  •              IN THE COURT OF APPEALS OF NORTH CAROLINA
    Nos. COA19-533, COA19-534
    Filed: 31 December 2020
    Harnett County, Nos. 17 CVS 363, 17 CVS 1361
    ANDERSON CREEK PARTNERS, L.P.; ANDERSON CREEK INN, LLC;
    ANDERSON CREEK DEVELOPERS, LLC; FAIRWAY POINT, LLC; STONE
    CROSS, LLC d/b/a STONE CROSS ESTATES, LLC; RALPH HUFF HOLDINGS,
    LLC; WOODSHIRE PARTNERS, LLC; CRESTVIEW DEVELOPMENT, LLC;
    OAKMONT DEVELOPMENT PARTNERS, LLC; WELLCO CONTRACTORS, INC.;
    NORTH SOUTH PROPERTIES, LLC; W.S. WELLONS CORPORATION; ROLLING
    SPRINGS WATER COMPANY, INC.; and STAFFORD LAND COMPANY, INC.,
    Plaintiffs,
    v.
    COUNTY OF HARNETT, Defendant.
    PF DEVELOPMENT GROUP, LLC, Plaintiff,
    v.
    COUNTY OF HARNETT, Defendant.
    Consolidated appeal by Plaintiffs from order entered 26 November 2018 by
    Judge Michael J. O’Foghludha in Superior Court, Harnett County. Heard in the
    Court of Appeals 6 February 2020.
    Ferguson, Hayes, Hawkins & Demay, PLLC, by James R. DeMay, and
    Scarbrough & Scarbrough, PLLC, by James E. Scarbrough, Madeline J.
    Trilling, and John F. Scarbrough, for Plaintiffs-Appellants.
    Fox Rothschild LLP, by Kip David Nelson, Bradley M. Risinger, and Troy D.
    Shelton, and Christopher Appel, for Defendant-Appellee.
    McGEE, Chief Judge.
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    Plaintiffs Anderson Creek Partners, L.P., et al. (“Anderson Creek”), and PF
    Development Group, LLC (“PF Development”) (together, the “Developers”), each
    brought suit seeking refunds for fees paid to Defendant Harnett County (the
    “County”) for water and sewer services “to be furnished” to their future real estate
    developments. Each of the two cases was designated to be an exceptional civil case
    and the two cases were consolidated for a single decision in the trial court, as well as
    consolidated for appeal to this Court.
    The Developers appeal from the 26 November 2018 order of the trial court
    granting the County’s motion for judgment on the pleadings. The Developers contend
    that (1) the trial court erred by taking judicial notice of an interlocal agreement
    between the County and its water and sewer districts; (2) the pleadings presented
    material issues of fact with respect to whether the County was authorized to charge
    fees for services “to be furnished;” and (3) the pleadings presented a viable
    unconstitutional conditions claim.
    We hold (1) that the trial court did not err in taking judicial notice of the
    interlocal agreements because the agreements are public documents; (2) there were
    no issues of material fact in the pleadings with respect to whether the County had
    authority to charge prospective fees; and (3) the capacity use fees collected by the
    County are not subject to review under the unconstitutional conditions doctrine. We
    affirm the trial court’s order.
    -2-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    I. Factual and Procedural Background
    A. Interlocal Agreements and Assessment of Fees
    The Harnett County Board of Commissioners created a water and sewer
    district in Buies Creek (the “Buies Creek District”) to collect wastewater within the
    district.   The County and the Buies Creek District entered into an interlocal
    agreement in 1984 (the “1984 Buies Creek Agreement”), whereby the County agreed
    to operate the Buies Creek District’s water and sewer system. The 1984 Buies Creek
    Agreement was the subject of the North Carolina Supreme Court decision in McNeill
    v. Harnett County, 
    327 N.C. 552
    , 
    398 S.E.2d 475
     (1990). In McNeil, the North
    Carolina Supreme Court held that counties could lawfully enter into and act upon an
    interlocal agreement to operate a water and sewer system on behalf of a water and
    sewer district, and could exercise the water and sewer district’s “rights, powers, and
    functions” in carrying out those operations. 
    Id.
     at 559–60, 
    398 S.E.2d at 479
    .
    By 1998, the County created eight water and sewer districts (the “Districts”)
    to manage wastewater across its entire jurisdiction. The County and the Districts
    then entered into a joint interlocal agreement in May 1998 (the “1998 Agreement”),
    whereby the County agreed to administer the Districts’ water and sewer systems.
    Per the 1998 Agreement, the County and the Districts agreed that the County would
    lease the Districts’ property; the Districts would transfer their intangible assets to
    the County; the County would assume most of the Districts’ liabilities; and the
    -3-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    County would “administer all operations and maintenance” of the Districts’ water
    and sewer systems.
    The County then incorporated its duties under the 1998 Agreement into the
    Harnett County Water and Sewer Ordinance (the “Ordinance”). See Harnett County,
    N.C., Water and Sewer Ordinance (July 1, 2016) [hereinafter, Ordinance]. Pursuant
    to section 28(h) of the Ordinance, the County charges landowners “capacity use” fees
    (the “Fees”) for future water or sewer service as a mandatory condition prior to the
    County issuing approvals and/or permits for developments to real property.
    Ordinance § 28(h). The Fees for a single-family residential lot are a one-time, non-
    negotiable payment of $1,000 for water and $1,200 for sewer. Ordinance § 28(h).
    B. Anderson Creek’s Case
    The Developers each sought to build a number of residences in the County in
    or around 2017. Cumulatively, the County required the Developers to pay over
    $25,000 in Fees prior to issuing its approval for the Developers’ proposed plans.
    Anderson Creek filed a complaint against the County on 1 March 2017. The
    complaint initially alleged six claims for relief, requesting:
    (1) a declaration that the Ordinance and Fees were
    unlawful because the County exceeded its authority under
    
    N.C. Gen. Stat. § 153-277
     in adopting and enforcing the
    Ordinance and Fees, and/or because the Fees lacked an
    “essential nexus” and “rough proportionality” to the impact
    of the proposed developments on the County’s water and
    sewer systems;
    -4-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    (2) a declaration that the Ordinance and Fees violated the
    Developers’ rights to equal protection and substantive due
    process under Article I, Section 19 of the North Carolina
    Constitution;
    (3) a refund to the Developers of all fees exacted by the
    County, together with interest at the rate of 6% per annum
    pursuant to N.C. Gen. Stat. § 153A-324;
    (4) an award of costs, expenses, and attorneys’ fees
    pursuant to 
    N.C. Gen. Stat. § 6-21.7
     and/or other applicable
    law;
    (5) an accounting of all fees exacted by the County from the
    Developers; and
    (6) an order allowing any future Fees required to be paid
    into escrow pending the litigation resolution.
    The County filed an amended1 answer, counterclaims, and motion for sanctions
    in response to Anderson Creek’s complaint on 19 May 2017. Anderson Creek then
    filed a motion to amend its complaint on 23 August 2017. The trial court granted the
    motion, and Anderson Creek filed an amendment to its complaint asserting a seventh
    and eighth claim for relief:
    (7) alleging that the County breached the terms of a 4 April
    2018 agreement with Anderson Creek, specifically; and
    (8) requesting a declaration regarding the severability of a
    provision of the agreement with Anderson Creek relating
    to the payment of fees from Anderson Creek’s development
    properties.
    1 The County’s original answer, counterclaims, and motion for sanctions is not included in the
    record on appeal.
    -5-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    The Anderson Creek case was designated an exceptional civil case under Rule
    2.1 of the General Rules of Practice for the Superior and District Courts on 27
    September 2017 and was reassigned to another Superior Court Judge in Chatham
    County.
    The County filed an answer and counterclaim in response to Anderson Creek’s
    amended complaint on 1 February 2018.2 The County’s counterclaim requested a
    declaration that the 1998 Agreement gave the County authority to collect fees
    through the Ordinance.
    On 12 February 2018, the County filed a Rule 12(c) motion for judgment on the
    pleadings as to claims 1 through 6 and 8 of Anderson Creek’s amended complaint,
    and filed a motion to join necessary parties or, in the alternative, motion for
    permissive joinder of parties. The County attached to its motions the 1984 Buies
    Creek Agreement at issue in McNeill, as well as the subsequent 1998 Agreement.
    The motions were heard at the 6 August 2018 civil session of Chatham County,
    Superior Court.
    C. PF Development’s Case
    2 The record indicates that the trial court did not grant Anderson Creek’s motion to amend its
    complaint until 22 February 2018 and that Anderson Creek’s amended complaint was not filed until
    16 March 2018. According to these filing dates, the County filed its answer, counterclaims, and motion
    for judgment on the pleadings in response to Anderson Creek’s amended complaint over one week
    before the trial court granted the motion to amend and over a month before the amended complaint
    was filed. Nevertheless, the County’s answer, counterclaims, and motions evidence its receipt of the
    amended complaint and the parties do not bring any arguments regarding the timeliness or
    authenticity of the amended complaint.
    -6-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    PF Development’s complaint was filed against the County on 19 July 2017. Six
    claims for relief were alleged in PF Development’s complaint. These claims were
    identical to the claims raised in Anderson’s Creek initial complaint. The County filed
    an answer denying the material allegations of the complaint and a counterclaim for
    declaratory relief on 9 October 2017.         PF Development filed a reply to the
    counterclaim on 9 November 2017.
    The County filed a Rule 12(c) motion for judgment on the pleadings as to all
    six of PF Development’s claims, and a motion to join necessary parties or, in the
    alternative, motion for permissive joinder of parties on 12 February 2018. The PF
    Development case was designated an exceptional civil case on 4 October 2018 and
    also reassigned to the same Superior Court Judge in Chatham County.
    D. Consolidation for Decision and Appeal
    The Developers initially filed a motion to consolidate their cases before the trial
    court on 30 January 2018. After consideration of the pleadings, arguments of counsel
    at the 6 August 2018 hearing in Anderson Creek’s case, and materials submitted to
    the trial court, the trial court informed the Developers that the County’s Rule 12(c)
    motion would be partially allowed in Anderson Creek’s case. The Developers again
    filed a joint consent motion to consolidate their cases with the trial court on 5 October
    2018. The trial court entered an order granting the consent motion to consolidate on
    26 November 2018. The parties to the PF Development case elected to accept the
    -7-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    result of the Anderson Creek case and did not request additional oral argument for
    PF Development’s case.
    On 26 November 2018, the trial court entered an order (the “Consolidated
    Order”) resolving each case, granting: (1) in the Anderson Creek case, the County’s
    motion for judgment on the pleadings on claims 1 through 6 and 8 and dismissing
    each with prejudice; and (2) in the PF Development case, the County’s motion for
    judgment on the pleadings on all claims and dismissing all with prejudice. The
    Consolidated Order noted that the court had “taken judicial notice of public
    documents appended to [the County’s] Rule 12(c) Motion [] which are May 1998 and
    July 1984 Agreements entered into among and between [the County] and other North
    Carolina governmental units that are relevant to the matters involved in this action.”
    The Consolidated Order also stated that the County’s motions to join necessary
    parties or, in the alternative, motions for permissive joinder of parties in each of the
    Developers’ cases were moot based on its decision.           The Developers filed a
    consolidated notice of appeal on 21 December 2018.
    II. Analysis
    A. Judicial Notice of Public Contracts
    We first address the Developers’ argument that the trial court erred by (1)
    taking judicial notice of the 1984 Buies Creek Agreement and the 1998 Agreement,
    each of which the County attached to its motion for judgment on the pleadings, and
    -8-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    (2) considering the documents in the determination of its Consent Order.           The
    Developers contend that the Consent Order is, “in essence, a motion for summary
    judgment by ambush” because they were not “afford[ed] an opportunity to reasonably
    confront these documents.” Essentially, the Developers claim that they were unduly
    surprised by the County’s presentation of the agreements, and placed in the
    “untenable position” of having to “defend matters external to the allegations of their
    Complaint[.]” We disagree.
    The Developers are correct that “[i]f, on a motion for judgment on the
    pleadings, matters outside the pleadings are presented to and not excluded by the
    court, the motion shall be treated as one for summary judgment and disposed of as
    provided in Rule 56[.]” N.C. Gen. Stat. § 1A-1, Rule 12 (2017). However, in deciding
    a Rule 12(c) motion for judgment on the pleadings, our Court has held that “courts
    must consider the complaint in its entirety, as well as other sources courts ordinarily
    examine when ruling on Rule 12(b)(6) motions to dismiss, in particular, documents
    incorporated into the complaint by reference, and matters of which a court may take
    judicial notice.” QUB Studios, LLC, v. Marsh, 
    262 N.C. App. 251
    , 260, 
    822 S.E.2d 113
    , 120–21 (2018) (emphasis added) (adopting the United States Supreme Court’s
    language in Tellabs, Inc., v. Makor Issues & Rights, Ltd., 
    551 U.S. 308
    , 322, 
    168 L. Ed. 2d 179
    , 193 (2007)). To be clear, a court may take judicial notice of matters
    -9-
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    outside the pleadings, where appropriate, without causing the proceeding to convert
    from a Rule 12(c) motion to one for summary judgment under Rule 56. 
    Id.
    Judicial notice is appropriate where a fact is “not subject to reasonable dispute
    in that it is either (1) generally known within the territorial jurisdiction of the trial
    court or (2) capable of accurate and ready determination by resort to sources whose
    accuracy cannot reasonably be questioned.” N.C. Gen. Stat. § 8C-1, Rule 201 (2017).
    North Carolina Courts have long held that “important public documents will be
    judicially noticed.” State ex rel. Utils. Comm’n v. S. Bell Tel. & Tel. Co., 
    289 N.C. 286
    ,
    287, 
    221 S.E.2d 322
    , 323 (1976) (citing Staton v. Atl. Coast Line Rail Co., 
    144 N.C. 135
    , 145, 
    56 S.E. 794
    , 797 (1907)). “Important public documents” in this context have
    been held to include, among other things, a Utilities Commission order modifying a
    joint venture agreement, Town of Midland v. Morris, 
    209 N.C. App. 208
    , 214, 
    704 S.E.2d 329
    , 335 (2011); a vehicle insurance classification scheme composed by the
    North Carolina Rate Bureau, State ex rel. Com’r of Ins. v. N.C. Auto. Rate Admin.
    Office, 
    293 N.C. 365
    , 381, 
    239 S.E.2d 48
    , 58 (1977); and contractual agreements
    between a Native American tribe and both the state government and private entities,
    Hatcher v. Harrah’s N.C. Casino Co., LLC, 
    169 N.C. App. 151
    , 154, 
    610 S.E.2d 210
    ,
    212 (2005). “[A] trial court’s decision concerning judicial notice will not be overturned
    absent an abuse of discretion.” Muteff v. Invacare Corp., 
    218 N.C. App. 558
    , 568, 
    721 S.E.2d 379
    , 386 (2012) (citation omitted).
    - 10 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    The 1984 Buies Creek Agreement and the 1998 Agreement are public contracts
    between government entities, Harnett County and its municipal water and sewer
    districts.   See 
    N.C. Gen. Stat. § 132-1
     (2017) (defining documents created by
    municipalities, counties, and special districts “in connection with the transaction of
    public business” to be public records). These documents are subject to public review,
    
    N.C. Gen. Stat. § 132-1
    , and their existence is therefore “not subject to reasonable
    dispute.” The agreements are important public documents germane to the resolution
    of this case; indeed, some of the Developers reference—or even incorporate—the 1998
    Agreement in their pleadings. The Developers’ position was far from “untenable.”
    The trial court took judicial notice of the existence of the agreements and of the
    language therein, then interpreted that language as a matter of law.            It was,
    therefore, not an abuse of discretion for the trial court to take judicial notice of the
    1984 Buies Creek Agreement and the 1998 Agreement and to consider the documents
    in its review of the parties’ pleadings.
    B. Preemptive Collection of Fees
    The Developers primarily contend that the trial court erred in granting the
    County’s motion for judgment on the pleadings because the pleadings presented
    material issues of fact with respect to whether the County had authorization to
    prospectively collect fees for water and sewer services “to be furnished” in the future.
    - 11 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    We hold that the County had authority to collect prospective fees by virtue of the 1998
    Agreement.
    i. Standard of Review
    “We review de novo a trial court’s order granting a motion for judgment on the
    pleadings under Rule of Civil Procedure 12(c).” Tully v. City of Wilmington, 
    370 N.C. 527
    , 532, 
    810 S.E.2d 208
    , 213 (2018) (citation omitted). The moving party must show
    that, after considering all well-pleaded factual allegations in the nonmoving party’s
    pleadings as true, “no material issue of fact exists and that he is entitled to judgment
    as a matter of law.” 
    Id.
     A defendant moving for judgment on the pleadings must
    prove, essentially, that the plaintiff’s pleadings “fail[] to allege facts sufficient to state
    a cause of action or admit[] facts which constitute a complete legal bar to a cause of
    action.” CommScope Credit Union v. Butler & Burke, LLP, 
    369 N.C. 48
    , 51–52, 
    790 S.E.2d 657
    , 659–60 (2016) (citations and quotation marks omitted).
    This case also requires our review of two interlocal agreements between the
    parties. “Generally, ‘the purport of a written instrument is to be gathered from its
    four corners, and the four corners are to be ascertained from the language used in the
    instrument.’” China Grove 152, LLC, v. Town of China Grove, 
    242 N.C. App. 1
    , 9, 
    773 S.E.2d 566
    , 572 (2015) (citation omitted).
    ii. Authorization to Collect Prospective Fees
    - 12 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    A clear understanding of the question before us first requires discussion of the
    statutes and seminal cases which comprise the relevant fee-collecting authority of the
    municipal entities involved. Municipalities are entities born purely from “legislative
    will” and have no authority or powers apart from those given to them by the General
    Assembly. Lutterloh v. City of Fayetteville, 
    149 N.C. 65
    , 69, 
    62 S.E. 758
    , 760 (1908)
    (citations omitted). The General Assembly allows for the creation of municipalities
    and expressly delegates powers and authorities to them via enabling statutes. N.C.
    Const. art. VII, § 1; Lanvale Props., LLC, v. County of Cabarrus, 
    366 N.C. 142
    , 150,
    
    731 S.E.2d 800
    , 807 (2012) (citations omitted). Acts taken by a municipality that
    extend beyond the scope of the powers and authorities statutorily granted to it are
    void.   City of Asheville v. Herbert, 
    190 N.C. 732
    , 735, 
    130 S.E. 861
    , 863 (1925)
    (citations omitted).
    When the Developers sought development permits in early 2017, the County
    had the statutory authority only to collect fees for past and present “services
    furnished.” The governing statute then stated:
    A county may establish and revise from time to time
    schedules of rents, rates, fees, charges, and penalties for
    the use of or the services furnished by a public enterprise.
    N.C. Gen. Stat. § 153A-277(a) (2015) (emphasis added).
    The North Carolina Supreme Court held that a nearly identical statute
    regarding the fee-collecting authorities of cities did not authorize the collection of
    - 13 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    prospective impact fees in its 2016 decision in Quality Built Homes Inc. v. Town of
    Carthage, 
    369 N.C. 15
    , 
    789 S.E.2d 454
     (2016). In Quality Built Homes, the town of
    Carthage required developers to pay a progressively scaling fee prior to final approval
    of the developers’ plats and building permits. 
    Id. at 17
    , 
    789 S.E.2d at 456
    . Carthage
    claimed authority to charge these prospective fees under N.C. Gen. Stat. § 160A-314,
    which then read:
    A city may establish and revise from time to time schedules
    of rents, rates, fees, charges, and penalties for the use of or
    the services furnished by a public enterprise.
    N.C. Gen. Stat. § 160A-314 (2015) (emphasis added). Our Supreme Court held the
    plain language of N.C. Gen. Stat. § 160A-314 “clearly and unambiguously
    empower[ed] Carthage to charge for the contemporaneous use of water and sewer
    services—not to collect fees for future [] spending.” Id. at 20, 
    789 S.E.2d at 458
    (emphasis added) (citation omitted). The statute’s provisions were “operative in the
    present tense.” 
    Id.
    Our Court addressed similar language enabling a utilities commission to
    collect fees in Kidd Construction Group, LLC, v. Greenville Utilities Commission, ___
    N.C. App. ___, 
    845 S.E.2d 797
     (2020). In Kidd, the Greenville Utilities Commission
    (the “GUC”), a local government entity created by our General Assembly to provide
    water and sewer services to Pitt County, collected prospective capacity fees “as a
    precondition to development approval, to the issuance of building permits, and to
    - 14 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    receiving service.” 
    Id.
     at ___, 845 S.E.2d at 799. The charter establishing creation of
    the GUC and outlining its powers authorized the GUC to “fix uniform rates for all
    services rendered[.]” Id. at ___, 845 S.E.2d at 801. This Court held that the operative
    language in GUC’s charter was “functionally equivalent” and “nearly identical” to the
    enabling language at issue in Quality Built Homes, and “also fail[ed] to confer
    prospective charging authority by lacking the critical ‘to be’ language.” Id. (“Just as
    the ‘services furnished’ language did not empower Carthage to impose impact fees
    prior to any service being provided, so too does ‘services rendered’ fail to empower
    GUC to impose impact fees on builders and developers as a condition of final
    development approval.” (citation omitted)).
    The only difference between the text of N.C. Gen. Stat. § 160A-314 reviewed in
    Quality Built Homes and the text of N.C. Gen. Stat. § 153A-277(a) subject to our
    review in this case is the substitution of the word “city” for “county.” We interpret
    the nearly identical, plain language of N.C. Gen. Stat. § 153A-277(a) in the same
    manner. N.C. Gen. Stat. § 153A-277(a) authorized the County only to assess fees for
    the “contemporaneous use” of its water and sewer systems, and otherwise “clearly
    and unambiguously fail[ed] to give [the County] the essential prospective charging
    power necessary to assess [the Fees].” Quality Built Homes, 
    369 N.C. at 22
    , 
    789 S.E.2d at 459
    .
    - 15 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    In response to the Quality Built Homes decision, our General Assembly
    modified both N.C. Gen. Stat. § 153A-277(a) and N.C. Gen. Stat. § 160A-314 to
    authorize counties and cities to collect fees for “services furnished or to be furnished
    by any public enterprise.” N.C. Gen. Stat. § 153A-277(a) (2019); N.C. Gen. Stat. §
    160A-314 (2019). The General Assembly thus amended each statute to permit the
    prospective fee-collecting acts complained of here. The amended language of N.C.
    Gen. Stat. § 153A-277(a) became effective 1 October 2017; however, the General
    Assembly specified that “[n]othing in th[e] act provides retroactive authority for any
    system development fee, or any similar fee for water or sewer services to be furnished,
    collected by a local governmental unit prior to October 1, 2017.” PUBLIC WATER
    AND SEWER SYSTEM DEVELOPMENT FEE ACT, 2017 North Carolina Laws S.L.
    2017-138 (H.B. 436).
    The Districts, on the other hand, were authorized to collect prospective fees in
    2016. Each of the Districts involved in this case are water and sewer districts created
    under chapter 162A of the North Carolina General Statutes and governed by the
    Harnett County Board of Commissioners. Water and sewer districts are bodies
    corporate and politic which are and were, at all times relevant to this case, authorized
    to “contract and be contracted with” and to “establish, revise and collect rates, fees or
    other charges and penalties for the use of or the services furnished or to be
    furnished[.]” N.C. Gen. Stat. § 162A-88 (2015) (emphasis added). Unlike the versions
    - 16 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    of N.C. Gen. Stat. §§ 153A-277 and 160A-314 in effect when the Developers were
    required to pay the Fees, N.C. Gen. Stat. § 162A-88 “included the language ‘services
    furnished and to be furnished’ and thus ‘plainly allowed the charge for prospective
    services[.]’” Kidd, ___ N.C. App. at ___, 845 S.E.2d at 800 (quoting Quality Built
    Homes, 
    369 N.C. at 20
    , 
    789 S.E.2d at 458
    ) (distinguishing N.C. Gen. Stat. § 160A-314
    (2015) and N.C. Gen. Stat. § 162A-88 (2015)).
    Additionally, local government entities may generally cooperate through
    interlocal agreements to carry out their purposes. See N.C. Gen. Stat. §§ 153A-275,
    153A-278 (2015). Our Supreme Court has made it clear that a county may contract
    with another local government entity to enable the county to exercise authority given
    to that entity. Specifically, this issue has been addressed with respect to the County
    and its water and sewer districts. In McNeil v. Harnett County, our Supreme Court
    held that the 1984 Buies Creek Agreement—the prior interlocal agreement between
    the County and the Buies Creek District, one of the Districts in this case—properly
    enabled the County to exercise all “rights, powers, and functions granted to water
    and sewer districts as found in N.C.G.S. § 162A-88[.]” McNeill, 
    327 N.C. at 559
    , 
    398 S.E.2d at 479
    .
    At all times relevant to this action, counties did not have the authority to
    collect prospective fees themselves. However, the Districts each had the authority to
    collect prospective fees and were free to contract with the County to enable the
    - 17 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    County to collect prospective fees by exercising the statutory authority of the
    Districts. Therefore, the only way the County could have had the authority to charge
    any prospective fees would be pursuant to an interlocal agreement through which the
    County could exercise authority held by the Districts.3
    iii. Issues of Fact
    Having explained that the County may only collect fees for services “to be
    furnished” by virtue of an interlocal agreement granting such rights, the question
    before this Court is whether the 1998 Agreement did grant the County the Districts’
    authority to collect prospective fees under N.C. Gen. Stat. § 162A-88.
    In McNeil, our Supreme Court held that the County could lawfully enter into
    and act under an interlocal agreement to operate a water and sewer system on behalf
    of its water and sewer districts:
    [P]ursuant to an interlocal cooperative agreement and
    pursuant to authority granted in article 15 of chapter
    153A, a county may, among other things, operate a water
    and/or sewer system for and on behalf of another unit of
    local government, such as a water and sewer district, and
    in conjunction therewith may exercise those rights, powers,
    and functions granted to water and sewer districts as found
    in N.C.G.S. § 162A-88 and those rights, powers, and
    3 We note that the impact fees charged in Quality Built Homes were assessed on a progressively
    scaling basis, whereas the Fees charged by the County in the present case are flat and non-negotiable
    charges which the County deems “capacity use” fees. This difference is not material to our
    consideration of the County’s prospective fee-collecting authority. The Fees charged by the County
    here are “not assessed at the time of actual use, but are payable in full at the time of final subdivision
    plat approval—a time when water, sewer, or other infrastructure might not have been built and only
    a recorded plat exists” and “requir[e] [the County] to invoke prospective charging power” for future
    services. Quality Built Homes, 
    369 N.C. at 21
    , 789 S.E.2d at 458–59 (quotation marks and brackets
    omitted).
    - 18 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    functions granted to counties in N.C.G.S. ch. 153A, art. 15.
    McNeil, 
    327 N.C. at 559
    , 
    398 S.E.2d at 479
    . The McNeil Court recognized that the
    County and the Buies Creek District had entered into the 1984 Buies Creek
    Agreement “on 23 July 1984 wherein it was agreed that the [Buies Creek District’s]
    sewer system, which had been completed that year, would be operated by Harnett
    County through its Department of Public Utilities.” 
    Id.
     The McNeil Court held that,
    pursuant to the 1984 Buies Creek Agreement, the County was “clothed” with “those
    powers granted to the [Buies Creek District] in N.C.G.S. § 162A-88[,]” as well as
    “those powers set forth in chapter 153A, article 15 of the General Statutes[.]” Id.
    Therefore, the 1984 Buies Creek Agreement granted the County the power, among
    other things, to “establish, revise and collect rates, fees or other charges and penalties
    for the use of or the services furnished or to be furnished by any sanitary sewer
    system, water system or sanitary sewer and water system” and to “exercise those
    powers[.]” N.C. Gen. Stat. § 162A-88 (emphasis added); McNeil, 
    327 N.C. at 559
    , 
    398 S.E.2d at 479
    .
    The terms of the 1984 Buies Creek Agreement stated, in relevant part, that
    the County and the Buies Creek District “agreed to enter into [the] contract for . . .
    the operation of the wastewater collection system as a County operated sewer and
    wastewater collection system[.]” The contract provided that a newly constructed
    “wastewater treatment plant owned by the County” would be operated by the County
    - 19 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    to serve the sewer and wastewater needs of the Buies Creek District. In so doing, the
    County was “entitled to fund or cause to be funded the construction of any sewer line
    to be connected to the [Buies Creek District’s] system as an extension . . . for the
    purpose of serving needy users with wastewater utility services[.]” Notably, the 1984
    Buies Creek Agreement made no direct reference to N.C. Gen. Stat. § 162A-88.
    The 1998 Agreement provides the County with substantially the same rights
    as it was granted in the 1984 Buies Creek Agreement and more clearly incorporates
    the Districts’ prospective fee-collecting authority. The 1998 Agreement opens by
    acknowledging that it exists pursuant to statutory authority, which includes a
    number of statutes “[w]ithout limitation.” The enumerated statutory authorities
    include the authority of “two or more . . . units of local government [to] cooperate” in
    the “joint provision of enterprisory services” as granted by N.C. Gen. Stat. § 153A-
    278. The 1998 Agreement then expressly recognizes that the Districts have the
    ability to assess fees for “services furnished or to be furnished” pursuant to N.C. Gen.
    Stat. § 162A-88. In a section labeled “Purpose of the Agreement,” the 1998 Agreement
    states that its purpose is to “provide a cost efficient method for the administration,
    operation, maintenance and expansion of water and . . . wastewater services to each
    of the Districts through [the County’s] Department of Public Utilities.” Like the 1984
    Buies Creek Agreement, the 1998 Agreement does not make a specific reference to
    the County’s receipt of the Districts’ authority to collect prospective fees, but does
    - 20 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    wholly acknowledge an intent between the parties to have the County step into the
    Districts’ shoes to efficiently provide water and sewer services throughout each
    District. We therefore hold that the 1998 Agreement granted the County the ability
    to exercise the Districts’ prospective fee-collecting authority, and that the pleadings
    failed to present a material issue of fact regarding the County’s authority to collect
    prospective fees.
    The Developers’ argue that this case turns, instead, on a different issue:
    whether the pleadings show a material issue of fact regarding how the County
    assessed the Fees, either by managing the Districts’ infrastructure or by operating
    its own county infrastructure. In the Developers’ view, this case presents a “complex
    puzzle regarding the Ordinance, the Fees, and the true relationship of the County
    and the Districts in the provision of water and sewer service.” The Developers
    contend the County had no authority to collect the Fees because “[t]he clear inference
    from the [1998 Agreement] is that the County is operating its own, countywide water
    and sewer system—not the systems of the Districts.”
    We disagree with the Developers’ statement of the issue in this case. The
    pleadings may show an issue of fact with respect to whose infrastructure the County
    used to assess the Fees, and whether the District even maintained any water and
    sewer system of its own, but these issues are not material to the resolution of this
    case. Regardless of whether the County is operating its own physical water and sewer
    - 21 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    infrastructure, the Districts’ infrastructure, infrastructure it acquired from the
    Districts, or a combination thereof, the issue is whether the County had the authority
    to use any means to assess prospective fees for water and sewer services to be
    furnished in the future.4 Indeed, the McNeil Court found that the County had this
    authority where the 1984 Buies Creek Agreement specified that the County would
    operate a “wastewater treatment plant owned by the County” and a “wastewater
    treatment facility owned by the County[,]” which were located within the boundaries
    of the Buies Creek District and thereafter referred to as “the [Buies Creek District’s]
    wastewater collection system” and “the [Buies Creek District’s] wastewater
    treatment facility[.]” It was immaterial to the holding of McNeil that the County
    owned the infrastructure used. We hold that the 1998 Agreement gave the County
    the rights to exercise the Districts’ fee-collecting authority—by any legal means—and
    therefore affirm the Consolidated Order.
    4 After hearing arguments from counsel regarding the County’s motion for judgment on the
    pleadings, the trial court properly understood the issue in this case to be the same:
    Legally, it doesn’t matter how they do it; legally, it matters can they
    legally do it? But, how they do it doesn’t matter. Isn’t that kind of
    irrelevant?
    ....
    They have to have the authority, but, as long as they continue to have
    the authority, that’s—that’s the legal threshold issue.
    ....
    [T]he threshold issue for me to decide in this case is whether the [1998
    Agreement] is legally—legally different than the [1984 Buies Creek
    Agreement] and whether the [1998 Agreement] is not done pursuant to
    [N.C. Gen. Stat. § 162A].
    (Emphasis added).
    - 22 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    C. Unconstitutional Conditions Doctrine
    Lastly, the Developers argue that the pleadings presented a material issue of
    fact of whether assessment of the Fees constituted an unconstitutional condition
    under the United States Supreme Court’s decision in Koontz v. St. Johns River Water
    Management District, 
    570 U.S. 595
    , 
    186 L. Ed. 2d 697
     (2013). The Developers’
    pleadings claim that, assuming the County had the authority to assess the Fees, the
    Fees were nonetheless an unconstitutional condition on the exercise of their property
    rights. Thus, this Court is asked to determine whether a generally applicable fee
    assessed as a condition precedent to approval of a land-use permit warrants review
    under the “unconstitutional conditions doctrine.” For the reasons below, we hold that
    it does not and further affirm the Consolidated Order.
    The “unconstitutional conditions doctrine” rests on the principle that “the
    government may not deny a benefit to a person because he exercises a constitutional
    right,” Regan v. Taxation With Representation of Wash., 
    461 U.S. 540
    , 545, 
    76 L. Ed. 2d 129
    , 136–37 (1983) (citation omitted), and works to “vindicate[] the Constitution’s
    enumerated rights by preventing the government from coercing people into giving
    them up[,]” Koontz, 
    570 U.S. at 604
    , 
    186 L. Ed. 2d at 708
    . The United States Supreme
    Court has held that the unconstitutional conditions doctrine is particularly relevant
    in the context of the land-use permitting process, as landowners are especially
    vulnerable   to   the   government’s    broad      discretion   in   imposing   potentially
    - 23 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    “[e]xtortionate demands” on the grant of land-use permits. Koontz, 
    570 U.S. at 605
    ,
    
    186 L. Ed. 2d at 708
    . Government conditions that request the landowner deed land
    as an easement or designate a portion of his or her land for a particular use “can
    pressure an owner into voluntarily giving up property for which the Fifth Amendment
    would otherwise require just compensation.” Id.; U.S. Const. amend. V. However,
    where a landowner’s proposed use of real property “threaten[s] to impose costs on the
    public” the government may constitutionally require the landowner to “internalize
    the negative externalities of their conduct” and make contributions of real property
    or finances to mitigate the public costs imposed. 
    Id.
    The Supreme Court recognized these competing realities in Nollan v.
    California Coastal Commission, 
    483 U.S. 825
    , 
    97 L. Ed. 2d 677
     (1987), and Dolan v.
    City of Tigard, 
    512 U.S. 374
    , 
    129 L. Ed. 2d 304
     (1994). In Nollan and Dolan, the
    Court ruled that the government is allowed to condition approval of land-use permits
    by requiring the landowner to mitigate the impact of his or her proposed use. Dolan,
    
    512 U.S. at 391
    , 
    129 L. Ed. 2d at 320
    ; Nollan, 438 U.S. at 837, 
    97 L. Ed. 2d at 689
    .
    The government may require that the landowner agree to a particular public use of
    the landowner’s real property, as long as there is an “essential nexus” and “rough
    proportionality” between the public impact of the landowner’s proposed developments
    and the government’s requirements. Dolan, 
    512 U.S. at 391
    , 
    129 L. Ed. 2d at 320
    ;
    Nollan, 438 U.S. at 837, 
    97 L. Ed. 2d at 689
    .
    - 24 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    In Koontz, the Court extended the application of Nollan/Dolan’s “essential
    nexus” and “rough proportionality” requirements to government demands for
    monetary contributions where there is a “direct link between the government’s
    demand and a specific parcel of real property.” Koontz, 
    570 U.S. at 614
    , 
    186 L. Ed. 2d at 714
     (footnote omitted).     The plaintiff in Koontz was required to obtain a
    Wetlands Resource Management Permit before he could make improvements to his
    property which would, among other impacts, raise the elevation of the improved
    property. 
    Id.
     at 599–602, 186 L. Ed. 2d at 704–06. The plaintiff offered to deed a
    portion of his property as a conservation easement to the water district to mitigate
    the environmental impact of his proposed improvements. 
    Id.
     The water district
    considered the plaintiff’s offer inadequate, and refused to grant the plaintiff’s permit
    unless he either (1) agreed to increase the amount of property encumbered by the
    proposed conservation easement, or, in the alternative, (2) to deed the conservation
    easement as offered and to also pay for environmental improvements to district-
    owned real property several miles away. 
    Id.
     The Koontz Court held that the district’s
    second condition also warranted Nollan/Dolan review because such demands for
    money operated, essentially, “in lieu of” relinquishments of real property rights, were
    therefore “functionally equivalent to other types of land use exactions[,]” and
    accomplished the same diminution in the landowner’s property rights: the landowner
    - 25 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    could comply with the request, or be denied the right to use his or real property in
    the desired way. 
    Id. at 612
    , 
    186 L. Ed. 2d at 713
    .
    In the case before us, the County assessed the Fees as a condition precedent to
    its approval of the Developers’ building permits; if the Developers declined to pay the
    Fees, the County would have denied the Developers’ permission to begin their desired
    construction projects. The Fees in this case were categorized as impact fees and
    referred to as “capacity use fees,” despite the County’s requirement that the fees be
    paid prior to approval of a developer’s permits.
    The Koontz Court stressed that taxes and fees do not trigger review under the
    unconstitutional conditions doctrine, and stated: “It is beyond dispute that ‘[t]axes
    and user fees . . . are not “takings.”’” 
    Id. at 615
    , 
    186 L. Ed. 2d at 715
     (citation omitted).
    The Koontz Court explained that its holding did “not affect the ability of governments
    to impose property taxes, user fees, and similar laws and regulations that may impose
    financial burdens on landowners.” 
    Id.
     But the Koontz Court otherwise provided little
    guidance on how courts should tread the fine line between unconstitutional exactions
    and constitutional, routine taxes and fees. See Michael B. Kent, Jr., Viewing the
    Supreme Court’s Exactions Cases Through the Prism of Anti-Evasion, 87 U. COLO. L.
    REV. 827, 871 (2016); Adam Lovelady, The Koontz Decision and Implications for
    Development Exactions, Coates’ Canons: N.C. Local Government Law Blog (Dec. 17,
    2020),             https://canons.sog.unc.edu/the-koontz-decision-and-implications-for-
    - 26 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    development-exactions/ (opining that the majority opinion in Koontz did not provide
    a clear test for distinguishing permissible taxes and fees from potentially
    unconstitutional exactions). Indeed, the dissenting justices in Koontz warned that
    the majority’s decision extended the “notoriously ‘difficult’ and ‘perplexing’
    standards” of the Fifth Amendment Takings Clause “into the very heart of local land-
    use regulation and service delivery[,]” including the levy of fees to “cover the direct
    costs of providing services like sewage or water to [a] development.” Koontz, 
    570 U.S. at 626
    , 
    186 L. Ed. 2d at 722
     (Kagan, J., dissenting) (citations omitted). The dissenting
    justices concluded that these fees—such as the Fees at issue in the present case—
    “now must meet Nollan and Dolan’s nexus and proportionality tests.” 
    Id. at 627
    , 
    186 L. Ed. 2d at 722
    .
    Neither party in this case briefed any North Carolina precedent, and our own
    review has found no precedent, which speaks directly to the application of the
    unconstitutional conditions doctrine to monetary exactions in North Carolina. Cf.
    Homebuilders Ass’n of Charlotte, Inc., v. City of Charlotte, 
    336 N.C. 37
    , 46, 
    442 S.E.2d 45
    , 51 (1994) (assessing the legality of the city’s user fees without reviewing their
    constitutionality); River Birch Assocs. v. City of Raleigh, 
    326 N.C. 100
    , 120–22, 
    388 S.E.2d 538
    , 550–51 (1990) (applying Nollan and holding no constitutional taking
    occurred where the city required a dedication of real property as condition precedent
    to permit approval, but the plaintiff’s permit was denied for other valid reasons). At
    - 27 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    a minimum, this is the first time North Carolina appellate courts have been asked to
    address this issue since the United States Supreme Court decided Koontz in 2013.
    This Court most closely addressed the constitutionality of government
    exactions in any form as takings in its 1989 decision in Franklin Road Properties v.
    City of Raleigh, 
    94 N.C. App. 731
    , 
    381 S.E.2d 487
     (1989). In Franklin Road, the city
    of Raleigh refused to issue building permits for a subdivision requested by the
    plaintiff because the plaintiff would not comply with city ordinances which required
    the plaintiff to “dedicate and pave a portion of its property as part of [a] right-of-way”
    prior to approval of a building permit. Franklin Rd., 
    94 N.C. App. at 734
    , 
    381 S.E.2d at 489
    . The plaintiff sued seeking a declaratory judgment of its rights with respect
    to the city ordinances, and the trial court granted summary judgment to the
    defendant city of Raleigh. 
    Id.
     This Court reviewed the constitutionality of the city
    ordinance’s requirement that the plaintiff dedicate a portion of its land as a public
    right-of-way. 
    Id.
    The Franklin Road Court concluded that the city ordinance was an “exaction”
    which required constitutional scrutiny under North Carolina’s “rational nexus” test,
    adopted only six months earlier in the 1989 opinion of Batch v. Town of Chapel Hill,
    
    92 N.C. App. 601
    , 
    376 S.E.2d 22
     (1989), rev’d, 
    326 N.C. 1
    , 
    387 S.E.2d 655
     (1990). Id.
    at 737, 
    381 S.E.2d at 491
    . The Franklin Road Court explained:
    In [a] portion of our opinion in Batch we concluded that the
    town’s requirement that plaintiff dedicate a portion of her
    - 28 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    property as a right-of-way for the proposed [parkway] was
    an “exaction.” In defining “exaction” we stated:
    [A]n exaction is a condition of development permission that
    requires a public facility or improvement to be provided at
    the developer’s expense. Most exactions fall into one of four
    categories: (1) requirements that land be dedicated for
    street rights-of-way, parks, or utility easements and the
    like; (2) requirements that improvements be constructed or
    installed on land so dedicated; (3) requirements that fees
    be paid in lieu of compliance with dedication or
    improvement provisions; and (4) requirements that
    developers pay “impact” or “facility” fees reflecting their
    respective prorated shares of the cost of providing new
    roads, utility systems, parks, and similar facilities serving
    the entire area.
    We further stated that “Not all exactions are constitutional
    takings.” To aid a trial court in determining whether an
    exaction is an unconstitutional taking, we adopted the
    following rational nexus test:
    To determine whether an exaction amounts to an
    unconstitutional taking, the court shall: (1) identify the
    condition imposed; (2) identify the regulation which caused
    the condition to be imposed; (3) determine whether the
    regulation substantially advances a legitimate state
    interest.   If the regulation substantially advances a
    legitimate state interest, the court shall then determine (4)
    whether the condition imposed advances that interest; and
    (5) whether the condition imposed is proportionally related
    to the impact of the development.
    
    Id. at 736
    , 
    381 S.E.2d at 490
     (emphasis added) (citing Batch, 92 N.C. App. at 613–14,
    621, 
    376 S.E.2d at 30, 34
    ).
    Notably, though, the North Carolina Supreme Court reversed Batch a year
    later, holding that the Town of Chapel Hill properly denied the plaintiff’s request for
    - 29 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    a subdivision building permit because the permit failed to comply with town
    ordinances requiring permits to contemplate coordination with the town’s
    transportation plans. Batch v. Town of Chapel Hill, 
    326 N.C. 1
    , 13, 
    387 S.E.2d 655
    ,
    663 (1990). Based on this holding, the Court declined to address any other reason
    why the permit was or may have been denied, and, particularly, did “not find it
    necessary to review or decide any of [the] plaintiff’s constitutional claims or other
    issues arising upon her complaint.” 
    Id. at 13, 14
    , 
    387 S.E.2d at 663
    .
    As a result, North Carolina law in regard to exactions as takings is without
    foundation and has not been updated following Dolan and Koontz. The definition of
    “exaction” and the “rational nexus” test presented in Franklin Road (and derived
    from the Court of Appeals decision in Batch) were developed after the United States
    Supreme Court decided Nollan, but prior to its decisions in Dolan and Koontz.
    Nonetheless, Franklin Road addressed potentially unconstitutional exactions in
    North Carolina by employing a “rational nexus” test which in many ways mirrors the
    “essential nexus” and “rough proportionality” requirements of Nollan/Dolan, and
    which also preemptively addressed Koontz’s later extension of those requirements to
    monetary exactions “in lieu of” physical takings of land or as recompensation for the
    impact of a proposed development.
    The Developers cite to decisions from other states that have issued rulings
    regarding the thin line between unconstitutional exactions and constitutional user
    - 30 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    fees. However, we find most of these cases unpersuasive because they involve these
    courts’ attempts to apply the real property-focused decisions in Nollan/Dolan alone
    to exactions and fees, prior to the United States Supreme Court’s decision in Koontz.
    See Home Builders Ass’n of Dayton & the Miami Valley v. City of Beavercreek, 
    729 N.E.2d 349
    , 356 (Ohio 2000); Trimen Dev. Co. v. King Cty., 
    877 P.2d 187
    , 194 (Wash.
    1994); N. Ill. Home Builders Ass’n, Inc. v. Cty. of Du Page, 
    621 N.E.2d 1012
    , 1020 (Ill.
    App. Ct. 1993), aff’d in part, rev’d in part, 
    649 N.E.2d 384
     (Ill. 1995). These cases
    were part of the pre-Koontz division of authority over whether a demand for money
    could give rise to an unconstitutional conditions claim under Nollan/Dolan—a
    division which Koontz settled in the affirmative. See Koontz, 
    570 U.S. at 603
    , 
    186 L. Ed. 2d at 707
    .
    The most persuasive case cited by the parties is the 2018 decision of Maryland’s
    highest court in Dabbs v. Anne Arundel County, 
    182 A.3d 798
     (Md. 2018), which cites
    to Koontz in holding that a generally applicable fee does not invoke the
    unconstitutional conditions doctrine. In Dabbs, the plaintiffs sought refunds for
    impact fees paid to their county in connection with real estate developments; the fees
    were collected to facilitate future improvements to transportation and education
    infrastructure within the county. 
    Id.
     at 801–02. The impact fees at issue were
    “legislatively-imposed[,] predetermined, based on a specific monetary schedule, and
    applie[d] to any person wishing to develop property in the district.” 
    Id. at 811
    . The
    - 31 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    plaintiffs argued that the impact fees were takings subject to the “essential nexus”
    and “rough proportionality” requirements of Nollan/Dolan. 
    Id.
     at 807–08. The
    Dabbs Court acknowledged that Koontz extended the protections of Nollan/Dolan to
    instances where there is a “‘direct link between the government’s demand and a
    specific parcel of real property[,]’” but noted Koontz’s insistence that “‘taxes [and] user
    fees . . . that may impose financial burdens on [land]owners’” are not takings under
    Nollan/Dolan. 
    Id.
     at 809–10 (citing Koontz, 
    570 U.S. at 614, 615
    , 
    186 L. Ed. 2d at 714, 715
    ).
    The Dabbs Court held that the impact fees were not subject to scrutiny under
    Nollan/Dolan because, “[u]nlike Koontz, the Ordinance [did] not direct a [land]owner
    to make a conditional monetary payment to obtain approval of an application for a
    permit of any particular kind, nor [did] it impose the condition on a particularized or
    discretionary basis.” Id. at 811 (citation omitted). Instead, the ordinance at issue in
    Dabbs “applied on a generalized district-wide basis, making no determination as to
    whether an actual permit will issue to a payor individual with a property interest.”
    Id. (citing Koontz, 
    570 U.S. at 628
    , 
    186 L. Ed. 2d at 723
     (Kagan, J., dissenting)
    (commenting that the majority’s holding should apply “only to permitting fees that
    are imposed ad hoc, and not to fees that are generally applicable”)). The Dabbs Court
    further based its decision on its understanding that Dolan recognized that impact
    fees “imposed on a generally applicable basis are not subject to a rough
    - 32 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    proportionality or nexus analysis.” 
    Id.
     (citing Dolan, 
    512 U.S. at 385
    , 
    129 L. Ed. 2d at 316
    ).
    We find the holding of Dabbs persuasive and find it in harmony with both the
    United States Supreme Court’s decision in Koontz and the definition of “exaction”
    employed by this Court in Franklin Road. In Franklin Road, this Court defined
    “exaction” to include fees assessed “in lieu of compliance with dedication or
    improvement provisions” or fees “reflecting [developers’] respective prorated shares
    of the cost of providing new [infrastructure.]” Franklin Rd., 
    94 N.C. App. at 736
    , 
    381 S.E.2d at 490
    . This definition did not include fees assessed on a generally applicable
    basis in a static quantity indifferent to the particular developers’ prorated share of
    any resulting impact. We hold that impact and user fees which are imposed by a
    municipality to mitigate the impact of a developer’s use of property, which are
    generally imposed upon all developers of real property located within that
    municipality’s geographic jurisdiction, and which are consistently imposed in a
    uniform, predetermined amount without regard to the actual impact of the
    developers’ project do not invoke scrutiny as an unconstitutional condition under
    Nollan/Dolan nor under North Carolina precedent.
    The Fees assessed in the present case are similar to those assessed in Dabbs.
    The parties agree that, under Section 28(h) of the Ordinance, any landowner who
    wishes to develop a single-family residential lot in the County must pay one-time fees
    - 33 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    of $1,000 for water and $1,200 for sewer.         Ordinance § 28(h).   The Fees are
    predetermined, set out in the Ordinance, and non-negotiable; the Fees are not
    assessed on an ad hoc basis or dependent upon the landowner’s particular project.
    Ordinance § 28(h). The Fees are assessed in conjunction with the landowner’s intent
    to make use of real property located within the County’s jurisdiction, but, unlike the
    conditions imposed in Koontz, the County does not view a landowner’s proposed
    project and then make a demand based upon that specific parcel of real property.
    Koontz, 
    570 U.S. at 613
    , 
    186 L. Ed. 2d at 714
     (holding Nollan/Dolan scrutiny applied
    where there is a “direct link between the government’s demand and a specific parcel
    of real property”).
    We recognize that Dabbs is distinguishable from the present case in that the
    Fees here were assessed prior to the County’s grant of building permits, thus making
    them a condition of approval. The Dabbs Court expressly based its holding, in part,
    on the fact that the fees at issue were not “a conditional monetary payment to obtain
    approval of an application for a permit of any particular kind[.]” Dabbs, 
    182 A.3d at 811
    . This distinction speaks directly to the types of coercive harms that the United
    States Supreme Court sought to prevent in Koontz: the unconstitutional conditions
    doctrine seeks to prevent the government from leveraging its legitimate interest in
    mitigating harms by imposing “[e]xtortionate demands” which may “pressure a[]
    [land]owner into voluntarily giving up property for which the Fifth Amendment
    - 34 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    would otherwise require just compensation.” Koontz, 570 U.S. at 605–06, 
    186 L. Ed. 2d at
    ___; but see 
    id. at 607
    , 
    186 L. Ed. 2d at 709
     (“Our unconstitutional conditions
    cases have long refused to attach significance to the distinction between conditions
    precedent and conditions subsequent.” (citation omitted)). Nonetheless, we do not
    find the distinction material in this case. Regardless of whether the Fees were to be
    paid prior to or after the Developers began their projects, the fees were predetermined
    and are uniformly applied—not levied against the Developers on an ad hoc basis—
    and thus do not suggest any intent by the County to bend the will or twist the arm of
    the Developers.
    Therefore, we hold that the Developers’ pleadings failed to present a
    constitutional takings claim under current federal and state unconstitutional
    conditions jurisprudence as a matter of law. The trial court had no duty to apply the
    unconstitutional conditions doctrine to the Fees; rather, the court needed only ensure
    that, if the County “[did] have the authority to assess user fees to defray the costs of
    [future services to be rendered,] such fees [were not] upheld if they [were]
    unreasonable.” Homebuilders Ass’n of Charlotte, 336 N.C. at 46, 442 S.E.2d at 51
    (citation omitted).
    III. Conclusion
    We hold that the trial court did not abuse its discretion in taking judicial notice
    of the 1984 Buies Creek Agreement and the 1998 Agreement. Further, we hold that
    - 35 -
    ANDERSON CREEK PARTNERS, L.P., V. COUNTY OF HARNETT
    Opinion of the Court
    the 1998 Agreement granted the County the contractual right to exercise the
    Districts’ prospective fee-collecting authority, and the County properly exercised that
    authority in collecting the Fees. We further hold that the Developers failed to present
    a viable constitutional claim because generally applicable impact and user fees, such
    as the Fees in this case, are not subject to the unconstitutional conditions doctrine.
    We affirm the trial court’s Consolidated Order.
    AFFIRMED.
    Judges STROUD and BROOK concur.