Jeffery Lake Dev. v. Central Neb. Pub. Power ( 2016 )


Menu:
  •                           IN THE NEBRASKA COURT OF APPEALS
    MEMORANDUM OPINION AND JUDGMENT ON APPEAL
    (Memorandum Web Opinion)
    JEFFREY LAKE DEV. V. CENTRAL NEB. PUB. POWER
    NOTICE: THIS OPINION IS NOT DESIGNATED FOR PERMANENT PUBLICATION
    AND MAY NOT BE CITED EXCEPT AS PROVIDED BY NEB. CT. R. APP. P. § 2-102(E).
    JEFFREY LAKE DEVELOPMENT, INC., A NEBRASKA NONPROFIT CORPORATION,
    AND MIDWAY WILDLIFE & RECREATION CLUB, A NEBRASKA NONPROFIT
    CORPORATION, ET AL., APPELLANTS AND CROSS-APPELLEES.
    V.
    CENTRAL NEBRASKA PUBLIC POWER AND IRRIGATION DISTRICT, A NEBRASKA
    PUBLIC CORPORATION, APPELLEE AND CROSS-APPELLANT.
    Filed June 7, 2016.    No. A-15-277.
    Appeal from the District Court for Lincoln County: RICHARD A. BIRCH, Judge. Affirmed.
    Steve Windrum, of Malcom, Nelsen & Windrum, L.L.C., for appellants.
    David J.A. Bargen, of Rembolt Ludtke, L.L.P., for appellee.
    MOORE, Chief Judge, and INBODY and RIEDMANN, Judges.
    RIEDMANN, Judge.
    INTRODUCTION
    This case involves lakeside land owned by the Central Nebraska Public Power and
    Irrigation District (Central) that lies adjacent to hydroelectric power projects. Central leased
    portions of this lakeside to Jeffrey Lake Development, Inc. (Jeffrey) and Midway Wildlife &
    Recreation Club (Midway) for development of private recreational cabins. These leases have been
    the subject of significant litigation over the past 20 years. The primary issue of the current appeal
    is the meaning of contractual language setting elevation restrictions for certain types of
    construction on the leased land. The district court interpreted the language of the lease to prohibit
    construction of cabins, including subterranean support structures, below stated elevation levels.
    -1-
    However, the district court also construed our holdings from prior appeals to allow repair or
    replacement of nonconforming structures that were the subject of a prior injunction against lease
    enforcement. Following our review of the record and the parties’ arguments, we affirm the
    judgment of the district court.
    BACKGROUND
    The leases at issue in this case have been the subject of considerable litigation, reaching
    the Court of Appeals or the Nebraska Supreme Court at least 6 prior times. We most recently
    considered the leases between the parties in Jeffrey Lake Dev., Inc. v. Cent. Nebraska Pub. Power
    & Irrigation Dist., No. A-09-996, 
    2010 WL 2990040
     (Neb. App. July 27, 2010) (hereinafter
    “Jeffrey VI”). We briefly recount the background of this appeal here, and will discuss additional
    details of the leases and prior litigation in the analysis section below as needed.
    Central entered into leases with Jeffrey and Midway in 1980 and 1981, respectively. The
    leases are similar, with many identical provisions, and provide for Jeffrey and Midway to lease
    residential cabin areas and lots above the shorelines of each lake. The leases extend for a primary
    term of 31 years and contain an automatic renewal provision.
    In Jeffrey VI, Central attempted to terminate both leases based in part upon alleged
    elevation violations of various structures. We determined that because Central had not previously
    enforced those violations, it was enjoined from declaring a forfeiture of either lease based on any
    of the alleged violations on which it adduced evidence at trial. Jeffrey Lake Dev., Inc. v. Cent.
    Nebraska Pub. Power & Irrigation Dist., No. A-09-996, 
    2010 WL 2990040
     (Neb. App. July 27,
    2010). However, we determined that Central could enforce future lease violations. 
    Id.
     The parties
    now dispute the meaning of the elevation requirements in the leases, as well as the extent of the
    injunction outlined in Jeffrey VI. Both leases prohibit some types of construction at elevations
    below a specified “freeboard elevation” -- that is, an elevation somewhat above the high water
    level of the lakes. This restriction is intended to prevent flood damage that would harm structures
    and the hydroelectric project.
    At trial, Jeffrey and Midway submitted testimony from several of their sublessees to whom
    Central has denied building permits based on its interpretation of the leases’ elevation restrictions.
    Timothy Dilley testified that he is a sub-leaseholder on Jeffrey Lake. He entered into his sublease
    in 2010 with the hope of building a retirement home on the property. When Dilley executed the
    sublease for his lot, the lot contained a garage, an electrical service, a septic system, a well, several
    hydrants, and a concrete pad approximately 9′ wide by 20′ long. The lot had previously contained
    a smaller modular home, but that home had been destroyed and removed from the premises before
    Dilley obtained his sublease.
    Dilley submitted a permit application to Central for retaining walls, a driveway, and a
    larger septic system to support the house he hoped to build. The proposed septic system would
    replace the existing, smaller septic system in approximately the same location. Central denied the
    septic system application because the subterranean tank and drain field proposed by Dilley extend
    below the Jeffrey Lake lease’s freeboard elevation of 2,764 feet above sea level. The Dilleys’
    permit for a driveway was initially denied, then approved provided that Dilley use fill dirt to raise
    the elevation of the driveway to 2,764 feet. Central informed Dilley that retaining wall footings
    also had to be above 2,764 feet in elevation. Central invited Dilley to re-submit conceptual
    -2-
    drawings of the retaining walls, driveway, house, and septic tank, stating that it believed there was
    a “good chance” everything would be approved, so long as the septic tank and drain field were
    modified to be constructed entirely above 2,764 feet in elevation. Central employees testified that
    they believed that alternative locations or alternative septic system types would have met Central’s
    requirements and allowed the Dilleys to build the size of septic system they desired. Central
    suggested that an above-ground holding tank system recently installed on a lot at Midway Lake
    might provide an example of a system that would meet elevation and setback requirements.
    However, Dilley and his sewage contractor testified to their belief that alternative sewage system
    locations were not feasible and that an above-ground holding tank system would require more
    frequent pumping and be more susceptible to freezing. Dilley did not submit an amended
    application to Central.
    Dell Shepherd testified that he is a sub-leaseholder at Jeffrey Lake and has been since 1981.
    In 2013, Shepherd submitted an application for an addition to his cabin and modification of his
    sewage, heating, and air conditioning systems. His applications were initially approved subject to
    an elevation inspection. After inspection, Central informed Shepherd that he could not build as
    proposed because of elevation restrictions in the Central-Jeffrey lease. Central suggested an
    above-ground holding tank instead of a septic tank to avoid elevation issues. Central also suggested
    that a slab foundation rather than a block foundation “might be a possibility” for his cabin addition.
    Shepherd’s contractor felt that a slab foundation would be inappropriate because the rest of the
    cabin was block foundation. Shepherd testified that he was uninterested in submitting a
    re-application after the denials.
    Evidence in the record also reflects that in 2013 Central denied another Jeffrey Lake
    sub-leaseholder a permit to demolish and replace a home on her lot because of elevation
    requirements in the lease as well as horizontal setback-from-the-shoreline requirements contained
    in Central’s permitting procedures. We note that the validity of the horizontal setbacks in the
    permitting procedures are not at issue on this appeal. Evidence in the record also reflects that at
    least one sub-leaseholder’s application to construct an underground sprinkler system was denied
    because of elevation.
    Michael Drain, a Central employee, testified that sub-leaseholders whose permits were
    denied could submit a new application that includes a variance request. The mechanism to request
    a variance does not appear in either of the leases, but rather in Central’s permitting procedures,
    which it developed as part of its separate license with the Federal Energy Regulatory Commission
    (FERC). A provision of the lease requires sublessees to comply with terms of Central’s FERC
    license. Central’s permitting procedures on file with FERC allow for new construction of
    residences at Jeffrey Lake and the Midway Lakes with the lowest living elevation significantly
    lower than those required by the lease. However, the permitting procedures also state that a
    more-restrictive condition in a lease will control over a more-permissive condition in the
    permitting procedures.
    In 2013, Jeffrey and Midway filed this action seeking (1) a declaratory judgment
    interpreting paragraphs 13, 14, 15, and 16 of each of the leases to allow construction of residential
    cabins and related structures that extend at least in part below the listed elevations, (2) a finding
    that Central is in breach of its lease, (3) a permanent injunction prohibiting Central from denying
    applications for construction that comply with this interpretation of the restrictions; (4) and for
    -3-
    damages, attorney fees, and costs. The trial court determined that paragraph 13 prohibited
    construction of residential cabins and related structures, including subterranean structures such as
    footings and sewage systems, below the stated elevations. The trial court further found that these
    elevations do not apply to boat docks and related structures. Additionally, the trial court interpreted
    the injunction we prescribed in Jeffrey VI to prohibit Central from enforcing elevation restrictions
    for repair and replacement of the structures at issue in Jeffrey VI, so long as the repair or
    replacement is of the same type of item in the same location. The trial court also held that the
    specific language of the elevation restriction in the lease concerning Jeffrey Lake required only
    that building “generally” complied with the elevation requirement -- that is, slight deviations from
    the required elevation are permitted under that lease only. The remainder of Jeffrey and Midway’s
    request for relief was denied.
    Jeffrey and Midway appeal from this order, and Central cross-appeals.
    ASSIGNMENTS OF ERROR
    To be considered by an appellate court, an alleged error must be both specifically assigned
    and specifically argued in the party’s brief. Stekr v. Beecham, 
    291 Neb. 883
    , 
    869 N.W.2d 347
    (2015). Additionally, an appellate court is not obligated to engage in analysis that is not necessary
    to adjudicate case and controversy before it. Facilities Cost Mgmt. Group v. Otoe. Cty. Sch. Dist.,
    
    291 Neb. 642
    , 
    868 N.W.2d 67
     (2015). Therefore, to the extent that assignments of error are not
    specifically argued or are consumed within a broader argument, we consolidate the assignments
    and consider only those that are specifically argued and are necessary to adjudicate the appeal
    before us.
    Jeffrey & Midway assign, restated and reordered, that the district court erred in (1) failing
    to consider the terms of paragraphs 14, 15, and 16 of the leases and failing to interpret paragraphs
    13, 14, 15, and 16 together to allow construction of at least some parts of residence cabins and
    related structures below the specified elevations; (2) interpreting erosion control structures,
    retaining walls, and wells to categorically fall under exceptions to the elevation requirements; (3)
    finding that the Jeffrey VI injunction applied only to construction upon which evidence was
    produced in Jeffrey VI, and that repair or replacement of structures covered by the Jeffrey VI
    injunction must be the same type of item in the same location; (4) interpreting the word “generally”
    in paragraph 13 of the Jeffrey lease by referencing our discussion of that provision in Jeffrey VI;
    (5) failing to issue an injunction prohibiting Central from denying applications for construction
    that comply with the elevation requirements contained in its permitting procedures; (6) finding
    Central’s motivation in its enforcement of the contract to be immaterial; and (7) failing to award
    Jeffrey and Midway attorney fees.
    On cross-appeal, Central assigns that the district court erred in (1) failing to find that Jeffrey
    and Midway failed to state a claim and that the district court lacked subject matter jurisdiction by
    operation of res judicata; (2) failing to find Jeffrey and Midway’s claims were barred by waiver;
    (3) applying Jeffrey VI’s injunction to extend to repair and replacement of the same type of items
    in the same locations; and (4) applying our definition of “generally” from Jeffrey VI in interpreting
    the elevation restriction at Jeffrey Lake.
    -4-
    STANDARD OF REVIEW
    An action for declaratory judgment is sui generis; whether such action is to be treated as
    one at law or one in equity is to be determined by the nature of the dispute. Wetovick v. County of
    Nance, 
    279 Neb. 773
    , 
    782 N.W.2d 298
     (2010). When a dispute sounds in contract, the action is to
    be treated as one at law. Spanish Oaks v. Hy-Vee, 
    265 Neb. 133
    , 
    655 N.W.2d 390
     (2003). This
    court treats the determination of factual issues in such a declaratory judgment action which was
    tried without a jury in the same manner as any other action at law; accordingly, the findings of the
    trial court have the effect of a verdict and will not be set aside unless clearly wrong. Donaldson v.
    Farm Bureau Life Ins. Co., 
    232 Neb. 140
    , 
    440 N.W.2d 187
     (1989). When a declaratory judgment
    action presents a question of law, an appellate court decides the question independently of the
    conclusion reached by the trial court. Vlach v. Vlach, 
    286 Neb. 141
    , 
    835 N.W.2d 72
     (2013).
    The construction of a contract is a question of law, and is reviewed de novo. Labenz v.
    Labenz, 
    291 Neb. 455
    , 
    866 N.W.2d 88
     (2015).
    An action for injunction sounds in equity. Lambert v. Holmberg, 
    271 Neb. 443
    , 
    712 N.W.2d 268
     (2006). In an appeal of an equity action, an appellate court tries the factual questions
    de novo on the record and reaches a conclusion independent of the findings of the trial court.
    Hogelin v. City of Columbus, 
    274 Neb. 453
    , 
    741 N.W.2d 617
     (2007). A party seeking an injunction
    must establish by a preponderance of the evidence every controverted fact necessary to entitle the
    claimant to relief. Abboud v. Lakeview, 
    237 Neb. 326
    , 
    466 N.W.2d 442
     (1991).
    On appeal, a trial court’s decision awarding or denying attorney fees will be upheld absent
    an abuse of discretion. Vlach v. Vlach, 
    supra.
     (2013).
    ANALYSIS
    Interpretation of Elevation Requirements in Leases.
    The primary dispute on appeal concerns interpretation of the construction elevation
    requirements contained in paragraphs 13, 14, 15, and 16 of the Jeffrey and Midway leases with
    Central. Jeffrey and Midway assign that the district court erred in failing to interpret paragraphs
    14, 15, and 16 of the lease in its order, and more specifically in failing to construe those paragraphs
    jointly with paragraph 13 to permit construction of at least some parts of residential cabins and
    related structures below the minimum elevation described in paragraph 13 of each lease. We
    recognize that the district court failed to discuss paragraphs 14, 15, or 16 in its order. However,
    because we agree with the conclusion reached by the district court after we independently interpret
    all of the paragraphs jointly, we affirm the district court’s judgment.
    A lease agreement is to be construed as any other contract. Johnson Lakes Dev. v. Cent.
    Nebraska Pub. Power, 
    254 Neb. 418
    , 
    576 N.W.2d 806
     (1998). In interpreting a contract, a court
    must first determine, as a matter of law, whether the contract is ambiguous. 
    Id.
     A contract is
    ambiguous when a word, phrase, or provision in the contract has, or is susceptible of, at least two
    reasonable but conflicting interpretations or meanings. 
    Id.
     The determination of whether a contract
    is ambiguous is to be made on an objective basis, not by the subjective contentions of the parties
    suggesting opposing meanings of the disputed language. 
    Id.
     The terms of a contract are to be
    accorded their plain and ordinary meaning as ordinary, average, or reasonable persons would
    understand them. 
    Id.
    -5-
    Here, neither party contends that the leases are ambiguous. We have previously examined
    the same lease provisions as part of a prior appeal between these parties, and determined as a
    matter of law that these leases are not ambiguous. Jeffrey Lake Dev., Inc. v. Cent. Nebraska Pub.
    Power & Irrigation Dist., No. A-03-106, 
    2004 WL 2216494
     (Neb. App. Oct. 5, 2004). We adhere
    to our previous decision.
    Extrinsic evidence is not permitted to explain the terms of a contract that is not ambiguous.
    Facilities Cost Mgmt. Group v. Otoe Cty. Sch. Dist., 
    291 Neb. 642
    , 
    868 N.W.2d 67
     (2015). When
    a contract is unambiguous, the intentions of the parties must be determined from the contract itself.
    
    Id.
     Accordingly, we refer only to the terms of the contract to interpret the paragraphs at issue.
    Paragraph 13 contains elevation restrictions prohibiting certain types of construction below
    each lake’s freeboard elevation. We have previously determined the “freeboard area” referenced
    in these paragraphs to be the surface of the ground between the level of water, i.e., the shoreline,
    and the normal high water level specifically designated by measured elevations in the particular
    lease agreements. Jeffrey Lake Dev., Inc. v. Cent. Nebraska Pub. Power & Irrigation Dist., No.
    A-03-106, 
    2004 WL 2216494
    , at *11 (Neb. App. Oct. 5, 2004).
    Each lease has similar, but slightly different wording of the restrictions in paragraph 13.
    The Jeffrey lease provides:
    (13) All permanent construction of private residence cabins and related structures shall be
    placed generally above the freeboard contour of the lake which is Elevation 2764.0 feet
    above sea level, U.S.G.S. datum, except that boat docks and such related structures for
    access to or for the use of water facilities may be constructed below said lake freeboard
    contour elevation. Such structures shall comply with all relevant federal, state and local
    statutes and regulations in existence, shall first be approved by [Jeffrey] and [Central] in
    writing, and shall be constructed entirely at the risk of the sublessee so constructing, using
    or maintaining these boat docks and related structures. Such structures shall be subject to
    the use of the storage facilities of said lake as may be desired by [Central], all without
    notice to [Jeffrey] or to any sublessees holding by, through or under this Agreement.
    Paragraph 13 of the Midway lease similarly provides for elevation restrictions for construction,
    and also requires a horizontal setback from the shoreline:
    (13) All permanent construction of private residence cabins and related structures shall be
    located back of a buffer or clear zone of not less than thirty (30) feet, measured horizontally,
    and not less than five (5) feet, measured vertically, from the normal high water elevations
    of said lakes. Said normal high water elevations, being above sea level U.S.G.S. datum,
    are 2635.3 feet on Central Midway Lake and 2635.1 feet on Walker Lake and Glen Young
    Lake. Boat docks and related structures for access to or for use of water facilities may be
    constructed on the shoreline below said freeboard contour elevations. Such structures shall
    comply with all relevant federal, state and local statutes and regulations in existence, shall
    first be approved by [Midway] and [Central] in writing, and shall be constructed entirely
    at the risk of the sublessees so constructing, using or maintaining these boat docks and
    related structures. Such structures shall be subject to the use of the water storage facilities
    of said lakes as may be desired by [Central], all without notice to [Midway] or to any
    sublessees holding by, through or under this Agreement. Construction of cabins and related
    -6-
    structures as well as boat docks and related structures is forbidden on or along any of the
    canal areas.
    Central asserts that paragraph 13 of each lease means that all cabins, including subterranean
    support structures for those cabins such as footings and drainage fields for septic tanks, must be
    located above 2,764.0 feet above sea level at Jeffrey Lake and the corresponding elevation at the
    Midway lakes. Jeffrey and Midway argue that this paragraph means that the living area of cabins
    must be above 2,764.0 feet, but that subterranean support structures such as footings and septic
    systems may be below 2,764.0 feet, or alternately that cabins may be constructed below 2,764.0
    feet with prior permission. For this interpretation, Jeffrey and Midway rely upon the contents of
    paragraphs 14, 15, and 16 of the leases; the parties’ prior course of practice; and the word
    “generally” in paragraph 13 of the Jeffrey lease. Because this contract is unambiguous, we do not
    consider extrinsic course of conduct evidence in interpreting the parties’ intent. See Facilities Cost
    Mgmt. Group v. Otoe Cty. Sch. Dist., 
    291 Neb. 642
    , 
    868 N.W.2d 67
     (2015). We will address the
    construction of the word “generally” in the corresponding separate assignment of error section
    below. We turn now to Jeffrey and Midway’s arguments about the construction of paragraphs 14,
    15, and 16 and their impact on paragraph 13.
    Paragraphs 14, 15, and 16 of the two leases contain identical language. These paragraphs
    provide:
    (14) Any permanent reconstruction or new construction of private resident cabins
    and related structures in the present designated areas located below or within the lake
    freeboard area shall meet the requirements of [Central] as herein set forth and shall have
    written approval of [Jeffrey/Midway] prior to the beginning of any work.
    (15) Prior to any permanent, new construction of private resident cabins and related
    structures in an extension of a present cabin area, [Jeffrey/Midway] shall, at its expense
    and with the assistance of [Central’s] authorized engineer, determine and designate on the
    ground and/or area lot plat the lower limits of said permanent, new construction. When this
    has been done, the sublessee of any such lot shall submit plans to [Jeffrey/Midway] for all
    proposed construction on said lot. In the event [Jeffrey/Midway] decides there is or may
    be a conflict or non-compliance of proposed construction on the part of a sublessee or for
    any other reason, [Jeffrey/Midway] shall submit such proposals or questions to [Central]
    for a decision which shall be provided in writing.
    (16) Any permanent construction, such as private residences, garages and related
    structures as mentioned in the above three paragraphs, shall be placed on concrete slabs,
    foundations or bases and sufficiently bolted thereto so that such structures shall not enter
    into the lake or into [Central’s] works of improvement. Any permanent shoreline
    structures, such as boat docks, boat storage facilities, stairways and related structures, shall
    be constructed and anchored in such a manner whereby they will not be allowed to enter
    into the lake during normal or high water level. [Jeffrey/Midway] and/or the sublessee shall
    be liable to [Central] for any damage done to [Central’s] property by reason of any structure
    or debris becoming loose and entering the lake, including the cost to [Central] of removing
    the same. Any sublessees so occupying or constructing any of the above-mentioned
    structures shall recognize and understand that such premises, structures and contents
    -7-
    thereof may become flooded, and that [Central] shall assume no responsibility or liability
    of any kind whatsoever for damages.
    Jeffrey and Midway urge us to interpret paragraphs 14 through 16 to impliedly authorize
    construction of at least some part of cabins below the freeboard elevations described in paragraph
    13 of each lease. We cannot read these paragraphs to affirmatively authorize construction of cabins
    or parts of cabins below freeboard elevation. Paragraph 15 provides for construction in areas that
    were not platted as cabin areas at the time of the contract. We do not find any language in paragraph
    15 that modifies the elevation restrictions for residential cabins contained in paragraph 13. Instead,
    paragraph 15 notes that those restrictions will extend to new cabin areas and requires elevation
    surveys of construction in new cabin areas to ensure compliance. Similarly, we do not read
    paragraph 16 to imply authorization to build below freeboard elevation. Paragraph 16 contains
    additional rules for anchoring construction to prevent structures from washing into the lake. It
    provides one set of anchoring requirements for residences, garages, and related structures and a
    separate set of anchoring requirements for “permanent shoreline structures, such as boat docks,
    boat storage facilities, stairways and related structures.” We do note the significance of paragraph
    16’s statement that “the above three paragraphs” mention construction of cabins and related
    non-shoreline structures. We will explain this significance further below.
    Paragraph 14 provides the brunt of Jeffrey and Midway’s textual argument that cabin
    construction below freeboard elevation is authorized. This paragraph generally deals with approval
    processes for construction on designated cabin areas below freeboard elevation. Jeffrey urges us
    to read this paragraph to mean that construction of cabins and related structures is permissible
    below freeboard elevation so long as the builder obtains prior written approval of Jeffrey or
    Midway. We cannot give this paragraph this construction. First, this paragraph does not
    affirmatively authorize Jeffrey and Midway to approve exemptions to the elevation requirements
    to which they agreed in paragraph 13. Rather, the paragraph specifically states that any
    construction referenced in Paragraph 14 must meet the requirements of Central and have written
    permission from Jeffrey or Midway. It does not say that construction must meet Central’s
    requirements or have written permission [to waive the requirements]. One of those requirements
    is Paragraph 13’s elevation requirements for residence cabins. Further, the written permission
    referenced in Paragraph 14 is written permission from Jeffrey or Midway, not from Central.
    Jeffrey and Midway’s proposed interpretation would gut paragraph 13’s elevation restrictions by
    allowing Jeffrey or Midway to unilaterally exempt their sublessees from Jeffrey and Midway’s
    commitments to Central not to allow construction of private residence cabins below freeboard
    elevation. For these reasons, we cannot read the plain language of Paragraph 14 as a variance
    mechanism to allow construction below freeboard elevation if Central gives prior written
    permission.
    Jeffrey alternatively proposes that the parties intended for “related structures” to cabins
    such as footings and subterranean sewage systems to be placed below freeboard elevation and that
    paragraph 14 provides the procedures for allowing these subterranean structures related to cabins.
    However, Jeffrey relies primarily upon extrinsic evidence for this argument that we cannot
    consider given our determination that the contract is not ambiguous. See Facilities Cost Mgmt.
    Group v. Otoe Cty. Sch. Dist., 
    291 Neb. 642
    , 
    868 N.W.2d 67
     (2015). Further, the unambiguous,
    -8-
    plain language of paragraphs 13 through 16 make no exception for the placement of subterranean
    cabin structures to be allowed below freeboard elevation. Jeffrey argues that footings and other
    subterranean improvements may be considered as “related structures” rather than “cabins.” Even
    if we consider footings of cabins to be “related structures,” this does not obviate paragraph 13’s
    requirement that “cabins and related structures” be placed above freeboard elevation. Jeffrey and
    Midway make no argument that footings should qualify as a shoreline or water-access related
    structure, which is the only exception to paragraph 13’s prohibition against constructing “cabins
    and related structures” below freeboard elevation.
    Jeffrey and Midway argue that if we do not find construction of cabins or footings to be
    permitted below 2,764 feet, that paragraph 14 is meaningless because it references construction
    that is prohibited in paragraph 13. We disagree. Paragraph 14 requires that any “construction of
    private residential cabins and related structures in the present designated areas located below or
    within the lake freeboard area” meets Central’s requirements contained in the leases. We agree
    with Central’s interpretation of “in the present designated areas located below or within the lake
    freeboard area” to mean the areas designated for lease that are located below or within the lake
    freeboard area. This interpretation is reasonable given other provisions contained in the lease. For
    example, paragraph 13 permits construction of boat docks and related structures “below said lake
    freeboard contour elevation”; Paragraph 15 refers to construction “in a new cabin area located
    below or within the lake freeboard area.” Furthermore, we previously determined that “the leased
    premises extend to the shoreline, including areas both above and below the freeboard line.” Jeffrey
    Lake Development v. Central Nebraska Pub. Power, No. A-02-106, 
    2004 WL 2216494
     at *11
    (Neb. App. Oct. 5, 2004). Therefore, if a sublessee seeks to construct on this below elevation land,
    paragraph 14 clarifies that Central’s elevation and other construction requirements must still be
    met and reiterates that cabins may not be built at-will in any area designated as a “cabin area.”
    Although the district court’s order did not include a discussion of paragraphs 14 through
    16, we have independently reviewed them and conclude that the lease provisions, when read
    together, do not authorize construction of cabins and their related structures in disregard of
    paragraph 13’s elevation requirements.
    Retaining Walls, Wells, and Erosion Control Designation.
    Jeffrey and Midway separately assign that the district court erred in categorizing “retaining
    walls and erosion control structures” as “boat docks and related structures” and in determining that
    public wells are to be treated differently from other structures related to cabins under the terms of
    the lease. However, Jeffrey and Midway’s argument on these assignments relates to their broader
    argument that Central’s course of performance was to allow “residence cabins and related
    structures” to be built below the lake freeboard elevation and that this course of performance
    should be considered in interpreting the intent of the parties to allow such construction below
    paragraph 13’s specified freeboard elevations. Because the contract is unambiguous, we cannot
    consider this extrinsic evidence in our interpretation of the contractual provisions. Therefore, these
    assignments of error are irrelevant to our disposition of the case. An appellate court is not obligated
    to engage in analysis that is not necessary to adjudicate case and controversy before it. Facilities
    Cost Mgmt. Group v. Otoe Cty. Sch. Dist., 
    291 Neb. 642
    , 
    868 N.W.2d 67
     (2015). We therefore do
    not address these arguments.
    -9-
    Interpretation of Word “Generally” in Jeffrey Lease.
    Both parties assign that the district court erred in its adoption of our Jeffrey VI definition
    of the lease term “generally.” The term appears in paragraph 13 of the Jeffrey lease in the phrase
    “[a]ll permanent construction of private residence cabins and related structures shall be placed
    generally above the freeboard contour of the lake which is Elevation 2764.0 feet above sea level,
    U.S.G.S. datum, except that boat docks . . . .” The term does not appear in the Midway lease. In
    Jeffrey VI, we considered evidence that Central had measured the bottom elevation of a guest house
    on Jeffrey Lake at 2,761.34 feet above sea level. Jeffrey VI, supra. We held that although this
    measurement was below the 2,764-foot elevation required in paragraph 13, this was not a material
    breach because:
    The Jeffrey lease required only that improvements be located ‘generally’ above [freeboard
    elevation], which it determined to be 2,764 feet. . . . Considering these measurements, and
    the plain language meaning of the term “generally,” this is not a material breach. The
    Jeffrey lease does not require absolute compliance with elevation requirements, and the
    elevation of the building in question is very close to 2,764 feet.
    Id. Central urges us to rewrite the sentence to read “‘Generally,’ all construction is to be placed
    above elevation 2764, ‘except that boat docks’ and structures for water access need not be.” Jeffrey
    and Midway suggest that we construe “generally” to mean that the cabins and their related
    structures, such as footings and subterranean sewage systems, must as one unit generally be placed
    above the freeboard elevation but may partially be placed below that elevation. We decline to
    adopt either proposed alternative definition. Neither party has asserted that this contract is
    ambiguous, and our prior interpretation of the same contractual language to allow near compliance
    but not strict compliance with the elevation restriction is controlling. The district court did not err
    in applying our definition of “generally” from Jeffrey VI.
    Extent of Jeffrey VI Injunction.
    In Jeffrey VI, the district court issued a broad injunction against Central. On appeal, we
    struck the following sentence from the district court’s order:
    Therefore, the Court finds that [Central] should be enjoined from taking any actions to
    declare a violation or breach of the contract and lease agreement entered into between
    [Jeffrey and Midway] and [Central] or to take any actions declaring a violation or breach
    in regard to any of the sublessees as set out in the letter of November 14, 2006.
    Jeffrey Lake IV, supra at *17. We replaced the stricken sentence with the substitute: “Central is
    enjoined from declaring a forfeiture of the Jeffrey lease or the Midway lease based on any of the
    alleged violations regarding which Central adduced evidence at trial.” Id.
    In the present appeal, both parties assign that the district court erred in the extent of its
    application of the Jeffrey VI injunction. Jeffrey and Midway argue that the estoppel provisions
    contained in the trial court’s order should not “only apply to construction at Jeffrey Lake and
    Midway Lake upon which evidence was produced at trial on April 14, 2009” because this is an
    unworkable provision. Central argues that the Jeffrey VI injunction should not apply to repair or
    - 10 -
    replacement of the structures because the issue on appeal in Jeffrey VI was lease forfeiture, not
    lease enforcement. We disagree with both arguments.
    Although Central is correct that the primary issue on appeal in Jeffrey VI was lease
    forfeiture, the underlying trial court action also dealt with whether Central could enforce certain
    lease violations. The trial court order from Jeffrey VI, of which we take judicial notice stated:
    Finding no violations, or finding only violations that have been acquiesced in by the
    Defendant, the Court finds that the Defendant should be enjoined and restrained from
    declaring any violations or breaches of the lease agreement between the Plaintiffs and the
    Defendant or any alleged breaches by the sublessees of the Plaintiffs.
    Accordingly, it is clear from the full context of the trial court order that lease violations were at
    issue and we intended the trial court’s injunction against Central finding violations based upon the
    evidence at trial to remain in effect. Accordingly, the district court in the present action did not err
    in extending this injunction to cover repair and replacement of those same structures that were at
    issue in the trial underlying Jeffrey VI.
    We also find no merit to Jeffrey and Midway’s concern that limiting the injunction in this
    manner is unworkable. Public records of court proceedings exist and the voluminous
    re-introduction of many of the exhibits from Jeffrey VI in the present case show that the parties are
    in fact able to access information regarding the evidence at issue in the trial underlying Jeffrey VI.
    This assignment of error is without merit.
    Central’s Permitting Procedures.
    Jeffrey and Midway next assign that the district court erred in failing to issue an injunction
    preventing Central from denying permits to construct structures that comply with Central’s
    permitting procedures even if those structures violate the more-restrictive elevation requirements
    contained in the Jeffrey and Midway leases. We disagree that the district court erred in failing to
    issue such an injunction. An injunction is an extraordinary remedy that ordinarily should not be
    granted except in a clear case where there is actual and substantial injury. Hogelin v. City of
    Columbus, 
    274 Neb. 453
    , 
    741 N.W.2d 617
     (2007). Such a remedy should not be granted unless
    the right is clear, the damage is irreparable, and the remedy at law is inadequate to prevent a failure
    of justice. 
    Id.
    Jeffrey and Midway signed their respective leases with Central. These leases do not require
    payment of rent. They do require Jeffrey and Midway to assume certain maintenance and liabilities
    of the leased premises, and to assure compliance with certain building restrictions including
    elevation requirements. We have previously noted that an injunction broadly preventing Central
    from enforcing these requirements would make the lease entirely one-sided in Jeffrey and
    Midway’s favor. (Jeffrey VI). Nothing in the language of the leases allows Jeffrey and Midway to
    escape the terms of their agreement simply because Central’s permitting procedures would allow
    more permissive building standards if not for the leases.
    The permitting procedures themselves make clear that this is not the intended consequence,
    stating that “to the extent that leases or other contractual agreements impose additional or more
    restrictive conditions[,] . . . such additional or more restrictive conditions shall also apply.” The
    existence of the more-permissive standards in the permitting procedures document does not create
    - 11 -
    a “failure of justice” that requires an injunction against Central enforcing the terms of the parties’
    bargained-for lease agreements. See Hogelin v. City of Columbus, 
    supra.
     Accordingly, the district
    court did not err in denying this relief and this assignment of error is without merit.
    Bad Faith.
    Although Jeffrey and Midway’s argument on this assigned error is somewhat difficult to
    ascertain, it appears they are arguing that Central’s motivation for requiring strict compliance with
    the elevation requirement should impact our interpretation of the lease. As evidenced by prior
    litigation, Central has tried on various occasions to terminate the leases in an effort to renegotiate
    them to include a rent provision. The district court found that “motivation in seeking to enforce
    legal rights under the leases is immaterial, and even if based on malice only applies to determining
    the credibility of the evidence.” We agree.
    In their brief, Jeffrey and Midway make references to the implied covenant of good faith
    and fair dealing. Although evidence of bad faith would be relevant to a claim for breach of this
    covenant, Jeffrey and Midway did not plead breach of the implied covenant of good faith and fair
    dealing. The only implied covenant that their pleadings assert Central breached is the implied
    covenant of quiet enjoyment, which is not at issue on appeal. Accordingly, motivation is not
    relevant to any issue on appeal and we therefore find no error by the district court in including this
    correct statement of law in its order.
    Attorney Fees.
    Jeffrey and Midway finally assign that the district court erred in denying attorney fees. On
    appeal, a trial court’s decision awarding or denying attorney fees will be upheld absent an abuse
    of discretion. In re Rolf H. Brennemann Testamentary Trust, 
    288 Neb. 389
    , 
    849 N.W.2d 458
    (2014). A party may recover attorney fees and expenses in a civil action only when a statute permits
    recovery or when we have recognized and accepted a uniform course of procedure for allowing
    attorney fees. Evertson v. City of Kimball, 
    278 Neb. 1
    , 
    767 N.W.2d 751
     (2009). Jeffrey and
    Midway claim attorney fees under 
    Neb. Rev. Stat. § 25-824
     (Reissue 2008) which authorizes fees
    against a party who has defended a civil action with a claim that a court determines is frivolous or
    made in bad faith. Because neither the district court nor we have found that any of Central’s
    defenses were frivolous or made in bad faith, we find no abuse of discretion in the trial court’s
    denial of attorney fees.
    Res Judicata.
    Central assigns that the district court erred in failing to find Jeffrey and Midway’s claims
    barred by res judicata. Res judicata is an affirmative defense which must be specifically pled.
    Supreme Court Rule § 6-1108(c). Because Central failed to plead res judicata in its answer, we
    will not address this argument made for the first time on appeal. Leseberg v. Meints, 
    224 Neb. 533
    ,
    
    399 N.W.2d 784
     (1987).
    Waiver.
    Central assigns that the district court erred in failing to find that Jeffrey and Midway’s
    claims are barred by the doctrine of waiver. We disagree. A waiver is a voluntary and intentional
    relinquishment or abandonment of a known existing legal right or such conduct as warrants an
    - 12 -
    inference of the relinquishment of such right. Omaha Police Union Local 101 v. City of Omaha,
    
    292 Neb. 381
    , 
    872 N.W.2d 765
     (2015). To establish a waiver of a legal right, there must be a clear,
    unequivocal, and decisive act of a party showing such a purpose, or acts amounting to an estoppel
    on his or her part. 
    Id.
     A party may prove the waiver of a contract by (1) a party’s express
    declarations manifesting the intent not to claim an advantage or (2) a party’s neglecting and failing
    to act so as to induce the belief that it intended to waive. 
    Id.
     The party asserting a waiver defense
    bears the burden of establishing that a clear and unmistakable waiver has occurred. 
    Id.
    Central submits that Jeffrey waived rights to enforce a favorable interpretation of the lease
    by remaining silent after being informed that subterranean support structures for cabins must be
    built above the freeboard elevation. In support of its argument, it points to two 2007 letters sent to
    sublessees advising of the elevation requirement. We note, however, that Jeffrey did not “remain
    silent” regarding Central’s actions in declaring lease violations based on elevation; to the contrary,
    in 2007 when these letters were sent, the parties were already embroiled in litigation leading to
    Jeffrey VI. As set forth above, lease violations based on elevation were involved in that litigation.
    Therefore, although the issue of whether component parts of residential cabins could be placed
    below the minimum elevation levels was not specifically litigated, given the ongoing litigation
    between the parties, the district court did not err in finding no clear, unequivocal, and decisive act
    of Jeffrey to support a waiver. This assignment of error is without merit.
    CONCLUSION
    Having reviewed the record, we agree with the construction of the lease and our former
    case law applied by the trial court. Accordingly, we affirm its judgment.
    AFFIRMED.
    - 13 -