William Timothy Hayes v. Coopertown Mastersweep, Inc. ( 2015 )


Menu:
  •                IN THE COURT OF APPEALS OF TENNESSEE
    AT MEMPHIS
    February 24, 2015 Session
    WILLIAM TIMOTHY HAYES, ET AL. V. COOPERTOWN’S
    MASTERSWEEP, INC.
    Appeal from the Circuit Court for Shelby County
    No. CT00023608     Karen R. Williams, Judge
    No. W2014-00783-COA-R3-CV – Filed May 20, 2015
    This is an appeal from the grant of two motions for directed verdict. Appellants
    contracted with Appellee chimneysweep company to redesign and reconstruct portions of
    their fireplace and chimney to address a problem with smoke escaping into the den, upper
    floors, and attic. More than a year after the construction was completed, Appellants‟
    home was damaged by a fire, which started when wood flooring joists in close proximity
    to the firebox ignited. Appellants brought claims for negligence and breach of contract
    against Appellee. The case was tried before a jury. At the close of Appellants‟ proof, the
    trial court granted the Appellee‟s motions for directed verdict on the ground that the
    Appellants had failed to establish that the Appellee owed them a duty of care to conduct a
    destructive investigation of the safety of the Appellants‟ fireplace and also on the ground
    that the suit was barred by the applicable statute of repose. We affirm and remand.
    Tenn. R. App. P. 3 Appeal as of Right; Judgment of the Circuit Court is
    Affirmed and Remanded
    KENNY ARMSTRONG, J., delivered the opinion of the Court, in which J. STEVEN
    STAFFORD, P.J., W.S., and BRANDON O. GIBSON, J., joined.
    Russell E. Reviere, Jonathan D. Stewart, and Brandon W. Reedy, Jackson, Tennessee, for
    the appellants, William Timothy Hayes and Stephanie Hayes.
    Leland M. McNabb, Pam Warnock Blair, and Andrew J. Droke, Memphis, Tennessee,
    for the appellee, Coopertown‟s Mastersweep, Inc.
    1
    OPINION
    I. Background
    On November 17, 2000, William and Stephanie Hayes (together, “the Hayeses,”
    or “Appellants”) purchased a house, which was constructed in 1964. Before the Hayeses
    moved into their home, they contracted with a third party, who is not a party to this
    appeal, to have the kitchen and the den fireplace remodeled. The fireplace was originally
    all-brick construction, but the Appellants replaced some sections of the hearth with
    granite, and lowered the location of the firebox by roughly two feet, flush with the floor
    of the sunken den. The sunken den is slab construction, but the rest of the first floor is
    conventional foundation construction. The back of the fireplace originally served as part
    of the kitchen wall; however, as part of the remodeling, Appellants had the fireplace brick
    covered in the kitchen and painted the inside of the new, lowered firebox, which obscured
    the fact that the lowered firebox was new construction.
    The remodeled fireplace did not function properly. Whenever the Hayes built a
    fire, they noticed that smoke escaped into the den and that the upper floors and attic
    smelled like smoke. Eventually, Mr. Hayes contacted Coopertown‟s Mastersweep, Inc.
    (“Mastersweep” or “Appellee”) and requested an inspection of the fireplace to determine
    the cause of the smoke problem. On December 18, 2002, Mastersweep‟s president,
    Charles “Ken” Robinson, inspected the Hayeses‟ chimney and fireplace. The Appellants
    did not inform Mr. Robinson that the firebox had been lowered as part of the recent
    remodeling work. Mr. Robinson‟s inspection included: (1) a visual inspection of the
    chimney sections located in the house‟s attic and above the roof; (2) a visual inspection
    beneath the fireplace in the house‟s crawlspace; and (3) a visual inspection of the inside
    of the fireplace and the chimney. Mr. Robinson used a camera to inspect the chimney
    flue, and he also drilled into the fireplace to ascertain whether there was any combustible
    material in contact with the fireplace. Parts of this inspection, including the inspection
    beneath the fireplace and the drilling, went beyond the inspection that the Hayeses
    contracted for. There were areas underneath the fireplace that could not be seen or
    inspected by Mr. Robinson. Based upon his inspection, Mr. Robinson concluded that the
    dimensions of the fireplace and the chimney were not conducive to proper smoke flow.
    Mr. Robinson also determined that the inside of the fireplace was incorrectly shaped,
    causing improper smoke ventilation and resulting in smoke from the fireplace escaping
    into the den. He also discovered that the clay tiles lining the chimney flue were cracked,
    which allowed smoke to escape into the upper floors and attic of the house.
    In a letter to Mr. Hayes dated December 23, 2002, Mr. Robinson proposed a
    redesign of the fireplace to correct the smoking problems. Mr. Robinson‟s letter
    contained six specific recommendations:
    1. Tear out [a] portion of the existing firebox and the damper to gain
    2
    access to the smoke chamber.
    2.   Climb up into the smoke chamber and repair all of the cracked and
    damaged mortar that has been thermal shocked by completely
    parging the smoke chamber with fire clay mortar.
    3.   Remove the loose and/or cracked flue liners as necessary to prepare
    for the liner installation.
    4.   Install a 304 grade, heavy walled, flexible, stainless steel liner from
    the top of the chimney to the top of the smoke chamber. This will
    require removal of the clay pot and I would suggest it be left off of
    the chimney.
    5.   Insulate the liner with a…“cast-in-place” chimney insulation.
    6.   Rebuild the firebox as necessary and reinstalled [sic] the damper.
    The letter listed the materials required to implement these recommendations as “304
    grade, heavy walled, flexible stainless steel liner, „cast-in-place‟ insulation, firebrick,
    mortar, fireclay, high temperature caulk, etc.” Sometime in 2003, the Appellants accepted
    Mastersweep‟s proposal. Thereafter, Mastersweep replaced the square flue from the
    original fireplace with a round flue, using a heavy-duty, flexible, stainless steel pipe. In
    order to facilitate the installation of the new chimney flue, Mastersweep removed bricks
    from the inside of the chimney and then filled the space between the chimney walls and
    the new flue with a type of “insulating mud.” During his testimony, Mr. Robinson
    characterized the work as a “permanent addition” that would require “destructive
    methods” to remove. It is undisputed that Mastersweep substantially completed this
    work on October 8, 2003.
    On January 17, 2005, the Appellants‟ house was severely damaged by fire. The
    fire began when wooden floor joists that had been in contact with the firebox ignited
    from exposure to heat generated by the fireplace. Although no one was injured as a result
    of the fire, the Hayeses were forced to move out of their house for fifteen months while
    repairs were made.
    On February 15, 2008, the Hayeses brought suit against Mastersweep, alleging
    negligence and breach of contract. This case was ultimately tried before a jury on March
    25-26, 2014. On March 27, 2014, the Appellee filed two separate motions for directed
    verdict, arguing that the Appellants had failed to prove that Mastersweep owed the
    Hayeses a duty of care to conduct a destructive inspection of the fireplace and that the
    statute of repose, codified at Tennessee Code Annotated Section 28-3-202, barred the
    Appellants‟ lawsuit. In an order dated April 9, 2014, the trial court granted both motions
    for directed verdict, holding that the Appellee did not owe such a duty of care to the
    Appellants and that the applicable statute of repose barred the Appellants‟ lawsuit. On
    April 9, 2014, Appellee filed a motion for discretionary costs. On April 25, 2014, the
    Appellants appealed the trial court‟s decision on the directed verdict motions. On May
    27, 2014, the trial court granted Appellee‟s motion for discretionary costs, awarding
    3
    $5,820.50 in discretionary costs.
    II. Issues
    We restate the dispositive issues as follows:
    1. Whether the trial court erred by concluding that the Appellants‟ claims against the
    Appellee were time-barred by the four-year statute of repose codified at Tennessee
    Code Annotated Section 28-3-202.
    2. Whether the trial court erred by concluding that the Appellee did not assume a
    duty of care toward the Appellants once it exceeded its contracted-for inspection.
    3. Whether the trial court erred in awarding discretionary costs to the Appellee.
    III. Standard of Review
    This case requires us to review the trial court‟s grant of a motion for directed
    verdict pursuant to Tennessee Rule of Civil Procedure 50.01.1 “The grant or denial of a
    motion for directed verdict is a question of law; therefore, the court‟s decision is subject
    to a de novo review with no presumption of correctness.” Riad v. Erie Ins. Exchange,
    
    436 S.W.3d 256
    , 271 (Tenn. Ct. App. 2013). We review the trial court‟s findings of fact
    de novo with a presumption of correctness unless the evidence preponderates otherwise.
    Tenn. R. App. P. 13(d).
    IV. Analysis
    A. Statute of Repose
    We begin our analysis by reviewing the trial court‟s grant of Mastersweep‟s
    motion for directed verdict on the statute of repose ground. The applicable statute of
    repose provides as follows:
    1
    Tennessee Rule of Civil Procedure 50.01 provides that:
    A motion for a directed verdict may be made at the close of the evidence offered by an
    opposing party or at the close of the case. The court shall reserve ruling until all parties
    alleging fault against any other party have presented their respective proof-in-chief. A
    party who moves for a directed verdict at the close of the evidence offered by an
    opponent may offer evidence in the event that the motion is not granted, without having
    reserved the right so to do and to the same extent as if the motion had not been made. A
    motion for a directed verdict which is not granted is not a waiver of trial by jury even
    though all parties to the action have moved for directed verdicts. The order of the court
    granting a motion for a directed verdict is effective without any assent of the jury.
    4
    All actions to recover damages for any deficiency in the design, planning,
    supervision, observation of construction, or construction of an improvement
    to real property, for injury to property, real or personal, arising out of any
    such deficiency, or for injury to the person or for wrongful death arising out
    of any such deficiency, shall be brought against any person performing or
    furnishing the design, planning, supervision, observation of construction,
    construction of, or land surveying in connection with, such an improvement
    within four (4) years after substantial completion of such an improvement.
    Tennessee Code Annotated Section 28-3-202.
    Appellants argue that their claim and damages result from Appellee‟s failure to
    conduct a proper inspection of their fireplace structure, as opposed to negligent
    construction of an improvement to the fireplace structure. Appellants further argue that
    the work performed by Appellee was repair work and not an improvement to real
    property. Consequently, Appellants contend, the statute of repose does not apply in this
    case. Appellee, on the other hand, argues that Appellants‟ claims arise from injury to real
    property from deficient design and construction of an improvement to real property, and,
    therefore, Appellant‟s lawsuit is subject to the time limit prescribed by the statute of
    repose.
    We note that statutes of limitations and statutes of repose do not function in the
    same way. “A statute of limitations normally governs the time within which legal
    proceedings must be commenced after a cause of action accrues. A statute of
    repose…limits the time within which an action may be brought and is unrelated to the
    accrual of any cause of action.” Calaway ex rel. Calaway v. Schucker, 
    193 S.W.3d 509
    ,
    515 (Tenn. 2005). Although the Appellants couch their complaint as a claim for
    negligence based upon Mr. Robinson‟s inspection of their fireplace, that characterization
    does not render their action beyond the application of the statute of repose. “[T]he
    designation given to a cause of action does not necessarily or conclusively determine
    whether Tenn. Code Ann. § 28-3-202 applies. Rather, we must look to the substantive
    allegations of the complaint.” Chrisman v. Hill Home Development Inc., 
    978 S.W.2d 535
    , 540 (Tenn. 1998); see also Henry v. Cherokee Const. and Supply Co., Inc., 
    301 S.W.3d 263
    , 266 (Tenn. Ct. App. 2009). The Appellants‟ complaint contains specific
    allegations that Mastersweep committed negligence by “failing to properly repair the
    fireplace and/or chimney of [the Appellants‟] home in a reasonable and workmanlike
    manner so as to prevent excess heat from transferring to the wood flooring structure.”
    The complaint also alleges that Mastersweep breached a contract between the parties by
    failing to “adequately rebuild the existing firebox such that the existing wood floor
    structure beneath it would not catch fire.”
    Although the complaint alleges that Mr. Robinson was negligent in his inspection
    of the fireplace, from the entirety of the complaint, and considering the damages sought,
    5
    we conclude that the Hayeses‟ causes of action, including the claim for negligent
    inspection, arise from deficiencies “in the design, planning…or construction of an
    improvement to real property,” and, therefore, is subject to the time limitations of Section
    28-3-202. Tennessee Code Annotated Section 28-3-202 bars any cause of action that
    arises out of a deficiency in the design or construction of an improvement to real
    property, including claims of negligence, nuisance, strict liability and negligent
    misrepresentation. See, e.g., 
    Chrisman, 978 S.W.2d at 540
    (holding that Tennessee Code
    Annotated Section 28-3-202 bars not just negligence claims, but a nuisance claim arising
    from deficient construction); 
    Henry, 301 S.W.3d at 266-76
    (holding that an action
    couched as a negligent misrepresentation was in fact an action arising from construction
    of an improvement to real property and therefore barred by the statute of repose);
    Lonning v. Jim Walter Homes, Inc., 
    725 S.W.2d 682
    , 685-86 (Tenn. Ct. App. 1986)
    (holding that Tennessee Code Annotated Section 28-3-202 barred a claim for fraud).
    Therefore, if a court determines that a cause of action is for injury to real property arising
    from a deficiency in the construction or design of an improvement to real property, it is
    subject to the time limit prescribed in Tennessee Code Annotated Section 28-3-202.
    Because we conclude that Appellants‟ claims, including the negligent inspection claim,
    are for injury to real property arising from deficient design and construction, these claims
    will be barred by Tennessee Code Annotated Section 28-3-202 if their lawsuit was not
    brought within the time limit prescribed.
    Appellants have also argued that Appellee‟s work constituted mere repair work,
    and, therefore, does not fall into the category of an improvement to real property required
    by the statute of repose. Tennessee Code Annotated Section 28-3-202 does not provide a
    definition for an “improvement to real property”; however, this Court has previously
    defined several tests to determine whether construction constitutes an improvement to
    real property. One such test is that an improvement to real property may be
    a “valuable addition” to property or an amelioration in a property‟s
    condition, an amelioration which amounts to more than a repair or
    replacement, which costs labor or capital, and which is meant to increase
    the property‟s value, beauty, or utility, or which is meant to adapt the
    property for a new purpose.
    Cartwright v. Presley, No. E2005-02418-COA-R3-CV, 
    2007 WL 161042
    , at *5 (Tenn.
    Ct. App. Jan. 23, 2007) (emphasis in original) (citing Watkins v. Tankersley Const., Inc.,
    No. W2004-00869-COA-R3-CV, 
    2005 WL 1541869
    , at *5 (Tenn. Ct. App. June 29,
    2005)). The construction at issue in this case must satisfy the definition of either a
    valuable addition or an amelioration to constitute an improvement to real property for
    purposes of Tennessee Code Annotated Section 28-3-202. See 
    id. In Cartwright,
    this Court concluded that the installation of a walk-in cooler in a
    floral store constituted an improvement to real property. 
    Id. at *5.
    The Cartwright court
    6
    concluded that the walk-in cooler had been added to the shop and was valuable in that it
    furthered the business of the floral store, and, therefore, constituted an improvement to
    real property. 
    Id. The Cartwright
    court also concluded that the walk-in cooler
    constituted an amelioration because it enhanced the property‟s utility as a floral business,
    cost labor and capital, and made the property “better.” 
    Id. In Watkins,
    this Court
    concluded that the “removal of trees, grading, and fill work…constituted an improvement
    to real property.” Watkins, 
    2005 WL 1541869
    , at *5. The Watkins court concluded that,
    because this work enhanced the utility of the land in question by preparing it for home
    construction, the work constituted an improvement to real property. 
    Id. Testimony at
    trial revealed that Mastersweep completed all of the work that Mr.
    Robinson proposed in his December 23, 2002 letter. As set out above, Mr. Robinson‟s
    proposal included, inter alia, tearing out and rebuilding the firebox, replacing the damper,
    parging the smoke chamber with fireclay, and installing and insulating a new flue liner.
    Mr. Hayes testified that he paid $3,300 for the labor and materials required to implement
    these proposals, which clearly satisfies the labor and capital requirement of the definition
    of amelioration. This work also enhanced the utility of the home by enabling the Hayes
    family to use their fireplace without smoke escaping into several different parts of the
    house. We conclude, therefore, that the work performed by Mastersweep satisfies the
    requirements of an amelioration and, therefore, constitutes an improvement to real
    property and not merely repair work as asserted by Appellants.
    Accordingly, the statute of repose applies and bars all such actions commenced
    outside the four-year limit. See 
    Chrisman, 978 S.W.2d at 540
    . Because Appellants‟
    complaint is for a claim arising from Mastersweep‟s redesign and construction of the
    Appellants‟ fireplace, their lawsuit must have been filed within four years of substantial
    completion of the work to survive the statute of repose. It is undisputed that
    Mastersweep substantially completed its work on the Hayeses‟ house on October 8, 2003.
    The instant suit was filed on January 16, 2008, more than four years after Mastersweep
    substantially completed its construction. As such, the trial court did not err in granting a
    directed verdict on this issue.
    B. Duty of Care
    Although we hold that all of the Appellants‟ claims, including their negligent
    inspection claim, are barred by the statute of repose, in the interest of full adjudication,
    we will also address Appellants‟ argument that the trial court erred when it granted the
    Appellee‟s motion for directed verdict on the ground that Appellee did not owe a duty of
    care to the Hayeses. Appellants argue that Mr. Robinson assumed a duty of care when he
    examined the fireplace from the house‟s crawlspace because that action constituted an
    affirmative act that created a duty. The Appellee argues that there was nothing in the
    scope of Mr. Robinson‟s inspection that would have revealed the hidden flaw that
    eventually led to the fire in the Hayeses‟ home.
    7
    As found by the trial court, the Appellee was hired to address the problem of
    smoke escaping from the fireplace, and the inspection Mr. Robinson needed to perform to
    assess this problem did not require destruction of the fireplace structure, which would
    have been necessary to expose the defect that ultimately caused the fire. The trial court
    stated in its ruling that the Appellee‟s inspection did not suggest the existence of a hidden
    defect. The trial court also found that the “testimony…does not reflect that the
    [Appellants] discussed with the [Appellee] the prior renovation.” Based on those facts,
    the trial court concluded that Mr. Robinson‟s investigation did not create a duty on
    Appellee‟s part to conduct a destructive inspection of the fireplace.
    “Whether or not a person has assumed a duty to act is a question of law.” Biscan
    v. Brown, 
    160 S.W.3d 462
    , 483 (Tenn. 2005) (citing Stewart v. State, 
    33 S.W.3d 785
    ,
    793 (Tenn. 2000)). “Duty is a legal obligation to conform to a reasonable person
    standard of care in order to protect others against unreasonable risks of harm.”
    Satterfield v. Breeding Insulation Co., 
    266 S.W.3d 347
    , 355 (Tenn. 2008). “[P]ersons
    do not ordinarily have a duty to act to protect others from dangers or risks except for
    those that they themselves have created.” 
    Satterfield, 266 S.W.3d at 357
    . However,
    “„[o]ne who assumes to act, even though gratuitously, may thereby become subject to the
    duty of acting carefully.‟” 
    Biscan, 160 S.W.3d at 482-83
    (quoting 
    Stewart, 33 S.W.3d at 793
    )). In other words, “it is clear that one who assumes to act assumes a duty to act with
    reasonable care.” Messer Griesheim Indus. v. Cryotech of Kingsport, Inc., 
    45 S.W.3d 588
    , 604 (Tenn. Ct. App. 2001).
    “In order to determine whether a duty is owed in a particular circumstance, courts
    must first establish that the risk is foreseeable, and, if so, must then apply a balancing test
    based upon principles of fairness to identify whether the risk was unreasonable.”
    
    Giggers, 277 S.W.3d at 365
    . “An unreasonable risk of harm arises and creates a legal
    duty if the foreseeability and gravity of harm caused by the defendant‟s conduct
    outweighs the burdens placed on a defendant to engage in other conduct that would
    prevent such harm.” Cullum v. McCool, 
    432 S.W.3d 829
    , 833 (Tenn. 2013). “A risk is
    foreseeable if a reasonable person could foresee the probability of its occurrence or if the
    person was on notice that the likelihood of danger to the party to whom the duty is owed
    is probable.” Doe v. Linder Const. Co., Inc., 
    845 S.W.2d 173
    , 178 (Tenn. 1992).
    Appellants argue that it was foreseeable that the fireplace might have a hidden
    defect because Mr. Robinson could not view the entire underside of the fireplace from the
    crawlspace; therefore, Appellants contend, he could not be sure that there were no
    combustible materials in proximity to the fireplace. Appellants argue that, once Mr.
    Robinson ascertained the fact that he could not view the entirety of the underside of the
    fireplace, he became duty-bound to perform a destructive investigation to ensure that no
    combustible materials were in proximity to the firebox.
    This Court has previously addressed the issue of whether an inspection gave rise
    8
    to a duty of care. In Bostaph v. Laws, 
    841 S.W.2d 330
    (Tenn. Ct. App. 1992), the
    defendant termite inspector inspected a house on the plaintiffs‟ behalf. 
    Id. at 331.
    The
    termite inspector conducted a “standard inspection of the home, including an inspection
    of the interior of the home and the exterior of the home and the readily accessible crawl
    space under the home.” 
    Id. (emphasis added).
    Three months after the termite inspection,
    the plaintiffs hired a general contractor to remodel the home. 
    Id. After tearing
    down a
    wall, the contractor discovered a termite infestation. 
    Id. In response
    to this discovery,
    the plaintiffs brought a negligence action against the termite inspector. 
    Id. at 332.
    The
    trial court in the Bostaph case granted a directed verdict in the defendant‟s favor. See 
    id. Because the
    record did not demonstrate that the termite inspector‟s inspection was below
    the standard of care or that “he did anything wrong,” the Bostaph Court affirmed the
    directed verdict in favor of the defendant. 
    Id. The Bostaph
    case creates a guide for our analysis of the issue of duty. Like the
    inspector in Bostaph, the record demonstrates that Mastersweep competently performed
    an inspection of all of the areas of the fireplace and chimney that were accessible. Also
    like in Bostaph, there was no evidence at the time of the inspection to suggest a hidden
    defect. We infer from the holding in Bostaph that when a properly conducted inspection
    does not reveal any signs of a defect, then the inspector does not have a duty of care to
    conduct further inspection using special or destructive methods. From the totality of the
    circumstances, we conclude, as did the trial court, that the inspection was performed
    reasonably and that it did not suggest a hidden defect in the fireplace‟s construction. The
    burden is on the plaintiffs to show by competent evidence that the Appellee was negligent
    in the inspection of the fireplace and chimney, or that the Appellee deviated from the
    accepted standard of care for fireplace inspectors in making the December 8, 2002
    inspection. Plaintiffs failed to carry their burden in the trial court. Accordingly, we
    conclude that Mastersweep neither owed nor assumed a duty of care.
    C. Discretionary Costs
    In regard to the discretionary costs issue, Appellants argue that, if the trial court
    committed reversible error by granting the Appellee‟s motion for directed verdict, then
    the Appellee is not the prevailing party in the case, and, therefore, the trial court abused
    its discretion in awarding discretionary costs. In light of our holding affirming the trial
    court‟s ruling on the applicability of the statute of repose, this issue is pretermitted.
    V. Conclusion
    For all of the foregoing reasons, we affirm the judgment of the trial court. The
    case is remanded for such further proceedings as may be necessary and are consistent
    with this opinion. Costs of the appeal are assessed against the Appellants, William
    Timothy Hayes and Stephanie Hayes, and their surety, for all of which execution may
    issue if necessary.
    9
    _________________________________
    KENNY ARMSTRONG, JUDGE
    10