Richard Crowe v. First American ( 2001 )


Menu:
  •                  IN THE COURT OF APPEALS OF TENNESSEE
    AT JACKSON
    August 29, 2001 Session
    RICHARD CROWE v. FIRST AMERICAN NATIONAL BANK
    A Direct Appeal from the Circuit Court for McNairy County
    No. 4759    The Honorable Jon Kerry Blackwood, Judge
    No. W2001-00800-COA-R3-CV - Filed December 10, 2001
    Owner of a pickup truck sued the bank that financed the purchase for conversion after the
    bank repossessed the truck. The trial court entered judgment on a jury verdict for plaintiff in the
    amount of $250,000.00. Bank appeals. We affirm in part reverse in part and remand.
    Tenn.R.App.P. 3; Appeal as of Right; Judgment of the Affirmed as Modified
    W. FRANK CRAWFORD , P.J., W.S., delivered the opinion of the court, in which ALAN E. HIGHERS ,
    J. and HOLLY KIRBYLILLARD , J., joined.
    Andy Rowlett, Nashville; Stephen Craig Kennedy, Selmer, for Appellant, First American National
    Bank
    Terry Abernathy, Selmer, For Appellee, Richard Crowe
    OPINION
    Plaintiff, Richard Crowe (“Crowe”), sued defendant, First American National Bank (“Bank”),
    for damages resulting from the repossession of his pickup truck financed by Bank. The jury returned
    a verdict against Bank in favor of Crowe in the amount of $250,000 for conversion, finding that the
    Bank did not have the right to repossess Crowe’s vehicle. The Bank moved to set aside the jury
    verdict and enter judgment in accordance with the Bank’s motions for directed verdict.
    Alternatively, the Bank moved for a new trial or to alter the judgment amount. The trial court denied
    all of the Bank’s post-trial motions. The Bank has appealed, presenting seven (7) issues for review.
    By Retail Installment Sale Contract and Security Agreement, hereinafter referred to as the
    sales contract, dated March 12, 1994, Crowe purchased a new 1994 Chevrolet Pickup Truck from
    Lofton Chevrolet, Inc., and the contract was assigned to Bank who provided financing on the truck.
    The total sale price of $27,394.48 was to be paid in 48 monthly installments of $409.26, beginning
    on April 25, 1994. The contract specifically provides that “[y]ou [Crowe] are giving the Creditor
    [Bank] a security interest in the vehicle being purchased.” The contract provides in pertinent part:
    Late Charge. You [Crowe] will have to pay a late charge on each
    payment received by the Creditor [Bank] more than fifteen days late.
    The charge is shown on the front. Acceptance of a late payment or
    late charge does not excuse your [Crowe’s] late payment or mean that
    you [Crowe] can keep making payments after they are due. The
    Creditor [Bank] may also take the steps set forth below if there is any
    late payment.
    *       *       *
    Payments. You [Crowe] agree to make all payments in accordance
    with the payment schedule . . . on their respective due dates at the
    main or any branch office of the Creditor [Bank]. . . .
    *       *       *
    Required Repayment in Full Before the Schedule Date. If you fail to
    pay any payment according to the payment schedule; if a processing
    in bankruptcy receivership or insolvency is started by you or against
    you or your property; if the Creditor honestly feels its prospects of
    payment are impaired; if you are in default on any other obligation to
    the Creditor; or if you break any of the agreements in this contract
    (default), all that you owe on this contract will be due and payable at
    once at the Creditor’s option. In calculating what you owe, the
    Creditor will not charge a prepayment processing fee, but you will be
    obligated to pay the Bank Processing fee.
    Repossession of the Vehicle for Failure to Pay. Repossession means
    that, if you [Crowe] fail to pay according to the payment schedule or
    if you break any of the agreements in this contract (default), the
    Creditor [Bank] can take the vehicle from you.
    *       *       *
    Delay In Enforcing Rights and Changes of this Contract. The
    Creditor can delay or refrain from enforcing any of its rights under
    this contract without losing them. For example, the Creditor can
    extend the time for making some payments without extending others.
    Any change in terms of this contract must be in writing and signed by
    the Creditor. No oral changes are binding. If any part of this contract
    is not valid, all other parts will remain enforceable.
    -2-
    In addition to the above contract, Crowe entered into an “Agreement for Purchaser to Provide
    Accidental Physical Damage Coverage”, hereinafter referred to as the insurance contract, with the
    Bank on March 12, 1994. This agreement provided that:
    I understand that to provide protection from serious financial loss,
    should an accident or loss occur, my installment contract requires the
    vehicle or other goods described below to be continuously covered
    with insurance against the risks of fire, theft and collision, and that
    failure to provide such insurance gives the Seller or his Assignee the
    right to declare the entire unpaid balance immediately due and
    payable. Accordingly, I have arranged for the required insurance
    through the insurance company shown below and have requested my
    agent to note the Seller’s or his Assignee’s interest in the goods and
    endorse the policy with a loss payable endorsement (ISO-51) or
    equivalent in favor of the Seller or his Assignee.
    On September 29, 1997, the Bank repossessed the truck and sold it because allegedly Crowe
    defaulted upon his obligations to make the scheduled monthly payments and also failed to have his
    insurance agent endorse the policy with a loss payable endorsement in favor of the Bank. However,
    Crowe alleges in his complaint and asserted at trial that he fulfilled his obligations under the terms
    of both contracts by making all of the required monthly payments and continuously carrying
    insurance on the truck at all times prior to the Bank’s repossession. Crowe asserts that the Bank’s
    repossession constitutes a conversion1 of his vehicle.
    The first issue presented for review as stated in the Bank’s brief is:
    I. Whether the Bank had the right to repossess the truck under its
    contract with Crowe.
    This issue is, in essence, the alleged error of the trial court in denying the Bank’s motion for a
    directed verdict. When deciding a motion for a directed verdict, both the trial court and the
    reviewing court on appeal must look to all the evidence, take the strongest legitimate view of the
    evidence in favor of the opponent of the motion, and allow all reasonable inferences in favor of that
    party. The court must discard all countervailing evidence, and if there is then any dispute as to any
    material fact, or any doubt as to the conclusions to be drawn from the whole evidence, the motion
    must be denied. Conatser v. Clarksville Coca-Cola Bottling Co., 
    920 S.W.2d 646
    , 647 (Tenn.
    1995); Hurley v. Tennessee Farmers Mut. Ins. Co., 
    922 S.W.2d 887
    , 891 (Tenn. Ct. App. 1995).
    A directed verdict cannot be sustained if there is material evidence in the record which would
    support a verdict for the plaintiff under any theory he has advanced. Id.; Conatser, 920 S.W.2d at
    647.
    1
    The trial court concluded that Crowe’s only cause of action was for conversion.
    -3-
    In the instant case, the sales contract provides and the parties do not dispute that Crowe’s
    payments were due on the 25th of each month beginning April 25, 1994. The sales contract is clear
    and unambiguous that Crowe agreed “to make all payments in accordance with the payment
    schedule . . . on their respective due dates” and that “[a]cceptance of a late payment or late charge
    does not excuse [Crowe’s] late payment or mean that [Crowe] can keep making payments after they
    are due.” The sales contract is equally clear that if Crowe defaults, then the Bank may repossess the
    truck. Furthermore, Tennessee statutory law provides that “[a]fter default, a secured party may take
    possession of the collateral . . . . [and]. . . sell, lease, license, or otherwise dispose of any or all of the
    collateral in its present condition or following any commercially reasonable preparation or
    processing.” T.C.A. § 47-9-609-610 (Supp. 2000).
    Our Supreme Court has held that “as a result of a course of dealing between parties [to a
    contract], the holder of an indebtedness may be deemed to have waived the right [to declare a
    default] without giving prior notice to the debtor of his intention to do so.” Lively v. Drake, 
    629 S.W.2d 900
    , 903 (Tenn. 1982). In Lively, appellants executed a promissory note on August 15,
    1972, payable in monthly installments and the note was secured by a deed of trust upon the
    appellants’ residence. Id. at 901. Appellants made regular payments until November 1976 at which
    time appellants missed one payment. Id. at 902. This payment was later made, but beginning in
    February 1977 payments were irregular. Id. A pattern of irregular payments continued through 1977
    and the entire calendar year 1978. Id. On January 3, 1979, appellee delivered the note to the trustee
    under the deed of trust and called upon the trustee to commence foreclosure. Id. Actual notice of
    the decision to accelerate the note and foreclose, as authorized by the terms of the note and deed of
    trust, was not communicated to appellants until January 18, 1979. Id. In the meantime, unaware of
    the decision to accelerate and foreclose, and in accordance with the practice which by this time had
    become established, appellants mailed appellee a check for two monthly payments. Id. The two
    payments were credited on the debt and the checks were deposited into appellee’s account. Id. The
    Tennessee Supreme Court noted that “[i]t is thus established that four days after foreclosure notice
    had been mailed to appellants, appellee received and unconditionally accepted a partial payment on
    the arrearage. He credited it as he had been doing for almost two years and did not communicate
    further with appellants.” Id. The Court held that:
    We are of the opinion that the course of dealing between the parties
    over a period of almost two years was such that appellants had been
    led to believe that irregular payments would be accepted without
    acceleration. Under those circumstances appellee should not be
    permitted to foreclose on the note without first calling attention of
    appellants to the fact that he was insisting upon the original terms,
    and that no further irregular payments would be accepted. He should
    have afforded them an opportunity to make current any arrears, if
    such existed.
    Id. at 904.
    Upon review of the record, we have determined that every payment Crowe made to the Bank
    during a period of over three (3) years was after the 25th of the month and, according to the contract
    -4-
    as written, was late. However, at no time prior to repossession did the Bank refuse any of Crowe’s
    late payments or notify Crowe that future late payments would not be accepted. In fact, the Bank
    accepted one of Crowe’s payments on October 6, 1997, after his vehicle had been repossessed on
    September 29, 1997.
    We are of the opinion that the course of dealing between Crowe and the Bank during a period
    of over three (3) years was such that Crowe had been led to believe that the Bank would accept late
    payments without considering Crowe in default. Furthermore, as to the insurance contract, the Bank
    knew that the truck was insured and that it was not listed as a loss payee, but at no time during a
    period of over three (3) years, did the Bank place Crowe in default for not endorsing the bank as a
    loss payee on the insurance policy he had on the truck. Instead, the Bank simply added their own
    insurance on the truck and charged it to the end of Crowe’s loan. Therefore, we hold that the trial
    court correctly overruled the Bank’s motion for directed verdict.
    The second issue presented for review as stated in the Bank’s brief is:
    II. Whether [Crowe’s] action is barred by the statute of limitations.
    Again, this issue is, in essence, the alleged error of the trial court in denying the Bank’s motion for
    a directed verdict.
    In order to determine the applicable statute of limitations, we must look to the gravamen of
    the action. See Yater v. Wachovia Bank of Georgia, N.A., 
    861 S.W.2d 369
    , 372 (Tenn. Ct. App.
    1993). In determining the gravamen, or real purpose of an action, the court must look to the basis
    for which damages are sought. Keller v. Colgems-EMI Music, Inc., 
    924 S.W.2d 357
    , 359 (Tenn.
    Ct. App. 1996)(citing Bland v. Smith, 
    277 S.W.2d 377
     (Tenn. 1955). Another way of stating this
    principle is "[t]he limitation is not determined by the form of the action but by its object." Keller
    v. Colgems-EMI Music, Inc., 924 S.W. 2d at 359 (quoting Bodne v. Austin, 
    2 S.W.2d 100
     (Tenn.
    1928)).
    The Bank argues that Crowe’s action is barred under Tenn. Code Ann. § 28-3-104 (2000),
    the one-year statute of limitations for “injuries to the person.” The Bank asserts that the object of
    Crowe’s action is credit reporting damages and, therefore, is an “injury to the person” similar to
    defamation. However, Crowe points out that according to the specific language in the complaint,
    the Bank was sued for conversion and, therefore, his claim is governed by Tenn. Code Ann. § 28-3-
    105 (2000), the three-year statute of limitations for conversion of personal property.
    After a review of the complaint filed by Crowe, we are of the opinion that the gravamen of
    Crowe’s complaint is for conversion governed by Tenn. Code Ann. § 28-3-105. Furthermore, the
    trial court found that according to the complaint, conversion was Crowe’s only cause of action.
    Therefore, we find that the trial court correctly denied the Bank’s motion for directed verdict on this
    issue.
    The third, fourth, fifth and sixth issues presented for review as stated in the Bank’s brief are:
    -5-
    III. Whether [Crowe’s] action is barred because he failed to mitigate
    his damages.
    IV. Whether the trial court’s admission of evidence of the damages
    claimed by [Crowe] was error because he failed to mitigate his
    damages.
    V. Whether the trial court’s admission of evidence of [Crowe’s]
    claimed lost profits damages was error because the evidence was (1)
    hearsay, (2) from a witness lacking personal knowledge, and (3)
    speculative.
    VI. Whether the trial court’s admission of evidence of [Crowe’s]
    claimed lost profits from credit reputation injury was error because
    such damages are not conversion damages.
    These issues, in essence, emanate from the damages Crowe alleges he suffered from the loss
    of his truck caused by the Bank’s repossession on September 29, 1997.
    The law in Tennessee on loss of use damages in conversion cases can be compared to
    collision cases and is summarized in Tire Shredders, Inc. v. ERM-North Central, Inc., 
    15 S.W.3d 849
     (Tenn. Ct. App. 1999). This Court in Tire Shredders, Inc. cited a number of cases discussing
    loss of use damages that are available when negligent conduct results in injury to personal property.
    Id. at 854. In Tire Shredders, Inc., and in the collision cases discussed, the measure of loss of use
    damages is for a reasonable time to repair or replace the vehicle. Id.
    For instance, in Perkins v. Brown, 
    177 S.W. 1158
     (Tenn. 1915), an automobile collision
    case, the Tennessee Supreme Court commented that ‘the owner of a vehicle held for use may recover
    for the loss of its use, by reason of tortious injury, while being repaired, in addition to the cost of the
    necessary repairs.’ Tire Shredders, Inc. v. ERM-North Central, Inc., 15 S.W.3d at 854 (quoting
    Perkins v. Brown, 177 S.W. at 1159). In another collision case, Smith v. Fisher, 
    11 Tenn. App. 273
    (Tenn. Ct. App. 1929), the trial court instructed the jury that it could award damages for the loss of
    use of the plaintiff’s vehicle during the time reasonably required to repair the vehicle. Tire
    Shredders, Inc. v. ERM-North Central, Inc., 15 S.W.3d at 854 (citing Smith v. Fisher, 11 Tenn.
    App. at 273) (emphasis added). However, the plaintiff in Smith did not repair his vehicle, but used
    it as a trade in on a new vehicle. Id. This Court held that because the plaintiff’s vehicle was not
    actually repaired, loss of use damages should not have been considered when measuring the
    plaintiff’s damages. Id. Furthermore, in Yazoo & M. V. R. Co. v. Williams, 
    185 S.W.2d 527
     (Tenn.
    1945), the plaintiff’s truck was damaged in a collision with the defendant’s train. Tire Shredders,
    Inc. v. ERM-North Central, Inc., 15 S.W.3d at 854 (citing Yazoo & M. V. R. Co. v. Williams, 185
    S.W.2d at 528). The trial court instructed the jury that, “if it found in favor of the plaintiff, the
    measure of damages was the cost of repairing the truck plus the value of the use of the truck during
    the period of time that would reasonably be required to obtain the necessary repairs.” Tire
    Shredders, Inc. v. ERM-North Central, Inc., 15 S.W.3d at 854 (citing Yazoo & M. V. R. Co. v.
    -6-
    Williams, 185 S.W.2d at 529)(emphasis added). After noting that the truck had not been repaired,
    the Court held that the proper measure of damages did not include loss of use damages. Id.
    Therefore, “permitting the recovery for loss of use during a period necessary to replace an
    injured or destroyed chattel would be consistent with Tennessee decisions in contract cases involving
    loss of use.” Tire Shredders, Inc. v. ERM-North Central, Inc., 15 S.W.3d at 854 (quoting Mayo
    L. Coiner, Tennessee Law of Damages § 6-4 (1988)).
    This Court, in Tire Shredders, also upheld the following jury instruction which we are of the
    opinion represents the law in Tennessee on loss of use damages:
    The measure of damages for loss of use is reasonable compensation
    to the plaintiff for being deprived of the use of the property during the
    time reasonably necessary for a reasonably prudent person to replace
    the property. . . .
    Tire Shredders, Inc. v. ERM-North Central, Inc., 15 S.W.3d at 853. Furthermore, the trial court
    in the present case properly gave the following instruction to the jury:
    A person whose property has been damaged by the wrongful act of
    another is bound to use reasonable care to avoid and minimize
    damages. A party may not recover for losses that could have been
    prevented with reasonable efforts or by expenditures that might
    reasonably have been made.
    In addition to loss of use damages, these issues also involve a determination of damages for
    conversion of property. The law in Tennessee on conversion damages is as follows:
    As a general rule, plaintiff’s damages in an action for conversion are
    measured by the sum necessary to compensate him for all actual
    losses or injuries sustained as a natural and proximate result of the
    defendant’s wrong. However consequential damages must be proved
    with reasonable certainty. The ordinary measure of damages for
    conversion is the value of the property converted at the time and place
    of conversion, with interest. If special damages are pleaded and
    proved, plaintiff may recover for all injuries or losses sustained as a
    proximate result of the conversion, but there can be no recovery for
    losses or injuries which are too remote or uncertain, or which the
    plaintiff could have avoided by the exercise of ordinary diligence.
    *    *    *
    While it has been held absolutely that injuries to business are not
    recoverable as damages in trover, and there can be no recovery for
    -7-
    loss of profits or injuries to businesses of a speculative or uncertain
    nature, it is often held that there can be a recovery for such losses if
    they are shown with certainty, except in so far as such losses could
    have been avoided or minimized by the exercise of due diligence on
    the part of the plaintiff. (citation omitted).
    *   *     *
    Damages for conversion of a vehicle are comparable to damages for
    loss or loss of a vehicle by negligence as in a collision. In such cases,
    the rule is that, where no other vehicle is available, lost profits may
    be recovered if proved with certainty, but an award of lost profits is
    erroneous in the absence of a showing that no other vehicle could be
    had. There is no evidence of the unavailability of another vehicle
    except lack of funds which is not recognized as an exception to the
    duty to mitigate damages by obtaining another vehicle.
    Lance Productions v. Commerce Union Bank, 
    764 S.W.2d 207
    , 213 (Tenn. Ct. App. 1988)(citation
    omitted).
    The Bank argues that Crowe’s claim for conversion damages is barred because Crowe should
    have exercised ordinary diligence by making his payments to the Bank on time which would have
    prevented the Bank from repossessing his truck. We must disagree. As we stated earlier in this
    opinion, the Bank’s course of dealing with Crowe over three (3) years led him to believe that late
    payments would be accepted. Therefore, we are of the opinion that the trial court correctly denied
    the Bank’s motion for a directed verdict.
    The Bank argues, in the alternative, that even if Crowe’s claim is not barred for failure to
    mitigate his damages, he cannot recover for damages that ‘could have been avoided or minimized
    by the exercise of due diligence on the part of the plaintiff.’ The Bank specifically mentions in its
    brief that Crowe’s air travel and rental car expenses, as well as his lost profit damages, are the
    damages that Crowe failed to mitigate and the Bank’s position is that the trial court erred in
    admitting evidence of these damages.
    Tenn.R.Evid. 103 provides in pertinent part:
    Rule 103. Rulings on evidence. - (a) Effect of Erroneous Ruling. -
    Error may not be predicated upon a ruling which admits or excludes
    evidence unless a substantial right of the party is affected, and
    (1) Objection. - In case the ruling is one admitting evidence, a timely
    objection or motion to strike appears of record, stating the specific
    ground of objection if the specific ground was not apparent from the
    context; . . . .
    -8-
    Furthermore, “a litigant who files an unsuccessful motion in limine need not also make another
    objection when the evidence is introduced in order to preserve an evidentiary issue for appellate
    review as long as the trial court has ‘clearly and definitively’ disposed of the motion in limine.”
    Wright v. United Servs. Auto. Assoc., 
    789 S.W.2d 911
    , 914 (Tenn. Ct. App. 1990)(quoting State
    v. McGhee, 
    746 S.W.2d 460
    , 462 (Tenn. 1988)(emphasis added)). However, if the trial court has
    not “clearly and definitively” acted on the motion, the moving party must renew the motion
    contemporaneously with the introduction of the objectionable evidence. Grandstaff v. Hawks, 
    36 S.W.3d 482
    , 488 (Tenn. Ct. App. 2000). Failure to renew the motion will preclude the moving party
    from taking issue on appeal with the admission of the evidence. Id.
    In the instant case, the Bank alleges that the trial court’s erroneous action which raised this
    issue was its denial of the Bank’s motion in limine number 4 which provides as follows:
    Defendant moves the Court to exclude (1) argument for and
    statements about plaintiff’s claim for damages and (2) evidence the
    sole purpose of which is to support that claim.
    Plaintiff failed to mitigate his damages by replacing the repossessed
    truck. Plaintiff was unable to buy a replacement truck due to lack of
    funds. Plaintiff’s deposition at 88. A claim of “lack of funds” is not
    a recognized exception to the duty to mitigate damages for obtaining
    another vehicle. Lance Productions, Inc. v. Commerce Union Bank,
    
    764 S.W.2d 207
    , 213 (Tenn. Ct. App. 1988).
    The Court should grant this motion because such arguments,
    statements and evidence would be irrelevant and unfairly prejudicial.
    However, the record does not reflect that the trial court entered a written order on this motion.
    Furthermore, the Bank argued this motion in limine preliminarily before the trial court as follows:
    MR. ROWLETT: Your Honor, motion in limine No. 4. Mr. Crowe
    had this truck repossessed and he was unable to buy a replacement
    due to lack of funds and there is a case that we cited on that that (sic)
    said lack of funds is not a recognized exception to the duty to mitigate
    so any damages that Mr. Crowe claims due to his inability to buy a
    replacement truck due to lack of funds should not be admissible in
    evidence.
    MR. ABERNATHY: Your Honor, I think what the Lance case says
    among other things is if someone finds themselves in the position of
    Mr. Crowe has (sic) certain responsibilities to undertake. They even
    talked about in the Lance case had (sic) some responsibility to try to
    go to Court to get the repoed vehicle back.
    -9-
    The court is going to hear proof and I think the Court should hear
    proof about what this man did after the bank took his truck, and I
    think the Court will clearly find that he did all that was required of
    any reasonable person to mitigate his loss. Matter of fact, he did all
    any reasonable person could do to persuade the bank that they had
    made a mistake. He was unsuccessful in doing that.
    The trial court made the following comment on the Bank’s motion in limine number 4:
    THE COURT: All right. The Court will charge, of course, the
    standard and mitigation damages.
    We do not find a clear and definitive ruling on the Bank’s motion in limine number 4 which,
    in essence, addresses the introduction of evidence on Crowe’s air travel and rental car expenses
    allegedly suffered by Crowe as a result of the Bank’s conversion. Furthermore, the Bank does not
    direct this Court to the location, and we do not find in the record, where the Bank made an objection
    to Crowe’s testimony that the total amount of car rental and airline expenses he incurred as a result
    of not having his truck was $20,945.81. In the absence of a clear and definitive ruling on the Bank’s
    motion in limine and in the absence of a timely objection by the Bank to the evidence introduced,
    this Court cannot consider the alleged error. This issue is without merit.
    The Bank further contends that the trial court erred in admitting evidence of Crowe’s alleged
    lost profit damages because the testimony was either hearsay, from a witness lacking personal
    knowledge and speculative. During the direct examination of Mr. Crowe, the trial court overruled
    the Bank’s objection on this issue as follows:
    Q. Mr. Crowe, you’ve alleged in your complaint that as a result of
    this repossession you’ve lost revenue, you’ve lost contracts?
    A. Yes, sir.
    Q. Is that true?
    A. That’s true.
    MR. ROWLETT: Your Honor, I’d just like to note a continuing
    objection on the lost contracts because Mr. Crowe doesn’t have
    personal knowledge of why he didn’t get any of those contracts.
    THE COURT: All right, sir. Be overruled.
    When reviewing a trial court’s decision to admit evidence, we must remember that the trial
    court is afforded wide discretion in the admission or rejection of evidence, and the trial court's action
    will be reversed on appeal only when there is a showing of an abuse of discretion. Otis v.
    -10-
    Cambridge Mut. Fire Ins. Co., 
    850 S.W.2d 439
    , 442 (Tenn. 1992); Davis v. Hall, 
    920 S.W.2d 213
    ,
    217 (Tenn. Ct. App. 1995). The abuse of discretion standard requires us to consider: (1) whether
    the decision has a sufficient evidentiary foundation; (2) whether the trial correctly identified and
    properly applied the appropriate legal principles; and (3) whether the decision is within the range of
    acceptable alternatives. State ex rel. Vaughn v. Kaatrude, 
    21 S.W.3d 244
    , 248 (Tenn. Ct. App.
    2000). While we will set aside a discretionary decision if it does not rest on an adequate evidentiary
    foundation or if it is contrary to the governing law, we will not substitute our judgment for that of
    the trial court merely because we might have chosen another alternative.
    Crowe testified at trial that his damages, as a result of the Bank’s repossession and
    conversion of his truck, include anticipated lost profits from six (6) competitively bid job contracts
    worth between 15 and 20 percent of the total job amount. However, Crowe testified on cross-
    examination as follows:
    Q. An you’ve testified about – let me just ask you a question about
    these. You testified, I think, about this job, this Nelson Poultry job
    and you indicated that you would have a 15 percent net profit; is that
    right?
    A. Yes, sir.
    Q. And that’s just what you anticipated, correct?
    A. Yes, sir.
    *    *     *
    Q. And on this Mahard Egg Farm job, you didn’t even submit a bid
    on that job, did you?
    A. We had our bid all made out and the estimator had it.
    Q. My question to you, though, was you did not submit a bid on that
    job, did you?
    A. Not directly to Mahard. Like I said, the bid estimator had it.
    Q. And what you’ve written here says by way of estimation, I
    probably lost the opportunity to bid; is that correct?
    A. Well, I did lose the opportunity to carry it further.
    Q. And you’ve testified that you think that your profit would have
    been – net profit would have been 15 percent?
    -11-
    A. That’s right, of the total contract.
    Q. And if the total contract was a million, you think your net profit
    would have been $150,000?
    A. That’s what the contract would have been.
    *    *     *
    Q. And isn’t it true that on these jobs that you’ve referred to earlier
    with Mr. Abernathy, that there were at least three other jobs where
    you did not – had not submitted a bid?
    A. Couldn’t get the bonding. No need to doing all the paperwork.
    According to Crowe’s own testimony, we find no material evidence of Crowe’s lost profit
    damages. It is uncertain that Crowe would have received the job contracts even if the bank had not
    repossessed his truck. In fact, Crowe testified that he did not even submit a bid on four (4) of the
    six (6) job contracts on which he claims damages. Crowe’s testimony as to lost profits is speculative
    and uncertain and, therefore, we are of the opinion that the trial court abused its discretion when it
    overruled the Bank’s objections on this issue.
    The Bank also argues that the trial court erred in admitting evidence of Crowe’s claimed lost
    profits from credit reputation injury because such damages are not conversion damages. The trial
    court overruled the Bank’s objections to Crowe’s testimony regarding the adverse effect the
    repossession had on Crowe’s business including his testimony that he lost contracts because of the
    repossession.
    In sum, Crowe testified at trial that the damage to his credit reputation, resulting from the
    Bank reporting the repossession to credit bureaus, prevented Crowe from obtaining the bonding and
    insurance necessary to receive the job contracts on which he claims damages.
    We find that even if Crowe would have been able to obtain the bonding and insurance, there
    is still nothing to indicate that he would have received the job contracts. Crowe’s testimony on
    direct examination that “[I] [n]ever did go to get one [job contract] that I didn’t get if I wanted it”
    and “[i]f I wanted the job, I come home with it”, is uncertain and speculative. Therefore, because
    Crowe’s lost profit damages are uncertain and speculative, we find that the trial court abused its
    discretion when it allowed Crowe’s testimony of lost profits based on credit reputation injury.
    The seventh issue in this case is pretermitted.
    The judgment of the trial court that Bank was guilty of conversion is affirmed. The judgment
    is modified to award plaintiff total damages as proven in the amount of $20,945.80. The case is
    remanded to the trial court for such further proceedings as necessary. Costs of appeal are assessed
    one-half against appellant, First American National Bank, and its surety, and one-half against
    appellee, Richard Crowe.
    -12-
    __________________________________________
    W. FRANK CRAWFORD, PRESIDING JUDGE, W.S.
    -13-