    BERNADETTE CIESLAK, et al.,                            :
    CASE NO. CA2014-02-026
    Plaintiffs-Appellees,                          :
    OPINION
    :                   8/25/2014
    - vs -
    :
    M&C EXCAVATING                                         :
    AND SEPTIC SYSTEMS,
    :
    Defendant-Appellant.
    :
    CIVIL APPEAL FROM BUTLER COUNTY AREA II COURT
    Case No. CFV1100940
    Robinson, Lipnickey & Jones Co., L.P.A., Tara R. Jones, 14 W. Park Place, Suite D, Oxford,
    Ohio 45056, for plaintiffs-appellees
    Timothy R. Evans, 110 N. Third Street, Hamilton, Ohio 45013, for defendant-appellant
    M. POWELL, J.
    {¶ 1} Defendant-appellant, M&C Excavating and Septic Systems (M&C), appeals a
    decision from the Butler County Area II Court granting judgment in favor of plaintiffs-
    appellees, Bernadette and Matthew Cieslak, and awarding them $7,550 in damages for their
    septic system.
    {¶ 2} In April 2009, the Cieslaks purchased a residential property in Hamilton, Ohio
    Butler CA2014-02-026
    (the property) and subsequently rented it.       The property used a septic system which
    consisted of a septic tank, a leach field, and the associated piping. In September 2009, after
    their tenants experienced problems with toilets and their bathtub, the Cieslaks had the septic
    tank pumped by a third party. This did not correct the problem, however. Consequently, the
    Cieslaks called M&C in October 2009; Wayne Neely (Neely) came to the property. Neely is
    the son of Michael Neely (Mike Neely) whose wife owns M&C. Mike Neely works for M&C;
    Neely does so as well, occasionally.
    {¶ 3} Upon inspecting the septic system, Neely told the Cieslaks that both the
    discharge pipe from the septic tank leading to the leach field and the four-inch leach lines
    were failing and needed to be replaced by eight-inch pipes. Neely also noticed that the
    septic tank was old and missing a baffle. According to Matthew Cieslak, Neely did not
    address the tank with him at all. According to Neely, he told the Cieslaks about the tank.
    The Cieslaks paid Neely $1,250 as a down payment for the work. The receipt for the deposit
    was on M&C letterhead.
    {¶ 4} Neely performed the work when the Cieslaks and their tenants were out of
    town. According to Neely, he replaced the pipe coming out of the tank with a four-inch pipe,
    replaced the existing leach lines with eight-inch leach lines, and connected the four-inch pipe
    with the new leach lines with a reducer. He also installed a baffle in the tank.
    {¶ 5} In December 2009, sewage began pooling in the backyard. After multiple calls
    from the Cieslaks, Neely and his father came to the property in the spring of 2010. The
    Neelys told the Cieslaks that because of the tenants' heavy use of water, the leach field was
    not big enough. Subsequently, M&C extended the leach lines. In the summer of 2010,
    several sewage pools appeared in the backyard. Matthew Cieslak rented a bobcat and filled
    the sewage pools with dirt. In October 2010, the tenants once again experienced problems
    with toilets and their bathtub. Matthew Cieslak inspected the septic tank, saw that it was full,
    -2-
    Butler CA2014-02-026
    and had it pumped. The Cieslaks then called Napier Plumbing & Mechanical, a plumbing
    company they had used before.
    {¶ 6} James Napier came to the property in November 2010. The septic tank was
    once again full. Upon inspecting the septic system, Napier noticed that the pipe between the
    house and the septic tank was crushed and had collapsed. Napier replaced the pipe with a
    new four-inch pipe. The Cieslaks paid him $800 for the work. Issues with the septic system
    continued however. Napier came back to the property in December 2010.
    {¶ 7} Napier determined that the septic system was not leaching and the leach field
    was full of fecal matters. Upon inspecting the septic tank, Napier observed that it did not
    have either a skimmer or a baffle, both critical components of a septic tank; there were
    cracks on both sides of the tank; there was a gaping hole on the end of the tank connecting
    to the leach field; and the tank was missing "a big chunk" of concrete near the gaping hole.
    Napier also observed that the pipe connecting the tank to the leach field was an eight-inch
    pipe rather than a four-inch pipe, the pipe was "sticking inside of the tank," and there was no
    sealant.
    {¶ 8} With regard to the gaping hole, Napier explained it looked like as if it had been
    "beat out" to fit the eight-inch pipe into the tank. Napier also explained that whenever the
    hole had been knocked in the tank, "it actually broke the corner of it down and it, actually the
    lid was collapsing on top of it." Because of its numerous problems, the tank was not safe,
    was on its way to collapse, and had to be replaced. Consequently, Napier replaced the tank
    with a new, 1,200-gallon tank, ran a four-inch pipe from the tank and connected it to an eight-
    inch leach pipe with a reducer, added a new leach field, and installed a diverter valve to
    divert the septic system into the new leach field to allow the other leach field to dry out. The
    invoice for this work was $8,700.
    {¶ 9} On October 20, 2011, the Cieslaks filed a complaint against M&C for breach of
    -3-
    Butler CA2014-02-026
    contract, breach of duty of workmanlike performance, and unjust enrichment. A hearing was
    held before a magistrate. At issue were whether Neely was an agent of M&C, performed the
    job in a workmanlike manner, and caused damage to the septic tank resulting in the tank
    having to be replaced. Also at issue was the amount of damages to be awarded to the
    Cieslaks as a result of Neely's performance. The Cieslaks, Neely, Mike Neely, Napier, a
    former tenant of the Cieslaks, and the director of the Butler County Health Department
    testified at the hearing.1
    {¶ 10} On December 1, 2012, the magistrate granted judgment in favor of the Cieslaks
    and awarded them $8,350 in damages. The magistrate found that Neely was an agent of
    M&C and thus, M&C was liable for the work performed by Neely. The magistrate also found
    that M&C caused the damages to the septic system which resulted in the replacement of the
    septic tank.
    {¶ 11} M&C filed objections to the magistrate's decision. M&C argued the magistrate
    erred in finding that Neely was an agent of M&C. M&C also challenged the amount of the
    damages award on the ground the Cieslaks failed to prove their damages were caused by
    either M&C or Neely.
    {¶ 12} On January 13, 2014, the trial court overruled in part and granted in part M&C's
    objections. The trial court found that Neely was an agent of M&C, did not perform his job in a
    workmanlike manner, and caused damages to the septic system. As a result, the trial court
    found that M&C was liable for the damages caused by Neely. The trial court, however,
    reduced the magistrate's damages award by $800, and awarded $7,550 in damages to the
    1. At the hearing, after the Cieslaks rested their case, M&C orally moved to dismiss the case on the grounds the
    Cieslaks had failed to prove that Neely was an agent of M&C and that the various damages to the septic system
    were caused by Neely and/or M&C. The magistrate took the motion under advisement. M&C renewed its
    motion to dismiss at the close of its case. The magistrate never ruled on the motion. However, by granting
    judgment in favor of the Cieslaks, we presume the magistrate overruled it. Woodworking Shop, L.L.C. v. Shay,
    12th Dist. Butler No. CA2009-12-298, 
    2010-Ohio-4568
    , ¶ 4, fn. 1.
    -4-
    Butler CA2014-02-026
    Cieslaks.
    {¶ 13} M&C appeals, raising one assignment of error:
    {¶ 14} THE COURT ERRED WHEN IT FAILED TO GRANT DEFENDANT'S MOTION
    TO DIMISS AND THE JUDGMENT IS AGAINST THE MANIFEST WEIGHT OF THE
    EVIDENCE CONTRARY TO LAW AND IS NOT SUSTAINED BY SUFFICIENT EVIDENCE.
    {¶ 15} M&C argues the trial court erred in finding that Neely was an agent of M&C
    when he performed work on the Cieslaks' septic system. M&C also argues the trial court
    erred in awarding damages to the Cieslaks.
    {¶ 16} An agency by estoppel is created where a principal holds an agent out as
    possessing authority to act on the principal's behalf, or the principal knowingly permits the
    agent to act as though the agent had such authority. Cyrus v. Home Depot USA, Inc., 12th
    Dist. Clermont No. CA2007-09-098, 
    2008-Ohio-4315
    , ¶ 11, citing McSweeney v. Jackson,
    
    117 Ohio App.3d 623
    , 630 (4th Dist.1996). The burden of proving the existence of an
    agency relationship rests upon the party asserting the agency. See Akers v. Classic
    Properties, Inc., 12th Dist. Warren No. CA2003-03-035, 
    2003-Ohio-5436
    .
    {¶ 17} "For a principal to be bound by an agent's acts, the evidence must show that: 1)
    the defendant made representations leading the plaintiff to reasonably believe that the
    wrongdoer was operating as an agent under the defendant's authority; and 2) the plaintiff
    was thereby induced to rely upon the ostensible agency relationship to his or her detriment."
    Cyrus at ¶ 11, citing Shaffer v. Maier, 
    68 Ohio St.3d 416
    , 418 (1994). The apparent power of
    an agent is to be determined by the acts of the principal, and not by the acts of the agent.
    See Schaffer at 419; Sevruk v. Carr, 12th Dist. Butler No. CA2002-01-022, 
    2002-Ohio-4707
    .
    {¶ 18} Upon recognizing there was conflicting evidence and resolving it in favor of the
    Cieslaks, the trial court found that Neely was an agent of M&C on the following grounds:
    The evidence was that M&C is a family-owned business and that
    -5-
    Butler CA2014-02-026
    Wayne Neely is a part of that family. This court also finds that,
    because the [Cieslaks] called M&C's phone number; that
    because Mike Neely, as owner of M&C, went with his son,
    Wayne, to the Cieslaks' property in order to address the issues;
    that, because on at least one occasion, Wayne went to the
    property in an M&C truck; that because the receipt for the
    deposit paid by the Cieslaks was on M&C letterhead; and that
    because M&C applied for a work permit with the Butler County
    Health Department, there was sufficient evidence to prove that
    M&C had been hired by the [Cieslaks] to do the plumbing work
    and that Wayne Neely was acting as an agent on behalf of M&C.
    M&C is therefore a proper party Defendant and is liable for the
    damages caused by its agent, Wayne Neely.
    {¶ 19} The existence of an agency relationship is a question of fact. McSweeney, 117
    Ohio App.3d at 631.      Consequently, a reviewing court will not overrule reasonable
    conclusions by the trier of fact simply because the reviewing court might not have reached
    the same result. Id. While there is conflicting evidence in this case, we find that the trial
    court's decision was supported by the record and that it was reasonable to conclude that an
    agency relationship existed between M&C and Neely. Id.
    {¶ 20} We therefore hold that the trial court did not err in finding that Neely was an
    agent of M&C when he performed work on the Cieslaks' septic system. We now address the
    amount of damages awarded to the Cieslaks by the trial court.
    {¶ 21} The Cieslaks sought $13,350 in damages, to wit: $3,150 paid to M&C and/or
    Neely to fix the septic system; $700 paid to pump the septic tank, grade the yard, and haul
    away raw sewage; $800 paid to Napier to install a new pipe from the house to the septic
    tank; and $8,700 for a new septic tank. The magistrate rejected the Cieslaks' contention that
    a septic system should last forever and instead found "that there is some depreciation to a
    septic system." Accordingly, the magistrate reduced the award sought by $5,000 and
    awarded the Cieslaks $8,350 in damages.
    {¶ 22} M&C objected to the damages award on the ground, inter alia, that the $800
    paid to Napier to install a new pipe between the house and the septic tank was not related to
    -6-
    Butler CA2014-02-026
    any of the work performed by Neely or M&C. The trial court agreed:
    Napier testified that he could not correlate the damage between
    the house and the tank to any of the work performed by M&C. It
    appears, instead, that this damage was independent of any of
    the work performed by M&C. * * * This court finds, however, that
    in all other respects, the damages are properly attributable to
    M&C.
    Consequently, the trial court subtracted the $800 paid to Napier from the magistrate's $8,350
    award and awarded the Cieslaks $7,550 in damages.
    {¶ 23} On appeal, M&C challenges the damages award on the ground that "the only
    evidence was the cost of replacing the septic tank and there was no evidence of the
    difference in fair market value of the property before and after the damage, which is the
    actual measure of damages." However, M&C failed to raise this issue with the trial court in
    its objections to the magistrate's decision, does not claim plain error here, and is
    consequently precluded from raising this issue on appeal. See Civ.R. 53(D)(3)(b); Chivukula
    v. Williams, 12th Dist. Butler No. CA2009-07-187, 
    2010-Ohio-1634
    , ¶ 9-10.
    {¶ 24} M&C also argues "there was no evidence as to the amount of damage, if any,
    caused by M&C Excavating or Wayne Neely."              In addition, "the magistrate awarded
    $8,350.00 later reduced to $7,550.00 by the court without any justification on how it arrived at
    the figure."
    {¶ 25} The trial court found, and we agree, that the "magistrate did provide his
    explanation regarding his assessment of the costs[.]" The magistrate's decision to award
    $8,350 to the Cieslaks was based upon the costs incurred by the Cieslaks between
    November 2009 and December 2010 as broken down in the magistrate's findings of facts,
    and the magistrate's determination to reduce the Cieslaks' claim by $5,000 to account for
    septic system depreciation. While the magistrate did not explain how he arrived at the
    $5,000 figure, M&C never raised this specific issue in its objections to the magistrate's
    -7-
    Butler CA2014-02-026
    decision and has therefore waived it on appeal. See Chivukula, 
    2010-Ohio-1634
    .
    {¶ 26} We further find the record supports the trial court's award of $7,550 in damages
    to the Cieslaks. It is true that Napier did not know who or what caused the damage to the
    septic tank, which included the gaping hole and the missing chunk of concrete. However, the
    record shows that pools of sewage did not start to appear in the backyard until after Neely
    replaced the pipe connecting the tank to the leach field in October 2009.
    {¶ 27} Neely testified he replaced that pipe with a four-inch pipe which he then
    connected to an eight-inch pipe by using a reducer. He also testified he installed a baffle in
    the septic tank as the latter was missing one. Yet, when Napier inspected the septic tank
    over a year later, the tank did not have a baffle and the pipe connecting the tank to the leach
    field was not a four-inch pipe but rather, was an eight-inch pipe that had been forcefully
    inserted into the tank. Further, Napier did not find a reducer. At the hearing, Neely's only
    possible explanation as to why Napier did not find a baffle was that "the glue didn't attach."
    He also could not explain why Napier did not find a reducer. While the tank had several
    issues not necessarily related to Neely's work, it did not have a baffle and had to be replaced.
    Napier testified that a septic tank without a baffle is "worthless". Further, the trial court did
    not award the full cost of replacing the tank but rather upheld the magistrate's subtraction of
    $5,000 for depreciation.
    {¶ 28} With regard to the other costs sought by the Cieslaks, each of the amounts is
    supported by the record and the Cieslaks' exhibits. At the outset, we find that the trial court
    properly declined to award $800 to the Cieslaks for Napier's replacement of the pipe between
    the house and the septic tank as there was no correlation between the damage to that pipe
    and Neely's work. The $700 sought by the Cieslaks were incurred after sewage pools
    appeared in the backyard following Neely's work in October 2009. Specifically, Matthew
    Cieslak testified he rented a bobcat to fill the sewage pools with dirt in the summer of 2010,
    -8-
    Butler CA2014-02-026
    and had the septic tank pumped in November 2010 prior to Napier's first visit.
    {¶ 29} The Cieslaks also sought $3,150 in damages for the amount they paid Neely for
    his work. The parties do not dispute that the Cieslaks paid Neely $1,250 as a down payment.
    Matthew Cieslak testified they later paid an additional $1,900 to Neely. By contrast, Neely
    testified he only received $1,250 from the Cieslaks. However, the carbon copy of the receipt
    Neely gave to the Cieslaks shows an additional amount paid by the Cieslaks (it is not clear if
    that amount is $1,400 or $1,900). The additional amount is written in black ink in contrast to
    the faded grey handwriting for the $1,250 down payment. Neely testified he did not know if
    he wrote the additional amount on the receipt but admitted it looked like his handwriting.
    {¶ 30} In light of the foregoing, we find that the trial court did not err in awarding
    $7,550 in damages to the Cieslaks. M&C's assignment of error is accordingly overruled.
    {¶ 31} Judgment affirmed.
    HENDRICKSON, P.J., and PIPER, J., concur.
    -9-
    

Document Info

Docket Number: CA2014-02-026

Citation Numbers: 2014 Ohio 3660

Judges: M. Powell

Filed Date: 8/25/2014

Precedential Status: Precedential

Modified Date: 10/30/2014