Borough of Carteret v. Carteret Terrace, LLC ( 2024 )


Menu:
  •                                 NOT FOR PUBLICATION WITHOUT THE
    APPROVAL OF THE APPELLATE DIVISION
    This opinion shall not "constitute precedent or be binding upon any court ." Although it is posted on the
    internet, this opinion is binding only on the parties in the case and its use in other cases is limited. R. 1:36-3.
    SUPERIOR COURT OF NEW JERSEY
    APPELLATE DIVISION
    DOCKET NO. A-0355-23
    A-0357-23
    BOROUGH OF CARTERET,
    Plaintiff-Respondent,
    v.
    CARTERET TERRACE, LLC, and
    THE BANK OF NEW YORK
    MELLON, PAR U HARTFORD LIFE
    INSURANCE COMFORT TRUST,
    Defendants-Appellants,
    and
    LASALLE BANK NATIONAL
    ASSOCIATION, COUNTY OF
    MIDDLESEX, MIDDLESEX WATER
    COMPANY, NUI CORPORATION,
    d/b/a ELIZABETHTOWN GAS
    COMPANY, BELL ATLANTIC-NEW
    JERSEY, INC., PUBLIC SERVICE
    AND GAS COMPANY, PIVOTAL
    UTILITY HOLDING, INC., and ETG
    ACQUISITION CORPORATION,
    Defendants.
    _________________________________
    BOROUGH OF CARTERET,
    Plaintiff-Respondent,
    v.
    MERIDIAN II, LLC,
    Defendant-Appellant,
    and
    PRINCIPAL LIFE INSURANCE
    COMPANY AND PIVOTAL
    UTILITY HOLDINGS, INC., d/b/a
    ELIZABTHTOWN GAS COMPANY,
    Defendant.
    _________________________________
    Argued September 26, 2024 – Decided October 17, 2024
    Before Judges Mawla, Natali, and Vinci.
    On appeal from the Superior Court of New Jersey, Law
    Division, Middlesex County, Docket Nos. L-1308-23
    and L-1313-23.
    Anthony F. DellaPelle argued the cause for appellants
    (McKirdy, Riskin, Olson & DellaPelle, PC, attorneys;
    Anthony F. DellaPelle, of counsel and on the briefs;
    Michael Realbuto, on the briefs).
    Kevin P. McManimon argued the cause for respondent
    (McManimon, Scotland & Baumann, LLC, attorneys;
    Kevin P. McManimon and Malcolm X. Thorpe, on the
    briefs).
    A-0355-23
    2
    PER CURIAM
    In these related appeals, which we consolidate for the purpose of issuing
    a single opinion, defendants Carteret Terrace, LLC (Carteret Terrace) 1 and
    Meridian II, LLC (Meridian) appeal from the Law Division's September 15,
    2023 order for judgment and appointing commissioners permitting plaintiff
    Borough of Carteret (Borough) to take portions of defendants' properties
    pursuant to its power of eminent domain for use as a public road. We affirm.
    On April 8, 2021, plaintiff adopted an ordinance authorizing the
    acquisition of certain real property, including portions of adjacent properties
    owned by defendants, for the purpose of building a roadway extension to directly
    connect plaintiff's downtown and waterfront areas (the Extension), as well as to
    make related sidewalk and traffic signal improvements. The Extension will link
    Carteret Avenue, which currently terminates at Roosevelt Avenue, with Peter J.
    Sica Industrial Highway (Industrial Highway) by extending Carteret Avenue
    through a portion of the Carteret Terrace property now used as an internal access
    1
    Lienholder The Bank of New York Mellon, as trustee for Par U Hartford Life
    Insurance Comfort Trust, filed a contesting answer and is a party to this appeal,
    but does not assert any independent arguments.
    A-0355-23
    3
    roadway and parking lot, and a portion of the Meridian property now used as a
    detention basin.
    The Carteret Terrace property is developed with an existing, multifamily
    apartment complex located at the intersection of Roosevelt Avenue, Carteret
    Avenue, and the internal access roadway known as Abbi Road. The Carteret
    Terrace complex, constructed in 2001, consists of 160 residential units and 311
    parking spaces. The Meridian property is developed with an existing, 190-unit
    multifamily apartment complex located along Industrial Highway, adjacent to
    where Industrial Highway will intersect with the Extension. The Meridian
    complex was constructed in 2009.
    To facilitate the Extension through the Carteret Terrace property, plaintiff
    seeks an easement along the north end of the property where the Extension will
    be constructed. The Extension will create seventeen new angled parking spaces
    and two access driveways from the Extension into the Carteret Terrace and
    Meridian complexes. Plaintiff also seeks a sidewalk easement along the west
    end of the property, a traffic signal easement at the northwest corner of the
    property, and two temporary construction easements. To facilitate the Extension
    through the Meridian property, plaintiff seeks an easement through a portion of
    A-0355-23
    4
    an existing detention basin that will be redesigned by plaintiff, as well as two
    temporary construction easements.
    Plaintiff contends its plans for a roadway similar to the Extension can be
    traced to the 1970s. In May 1973, plaintiff's Master Plan and Master Plan
    Reexamination Report, which included a circulation plan and plan for proposed
    street improvements, contemplated an extension of Carteret Avenue like the
    Extension at issue. Specifically, the plans depict a road connecting Roosevelt
    Avenue to the area that is now Industrial Highway. More than two decades later,
    plaintiff's June 1998 Master Plan Reexamination Report included two maps
    depicting a road connecting Roosevelt Avenue to Industrial Highway.
    On May 12, 2004, plaintiff entered into a redevelopment agreement with
    Carteret Landing, L.L.C., that contemplated extending Carteret Avenue to the
    waterfront area.2 The redevelopment agreement provided:
    The project also will include the extension of Carteret
    Avenue, from Roosevelt Avenue extending eastward to
    the ferry landing, the construction of Landings
    Boulevard, a major cross street running parallel with
    the waterfront and the extension of Middlesex Avenue
    from Industrial Road extending eastward to the marina.
    2
    Carteret Landing, L.L.C., was a joint venture consisting of Roseland Property
    Company, BNE Real Estate Group, and Atlantic Realty Development
    Corporation. Atlantic Realty Development Corporation is the parent company
    of Carteret Terrace and Meridian.
    A-0355-23
    5
    The extension of Carteret Avenue will occur as a
    component of Phase I.
    The redevelopment agreement was ultimately terminated by agreement of the
    parties on August 11, 2010.
    In 2018, in anticipation of the construction of a ferry terminal on plaintiff's
    waterfront with ferry service to and from New York City, plaintiff
    commissioned a study of potential ferry ridership demand by the Rutgers
    University Bloustein School of Planning and Public Policy (Rutgers Study). The
    Rutgers Study predicted anticipated ferry ridership ranging from 739 to 2,199
    weekday boardings. According to the study, as much as fifteen percent of the
    anticipated vehicular traffic to or from the ferry terminal, or up to 330 vehicles
    per day, would likely use the Extension. Plaintiff initiated its efforts to create
    the Extension in anticipation of traffic associated with the ferry terminal and
    other waterfront attractions.
    In 2021, a ferry terminal traffic impact study was prepared by McCormick
    Taylor (McCormick Study) for the New Jersey Department of Transportation
    (NJDOT). The purpose of the study was to "identify the traffic impacts of the
    proposed [ferry] terminal on the adjacent roadway network and to provide
    recommendations . . . for roadway improvements to accommodate the future
    traffic demands." The McCormick Study assumed the Extension would be
    A-0355-23
    6
    completed by 2022 and, for its analysis of expected traffic conditions in 2022,
    considered the "traffic redistributions caused by the proposed" Extension.
    McCormick Taylor conducted "manual turning movement traffic counts"
    at each intersection in the area. The study assumed seventy-three percent of
    ferry riders would drive to the terminal alone and eleven percent would carpool.
    The McCormick Study predicted forty-five percent of the vehicular traffic, again
    hundreds of vehicles per day, would likely use the Extension traveling to or from
    the ferry terminal.
    Consulting and Municipal Engineering Associates (CME) conducted a
    review of the proposed improvements, including the installation by the County
    of Middlesex (County) of traffic signals at the proposed intersections. CME
    determined that, with the construction of the ferry terminal and the Extension,
    installation of the new traffic signals and replacement of existing traffic signal s
    in the area is warranted. CME also conducted traffic counts "to evaluate the
    existing and proposed operations for [the proposed] traffic signals . . . ." CME's
    traffic counts also predicted hundreds of trips per day along the Extension to and
    from the ferry terminal and waterfront area.
    On July 18, 2019, CME, on behalf of plaintiff, applied to NJDOT for
    funding in connection with the Extension from NJDOT's municipal aid program.
    A-0355-23
    7
    The application contained a description of the Extension, photographs, and an
    aerial map. In its application, plaintiff stated:
    [It i]s proposing the extension of Carteret Avenue from its existing
    "T" intersection with Roosevelt Avenue . . . through to [Industrial
    Highway] (approximately 650 feet) partially along the alignment of
    an existing parking lot. At its future intersection with Industrial
    Highway, Carteret Avenue will connect to Waterfront Access Road,
    which leads to the Waterfront Park, boat ramp, fishing pier,
    municipal marina, [New Jersey] State Police Marina Barracks, and
    future ferry terminal with service to New York City. The road and
    sidewalk extensions will provide a critical connection to the
    Borough's two . . . mile long Arthur Kill Riverwalk, including
    walking paths and observation piers stretching the length of the
    Borough's waterfront along the Arthur Kill.
    ....
    The extension of Carteret Avenue will also serve[] [as] an
    entrance feature connecting the Borough's Waterfront and the
    developing Downtown Arts District, which stretches from
    Washington Avenue to Carteret Avenue . . . .
    On February 6, 2020, NJDOT awarded plaintiff $700,000 in funding for
    the Extension. On May 2, 2022, CME submitted plans for the Extension, which
    included specifications, a design certification, and a cost estimate , to NJDOT
    for approval. Included within the plans were detailed construction drawings,
    which showed the location of the Extension, where and how it will intersect
    Roosevelt Avenue and Industrial Highway, the location of the proposed
    A-0355-23
    8
    driveways to the Carteret Terrace and Meridian complexes, and the proposed
    angled parking along the Extension.
    NJDOT provided detailed comments suggesting revisions. In response,
    CME submitted revised construction drawings to NJDOT. On May 12, 2022,
    NJDOT approved the resubmitted design for the Extension and authorized
    bidding for the project.
    Plaintiff and the County entered into an agreement that apportioned
    responsibility for work and funding in connection with the installation of traffic
    signals on both ends of the Extension. The County agreed, among other things,
    to perform all necessary engineering and design work related to the traffic
    signals and pay a portion of the construction costs.
    On March 7, 2023, after its attempts to negotiate the purchase of the
    properties from defendants failed, plaintiff filed its verified condemnation
    complaints and orders to show cause. The court consolidated the matters and
    entered an order to show cause. On May 5, 2023, the court conducted a hearing
    on the order to show cause at which defendants contended the taking was
    unnecessary, and therefore arbitrary and capricious. On May 10, 2023, the court
    entered an order, supported by a written opinion, finding a plenary hearing was
    A-0355-23
    9
    required and permitting the parties to engage in limited discovery "to ascertain
    the necessity of the present taking."
    On August 15, 2023, the court conducted a plenary hearing on plaintiff's
    application. Defendants' expert traffic engineer, Daniel Disario, testified the
    Extension is not designed in accordance with applicable American Association
    of State Highway and Transportation Officials (ASHTO) guidelines, New Jersey
    Residential Site Improvement Standards (RSIS), and plaintiff's own ordinances
    regarding intersection geometry. According to Disario, all those standards
    provide intersections should meet at approximately a ninety-degree angle and
    "angles less than [sixty] degrees normally warrant realignment closer to [ninety]
    degrees."
    In this case, the intersection with Roosevelt Avenue is fifty-eight degrees
    and the intersection with Industrial Highway is sixty-two degrees, which,
    according to Disario, violate all applicable standards for intersection geometry .
    Disario, however, agreed that "there are intersections in . . . [New Jersey],
    maybe even in the Borough, that have those kinds of skewed intersections, but
    in [his] opinion, when you[ are] designing something new[,] you should strive
    for better design rather than lesser design."
    A-0355-23
    10
    Disario testified that when plaintiff submitted its initial 2019 application
    for NJDOT funding, it misrepresented to NJDOT that the Extension would be
    built in compliance with ASHTO standards. Plaintiff also misrepresented to
    NJDOT that the angled parking spaces on the Extension would be unrestricted,
    even though plaintiff advised defendants the spaces would be reserved for their
    use.
    Disario testified that according to the Rutgers Study, fifteen percent of the
    anticipated ferry traffic, or as many as 330 vehicles per day, would use the
    Extension to access the ferry terminal, and the McCormick Study concluded
    forty-five percent of the ferry traffic would likely use the Extension. According
    to Disario, assuming the forty-five percent prediction in the McCormick Study
    is correct, the Extension is unnecessary because the existing roadways and
    intersections are sufficient to handle the predicted increased ferry traffic without
    "any change to the level of service that exists today." Disario opined the
    Extension "itself does not improve traffic flow in this area."
    Disario testified that, in "[his] opinion[,] . . . angled parking should[ not]
    be provided along local roadways" because it "inherently is not good design and
    inherently it[ is] less safe." Disario conceded angled parking is not prohibited
    and is provided on other streets within the Borough.
    A-0355-23
    11
    Disario also testified that defendants would be left with approximately
    260 parking spaces after the Extension is built even though over 300 are required
    by the RSIS. He conceded CME conducted a parking study and determined
    defendants used a maximum of 247 spots during the period of the study. Disario
    did not conduct any similar study.
    Disario also testified the Extension could result in garbage trucks needing
    to temporarily block the road when collecting trash. However, he conceded the
    Extension has the "potential to provide improved pedestrian access to the marina
    or ferry" and "any time you can enhance pedestrian connections, that[ is] a good
    thing."
    Defendants also called James C. Watson, a licensed professional engineer
    employed by CME and a consultant for the County, who testified the proposed
    intersections comply with County design standards. According to Watson, in
    accordance with NJDOT standards, "[sixty] degrees is a standard [CME] tr[ies]
    to hit" when designing roads for the County. "However, it is a . . . should
    condition. It[ is] not a hard standard that it has to be [sixty] degrees." Here, the
    proposed intersections "were right at that [sixty]-degree mark, somewhere
    between [fifty-eight], [sixty-two] degrees . . . ."    Watson also testified the
    intersections comply with applicable sight distance guidelines because they are
    A-0355-23
    12
    controlled by traffic signals and "there[ is] less concern with the . . . [sight]
    distances because as per ASHTO, we really only need the approaching vehicles
    to be able to see the stopped vehicles on the adjacent roadway . . . ."
    Watson testified that full-size WB-67 (sixty-seven foot) tractor-trailer
    vehicles would not be able to turn onto the Extension. However, the weight
    limit on the Extension would be four tons and a "WB-67 . . . does[ not] even
    come close to that weight limit."
    Defendant called John Paul Dupont, director of municipal engineering for
    the Borough, who testified the "Borough's consultant reviewed [the intersection
    angles] with the Borough. [They] did look at th[e] intersections and they were
    signalized and [they] were comfortable with that." Dupont also testified that if
    the Extension created any issues with trash collection, the Borough would assist
    with trash collection.
    Trevor Taylor, a civil engineer employed by CME who participated in the
    design of the Extension, testified for plaintiff as an expert in civil engineering.
    Taylor testified the 2019 application for DOT funding did not include detailed
    specifications for the Extension project because those details did not yet exist,
    and CME did not at that point know the dimensions and angles of the
    intersections. However, the subsequent NJDOT submission in 2022 did include
    A-0355-23
    13
    detailed design specifications that showed the proposed intersection geometry.
    The plans submitted in 2022 were the plans NJDOT approved. Subsequent to
    NJDOT approval, the specifications were changed to bring the internal
    driveways from the Extension into defendants' complexes closer to ninety
    degrees, but the intersections with Roosevelt Avenue and Industrial Highway
    were not modified from what NJDOT approved.
    With respect to the intersection angles, Taylor testified the proposed
    intersection with Roosevelt Avenue is fifty-eight degrees but "[w]hen you look
    at ASHTO, it says . . . 'should' . . . get as close to [sixty] as possible, so we use
    [sixty] as a benchmark . . . ." According to Taylor, "two degrees off from [sixty]
    degrees . . . [ is] close enough to [sixty] . . . ." Sight triangles are not required
    because the intersections are controlled by traffic lights. Taylor testified that
    power outages are not a significant concern because CME designs traffic signals
    with "a [twenty-four]-hour battery backup within the controller box and . . . a
    hookup for a generator . . . if . . . the power[ is] out for more than [twenty-four]
    hours . . . ."
    On September 15, 2023, the court entered an order for judgment and
    appointing commissioners, supported by a written opinion.                It rejected
    defendant's necessity claim because plaintiff is not required to prove the
    A-0355-23
    14
    proposed Extension is necessary and "the mere existence of alternative routes
    does not prove that [p]laintiff's desire for a new route is arbitrary." The court
    also found defendants' "safety concerns are not enough to deem the taking
    arbitrary." It noted NJDOT approved plaintiff's plans and design specifications
    and Taylor refuted defendants' claims regarding intersection angles and sight
    triangles.
    On September 25, 2023, the court entered an order appointing
    commissioners. Defendants subsequently moved for a stay pending appeal,
    which the court denied. On March 14, 2024, we granted defendants' motion for
    a stay.
    On appeal, defendants argue the trial court erred when it found plaintiff's
    proposed taking was not arbitrary and capricious. Specifically, they argue the
    court erred in finding the taking is necessary and justified and that the safety
    and design issues with the taking were justified under the law.
    We review de novo "[the] trial court's interpretation of the law and the
    legal consequences that flow from established facts . . . ." Manalapan Realty
    L.P. v. Twp. Comm. of Manalapan, 
    140 N.J. 366
    , 378 (1995). However, we
    defer to the court's factual findings when they are "'supported by adequate,
    A-0355-23
    15
    substantial and credible evidence.'" Zaman v. Felton, 
    219 N.J. 199
    , 215 (2014)
    (quoting Toll Bros., Inc. v. Twp. of W. Windsor, 
    173 N.J. 502
    , 549 (2002)).
    "'Eminent domain is the power of the State to take private property for
    public use . . . . It is a right founded on the law of necessity which is inherent
    in sovereignty and essential to the existence of government[.]'" Twp. of W.
    Orange v. 769 Assocs., L.L.C., 
    172 N.J. 564
    , 571 (2002) (alteration and
    omission in original) (quoting State v. Lanza, 
    27 N.J. 516
    , 529 (1958)).3
    Courts use a limited and deferential standard when reviewing a
    municipality's decision to use its eminent domain power. 769 Assocs., 
    172 N.J. at 571-72
    . "Ordinarily, when a municipality adopts an ordinance in the exercise
    of its power of eminent domain, that determination is presumed valid and
    entitled to great deference." Borough of Essex Fells v. The Kessler Inst. for
    Rehab., Inc., 
    289 N.J. Super. 329
    , 337 (Law Div. 1995) (citing Taxpayers Ass'n
    of Weymouth Twp. v. Twp. of Weymouth, 
    71 N.J. 249
    , 264 (1976)). "Courts
    3
    The Constitution gives the State the right to take private property for public
    use, but the State must pay "just compensation." N.J. Const. art. I, ¶ 20. The
    Constitution allows the Legislature to delegate the power of eminent domain to
    State agencies or political subdivisions. N.J. Const. art. IV, § 6, ¶ 3. The
    Legislature authorized municipalities to acquire through condemnation,
    N.J.S.A. 40A:12-2(a), "[a]ny real property[,]" N.J.S.A. 40A:12-4(a).
    A-0355-23
    16
    will generally not inquire into a public body's motive concerning the necessity
    of the taking or the amount of property to be appropriated for public use." Ibid.
    (citing Riggs v. Twp. of Long Beach, 
    109 N.J. 601
    , 613 (1988)). "[A] reviewing
    court will not upset a municipality's decision to use its eminent domain power
    'in the absence of an affirmative showing of fraud, bad faith, or manifest abuse.'"
    769 Assocs., 
    172 N.J. at 571
     (quoting City of Trenton v. Lenzner, 
    16 N.J. 465
    ,
    473 (1954)). Our Supreme Court has "never held that the standard is other than
    the manifest abuse of discretion test." 
    Id. at 578
    .
    The power of eminent domain is, however, subject to several
    constitutional limitations. "[T]he property acquired must be taken for a 'public
    use,' the State must pay 'just compensation' in exchange for the property, and no
    person shall be deprived of [their] property without due process of law." 
    Id. at 572
    . In addition, "when private property is condemned[,] the taking must be
    limited to the reasonable necessities of the case . . . ." Tex. E. Transmission
    Corp. v. Wildlife Pres., Inc., 
    48 N.J. 261
    , 269 (1966).
    "New Jersey courts traditionally have granted wide latitude to
    condemning authorities in determining what property may be condemned for
    'public use,' reasoning that it is the province of the Legislature to shape the
    contours of the 'public use' requirement." 769 Assocs., 
    172 N.J. at 572
     (first
    A-0355-23
    17
    citing Burnett v. Abbott, 
    14 N.J. 291
    , 294 (1954); then citing Lenzner, 
    16 N.J. at 473
    ). Public use is "anything that 'tends to enlarge resources, increase the
    industrial energies, and . . . manifestly contributes to the general welfare and the
    prosperity of the whole community.'" 
    Id. at 573
     (quoting Julius L. Sackman, 2A
    Nichols' The Law of Eminent Domain, § 7.02[2] (3d ed. rev. 1990)). "Given the
    broad definition of 'public use,' it is not essential that the entire community or
    even any considerable portion of the community directly enjoy or participate in
    the condemned property for the taking to constitute a 'public use.'" Ibid. (citing
    State Highway Comm'r v. Totowa Lumber & Supply Co., 
    96 N.J. Super. 115
    ,
    121 (App. Div. 1967)).
    Pursuant to these principles, we affirm substantially for the reasons set
    forth in the court's September 15, 2023 written opinion. We add the following
    comments.
    We are not persuaded by defendant's contention that plaintiff's use of the
    power of eminent domain in this case is arbitrary and capricious because the
    road extension is "unnecessary." Essentially, defendants contend sufficient
    routes to the waterfront area already exist and are adequate to handle the
    anticipated ferry terminal and waterfront area traffic without the Extension. As
    A-0355-23
    18
    a result, plaintiff should not be permitted to build the Extension because it is not
    necessary to do so.
    "Existence of a more desirable alternative [route] is one of the factors
    which courts have recognized as entering into the determination of whether a
    particular proposal would serve the public convenience and necessity." Tex. E.,
    
    48 N.J. at 273-74
    . Plaintiff's choice of the route, however, "is entitled to
    deference" and it "is under no affirmative obligation to show that the proposed
    road is superior to [another] right-of-way." 769 Assocs., 
    172 N.J. at 579
    . The
    "burden of proving arbitrariness in the choice of route will be on" the party
    challenging the condemnation. Tex. E., 
    48 N.J. at 275
    . Consistent with the
    applicable manifest abuse of discretion test, plaintiff need only establish "that
    the location of the right of way selected represented a reasonable and not
    capricious choice . . . ." 
    Id. at 275-76
    .
    We are satisfied plaintiff amply demonstrated its plan to construct the
    Extension over the chosen route is reasonable and not capricious.            By all
    accounts, hundreds of cars are expected to use the Extension every day to access
    the ferry terminal alone. The Extension will connect the heart of the Borough
    with the ferry terminal and waterfront area. It will also provide signal-controlled
    intersections for pedestrians to use when accessing the area. The choice of the
    A-0355-23
    19
    location for the Extension was anything but capricious. In fact, the concept of
    creating a thoroughfare like the Extension existed since at least 2004 and
    possibly decades before that. The route represents the most direct way to
    connect Carteret Avenue to the ferry terminal and waterfront area.
    Defendants' reliance on Borough of Glassboro v. Grossman, 
    457 N.J. Super. 416
     (App. Div. 2019), in support of their claim that plaintiff must
    establish necessity is misplaced. In Grossman, the proposed condemnation was
    based on the Local Redevelopment and Housing Law (LRHL), N.J.S.A.
    40A:12A-1 to -49, which authorizes a municipality to acquire land by
    condemnation for a redevelopment project only if the condemnation is
    "necessary for the redevelopment project." 
    Id. at 422
    .
    Based on that statutory limitation, we held a condemnation pursuant to the
    LRHL must be "reasonably necessary" for an identified redevelopment project,
    not to stockpile land for potential future projects. Grossman is not applicable
    here because the proposed condemnation is not based on the LRHL and plaintiff
    is taking the property for an identified and approved plan, not to stockpile
    property. Defendants' reliance on Casino Reinvestment Auth. v. Birnbaum, 
    458 N.J. Super. 173
     (App. Div. 2019), misses the mark for the same reasons.
    A-0355-23
    20
    Contrary to defendants' contention, plaintiff "is under no affirmative
    obligation to show that the proposed road is superior to [another] right-of-way."
    769 Assocs., 
    172 N.J. at 579
    . Nor is plaintiff under any obligation to prove the
    Extension is necessary. Plaintiff need only demonstrate the route selected is
    reasonable and not capricious. Tex. E., 
    48 N.J. at 275-76
    . We conclude plaintiff
    has more than satisfied that standard.
    We also conclude the court correctly rejected defendants' claims regarding
    the design of the intersections and angled parking spaces. These claims are
    based on various design standards and guidelines that are not absolute or
    intended for rigid application. They are, by their very terms, guidelines that
    "should" be applied as the case warrants when designing roadways.
    Of equal importance, the project plans, which included detailed drawings
    depicting the Extension and its intersections with Roosevelt Avenue and
    Industrial Highway, were reviewed and approved by NJDOT and the County's
    representatives and were reviewed by the Borough's employees.4 Defendants'
    4
    Defendants' contention that plaintiff made misrepresentations to NJDOT
    regarding the design of the Extension in its 2019 funding application lacks merit.
    As Taylor explained, the 2019 funding application was submitted before detailed
    design drawings were created and NJDOT approved the detailed drawings
    showing the intersection angles in 2022.
    A-0355-23
    21
    design claims are not sufficient to substantiate a finding of arbitrary or
    capricious conduct.
    We discern no basis to find plaintiff abused its considerable discretion in
    exercising its power of eminent domain in this case.
    To the extent we have not addressed any of defendants' remaining
    arguments, it is because they lack sufficient merit to warrant discussion in a
    written opinion. R. 2:11-3(e)(1)(E).
    Affirmed. The stay we entered on March 14, 2024, is continued for twenty
    days to permit defendants time to file a petition for certification and to seek a
    further stay from our Supreme Court.
    A-0355-23
    22
    