Fingerle v. City of Ann Arbor ( 2014 )


Menu:
  •                             STATE OF MICHIGAN
    COURT OF APPEALS
    LAWRENCE FINGERLE,                                                    FOR PUBLICATION
    December 2, 2014
    Plaintiff-Appellee,
    v                                                                     No. 310352
    Washtenaw Circuit Court
    CITY OF ANN ARBOR,                                                    LC No. 11-000228-CZ
    Defendant-Appellant,
    and
    AMERICAN          FIRE       AND        CASUALTY
    COMPANY,
    Defendant.
    Before: BECKERING, P.J., and SAAD and O’CONNELL, JJ.
    BECKERING, P.J. (dissenting)
    With all due respect, I disagree with the analysis of my colleagues. The governmental
    tort liability act (GTLA), MCL 691.1401 et seq., provides a statutory framework that establishes
    when a governmental agency is liable for defects in its sewage disposal system. According to
    the express language of the GTLA, a governmental agency that knows, or in the exercise of
    reasonable diligence should know, about a defect in its sewage disposal system—whether it be a
    defect in the design or a malfunction—must take reasonable steps in a reasonable amount of time
    to repair, correct, or remedy the defect. Failure to do so exposes the governmental agency to
    liability for damages proximately caused by the defect. Here, plaintiff Lawrence Fingerle
    produced evidence to establish that the relief storm sewer system at issue contained defects in its
    design and construction, which defendant City of Ann Arbor1 knew about and had plenty of time
    to fix, that caused it to back up during a rainstorm and flood his home. I agree with the trial
    court’s finding that genuine issues of material fact exist, entitling plaintiff to a jury trial on the
    issues of defect and causation. Therefore, I would affirm the trial court’s denial of defendant’s
    motion for summary disposition under MCL 2.116(C)(7).
    I. STANDARD OF REVIEW
    1
    Although there are two defendants, City of Ann Arbor and American Fire and Casualty, the use
    of the word “defendant” in this opinion refers solely to City of Ann Arbor.
    -1-
    This Court reviews de novo both the applicability of governmental immunity and a trial
    court’s decision on a motion for summary disposition under MCR 2.116(C)(7). Roby v Mount
    Clemens, 
    274 Mich. App. 26
    , 28; 731 NW2d 494 (2006). “When reviewing a motion under MCR
    2.116(C)(7), a reviewing court must consider all affidavits, pleadings, and other documentary
    evidence submitted by the parties and construe the pleadings and evidence in favor of the
    nonmoving party.” Anzaldua v Neogen Corp, 
    292 Mich. App. 626
    , 629; 808 NW2d 804 (2011).
    See also Dextrom v Wexford Co, 
    287 Mich. App. 406
    , 428-429; 789 NW2d 211 (2010). “To
    overcome a motion brought under MCR 2.116(C)(7), the plaintiff must allege facts warranting
    the application of an exception to governmental immunity.” 
    Roby, 274 Mich. App. at 28-29
    . “If
    no facts are in dispute, or if reasonable minds could not differ regarding the legal effect of the
    facts, the question whether the claim is barred by governmental immunity is an issue of law.”
    Pierce v City of Lansing, 
    265 Mich. App. 174
    , 177; 694 NW2d 65 (2005).
    II. ANALYSIS
    Defendant argues that it was entitled to summary disposition under MCR 2.116(C)(7)
    because plaintiff failed to satisfy all of the elements of MCL 691.1416 through MCL 691.1419 in
    order to establish an exception to governmental immunity and that plaintiff failed to establish
    that defendant breached a duty under the circumstances presented in this case. I disagree.
    A. APPLICABILITY OF GTLA TO THIS CASE
    AND EXISTENCE OF A STATUTORY DUTY
    Absent the applicability of a statutory exception, the GTLA provides a broad grant of
    immunity from tort liability to government agencies that are engaged in the discharge or exercise
    of a governmental function. MCL 691.1407(1); Maskery v Univ of Mich Bd of Regents, 
    468 Mich. 609
    , 613; 664 NW2d 165 (2003). “MCL 691.1417(2) provides an exception to
    governmental immunity for sewage disposal system events . . . .” Linton v Arenac Co Rd Comm,
    
    273 Mich. App. 107
    , 114; 729 NW2d 883 (2006). The statute provides as follows, in pertinent
    part:
    A governmental agency is immune from tort liability for the overflow or backup
    of a sewage disposal system unless the overflow or backup is a sewage disposal
    system event and the governmental agency is an appropriate governmental
    agency. Sections 16 to 19 abrogate common law exceptions, if any, to immunity
    for the overflow or backup of a sewage disposal system and provide the sole
    remedy for obtaining any form of relief for damages or physical injuries caused
    by a sewage disposal system event regardless of the legal theory. [MCL
    691.1417(2).]
    Moreover, MCL 691.1417(3) states the following:
    If a claimant, including a claimant seeking noneconomic damages, believes that
    an event caused property damage or physical injury, the claimant may seek
    compensation for the property damage or physical injury from a governmental
    agency if the claimant shows that all of the following existed at the time of the
    event:
    -2-
    (a) The governmental agency was an appropriate governmental agency.
    (b) The sewage disposal system had a defect.
    (c) The governmental agency knew, or in the exercise of reasonable diligence
    should have known, about the defect.
    (d) The governmental agency, having the legal authority to do so, failed to take
    reasonable steps in a reasonable amount of time to repair, correct, or remedy the
    defect.
    (e) The defect was a substantial proximate cause of the event and the property
    damage or physical injury.
    “To successfully bring an action, a plaintiff cannot merely satisfy subsection 2 but must, instead,
    establish all the requirements of subsection 3.” Bosanic v Motz Dev, Inc, 
    277 Mich. App. 277
    ,
    282; 745 NW2d 513 (2007), citing Willett v Waterford Charter Twp, 
    271 Mich. App. 38
    , 49-50;
    718 NW2d 386 (2006). Moreover, the statute provides not only an exception to immunity if its
    requirements are satisfied, but also a cause of action. 
    Id. at 282-284.
    Bosanic rejects the idea
    that the statute itself does not provide a cause of action:
    The drain commissioner relies on an extremely strained reading of MCL
    691.1417 to contend that the statute does not itself provide plaintiffs any cause of
    action, but instead, some independent cause of action must be pleaded . . . . While
    the argument is difficult to comprehend or summarize, the contention is that the
    statute provides an exception to immunity if its requirements are satisfied, but
    only if there is some legal theory upon which a claim for damages is based. In
    other words, defendant argues that the statute does not itself provide a cause of
    action.
    A plain reading of subsection 2 itself does not support that conclusion and,
    when subsection 3 is also considered, that conclusion becomes even less tenable.
    [Id. at 282-283.]
    Thus, if plaintiff can establish the elements set forth in MCL 691.1417, he can recover for his
    losses.
    The majority views plaintiff’s action as being predicated on the idea that defendant did
    not build a storm water drainage system that would divert as much water as defendant said it
    would, amounting to an alleged breach of promise; thus, the majority concludes that plaintiff’s
    claim sounds in contract law, not tort law. As such, the majority concludes that the GTLA is
    completely inapplicable under the circumstances. I do not agree with this characterization of
    plaintiff’s case. Plaintiff has alleged, consistent with the plain language of the GTLA, defects in
    defendant’s storm sewer system of which defendant was aware or should have been aware, and
    which, according to plaintiff, proximately caused damage to his home. For instance, plaintiff
    alleged that the storm sewer at issue suffered from a host of defects, including: 1) inadequate
    design capacity for regularly recurring peak flows leading to recurring collection of storm water
    outside the detention easement; 2) inadequate inlet capacity resulting in storm water backup and
    -3-
    surface pooling; 3) drainage into the storm sewer from areas outside of the planned drainage area
    (including runoff from upstream development); 4) failure to increase capacity in response to
    increased load from upstream development; 5) inadequate or defective upstream detention; 6)
    misalignment in pipes and inlets; 7) inadequate capacity at downstream restrictions resulting in
    backup into the detention easement; and 8) failure to provide an adequate emergency storm water
    overflow route. These defects, according to plaintiff, proximately caused his damages. When
    examining plaintiff’s complaint, it is evident that the nature of the liability sought to be imposed
    is tort liability grounded in MCL 691.1417, not contract liability. See In re Bradley Estate, 
    494 Mich. 367
    , 383-385; 835 NW2d 545 (2013) (explaining that the GTLA requires courts to look
    past the label of a claim to the nature of the liability sought to be imposed).
    Defendant does not claim that plaintiff’s case sounds in contract. Instead, defendant
    essentially argues that because it owed no duty to build a storm sewer system in the first place,
    once it undertakes to build one it cannot be held to owe a duty to design and build an adequate
    one. But the plain language of the GTLA expressly requires a governmental agency to repair
    any defects—including defects in the design of the system. In direct contrast to the limitations
    on liability set forth in the GTLA’s public buildings exception, MCL 691.14062, and the public
    highway exception, MCL 691.1402(1)3, wherein the Legislature did not include design defects
    among the exceptions for which a governmental agency may be held liable, the GTLA expressly
    holds governmental agencies accountable for design defects. MCL 691.1416(e), which defines
    the language used in 691.1417 to MCL 691.1419, defines the word “defect” to mean “a
    construction, design, maintenance, operation, or repair defect.”4 For purposes of MCL
    2
    In Renny v Dept of Transp, 
    478 Mich. 490
    , 500; 734 NW2d 518 (2007), our Supreme Court
    noted that “[t]he statutory language refers only to the governmental agency’s duty to ‘repair and
    maintain public buildings,’ and does not refer to any duty to design a public building. Therefore,
    to hold that the language of the statute includes a design defect claim is inconsistent with its
    plain language.” The Court further elaborated that
    “Design” is defined as “to conceive; invent; contrive.” By contrast, “repair”
    means “to restore to sound condition after damage or injury.” Similarly,
    “maintain” means “to keep up” or “to preserve.” Central to the definitions of
    ‘repair’ and ‘maintain’ is the notion of restoring or returning something, in this
    case a public building, to a prior state or condition. “Design” refers to the initial
    conception of the building, rather than its restoration. “Design” and “repair and
    maintain,” then, are unmistakably disparate concepts, and the Legislature’s sole
    use of “repair and maintain” unambiguously indicates that it did not intend to
    include design defect claims within the scope of the public building exception.
    [Id. at 500-501 (emphasis added, footnotes omitted).]
    3
    In Hanson v Board of County Road Com’rs of County of Mecosta, 
    465 Mich. 492
    , 501-502; 638
    NW2d 396 (2002), the Supreme Court noted that “[n]owhere in the statutory language is there a
    duty to install, to construct or to correct what may be perceived as a dangerous or defective
    ‘design.’ ” Moreover, it is not the province of this Court to make policy judgments or to protect
    against anomalous results.”
    4
    The Legislature’s decision to include design defects among those that a governmental agency
    must timely remedy or repair may be due to the fact that a defect in a sewage disposal system
    -4-
    691.1416(e), this Court has determined that a “defect” means “ ‘a fault or shortcoming;
    imperfection.’ ” 
    Willett, 271 Mich. App. at 51
    , quoting Random House Webster’s College
    Dictionary (1997).
    Here, plaintiff alleges shortcomings in the storm sewer’s design and construction, and the
    GTLA expressly provides a cause of action for such claims. MCL 691.1417. See also 
    Bosanic, 277 Mich. App. at 283
    (“[MCL 691.1417(3)] clearly provides that a ‘claimant may seek
    compensation’ if the listed requirements are satisfied. In sum, while some semantic challenges
    may exist, it is difficult to imagine a statutory scheme that more clearly provides a potential
    cause of action.”). Where the Legislature has made the policy choice to provide a theory of
    recovery in cases involving design defects in sewage disposal systems, this Court should not
    second-guess that decision. Wells Fargo Bank, NA v Cherryland Mall Ltd Partnership (On
    Remand), 
    300 Mich. App. 361
    , 376; 835 NW2d 593 (2013) (quotation omitted) (“the Legislature
    possesses superior tools and means for gathering facts, data, and opinion and assessing the will
    of the public.”). Put simply, defendant’s argument that it owed no duty to build a storm sewer
    system in the first place, and thus, it should not owe any duty to repair design defects in the
    system it builds, flies in the face of the plain language of the GTLA.
    Defendant also argues that it does not owe plaintiff a duty under the GTLA because the
    GTLA does not impose a duty on defendant to remove all naturally collecting surface water and
    rainwater from private property. I agree that the GTLA does not impose such a duty on
    defendant. And so does plaintiff, as this is not the duty that plaintiff is alleging, expressly or
    implicitly. Indeed, plaintiff expressly states the following in his brief on appeal:
    There is no general duty “to capture all storm water run-off from private
    property” and Plaintiff has not alleged one. Liability arises when a public storm
    sewer has a defect, the City has notice of the defect, the City fails to take
    reasonable steps to correct the defect, and the defect causes the plaintiff’s
    damages. MCL 691.1417(3). . . . [T]here is no need to consider abstract notions
    of “duty” that have not been alleged.
    Although defendant does not have a general duty to remove naturally collecting surface water
    and rainwater from private property, it is well established that a duty may be imposed on a
    defendant that “voluntarily assumed a function that it was under no legal obligation to assume.”
    Baker v Arbor Drugs, Inc, 
    215 Mich. App. 198
    , 205; 544 NW2d 727 (1996). In this case,
    defendant voluntarily undertook to construct, assess the residents for, become the operator of,
    and exert jurisdiction and control over the relief storm sewer system, which is a sewage disposal
    system under the GTLA. The documentary evidence submitted to the trial court illustrates that
    defendant implemented the relief storm sewer system to alleviate significant flooding, including
    basement flooding, by being able to accommodate a 24-hour 10-year storm event. Because
    defendant voluntarily assumed this function, it had a duty under the GTLA to take reasonable
    steps in a reasonable amount of time to repair, correct, or remedy a known defect in the system
    or a defect in the system that it should have known of through the exercise of reasonable
    diligence. See MCL 691.1417(3). Defendant’s failure to timely correct any known design or
    that is bad enough to cause damage to people or property, aside from being disgusting, can have
    serious health consequences to a significant number of people.
    -5-
    construction defects in the system exposed it to liability according to the plain language of the
    GLTA.
    To the extent the majority questions the applicability of the GTLA to sewage disposal
    events involving rainwater, I respectfully disagree. The majority suggests that defendant’s storm
    sewer is not a sewage disposal system under the plain language of MCL 691.1416(j), which
    provides as follows:
    “Sewage disposal system” means all interceptor sewers, storm sewers, sanitary
    sewers, combined sanitary and storm sewers, sewage treatment plants, and all
    other plants, works, instrumentalities, and properties used or useful in connection
    with the collection, treatment, and disposal of sewage and industrial wastes, and
    includes a storm water drain system under the jurisdiction and control of a
    governmental agency. [Emphasis added.]
    The majority construes the phrase “used or useful in connection with the collection, treatment,
    and disposal of sewage and industrial wastes” as modifying all types of sewers and systems
    listed in MCL 691.1416(j). Thus, the majority opines that an appropriate government agency
    only has a duty to repair, correct, or remedy defects in disposal systems that handle the
    collection, treatment, and disposal of sewage and industrial wastes. However, this Court has
    previously held, in a case involving flooding after heavy rainfall, that a “sewage disposal
    system” under the GTLA is not limited to instrumentalities dealing with sewage or waste matter.
    
    Linton, 273 Mich. App. at 121
    . Even if the majority were correct in construing the phrase “used
    or useful in connection with the collection, treatment, and disposal of sewage and industrial
    wastes” as modifying all types of sewers listed before it, it fails to account for critical language
    in the remainder of the statute; MCL 691.1416(j) specifically includes “a storm water drain
    system under the jurisdiction and control of a governmental agency” within the meaning of a
    sewage disposal system. The phrase “used or useful in connection with the collection, treatment,
    and disposal of sewage and industrial wastes” does not modify this later inclusion of a storm
    water drain system. A storm water drain system undoubtedly serves events involving rainwater;
    after all, storm water is rainwater; and, thus, the GTLA applies to events involving rainwater.
    Had the Legislature not wanted the GTLA exception to apply to rainwater, it would not have
    included the words “storm water” in the statute. As this Court explained in Linton, “if the
    Legislature had intended that the exception only apply to sewage, then it would [ ] not have made
    a point of specifically clarifying that the exception applies to ‘a storm water drain system.’ ” 
    Id. at 117.
    To interpret the statute otherwise would render nugatory the phrase “and includes a
    storm water drain system.” Defendant’s relief storm sewer system is “a storm water drain
    system under the jurisdiction and control of a governmental agency” and, thus, it is a sewage
    disposal system. MCL 691.1416(j).
    B. PLAINTIFF HAS PRESENTED EVIDENCE TO EITHER ESTABLISH OR CREATE
    GENUINE ISSUES OF MATERIAL FACT CONCERNING THE
    ELEMENTS SET FORTH IN MCL 691.1417(3)(a) THROUGH (e)
    Upon review of the evidence presented in this case, I would find that plaintiff has
    produced sufficient evidence to either establish or create genuine issues of material fact with
    -6-
    regard to the elements set forth in MCL 691.1417(a) through (e), which if met, would entitle
    plaintiff to recovery.
    1. MCL 691.1417(3)(a), APPROPRIATE GOVERNMENTAL AGENCY
    As noted above, MCL 691.1417(3)(a) requires plaintiff to establish that defendant was
    “an appropriate governmental agency.” Defendant argues that it is not “an appropriate
    governmental agency” for purposes of MCL 691.1417. I disagree.
    The Legislature defined the phrase, “appropriate governmental agency” to mean “a
    governmental agency that, at the time of a sewage disposal system event, owned or operated . . .
    the portion of the sewage disposal system that allegedly caused damage or physical injury.”
    MCL 691.1416(b). MCL 691.1416(j) defines a “sewage disposal system” to include “storm
    sewers” and “a storm water drain system under the jurisdiction and control of a governmental
    agency.”
    In this case, plaintiff alleges that the relief storm sewer system caused damage to his
    home during the June 2010 storm because the system was defective. The relief storm sewer
    system is a storm water drain system. See MCL 691.1416(j). There is evidence demonstrating
    that the relief storm sewer system is owned or operated by and under the jurisdiction and control
    of defendant. MCL 691.1416(b); MCL 691.1416(j). Specifically, the pleadings and
    documentary evidence demonstrate that defendant commissioned the relief storm sewer study in
    1989, constructed it in approximately 1991, and funded the construction through special
    assessments and improvement charges upon its residents. A map submitted to the trial court by
    defendant indicates that the relief storm sewer system is a public storm main. Defendant
    admitted in interrogatories that it maintains, repairs, and cleans the system, and there was
    evidence identifying the system as being under defendant’s jurisdiction and control.
    Defendant contends that it is not an “appropriate governmental agency” because there is
    no record evidence that the flooding of plaintiff’s basement was caused by an overflow of the
    relief storm sewer. This contention lacks merit. MCL 691.1416(b) includes as an appropriate
    governmental agency one that owned or operated a sewage disposal system that “allegedly”
    caused damage. Plaintiff’s complaint alleges that the relief storm sewer system caused damage
    to his home during the June 2010 storm; thus, defendant is an “appropriate government agency”
    under the facts of this case.5
    2. MCL 691.1417(3)(b), (c) & (d), DEFECT IN SEWAGE DISPOSAL SYSTEM
    ABOUT WHICH DEFENDANT EITHER KNEW OR SHOULD HAVE KNOWN AND
    WHICH DEFENDANT FAILED TO TAKE REASONABLE STEPS IN A REASONABLE
    AMOUNT OF TIME TO REPAIR, CORRECT, OR REMEDY
    5
    To the extent defendant’s argument challenges causation, such argument is relevant to MCL
    691.1417(3)(e), discussed infra.
    -7-
    Subsections (b) through (d) of MCL 691.1417(3) collectively prescribe the duty imposed
    on governmental agencies when a defect exists in one of their sewage disposal systems.
    Specifically, a government agency that owns or operates a sewage disposal system must take
    reasonable steps in a reasonable amount of time to repair, correct, or remedy a defect in the
    system that the agency either knew about or should have known about through the exercise of
    reasonable diligence.
    Here, as noted above, plaintiff identified a host of defects in defendant’s storm sewer,
    including: 1) inadequate design capacity for regularly recurring peak flows leading to recurring
    collection of storm water outside the detention easement; 2) inadequate inlet capacity resulting in
    storm water backup and surface pooling; 3) drainage into the storm sewer from areas outside of
    the planned drainage area (including runoff from upstream development); 4) failure to increase
    capacity in response to increased load from upstream development; 5) inadequate or defective
    upstream detention; 6) misalignment in pipes and inlets; 7) inadequate capacity at downstream
    restrictions resulting in backup into the detention easement; and 8) failure to provide an adequate
    emergency storm water overflow route. In support of his defect claims, plaintiff submitted
    evidence from Clif Seiber and Mark Pribak, civil engineers, and John and Nancy Yalonen,
    plaintiff’s neighbors.
    Seiber testified that the relief system was designed to accommodate a 24-hour 10-year
    storm event, but that the system failed to do so during the June 2010 storm. He opined that
    unless something was wrong with the system’s design, the amount of rainfall should not have
    caused flooding. Seiber identified several specific defects in the relief storm sewer system,
    including under-capacity catch basin covers and undersized piping. He explained that upstream
    water could not enter the relief storm sewer in sufficient rate flows. There was not capacity for
    23 acres of runoff. He opined that the catch basin covers restricted inlet capacity. And he
    explained that the design for the relief system included errors in the calculation of upstream
    runoff. Pribak testified specifically that the design of the relief sewer erroneously assumed a 4.4
    cubic feet per second (cfs) peak flow for a 10-year 24-hour storm, but that the actual expected
    peak rate of upstream flow is 35.7 cfs. Nancy Yalonen testified that defendant told her that the
    installation of the relief storm sewer system would “take care of your issue,” i.e., take care of the
    flooding problem.6 Yet, the Yalonens testified that they received no benefit from the relief
    system that they paid for through a special assessment—according to Nancy, “it never made
    things better.”
    In addition, plaintiff presented evidence that defendant knew or should have known about
    the defect in the relief storm sewer system. See MCL 691.1417(3)(c) (requiring the plaintiff to
    prove that the governmental agency “knew, or in the exercise of reasonable diligence should
    have known, about the defect.”). Notably, plaintiff’s neighbors testified that they repeatedly
    notified defendant, over an eight-year period, of severe flooding in the area. In addition, Seiber
    opined that, based on the persistent flooding, defendant should have known about serious design
    defects. Pribak, who was defendant’s expert witness, agreed that the repeated flooding “raises
    6
    Additionally, Cresson Slotten, the manager of defendant’s systems planning unit, testified that
    the relief storm sewer system was implemented in response to basement flooding and that the
    system was intended to alleviate flooding.
    -8-
    some indication that there’s something different going on with the system,” and that it was fair to
    say that the repeated flooding indicated a problem.
    Supporting defendant’s position that the relief storm sewer system did not contain a
    defect, Cresson Slotten, the manager of defendant’s systems planning unit, testified that he was
    involved in the construction of the relief system and that he was not aware that it had any
    problems or that it was not operating as designed. Similarly, Gerald Hancock, defendant’s storm
    water and floodplain programs coordinator, testified that he was not aware of any defects in the
    relief system. He also was not aware that the system could not handle the flow of northerly
    water from upstream. Hancock explained that the relief system was designed to handle a 10-year
    24-hour storm event. He testified that the June 2010 storm leading to the damage of plaintiff’s
    home was less than a 10-year storm event over the course of 24 hours. Suggesting an
    explanation for why the relief system did not accommodate the June 2010 storm despite being
    designed to handle a 10-year 24-hour storm event, Hancock explained that there were peaks
    during the storm that exceeded a 10-year storm event.
    In light of this documentary evidence, I would find that reasonable minds could differ
    regarding whether the relief storm sewer system contained a fault, shortcoming, or imperfection,
    i.e., a defect, in design, particularly inadequate piping and inlet capacity, and whether defendant
    knew or should have known about such a defect. See MCL 691.1417(3); MCL 691.1416(e);
    
    Willett, 271 Mich. App. at 51
    . It is undisputed that nothing was done to repair the system or
    remedy the problem before plaintiff’s flooding incident. Therefore, I would conclude that the
    trial court properly denied defendant’s motion for summary disposition with regard to whether
    plaintiff submitted enough evidence to satisfy the elements set forth in MCL 691.1417(3)(b)
    though (d). See West v Gen Motors Corp, 
    469 Mich. 177
    , 183; 665 NW2d 468 (2003).
    3. MCL 691.1417(e), DEFECT AS A SUBSTANTIAL PROXIMATE CAUSE
    OF THE EVENT & PROPERTY DAMAGE
    Although the trial court determined causation to be a genuine issue of material fact and
    defendant does not raise this issue on appeal, the majority concludes that there is no causation.
    The GTLA requires that the defect in the sewage disposal system be “a substantial proximate
    cause of the event and the property damage or physical injury.” MCL 691.1417(3)(e). The
    GTLA defines a “substantial proximate cause” as “a proximate cause that was 50% or more of
    the cause of the event and the property damage or physical injury.”7 MCL 691.1416(l).
    Causation is generally a question for the trier of fact. Holton v A+ Ins Assoc, Inc, 
    255 Mich. App. 318
    , 326; 661 NW2d 248 (2003).
    Here, plaintiff produced documentary evidence of an accumulation of storm water onto
    his property that was caused by inadequate piping and inlet capacity, i.e., defects in the storm
    sewer. Seiber opined that had the defects in the relief system not been present, the relief system
    would have adequately accommodated the storm event that caused plaintiff’s flooding. Seiber
    opined that the predominate cause of plaintiff’s flooding was the inadequate design of the relief
    storm sewer system. And he concluded to a reasonable degree of professional certainty that the
    7
    Generally, proof of causation requires both cause in fact and proximate cause. Haliw v Sterling
    Hts, 
    464 Mich. 297
    , 310; 627 NW2d 581 (2001).
    -9-
    defects in the system were 50% or more of the cause of the flooding and damage. Defendant
    built the relief storm sewer system in response to flooding at Chaucer Court. And the
    documentary evidence illustrates that the system was intended to accommodate a 10-year 24-
    hour storm event. It is undisputed that the June 2010 storm was less than a 10-year 24-hour
    storm event. Thus, the evidence supports the conclusion that the June 2010 storm was
    reasonably foreseeable. An intervening cause is not a superseding cause if it was reasonably
    foreseeable. McMillan v Vliet, 
    422 Mich. 570
    , 576; 374 NW2d 679 (1985). Given the evidence
    in this case, I would conclude that whether the defect in the relief storm sewer system was a
    proximate cause that was 50% or more of the cause of the sewage disposal system event and
    plaintiff’s basement flooding, see MCL 691.1416(l), is a question for a jury to consider along
    with the fact that plaintiff built the basement window in an area with both a storm water
    detention basin and a history of flooding. Accordingly, I would conclude that the trial court
    properly denied defendant’s motion for summary disposition on the basis that causation was a
    genuine issue of material fact.
    C. MCL 691.1417(2), SEWAGE DISPOSAL SYSTEM EVENT
    Finally, although not addressed by the majority, I note that defendant raises the
    additional, unpreserved argument that plaintiff’s flooding was not the result of a “sewage
    disposal system event” under MCL 691.1417. See, generally, In re Smith Trust, 
    274 Mich. App. 283
    , 285; 731 NW2d 810 (2007) (“Because this argument was not raised in the trial court, it is
    not preserved.”). As this issue is unpreserved, I would decline to address it. See, generally,
    Wiggins v City of Burton, 
    291 Mich. App. 532
    , 574; 805 NW2d 517 (2011) (“We decline to
    address this issue for the first time on appeal.”); Bombalski v Auto Club Ins Ass’n, 
    247 Mich. App. 536
    , 546; 637 NW2d 251 (2001) (“We decline to address this unpreserved issue, which the trial
    court did not expressly consider.”). However, in the event this Court were to exercise its
    discretion to overlook the preservation requirements and review this issue, see generally Smith v
    Foerster-Bolser Constr, Inc, 
    269 Mich. App. 424
    , 427; 711 NW2d 421 (2006), I would conclude
    that defendant’s argument lacks merit.
    A “sewage disposal system event,” or simply an “event” as referred to in MCL
    691.1417, “means the overflow or backup of a sewage disposal system onto real property.”
    MCL 691.1416(k). The statute does not define the terms “overflow” or “backup.” Therefore,
    this Court may reference a dictionary to ascertain their plain meaning. See Willett, 271 Mich
    App at 51. See also Coventry Parkhomes Condo Ass’n v Fed Nat’l Mtg Ass’n, 
    298 Mich. App. 252
    , 259; 827 NW2d 379 (2012). “Overflow” is defined as “to flow or run over, as rivers or
    water,” “to have the contents flowing over or spilling,” “flood; inundate,” “to flow over the edge
    or brim of,” “something that flows or runs over,” and “a portion crowded out of an overfilled
    place.” Random House Webster’s College Dictionary (2005). “Backup” means “an
    accumulation due to stoppage.” 
    Id. In this
    case, Seiber concluded that upstream water could not enter the relief storm sewer
    system in sufficient rate flows because of inadequate design capacity of inlets and piping. Seiber
    noted that there were errors in the calculation of upstream runoff during the system’s design.
    During his deposition, Arthur Herold, another one of plaintiff’s neighbors, described the flow of
    upstream water to the two relief storm sewer drains (beehives) on his property:
    -10-
    Q. Now based on what you are saying, fair to say that when [the upstream
    water] hits your property it doesn’t all go into that intake drain?
    A. My experience is that very little of it goes into the intake drain.
    ***
    A. [A]nd so what happens is that the water hits the [first] drain, then as it
    can’t go down in and more and more water collects it starts going on either side of
    the drain and over the drain until finally it’s several feet on either side of the drain
    and the drain itself is buried under rushing water by several feet and then there is
    usually a huge vortex going on.
    ***
    A. [B]y the time the water hits that second beehive very, very little of it,
    in fact, there is never a vortex there. Very, very little of it actually goes into that
    system because the system is maxed out at that point. In other words, it has taken
    all the water it can get. There is no reserve left over once the water that starts at
    the beginning of it enters into that pipe at the first beehive. So by the time that
    water rushed down and around the property and gets to the second beehive there
    is very little capacity for that system . . . . And so that beehive never really
    exhibits that real profound entry sucking, vortex kind of thing happening in the
    first one.
    Q. And you are referring to the second?
    A. The second beehive.
    Q. The one that’s basically downstream of the water flow.
    A. Yeah, the pipe is filled is how it has been described.
    Q. How is it filled at that point if the water wasn’t getting in at the first
    beehive?
    A. Maybe I said this clumsily. Water enters into the beginning beehive,
    whatever water and it’s continually entering in, that’s the vortex.
    Q. Yes.
    A. Whatever water cannot enter in through that action goes over the
    beehive and then starts the aboveground process.
    ***
    A. So it’s sort of like it’s a pipe that comes around which is already filled
    by this first action. By the time it gets here the second beehive there is not like
    -11-
    not [sic] much capacity to drop more water into that system since the piping is
    already filled.
    This documentary evidence illustrates that there was a “backup” of the relief storm sewer
    system, i.e., an accumulation of water onto real property due to stoppage of the system, and,
    thus, a “sewage disposal system event” for purposes of MCL 691.1417. See MCL 691.1416(k).
    Specifically, there was a stoppage of storm-water intake into the relief storm sewer system due to
    the system’s inadequate capacity of inlets and piping, and the stoppage caused an accumulation
    of storm water. Therefore, defendant’s unpreserved argument that plaintiff’s flooding was not
    the result of a “sewage disposal system event” lacks merit.
    For the reasons provided in this dissenting opinion, I would affirm the trial court’s order
    denying defendant’s motion for summary disposition under MCR 2.116(C)(7).
    /s/ Jane M. Beckering
    -12-
    

Document Info

Docket Number: Docket 310352

Judges: Beckering, Saad, O'Connell

Filed Date: 12/2/2014

Precedential Status: Precedential

Modified Date: 11/10/2024