Smith v. Northern Pacific Railway Co. ( 1914 )


Menu:
  • Fullerton, J.

    The respondent, plaintiff below, brought this action against the appellant railway company, under the Federal employer’s liability act, to recover for personal injuries suffered by him while in the appellant’s service as a member of its bridge crew. At the trial, the superior court refused to direct a verdict in the appellant’s favor, and the jury returned a verdict for the respondent in the sum of $15,000. Judgment was afterwards entered on the verdict, and this appeal taken therefrom.

    At the time of the accident giving rise to the injury, the appellant was engaged in repairing a bridge extending across a stream on one of its branch lines. The repair work necessitated the driving of piles. Timbers suitable for piling were hauled by the appellant and unloaded alongside of the railway track, a short distance back from the margin of the stream. The respondent’s duty was to cut the timbers into *450proper lengths for use as piles and prepare the points and heads for driving. The work of driving the piles was carried on as the respondent prepared them for use. To drive the piles, the appellant used a pile driver fastened upon a flat car, which car was moved forward and back along the railway track by means of a locomotive engine. The uprights or leads of the pile driver were 35 feet in height, while the piles then being driven were 55 feet long. To pick up a pile for driving, the car containing the pile driver was moved along the railway track to a point opposite the pile and stopped, or, in technical parlance, spotted. The cable of .the pile driver which passed over the top of the leads was then fastened to the pile, and by means of the engine which operated the pile driver, the pile was hauled up between the leads into an upright position. As the piles in this instance were some 20 feet longer than the leads of the pilé driver, it was necessary, in order that the piles might be clear of the track when placed between the leads, to fasten the cable some 20 feet back from the top or heavy end of the pile.

    A pile was being picked up in the manner described at the time the respondent was injured. He assisted in fastening the cable to a pile and moved across to the opposite side of the track from the pile when a signal to hoist was given the engineer operating the pile driver engine. After the end of the pile had been hoisted to a height of some 10 or 12 feet it suddenly swung over to the side of the track on which the respondent was standing, where it struck the respondent and caused the injuries for which he sues.

    Noticing the errors assigned in the order in which the appellant presents them, it is first contended that there is no allegation in the complaint, .or proof in the record, that the branch line of the appellant’s railway, on which the accident happened, was used by it in its business of carrying interstate commerce. But.while the allegation of.the complaint was not as full in this respect as it could have been made, we think.it sufficient, as against an objection raised for the first time by *451motion for an instructed verdict. In the complaint, it is alleged that the appellant “is at this time, and was at all the times herein mentioned, a corporation organized and existing under the laws of the state of Wisconsin, owning and operating an interstate system of railways, with several branches in the western part of the state of Washington, engaged in commerce between the several states from Minnesota to Puget Sound and Oregonand that one of its branch lines extended “out from the city of Tacoma southeasterly, herein called the Wilkeson branch,” on which the accident to the respondent happened. It is true, as the appellant argues, there is no direct allegation in the complaint that the so-called Wilkeson branch was, at the time of the injury, used by the appellant in interstate commerce, but we think it is clearly so inferable from the other facts alleged. While the language might have been better chosen, it is plain that the pleader meant to allege, and would be commonly understood as alleging, that the interstate system as well as the several branches mentioned were used by the appellant in its business of interstate commerce. Moreover, the record discloses that the trial proceeded throughout on this theory. The motion for a directed verdict, which is now thought to have raised the. question, was couched in language so general as not to call attention to the particular question, and was, furthermore, submitted without argument; and, indeed, the court charged the jury, without exception from the appellant, that the fact that the appellant was engaged in interstate commerce on this branch of its road was conceded by both the parties. This being true, it is too late to urge the question in this, court.

    The allegations of the complaint in the respect mentioned were admitted in the answer, and since we hold them sufficient, it was of course not necessary that proof thereof be tendered or made.

    It is next contended that the evidence failed to show negligence on the part of the appellant. But we think the most *452that the appellant can claim on this branch of the case is that the evidence was in dispute. The evidence on the part of the respondent tended to show that, when the pile swung from the one side of the track to the other, it was sufficiently high to have swung clear of the respondent had the engineer operating the pile driver engine held on to the line; that it was his duty to hold the line unless he received a signal from the signalman, directing the operations, to let go; that he let go of the line without such a signal, and it was because of his neglect of his duty in this respect that the pile fell upon the respondent. Stress is laid on the fact that no one was able to testify directly that they saw the pile dropped by the engineer. But the conclusion was inferable from other facts shown, and this justified the trial court in submitting the question to the jury.

    The respondent, among other injuries, sustained a fracture of the femur of the left leg. When still in the hospital, although going about on crutches, he fell while attempting to descend a stairway and refractured the bone at the place of the original fracture. This accident confined him to his bed for an additional eleven weeks, and correspondingly increased his sufferings and delayed his recovery. The appellant introduced evidence tending to show that the respondent was in an intoxicated condition at the time of the second fracture, and that such fracture was the direct and proximate result of his intoxicated condition. In its charge to the jury upon this question, the court instructed them that, if they found that the respondent was in an intoxicated condition at the time he received his second injury, and that such condition was the direct and proximate cause of such second injury, then the appellant would not be liable in damages for the ádditional suffering and delay in recovery caused thereby, but would be liable only for such damages as were the direct and proximate result of the original injury; adding thereto that, if they found that the respondent was intoxicated at the time he fell and fractured his leg the second time, but *453that his fall was not the result of his intoxicated condition, then they should disregard such fact in making up their verdict.

    Error is assignéd on the last part of the instruction, but manifestly it is a correct statement of the law. If a person receives an injury through the negligent act of another, and the injury is afterwards aggravated, and a recovery retarded through some accident not the result of want of ordinary care on the part of the injured person, he may recover for the entire injury sustained, as the law regards the probability of such aggravation as a sequence and natural result likely to flow from the original injury.

    In the course of the argument to the jury, one of the attorneys for the respondent made statements to the effect that there was no evidence before them concerning a particular fact. The attorney for the appellant had the stenographer in attendance upon the court transcribe extracts from the testimony of a certain witness, and when arguing the appellant’s case to the jury, sought to read these extracts as controverting the attorney’s statements. An objection was made to the reading of the extracts unless the whole of the evidence of the witness should be read. The court sustained the objection, whereupon the attorney requested that the stenographer read the parts transcribed from his shorthand notes, which request was also denied by the court. These rulings are assigned as error, but we do not think them so. How many times a witness may be recalled on a particular matter, or how many times his evidence may be repeated to the jury, rests in the sound discretion of the court, to be reviewed only for abuse. Here we find no abuse of discretion. The attorney was not denied the right to refresh his memory from the stenographic notes, or from any memorandum he may have made of the evidence otherwise, nor was he denied the right of stating to the jury his remembrance of the testimony of any witness, nor from drawing any deduction or conclusion he chose to draw therefrom. He *454was' denied only the right of doing what amounted virtually to a recall of the witness and have him repeat to the jury what he had testified on a particular matter. Doubtless in the interests of truth and justice the trial judge may permit such a practice, but it does not belong to either litigant to demand it as an absolute right.

    Lastly, it is contended that the verdict is excessive, and with this contention we are constrained to agree. Unques-. tionably the respondent’s injuries were severe, and he has suffered much because thereof. But, nevertheless, we think the verdict ought not to be allowed to stand for the amount returned by the jury. The resultant effect of' the injury is a shortened and otherwise deformed leg, which will probably not permit the respondent to engage in the avocations followed by him prior to his injury. But his physical health is otherwise good, and as we said in passing upon a similar injury, there are avocations open to him which he may still pursue. In finding the amount of the recovery, this is a proper consideration, and seemingly the jury, which gave but thirty minutes to a consideration of the case, did not sufficiently consider it.

    The judgment appealed from will therefore be reversed and the cause remanded with instructions to grant a new trial, unless the respondent will, in writing, within thirty days after the remittitur from this court reaches the trial court, consent to a judgment of ten thousand dollars. If he so consents, judgment shall be entered in his favor for that sum. If he fails to consent within the time named, a new trial will be granted.',

    Crow, C. J., Mount, Morris, and Parker, JJ., concur.