In re Application of Gourley Brothers, LLC for a Water Appropriation Permit. ( 2015 )


Menu:
  •                           This opinion will be unpublished and
    may not be cited except as provided by
    Minn. Stat. § 480A.08, subd. 3 (2014).
    STATE OF MINNESOTA
    IN COURT OF APPEALS
    A14-2141
    In re Application of Gourley Brothers, LLC
    for a Water Appropriation Permit.
    Filed August 24, 2015
    Affirmed
    Toussaint, Judge*
    Department of Natural Resources
    File No. 2013-1423
    Amanda P. Hungerford (pro hac vice), Washington, D.C. (for relators Russell Anderson,
    Katrina Downes, Travis Winter, Joel Walsh, Amy Walsh, and Mary Soupir)
    Amanda E. Prutzman, Eckberg, Lammers, Briggs, Wolff & Vierling, PLLP, Stillwater,
    Minnesota (for relators The Humane Society of the United States, Russell Anderson,
    Katrina Downes, Travis Winter, Joel Walsh, Amy Walsh, and Mary Soupir)
    Lori Swanson, Attorney General, Karen D. Olson, Assistant Attorney General, St. Paul,
    Minnesota (for respondent Minnesota Department of Natural Resources)
    Jack Y. Perry, Maren F. Grier, Briggs and Morgan, P.A., Minneapolis, Minnesota (for
    respondents Gourley Premium Pork, a/k/a Gourley Premium Pork, LLC, a/k/a Gourley
    Brothers, LLC)
    Considered and decided by Johnson, Presiding Judge; Kirk, Judge; and Toussaint,
    Judge.
    *
    Retired judge of the Minnesota Court of Appeals, serving by appointment pursuant to
    Minn. Const. art. VI, § 10.
    UNPUBLISHED OPINION
    TOUSSAINT, Judge
    Relators1 challenge respondent Minnesota Department of Natural Resources’
    (DNR) issuance of a water-appropriation permit, arguing that the DNR’s decision was
    arbitrary and capricious and its findings were not supported by substantial evidence. We
    affirm.
    FACTS
    In 2012, Gourley Brothers, LLC (Gourley) proposed to build a total-confinement,
    4,000-hog feedlot in Todd County.        The proposed feedlot underwent environmental
    review in 2012.       The Minnesota Pollution Control Agency (MPCA) completed an
    environment assessment worksheet (EAW) and determined that the feedlot did not have
    the potential for significant environmental effects, negating the need for an environmental
    impact statement (EIS).
    In May 2013, Gourley applied for a water-appropriation permit from the DNR.
    Included with the application was a “well and boring record” that identified the location
    of each well and provided geological information and information on the static water
    level of the aquifer. Gourley also submitted well pump test results for each well that
    indicated the drawdown and recovery rates of the aquifer when both wells were pumping
    water at the maximum rate. The DNR requested additional information from Gourley,
    including property tax information, and an estimate of daily and annual water usage,
    1
    Relators include the Humane Society of the United States (the humane society), Russell
    Anderson, Katrina Downes, Travis Winter, Joel Walsh, Amy Walsh, and Mary Soupir.
    2
    which Gourley provided. According to Gourley’s water usage estimates, the feedlot
    would use approximately 6.62 million gallons of water per year.
    In early October, the DNR issued Gourley a water-appropriation permit allowing
    the feedlot to use up to 8 million gallons of water annually. In November, relators
    requested a contested case hearing on the issuance of the permit under Minn. Stat.
    103G.311 (2014). DNR denied this request on the basis that relators are not one of the
    parties permitted to demand a hearing under Minn. Stat. 103G.311, subd 5(a). Relators
    petitioned for certiorari review of the DNR’s issuance of the permit, arguing the DNR
    inappropriately issued the permit without making factual findings. This court agreed,
    concluding that the DNR’s failure to provide any findings prevented meaningful
    appellate review of its decision. In re Gourley Bros., LLC, No. A13-2247, 
    2014 WL 4056063
    , at *5 (Minn. App. Aug. 18, 2014) (hereinafter “Gourley I”). Accordingly, this
    court remanded for additional findings. 
    Id. In September
    2014, DNR issued an amended
    water-appropriation permit that adopted and incorporated the MPCA’s findings from the
    EAW and negative declaration on the need for an EIS. This certiorari appeal follows.
    DECISION
    “[D]ecisions of administrative agencies enjoy a presumption of correctness, and
    deference should be shown by courts to the agencies’ expertise and their special
    knowledge in the field[s] of their technical training, education, and experience.” Reserve
    Mining Co. v. Herbst, 
    256 N.W.2d 808
    , 824 (Minn. 1977). This court’s role is to ensure
    the agency has taken a “hard look” at the salient issues and “genuinely engaged in
    reasoned decision-making.” 
    Id. at 825.
    We will not disturb an agency’s decision unless
    3
    it reflects an error of law, the findings are arbitrary and capricious, or the findings are not
    supported by substantial evidence. Citizens Advocating Responsible Dev. v. Kandiyohi
    Cnty. Bd. of Comm’rs, 
    713 N.W.2d 817
    , 832 (Minn. 2006) (quotation omitted).
    “Substantial evidence consists of: (1) such relevant evidence as a reasonable mind
    might accept as adequate to support a conclusion; (2) more than a scintilla of evidence;
    (3) more than ‘some evidence’; (4) more than ‘any evidence’; and (5) evidence
    considered in its entirety.” 
    Id. (quotation omitted).
    An agency’s decision is arbitrary and
    capricious if the agency (a) relied on factors the legislature never intended it to consider,
    (b) entirely failed to consider an important aspect of the problem, (c) offered an
    explanation for the decision that runs counter to the evidence, or (d) rendered a decision
    so implausible that it could not be ascribed to a difference in view or the result of agency
    expertise. Watab Twp. Citizen All. v. Benton Cnty. Bd. of Comm’rs, 
    728 N.W.2d 82
    , 89
    (Minn. App. 2007), review denied (Minn. May 15, 2007).
    If an agency engages in reasoned decision-making, this court will affirm, even
    though it may have reached a different conclusion had it been the factfinder. Cable
    Commc’ns Bd. v. Nor-west Cable Commc’ns P'ship, 
    356 N.W.2d 658
    , 669 (Minn. 1984).
    The party challenging the agency decision has the burden of proving grounds for reversal.
    Markwardt v. State Water Res. Bd., 
    254 N.W.2d 371
    , 374 (Minn. 1977).
    Relators argue that the DNR’s decision to grant a water-appropriation permit was
    arbitrary and capricious because its findings on remand represent conclusory post-hoc
    rationalizations and “unsubstantiated assertions,” which demonstrate that the DNR failed
    4
    to conduct a meaningful review of the statutory factors it was required to consider. We
    disagree.
    A complete groundwater-use permit application requires the following:
    (1) a water well record . . . information on the
    subsurface geologic formations penetrated by the well and the
    formation or aquifer that will serve as the water source, and
    geologic information from test holes drilled to locate the site
    of the production well;
    (2) the maximum daily, seasonal, and annual pumpage
    rates and volumes being requested;
    (3) information on groundwater quality in terms of the
    measures of quality commonly specified for the proposed
    water use and details on water treatment necessary for the
    proposed use;
    (4) an inventory of existing wells within 1–1/2 miles of
    the proposed production well or within the area of influence,
    as determined by the commissioner. The inventory must
    include information on well locations, depths, geologic
    formations, depth of the pump or intake, pumping and
    nonpumping water levels, and details of well construction;
    [and]
    (5) the results of an aquifer test completed according to
    specifications approved by the commissioner. The test must
    be conducted at the maximum pumping rate requested in the
    application and for a length of time adequate to assess or
    predict impacts to other wells and surface water and
    groundwater resources. The permit applicant is responsible
    for all costs related to the aquifer test, including the
    construction of groundwater and surface water monitoring
    installations, and water level readings before, during, and
    after the aquifer test[.]
    Minn. Stat. § 103G.287, subd. 1(a) (2014). The DNR is permitted to waive any of the
    application requirements above “if the information provided with the application is
    adequate to determine whether the proposed appropriation and use of water is sustainable
    5
    and will protect ecosystems, water quality, and the ability of future generations to meet
    their own needs.” 
    Id., subd. 1(b)
    (2014).
    The DNR shall issue the water-appropriation permit if it concludes the applicant’s
    plans are “reasonable, practical, and will adequately protect public safety and promote the
    public welfare.” Minn. Stat. § 103G.315, subd. 3 (2014). The DNR shall make findings
    of fact on issues necessary for determination of the applications considered and those
    findings must be based on substantial evidence. 
    Id., subd. 2
    (2014). The DNR shall
    consider the following factors when reviewing an application:
    (1) the location and nature of the area involved and the
    type of appropriation and its impact on the availability,
    distribution, and condition of water and related land resources
    in the area involved;
    (2) the hydrology and hydraulics of the water
    resources involved and the capability of the resources to
    sustain the proposed appropriation based on existing and
    probable future use;
    (3) the probable effects on the environment including
    anticipated changes in the resources, unavoidable detrimental
    effects, and alternatives to the proposed appropriation;
    (4) the relationship, consistency, and compliance with
    existing federal, state, and local laws, rules, legal
    requirements, and water management plans;
    (5) the public health, safety, and welfare served or
    impacted by the proposed appropriation;
    (6) the quantity, quality, and timing of any waters
    returned after use and the impact on the receiving waters
    involved;
    (7) the efficiency of use and intended application of
    water conservation practices;
    (8) the comments of local and regional units of
    government, federal and state agencies, private persons, and
    other affected or interested parties;
    (9) the adequacy of state water resources availability
    when diversions of any waters of the state to any place
    outside of the state are proposed;
    6
    (10) the economic benefits of the proposed
    appropriation based on supporting data when supplied by the
    applicant.
    Minn. R. 6115.0670, subp. 2 (2013).
    The DNR expressly adopted the MPCA’s findings from its EAW and negative
    declaration, and relied heavily on them in justifying its decision to issue the permit.
    Such reliance on the MPCA’s findings is authorized by law. See Minn. R. 4410.7055
    (2013) (directing governmental bodies with permitting authority over a project to
    consider environmental review in making a decision to authorize the project); Minn. R.
    4410.0300, subp. 4 (2013) (identifying objectives of the environmental review process
    including the provision of usable information to “governmental decision makers . . .
    concerning the primary environmental effects of a proposed project”). And when the
    DNR’s findings are considered in conjunction with the adopted MPCA findings it is clear
    that the DNR’s decision was not arbitrary and capricious and based on substantial
    evidence in the record.
    First, the adopted MPCA findings as a whole support the determination that the
    feedlot’s water appropriation will not dangerously deplete the aquifer and is unlikely to
    contaminate the area’s water resources.      With regards to the impact on available
    groundwater, the EAW states:
    A review of published geologic and hydrogeologic
    data indicates that the water-bearing characteristics of the
    surficial aquifer (including recharge) and the nature of its
    existing use as a groundwater source, water use for this
    project is not expected to interfere with other groundwater
    uses.
    7
    The negative declaration also acknowledged that “[s]ignificant adverse impacts to water
    quantity are not expected.” Moreover, we disagree with relators’ assertion that the
    MPCA deferred to the DNR on the issue of groundwater quantity based on its
    acknowledgement that Gourley was required to secure a water-appropriation permit from
    the DNR. The substance of MPCA’s findings does not indicate that it deferred to the
    DNR to determine the groundwater impact of the project. Rather, it demonstrates that the
    MPCA was merely highlighting the fact that the water-appropriation permit provided a
    further mechanism to investigate and address any “well interference” that might arise in
    the future.
    Second, the EAW and negative declaration found that the feedlot would not
    negatively impact surface or groundwater quality. The MPCA specifically noted that the
    facility was a “total confinement” building with no access to surface water and “[t]he
    manure storage structures proposed will be concrete, will not be open to the environment,
    and are designed specifically to prevent contamination of groundwater.” The MPCA also
    highlighted the fact that the feedlot was required to meet a “zero discharge” standard as
    part of its 2011-2016 Feedlot General NPDES/SDS permit, which minimized, if not
    eliminated, the risk of water contamination.
    Third, in addition to adopting and discussing the MPCA findings above, the DNR
    identified other evidence in the record that supports its decision to issue the permit. With
    regard to the feedlot’s impact on water quantity and availability, the DNR noted that the
    pump test data indicates that the aquifer “is strong, stabilized at three feet of drawdown,
    and quickly recharged.”     The DNR further explained that this pump test data was
    8
    analyzed by a DNR Area Hydrologist who determined the proposed appropriation was
    sustainable. The DNR also stated that in completing this hydrological analysis it relied
    on the County Well Index and its well and boring records that included information about
    the wells’ location, depth, static water level, construction and geological analysis.
    Relators challenge the reliability of the DNR hydrologist’s calculations and the
    data she relied on in making those calculations.       The DNR’s findings indicate its
    hydrologist reviewed the data in the record, did not find it lacking and used it to
    determine the appropriation’s impact on the aquifer would not be detrimental. Such
    findings and determinations fall squarely within the realm of the agency’s technical
    training and expertise. We defer to the agency on such matters when, as is the case here,
    there is support in the record for its conclusions. Reserve 
    Mining, 256 N.W.2d at 824
    .
    The DNR’s findings also addressed the environmental and public health concerns
    raised by “Brooke Haworth, the Humane Society of the United States, the Socially
    Responsible Agricultural Project, and Minnesotans Fighting for Minnesota.” The DNR
    explained that “[t]he MPCA Findings specifically addressed the water quality and public
    health concerns raised in [the] comments” and the DNR relied on those findings, which
    “determined that the proposed project does not pose a significant environmental effect on
    groundwater or surface water quality.”      The DNR also addressed the commenters
    concerns about the impact on the aquifer, stating “[c]oncerns raised regarding the effect
    of the water appropriation on the water table” were not only addressed by the MPCA’s
    determination that the groundwater appropriation did not have the potential for
    9
    environmental effects, but also by the DNR’s hydrological analysis which showed that
    the proposed appropriation “was not likely to have a deleterious effect on the aquifer.”
    In sum, the DNR’s discussion of the evidence above demonstrates that its findings
    were more than conclusory post hoc rationalizations, as relators suggest. On remand, the
    DNR was directed to make findings and it did so in part by permissibly relying on the
    MPCA environmental review findings. Moreover, the DNR’s findings relied on its own
    hydrologist’s analysis of the evidence in the record. Such analysis is entitled to deference
    in this context as it addresses matters that fall directly within the DNR’s area of technical
    expertise. This analysis combined with the MPCA findings that the DNR properly relied
    upon demonstrate its decision to grant the water-appropriation permit was based on
    substantial evidence in the record. And when the DNR’s findings are examined as whole,
    along with the adopted MPCA findings, we are not left with the distinct impression its
    actions in this context were arbitrary and capricious. Accordingly, we affirm the DNR”s
    decision to grant the water-appropriation permit.
    Affirmed.
    10