  •            IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P. and Pohlig Builders, LLC    :
    :
    v.                     :       No. 378 C.D. 2020
    :       No. 380 C.D. 2020
    Board of Supervisors of Schuylkill      :       No. 712 C.D. 2020
    Township and Glenn Makela               :       No. 713 C.D. 2020
    :       Argued: June 7, 2021
    Appeal of: Glenn Makela                 :
    :
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P., and Pohlig Builders, LLC   :
    :
    v.                     :
    :
    Board of Supervisors of Schuylkill      :
    Township and Glenn Makela               :
    :
    Appeal of: Board of Supervisors of      :
    Schuylkill Township                     :
    :
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P., and Pohlig Builders, LLC, :
    :
    Appellants    :
    :
    v.                     :
    :
    Board of Supervisors of Schuylkill      :
    Township and Glenn Makela               :
    BEFORE:       HONORABLE RENÉE COHN JUBELIRER, Judge1
    HONORABLE MICHAEL H. WOJCIK, Judge
    HONORABLE ELLEN CEISLER, Judge
    OPINION BY JUDGE WOJCIK                                          FILED: April 13, 2022
    1
    This case was assigned to the opinion writer before January 7, 2022, when Judge Cohn
    Jubelirer became President Judge.
    The Board of Supervisors (Board) of Schuylkill Township
    (Township) and Glenn Makela (Intervenor) appeal the order of the Court of
    Common Pleas of Chester County (trial court), which granted the appeal of Reeves
    Family Real Estate, L.P., Select Sites, L.P., and Pohlig Builders, LLC (together,
    Applicants), and reversed and remanded the Board’s decision to deny Applicants’
    application for tentative approval of a Planned Residential Development (PRD).
    Applicants filed a cross-appeal on the remand issue.2 Per this Court’s order dated
    July 2, 2020, the parties were directed to address whether the January 14, 2020 trial
    court order is a final, appealable order. Further, per this Court’s order dated June
    21, 2021, we granted permission for the parties to file supplemental briefs, which
    we now consider along with the record and briefs already filed.             As to the
    jurisdictional issue, we hold that the trial court’s order is a final, appealable order,
    pursuant to Pa. R.A.P. 311(f). On the merits, we reverse and remand to the trial
    court to reinstate the Board’s order that denied Applicants’ PRD application.
    As summarized by the Board, Reeves Family Real Estate, L.P. is the
    title owner of a parcel containing 65.751 acres located in Schuylkill Township,
    Chester County.     Select Sites, L.P. is the title owner of a contiguous parcel
    containing .9737 acres. Together, the two parcels, containing a total of 66.72 acres,
    comprise the property at issue here (Subject Property). Pohlig Builders, LLC, is the
    equitable owner of the Reeves parcel and the authorized agent for the Select Sites
    parcel. In 2018, Applicants submitted their PRD application that is the subject of
    this appeal to the Township, where Applicants sought to develop the Subject
    Property as 94 dwelling units. Reproduced Record (R.R.) at 8a-10a.
    2
    Per this Court’s Order dated August 11, 2020, the appeals and cross-appeal were
    consolidated for disposition.
    2
    The Subject Property is bordered on the eastern and southern edges
    by the Pickering Reservoir. A finger or stream of the reservoir bisects the Property
    from east to west. The stream is currently crossed at the western edge of the Property
    by a gravel road over a water culvert by way of an easement from Aqua America,
    Inc. The Subject Property is connected to Valley Forge Road (Pennsylvania Route
    23) via a 50-foot panhandle, and the Property is located at the end of East Philip
    Drive, a cul-de-sac road. Both the panhandle and access to East Philip Drive are
    north of the stream, leaving approximately two-thirds of the Property to the south of
    the stream. R.R. at 9a, 167a.
    Prior to their 2018 PRD application, Applicants submitted a 51-unit,
    single-family dwelling unit residential development plan, which they pursued from
    2006 through 2009, and which the Board never approved. This plan (51 Lot Plan)
    remains in suspension following an open-ended extension agreement. Applicants
    could pursue the 51 Lot Plan if their PRD application is not approved. R.R. at 10a-
    11a.
    After the suspension of the 51 Lot Plan and before the PRD
    application was filed, the Board and Applicants began discussing amending the
    Schuylkill Township Code (Code)3 by enacting a PRD Ordinance4 to establish a PRD
    Overlay District which would encompass the Subject Property. Pursuant to Article
    VII of the Pennsylvania Municipalities Planning Code (MPC),5 the PRD Ordinance
    would establish certain development standards and conditions required for tentative
    3
    Schuylkill Township, Chester County, Pa., Code, §§1-1-370.233 (2013).
    4
    See PRD Ordinance, §§252-100 - 252-117, Appendix A, of the Code. R.R. at 632a-89a.
    5
    Act of July 31, 1968, P.L. 805, as amended, added by the Act of December 21, 1988, P.L.
    1329, 53 P.S. §§10701-10713.
    3
    approval of a PRD application. When drafting the PRD Ordinance, the Board met
    and consulted with Applicants, the Planning Commission, the Historic Commission,
    and the Environmental Advisory Board. During these discussions, Applicants
    presented numerous plans that could be submitted for review under a PRD
    Ordinance, arriving at “Plan J,” which was a rough template of the PRD application
    eventually submitted for consideration, after the PRD Ordinance was enacted. R.R.
    at 13a-14a.
    In 2013, the Township held three public hearings on the proposed
    PRD Ordinance, during which Applicants presented Plan J as an example of a plan
    that could be reviewed under the proposed PRD Ordinance, if enacted. After public
    hearings, the Board enacted the PRD Ordinance, including Appendix A, on
    November 20, 2013. R.R. at 632a-89a. One month later, the Board amended the
    zoning map to designate the Subject Property as being within the newly established
    PRD Overlay District. Although the Board discussed Plan J as part of its review and
    enactment of the PRD Ordinance, it did not approve Plan J or any other plan when
    it enacted the PRD Ordinance. The Board stated that any tentative plans would need
    to be submitted for review and approval, subject to public hearings, other studies,
    and reviews required by the MPC and the PRD Ordinance. Id. at 14a-15a.
    Five years elapsed between the enactment of the PRD Ordinance and
    Applicants’ submission of their PRD application in 2018.                    After Applicants
    submitted their PRD application, the Board held public hearings on April 2, April
    30, May 9, May 10, May 25, and May 31, 2018.6 Several neighbors were granted
    party status during the hearings, including Intervenor. R.R. at 16a-17a.
    6
    The hearing that began on May 31, 2018, did not conclude until the early morning of June
    1, 2018, and is referred to as the May 31st hearing.
    4
    At the hearings, Applicants presented their PRD application, which
    was similar in many respects to Plan J. Applicants sought to develop a cluster
    residential plan, age-targeted at empty-nesters, comprised of 94 dwellings, with 10
    new homes and 1 existing home on the northern portion of the Subject Property, and
    80 new and 3 existing dwellings on the southern portion. Applicants proposed a
    controlled, gated access onto East Philip Drive, to provide a second entrance/exit to
    the Subject Property. Applicants also proposed the development of an improved
    culvert crossing, to provide for travel between the northern and southern portions of
    the Property.      Applicants also sought relief from the Township’s Stormwater
    Ordinance,7 to permit an alternative management approach. In support of their PRD
    application, Applicants presented testimony from four engineers and the developer,
    Mr. Pohlig, along with numerous documentary exhibits. In opposition to the PRD
    application, neighboring parties/objectors presented testimony from four engineers
    and a neighbor, along with documentary evidence. R.R. at 17a-19a.
    On July 30, 2018, the Board issued a decision containing 154 findings
    of fact, 9 conclusions of law, and a discussion. R.R. at 8a-55a. The Board, by a vote
    of 3-2, with two commissioners dissenting, denied Applicants’ PRD application
    because it did not comply with Sections 252-102(B),8 252-104(C)(1),9 and 252-
    7
    Schuylkill Township Code, §§310-101-310-907.
    8
    Section 252-102(B) of the PRD Ordinance provides in relevant part:
    B. The tract for any planned residential development shall consist
    of a contiguous area with a minimum land area of 60 acres and with
    not less than two points of access to public roads.
    9
    Section 252-104(C)(1) of the PRD Ordinance provides:
    (Footnote continued on next page…)
    5
    113(B)(2), (4), and (5) of the PRD Ordinance.10 The Board held that the PRD
    application did not comply with Section 252-102(B) of the PRD Ordinance because,
    (1)     Traffic impact study. The applicant shall submit a traffic
    impact study, prepared by a trained traffic consultant, following
    current PennDOT guidelines for such studies. The study shall
    identify any proposed improvements which would be required to
    obtain any PennDOT permits necessary for construction and
    occupancy of the PRD. The study area shall include any
    intersections identified by PennDOT regulations and/or policies as
    needing to be studied in order to obtain any permit or approval
    required by PennDOT.
    10
    Sections 252-113(B)(2), (4), and (5) of the PRD Ordinance provide:
    B. Findings. The grant or denial of tentative plan approval by
    official written communication shall include not only conclusions
    but also findings of fact related to the specific proposal and shall set
    forth the reasons for the grant, with or without conditions, or for the
    denial, and said communication shall set forth with particularity in
    what respects the development plan would or would not be in the
    public interest, including but not limited to findings of fact and
    conclusions on the following:
    ***
    (2)     The extent to which the development plan departs from
    zoning and subdivision regulations otherwise applicable to the
    subject property, including but not limited to density, bulk and use,
    and the reasons why such departures are or are not deemed to be in
    the public interest;
    ***
    (4)     The physical design of the development plan and the manner
    in which said design does or does not make adequate provision for
    public services, provide adequate control over vehicular traffic, and
    further the amenities of light and air, recreation and visual
    enjoyment;
    (Footnote continued on next page…)
    6
    although the Subject Property had two points of access, by way of the entrance to
    Valley Forge Road and the gated entrance to the East Philip Drive cul-de-sac, the
    unique topography of the site effectively denied two points of access to the residents
    in the southern two-thirds of the property. The Board found that the vast majority
    of residences on the southern portion (83 residences or 88% of the 94 total
    residences) would have only one effective means of accessing public roads from
    their lots, namely over the proposed new culvert crossing. The Board found that
    “[t]here is no competent evidence of record, deemed credible by the Board, by which
    Applicants have established that the proposed development will have minimal
    impact on fire and other emergency services provided within the Township.” R.R.
    at 26a.   Relatedly, the Board found that the single culvert crossing would
    substantially restrict and preclude emergency vehicle access to the majority of units
    in the southern portion, and, as such, constituted an abnormal adverse effect of the
    plan. The Board found that another existing gravel driveway crossing the culvert
    did not provide a second suitable emergency access, leaving only a single access
    point for the majority of residents in the southern portion. The Board noted that,
    although Applicants’ proposal to add sprinklers to the units on the southern portion
    would somewhat ameliorate fire safety concerns, it would not suitably address health
    or other public safety concerns. Because the PRD application lacked two effective
    points of access to public roads for the majority of units in the southern portion, the
    Board concluded that the PRD application violated the public safety and public
    interest concerns for the health, safety, and welfare of its residents under Sections
    252-113(B)(2) and (4) of the PRD Ordinance. R.R. at 26a, 33a-40a.
    (5)    The relationship, beneficial or adverse, of the proposed
    planned residential development of the neighborhood in which it is
    proposed to be established[.]
    7
    The Board further found that the PRD application’s proposed gated
    access to East Philip Drive violated Section 252-113(B)(5) of the PRD Ordinance
    because of the adverse impact on the residences on the existing cul-de-sac. R.R.
    24a-25a. The Board found that the connector to East Philip Drive would not function
    as a driveway but would instead “provide a through-way for all traffic” to the Subject
    Property, and would adversely affect the residents of East Philip Drive, whose cul-
    de-sac road would now serve as an access road for the Subject Property. Id. at 25a.
    The Board also found that the proposed gated access “has not been evaluated or
    approved by the police, fire companies, local ambulance companies or other
    emergency services provided in the Township.” Id. at 26a.
    The Board also denied the PRD application because Applicants failed
    to present a traffic impact study compliant with Section 252-104(C)(1) of the PRD
    Ordinance. Specifically, the Board objected that the traffic impact study was based
    on traffic counts that were more than 10 years old. The Board also found Applicants’
    traffic engineer’s testimony not credible based on his “educated guess” that only
    22% of traffic entering or exiting the development would use the gated East Philip
    Drive access. R.R. at 24a-25a, 33a, 38a, 42a.
    Applicants appealed the Board’s denial to the trial court, which took
    no additional evidence, but did permit Intervenor to present argument on legal issues
    that he had not formally presented to the Board. In an order and decision dated
    January 14, 2020, the trial court sustained Applicants’ land use appeal, reversed the
    Board’s decision, approved the PRD application, and remanded the case to the Board
    for consideration of “reasonable conditions for the tentative plan approval.” R.R. at
    452a-67a. The trial court found that the Board committed an error of law when it
    concluded that the PRD application failed to provide two access points to the tract,
    8
    as required by Section 252-102(B) of the PRD Ordinance. The trial court found that
    the Board erred by requiring two crossing points over the stream culvert, because
    that circumstance “only restricts movement within the boundaries of the Property
    itself.” Id. at 457a (emphasis in original). The trial court interpreted the plain
    language of Section 252-102(B) of the PRD Ordinance and the term “tract” as
    referring to the entire Subject Property, not to each individual dwelling unit. The
    trial court stated that “[t]he Board’s true objection to the plan on this basis appears
    to be that a number of the proposed dwellings must utilize the same route in order to
    reach the two access points.” Id. at 456a.
    The trial court also rejected the Board’s finding that Applicants’
    traffic study did not comply with Section 252-104(C)(1) of the PRD Ordinance. The
    trial court found that the traffic study complied with PennDOT requirements but that
    the Board rejected it anyway. The trial court held that the Board erred in rejecting
    the traffic study on PennDOT’s behalf when PennDOT was satisfied with it.
    Further, the trial court held that the Board abused its discretion when it rejected the
    study based on Applicants’ traffic engineer’s random use of the phrase “educated
    guess” without considering the context of the extensive study and report. R.R. at
    457a-59a.11
    The trial court further found that the Board’s public safety concerns
    as to the single culvert crossing and the East Philip Drive access failed to rise to the
    level of “very specific and exceptional,” as required by the PRD Ordinance and
    governing case law. R.R. at 460a. The trial court noted that these two issues were
    present from the outset of the development process, and, although the Board had
    several years to raise objections, it failed to do so until now, raising them as a matter
    11
    Neither the Township nor Intervenor appealed the traffic study issue to this Court, and,
    therefore, we will not address this issue further.
    9
    of public safety. The trial court noted that the Board failed to raise these issues with
    Applicants even though the parties worked closely together to draft the PRD
    Ordinance that specifically applies to the Subject Property. Id. at 459a-62a. The
    trial court found that “[t]he Board appears to be second-guessing its previous
    decision to adopt the Property as the site for the PRD Ordinance, and is couching its
    reconsideration in newly[-]found terms of public safety.” Id. at 462a. Thus, the trial
    court held that “under the circumstances present here, the Board erred as a matter of
    law in asserting its ‘public interest safety’ objections.” Id.
    The trial court also addressed Intervenor’s objections to road widths
    and classifications, which were based on the application of the Township’s
    Subdivision and Land Development Ordinance (SALDO)12 to the PRD application.
    R.R. at 463a-66a. The trial court reviewed Board of Supervisors of Charlestown
    Township v. West Chestnut Realty Corporation, 
    532 A.2d 942
     (Pa. Cmwlth. 1988),
    and Section 705(h) of the MPC, 53 P.S. §10705(h), and held that the SALDO
    standards not specifically incorporated into the PRD Ordinance do not apply to this
    PRD application. In this case, Applicants and the Township reviewed the SALDO
    and the proposed PRD Ordinance in detail, indicating which portions of the SALDO
    would be included in the PRD Ordinance and which would not. The trial court held:
    If it was the intent of the Board to have the entirety of the
    Township’s SALDO apply to the PRD, then there would
    have been no need for the committee drafting the PRD
    Ordinance to study the SALDO in detail and determine
    which elements thereof were to be incorporated into the
    PRD Ordinance. For that reason, the court concludes that
    the provisions of the SALDO which are not present in the
    PRD Ordinance do not apply to this PRD pursuant to 53
    P.S. §10705[(h)].
    12
    Schuylkill Township, Chester County, Pa., SALDO, §§320-1-320-75 (1996). R.R. at
    484a-631a.
    10
    R.R. at 464a.
    Intervenor also argued that the Valley Forge Road entrance to the PRD,
    the internal loop road, and East Philip Drive should be classified as secondary roads
    and not residential roads. As a secondary road, the Valley Forge Road entrance
    should be 60-feet-wide under the PRD Ordinance, and as it is only 50-feet-wide,
    Intervenor argues that the PRD application should be rejected. The trial court
    disagreed, and held that the roads were properly classified as residential streets, and,
    thus, did not violate the PRD Ordinance. R.R. at 464a-66a.
    The Township and Intervenor appealed the trial court’s decision to this
    Court. Applicants filed a cross-appeal on the remand issue only.13
    We first address the jurisdictional issue, that is, whether the trial court’s
    January 14, 2020 order is a final order subject to appeal. Applicants and the Board
    both argue that the trial court’s order is appealable pursuant to Pa. R.A.P. 311(f), and
    cases interpreting that rule. Intervenor did not present argument on this issue.
    Pa. R.A.P. 311(f) states:
    Administrative remand.—An appeal may be taken as of
    right from: (1) an order of a common pleas court or
    government unit remanding a matter to an administrative
    agency or hearing officer for execution of the adjudication
    of the reviewing tribunal in a manner that does not require
    the exercise of administrative discretion; or (2) an order of
    a common pleas court or government unit remanding a
    matter to an administrative agency or hearing officer that
    decides an issue that would ultimately evade appellate
    review if an immediate appeal is not allowed.
    13
    “Because the parties presented no additional evidence after the [Board’s] decision, our
    review is limited to determining whether the [Board] committed an abuse of discretion or an error
    of law.” Allegheny Tower Associates, LLC v. City of Scranton Zoning Hearing Board, 
    152 A.3d 1118
    , 1121 n.3 (Pa. Cmwlth. 2017) (citation omitted).
    11
    Applicants and the Board agree that where a local government agency
    must engage in fact-finding, administrative discretion is involved, and, thus, the
    order is not a final, appealable order, citing Arguelles v. Pennsylvania Board of
    Probation and Parole, 
    892 A.2d 912
    , 914 (Pa. Cmwlth. 2006). Applicants and the
    Board also agree that the trial court’s order approving the PRD application decided
    all of the issues of contention. However, Applicants and the Board further argue
    that where, as here, the trial court remanded the matter to the Board to adopt
    “reasonable conditions” without revealing or describing what those reasonable
    conditions should include, it deprived the Board of the authority to exercise
    administrative discretion. The Board argues that, here, after the remand to adopt
    reasonable conditions, a party aggrieved by those conditions would lack the ability
    to appeal from the already approved PRD application; thus, the issue would evade
    appellate review. The Board argues, therefore, that the trial court’s order is final and
    appealable under Pa. R.A.P. 311(f)(2), relying on Schulteis v. Board of Supervisors
    of Upper Bern Township, Berks County, 
    727 A.2d 145
    , 148 (Pa. Cmwlth. 1999), and
    Vanvoorhis v. Shrewsbury Township, 
    176 A.3d 429
    , 432-33 (Pa. Cmwlth. 2017).
    Applicants agree that the trial court’s order is final and appealable under
    Pa. R.A.P. 311(f)(2), Schulteis, and Vanvoorhis. Applicants argue that the trial
    court’s remand for adoption of reasonable conditions is not permitted under Section
    1006-A(c) of the MPC,14 when the trial court approved the PRD application in its
    entirety, but did not approve some elements and refer others to the Board for further
    proceedings. Applicants argue that the legality of the trial court’s remand would
    become moot after the remand occurred, thus evading appellate review.
    14
    Added by the Act of December 21, 1988, P.L. 1329, 53 P.S. §11006-A(c).
    12
    We agree with Applicants and the Board that the trial court’s order is
    final and appealable under Pa. R.A.P. 311(f)(2), because the adoption of reasonable
    conditions to the approved PRD application on remand would evade review if an
    immediate appeal was not allowed. In Schulteis, 
    727 A.2d at 148
    , this Court granted
    immediate review where the trial court decided the merits before remanding the
    matter. In Vanvoorhis, 176 A.3d at 432-33, this Court held that an order that settles
    the only point of contention between the parties before remand is immediately
    appealable. We find the trial court’s order here to be similar to, and governed by,
    our Court’s interpretation of Pa. R.A.P. 311(f)(2) in Schulteis and Vanvoorhis.
    As to the merits, the Board, joined by Intervenor, presents two
    questions for our review: (1) whether the trial court erred or abused its discretion
    when it reversed the Board’s denial of the PRD application, when the Board’s public
    safety reasons for its denial were stated with “particularity,” and are of a “very
    specific and exceptional nature”; and (2) whether the trial court erred or abused its
    discretion in its interpretation of Section 252-102(B) of the PRD Ordinance, which
    requires the tract to have at least two points of access to public roads.15
    The Board argues that its public safety objections are stated with
    particularity, are of a very specific and exceptional nature, and have a legitimate
    basis in law and fact, and thus, should be upheld. In support, the Board cites Appeal
    of Molnar, 
    441 A.2d 487
    , 489 (Pa. Cmwlth. 1982), which held that “[i]n the absence
    of public interest objections of a substantial, specific and exceptional nature,” the
    borough abused its discretion in denying tentative approval to the developer’s PRD
    application. In further support, the Board cites Doran Investments v. Muhlenburg
    Township Board of Commissioners, 
    309 A.2d 450
    , 459 (Pa. Cmwlth. 1973), for the
    15
    For clarity, we combined the Board’s Statement of Questions C and D in its brief.
    13
    proposition that, even when a plan conforms with all aspects of a relevant ordinance,
    a board may deny its approval where circumstances are “so exceptional as to support
    a conclusion that the plan in one or more respects, stated ‘with particularity’ would
    not be in the public interest.” In Doran, although our Court held that the governing
    body abused its discretion when it denied tentative approval of the PRD application
    based on general density and traffic concerns, we further explained:
    We do not decide that in no case may a conforming plan
    be denied tentative approval; for it is possible that the
    circumstances of a particular matter might be so
    exceptional as to support the conclusion that the plan in
    one or more respects, stated ‘with particularity’, would not
    be in the public interest.
    Id. at 459-60.
    The Board acknowledges that it cannot point to any court decisions
    where this Court has upheld a board’s public interest objections when a PRD
    application otherwise conformed with the relevant ordinance. The Board argues,
    however, that this case presents just such an unusual circumstance, because of the
    particular and exceptional safety concerns in the PRD application. The Board
    further argues that this case is distinguishable from Doran and its progeny, when the
    PRD applications in those cases were rejected because they were not consistent with
    the municipality’s comprehensive plan, or other generalized concerns. The Board
    argues that this case is distinguishable because the Board gave particular public
    interest objections based on the unique characteristics of the Subject Property, and
    not based on its nonconformance with the comprehensive plan.
    The Board argues that it denied tentative approval of the PRD
    application, setting forth with “particularity” in what respects the PRD application
    would not be in the public interest, based on Sections 252-113(B)(2), (4), and (5) of
    14
    the PRD Ordinance. Specifically, the Board found that the PRD application was not
    in the public interest under Section 252-113(B)(2) of the PRD Ordinance, because it
    failed to comply with Section 252-102(B) of the PRD Ordinance and would create
    a public safety hazard. Section 252-102(B) of the PRD Ordinance provides that
    “[t]he tract for any planned residential development shall consist of a contiguous
    area with a minimum land area of 60 acres and with not less than two points of access
    to public roads.”
    Regarding access points, the Board found that 83 of the 94 residences
    in the southern portion of the tract would only be accessible by the one single-access
    bridge road over the culvert that divides the Property. The Board found that forcing
    all traffic, whether residential or emergency, that requires access to the southern
    portion of the Subject Property, to cross the ravine by the proposed bridge posed
    legitimate and substantial public safety concerns. R.R. at 38a-41a. The Board found
    the public safety concerns to be substantial due to the unique natural, physical
    characteristics of the Subject Property, namely, the stream bisecting the property and
    the single bridge culvert road over the stream. The Board found that, if the single
    bridge access was blocked, the residences in the southern portion would be
    inaccessible, leading it to conclude that the PRD application violated Section 252-
    113(B)(4) of the PRD Ordinance by failing to adequately provide public services to
    the southern portion of the property. Id.
    The Board found that “the specific layout and access design for the
    PRD [application] creates a public health, safety and welfare risk as to the [] 83
    dwelling units on the southern portion of the Subject Property, for which only one
    means of access is proposed.” R.R. at 26a. The Board argues that the trial court
    abused its discretion when it rejected this finding and entered its own finding that
    15
    the existing, dilapidated driveway crossing could be used as a secondary emergency
    access route. Id. at 461a. The Board argues that the trial court also erred by finding
    the Board’s safety concerns not legitimate and, therefore, not very specific and
    exceptional. The Board objects to the trial court’s reasoning that if these issues truly
    affected the well being of future Township residents, it would have brought them to
    Applicants’ attention at some prior point. The Board argues that the trial court erred
    when it precluded the Board from raising public safety concerns that it had not raised
    prior to the enactment of the PRD Ordinance. The Board characterizes the trial
    court’s decision as effectively enforcing unlawful contract zoning when it precluded
    the Board from considering public safety concerns in the PRD application.
    The Board also argues that the trial court improperly dismissed the
    Board’s finding that the gated access to East Philip Drive would have a specific
    adverse impact on the surrounding neighborhood. The Board argues that, by
    breaching the cul-de-sac, Applicants will be changing the classification from a
    single-access cul-de-sac to a through road, creating a dramatic adverse change in
    that neighborhood. The Board concluded that this aspect of the PRD application
    violated Section 252-113(B)(5) of the PRD Ordinance, therefore justifying its denial.
    Intervenor’s argument focuses on, and echoes, the Board’s argument
    that the single culvert crossing failed to make adequate provision for public services
    to the southern portion of the Subject Property, and that the denial is justified under
    Section 252-113(B)(4) of the PRD Ordinance.
    Applicants agree that the Board’s denial of the PRD application based
    on public interest concerns must be specific and exceptional, but they argue that the
    Board failed to provide adequate reasons. In support, Applicants also cite Doran
    and its progeny, arguing that in the 47 years since Doran raised the possibility of a
    16
    PRD application being denied on public interest grounds, no case has actually
    sustained denial of a PRD application based on public interest grounds. Applicants
    respond that, in those cases, as in this case, the Board raised public interest issues,
    but those issues did not rise to the level of the unexpected or exceptional.
    Applicants focus on the legislative history of the Township’s drafting
    and adopting its PRD Ordinance to reject further the Board’s public safety concerns
    with their PRD application. Although the Board did not approve Plan J or any
    specific plan when it adopted the PRD Ordinance, Applicants respond that the Board
    was aware of, and embraced, the development of the Property consistent with Plan
    J. Applicants respond that during the process of adopting the PRD Ordinance, the
    Board understood and accepted that the two access points to the Subject Property
    would be by way of the panhandle to Valley Forge Road and through gated access
    onto East Philip Drive. Applicants argue that the Board accepted that the new road
    crossing over the culvert would provide access to the southern portion of the
    property. Applicants argue that the Board also accepted that the PRD Ordinance and
    Appendix A would permit the design of a PRD on the Subject Property consistent
    with Plan J. Because the two means of access and the culvert crossing were known
    components of Plan J, Applicants argue that the public interest concerns articulated
    by the Board were expected and, therefore, not exceptional. Applicants argue that
    Doran and the cases following it do not permit the Board to make an ad hoc denial
    of their PRD application, which they believe complies with the PRD Ordinance,
    under the guise of the Township’s general duty to protect the health, safety, and
    welfare of its residents.
    Applicants argue that some of the Board’s descriptions of the culvert
    crossing are inaccurate. Applicants aver that the existing culvert crossing and the
    17
    planned upgraded crossing are not bridges, but rather roadways crossing fill over a
    culvert. Applicants argue that the Board erred by confusing emergency access under
    the fire code with regular traffic access. Applicants argue that the Board erred when
    it determined that the existing culvert crossing failed to provide emergency access,
    when the PRD Ordinance had no such requirement. Applicants further reject the
    Board’s argument that the trial court approved contract zoning through the PRD
    Ordinance. Applicants argue that the Board looked at the Property it intended to
    rezone, drafted the PRD Ordinance to meet the vision the Board had for the Property,
    and then adopted the PRD Ordinance including design standards to permit the
    Property to be developed consistent with Plan J.16
    As to its next issue, the Board objected to the trial court’s interpretation
    of Section 252-102(B) of the PRD Ordinance, which requires the tract to have at
    least two access points to public roadways. The Board found that the residences in
    the southern portion of the property, comprising 88% of the total residences on the
    Property, could reach the two access points to the development only by using the
    single culvert crossing.       Therefore, the Board concluded, the majority of the
    residents in the PRD would have only one effective access point, in violation of
    Section 252-102(B) of the PRD Ordinance. R.R. at 38a.
    16
    Applicants argue in their supplemental brief that counsel for the Board made a
    misleading statement during argument before this Court when he stated that, at one time, the PRD
    application included two crossing points over the culvert, and that Applicants later removed the
    second crossing from their PRD application. The Board responded in its supplemental brief that
    counsel made no such statement during argument, and, even if he had, it had no bearing on the
    Board’s decision, because the PRD application as submitted showed only one crossing point over
    the culvert. R.R. at 197a-98a. We have reviewed the parties’ arguments and the record, and we
    conclude that Applicants were not prejudiced by any statements made by the Board’s counsel
    during argument, as our analysis is based on Applicants’ final PRD application in the record.
    18
    The Board argues that the trial court erred as a matter of law by not
    deferring to the Board’s reasonable interpretation of its own ordinance, citing in
    support Johnston v. Upper Macungie Township, 
    638 A.2d 408
    , 411 (Pa. Cmwlth.
    1994). The Board argues that its interpretation of the PRD Ordinance, requiring two
    access points for all residences in the plan, was reasonable in light of the Board’s
    legal mandate to maintain the health and welfare of its citizens.
    Intervenor also argues the trial court erred as a matter of law in
    interpreting the PRD Ordinance as requiring two access points for the tract, rather
    than two access points for all residences in the tract. Intervenor points to the stream
    that divides the Property in two as a natural feature that creates public safety
    concerns for the majority of residents. Intervenor argues that the Board correctly
    interpreted Section 252-102(B) of the PRD Ordinance, and rejected the PRD
    application on that basis.
    Applicants respond that the Board erred, and the trial court correctly
    found that the PRD application met Section 252-102(B)’s requirement that the tract
    have two points of access. Applicants note that the Board clearly understood where
    the two points of access would be located when they made the Property a tract in the
    PRD district. Applicants argue that land use ordinance requirements may not be
    extended by implication, citing Fidler v. Zoning Board of Adjustment of Upper
    Macungie Township, 
    182 A.2d 692
    , 695 (Pa. 1962). Applicants argue that the Board
    committed an error of law when it interpreted the Ordinance to require two points of
    access for each unit to roads within the tract, rather than to public roads to and from
    the tract.
    As to the primary issue regarding access to the majority of dwelling
    units in the southern portion of the Subject Property, we hold that the trial court erred
    19
    when it substituted its findings for the Board’s. The trial court must accept the
    credibility determinations made by the Board, which hears testimony, evaluates
    credibility, and serves as the fact finder. In re Thompson, 
    896 A.2d 659
    , 668 (Pa.
    Cmwlth. 2006). The trial court may not “substitute its judgment on the merits” for
    that of the Board. 
    Id.
     Assuming the record demonstrates that substantial evidence
    supports the Board’s findings, the trial court is bound by those findings. 
    Id.
    Here, the Board made numerous specific findings that the single culvert
    crossing in the PRD application was not in the public interest. R.R. at 38a-40a. We
    agree with the Board that its denial of the PRD application was “not premised on a
    mere inconsistency with a comprehensive plan or the fact of increased density,” R.R.
    at 41a, which would not be sufficient, but rather based on findings stated with
    “particularity” regarding “exceptional” circumstances that the PRD application
    would not be in the public interest. Doran, 309 A.2d at 459. Following Doran, our
    Court continued to apply the standard, that a board’s public interest objections must
    be stated with particularity, and must contain “objections [] of a very specific and
    exceptional nature and have a legitimate basis in law and fact.”           Michael’s
    Development Company, Inc. v. Benzinger Township Board of Supervisors, 
    413 A.2d 743
    , 746 (Pa. Cmwlth. 1980). Our Court continued to apply the same standard in
    Appeal of Molnar, 441 A.2d at 491. Here, the Board’s findings are supported by
    substantial evidence in the record, based on testimony from its own experts, and on
    testimony from Applicants’ builder, Mr. Pohlig, that the existing culvert crossing is
    not suitable for, or intended to be used as, an emergency access for fire, police, or
    other first responders. R.R. at 40a, 90a. We therefore conclude that the trial court
    erred when it held that the Board’s denial failed to meet this standard.
    20
    As it relates directly to the particular public interest grounds discussed
    above, we further conclude that the trial court erred in interpreting Section 252-
    102(B) of the PRD Ordinance, when it limited the requirement that the “tract”
    contain “not less than two points of access to public roads” to the Subject Property
    as a whole, and ignored the legitimate, specific safety concerns for 88% of residences
    in the southern portion of the tract, where access to public roads would be limited
    by the ability to cross the culvert at only one point. “Generally, deference to a local
    zoning board’s interpretation is warranted unless shown to be clearly erroneous.”
    Gouwens v. Indiana Township Board of Supervisors, 
    260 A.3d 1029
    , 1037 (Pa.
    Cmwlth. 2021). The interpretation of an ordinance is a question of law, over which
    this Court’s review is plenary, and which “begins with examination of the text
    itself.” 
    Id. at 1038
    . “Tract” is not defined in the PRD Ordinance. It is a rule of
    statutory construction that where terms are not otherwise defined in a statute,
    “[w]ords and phrases shall be construed according to their common and approved
    usage[.]” Section 1903 of the Statutory Construction Act of 1972, 1 Pa. C.S. §1903.
    We generally use dictionaries as source material for determining the common and
    approved usage of a term. Gmerek v. State Ethics Commission, 
    751 A.2d 1241
    , 1260
    (Pa. Cmwlth. 2000), aff’d, 
    807 A.2d 812
     (Pa. 2002). “Tract” is defined as “a
    specified parcel of land.” Black’s Law Dictionary 1720 (10th ed. 2014). Although
    the Statutory Construction Act of 1972 is “not expressly applicable to the
    construction of local ordinances, the rules of statutory construction are applicable to
    statutes and ordinances alike.” Geerling Florist, Inc. v. Board of Supervisors of
    Warrington Township, 
    226 A.3d 670
    , 676 (Pa. Cmwlth. 2020).
    Considering this definition, we cannot conclude that the Board erred
    when it interpreted “tract” in Section 252-102(B) of the PRD Ordinance, as applied
    21
    to the Subject Property, to require two points of access to public roads for the
    majority of residences in the southern portion of the Subject Property, which the
    PRD application did not provide.                 We cannot conclude that the Board’s
    interpretation of Section 252-102(B) of the PRD Ordinance was clearly erroneous,
    when it was based on the unique configuration of the Subject Property.17
    Because we reverse the trial court for the reasons already discussed, we
    need not reach the Board’s argument that the trial court erred when it rejected the
    Board’s denial of the PRD application based on the adverse effects of the East Philip
    Drive gated connector on the neighbors residing on this cul-de-sac, in violation of
    Section 252-113(B)(5) of the PRD Ordinance. We are mindful that “[t]he rejection
    of a plan may stand, however, if validly supported by even one of several
    objections.”     Robal Associates, Inc. v. Board of Supervisors of Charlestown
    Township, 
    999 A.2d 630
    , 635 (Pa. Cmwlth. 2010). Further, because we reverse the
    trial court for the reasons already discussed, we need not reach Intervenor’s
    arguments that the trial court erred when it determined that certain elements of the
    PRD application did not violate the PRD Ordinance, namely, the limitation on the
    number of homes on a loop road, the maximum length of the access to the loop road,
    and width of access roads into the Subject Property. 
    Id.
     Finally, because we reverse
    the trial court for the reasons already discussed, we need not reach Applicants’
    objections to the trial court’s remand.
    17
    We note further that the trial court erred when it concluded that the Board “appears to be
    second-guessing its previous decision to adopt the [Subject] Property as the site for the PRD
    Ordinance, and is couching its reconsideration in newly[-]found terms of public safety.” R.R. at
    462a. We find no basis for the trial court’s conclusion in the record, and we note that the Court
    “will not inquire into the motives of a municipal legislative body” in making zoning decisions.
    Streck v. Lower Macungie Township Board of Commissioners, 
    58 A.3d 865
    , 879 (Pa. Cmwlth.
    2012).
    22
    Accordingly, we reverse and remand to the trial court to reinstate the
    Board’s order that denied Applicants’ PRD application.18
    MICHAEL H. WOJCIK, Judge
    18
    Applicants’ April 11, 2022 Motion to file a Post-Submission Communication pursuant
    to Pa. R.A.P. 2501(a), in the form of permits issued for the repair, reconstruction, and paving of
    the existing site driveway, is dismissed as moot.
    23
    IN THE COMMONWEALTH COURT OF PENNSYLVANIA
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P. and Pohlig Builders, LLC    :
    :
    v.                     :   No. 378 C.D. 2020
    :   No. 380 C.D. 2020
    Board of Supervisors of Schuylkill      :   No. 712 C.D. 2020
    Township and Glenn Makela               :   No. 713 C.D. 2020
    :
    Appeal of: Glenn Makela                 :
    :
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P., and Pohlig Builders, LLC   :
    :
    v.                     :
    :
    Board of Supervisors of Schuylkill      :
    Township and Glenn Makela               :
    :
    Appeal of: Board of Supervisors of      :
    Schuylkill Township                     :
    :
    Reeves Family Real Estate, L.P., Select :
    Sites, L.P., and Pohlig Builders, LLC, :
    :
    Appellants    :
    :
    v.                     :
    :
    Board of Supervisors of Schuylkill      :
    Township and Glenn Makela               :
    ORDER
    AND NOW, this 13th day of April, 2022, the order of the Chester
    County Court of Common Pleas dated January 14, 2020, is REVERSED, and the
    above-captioned matters are REMANDED to that court for the reinstatement of the
    Board of Supervisors of Schuylkill Township’s July 30, 2018 Order, which denied
    the application of Reeves Family Real Estate, L.P., Select Sites, L.P., and Pohlig
    Builders, LLC, for tentative approval of a Planned Residential Development. The
    Motion of Reeves Family Real Estate, L.P, Select Sites, L.P., and Pohlig Builders,
    LLC, to file a post-submission communication pursuant to Pa. R.A.P. 2501(a) is
    DISMISSED as moot.
    Jurisdiction is relinquished.
    __________________________________
    MICHAEL H. WOJCIK, Judge
    2