-
GAINES, Associate Justice. The appellant sued appellee to recover damages for a depreciation in value of his lot in the town of La Grange, alleged to have resulted from the construction of appellee’s road and the operation of its trains along a street in front of his property.
In defense appellee alleged that appellant, with others, before the construction of its road, had entered into a contract with it to procure for it the right of way through "the town, and that they did procure the right, of way along the street upon which the railway was constructed.
The contract was made a part of the answer, and .it appears by its terms, that the plaintiff and others bound themselves, among other things, “ to-obtain and procure free of all costs and expenses of the 23arty of the first part of the owners thereof for the party of the first 23art the right of way over all and every tract of land over and through which the line of said railway may enter and pass in the county of Fayette, the said right of way to be not less than 100 feet in width outside of the corporate limits of towns and not less than 100 feet in width inside of the corporate limits of* towns, except when the line is located through streets already laid out, in which case the right of way shall be so much of said 'streets as is requisite for the operation of said road, and which right of way shall be obtained from the municipal authorities of said town.”
The 23roperty injured was the lots U2>on which the plaintiff resided with his family, and the damages were alleged to result—first, from a faulty construction of the embankment upon which the track was laid in obstruct*
*327 ing the previous flow of water and in causing it to stand in pools near and upon the lots; and in the second place, from noise, dust, smoke, and cinders caused by the operation of the company’s trains.There was evidence tending to establish the facts alleged in the petition as to the manner of the construction of the railroad in front of the lots and as to the result of that construction and the operation of the trains. There was a conflict in the testimony upon the question whether the property had been depreciated in value or not and as to the extent of the depreciation. There was, however, testimony that the value of the property had been diminished by the.amount of $1000 from the combined effects of the embankment and of the operation of the trains, but no witness testified what proportion of the depreciation was attributable to the one cause or what to the other.
The court instructed the jury as follows: “You are instructed that the terms of the-contract entered into by plaintiff with the defendant company estops the plaintiff from asserting a recovery of damages that may result from the ordinary and proper operation of trains. . You are further instructed that the injury to plaintiff’s premises, if any, occasioned by an alleged defective construction of the road is not of a permanent nature to the land, but renders it liable to overflows; neither the allegations of plaintiff’s petition nor the evidence before you is sufficient to support a recovery for injury the premises may have sustained from successive overflows as they may have occurred. You are therefore instructed to return a verdict for defendant.”
We think there was error in holding that the plaintiff was estopped by the contract with the defendant to procure the right of way. If the property had abutted upon the right of way out of a town our ruling might be different; but that question does not arise in this case and we give no opinion upon it. But the contract expressly provides what the subscribers were to do in order to procure the right of way of the company along the streets of a town, and that is that they were to obtain the consent of the authorities of the corporation. This not only defines their obligation, but is also a practical limitation upon their liability, and does not in our opinion admit of the construction that they were both'to procure consent of the town authorities and to secure to the defendant immunity from the payment of damages to persons owning property which abutted on streets along which the right of way should be established, and which might be injured by the operation of the road. When the consent of the municipal authorities of La Grange for the construction of the road was procured the contract was performed so far as the street and the holders of abutting property were concerned, and the plaintiff was not estopped to claim damages for a depreciation in his property resulting from noise, smoke, cinders, and dust created by passing trains. The operation of the road under the circumstances complained of, if done without authority
*328 of law, would have been a nuisance. The company lawfully acquired the right to operate the road along the street, subject, however, to that provision of the Constitution which secures indemnity to those whose property is damaged for a public use. Railway v. Hall, 78 Texas, 169.But the act of the defendant in so constructing the road bed as to obstruct the flow of the water was contrary to the provisions of our statute, and when the water so obstructed became stagnant and offensive, so as seriously to discommode the plaintiff and his family in the enjoyment of their residence, the obstruction became a nuisance and the defendant liable to him for the damages resulting from it. As to the measure of damages in such cases the authorities are not altogether in accord. Since in most cases a nuisance may be abated by the injured party, and since the wrongdoer may voluntarily remedy the wrong by removing it, the general rule seems to be that ordinarily the party damaged must bring his action for such damages as have accrued up to the institution of the suit and can not recover for any prospective injury. That rule has been adopted in a case very similar to this. Hopkins v. Railway, 50 Cal., 190.
But there are other cases which announce a contrary doctrine, and we think with the better reason. Railway v. Grabill, 50 Ill., 241; Kemper v. Louisville, 14 Bush, 87; Seeley v. Alden, 61 Pa. St., 302; Troy v. Railway, 23 N. H., 102; Finley v. Horshey, 41 Ia., 389; Fowler v. N. H., etc., Co., 112 Mass., 338.
In the case last cited the court say: “The case at bar is not to be treated in this respect as an action for an abatable nuisance. More accurately it is an action against the defendant for the construction of a public work under its charter in such a manner as to cause unnecessary damage by want of reasonable care and skill in its construction. For such an injury the' remedy is at common law. If it results from a cause which is either permanent in its character or which is treated as permanent by the parties, it is proper that the entire damage should be assessed with reference to the past and probable future injury.”
The language quoted is peculiarly applicable to this case. The controlling rule in actions for injuries resulting from similar nuisances would seem to be to adopt in each case that measure of damages which is calculated to ascertain in the most certain and satisfactory manner the compensation to which .the plaintiff is entitled. When the injury is liable to occur only at long intervals, or when the nuisance is likely to be removed by any agency, the damages which have occurred only up to the time of the action will be allowed; but if the nuisance is permanent and the injury constantly and regularly recurs, then the whole damage may be recovered at once. In a case like this the resulting depreciation in the value of the property is the safest measure of compensation. Here it maybe inferred from the evidence that the injury recurs upon each considerable rainfall, and continues during a stage of offensive stagnation until the water evap
*329 orates. The defendants seem to have treated the work as permanent, since they have failed, upon application, to make a culvert for the passage of-the water; and we are of opinion the depreciation in the value of plaintiff’s property is the most certain measure of his damages for the injury.Delivered January 23, 1891. The judgment is reversed and the-cause remanded.
Reversed and remanded.
Document Info
Docket Number: No. 3005
Citation Numbers: 79 Tex. 325, 15 S.W. 268, 1891 Tex. LEXIS 1228
Judges: Gaines
Filed Date: 1/23/1891
Precedential Status: Precedential
Modified Date: 10/19/2024