Sullivan v. Continental Construction of Montana, LLC ( 2013 )


Menu:
  •                                                                                                 April 23 2013
    DA 12-0489
    IN THE SUPREME COURT OF THE STATE OF MONTANA
    
    2013 MT 106
    MICHAEL SULLIVAN,
    Plaintiff and Appellant,
    v.
    CONTINENTAL CONSTRUCTION
    OF MONTANA, LLC,
    Defendant and Appellee.
    APPEAL FROM:            District Court of the Eighteenth Judicial District,
    In and For the County of Gallatin, Cause No. DV 11-119A
    Honorable Holly Brown, Presiding Judge
    COUNSEL OF RECORD:
    For Appellant:
    Todd Shea, Shea Law Firm, P.L.L.C.; Bozeman, Montana
    For Appellee:
    Edmond E. Koester; Coleman, Yovanovich & Koester, P.A.; Naples,
    Florida
    Dennis P. Clarke; Smith, Walsh, Clarke & Gregoire, PLLP; Great Falls,
    Montana
    Submitted on Briefs: February 27, 2013
    Decided: April 23, 2013
    Filed:
    __________________________________________
    Clerk
    Justice Brian Morris delivered the Opinion of the Court.
    ¶1     Michael Sullivan (Sullivan) filed a wrongful discharge action in the Eighteenth
    Judicial District, Gallatin County. The District Court granted summary judgment in favor of
    Continental Construction of Montana, LLC (Continental Construction). Sullivan appeals.
    We affirm.
    ¶2     Sullivan presents the following issues on appeal:
    ¶3     Whether the District Court properly concluded that Continental Construction had
    good cause to terminate Sullivan’s employment?
    ¶4     Whether Continental Construction improperly considered hearsay evidence in
    deciding to terminate Sullivan’s employment?
    ¶5     Whether the District Court improperly considered hearsay evidence in concluding
    that Continental Construction had good cause to terminate Sullivan’s employment?
    ¶6     Whether the District Court properly concluded that Continental Construction did not
    violate the provisions of its employee handbook when it terminated Sullivan’s employment?
    PROCEDURAL AND FACTUAL BACKGROUND
    ¶7     Continental Construction operates a construction company from its headquarters in
    Florida. Continental Construction hired Sullivan as a construction site supervisor in April
    2008. Sullivan directly supervised many of Continental Construction’s employees in
    Montana.     Sullivan also worked directly with many of Continental Construction’s
    subcontractors and clients.
    2
    ¶8     Sullivan left Montana on a scheduled vacation on October 21, 2010. John Cecil
    (Cecil), the Vice President of Construction for Continental Construction, travelled to
    Montana from Florida to replace Sullivan while Sullivan was on vacation. A group of
    Continental Construction employees approached Cecil that same day. The employees
    informed Cecil that they were unhappy with Sullivan as a supervisor. Cecil understood that
    these employees were threatening to quit unless Continental Construction immediately
    terminated Sullivan’s position as their supervisor.
    ¶9     Cecil called Peg Wilson (Wilson), Continental Construction’s office manager in
    Florida, to inform her of the employees’ dissatisfaction with Sullivan. Wilson instructed
    Cecil to interview each of the employees individually about their experiences with Sullivan.
    John Wallace (Wallace), the administrator for Continental Construction in Montana, helped
    Cecil conduct these interviews the following day, on October 22, 2010.
    ¶10    These interviews revealed that many employees felt that Sullivan routinely made
    demeaning and derogatory comments about Continental Construction’s management to both
    employees and non-employees. Sullivan also made derogatory and demeaning comments to
    employees and subcontractors about their work. Several employees reported that Sullivan
    often showed up late to work and would disappear for extended periods of time during the
    working shift. Many employees believed that Sullivan negatively affected employee morale.
    ¶11    Wallace e-mailed to Wilson copies of his notes from the employee interviews that
    same day. Wilson shared the notes with James Murphy (Murphy), the sole owner and
    president of Continental Construction, and Michael Kluck (Kluck), a Continental
    3
    Construction supervisor in Florida. Wilson, Murphy, and Kluck determined that Sullivan’s
    conduct did not meet the standards for Continental Construction supervisors. Wilson,
    Murphy, and Kluck decided to terminate Sullivan’s employment immediately.
    ¶12    Continental Construction contacted Sullivan by telephone on October 26, 2010, to
    notify him that his employment had been terminated. Continental Construction provided
    Sullivan with a letter that set forth the reasons for his discharge. The letter stated that
    Sullivan had been discharged for treating employees and subcontractors in a demeaning
    manner; for having frequent unexplained absences from work; for speaking to others in a
    derogatory manner about customers and employees; and for behaving in a manner that did
    not meet the standards of Continental Construction.
    ¶13    Sullivan filed an action that alleged that Continental Construction had violated the
    Montana Wrongful Discharge from Employment Act (WDEA), §§ 39-2-901 to 39-2-915,
    MCA. Continental Construction defended on the basis that it had terminated Sullivan’s
    employment for a valid business reason. Sullivan and Continental Construction filed cross-
    motions for summary judgment. The District Court granted Continental Construction’s
    motion for summary judgment. Sullivan appeals.
    STANDARD OF REVIEW
    ¶14    We review de novo a district court’s grant of summary judgment. McConkey v.
    Flathead Elec. Coop., 
    2005 MT 334
    , ¶ 19, 
    330 Mont. 48
    , 
    125 P.3d 1121
    . We apply the same
    method of evaluation applied by the district court. McConkey, ¶ 19. Summary judgment is
    proper if no genuine issues of material fact exist and the moving party is entitled to judgment
    4
    as a matter of law. McConkey, ¶ 19. The party seeking summary judgment possesses the
    burden of establishing a complete absence of any genuine issues of material fact. McConkey,
    ¶ 19. Once the moving party has met its burden, the opposing party must present material
    and substantial evidence, rather than mere conclusory or speculative statements, to raise a
    genuine issue of material fact. McConkey, ¶ 19.
    DISCUSSION
    ¶15    Sullivan argues that he raised genuine issues of material fact to suggest that
    Continental Construction violated WDEA when it terminated Sullivan. Sullivan first argues
    that he raised genuine issues of material fact to demonstrate that Continental Construction
    had discharged him without good cause, in violation of § 39-2-904(1)(b), MCA. Sullivan
    claims that the District Court improperly relied upon hearsay evidence in finding that
    Continental Construction possessed good cause. Sullivan further argues that he raised
    genuine issues of material fact to demonstrate that Continental Construction had not
    followed the provisions of its employee handbook when it terminated his employment, in
    violation of § 39-2-904(1)(c), MCA.
    ¶16    Whether the District Court properly concluded that Continental Construction had
    good cause to terminate Sullivan’s employment?
    ¶17    A discharge is wrongful if no good cause exists for the termination. Section 39-2-
    904(1)(b), MCA. Good cause includes a legitimate business reason. A legitimate business
    reason involves “a reason that is neither false, whimsical, arbitrary or capricious and it must
    5
    have some logical relationship to the needs of the business.” McConkey, ¶ 26 (quoting Buck
    v. Billings Mont. Chevrolet, Inc., 
    248 Mont. 276
    , 281-82, 
    811 P.2d 537
    , 540).
    ¶18   This Court has stressed the importance of the “right of an employer to exercise
    discretion” over whom “it will employ and keep in employment.” McConkey, ¶ 26 (quoting
    Buck, 248 Mont. at 282, 811 P.2d at 540). We afford employers the greatest discretion
    where an employee occupies a “sensitive” managerial position and exercises “broad
    discretion” in his job duties. McConkey, ¶ 26. We have emphasized that a court should not
    become involved in the day-to-day employment decisions of a business regarding its
    management. McConkey, ¶ 26 (quoting Buck, 248 Mont. at 282, 811 P.2d at 541).
    ¶19   This Court considered an employer’s desire to hire a trusted manager in Buck. Jim
    Buck (Buck) served as general manager at a Chevrolet dealership. Buck, 248 Mont. at 279,
    811 P.2d at 539. F.S. Enterprises purchased the dealership and promptly terminated Buck’s
    employment. Buck, 248 Mont. at 280, 811 P.2d at 539. F.S. Enterprises did not allege that
    Buck had engaged in any wrongful conduct that merited termination. In fact, Buck had been
    an exemplary employee. Buck, 248 Mont. at 279, 811 P.2d at 539. F.S. Enterprises
    nevertheless replaced Buck as general manager with a longtime employee of F.S.
    Enterprises.
    ¶20   The controlling stockholder of F.S. Enterprises lived in Louisiana. He wanted a long-
    term employee whom he trusted to manage his new investment in Montana. Buck, 248
    Mont. at 282, 811 P.2d at 541. This Court recognized that it would be “against common
    sense and rationality” to force F.S. Enterprises to “retain someone who it did not know or
    6
    perhaps even trust to manage a large dollar investment.” Buck, 248 Mont. at 282-83, 811
    P.2d at 541. This Court agreed that F.S. Enterprises possessed a legitimate business reason
    to terminate Buck. Buck, 248 Mont. at 283, 811 P.2d at 541.
    ¶21    The Court cautioned, however, that its determination applied only to employees who
    “occupy sensitive managerial or confidential positions” that “require the exercise of broad
    discretion.” Buck, 248 Mont. at 283, 811 P.2d at 541. A company’s interest in “running its
    business as it sees fit” would not apply to a decision to terminate a lower echelon employee.
    Buck, 248 Mont. at 283, 811 P.2d at 541.
    ¶22    This Court considered again in McConkey a firm’s interest in employing a manager
    whom it could trust. Warren McConkey (McConkey) served as the general manager of
    Flathead Electric Cooperative (FEC). McConkey, ¶ 8. McConkey convinced FEC to acquire
    another utility. McConkey, ¶ 9. FEC’s debt to equity ratio fell to the low single digits after
    FEC’s acquisition of the other utility. McConkey, ¶ 27. FEC also substantially increased its
    electricity rates, including 6.9% in 2000, 29% in April 2001, and 12.5% in October 2001.
    McConkey, ¶ 11. The FEC Board of Trustees voted unanimously in February 2002 to
    terminate McConkey’s employment as the general manager. McConkey, ¶ 14.
    ¶23    This Court determined that FEC possessed a legitimate business reason to terminate
    McConkey’s employment. McConkey, ¶ 31. FEC believed that McConkey’s managerial
    decisions had caused substantial damage to the company. McConkey, ¶ 31. FEC possessed
    broad discretion to terminate employment of a general manager if he failed to perform his
    job satisfactorily. McConkey, ¶ 31.
    7
    ¶24       Sullivan, similar to McConkey and Buck, occupied a managerial position within his
    company. Continental Construction’s executives work in Florida. Continental Construction
    argues that the lack of daily oversight from its Florida executives made it especially
    important to employ a trustworthy construction site manager in Montana. See Buck, 248
    Mont. at 282, 811 P.2d at 541.         Sullivan had engaged in activities that Continental
    Construction feared would cause substantial damage to the company. See McConkey, ¶ 31.
    ¶25       Continental Construction possessed broad discretion to terminate a person in an
    executive position, like Sullivan, if he had failed to fulfill his job requirements. See
    McConkey, ¶ 31. Continental Construction also possessed broad discretion to terminate
    Sullivan if it believed it could not trust him as a manager to run the day-to-day operations.
    See Buck, 248 Mont. at 282, 811 P.2d at 541. Here, Continental Construction concluded on
    the basis of its investigation that Sullivan had failed to fulfill the requirements of his
    managerial position and had failed to act in a trustworthy manner. We agree with the
    District Court that Continental Construction made what it determined to be a legitimate
    business decision to terminate Sullivan’s employment. We afford considerable discretion to
    Continental Construction’s decision. See McConkey, ¶ 31; Buck, 248 Mont. at 282, 811 P.2d
    at 541.
    ¶26       Sullivan argues that he raised genuine issues of material fact to suggest that
    Continental Construction lacked good cause to terminate his employment. Sullivan points to
    statements by other Continental Construction employees who indicated that Sullivan had not
    acted inappropriately in their presence. Sullivan also argued that he regularly had invited his
    8
    employees over to his house for dinner and recently organized a group golf trip for his
    employees.
    ¶27    The fact that not every Continental Construction employee complained about Sullivan
    failed to undermine the validity of Continental Construction’s conclusion that Sullivan’s
    continued employment could threaten its future viability in Montana. Similarly, the fact that
    Sullivan apparently treated some employees well does not challenge the validity of the
    complaints made by other Continental Construction employees. Sullivan failed to present
    material and substantial evidence to raise a genuine issue of material fact as to whether
    Continental Construction possessed a legitimate business reason to terminate Sullivan’s
    employment. McConkey, ¶ 19.
    ¶28    Whether Continental Construction improperly considered hearsay evidence in
    deciding to terminate Sullivan’s employment?
    ¶29    Sullivan argues that Continental Construction improperly relied upon hearsay
    statements from Continental Construction employees when it made the determination to
    terminate Sullivan’s employment. Sullivan points out that the Continental Construction
    managers who made the decision to terminate Sullivan’s employment never had spoken
    directly with the employees who had complained about Sullivan. Sullivan contends that
    Continental Construction acted arbitrarily and capriciously when it terminated Sullivan’s
    employment based entirely on hearsay statements detailed in the interview notes.
    ¶30    No legal authority supports the notion that a business cannot rely on hearsay
    statements when it makes a business judgment regarding whether to terminate an employee.
    9
    The Montana Rules of Evidence, which limit the admissibility of hearsay evidence, apply
    only to courts, not to private businesses. See M. R. Evid. 101. Further, it would have been
    impractical to have required Continental Construction’s managers in Florida to conduct in-
    person interviews with each employee in Montana before having made a determination
    whether to terminate Sullivan’s employment. Nothing prohibited Continental Construction
    from directing two of its employees to conduct interviews in Montana and report their
    findings to the management in Florida. Nothing prohibited Continental Construction from
    relying on these reports when it made its determination whether to terminate Sullivan’s
    employment.
    ¶31    Whether the District Court improperly considered hearsay evidence in concluding
    that Continental Construction had good cause to terminate Sullivan’s employment?
    ¶32    Sullivan next argues that the District Court improperly considered hearsay evidence as
    it determined whether Continental Construction possessed good cause to terminate Sullivan’s
    employment. Hearsay is a statement, other than one made by the declarant while testifying,
    offered into evidence to prove the truth of the matter asserted. M. R. Evid. 801. Evidence
    introduced for a purpose other than to establish the truth of the statement is not hearsay. See
    Moats Trucking Co. v. Gallatin Dairies, 
    231 Mont. 474
    , 479, 
    753 P.2d 883
    , 886 (1988).
    ¶33    Continental Construction submitted the depositions of Cecil, Wallace, Wilson,
    Murphy, and Kluck in support of its motion for summary judgment. These Continental
    Construction managers described having conducted interviews with employees, having taken
    notes, having submitted those notes to the Florida office, and the decisions made in the
    10
    Florida office based on those notes. Continental Construction also submitted the underlying
    interview notes. Continental Construction admits that this evidence would have represented
    inadmissible hearsay if Continental Construction had offered it to prove the truth of the
    allegations against Sullivan.
    ¶34    Continental Construction argues instead that it introduced the interview notes and
    depositions to explain its subsequent decision to terminate Sullivan’s employment.
    Continental Construction contends therefore that this evidence did not represent inadmissible
    hearsay. See Moats, 231 Mont. at 479, 
    753 P.2d at 886
    . We agree. The statements
    contained in the reports that Continental Construction received from its employees formed
    the basis for its decision to terminate Sullivan’s employment. The District Court properly
    considered this evidence when it determined that Continental Construction possessed a
    legitimate business reason that was not false, whimsical, arbitrary or capricious, when it
    terminated Sullivan’s employment. See Moats, 231 Mont. at 479, 
    753 P.2d at 886
    .
    ¶35    Continental Construction further argues that the WDEA does not require it to prove
    the truth of the allegations of bad behavior against Sullivan. In light of Sullivan’s
    managerial status and the employer’s basis for dismissing him, the WDEA requires the
    District Court to consider whether Continental Construction possessed a business reason that
    was not arbitrary or capricious to terminate Sullivan’s employment. McConkey, ¶ 26. The
    District Court properly considered whether Continental Construction, based on the
    information that it had before it, acted arbitrarily or capriciously when it terminated
    Sullivan’s employment. Sullivan has not argued or provided any evidence that Continental
    11
    Construction fabricated the employee reports as a pretext to terminate Sullivan’s
    employment or that Continental Construction otherwise acted in bad faith. Nothing in the
    WDEA requires the District Court to conduct independent fact-finding to determine the truth
    of the allegations against Sullivan under the facts presented here.
    ¶36    Sullivan further alleges that Continental Construction terminated his employment
    based on a mistake. Sullivan argues, as a result, that the District Court should have
    evaluated the truth of the allegations against Sullivan. Sullivan cites a Ninth Circuit
    decision, Marcy v. Delta Airlines, 
    166 F.3d 1279
     (9th Cir. 1999), for the proposition that the
    District Court needed to consider the truth of the allegations against Sullivan to conclude that
    Continental Construction had not terminated Sullivan’s employment based on a mistake.
    ¶37    The employer in Marcy terminated an employee after she had falsified her payroll
    records. The employee introduced evidence to suggest that she had falsified the payroll
    record inadvertently and therefore had been terminated based on a mistake. Marcy, 
    166 F.3d at 1280
    . The Ninth Circuit determined that Montana law precludes summary judgment when
    an employee claims that the employer terminated her employment based on a mistake, even
    if no evidence existed that the employer acted in bad faith. Marcy, 
    166 F.3d at 1287
    .
    ¶38    Sullivan has offered no evidence that Continental Construction decided to terminate
    Sullivan’s employment based on a mistake. Sullivan offered evidence that some employees
    and subcontractors stated that they had enjoyed working with Sullivan and that he had not
    acted inappropriately toward them.         Continental Construction possessed substantial
    conflicting evidence in the interview notes. Continental Construction made a business
    12
    judgment to terminate an employee who acted inappropriately some, but perhaps not all, of
    the time. No issue of mistake existed here. The WDEA does not require the District Court
    to conduct independent fact-finding to determine the truth of the allegations against Sullivan
    under the facts presented here.
    ¶39    Whether the District Court properly concluded that Continental Construction did not
    violate the provisions of its employee handbook when it terminated Sullivan’s employment?
    ¶40    Sullivan next argues that Continental Construction wrongfully discharged him when it
    violated the protocols set forth in the employee handbook. Continental Construction
    provided Sullivan with no prior written warning. Sullivan argues that the employee
    handbook required Continental Construction to give him two prior written warnings before
    Continental Construction could terminate his employment.
    ¶41    Continental Construction’s employee handbook provides that “[a] violation . . . will
    result in the issuance of a written warning unless the seriousness of the violation calls for a
    stronger disciplinary action.” The employee handbook lists “types of conduct” that may lead
    to disciplinary action “up to and including immediate termination of employment.” The
    employee handbook preserved Continental Construction’s right to terminate immediately an
    employee based on the “seriousness of the violation.”
    ¶42    Continental Construction’s employee handbook provided that Continental
    Construction could terminate Sullivan immediately for any of the reasons enumerated in its
    termination letter. The employee handbook stated that “excessive tardiness or absenteeism”
    could result in termination of employment. Engaging in “conduct detrimental to Continental
    13
    Construction and/or its efficient operation” could result in immediate termination. The
    employee handbook further provided that “this is not an all-inclusive listing of unacceptable
    behaviors. Other types of conduct will be evaluated and handled according to the severity of
    the conduct.”
    ¶43    A review of Continental Construction’s employee handbook demonstrates that no
    guarantee existed that Sullivan would receive two written warnings before Continental
    Construction could terminate his employment. The employee handbook provides that
    Continental Construction could terminate employees immediately for a variety of
    misconduct. This misconduct includes the types of activities for which Continental
    Construction terminated Sullivan’s employment.
    ¶44    Further, Continental Construction possessed more leeway in determining whether to
    give written warnings or to terminate Sullivan’s employment immediately after Continental
    Construction learned that Sullivan, a manager, had engaged continually in multiple
    violations of the employee handbook. This Court may have more closely scrutinized
    Continental Construction’s decision to terminate Sullivan’s employment immediately if
    Continental Construction had learned of only one violation, or had learned of a violation
    committed by a lower echelon employee. See Buck, 248 Mont. at 283, 811 P.2d at 541.
    ¶45    Sullivan next argues that Continental Construction violated the employee handbook
    by failing to provide Sullivan with a “fair” and “thorough” hearing before it terminated his
    employment. Continental Construction provided Sullivan with no chance to explain his
    actions before it made the decision to terminate his employment. The employee handbook
    14
    does not guarantee, as Sullivan argues, that Continental Construction will “fairly” and
    “thoroughly” discuss disciplinary matters with an employee before it terminates his
    employment. The employee handbook discusses “fair” and “thorough” in a section entitled
    Grievance Problem-Solving.        This section discusses the process that Continental
    Construction will follow when an employee complains about a problem that he is
    experiencing at work. The employee handbook does not discuss “fair” or “thorough” in
    relation to its disciplinary procedure.
    ¶46    Continental Construction attempted to address fairly and thoroughly concerns raised
    by its Montana employees regarding Sullivan’s conduct.           Continental Construction
    interviewed each employee individually and provided the notes taken during those
    interviews to the office in Florida. Continental Construction ultimately determined that the
    employees’ concerns merited the removal of their immediate supervisor, Sullivan.
    Continental Construction did not violate the provisions of its employee handbook in the
    manner that it terminated Sullivan’s employment.
    ¶47    Affirmed.
    /S/ BRIAN MORRIS
    We Concur:
    /S/ MIKE McGRATH
    /S/ MICHAEL E WHEAT
    /S/ LAURIE McKINNON
    /S/ BETH BAKER
    15