Concrete Spaces, Inc. v. Henry Sender ( 1998 )


Menu:
  •        IN THE COURT OF APPEALS OF TENNESSEE
    AT NASHVILLE
    FILED
    CONCRETE SPACES, INC.,             )              July 31, 1998
    FAUX FUR, INC.,                    )
    Cecil W. Crowson
    PAULETTE DALTON, and               )
    Appellate Court Clerk
    STUART DALTON,                     )
    )   Davidson Chancery
    Plaintiffs/Appellees,        )   94-993-I
    )
    VS.                                )   Appeal No.
    )   01A01-9607-CH-00288
    HENRY SENDER, Individually,        )
    DARREN LIFF and ZACKARY LIFF,      )
    HENRY SENDER, EUGENE I. SACKS      )
    and wife RUTH SACKS, d/b/a         )
    LIFF, SENDER AND SACKS, Tenants    )
    in Common, NATIONAL BUILDING       )
    CORPORATION,                       )
    )
    Defendants/Appellants.       )
    APPEAL FROM THE CHANCERY COURT
    FOR DAVIDSON COUNTY
    AT NASHVILLE, TENNESSEE
    THE HONORABLE WHITNEY STEGALL, SPECIAL CHANCELLOR
    For Plaintiffs/Appellees:              For Defendants/Appellants:
    Steve North                            Charles Hampton White
    Mark North                             Andrew D. Dunn
    Madison, Tennessee                     Cornelius & Collins
    Nashville, Tennessee
    Abby Rubenfeld
    Nashville, Tennessee
    AFFIRMED IN PART; REVERSED IN PART;
    AND REMANDED
    WILLIAM C. KOCH, JR., JUDGE
    -2-
    OPINION
    This appeal arises from a dispute over the lease and renovation of commercial
    space in Nashville’s Cummins Station. After abandoning the leases because the
    renovations had not been completed within the time promised, the lessees filed suit
    in the Chancery Court for Davidson County against the lessors and the project
    manager. A jury awarded the lessees $75,000 in compensatory damages and
    $1,100,000 in punitive damages which the trial court later reduced to $500,000. On
    this appeal, the lessors and the project manager take issue with the punitive damage
    award and with the inconsistencies between the judgment and the jury’s answers to
    special interrogatories. We affirm the compensatory damage award; however, we
    vacate the punitive damage award and remand the case to the trial court to consider
    whether the compensatory damages should be trebled in accordance with the
    Tennessee Consumer Protection Act.
    I.
    In early 1993, Paulette Dalton operated two businesses on lower Broadway
    near Second Avenue – a vintage clothing boutique called The Emperor’s New
    Clothes and a gallery for local artists called The Gallery on Broadway. She was
    considering relocating her businesses because she needed more space and because she
    had been approached by Gavin Gaskins about combining her gallery and boutique
    with a nightclub. Mr. Gaskins had managed several nightclubs in Nashville, and he
    and Ms. Dalton believed that a nightclub featuring progressive “grunge” music could
    be a commercial success. They became interested in Cummins Station after Ms.
    Dalton received an advertisement from its leasing agents in July 1993.
    Cummins Station is a large, five-story building on the corner of Tenth Avenue,
    South and Demontbreun Avenue in Nashville. It was erected in 1913 as office and
    warehouse space for wholesale merchants. It was largely unoccupied when a group
    of investors led by Henry Sender1 purchased it in March 1993 with the view to
    1
    The other four investors were Darren Liff, Zackary Liff, Eugene Sacks, and Ruth Sacks.
    The investors owned the property as tenants in common and did business under the trade name of
    (continued...)
    -3-
    renovate it into office, retail, and warehouse space. The building had fallen into
    disrepair, and the purchasers understood that it would require extensive renovations
    in order to make it suitable for commercial tenants.
    After discussing the location with her husband,2 Ms. Dalton met one of
    Cummins Station’s leasing agents to inspect possible spaces for the boutique, gallery,
    and nightclub. Ms. Dalton then toured Cummins Station a second time accompanied
    by her husband, Mr. Gaskins, and the curator of her gallery. After deciding that the
    space met their needs, the Daltons and Mr. Gaskins formed two corporations to carry
    out their business ventures. The Daltons incorporated Concrete Spaces, Inc. to
    operate the boutique and art gallery, and Ms. Dalton and Mr. Gaskins incorporated
    Faux Fur, Inc. to operate the nightclub.
    On August 18, 1993, the Daltons and Mr. Gaskins met with Mr. Sender,
    Michael Cooper, who is Mr. Sender’s son-in-law and who is also the president of
    National Building Corporation3, and the leasing agents to discuss the lease terms and
    the improvements needed in order to operate a boutique, art gallery, and nightclub in
    the proposed space. Mr. Sender left the meeting early, and most of the discussions
    concerning the parties’ obligations with regard to the “build out” of the space were
    handled by Mr. Cooper. During the meeting, Ms. Dalton stated she desired to open
    for business in early October in order to take advantage of the peak retail months of
    the holiday season. Mr. Cooper and the leasing agents replied that the space would
    be ready for occupancy by the first of October.
    At the conclusion of the meeting, the leasing agents provided the Daltons and
    Mr. Gaskins with copies of two proposed leases – one lease with Concrete Spaces for
    the boutique and gallery and the other lease with Faux Fur for the nightclub. The
    Daltons’ lawyer proposed extensive alterations in the leases. Eventually, on August
    1
    (...continued)
    “Liff, Sender, and Sacks”. Mr. Sender owned a 25% interest in the property; Mr. and Mrs. Sacks
    owned a 25% interest; and Darren and Zackary Liff owned the remaining 50% interest. Darren and
    Zackary Liff eventually acquired Mr. and Mrs. Sacks’s 25% interest in the property.
    2
    Stuart Dalton worked as a sales representative for a medical supply company and did not
    take an active role in the day-to-day management of his wife’s businesses.
    3
    National Building Corporation was the project manager for the renovation of Cummins
    Station. Mr. Sender is the chairman and chief executive officer of National Building Corporation
    and is also a major stockholder of the company.
    -4-
    26, 1993, the parties executed two leases for approximately 6,520 square feet of
    contiguous space on the first floor of Cummins Station. The terms of the two leases
    were essentially the same. Their term was for five years, and the rent was $1,222.50
    per month. Attached to both leases was an exhibit addressing some of the needed
    improvements to the space. The Daltons signed the Concrete Spaces lease, and Ms.
    Dalton and Mr. Gaskins signed the Faux Fur lease.
    As it turned out, the two leases did not clearly allocate the parties’
    responsibilities concerning the build out of the leased space. Ms. Dalton understood
    that the lessors would be responsible for paying for most of the improvements and for
    seeing that they were completed in time to open her businesses in October. Messrs.
    Sender and Cooper believed that this responsibility belonged to the lessees. As a
    result, the construction of the improvements was delayed, and numerous disputes
    arose between the parties – particularly between Ms. Dalton and Mr. Sender.
    Even though the construction plans for the leased space were not completed
    until September 28, 1993, the space for the boutique and gallery were ready for their
    grand opening on October 22, 1993. The insurance company providing coverage for
    the inventory in the boutique and gallery required Ms. Dalton to inquire into the
    security and fire safety of the building before she moved her inventory into the new
    space. Even though a rear door opening onto a common hallway had not been
    installed, Mr. Cooper assured Ms. Dalton that the building was secure and that the
    fire sprinkler system was adequate. Relying on Mr. Cooper’s assurances, Ms. Dalton
    moved her inventory into the building, and the boutique and gallery opened for
    business on October 22, 1993.
    The boutique and gallery were burglarized on October 24 and again on October
    27, 1993. The thieves stole all of Ms. Dalton’s inventory, a safe containing
    approximately $2,350 in cash and other business documents, a stereo system, and a
    cash register. When Ms. Dalton suggested that the lessors should reimburse her for
    the loss because Mr. Cooper had assured her that the building was secure, Mr. Sender
    and one of his business associates declined to accept responsibility for the burglary.
    They pointed out that the leases provided that each lessee was responsible for the
    security of their space.
    -5-
    Following the second burglary, the electrical contractor submitted a draw
    request to Ms. Dalton for $7,500 of the approximately $32,000 in electrical work that
    had been performed in the leased space. Ms. Dalton and Mr. Gaskins insisted that the
    lessors were responsible for the electrical work. On November 8, 1993, Mr. Gaskins,
    on behalf of Faux Fur, wrote a letter to Mr. Sender complaining about the delay in
    completing the improvements for the nightclub and the “exorbitant bill for proposed
    electrical work.” Mr. Gaskins also stated that he was terminating Faux Fur’s lease
    because of the lessors’ breaches. Mr. Sender responded on November 12, 1993 by
    informing Mr. Gaskins that the lessors intended to hold Faux Fur fully responsible
    for its obligations under the lease.
    Ms. Dalton never reopened the boutique and gallery following the burglaries
    but continued with her efforts to open the nightclub. The planned October 29, 1993
    opening date was rescheduled to January 28, 1994 because the construction of the
    improvements had not been completed. The relationship between Ms. Dalton and
    Mr. Sender continued to deteriorate because of the construction delays, their dispute
    over the burglary, and their disagreement over paying for the electrical work. One
    of their last confrontations occurred when Mr. Sender told Ms. Dalton that he would
    not permit her to operate a gay bar in Cummins Station. Mr. Sender eventually
    declined to meet with Ms. Dalton, and Mr. Dalton was forced to take time away from
    his job to assist his wife with the project.
    In early January 1994, Ms. Dalton applied for a beer permit and a dance permit
    in anticipation of the nightclub’s January 28, 1994 opening. She was unable to obtain
    these permits because the lessors could not provide her with a final use and
    occupancy permit and a certificate from the fire marshal. Accordingly, Ms. Dalton
    could not sell alcoholic beverages when the nightclub opened on January 28, 1994.
    As a gesture of good will, she gave drinks away to the persons who attended the
    opening.
    Ms. Dalton consulted a lawyer soon after Mr. Sender’s accusations that she
    intended to operate a gay bar. On April 6, 1994, a lawyer representing Concrete
    Spaces and Faux Fur informed the lessors’ lawyer that the lessors had breached the
    lease by delaying the construction and by failing to obtain a use and occupancy
    permit from the fire marshal. Accordingly, the lessees’ lawyer stated that it was no
    -6-
    longer feasible for the lessees to continue to wait to open their business and that the
    lessees would vacate the premises on April 11, 1994.
    On April 7, 1994, the Daltons and their two corporations filed suit in the
    Chancery Court for Davidson County against Mr. Sender, National Building
    Corporation, and the partnership that owned Cummins Station. The complaint
    included claims for breach of contract, negligent misrepresentation, fraudulent
    misrepresentation, and violation of the Tennessee Consumer Protection Act and
    sought recovery of compensatory damages, punitive damages, and treble damages.
    The essence of the Daltons’ claim was that Mr. Sender and his business associates
    had deceived them about the quality and availability of the space in Cummins Station
    and that Mr. Sender had “intentionally carried on a systematic plan of harassment and
    lack of cooperation” to force them to abandon their leases in order to enable him to
    lease the space to others on more favorable terms. The lessors filed a counterclaim
    seeking damages for the lessees’ alleged breach of the leases. Following a nine-day
    trial, the jury awarded the Daltons $75,000 in compensatory damages and $1,100,000
    in punitive damages. The trial court denied the post-trial motions but reduced the
    punitive damage award to $500,000 – the amount of punitive damages prayed for in
    the complaint.
    II.
    The lessors mount a three-pronged attack on the punitive damage award. First,
    they assert that the trial court should not have permitted the jury to award punitive
    damages because of its previous finding that the lessors had violated the Tennessee
    Consumer Protection Act. Second, they insist that the trial court failed to explain its
    reasons for approving the punitive damage award before entering the judgment.
    Third, they assert that the punitive damage award was excessive. Since the first issue
    is dispositive of the punitive damage question, we pretermit the latter two issues
    A.
    The trial court, the parties, and the jury struggled with the lessees’ multiple
    claims for relief when the case was submitted to the jury. In its original charge, the
    trial court set out the legal principles applicable to the lessees’ breach of contract,
    fraudulent misrepresentation, negligent misrepresentation, and punitive damage
    -7-
    claims but omitted an instruction concerning the Tennessee Consumer Protection Act
    despite the lessees’ earlier request for one. Thereafter, the trial court provided the
    jury with a verdict form containing the following five questions:
    We, the jury, in the cause of Concrete Spaces, Inc., et al. v.
    Henry Sender, et al. find as follows:
    1. We find for the plaintiff against the defendant and fix the
    compensatory damages at _________________.
    OR
    2. We find for the defendant against the plaintiff and fix the
    compensatory damages at _________________.
    3. We find that there was no meeting of the minds and,
    therefore, no contract.
    YES_____                   OR                   NO_____
    4. If compensatory damages for the plaintiff were fixed above
    by the jury, then the jury will answer this question. Are the plaintiffs
    due punitive damages under the Tennessee Consumer Act [sic]?
    (emphasis added).
    YES_____                  OR                   NO_____
    5. If you find that the plaintiffs are entitled to compensatory
    damages, do such damages arise from an unfair and deceptive act or
    practice by the defendants?
    YES_____                  OR                   NO_____
    During a recess before the jury retired to deliberate, the trial court acknowledged
    errors in questions four and five. When the jury returned, the trial court read the
    corrected verdict form that included revised questions four and five which now read:
    4. If compensatory damages for the plaintiff were fixed above
    by the jury, then the jury will answer this question. Are the plaintiffs
    due punitive damages.
    YES_____                  OR                    NO_____
    5. If you find that the plaintiffs are entitled to compensatory
    damages, did such damages arise from an unfair or deceptive act or
    practice by the defendants under the Tennessee Consumer Act [sic]?
    YES_____                  OR                    NO_____
    After deliberating approximately ninety minutes, the jury sent word that it
    wanted a copy of the Tennessee Consumer Protection Act. After the parties could not
    agree on the substance of a supplemental instruction, the trial court brought the jury
    back into court and informed them that it would not be “proper” to give them a copy
    of the Act because it was “rather lengthy.” Instead, the trial court provided the jury
    with a brief description of the Act’s purpose but did not provide a definition of an
    “unfair or deceptive act or practice.” The trial court recessed for the day after the jury
    -8-
    asked additional questions concerning the propriety of quotient verdicts4 and the
    calculation of the parties’ attorney’s fees. When the foreperson announced that the
    jury had already answered one of the questions on the verdict form, the trial court
    stated that it would retain the form until the following day. In the jury’s absence, the
    trial court candidly informed the parties that it should not have given the jury a
    portion of the instructions concerning the Tennessee Consumer Protection Act.
    When court convened the next morning, the trial court provided the jury with
    a new verdict form in addition to the one they had already started to fill out. The trial
    court also provided additional instructions concerning attorney’s fees5 and the
    meaning of unfair and deceptive acts or practices.6                     After deliberating for
    approximately ninety minutes, the jury announced its verdict. Reading from the jury
    form, the foreperson stated in answer to question one that
    1. We find for the plaintiff against the defendant and fix the
    compensatory damages at $75,000 plus accrued attorneys fees
    through case closure.
    In answer to the third question, the jury responded that the parties had entered into
    a contract. In answer to the fourth question, the jury responded that the lessees were
    entitled to punitive damages. Finally, in response to the fifth question, the jury
    answered that the lessees’ compensatory damages arose “from an unfair or deceptive
    act or practice by the defendants under the Tennessee Consumer Act [sic].”
    During a recess before the punitive damage phase of the trial, both lawyers
    expressed concern over the jury’s vague finding with regard to attorney’s fees.
    Eventually, the lawyers and the trial court decided that the jury must have intended
    to award the lessees $101,000 ($75,000 in compensatory damages plus $26,000 in
    attorney’s fees paid by the lessees prior to the trial). However, when the jury was
    informed that the parties had agreed to amend their verdict to $101,000, the
    4
    Quotient verdicts are, of course, improper. See Odom v. Gray, 
    508 S.W.2d 526
    , 532 (Tenn.
    1974); Thompson v. State, 
    197 Tenn. 112
    , 116, 
    270 S.W.2d 379
    , 381 (1954). Accordingly, the trial
    court informed the jury that it could not render such a verdict.
    5
    The trial court simply informed the jury that “The attorneys have presented the evidence to
    you with respect to the attorneys fees and I think that answers your question.”
    6
    The trial court informed the jury that the General Assembly had “included 29 examples of
    unfair and deceptive acts or practices” in the statute and that the members of the jury “should apply
    the usual and ordinary meaning to the words unfair and deceptive acts.”
    -9-
    foreperson stated that the jury had intended to include the $26,000 in attorney’s fees
    that the lessees had already paid in its $75,000 award.
    With all participants in agreement with the $75,000 compensatory damage
    award, the punitive damage phase of the trial proceeded. The jury deliberated for less
    than one hour and adjourned. After deliberating briefly the following morning, the
    jury awarded the lessees $1,100,000 in punitive damages. In response to the lessors’
    post-trial motions, the trial court reduced the punitive damage award to $500,000 –
    the amount prayed for in the complaint7 – and then approved the reduced punitive
    damage award because of Mr. Sender’s “highly insulting” treatment of Ms. Dalton
    and because of the “numerous unfair and deceptive acts” committed by the lessors.
    B.
    We must, whenever possible, give effect to, rather than undermine, a jury’s
    verdict. See Bankhead v. Hall, 
    34 Tenn. App. 412
    , 424, 
    238 S.W.2d 522
    , 527 (1950).
    Thus, we must give verdicts their most favorable interpretation and must give effect
    to the jury’s intent if permissible under law, see Briscoe v. Allison, 
    200 Tenn. 115
    ,
    125-26, 
    290 S.W.2d 864
    , 868 (1956); Newsom v. Markus, 
    588 S.W.2d 883
    , 886
    (Tenn. Ct. App. 1979). We must also give effect to verdicts, even if they are
    defective in form, if they enable the trial court to intelligently pass judgment on them.
    See Arcata Graphics Co. v. Heidelberg Harris, Inc., 
    874 S.W.2d 15
    , 27 (Tenn. Ct.
    App. 1993).
    An inconsistent verdict, however, resolves no conflicts and is no verdict at all.
    See McInturff v. White, 
    565 S.W.2d 478
    , 481 (Tenn. 1976). It is a nullity. See Slaten
    v. Earl Campbell Clinic Hosp., 
    565 S.W.2d 483
    , 484 (Tenn. 1978); Milliken v. Smith,
    
    218 Tenn. 665
    , 668, 
    405 S.W.2d 475
    , 477 (1966). Thus, we cannot give effect to a
    jury’s verdict based on irreconcilably inconsistent answers to special interrogatories.
    See Hock v. New York Life Ins. Co., 
    876 P.2d 1242
    , 1259 (Colo. 1994); Carr v.
    Strode, 
    904 P.2d 489
    , 503 (Haw. 1995); Shamrock, Inc. v. FDIC, 
    679 N.E.2d 344
    ,
    349 (Mass. Ct. App. 1994).
    7
    The lessees made an oral motion at trial to increase their compensatory and treble damages
    claims but did not move to increase their punitive damage claim.
    -10-
    Inconsistent verdicts are frequently caused by inadequate or confusing
    instructions. Jurors must receive and act on the law as presented to them by the trial
    court, see McCorry v. King’s Heirs, 22 Tenn. (3 Hum.) 266, 277 (1842), and the trial
    court’s instructions are the sole source of the legal principles used by jurors to guide
    their deliberations. See State ex rel. Myers v. Brown, 
    209 Tenn. 141
    , 148-49, 
    351 S.W.2d 385
    , 388 (1961). Thus, trial courts must provide jurors with accurate
    instructions that fairly embody the parties’ theories that are supported by the
    pleadings and the proof. See Betty v. Metropolitan Gov’t, 
    835 S.W.2d 1
    , 10 (Tenn.
    Ct. App. 1992).
    In addition to the trial court’s instructions, a special verdict form also provides
    the jurors with guidance concerning how to apply the legal principles in the
    instructions to the evidence they have heard. Decisions regarding the use of special
    verdict forms and the substance of these questions on the forms rest within the trial
    court’s discretion. See Tenn. R. Civ. P. 49.02; Smith v. Parker, 
    213 Tenn. 147
    , 159-
    60, 
    373 S.W.2d 205
    , 211 (1963); Petty v. Estate of Nichols, 
    569 S.W.2d 840
    , 847
    (Tenn. Ct. App. 1977). However, a special verdict form should include all issues
    raised by the parties. See Life & Cas. Ins. Co. v. Robertson, 
    6 Tenn. App. 43
    , 55
    (1927).
    Special verdict forms should use the same terms as those used in the jury
    instructions. See Lundquist v. Nickels, 
    605 N.E.2d 1373
    , 1389 (Ill. Ct. App. 1992).
    They should repeat and highlight the salient issues discussed in the instructions. See
    Kass v. Great Coastal Express, Inc., 
    676 A.2d 1099
    , 1107 (N.J. Super. 1996).
    Inconsistencies in the jury instructions and the special verdict form may confuse the
    jury. See Ladd v. Honda Motor Co., 
    939 S.W.2d 83
    , 103 (Tenn. Ct. App. 1996).
    Thus, the instructions and special verdict form should be construed together to
    determine whether they present the contested issues to the jury in an unclouded, fair
    manner. See Morton v. City of Chicago, 
    676 N.E.2d 985
    , 990 (Ill. Ct. App. 1997);
    Capers v. The Bon Marche, 
    955 P.2d 822
    , 825 (Wash. Ct. App. 1998); Nischke v.
    Farmers & Merchants Bank & Trust, 
    522 N.W.2d 542
    , 549 (Wis. Ct. App. 1994).
    Reversal is required when the special verdict form is confusing and does not comport
    with the jury instructions. See Helmar v. Harsche, 
    686 A.2d 766
    , 775 (N.J. Super.
    1996).
    -11-
    When viewed together, the instructions and special verdict forms used in this
    case could only have confused the jurors about the relationship between Tennessee
    Consumer Protection Act claims and punitive damages. The original special verdict
    form actually stated that the lessees could receive punitive damages for Tennessee
    Consumer Protection Act claims. Even though the jurors later received a second
    special verdict form correcting this error, the trial court never explained to them why
    they were receiving a revised special verdict form and even permitted the jurors to
    retain the erroneous form during their deliberations. Even as revised, the special
    verdict form did not foreclose the possibility that punitive damages were available in
    Tennessee Consumer Protection Acts cases, and this ambiguity in the special verdict
    was compounded by the extremely broad, generalized instructions concerning
    Tennessee Consumer Protection Act claims eventually given by the trial court.
    The jury’s confusion is reflected in their answers on the special verdict form.
    Their conclusions that the lessees are entitled to punitive damages and that the
    lessors’ breach of their lease obligations violated the Tennessee Consumer Protection
    Act are inconsistent. Punitive damages are generally not available in breach of
    contract cases, see Bland v. Smith, 
    197 Tenn. 683
    , 687, 
    277 S.W.2d 377
    , 379 (1955);
    B.F. Myers & Son of Goodlettsville, Inc. v. Evans, 
    612 S.W.2d 912
    , 916 (Tenn. Ct.
    App. 1980),8 and cannot be awarded with regard to Tennessee Consumer Protection
    Act claims. See Lorentz v. Deardan, 
    834 S.W.2d 316
    , 320 (Tenn. Ct. App. 1992);
    Paty v. Herb Adcox Chevrolet Co., 
    756 S.W.2d 697
    , 699 (Tenn. Ct. App. 1988). In
    the place of punitive damages, Tenn. Code Ann. § 47-18-109(a)(3) (1995) authorizes
    trial courts to award treble damages when there has been a “willful or knowing”
    violation of the Tennessee Consumer Protection Act. See Smith v. Scott Lewis
    Chevrolet, Inc., 
    843 S.W.2d 9
    , 12 (Tenn. Ct. App. 1992).
    The problem created by the jury’s misunderstanding about punitive damages
    does not necessarily vitiate the entire verdict. Verdicts have a liability component
    and a damage component. See All v. John Gerber Co., 
    36 Tenn. App. 134
    , 138, 
    252 S.W.2d 138
    , 139 (1952). The instructions and special verdict form presented the
    liability and compensatory damage issues to the jury fairly and understandably but
    8
    Punitive damages may be awarded in rare cases where the breach of contract is coupled with
    a tort involving fraud, malice, gross negligence, or oppression. See Medley v. A.W. Chesterton Co.,
    
    912 S.W.2d 748
    , 753 (Tenn. Ct. App. 1995).
    -12-
    fell short only with regard to the enhanced damage issues. Accordingly, we affirm
    the portion of the verdict and judgment finding that the lessors breached the lease
    agreements and determining that the lessees sustained $75,000 in compensatory
    damages as a result of these breaches. However, we vacate the punitive damage
    award and remand the case to enable the trial court to determine whether the lessees’
    compensatory damages should be trebled according to the standards contained in
    Tenn. Code Ann. § 47-18-109(a)(3)&(4).9
    C.
    Tenn. R. Civ. P. 8.01 permits plaintiffs to plead in the alternative.
    Accordingly, it is now common for plaintiffs to include Tennessee Consumer
    Protection Act claims in the same complaint with common-law claims for fraud,
    promissory fraud, or fraudulent or negligent misrepresentation. It is also common for
    plaintiffs to request punitive damages and treble damages in the same complaint.10
    Because plaintiffs are not entitled to both punitive damages and treble damages, see
    Lorentz v. Deardan, 834 S.W.2d at 320, trial courts and the parties should take care
    to make sure that the issues involving the exemplary damages be presented to the jury
    clearly and fairly.
    We offer the following suggestions for avoiding the confusion that beset the
    jury in this case. The jury instructions should fairly set out the elements of each of
    the plaintiff’s common-law and statutory causes of action. A trial court may permit
    the jury to return a general verdict, but if the plaintiff is seeking both punitive and
    treble damages, the trial court must require the jury to answer two questions. If the
    jury awards the plaintiff compensatory damages, it must also decide (1) whether the
    9
    No issue was raised on this appeal concerning whether the Tennessee Consumer Protection
    Act applies to commercial transactions such as the one involved in this case. Thus, our opinion
    provides no precedent for extending the Tennessee Consumer Protection Act to commercial leases.
    10
    See generally Lisa K. Gregory, Annotation, Plaintiff’s Rights to Punitive or Multiple
    Damages When Cause of Action Renders Both Available, 
    2 A.L.R. 5th 449
     (1992).
    -13-
    acts giving rise to the compensatory damages were knowing and willful11 and (2)
    whether the defendant acted intentionally, fraudulently, maliciously, or recklessly.12
    If the jury answers “no” to both questions, then the plaintiff is not entitled to
    exemplary damages under any theory. If the jury answers “yes” to the first question
    and “no” to the second, the trial court must proceed on its own to determine whether
    the compensatory damages should be trebled in accordance with the Tennessee
    Consumer Protection Act. If the jury answers “yes” to the second question and “no”
    to the first, the jury must determine whether the plaintiff should recover punitive
    damages in accordance with the procedures mandated by the Hodges v. S.C. Toof &
    Co. decision.
    Conceivably, the jury could answer “yes” to both questions. If a jury does so,
    the trial court should, at that juncture, invoke the doctrine of election of remedies
    whose purpose is to prevent the possibility of double recovery of damages. See
    Wimley v. Rudolph, 
    931 S.W.2d 513
    , 515 (Tenn. 1996); Allied Sound, Inc. v. Neely,
    
    909 S.W.2d 815
    , 822 (Tenn. Ct. App. 1995). In order to prevent a double recovery
    of exemplary damages, the trial court should require the plaintiff to decide whether
    it will pursue punitive damages in accordance with the Hodges v. S. C. Toof & Co.
    decision or whether it will pursue treble damages in accordance with Tenn. Code
    Ann. § 47-18-109(a)(3)&(4).
    In lieu of a general verdict, the trial court may also decide to submit special
    interrogatories to the jury in accordance with Tenn. R. Civ. P. 49.                         In that
    circumstance, the trial court’s instructions must fairly set out the elements of each of
    the plaintiff’s common-law and statutory causes of action. The special interrogatories
    must be consistent with the instructions and must cover each of the plaintiff’s
    common-law and statutory claims. If the jury determines that the plaintiff is entitled
    11
    This question relates to the plaintiff’s claim for treble damages under the Tennessee
    Consumer Protection Act.
    12
    This question relates to the plaintiff’s claim for punitive damages and is required by Hodges
    v. S.C. Toof & Co., 
    833 S.W.2d 896
    , 900-901 (Tenn. 1992) in order to determine whether the jury
    will proceed to consider the plaintiff’s punitive damage claim.
    -14-
    to compensatory damages, it should state the amount of the damages and should also
    identify each of the causes of action for which the plaintiff has carried its burden of
    proof. The jury should also be asked (1) whether the acts giving rise to the
    compensatory damages were knowing and willful or (2) whether the defendant acted
    intentionally, fraudulently, maliciously, or recklessly.
    If the jury answers “no” to both of these questions, then the plaintiff is not
    entitled to exemplary damages under any theory. If the jury answers “yes” to the
    former and “no” to the latter, then the trial court should proceed to consider whether
    the compensatory damages should be trebled under the Tennessee Consumer
    Protection Act if, and only if, the jury has also determined that the defendant has
    violated the Tennessee Consumer Protection Act but not any of the other common-
    law claims. If the jury answers “no” to the former question and “yes” to the latter,
    the trial court should proceed with the hearing on punitive damages if, and only if,
    the jury has determined that the plaintiff has carried its burden of proof on any of its
    common-law claims warranting punitive damages, but not on its claim under the
    Tennessee Consumer Protection Act. If the jury answers “yes” to both questions and
    has determined that the plaintiff has carried its burden of proof with regard to its
    Tennessee Consumer Protection Act claim and at least one of its common-law claims,
    then the trial court should require the plaintiff to decide to pursue either punitive
    damages or treble damages under the Tennessee Consumer Protection Act.
    III.
    As a final matter, the lessors argue that discrepancies in the designation of the
    parties in the special verdict forms and the judgment require that the judgment be
    overturned. Relying on Whittemore v. Classen, 
    808 S.W.2d 447
    , 458 (Tenn. Ct. App.
    1991), they assert that the verdict is too uncertain to permit the entry of a judgment
    and that the judgment does not conform to the verdict. While the discrepancies in the
    special verdict form and the judgment are unfortunate, we find that they did not
    prevent the trial court from intelligently rendering a judgment in the case consistent
    with the jury’s verdict.
    A.
    -15-
    The complaint named four plaintiffs and three defendants and alleged that each
    group had strong business connections. The plaintiffs included Ms. Dalton, her
    husband, and the two corporations she formed to operate her gallery, boutique, and
    nightclub. The defendants included Mr. Sender, the partnership consisting of Mr.
    Sender and others formed to develop and lease Cummins Station, and National
    Building Corporation, Mr. Sender’s construction company run by his son-in-law that
    was serving as the construction manager for the Cummins Station project.
    From the outset of the litigation, all parties recognized the strong unity of
    interest among the parties plaintiff on one hand and the parties defendant on the
    other. Virtually all the claims for relief in the complaint referred to the “plaintiffs”
    collectively and to the “defendants” collectively.              Likewise, the answer and
    counterclaim were filed on behalf of the “defendants” collectively, and the factual
    averments in both the answer and the counterclaim referred collectively to the
    “plaintiffs” and the “defendants.” The pleadings contain no indication that any single
    plaintiff or defendant took a position inconsistent with its counterparts or that any
    defendant undertook to pass liability on to one of the other defendants.
    The parties maintained their unity of interest throughout the discovery process,
    the pretrial proceedings, and the trial. Neither party presented evidence that the
    plaintiffs or the defendants were not acting in concert. Ms. Dalton was the plaintiffs’
    central witness, and Mr. Sender was the only defendant participating in the trial. The
    evidence makes clear that Mr. Sender was not just representing himself but was also
    representing the interests of the partnership13 and National Building Corporation.14
    The lessors’ proposed instructions and proposed special verdict form also
    referred to the “plaintiffs” and the “defendants” collectively. In addition, the opening
    and closing statements of the lawyers for both parties contained repeated references
    13
    As a matter of law, the acts of partners taken in the course of partnership business are
    binding on the partnership. See Pritchett v. Thomas Plater & Co., 
    144 Tenn. 406
    , 444, 
    232 S.W. 961
    , 972 (1921); Wyatt v. Brown, 
    39 Tenn. App. 28
    , 35, 
    281 S.W.2d 64
    , 68 (1955).
    14
    Mr. Sender was the president and principal stockholder of National Building Corporation.
    Corporations act at the direction of their officers and through their officers and employees. See
    Nelson v. Martin, 
    958 S.W.2d 643
    , 650 (Tenn. 1997); Allied Sound, Inc. v. Neely, 909 S.W.2d at
    821. The record contains no evidence that Mr. Sender was not acting on behalf of both the
    construction company and the partnership in his dealings with Ms. Dalton.
    -16-
    to the “plaintiffs” and the “defendants.” The trial court’s instructions were likewise
    couched in terms of “plaintiffs” and “defendants.” Inexplicably, both versions of the
    special verdict form prepared by the trial court did not contain consistent,
    complementary references to the remedies. In two of the four questions referring to
    the parties, the parties are referred to in the singular rather than the plural.15 One
    question contained party designations in both singular and plural form,16 and one
    question referred to both groups of parties in the plural.17
    Neither party took issue with the plural or singular designations of the parties
    plaintiff or the parties defendant or with the special verdict form. When the jury
    announced its verdict regarding compensatory damages, neither party requested
    clarifications with regard to whom or against whom the damages had been awarded.
    Likewise, neither party took issue with the special interrogatory on punitive
    damages,18 and when the jury announced that it had awarded the “plaintiffs”
    $1,100,000 in punitive damages, neither party requested clarification concerning
    against whom or in whose favor these damages had been awarded.
    Thereafter, the trial court entered a judgment prepared by the lessees’ lawyer
    that recited the jury’s answers on the two special verdict forms and that ordered “that
    the plaintiffs have and recover of the defendants judgment in the amount of Seventy-
    Five Thousand Dollars ($75,000.00) compensatory damages and One Million One
    Hundred Thousand Dollars ($1,100,000.00) punitive damages.” (emphasis added).
    Notwithstanding the use of the preceding plural designations of the “plaintiffs” and
    the “defendants,” the judgment concluded by taxing the costs against the “defendant.”
    15
    These questions include the first and second questions on the special verdict form which
    state “[w]e find for the plaintiff against the defendant and fix compensatory damages at _____”
    (emphasis added) and that “[w]e find for the defendant against the plaintiff and fix the compensatory
    damages at _____” (emphasis added).
    16
    The fourth question on the special verdict form stated: “If compensatory damages for the
    plaintiff were found above by the jury, then the jury will answer the question. Are the plaintiffs due
    punitive damages?” (emphasis added).
    17
    The fifth question on the special verdict form asked: “If you find that the plaintiffs are
    entitled to compensatory damages, did such damages arise from an unfair or deceptive act or practice
    by the defendants under the Tennessee Consumer Act [sic]?” (emphasis added).
    18
    The question regarding punitive damages read, in part, as follows: “You, the jury, have
    found that the plaintiffs are entitled to punitive damages. It is now your duty to fix the amount of
    damages.” (emphasis added).
    -17-
    The lessors raised the issue of the discrepancies caused by the use of the
    singular and plural references in the two verdict forms and the judgment for the first
    time in their motion for new trial. After noting that the case had been tried on the
    basis that there was a unity of interest between the parties plaintiff and the parties
    defendant, the trial court declined to grant a new trial because the lessors had not
    raised the issue at the stage of the proceeding where the ambiguity could easily have
    been clarified and corrected if need be.
    B.
    We have determined that the lessors have waived their opportunity to take
    issue with the designations of the parties. Like the lessees, the lessors tried this case
    on the basis that there was a unity of interest among the parties plaintiff and a similar
    unity of interest among the parties defendant. Unlike the other ambiguity in the
    jury’s compensatory damage verdict that was raised and corrected while the jury was
    still empaneled, the lessors did not call the trial court’s attention to the discrepancies
    in the parties’ designations while the jury could still have corrected them. Lawyers
    have an obligation to assist the trial court at all stages of litigation and cannot seek
    relief on appeal from errors that were, in part, of their own making. See Tenn. R.
    App. P. 36(a); Henry County Bd. of Educ. v. Burton, 
    538 S.W.2d 394
    , 397 (Tenn.
    1976); Gilson v. Gillia, 
    45 Tenn. App. 193
    , 217, 
    321 S.W.2d 855
    , 866 (1958).
    The lessors insist, however, that the ambiguous designation of the parties on
    the verdict forms are so fundamentally prejudicial that they should be excused from
    their obligation to alert the trial court in a timely manner so that they can be
    corrected. While we do not make light of the obvious shortcomings of the special
    verdict forms used in this case, we have concluded that the lessors overstate the
    prejudicial significance of the problem.
    A trial court may enter a judgment on a jury verdict, even when the verdict’s
    form is defective, as long as the verdict permits the trial court to intelligently pass
    judgment according to the jury’s decision. See Arcata Graphics Co. v. Heidelberg
    Harris, Inc., 874 S.W.2d at 27; Tennessee Cent. Ry. v. Scarbrough, 
    9 Tenn. App. 295
    ,
    299 (1928). However, the lessors insist that the trial court could not intelligently pass
    judgment on the verdict because the answers to the special interrogatories were too
    -18-
    uncertain to enable the trial court to determine against whom the damages were
    awarded. See Whittemore v. Classen, 808 S.W.2d at 458-59. We disagree under the
    facts of this case.
    When a verdict or judgment is awarded against multiple parties designated as
    “defendants” rather than by name, the courts may look to the process, pleadings, and
    proceedings to ascertain the parties against whom the jury has rendered the verdict.
    See Wilson v. Nance, 30 Tenn. (11 Hum.) 189, 191-92 (1850). Despite the sloppy
    drafting of the special interrogatories, the pleadings and the overwhelming weight of
    the evidence permitted the trial court to conclude that the jury intended to return a
    verdict in favor of all plaintiffs against all defendants. Accordingly, the trial court
    could properly enter judgment for all plaintiffs against all defendants.
    IV.
    We affirm the portion of the judgment awarding all plaintiffs $75,000 in
    compensatory damages against all defendants, and we reverse the $500,000 judgment
    for punitive damages against all defendants. We remand the case to enable the trial
    court to determine whether the plaintiffs’ compensatory damages should be trebled
    under the standards contained in Tenn. Code Ann. § 47-18-109(a)(3)&(4) and for any
    other proceedings that may be necessary. We tax the costs of this appeal in equal
    proportions to Paulette and Stuart Dalton, jointly and severally, and to Henry Sender
    and his surety for which execution, if necessary, may issue.
    ______________________________
    WILLIAM C. KOCH, JR., JUDGE
    CONCUR:
    __________________________________
    HENRY F. TODD, PRESIDING JUDGE
    MIDDLE SECTION
    __________________________________
    BEN H. CANTRELL, JUDGE
    -19-