Douglas H. Watts v. Board of Environmental Protection ( 2014 )


Menu:
  • MAINE SUPREME JUDICIAL COURT                                       Reporter of Decisions
    Decision:   
    2014 ME 91
    Docket:     BCD-13-487
    Submitted
    On Briefs: May 29, 2014
    Decided:    July 15, 2014
    Panel:       SAUFLEY, C.J., and ALEXANDER, SILVER, GORMAN, and JABAR, JJ.
    DOUGLAS H. WATTS
    v.
    BOARD OF ENVIRONMENTAL PROTECTION et al.
    GORMAN, J.
    [¶1] Douglas H. Watts appeals from a judgment entered in the Business and
    Consumer Docket (Horton, J.) affirming the decision of the Maine Board of
    Environmental Protection (BEP) approving S.D. Warren Co.’s application for
    water quality certification pursuant to section 401 of the Clean Water Act,
    
    33 U.S.C.A. § 1341
     (West, Westlaw through P.L. 113-120 approved 6-10-14), and
    Maine statute, 38 M.R.S. § 464(4)(F)(3) (2013). We affirm the judgment.
    I. BACKGROUND
    [¶2] Since at least 1827, a dam has existed at the outlet of Sebago Lake
    where Sebago Lake flows into the Presumpscot River.            The site is presently
    occupied by the Eel Weir Hydropower Project (“the project”), which is owned and
    operated by S.D. Warren Co. The project encompasses the Eel Weir Dam, an
    2
    impoundment (Sebago Lake), a power canal and powerhouse, a tailrace channel,
    and associated infrastructure. The project also includes the Eel Weir Bypass, a
    1.3-mile-long stretch of water that connects Sebago Lake to the Presumpscot River
    by circumventing the project facilities. Water flowing over the dam goes either to
    the power canal, where it is used to generate electricity, or to the bypass.1
    [¶3] Pursuant to the Federal Power Act, the Federal Energy Regulatory
    Commission (FERC) is responsible for issuing licenses for the construction,
    operation, and maintenance of hydroelectric dams located in any navigable waters
    over which Congress has jurisdiction pursuant to the Commerce Clause of the
    United States Constitution.             
    16 U.S.C.A. §§ 797
    (e), 817(1) (West, Westlaw
    through P.L. 113-120 approved 6-10-14). Pursuant to section 401 of the Clean
    Water Act, any applicant for a license to conduct activity that “may result in any
    discharge into the navigable waters” must provide FERC with a certification from
    the state in which the discharge will originate confirming that any such discharge
    will comply with water quality standards established by the Clean Water Act and
    that state’s statutes. 
    33 U.S.C.A. § 1341
    (a)(1); see also S.D. Warren Co. v. Bd. of
    Envtl. Prot., 
    2005 ME 27
    , ¶ 8, 
    868 A.2d 210
    , aff’d, 
    547 U.S. 370
     (2006). 
    FERC 1
    Warren owns and operates five other hydroelectric dams on the Presumpscot River below the Eel
    Weir Hydropower Project. See S.D. Warren Co. v. Bd. of Envtl. Prot., 
    2005 ME 27
    , ¶ 2, 
    868 A.2d 210
    ,
    aff’d, 
    547 U.S. 370
     (2006). The approval of water quality certification for those dams was the subject of
    a prior appeal by Warren to us. See id. ¶ 1. We affirmed the water quality certification, which required,
    among other things, the gradual installation of fish passages at Warren’s other dams. Id. ¶ 1; see also
    S.D. Warren Co. v. Me. Bd. of Envtl. Prot., 
    547 U.S. 370
    , 375 (2006).
    3
    issued a twenty-year license for the project in 1984.2 In 2002 Warren began the
    process of relicensing the project and, as required, filed an application with the
    Maine Department of Environmental Protection (DEP) for approval of water
    quality certification (“WQC”) in conjunction with the proposed relicensing.3
    [¶4] In August 2011, the DEP issued an order approving the WQC for the
    continued operation of the project. That order included numerous conditions to
    ensure that the continued operation of the project would not violate applicable
    water quality standards for Sebago Lake and the Presumpscot River.                                 The
    conditions established minimum and maximum water flows into the Eel Weir
    Bypass, provided for eel passage around the Eel Weir Dam, and set an annual
    target lake level for Sebago Lake. The WQC also included provisions specifically
    authorizing the DEP to reopen the certification in order to consider the installation
    of fish passage facilities around the dam and to modify Sebago Lake’s water level.
    Douglas Watts, a recreational user of Sebago Lake and the Presumpscot River,
    appealed the WQC to the Board of Environmental Protection (BEP). The BEP
    issued a decision affirming the DEP’s order approving the WQC in November
    2
    The initial license issued by FERC did not contain conditions regarding the management of Sebago
    Lake’s water level and did not require minimum water flows into the Eel Weir Bypass. A 1992 FERC
    order established minimum water flow requirements regarding the bypass. A 1997 FERC order, which
    was amended in 2000 and 2001, established a lake level management plan for Sebago Lake.
    3
    As is common practice, Warren voluntarily withdrew its first DEP application and refiled it several
    times as FERC continued to review its license application. Warren’s last filing was in 2011.
    4
    2012.4 Watts then filed a petition for review in the Superior Court pursuant to
    M.R. Civ. P. 80C. The matter was transferred to the Business and Consumer
    Docket, and in October 2013 the court entered a judgment affirming the BEP’s
    decision. Watts appealed to this Court.
    II. DISCUSSION
    A.       Standard of Review
    [¶5] When the Business and Consumer Docket acts in an intermediate
    appellate capacity pursuant to M.R. Civ. P. 80C, we review the BEP’s decision
    directly for errors of law, abuse of discretion, or findings of fact not supported by
    the record. See S.D. Warren Co., 
    2005 ME 27
    , ¶ 4, 
    868 A.2d 210
    . Our review of
    state agency decision-making is “deferential and limited.” Friends of Lincoln
    Lakes v. Bd. of Envtl. Prot., 
    2010 ME 18
    , ¶ 12, 
    989 A.2d 1128
    . The BEP’s
    interpretation of the statutes it administers “will be given great deference and
    should be upheld unless the statute plainly compels a contrary result.”
    S.D. Warren Co., 
    2005 ME 27
    , ¶ 4, 
    868 A.2d 210
     (quotation marks omitted). We
    will affirm the BEP’s findings of fact if they are supported by any competent
    4
    Watts initially appealed the DEP’s issuance of the WQC directly to the Superior Court, which
    remanded the matter to the BEP for consolidation with a separate appeal. The BEP did not hold any
    hearings on the consolidated appeals because members of the public had “attended meetings and
    submitted numerous comments” during the years the application was pending and because there was no
    “credible, conflicting technical evidence in the record that warrant[ed] . . . a hearing to gather additional
    information.” Pursuant to 38 M.R.S. §§ 341-D(4) and 345-A(1-A) (2013), the BEP has discretion to hold
    hearings on matters under its consideration.
    5
    evidence in the record, even if the record contains inconsistent evidence or
    evidence contrary to the result reached by the BEP. Friends of Lincoln Lakes,
    
    2010 ME 18
    , ¶¶ 13-14, 
    989 A.2d 1128
    . As the party seeking to vacate the BEP’s
    decision, Watts bears the burden of persuasion on appeal. Id. ¶ 15.
    B.       The Water Quality Certification
    [¶6] Watts’s primary contention on appeal is that the WQC fails to comply
    with Maine’s water quality standards governing the Eel Weir Bypass and Sebago
    Lake. Maine’s water quality standards designate uses and related characteristics
    for each class of water and prescribe numeric and narrative criteria to protect those
    uses and characteristics. See generally 38 M.R.S. §§ 464-470 (2013)5; Bangor
    Hydro-Elec. Co. v. Bd. of Envtl. Prot., 
    595 A.2d 438
    , 442 (Me. 1991). With
    respect to fresh surface waters that are not classified as great ponds, Maine law
    creates a hierarchy of water quality in which Class AA is the highest, followed by
    Classes A, B, and C. See 38 M.R.S. § 465 (2013).6 The Presumpscot River
    immediately below the Eel Weir Dam, including the Eel Weir Bypass, is a Class A
    water. 38 M.R.S. § 467(9)(A)(1) (2013).
    5
    Maine’s water classification program is set forth at 38 M.R.S. §§ 464-470 (2013). Some of the
    relevant statutes have been amended since Warren began its license application in 2002, but not in any
    way dispositive to this appeal. See, e.g., P.L. 2003, ch. 227, §§ 1-9 (effective Sept. 13, 2003) (codified at
    38 M.R.S. §§ 465 to 465-B (2013)).
    6
    Maine’s water quality standards also contain the federally required anti-degradation policy. See
    38 M.R.S. § 464(4)(F) (2013); 
    40 C.F.R. § 131.12
     (2014).
    6
    Class A waters must be of such quality that they are suitable for the
    designated uses of drinking water after disinfection; fishing;
    agriculture; recreation in and on the water; industrial process and
    cooling water supply; hydroelectric power generation, except as
    prohibited under Title 12, section 403; navigation; and as habitat for
    fish and other aquatic life. The habitat must be characterized as
    natural.
    38 M.R.S. § 465(2)(A) (2013). Sebago Lake is classified as GPA (Great Pond A):
    Class GPA waters must be of such quality that they are suitable for
    the designated uses of drinking water after disinfection, recreation in
    and on the water, fishing, agriculture, industrial process and cooling
    water supply, hydroelectric power generation, navigation and as
    habitat for fish and other aquatic life. The habitat must be
    characterized as natural.
    38 M.R.S. § 465-A(1)(A) (2013).         The term “natural,” as it is used in
    38 M.R.S. §§ 465(2)(A) and 465-A(1)(A), is defined as “living in, or as if in, a
    state of nature not measurably affected by human activity.” 38 M.R.S. § 466(9)
    (2013).
    [¶7] Watts contends that the water quality certification issued by the DEP
    fails to comply with these water quality standards in two ways: first, by failing to
    ensure the existence of self-sustaining populations of landlocked Atlantic salmon
    in the Eel Weir Bypass, and second, by establishing water levels for Sebago Lake
    that Watts considers to be too high. We address each contention in turn.
    7
    1.    Landlocked Atlantic Salmon in the Eel Weir Bypass
    [¶8] The landlocked Atlantic salmon is Maine’s state fish. Maine Secretary
    of State, State Fish – Landlocked Salmon, http://maine.gov/sos/kids/about/
    symbols/fish.htm (last visited July 11, 2014). Unlike anadromous fish species such
    as alewives or sea-run Atlantic salmon that migrate from the ocean to fresh water
    to spawn, “resident” species like the landlocked Atlantic salmon live their entire
    lives in freshwater lakes and rivers. To support a popular fishery at the Eel Weir
    Bypass, the Maine Department of Inland Fisheries and Wildlife (MDIFW) stocks
    the bypass with landlocked salmon, as well as brook trout and brown trout. During
    the application review process, MDIFW requested that the WQC continue to
    provide for a cap on the amount of water that flows into the bypass during the
    landlocked salmons’ spawning season in the fall, and that the WQC not provide for
    fish passage between Sebago Lake and the bypass. Although these restrictions on
    fish movement inhibit the landlocked salmons’ ability to reproduce in the bypass,
    MDIFW considers the restrictions necessary to support its fish stocking program
    and to support salmon fishing in Sebago Lake and the bypass.           The WQC
    ultimately incorporated a fall outflow cap and did not provide for fish passage
    between the lake and the bypass.
    [¶9] Watts argues that the WQC violates Maine’s Class A water quality
    standards because those standards mandate that landlocked salmon in Sebago Lake
    8
    have free access to and from the Presumpscot River. Watts asserts that the WQC,
    by limiting the reproduction of landlocked salmon in the bypass, fails to provide
    for a “natural” habitat in the bypass as required by 38 M.R.S. §§ 465(2)(A)
    and 466(9). The BEP directly addressed Watts’s contentions in its order, and
    stated:
    Nothing in the State’s water quality standards necessarily
    requires installation of fish passage at all dams or that all populations
    of indigenous species be self-sustaining, without regard to the
    particular circumstances of the waterbody. Rather, Class GPA and
    Class A water quality standards require that waters must be of such
    quality that they are suitable for the designated use of habitat for fish
    and other aquatic life, with the habitat characterized as natural, and of
    sufficient quality to support all indigenous species. The evidence in
    the record supports a finding that if the Project is operated as
    proposed, the water quality conditions in both Sebago Lake and the
    Presumpscot River, including the Eel Weir Bypass, will support
    indigenous species of fish and aquatic life and therefore meet
    applicable habitat and aquatic life water quality standards.
    [¶10] We defer to the BEP’s determination that the WQC satisfies the
    requirement that the habitat of the bypass be characterized as “natural,” that is,
    “living in, or as if in, a state of nature not measurably affected by human activity.”
    38 M.R.S. § 466(9); see also S.D. Warren Co., 
    2005 ME 27
    , ¶ 4, 
    868 A.2d 210
    (“The [BEP]’s interpretation of a statute administered by it, while not conclusive or
    binding on this court, will be given great deference and should be upheld unless the
    statute plainly compels a contrary result.” (quotation marks omitted)).           The
    definition of “natural” as “living in, or as if in, a state of nature not measurably
    9
    affected by human activity” allows for a range of habitat conditions that may be
    deemed “natural” while simultaneously accounting for the various designated uses
    of Class A waters. 38 M.R.S. § 466(9) (emphasis added). These designated uses
    include not only habitat for fish and other aquatic life, but also fishing, recreation,
    agriculture, drinking water supply, and hydroelectric power generation. 38 M.R.S.
    § 465(2)(A). Because the statute “contemplates that the designated uses actually
    be present,” Bangor Hydro-Elec. Co., 
    595 A.2d at 442
    , the BEP properly
    determined that the WQC should provide for all designated uses of the bypass,
    including “natural” habitat, despite the absence of a self-sustaining salmon
    population.
    [¶11] The remainder of Watts’s contentions regarding the Eel Weir Bypass
    largely amount to policy preferences about how the habitat of the bypass should be
    managed.        In reviewing the BEP’s decision, we do not weigh the merits of
    evidence or substitute our judgment for that of the agency. See Friends of Lincoln
    Lakes, 
    2010 ME 18
    , ¶¶ 12, 14, 
    989 A.2d 1128
    .7 Because the BEP did not err in
    7
    For example, Watts contends that the water quality certification, by providing for eel (but not fish)
    passage around the dam, creates an unlawful subcategory of Class A standards. This contention fails to
    recognize that competent evidence demonstrates that the documented presence of eels above and below
    the dam requires passage. Further, the WQC includes a provision that allows the DEP to reopen the
    certification for consideration of fish passage facilities if circumstances so require. Although Watts relies
    on some of our precedent as well as a letter from the EPA to the Maine Attorney General, these
    authorities are inapposite to the present case and generally support the BEP’s decision. See Save Our
    Sebasticook, Inc. v. Bd. of Envtl. Prot., 
    2007 ME 102
    , ¶¶ 13-35, 
    928 A.2d 736
     (affirming the BEP’s
    cost-benefit analysis regarding the removal of a dam and its determination that state water quality
    standards would be met by removal); S.D. Warren Co., 
    2005 ME 27
    , ¶¶ 4-31, 
    868 A.2d 210
     (deferring to
    10
    interpreting the statutes relating to its regulatory authority, and because its factual
    findings are supported by competent evidence in the record, we affirm the BEP’s
    decision with respect to the water quality certification of the Eel Weir Bypass.
    See S.D. Warren Co., 
    2005 ME 27
    , ¶¶ 4, 22 n.10, 
    868 A.2d 210
    .
    2.      Sebago Lake’s Water Levels
    [¶12] Watts next contends that the BEP erred in approving the provisions of
    the WQC regarding Sebago Lake’s water levels because the WQC does not ensure
    a “natural” habitat in              the lake as required              of Class GPA             waters.
    38 M.R.S. §§ 465-A(1)(A), 466(9). In its discussion of the lake’s water levels, the
    BEP directly addressed Watts’s contention:
    The Board finds that, contrary to Appellant Watts’[s] assertion,
    the standards for Class GPA waters require habitat not lake levels to
    be natural. That is, water quality standards do not require that a lake
    level be equivalent to the lake levels that existed prior to construction
    of the impounding dam. The Department’s interpretation of Class
    GPA water quality standards is consistent with the plain language of
    the BEP’s determination that dams owned by Warren required water quality certification because the
    operation of the dams may result in a discharge, and affirming the BEP’s imposition of conditions
    necessary to meet water quality standards); Bangor Hydro-Elec. Co. v. Bd. of Envtl. Prot., 
    595 A.2d 438
    ,
    442-43 (Me. 1991) (concluding that the BEP may properly consider the designated uses of a body of
    water in reviewing whether water quality standards are met); Letter from Stephen S. Perkins, Director,
    Office of Ecosystem Protection, United States EPA Region 1, to William J. Schneider, Maine Attorney
    General (July 9, 2012) (informing the Maine Attorney General that a since-repealed Maine statute that
    prevented river herring from entering Class A and AA portions of the St. Croix River violated Maine
    water quality standards). Watts also contends that the water quality certification fails to meet the
    “unimpaired” standard for Class B waters pursuant to 38 M.R.S. § 465(3)(A) (2013). The parties agree
    that the Class A standard governing the bypass necessarily includes the lower Class B standard. Because
    the BEP did not err in determining that the WQC meets the Class A standard, though, there is no need to
    discuss Watts’s contentions regarding the “unimpaired” standard. We find Watts’s remaining
    contentions, including his argument that the WQC violates the statute’s anti-degradation provision,
    38 M.R.S. § 464(4)(F), to be without merit and do not address them separately.
    11
    the statute, the fact that hydroelectric power generation is a designated
    use of GPA waters, and the Board’s long-standing interpretation of
    the State’s water quality standards.
    We agree with the BEP’s interpretation and application of the law.
    [¶13] Watts’s remaining contentions regarding Sebago Lake’s water levels
    are again based primarily on Watts’s preferences for how the lake should be
    managed. He has failed to demonstrate either that the BEP erred in interpreting the
    applicable statutes or that its factual findings were not supported by competent
    evidence.   See S.D. Warren Co., 
    2005 ME 27
    , ¶¶ 4, 22 n.10, 
    868 A.2d 210
    .
    Contrary to Watts’s arguments, the BEP properly construed and applied the water
    quality standards for Class GPA waters while balancing the lake’s designated uses,
    which include recreation, fishing, agriculture, hydroelectric power generation,
    drinking water supply, and habitat for fish and other aquatic life.        38 M.R.S.
    § 465-A(1)(A); see Bangor Hydro-Elec. Co., 
    595 A.2d at 442-43
    .
    [¶14] We therefore affirm the BEP’s decision with respect to the water level
    management of Sebago Lake.
    The entry is:
    Judgment affirmed.
    12
    On the briefs:
    Douglas H. Watts, pro se appellant
    Janet T. Mills, Attorney General, and Gerald D. Reid, Asst.
    Atty. Gen., Office of Attorney General, Augusta, for appellee
    Board of Environmental Protection
    Matthew D. Manahan, Esq., and Catherine R. Connors, Esq.,
    Pierce Atwood, LLP, Portland, for appellee S.D. Warren Co.
    Business and Consumer Docket docket number AP-2013-01
    FOR CLERK REFERENCE ONLY