In the Matter of Protest Filed by El Sol Contracting and Construction Corp., Contract T100.638 ( 2024 )


Menu:
  •                              NOT FOR PUBLICATION WITHOUT THE
    APPROVAL OF THE APPELLATE DIVISION
    This opinion shall not "constitute precedent or be binding upon any court ." Although it is posted on the
    internet, this opinion is binding only on the parties in the case and its use in other cases is limited. R. 1:36-3.
    SUPERIOR COURT OF NEW JERSEY
    APPELLATE DIVISION
    DOCKET NO. A-0232-24
    IN THE MATTER OF PROTEST
    FILED BY EL SOL CONTRACTING
    AND CONSTRUCTION CORP.,
    CONTRACT T100.638.
    ________________________________
    Argued November 13, 2024 – Decided November 27, 2024
    Before Judges Gooden Brown, Smith, and Vanek.
    On appeal from the New Jersey Turnpike Authority.
    Michael F. McKenna argued the cause for appellant
    El Sol Contracting and Construction Corp. (Cohen
    Seglias Pallas Greenhall & Furman, PC, attorneys;
    Michael F. McKenna and Timothy R. Ryan, on the
    briefs).
    Thomas A. Abbate argued the cause for respondent
    New Jersey Turnpike Authority (Decotiis, Fitzpatrick,
    Cole & Giblin, LLP, attorneys; Judy A. Verrone,
    Thomas A. Abbate, and Jason S. Nunnermacker, on the
    brief).
    PER CURIAM
    This appeal concerns the rejection of a bid submitted by El Sol
    Contracting and Construction Corp. (El Sol) to the New Jersey Turnpike
    Authority (NJTA) for a contract to perform construction and repair work on
    several bridges. Although El Sol was the lowest bidder, NJTA rejected its bid
    because the consent of surety (COS) was not submitted with a power of attorney
    (POA) setting forth the signatory's authority to sign that document. After our
    thorough review of the record and prevailing law, we reverse and remand for
    NJTA to award the contract to El Sol, as the lowest responsible bidder.
    I.
    We discern the salient facts from the record. On May 20, 2024, NJTA
    solicited bids for Contract T100.638 (the Contract), to perform a project entitled
    the Deck Rehabilitation of Newark Bay-Hudson County Extension (NB-HCE)
    Bridge Zones 2 and 3 (Redecking Project).
    The project and bid requirements were described in written bid
    specifications (the Bid Specifications). The Redecking Project involves the
    reconstruction and repair of eleven bridges in two of the NB-HCE's three
    "zones," including repairs to the bridges' decks, structural steel repairs, parapet
    and median barrier replacements, and drainage and lighting improvements. The
    Redecking Project is meant to ensure motorists' safety until the bridges can be
    entirely replaced as part of a greater project to be completed in the next ten to
    fifteen years.
    A-0232-24
    2
    Section 102.07 of the Bid Specifications for the Redecking Project
    required that bids be "accompanied by a Proposal Guaranty" in the form of either
    a "Proposal Bond or Letter of Surety using the forms provided in [NJTA's]
    Electronic Bidding software." If a bidder chose to submit a Proposal Bond, it
    needed to be "in the sum of not less than ten percent (10%) of the total price of
    the Proposal."
    Section 102.08 of the Bid Specifications further stated:
    The Proposal Bond . . . shall be accompanied by a
    Power of Attorney and a Consent of Surety, each in a
    form acceptable to the Authority, which shall be
    executed by the surety company. The Power of
    Attorney shall set forth the authority of the attorney-in-
    fact who has signed the Proposal Bond . . . on behalf of
    the surety company and shall further certify that such
    power is in full force and effect as of the date of the
    Proposal Bond . . . . The Consent of Surety shall set
    forth the surety company's obligation to provide the
    Contract Bond upon award of the Contract to the
    Bidder.
    Section 103.02 of the Bid Specifications stated that the lowest responsible
    bidder awarded the Contract would be required, within ten days of receipt of the
    Contract, to "[f]urnish and deliver three copies of the Contract Bond," which was
    to be in an amount "not less than the total amount bid." The successful low
    bidder would also be required to "[f]urnish proof satisfactory to [NJTA], of the
    A-0232-24
    3
    authority of the person or persons executing the Contract and Contract Bond on
    behalf of the Contractor."
    Section 103.03 of the Bid Specifications stated that if the successful low
    bidder failed to comply with Section 103.02 and execute the Contract in a timely
    fashion, the Contract could be voided and the bidder forced to pay damages. In
    such an event, the bidder's surety company would be required to "pay [NJTA]
    the amount provided for in the Proposal [Bond]."
    NJTA received five bids by the June 25, 2024 deadline. El Sol submitted
    the lowest bid, at $70,865,354. Joseph M. Sanzari, Inc. (Sanzari) submitted the
    second lowest, at $80,735,000.
    El Sol's bid included a Proposal Bond bearing the name of Liberty Mutual
    Insurance Company (Liberty) as the surety company. El Sol's Proposal Bond
    was accompanied by a POA and a COS. The POA stated Liberty "name[d],
    constitute[d] and appoint[ed] Katherine Acosta . . . its true and lawful attorney -
    in-fact, with full power and authority hereby conferred to sign, execute and
    acknowledge" El Sol's Proposal Bond. The POA further stated Liberty may
    appoint attorneys-in-fact "to act on behalf of the Corporation to make, execute,
    seal, acknowledge and deliver as surety any and all undertakings, bonds,
    recognizances and other surety obligations." Pursuant to the POA, all attorneys-
    A-0232-24
    4
    in-fact so designated by Liberty, "subject to the limitations set forth in their
    respective powers of attorney, shall have full power to bind the Corporation by
    their signature and execution of any such instruments . . . ." The POA also stated
    "this Power of Attorney limits the acts of those named herein and they have no
    authority to bind the Company except in the manner to the extent herein . . . ."
    El Sol's Proposal Bond was "entered and executed by" Acosta.
    Liberty agreed in the COS that in the event El Sol was awarded and signed
    the Contract, it would, as surety, "execute or arrange for the execution of the
    necessary final bonds in an amount not less than 100% of the [El Sol's] Proposal."
    Acosta signed the COS as Liberty's representative.
    El Sol asserts that on June 26, it was advised at a post-bid meeting with
    NJTA's engineer of record that a recommendation would be made to the NJTA
    Commissioners to award it the Contract at its July meeting. El Sol was not
    awarded the Contract.
    Instead, on August 12, NJTA issued Document Change Announcement
    DCA2024SS-05, revising the Authority's 2016 Standard Specifications for future
    projects.   NJTA revised Section 102.08 of the Standard Specifications to
    "clarif[y] that Powers of Attorney related to Proposal Bonds must explicitly grant
    A-0232-24
    5
    authority to the attorney-in-fact to execute both the Proposal Bond and the
    Consent of Surety." The new language in Section 102.08 reads:
    The Proposal Bond . . . and the Consent of Surety shall
    be accompanied by a Power of Attorney evidencing the
    signatory's authority to bind the Surety to the Proposal
    Bond . . . and the Consent of Surety. The Power of
    Attorney shall expressly set forth the attorney-in-fact's
    authority to sign the Proposal Bond . . . and the Consent
    of Surety on behalf of the surety company, and shall
    further certify that such power is in full force and effect
    as of the date of the Proposal Bond . . . and the Consent
    of Surety. The Consent of Surety shall set forth the
    surety company's unqualified obligation to provide the
    Contract Bond upon award of the Contract to the
    Bidder. The Power of Attorney and Consent of Surety
    shall be in a form acceptable to the Authority.
    On August 19, NJTA advised El Sol that its bid was disqualified due to
    an "incurable" error, without further explanation. NJTA's agenda for its August
    27 Meeting included action to award the Contract to Sanzari. El Sol asserted it
    had never been given "any reasoning or clarification as to why" its bid had been
    disqualified and requested that NJTA adjourn its award of the Contract to
    Sanzari.
    NJTA subsequently issued a letter to El Sol stating its Board of
    Commissioners voted to award the Contract to Sanzari, attaching documentation
    indicating NJTA's Law Department recommended rejecting El Sol's low bid
    "due to failure to provide a valid Consent of Surety" and specifying "[t]he
    A-0232-24
    6
    limited Power of Attorney provided does not grant authority to bind the surety
    to issue the requisite contract bond."
    NJTA's Director of Law, Thomas F. Holl, explained to El Sol's attorney
    that a "fatal defect" with El Sol's bid documents was discovered during a legal
    compliance review. Holl asserted that El Sol's POA limited Acosta's authority
    as attorney-in-fact to "executing the proposal bond" and provided "no authority
    for [her] to bind the surety to the obligations contained in the [COS]." Holl said
    there was no evidence the COS was binding on Liberty, "which [was]
    tantamount to El Sol having submitted no [COS] at all." He characterized El
    Sol's documents as "nothing more than an empty promise unenforceable against
    [Liberty]," positing that El Sol's bid was non-responsive to the Bid
    Specifications.
    On August 27, Liberty wrote to NJTA to express its "strenuous[]
    disagree[ment]" with the rejection of El Sol's bid. Liberty explained that the
    Proposal Bond and COS were "a single instrument, contained in a single
    electronic file and labeled with the same identifying bond number specifically
    listed and authorized by the POA," asserting it was "clear that the bond and
    consent [were] both authorized by the POA." Liberty also stated it "would be
    happy to amend the POA" to contain language NJTA proposed. Two days later,
    A-0232-24
    7
    Liberty wrote to El Sol's counsel, offering a list of thirteen recent instances
    where NJTA awarded a contract to a bidder based on the exact language Liberty
    used in El Sol's documents.
    On August 30, El Sol submitted a formal bid protest to NJTA,1 arguing its
    POA and COS complied with Section 102.08 of the Bid Specifications and
    asserting that NJTA's revision to the specifications after the bid opening was
    evidence that a POA for the COS was not previously required. El Sol also relied
    on Liberty's correspondence as confirmation that the surety company believed
    itself fully bound by the COS to satisfy its obligations. On September 17, Holl,
    acting as Hearing Officer, upheld NJTA's award of the Contract to Sanzari.
    NJTA denied El Sol's request for a stay on September 20. On September
    23, El Sol filed its notice of appeal and an emergent application for a stay
    pending appeal. We granted El Sol's emergent motion and issued a stay pending
    disposition of the accelerated appeal. 2
    1
    El Sol's submission is dated August 28, 2024, but the final agency decision
    indicates it was not sent to NJTA until August 30, 2024.
    2
    On October 10, 2024, the Court denied NJTA's motion to vacate the stay and
    ordered accelerated disposition of this appeal.
    A-0232-24
    8
    II.
    Our review of agency actions is "limited." Pub. Serv. Elec. & Gas Co. v.
    N.J. Dep't of Env't Prot., 
    101 N.J. 95
    , 103 (1985). An agency's "final quasi-
    judicial decision" should be affirmed unless there is a "'clear showing' that it is
    arbitrary, capricious, or unreasonable, or that it lacks fair support in the record."
    Circus Liquors, Inc. v. Governing Body of Middletown Twp., 
    199 N.J. 1
    , 9-10
    (2009) (quoting In re Herrmann, 
    192 N.J. 19
    , 27-28 (2007)). The reviewing
    court is restricted to three inquiries:
    (1) whether the agency action violates the enabling act's
    express or implied legislative policies; (2) whether
    there is substantial evidence in the record to support the
    findings upon which the agency based [its] application
    of legislative policies; and (3) whether, in applying the
    legislative policies to the facts, the agency clearly erred
    by reaching a conclusion that could not reasonably have
    been made upon a showing of the relevant factors.
    [Pub. Serv. Elec. & Gas Co., 101 N.J. at 103.]
    "The burden of demonstrating that an agency's action was arbitrary, capricious,
    or unreasonable rests upon [the challenger to that action]." In re Arenas, 
    385 N.J. Super. 440
    , 443-44 (App. Div. 2006). "The interest of justice . . . authorizes
    a reviewing court to abandon its traditional deference . . . when an agency's
    decision is manifestly mistaken." Outland v. Bd. of Trs. of the Tchrs.' Pension
    & Annuity Fund, 
    326 N.J. Super. 395
    , 400 (App. Div. 1999).
    A-0232-24
    9
    III.
    After de novo review of the record and prevailing law, we conclude NJTA
    acted arbitrarily, capriciously, and unreasonably by rejecting El Sol's bid since
    the POA, COS, and Proposal Bond that El Sol submitted complied with the Bid
    Specifications in effect at the time of the bid opening. In re On-Line Games,
    279 N.J. Super. at 594. We therefore reverse NJTA's final agency decision and
    remand the matter to NJTA to award the contract to El Sol as the lowest
    responsible bidder pursuant to N.J.S.A. 27:23-6.1.
    The general purpose of bidding is to "secure for the public the benefits of
    unfettered competition."    Meadowbrook Carting Co. v. Borough of Island
    Heights, 
    138 N.J. 307
    , 313 (1994). Bidding advances the public interest "in
    securing [the] most economical result by inviting competition in which all
    bidders are placed on an equal basis . . . ." 
    Ibid.
     (citing River Vale Twp. v. R.
    J. Longo Const. Co., 
    127 N.J. Super. 207
    , 215 (Law Div. 1974)). In doing so,
    the bidding process "guard[s] against 'favoritism, improvidence, extravagance
    and corruption.'" 
    Ibid.
     (quoting Twp. of Hillside v. Sternin, 
    25 N.J. 317
    , 322
    (1957)).
    NJTA's bidding process is governed by N.J.S.A. 27:23-1 to -60 and the
    implementing regulations at N.J.A.C. 19:9-2.1 to -2.13. Other public bidding
    A-0232-24
    10
    statutes, such as the Local Public Contracts Law, 3 apply to NJTA's contract
    procurement, where the statutory authority does not conflict. George Harms
    Constr. Co. v. N.J. Tpk. Auth., 
    137 N.J. 8
    , 36 (1994) (relying on precedent under
    the Local Public Contracts Law).
    Under N.J.S.A. 27:23-6.1, NJTA must publicly advertise for bids for any
    contract where the anticipated expenditure is over $25,000, and must award the
    contract to "the lowest responsible bidder." N.J.A.C. 19:9-2.2(c)(6) similarly
    states that a contract bid by NJTA "shall be awarded with reasonable promptness
    by written notice to the lowest responsible and responsive bidder."           This
    regulation further provides that NJTA "retains the right to reject any or all bids,
    to waive informalities and minor irregularities, and to rebid the entire contract."
    
    Ibid.
    N.J.A.C. 19:9-2.2(c)(8) states that NJTA may require "bid or proposal
    bonds . . . in such form and format as deemed acceptable by the [g]eneral
    [c]ounsel" in an amount "deemed necessary . . . to guarantee the amount of the
    bid."    Similarly, N.J.A.C. 19:9-2.2(c)(9) provides that NJTA may require
    submission of "[p]erformance bonds, contract bonds, or consents of surety," also
    "in such form and format as deemed acceptable by the [g]eneral [c]ounsel" and
    3
    N.J.S.A. 40A:11-1 to -60.
    A-0232-24
    11
    in an amount deemed necessary "to ensure faithful performance of the contract
    or for the payment of persons performing work on the project."
    However, the requirements for the mandatory bid submissions "shall be
    set forth or specified in the bid specifications."    
    Ibid.
       All conditions and
    specifications "must apply equally to all prospective bidders," to foster and
    preserve a "common standard of competition." Hillside, 
    25 N.J. at 322
    . When
    evaluating whether a contracting agency's decision regarding a bid's conformity
    with specifications was proper, "the preliminary inquiry is whether the bid
    deviates from" those specifications. In re Protest of Award of On-Line Games
    Prod. & Operation Servs. Cont., 
    279 N.J. Super. 566
    , 594 (App. Div. 1995).
    We begin our analysis by defining relevant terms. A COS is a certificate
    from a surety company that assures the public entity that the surety will provide
    a contract bond if the contract is awarded to and signed by the bidder that has
    submitted it.   Meadowbrook Carting Co., 
    138 N.J. at 316
    .          It provides a
    guarantee at the time of bid submission "that the low bidder will have the
    capacity to perform the contract and to supply the necessary bonds." 
    Ibid.
    A POA is "a written instrument by which an individual known as the
    principal authorizes another individual . . . known as the attorney -in-fact to
    perform specified acts on behalf of the principal as the principal's agent."
    A-0232-24
    12
    N.J.S.A. 46:2B-8.2(a).    A POA's purpose is "not to define the authority
    conferred on the agent . . . but to serve as evidence to third persons" of the
    attorney-in-fact's "agency authority." Kisselbach v. County of Camden, 
    271 N.J. Super. 558
    , 564 (App. Div. 1994).
    Where a COS is required by bid specifications, failure to submit that
    document containing an unequivocal assurance that the surety company will
    provide the contract/performance bond upon award renders a bid materially
    defective. Id. at 321-25. Requiring a COS may deter potential competitors from
    bidding, so it is considered unfair for a public entity to waive that requirement
    after bids are opened. Id. at 323. Accordingly, the failure to submit a COS at
    all, or submission of a COS that does not "bind the surety to supply the required
    bonds when the contract [is] awarded" will "constitute[] a material, non-
    waivable defect in the bid." Mayo, Lynch & Assocs. v. Pollack, 
    351 N.J. Super. 486
    , 497 (App. Div. 2002).
    Section 102.07 of the Bid Specifications required the submission of a
    Proposal Bond in the amount of at least ten percent of the total proposal price.
    El Sol's Proposal Bond was accompanied by a POA executed by Liberty, as its
    surety company. The POA expressly stated that Acosta, the attorney-in-fact,
    was given authority "to sign, execute and acknowledge the following surety
    A-0232-24
    13
    bond," referencing the Proposal Bond.        The POA contained generalized
    language that an appointed attorney-in-fact would have the power to act on
    behalf of Liberty in signing and executing "any and all undertakings, bonds,
    recognizances and other surety obligations," subject to any limitations that may
    be set forth in a POA.
    Well-settled principles governing construction of contracts merit a
    conclusion that El Sol's bid was compliant with NJTA's Bid Specifications,
    which did not require bidders to submit a POA authorizing the execution of the
    COS. When interpreting a contractual provision, a court must first consider
    whether it is clear or ambiguous. Schor v. FMS Fin. Corp., 
    357 N.J. Super. 185
    ,
    191 (App. Div. 2002). When the terms are clear, they must be enforced as
    written. Karl's Sales & Serv. v. Gimbel Bros., 
    249 N.J. Super. 487
    , 493 (App.
    Div. 1991). A court may not "rewrite the contract merely because one might
    conclude that it might well have been functionally desirable to draft it
    differently." Brick Twp. Mun. Utils. Auth. v. Diversified R.B. & T. Constr. Co.,
    
    171 N.J. Super. 397
    , 402 (App. Div. 1979).
    The express language of Section 102.08 supports a conclusion that the
    POA was required only for the Proposal Bond and that there was no mandate in
    the Bid Specifications for a bidder to provide a POA authorizing the COS. T he
    A-0232-24
    14
    first sentence of Section 102.08 stated that a bidder's Proposal Bond needed to
    be accompanied by a POA, and a COS executed by the surety company. The
    plain language establishes the POA and COS were separate documents
    accompanying the Proposal Bond.
    The requirements of the POA were tethered only to the Proposal Bond,
    not to the COS. Section 102.08 stated the POA needed to set forth the authority
    of the attorney-in-fact "who has signed the Proposal Bond" and to certify this
    authority was "in full force and effect as of the date of the Proposal Bond." The
    POA requirements in Section 102.08 do not reference the COS in any way, nor
    does the COS language reference a POA. There is no requirement in the Bid
    Specifications that a POA authorizing the attorney-in-fact to bind the surety
    company to the COS be submitted with the bid package. Section 102.08 did not
    describe what authority the attorney-in-fact must hold with any detail, nor did it
    set forth what the COS needed to contain beyond a statement of the surety
    company's obligation to provide a Contract Bond upon award of the Contract to
    the bidder.
    El Sol's bid conformed to the written Bid Specifications in effect at the
    time of the bid opening since its POA explicitly granted the authority to Acosta
    to execute, sign and acknowledge the Performance Bond on behalf of Liberty .
    A-0232-24
    15
    Its bid also contained a COS stating Liberty was obligated to provide the
    Contract Bond in the event of award to El Sol, which is all that was required
    under the Bid Specifications for the Project. Thus, NJTA's rejection of El Sol's
    bid was arbitrary, capricious, and unreasonable, since it was not based upon any
    actual, material defect or deviation from the Bid Specifications.
    We are unconvinced that "common sense and settled practice in the
    construction industry" compels the conclusion that a POA is necessary to
    support a COS where the Bid Specifications do not require it.          The Bid
    Specifications inform whether a COS is mandatory and shall contain any and all
    requirements for the submission of that document. Meadowbrook Carting Co.,
    
    138 N.J. at 321-25
     (reasoning a valid unequivocally binding COS is a key
    unwaivable part of a bid where a public entity's specifications require on e).
    NJTA has not proffered any binding precedent supporting its position that the
    POA was impliedly required to authorize the COS such that its absence
    constitutes a material, non-waivable defect.     Recognizing such an implied
    requirement might allow unfettered discretion to reject bids for failure to
    provide a POA for other bid documents, without bidders having notice of the
    requirement through the Bid Specifications.
    A-0232-24
    16
    NJTA's revision to Section 102.08 of its Standard Bid Specifications to
    require a bidder's POA to state the attorney-in-fact's authority to sign and bind
    the surety company to both the Proposal Bond and the COS does not dictate the
    outcome here since the modification post-dates the bid opening date for the
    Project. In light of NJTA's position at oral arguments that Section 102.08 was
    not ambiguous, we conclude that adding the requirement that a POA specifically
    authorize the COS was an acknowledgment of the previously absent
    requirement. Any of NJTA's practical concerns in obtaining assurances that El
    Sol will execute the Contract and perform its contractual obligations are
    obviated by Liberty's representation that the POA submitted with El Sol's bid
    binds it to the COS and to issue the required Contract Bond, coupled with its
    offer to modify the language of the POA to address the issue.
    NJTA does not dispute El Sol's submission that on thirteen prior projects,
    it had no concerns about the enforceability of the same form of COS provided
    by Liberty Mutual with El Sol's bid.4 No factual proffer justifying the change
    in position appears in the record.
    4
    We decline to consider El Sol's submission of an October 31 letter from
    Liberty in furtherance of its equitable estoppel argument since the letter was not
    before NJTA at the time of its decision.
    A-0232-24
    17
    We are mindful of the general principle that estoppel against a government
    entity is disfavored, see Cipriano v. Dep't of Civ. Serv. of State of N.J., 
    151 N.J. Super. 86
    , 91 (App. Div. 1977), especially when it would interfere with
    "essential governmental functions." Vogt v. Borough of Belmar, 
    14 N.J. 195
    ,
    205 (1954). However, the Court has applied estoppel against the government to
    prevent manifest wrong and injustice. See Meyers v. State Health Benefits
    Comm'n, 
    256 N.J. 94
    , 100 (2023) (citing Gruber v. Mayor & Twp. Comm. of
    Raritan Twp., 
    39 N.J. 1
    , 14 (1962)). Given our decision that NJTA improperly
    rejected El Sol's bid predicated on the plain language of the Bid Specifications
    for the Project and the dearth of binding precedent requiring a POA for a COS,
    an analysis of whether equitable estoppel applies need not be reached.
    Any arguments not addressed in this decision are without sufficient merit
    to warrant discussion in a written opinion. R. 2:11-3(e)(1)(E).
    Reversed and remanded.        We do not retain jurisdiction.        The stay
    previously granted is continued for three business days from entry of this
    decision by the clerk to allow the parties to seek emergent relief from the
    Supreme Court. Should any party file an emergent application with the Supreme
    Court, the stay shall continue until the Supreme Court disposes of that
    application, or until further order of the Court.
    A-0232-24
    18
    