a Board member testified at trial the Board
    approved or accepted the engineer’s report on that day, scheduled the public
    hearing on establishment with the forty-day rule in mind, and directed the county
    auditor to serve notice. The notice sent out to the landowners also stated that
    the Board “on the 20th day of September, 2010, approved the Engineer report[.]”
    Thus, the forty-day requirement ran from the September 20 Board meeting and
    the November 8 9:00 a.m. public hearing on establishment was the deadline for
    filing a remonstrance. Accordingly, we find the Naeves’ arguments fail. They did
    not file a remonstrance by the required time. The April 2012 remonstrance was
    untimely by a year and a half.
    C.     Classification and Assessment.
    1.     Classification Commissioner Qualifications.
    The Board appointed the same engineer and two non-engineer
    commissioners to prepare the classifications and assessments.         The Naeves
    contend the non-engineer commissioners were appointed inappropriately. Iowa
    Code section 468.24 provides once the board votes to establish the district, it
    shall appoint three commissioners to assess benefits and classify
    the lands affected by the improvement. One of the commissioners
    shall be a competent civil engineer and two of them shall be
    resident freeholders of the county in which the district is located,
    but not living within, nor interested in, any lands included in the
    17
    district, nor related to any party whose land is affected by the
    district.
    The Naeves argue the two lay classification commissioners were appointed
    inappropriately because, as taxpayers living within and financially supporting the
    school district, they had an interest in project and met the definition of “related to”
    an affected party, the school district.7 Eight written objections were timely filed
    before the hearing on the classification of lands. The Board heard comments
    from the objectors at the classification hearing and decided to “have the
    Commissioners take another look at the classifications and resubmit the report
    after consideration of the objections.”        Having done so, the Commissioners
    concluded their original classifications were correct, made no alterations, and
    resubmitted their report, which the Board approved.           The Naeves had not
    objected to the qualifications of the commissioners. Nor did the Naeves raise the
    qualifications of the commissioners on their petition to the district court; therefore
    the district court did not rule on the issue.      “It is a fundamental doctrine of
    appellate review that issues must ordinarily be both raised and decided by the
    district court before we will decide them on appeal.”             Kramer v. Bd. of
    Adjustment, 
    759 N.W.2d 86
    , 93 (Iowa Ct. App. 2010). Accordingly, we do not
    address their qualifications argument.
    2.     Mechanisms for Classification.
    The Naeves also contend the classification commissioners failed to apply
    the correct mechanisms for classification and assessment.            They assert the
    7
    See Bluffs Dev. Co., Inc. v. Bd. of Adjustment of Pottawattamie Cnty., 
    499 N.W.2d 12
    ,
    14-18 (Iowa 1993).
    18
    commissioners assessed them an excessive portion of the cost. The total cost of
    the project was around $300,000, of which the Naeves were required to pay
    around $57,000. The Naeves first argue the district court failed to recognize the
    taking of their prior improvements and properly compensate them for the taking.
    However, they failed to raise this issue in their petition before the district court
    and cannot raise it for the first time upon appeal. See id.8
    The Naeves assert various errors in the commissioners’ assessments
    arguing the commissioners failed to substantially comply with their statutory
    duties under chapter 468. Chapter 468 provides a conclusive presumption that,
    On the trial of an appeal from the action of the Board in fixing and
    assessing the amount of benefits to any land within the district as
    established, it shall not be competent to show that any lands
    assessed for benefits within said district as established are not
    benefited in some degree by the construction of the said
    improvement.
    See Iowa Code § 468.92. In assessing the proper apportionment of the costs,
    [i]f . . . it were permissible for every individual owner to come into
    court and show that his particular tract received no benefit from the
    improvement and be thereby relieved from liability to pay part of the
    tax, the law would be robbed of all practical effectiveness, and the
    whole system of drainage as a public enterprise be paralyzed.
    Chicago & N.W. Ry. Co. v. Bd. of Supervisors of Hamilton Cnty., 
    162 N.W. 868
    ,
    873 (Iowa 1917). Thus, the Naeves have the burden of proving the assessment
    was excessive. See Schwarz Farm Corp. v. Bd of Supervisors of Hamilton Cnty.,
    8
    The Naeves assert Philip Naeve tiled his land at expense to himself and as a result the
    district received benefits for which he was not compensated. A taking occurs where the
    state “substantially deprives one of the use and enjoyment of his property or a portion
    thereof.” Kingsway Cathedral v. Iowa Dep’t of Transp., 
    711 N.W.2d 6
    , 9 (Iowa 2006).
    The Naeves incorrectly view the assessments as a taking of their private tile, however,
    the tile they installed remains in their land and is their private property. Thus, the
    circumstances here do not constitute an eminent domain taking.
    19
    
    196 N.W.2d 571
    , 576 (Iowa 1972).                “An assessment based on the
    commissioners’ report and confirmed by the district court carries with it a strong
    presumption of correctness and must stand unless the objecting landowner
    shows it resulted from fraud, prejudice, gross error, or evident mistake.” Id.;
    Martin v. Bd. of Supervisors of Polk Cnty., 
    100 N.W.2d 652
    , 655 (Iowa 1960);
    Rogers v. Bd. of Supervisors of Cerro Gordo Cnty., 
    189 N.W. 950
    , 951 (Iowa
    1922). Thus, the Naeves must show fraud, prejudice, gross error, or evident
    mistake, rather than a standard of compliance, to overturn the commissioners’
    assessment.
    Chapter 468 sets out guidance for the classification commissioners’
    duties. They are required
    to perform the duties of classification of the lands, to fix the
    percentages of benefits, apportion and assess the costs and
    expenses of constructing the improvement, divide and rename
    original improvements, and, if included in the Board’s resolution,
    adopt special common outlet classifications to be maintained
    independent of the district’s regular assessment schedules,
    according to law and their best judgment, skill, and ability.
    Iowa Code § 468.38. The commissioners
    inspect and classify all the lands within said district . . . in tracts of
    forty acres or less according to the legal or recognized
    subdivisions, in a graduated scale of benefits to be numbered
    according to the benefit to be received by each of such tracts from
    such improvement, and . . . when completed, shall make a full,
    accurate, and detailed report thereof and file the same with the
    auditor. The lands receiving the greatest benefit shall be marked
    on a scale of one hundred and those benefited in a less degree
    with such percentage of one hundred as the benefits received bear
    in proportion thereto.      They shall also make an equitable
    apportionment of the costs, expenses, fees, and damages
    computed on the basis of the percentages fixed.
    Iowa Code § 468.39. Iowa Code section 468.40 further provides:
    20
    In estimating the benefits as to the lands not traversed by said
    improvement, [the commissioners] shall not consider what benefits
    such land shall receive after some other improvements shall have
    been constructed, but only the benefits which will be received by
    reason of the construction of the improvement in question as it
    affords an outlet to the drainage of such lands, or brings an outlet
    nearer to said lands or relieves the same from overflow and
    relieves and protects the same from damage by erosion.
    Drainage District Number 126 consists of a main drainage ditch extended
    east-west over two farms, including the Naeves’, fed by several laterals
    extending into two other landowners’ farms. The individual landowners may tile
    their lands to drain into the main or the laterals. The main directs water flow to
    an outlet located at the easternmost boundary of the Naeves’ farmland. Thus,
    the drainage facility traverses multiple owners’ land and benefits even non-
    traversed land by providing a convenient drainage path.        Classification and
    assessment is a process by which the commissioners determine how much
    benefit each landowner receives from the drainage facilities and consequently
    how much of the installation cost each should be pay.
    According to the engineer, the commissioners applied the “relative benefit”
    method of assessment as prescribed by section 468.38. They began by dividing
    the lands served by the drainage facilities into parcels of forty acres or less.
    They then classified each parcel of land based on three factors: a “use factor,” a
    “proximity factor,” and a “length factor.” The use factor is related to the land’s
    need for drainage.    Under Iowa Code section 468.40, the parcels with the
    greatest need for drainage receive the highest score of one hundred.          The
    proximity factor is determined by how far an owner’s land is from the
    improvement. Land that is farther away is assessed a lower proportion of the
    21
    cost because the landowner must pay more to install tile to connect to the
    drainage facilities.   The length factor relates to how much of the drainage
    facilities each parcel uses. Parcels that are farther upstream are assessed a
    higher proportion of the cost because they use a greater length of the system.
    The classifications and assessments depend on the availability of the drainage
    facility to the land, not the landowner’s actual use of it. The commissioners also
    considered the type of soil and the type of land. The commissioners classified
    each parcel in relation to the parcels receiving the most benefit and adjusted by
    percentages: a parcel receiving only one-quarter of the benefit of the most
    benefited parcel was adjusted to a twenty-five percent benefit.           Once the
    commissioners classified how much benefit each parcel received, they
    determined an abstract benefit value by which to determine how much each
    individual landowner should contribute to the costs of installing the drainage
    ditch.
    The commissioners took the number of acres in each parcel, multiplied by
    the benefit value for that parcel, to reach a value representing the total benefit to
    the parcel. They then determined how much benefit each parcel received as a
    percentage of the total benefit of the entire district. They then divided the total
    cost of the drainage district installation proportionally to the benefit received by
    each parcel. Each landowner owned several parcels. Adding these together, the
    commissioners determined what proportion of the total costs should be assessed
    to each landowner.
    22
    The Naeves contend the commissioners made a number of errors in their
    classifications and assessments. Their argument is that each of these asserted
    errors amounts to a lack of substantial compliance with the statutory
    requirements of the commissioner’s report. However, nothing in the Naeves’
    argument, nor in the record shows that the assessment is the result of fraud,
    prejudice, or mistake.    See Schwarz Farm 
    Corp., 196 N.W.2d at 576
    .           The
    Naeves argue the assessment contains “glaring errors and omissions” which are
    “prejudicial to the landowner’s rights.” Nonetheless, the Naeves were required to
    show the engineer was influenced by motives of fraud or prejudice, or that the
    engineer committed a gross error or mistake.
    First, the Naeves assert the commissioners failed to treat land not
    traversed by the drainage facility differently from lands traversed, as required
    under Iowa Code section 468.40.         Second, they argue the commissioners
    ignored the statutory concept of proximity and preexisting improvement. The
    drainage facility does not traverse the Naeves’ land in Section 14. Section 14 is
    south of Section 11—Section 11 is traversed—and separated by a gravel road.
    The tile the Naeves installed in Section 14 drains across Section 11 and into the
    district’s main.   The Naeves argue that, since the land in Section 14 is not
    traversed by the drainage facility, it should have been classified as receiving a
    minimal amount of benefit.         The engineer, however, testified that the
    commissioners adjusted the factors appropriately for Section 14. They classified
    all agricultural land as receiving only thirty-three percent of the benefit received
    by parcels receiving the most. With respect to Section 14, they assigned a
    23
    proximity factor of fifteen percent of the benefit because it is located farther away
    from the drainage facility.
    The Naeves also contend they should have been given benefit reductions
    based on the length of the drainage facility their Section 11 and Section 14 land
    use. They argue their Section 11 tile connects to the main only about 150 feet
    from the outlet on the eastern boundary of their property. They also argue their
    Section 14 tile connects to the main only fifty feet from the outlet. Thus, because
    their drainage system uses a shorter length of the drainage facility they should
    have been assessed a minimal amount.            However, the commissioners also
    reduced the length factor for Sections 11 and 14 to sixty percent benefit. Only
    one other parcel, also belonging to the Naeves, received reductions based on
    proximity or length.9 Thus, the commissioners considered whether the drainage
    facility traversed the Naeves’ parcels, their proximity to the facility, and their use
    of the facility and made reductions to their benefits accordingly. We perceive no
    gross error in the commissioners’ classifications on this basis.
    The Naeves’ final contention is the Board failed to consider benefits
    received by non-agricultural land in the drainage district differently from benefits
    received by agricultural lands and state the benefits as required by statute. As
    stated above, the engineer testified the commissioners reduced the benefit to all
    agricultural land to only thirty-three percent of the benefit received by non-
    agricultural lands. The commissioners assigned the school a use factor of 1.75,
    or 175, the greatest amount of benefit. Although this classification deviates from
    9
    Another small parcel of the Naeve property received a twenty-five percent benefit for
    proximity and sixty percent benefit for length.
    24
    the code, which specifies a 100-point scale where the parcel receiving the
    greatest benefits receives 100 points, the scale the commissioners used still
    indicates the school received the greatest possible benefit and all agricultural
    lands received less than one third of the benefit of the school. The engineer
    testified the commissioners gave these classifications because a school with a
    large roof area and parking lots creates more run-off than agricultural land. The
    commissioners therefore reduced the benefit to agricultural land significantly in
    comparison to the non-agricultural land.        The engineer also testified the
    commissioners listed the specific benefits to the non-agricultural land as separate
    line items in their classification report and explained the specific benefits to the
    Board in their meetings. Again, we perceive no gross error in the commissioners’
    classifications and assessments.
    The Naeves were required to show the engineer was influenced by
    motives of fraud or prejudice, or that the engineer committed a gross error or
    mistake. There is no evidence of fraud, prejudice, or mistake. The engineer’s
    testimony was that the commissioners applied the statutorily mandated
    procedure for classification, and we find there was no gross error in the
    procedures they used. The presumption that the commissioners were correct is
    strong and the Naeves have not overcome it. Thus, we reject their argument that
    the commissioners failed to use the appropriate mechanisms for classification.
    IV.    Conclusion.
    Upon our de novo review, we conclude the Naeves waived their
    arguments regarding procedural deficiencies in the creation of Drainage District
    25
    Number 126 by failing to timely file objections to notice or any other claimed
    procedural defect and by failing to timely file a remonstrance. We also conclude
    there was no evidence of fraud, prejudice, gross error, or evident mistake in the
    commissioners’ classifications and assessments associated with the drainage
    district. Accordingly, we affirm.
    AFFIRMED.