Radon Construction, LLC v. Land Endeavor 0-2, Inc. ( 2019 )


Menu:
  • J-S35016-19
    
    2019 PA Super 314
    RADON CONSTRUCTION, LLC AND                       IN THE SUPERIOR COURT
    GREGORY RADON                                        OF PENNSYLVANIA
    Appellants
    v.
    LAND ENDEAVOR 0-2, INC., JOHN
    ARCIDIACONO & DONNA ARCIDIACONO
    Appellees                  No. 3527 EDA 2018
    Appeal from the Order entered May 26, 2017
    In the Court of Common Pleas of Philadelphia County
    Civil Division at No: 1601-00329
    BEFORE: OLSON, J., STABILE, J., and STRASSBURGER, J.*
    OPINION BY STABILE, J.:                               FILED OCTOBER 18, 2019
    Appellants, Radon Construction, LLC and Gregory Radon (“Greg”)
    (collectively “Radon”), appeal from the May 26, 2017 order entered in the
    Court of Common Pleas of Philadelphia County, granting partial summary
    judgment in favor of Appellees, Land Endeavor 0-2, Inc., John Arcidiacono
    (“John”) (collectively “Land Endeavor”), and Donna Arcidiacono (“Donna”).1
    Radon argues that Greg was under duress when he signed a June 2015
    ____________________________________________
    * Retired Senior Judge assigned to the Superior Court.
    1The May 26, 2017 order was made final on October 30, 2018 when the trial
    court rendered its decision on the remaining claim between the parties.
    J-S35016-19
    contract between Radon and Land Endeavor, a contract that Land Endeavor
    terminated on November 24, 2015. Following review, we affirm.
    In an opinion issued following its May 26, 2017 order, the trial court
    explained:
    This lawsuit arises from a failed joint venture agreement between
    [Radon] and [Land Endeavor] to develop real estate in
    Philadelphia. The parties’ agreement provided that [Radon] would
    provide the labor and supplies for the project, and [Land
    Endeavor] would provide the financing and construction plans.
    [Radon was] to provide labor “at cost” so that the final cost of
    each home was $126,000. When the properties were eventually
    sold, [Land Endeavor] would receive 51% of the profits and
    [Radon] would receive 49%.
    Subsequent to signing the joint venture agreement, the parties
    entered into two separate subcontract agreements—in March
    2015 and June 2015. The March 2015 agreement allowed [Land
    Endeavor] to “terminate” the agreement “upon 48 hours notice”
    to [Radon] of [Radon’s] default “on any of the terms or conditions”
    in the contract. One of those conditions required [Radon] to
    complete each project phase within seven days “unless otherwise
    specified in a work order.” The contract did not give [Radon] an
    opportunity to cure any alleged default.
    The later executed June subcontract was largely the same as the
    March 2015 subcontract; however, it included more specific
    paragraphs regarding default. The provision provided [Radon]
    with 48 hours to cure any breach of the parties’ agreement. If
    [Radon] did not cure within that allotted period of time, [Land
    Endeavor] had the sole right to terminate the parties’ venture. If
    [Land Endeavor] chose that route, however, [Radon] would be
    provided a “termination payment” which would be “equal to the
    sum of payment for all work performed and unpaid to the date of
    termination and all direct costs reasonably incurred by [Radon] in
    connection with the termination period.”
    The joint venture was ultimately terminated in November 2015
    when [Radon] installed improper structural beams. On November
    11, 2015, [John] notified [Radon] of the issue with the beams via
    e-mail. Apparently, on November 19, 2015, [Greg] met with a
    -2-
    J-S35016-19
    structural engineer, Chris Menna, to review the issue and
    determine a solution. [Greg], however, misinformed Mr. Menna
    of [Land Endeavor’s] concerns with the beams, and, as a result,
    Mr. Menna’s proposed solution did not solve the identified
    problem.     Therefore, pursuant to ¶ 14 of the June 2015
    subcontract, [John] terminated the parties’ venture in a detailed
    letter to [Greg] on November 24, 2015.
    Trial Court Opinion, 7/11/17, at 2-3 (unnumbered) (citations to contract
    provisions omitted).
    The trial court noted that Pa.R.C.P. No. 1035.2 governs the disposition
    of summary judgment motions and that the court is to view the record in the
    light most favorable to the non-moving party, resolving any doubts as to the
    existence of genuine issues of material fact against the moving party. 
    Id.
    (citation omitted).    The court then determined that Land Endeavor’s
    termination under the plain terms of the June 2015 contract was proper.
    Although that contract afforded Radon 48 hours to cure a default, Radon was
    actually provided thirteen days to cure the problem with the beams.
    Nevertheless, Radon was “incapable of curing the issue because [Radon] not
    only improperly installed the beams, it misunderstood [Land Endeavor’s] issue
    with the installation[.]” Id. at 3. The court concluded:
    [Radon] argue[s] that the June subcontract is null and void
    because it was signed under duress. This court disagrees. “[I]n
    the absence of threats of actual bodily harm there can be no
    duress where the contracting party is free to consult with counsel.”
    Carrier v. William Penn Broad. Co., 
    233 A.2d 519
    , 521 (Pa.
    1967). Here, Mr. Radon had an opportunity to consult with
    counsel and there was no threat of actual bodily harm. In his
    deposition, Mr. Radon stated he did not feel physically threatened,
    but rather felt “emotionally threatened.” Furthermore, Mr. Radon
    stated he had the opportunity to speak about the contract with
    -3-
    J-S35016-19
    “everyone” which he defined as his wife, father, friends, and best
    friend []—who consequently all advised him not to sign the
    contract. Mr. Radon can hardly argue he did not have the
    opportunity to consult with an attorney prior to signing the
    contract.
    
    Id.
     Consequently, the trial court granted partial summary judgment in favor
    of Appellees on all counts of Radon’s complaint—including the duress claims
    in Count IV—with the exception of Count II, which alleged breach of the June
    2015 contract. The court explained that while Land Endeavor’s termination
    under the June contract was proper, Radon had not been paid its termination
    payment under the terms of Paragraph 14 of the agreement. Because the
    court was unable to determine the amount of damages, it transferred Count
    II to the Philadelphia County arbitration program, confident the amount at
    issue was clearly within that program’s $50,000 jurisdictional limits. 
    Id.
     at 3-
    4 (unnumbered).
    Radon filed an appeal to this Court from the May 26, 2017 order. We
    quashed the appeal because the May 26, 2017 order was not a final order.
    Order, 9/26/17, at 1.    The remaining claims asserted in Count II of the
    complaint were subsequently submitted to an arbitration panel, which
    awarded Radon the sum of $13,537.92. Arbitration Award, 2/6/18. Radon
    appealed from the arbitration award. On October 30, 2018, the trial court
    awarded damages to Land Endeavor in the net amount of $16,198.68.
    Disposition, 10/30/18.
    -4-
    J-S35016-19
    Radon filed an appeal from the October 30, 2018 adjudication. The trial
    court issued an opinion on December 18, 2018, suggesting the appeal should
    be dismissed in light of Radon’s failure to file post-trial motions as required by
    Pa.R.C.P. No. 227.1. We issued a rule directing Radon to show cause why the
    appeal should not be dismissed for failure to preserve any issues for appellate
    review. We further instructed, in part:
    [I]f the appellants are merely seeking review of the May 26, 2017
    order, review of this matter indicates that no judgment has been
    entered on the trial court docket as required by Pa.R.A.P. 301.
    Pursuant to this court’s policy, the appellant is directed to praecipe
    the trial court Prothonotary to enter judgment on the decision of
    the trial court. The appellant is further directed to file with the
    Prothonotary of the Superior Court within ten days a certified copy
    of the trial court docket reflecting the entry of the judgment. Upon
    compliance with Pa.R.A.P. 301, the notice of appeal previously
    filed in this case will be treated as filed after the entry of
    judgment. See Pa.R.A.P. 905(a).
    Order, 12/26/18, at 1-2.2
    Radon complied with the Court’s directive to enter judgment and filed
    the required certified copy of the docket reflecting entry of the judgment. The
    ____________________________________________
    2 Land Endeavor filed a motion to quash the appeal, asserting, inter alia, that
    permitting an appeal of the May 26, 2017 award creates the potential for two
    “final determinations with opposite holdings: for example, one final decision
    holding that [there] was duress and [a] separate final holding of no duress.”
    Application to Quash Appeal, 1/28/19, at ¶ 16. In light of our disposition, no
    such scenario is created. Further, Land Endeavor fails to acknowledge that
    Radon appealed from the May 26, 2017 order. However, because the May
    order was not a final order, we quashed that appeal. Radon had no
    opportunity to challenge the trial court’s rejection of its duress claim prior to
    the trial court’s October 30, 2017 ruling. Land Endeavor’s Application to
    Quash is denied.
    -5-
    J-S35016-19
    trial court did not order the filing of a statement of errors complained of on
    appeal pursuant to Pa.R.A.P. 1925(b).
    Radon asks us to consider one issue:
    Whether the trial court erred in granting Land Endeavor’s Motion
    for Summary Judgment as to Radon’s claim that the [June 2015]
    contract, which contained new terms and conditions detrimental
    to Radon’s financial interests, was signed under duress?
    Appellants’ Brief at 2.3
    Our Supreme Court has instructed:
    Our review on an appeal from the grant of a motion for summary
    judgment is well-settled. A reviewing court may disturb the order
    of the trial court only where it is established that the court
    committed an error of law or abused its discretion. As with all
    questions of law, our review is plenary.
    In evaluating the trial court’s decision to enter summary
    judgment, we focus on the legal standard articulated in the
    summary judgment rule. Pa.R.C.P. 1035.2. The rule states that
    where there is no genuine issue of material fact and the moving
    party is entitled to relief as a matter of law, summary judgment
    may be entered. Where the non-moving party bears the burden
    of proof on an issue, he may not merely rely on his pleadings or
    answers in order to survive summary judgment. Failure of a non-
    moving party to adduce sufficient evidence on an issue essential
    to his case and on which it bears the burden of proof establishes
    the entitlement of the moving party to judgment as a matter of
    law. Lastly, we will view the record in the light most favorable to
    the non-moving party, and all doubts as to the existence of a
    ____________________________________________
    3 In addition to filing a brief, Radon has submitted a reproduced record
    consisting of two volumes, containing hundreds of pages of documents and
    measuring approximately three and a half inches in height. We remind
    Appellants’ counsel that Pa.R.A.P. 2173 mandates that pages be numbered
    and Pa.R.A.P. 2174 directs that a reproduced record contain a full and
    complete table of contents. Appellants’ reproduced record violates both rules.
    (By means of comparison, Appellees’ properly numbered and indexed
    reproduced record, which is similar in size, spans 751 pages.)
    -6-
    J-S35016-19
    genuine issue of material fact must be resolved against the
    moving party.
    Murphy v. Duquesne University of the Holy Ghost, 
    777 A.2d 418
    , 429
    (Pa. 2001) (citations, quotations, and ellipses omitted).
    Radon contends the trial court erred in granting summary judgment in
    favor of Land Endeavor because Greg signed the June 2015 agreement under
    duress, as confirmed by Greg’s deposition testimony. Radon acknowledges
    Greg was not in fear of physical harm but contends Greg “was coerced into
    signing [the June 2015] subcontract as a result of [Donna] stating that if he
    left the meeting without signing the changed contract, the project would stop
    moving forward.” Appellants’ Brief at 7. In light of Donna’s statement “and
    other coercive statements and tactics,” Greg “was not free to leave the
    meeting to discuss his options with an attorney without being simultaneously
    terminated from the project[.]” Id. 7-8. Therefore, Greg “signed the contract
    under economic duress and business compulsion.” Id. at 8.
    Radon recognizes that mutual assent of contracting parties is required
    to form a valid contract; that persons who deal with each other on equal terms
    and at arm’s length are presumed to possess ordinary firmness; and that, in
    the absence of threats of physical harm, there can be no duress if the
    contracting party is free to consult with counsel. Id. at 9 (citing Degenhardt
    v. Dillon Co., 
    669 A.2d 946
    , 950 (Pa. 1996)).        See also McDonald v.
    Whitewater Challengers, Inc., 
    116 A.3d 99
    , 114 (Pa. Super. 2015)
    -7-
    J-S35016-19
    (same).4 As this Court reiterated in Adams v. Adams, 
    848 A.2d 991
     (Pa.
    Super. 2004), “[w]e have long defined duress as ‘that degree of restraint or
    danger, either actually inflicted or threatened and impending, which is
    sufficient in severity or apprehension to overcome the mind of a person of
    ordinary firmness.’”       
    Id. at 993
     (quoting Strickland v. University of
    ____________________________________________
    4 As this Court stated in McDonald, our Supreme Court has explained the
    issue of duress as follows:
    The formation of a valid contract requires the mutual assent of the
    contracting parties. Mutual assent to a contract does not exist,
    however, when one of the contracting parties elicits the assent of
    the other contracting party by means of duress. Duress has been
    defined as:
    That degree of restraint or danger, either actually inflicted
    or threatened and impending, which is sufficient in severity
    or apprehension to overcome the mind of a person of
    ordinary firmness . . . . The quality of firmness is assumed
    to exist in every person competent to contract, unless it
    appears that by reason of old age or other sufficient cause
    he is weak or infirm . . . . Where persons deal with each
    other on equal terms and at arm’s length, there is a
    presumption that the person alleging duress possesses
    ordinary firmness . . . . Moreover, in the absence of
    threats of actual bodily harm there can be no duress
    where the contracting party is free to consult with
    counsel . . . .
    Degenhardt v. Dillon Co., 
    543 Pa. 146
    , 153-54, 
    669 A.2d 946
    ,
    950 (1996) (citations and punctuation omitted).
    Id. at 114 (emphasis in original). Radon does not suggest there were any
    threats of physical harm against Greg, a 37-year old at the time of his 2017
    deposition, who stood 6’2” and weighed 280 pounds. See Deposition of Greg
    Radon, 1/27/17, at 180-81.
    -8-
    J-S35016-19
    Scranton, 
    700 A.2d 979
    , 986 (Pa. 1997) (additional citation omitted)). And,
    again, “[a] party who has reasonable opportunity to consult with counsel
    before entering a contract cannot later invalidate it by claiming duress.” Id.
    at 994 (quoting Degenhardt, 
    669 A.2d at 950
    ).
    With regard to economic duress and business compulsion, this Court has
    noted:
    [B]roadly speaking, ‘business compulsion’ is a species of duress,
    not the common-law duress, to be sure, but duress clothed in
    modern dress. It seems to be established as a general rule, at
    least in this country, that the payment of money or the making of
    a contract may be under such circumstances of business necessity
    or compulsion as will render the same involuntary and entitle the
    party so coerced to recover the money paid, or excuse him from
    performing the contract.
    “Business compulsion” is not established merely by proof that
    consent was secured by the pressure of financial circumstances.
    But it is said that a threat of serious financial loss is sufficient to
    constitute duress and ground for relief where an ordinary suit at
    law or equity might not be an adequate remedy.
    To constitute duress or business compulsion there must be more
    than a mere threat which might possibly result in injury at some
    future time, such as a threat of injury to credit in the indefinite
    future. It must be such a threat that, in conjunction with other
    circumstances and business necessity, the party so coerced fears
    a loss of business unless he does so enter into the contract as
    demanded.
    Tri-State Roofing Co. of Uniontown v. Simon, 
    142 A.2d 333
    , 335 (Pa.
    Super. 1958) (quoting 17A Am.Jur. 564, § 7. Doctrine of Business or Economic
    Compulsion (1957)); See also McDonald, 116 A.3d at 114-15 (same).
    -9-
    J-S35016-19
    In the instant case, Radon asserts that Greg’s deposition testimony
    proves that Greg signed the June 2015 contract under economic duress.
    Radon claims:
    [Greg] testified that there was a four-hour meeting after which he
    signed the contract because he was financially committed and
    [John] kept reassuring him that he would not get hurt. [Greg]
    also stated that he had a lot of money and two years of his time
    invested in the project[.] [Greg] was forced by Donna [] to sign
    the contract as a direct result of threats she made to [Greg] that
    the “project (was) not going to move forward . . . until (he) signed
    the document.” [Greg] was given an “ultimatum” by Donna [],
    which was to “sign it or (he) was not moving forward.” “Not
    moving forward,” according to [Greg’s] testimony, meant that he
    was going to lose everything that he had put into the project.
    During the four-hour meeting, [Donna] told [Greg] that he was
    not leaving the office until he signed the contract, and [Donna]
    was physically standing in the doorway. [Greg] was “emotionally
    distraught” from the “whole situation” and the only thing that
    made “any type of sense” to relieve the pressure from the entire
    situation was [John] saying to him that “he was not going to let
    (him) get hurt.” [Greg] testified that he was in fear of his “mental
    health” and stated that “(I)t’s just like you wanted to pop a pill
    and just — to get out of that situation.” In response to a question
    from Land Endeavor’s counsel regarding intimidation during the
    four-hour meeting, [Greg] sated “(T)he intimidation was basically
    if you don’t sign, you’re not getting anything. That’s intimidation.
    It’s financial.”
    Appellants’ Brief at 10-11 (citations to Greg’s deposition omitted) (quotation
    marks and parentheticals in original).        Radon then provided deposition
    excerpts explaining that the initial venture agreement was a two-page,
    straightforward agreement, simple enough that review by an attorney was
    unnecessary. Id. at 11-12. As for the June 2015 contract,
    The fact that the meeting lasted four hours clearly indicates that
    [Greg] did not attend the meeting that day with the intent of
    signing the contract, and, to the contrary, was determined not to
    - 10 -
    J-S35016-19
    sign. It was only after four hours of threats by [John and Donna]
    not to move forward with the project, misrepresentations by John
    [] that [Greg] would not get hurt financially, and a specific threat
    made by Donna [], that [Greg] was not leaving the office that day
    without signing the contract, among other factors stated above,
    that [Greg] succumbed to the pressure and the reality of suffering
    a serious financial crisis if he did not agree to the contract, that
    [Greg] signed.
    Id. at 12 (citations to Greg’s deposition omitted). Although not mentioned in
    Radon’s brief, Greg also recounted in his deposition that he had diarrhea and
    an upset stomach and was very distraught about signing the contract; that
    his wife, his father, and others discouraged him from signing it; and that it did
    not occur to him to have an attorney review it. Deposition of Greg Radon,
    1/27/17, at 175, 181, 188. He also acknowledged that Donna gave him a
    copy of the proposed June 2015 contract at a meeting “a week to two weeks”
    before the four-hour meeting during which he signed the contract. Id. at 160.
    Therefore, he was in a position to seek review of the contract in advance of
    the meeting. His testimony suggests he availed himself of that opportunity in
    discussing the contract with his wife, father, friends, and best friend, but not
    an attorney. See Trial Court Opinion, 7/11/17, at 3 (unnumbered). He further
    testified that he went to lunch with John for an hour or hour and a half at the
    conclusion of the meeting during which he signed the contract. Deposition of
    Greg Radon, 1/27/17, at 207.
    Viewing the evidence in the light most favorable to Radon as the non-
    moving party, we find no error in the trial court’s grant of summary judgment
    and its rejection of Greg’s claims that he signed the June contract under
    - 11 -
    J-S35016-19
    duress. As the trial court explained, Greg was not physically threatened and
    had the opportunity to speak with an attorney prior to signing the contract.
    Again, Greg’s own testimony indicates that approximately two weeks elapsed
    between the time Donna presented him a copy of the proposed contract and
    the time of the meeting during which he signed the document.              While
    conceding he discussed the contract with “multiple people” prior to signing, it
    simply did not “dawn on” him that he should talk with an attorney. Id. at
    188.    Under the circumstances, the trial court properly determined that
    Radon’s duress argument failed and that summary judgment was appropriate.
    However, even if Greg established that he signed the contract under
    economic duress, summary judgment would be appropriate nevertheless. As
    this Court recognized in National Auto Brokers v. Aleeda Development
    Corp., 
    364 A.2d 470
     (Pa. Super. 1976), economic duress merely renders a
    contract voidable, not void. 
    Id. at 473
     (citations omitted).
    In National Auto Brokers, we held that “[a] party who possesses a
    power of avoidance for business coercion loses it by electing to affirm the
    transaction.” 
    Id. at 476
     (Pa. Super. 1976) (citing Restatement of Contracts,
    §§ 493, 495, 499 and 484 (1932)) (additional citations omitted).            We
    recognized that “[r]atification results if a party who executed a contract under
    duress accepts the benefits flowing from it, or remains silent, or acquiesces in
    the contract for any considerable length of time after the party has the
    opportunity to annul or avoid the contract.” Id. (citation omitted). Here, only
    - 12 -
    J-S35016-19
    after Land Endeavor terminated the agreement at the end of November 2015
    for failure to perform did Radon claim the June 2015 contract improperly
    changed the terms of the earlier agreement.      In other words, despite the
    claimed “economic duress,” Radon continued with the project under the terms
    of the June contract for six months without taking any measures to set the
    contract aside. By remaining silent for six months after signing the contract,
    Radon ratified the agreement.
    In National Auto Brokers, an initial contract was signed on July 4,
    1972. The parties entered into a second contract on August 3, 1972, under
    which the National Auto Brokers (“Nabcor”) operated until October 1972 when
    Nabcor filed a complaint in equity seeking performance under the July contract
    and claiming it entered into the August contract under duress. The passage
    of time in that case—two and a half months—was deemed sufficient to warrant
    a finding that Nabcor ratified the August contract. In the instant case, more
    than six months elapsed between the signing of the contract and Land
    Endeavor’s notice of termination.      Therefore, the period of time was
    “considerable” and Radon’s actions ratified the June 2015 agreement,
    regardless of any claimed economic coercion.     Because Radon ratified the
    contract, Radon lost the power to avoid the contract based on duress.
    Finding no error on the part of the trial court in granting summary
    judgment, we shall not disturb its ruling. Further, recognizing this Court can
    affirm on any basis, see, e.g., Commonwealth v. Clouser, 
    998 A.2d 656
    ,
    - 13 -
    J-S35016-19
    661 n. 3 (Pa. Super. 2015), we further conclude Land Endeavor was entitled
    to summary judgment in light of Radon’s ratification of the June 2015
    agreement.
    Judgment affirmed. Application to quash denied.
    Judgment Entered.
    Joseph D. Seletyn, Esq.
    Prothonotary
    Date: 10/18/19
    - 14 -
    