Brandt v. County of Pennington , 2013 S.D. LEXIS 21 ( 2013 )


Menu:
  • #26364-a-GAS
    
    2013 S.D. 22
    IN THE SUPREME COURT
    OF THE
    STATE OF SOUTH DAKOTA
    ****
    ROBERT BRANDT,                              Plaintiff and Appellant,
    v.
    COUNTY OF PENNINGTON,                       Defendant and Appellee.
    ****
    APPEAL FROM THE CIRCUIT COURT OF
    THE SEVENTH JUDICIAL CIRCUIT
    PENNINGTON COUNTY, SOUTH DAKOTA
    ****
    THE HONORABLE ROBERT A. MANDEL
    Judge
    ****
    KEVIN S. LEWIS
    Rapid City, South Dakota                    Attorney for plaintiff
    and appellant.
    JAMES S. NELSON
    REBECCA L. MANN of
    Gunderson, Palmer, Nelson & Ashmore, LLP
    Rapid City, South Dakota                    Attorneys for defendant
    and appellee.
    ****
    CONSIDERED ON BRIEFS
    ON JANUARY 8, 2013
    OPINION FILED 02/27/13
    #26364
    SEVERSON, Justice.
    [¶1.]        In 1994, Robert Brandt granted a drainage easement to Pennington
    County on land he owned in the Sila Subdivision. In 1996, the County repaired a
    section of Clarkson Road, which abutted Brandt’s land. After the road repair, silt
    began to accumulate near the bottom of the canyon on part of Brandt’s land.
    Brandt provided written notice to the County in 2009 for damages. He filed suit for
    nuisance, constructive taking, trespass, and unlawful taking in late 2010. The
    County moved for summary judgment. After an April 2012 hearing, the trial court
    granted the motion after determining that there was no continuing tort and the
    statute of limitations had run. Brandt appeals the summary judgment and argues
    that the County’s action constitutes a continuing tort. We affirm the trial court’s
    decision.
    BACKGROUND
    [¶2.]        In August 1994, Robert Brandt purchased 57 acres in the Sila
    Subdivision in Pennington County. Brandt subdivided the property into three lots
    and eventually built a home on Lot 2. The plat for the property was filed with the
    Pennington County Register of Deeds in October 1994. The plat included a
    description of a 200-foot wide drainage easement extending across the property,
    including the canyon area of Lot 2. The drainage easement did not exist on the
    property prior to the 1994 plat filed by Brandt.
    [¶3.]        In 1996, the County repaired a section of Clarkson Road, which abuts
    Lot 3 in the Sila Subdivision. After the road repair, Brandt testified that silt began
    accumulating in Lot 2’s canyon within the drainage easement. The silt
    -1-
    #26364
    accumulated sporadically in the canyon after heavy runoff from melting snow or
    rainstorms in the spring and summer. Brandt testified that the silt is four to five
    inches deep in certain areas at the bottom of the canyon.
    [¶4.]         Periodically, the County attempted to control the silt flow. Heine
    Junge, Pennington County Highway Superintendent, testified that the County used
    rock dams and hay bales in the ditch near Clarkson Road to stop the flow of silt into
    the canyon.
    [¶5.]         On May 13, 2009, Brandt provided written notice to the Pennington
    County Auditor for damages to Lot 2. He stated that his property was damaged by
    runoff from the hillside following the County’s repair of Clarkson Road in 1996. In
    late 2010, Brandt sued the County under the theories of nuisance, constructive
    taking, trespass, and unlawful taking. The County raised affirmative defenses that
    a drainage easement existed across Brandt’s property where the runoff drains and
    that the statute of limitations had run.
    [¶6.]         The County moved for summary judgment and the trial court held a
    hearing on April 19, 2012. The trial court granted summary judgment after
    determining that there was no continuing tort and the statute of limitations had
    run. Brandt appeals the summary judgment and argues that the County’s action
    constitutes a continuing tort.
    STANDARD OF REVIEW
    [¶7.]         The standard of review for summary judgment is well settled:
    We must determine whether the moving party demonstrated the
    absence of any genuine issue of material fact and showed
    entitlement to judgment on the merits as a matter of law. The
    evidence must be viewed most favorably to the nonmoving party
    -2-
    #26364
    and reasonable doubts should be resolved against the moving
    party. The nonmoving party, however, must present specific
    facts showing that a genuine, material issue for trial exists. Our
    task on appeal is to determine only whether a genuine issue of
    material fact exists and whether the law was correctly applied.
    If there exists any basis which supports the ruling of the trial
    court, affirmance of a summary judgment is proper.
    Jacobson v. Leisinger, 
    2008 S.D. 19
    , ¶ 24, 
    746 N.W.2d 739
    , 745 (quoting Cooper v.
    James, 
    2001 S.D. 59
    , ¶ 6, 
    627 N.W.2d 784
    , 787).
    [¶8.]        Further, “if summary judgment is granted [based] on a statute of
    limitations defense[:]”
    The burden of proof is upon the movant to show clearly that
    there is no genuine issue of material fact and that he is entitled
    to judgment as a matter of law. When faced with “‘a summary
    judgment motion where the defendant asserts the statute of
    limitations as a bar to the action and presumptively establishes
    the defense by showing the case was brought beyond the
    statutory period, the burden shifts to the plaintiff to establish
    the existence of material facts in avoidance of the statute of
    limitations.’” It is well settled that “‘summary judgment is
    proper on statute of limitations issues only when application of
    the law is in question, and not when there are remaining issues
    of material fact.’” Generally, a statute of limitations question is
    left for the jury; however, deciding what constitutes accrual of a
    cause of action is a question of law and reviewed de novo.
    
    Id.
     (quoting Cooper, 
    2001 S.D. 59
    , ¶ 7, 
    627 N.W.2d at 787
    ) (citations omitted in
    original).
    DISCUSSION
    [¶9.]        When the trial court granted the County’s motion for summary
    judgment, it did so on the following basis: “[Brandt’s suit is] barred by the statute of
    limitations; but in part because the flow of the water and silt going through
    [Brandt’s land] now is not a continuing tort.” Brandt argues that the statute of
    -3-
    #26364
    limitations has not run because the County’s actions constitute a continuing tort,
    and thus, his notice to the County was timely.
    [¶10.]       South Dakota statutes require that a person seeking recovery for
    property damage from a public entity must file a written notice with the public
    entity within 180 days after the injury. SDCL 3-21-2. A public entity includes
    county governments and boards. SDCL 3-21-1(2). An action for damages cannot be
    “maintained against a public entity” unless timely written notice is given. In re
    Kindle, 
    509 N.W.2d 278
    , 280 (S.D. 1993) (citing Brishky v. State, 
    479 N.W.2d 489
    ,
    493 (S.D. 1991) and Finck v. City of Tea, 
    443 N.W.2d 632
    , 635 (S.D. 1989)). In
    addition, SDCL 15-2-1 requires that a cause of action begin before the statute of
    limitations expires, except in certain cases. Brandt asserts property damage via
    nuisance and trespass, which have a statute of limitations of six years. SDCL 15-2-
    13(3).
    [¶11.]       We previously addressed the definition of a continuing tort and its
    impact on the statute of limitations. “A continuing tort occurs when a wrongful act
    persists over time.” Holland v. City of Geddes, 
    2000 S.D. 71
    , ¶ 5, 
    610 N.W.2d 816
    ,
    818 (citing 54 C.J.S. Limitations of Actions § 177 (1987)). “To constitute a
    continuing tort, . . . all elements of the tort must be continuing, including breach of
    duty and damages.” Id. ¶ 9, 
    610 N.W.2d at
    819 (citing Hall’s Park Motel, Inc. v.
    Rover Constr., Inc., 
    460 S.E.2d 444
    , 449 n.3 (W. Va. 1995)). A continuing tort tolls
    the statute of limitations and the 180-day notice period does not begin until the
    wrong is terminated. See id. ¶ 10, 
    610 N.W.2d at 819
    . The reason a continuing tort
    suspends the running of the statute of limitations is that “when no discrete
    -4-
    #26364
    occurrence in continually wrongful conduct can be singled out as the principal cause
    of damage, the law regards the cumulative effect as actionable, and allows the
    limitations period to begin when the wrongful conduct ends.” Id. ¶ 5, 
    610 N.W.2d at
    818 (citing Curtis v. Firth, 
    850 P.2d 749
    , 754 (Idaho 1993)). However, “a continual
    consequence from a solitary unlawful act is not a continuing tort.” 
    Id.
     (citing
    Brishky, 479 N.W.2d at 492).
    [¶12.]       In this case, the trial court found significant to determining whether a
    continuing tort existed the fact that Brandt granted the County a 200-foot wide
    drainage easement across his land. “An easement is ‘an interest in the land in the
    possession of another which entitles the owner of such interest to a limited use or
    enjoyment of the land in which the interest exists.’” Brown v. Hanson, 
    2007 S.D. 134
    , ¶ 6, 
    743 N.W.2d 677
    , 679 (quoting Knight v. Madison, 
    2001 S.D. 120
    , ¶ 4, 
    634 N.W.2d 540
    , 541).
    [¶13.]       SDCL 43-13-5 provides that the scope or extent of an easement or
    servitude upon land is “determined by the terms of the grant, or the nature of the
    enjoyment by which it was acquired.” In general, “[a] servitude should be
    interpreted to give effect to the intention of the parties ascertained from the
    language used in the instrument, or the circumstances surrounding creation of the
    servitude, and to carry out the purpose for which it was created.” Restatement
    (Third) of Property (Servitudes) § 4.1(1) (2000).
    [¶14.]       The determinative material facts are not disputed. Brandt argues that
    the reconstruction of Clarkson Road in 1996 caused erosion on the hillside and
    accumulation of silt in the canyon bottom within the drainage easement on Lot 2 of
    -5-
    #26364
    his property. The reconstruction of Clarkson Road is a discrete occurrence. The
    alleged damage due to silt accumulation within the drainage easement on Brandt’s
    property is a continuing consequence of the County’s one-time road repair. The
    periodic runoff from the hillside is a result of the original construction in 1996, but
    it is not a continuing tort on the part of the County. As noted above, in order for a
    tort to be a continuing tort, all of the elements of the tort must continue, not just
    the damages from the tort. See Holland, 
    2000 S.D. 71
    , ¶ 8, 
    610 N.W.2d at 819
    .
    Brandt failed to present evidence of a genuine issue of material fact to meet his
    burden of proof to avoid the statute of limitations.
    [¶15.]       Brandt’s claims of nuisance and trespass are barred because there was
    no continuing tort. The plaintiff did not provide the required 180-day notice to the
    County and the statute of limitations has run. The trial court did not err in
    granting the motion for summary judgment to the County.
    CONCLUSION
    [¶16.]       We affirm the trial court’s decision.
    [¶17.]       GILBERTSON, Chief Justice, and KONENKAMP, ZINTER, and
    WILBUR, Justices, concur.
    -6-