Jewell, Kevin v. Cobble Construction & Arcus Restoration , 2015 TN WC App. 1 ( 2015 )


Menu:
  •               TENNESSEE DIVISION OF WORKERS’ COMPENSATION
    WORKERS’ COMPENSATION APPEALS BOARD
    Employee: Kevin Jewell                                )       Docket No. 2014-05-0003
    )
    Employer: Cobble Construction and                     )       State File No. 63150-2014
    Arcus Restoration                           )
    In accordance with Rule 0800-02-22-.02(6), please find attached the Workers’
    Compensation Appeals Board’s Order and Opinion Affirming and Remanding
    Interlocutory Order of Court of Workers' Compensation Claims in the referenced case.
    CERTIFICATE OF SERVICE
    I hereby certify that a true and correct copy of the Order and Opinion Affirming and
    Remanding Interlocutory Order of Court of Workers' Compensation Claims was sent to
    the following recipients by the following methods of service on this the 12th day of
    January, 2015.
    Name                      Certified   First Class   Via   Fax      Via     Email Address
    Mail        Mail          Fax   Number   Email
    Kevin Jewell                                                         X     quazykevin@yahoo.com
    J. Eric Hennessee, Esq.                                              X     Eric.hennessee@mitchellattorneys.com
    David Drobny, Esq.                                                   X     ddrobny@manierherod.com
    Joshua Davis Baker,                                                  X     Via Electronic Mail
    Judge
    Kenneth M. Switzer,                                                  X     Via Electronic Mail
    Chief Judge
    Penny Shrum, Clerk,                                                  X     Penny.Patterson-Shrum@tn.gov
    Court of Workers’
    Compensation Claims
    Matthew Salyer
    Clerk, Workers’ Compensation Appeals Board
    220 French Landing Dr., Ste. 1-B
    Nashville, TN 37243
    Telephone: 615-253-1606
    Electronic Mail: Matthew.Salyer@tn.gov
    TENNESSEE DIVISION OF WORKERS’ COMPENSATION
    WORKERS’ COMPENSATION APPEALS BOARD
    FILED
    Employee: Kevin Jewell                    )       Docket No. 2014-05-0003
    )                                   January 12, 201S
    Employer: Cobble Construction and         )       State File No. 63150-2014
    TENNESSEE
    Arcus Restoration               )                               WORKERS ' COl\IPENSATION
    )                                  APPEALS BOARD
    Appeal from the Court of Workers'         )
    Time: 12 :00 Pl\I
    Compensation Claims                       )
    Joshua Davis Baker, Judge                 )
    Affirmed and Remanded -January 12, 2015
    ORDER AND OPINION AFFIRMING AND REMANDING INTERLOCUTORY
    ORDER OF COURT OF WORKERS' COMPENSATION CLAIMS
    This interlocutory appeal involves a construction worker who injured his back lifting a
    granite slab while in the course and scope of his employment with Cobble Construction, a
    subcontractor on a residential construction project for which Arcus Restoration was the
    principal contractor. The subcontractor was uninsured for workers' compensation risks.
    The principal contractor and subcontractor denied the claim, asserting the employee was
    an independent contractor. Alternatively, they asserted the injury resulted from activity
    outside the scope of the employee's work duties. Following an expedited hearing, the
    trial court found that the employee was employed by the subcontractor; that the employee
    was injured while performing work in the course and scope of his employment with the
    subcontractor; that the employee is due medical benefits and temporary disability benefits
    for 29 days during which employee's doctor kept him out of work; and that the principal
    contractor is responsible for providing the benefits because the subcontractor does not
    have workers' compensation insurance. The subcontractor has appealed. Having
    carefully reviewed the record, we affirm the decision of the Court of Workers'
    Compensation Claims.
    Judge David F. Hensley delivered the opinion of the Appeals Board, in which Judge
    Marshall L. Davidson, III, and Judge Timothy W. Conner, joined.
    1
    J. Eric Hennessee, Murfreesboro, Tennessee, for the employer-appellant, Cobble
    Construction
    Kevin Jewell, LaVergne, Tennessee, employee-appellee, pro se
    David M. Drobny, Nashville, Tennessee, for Arcus Restoration
    Factual and Procedural Background
    In a June 12, 2014 telephone conversation between Kevin Jewell ("Employee")
    and Chad Cobble, a representative of Cobble Construction, Employee was offered a full-
    time job at the hourly rate of $18.00. Employee asked what tools he needed and was told
    to bring painting tools. Employee began working for Cobble Construction on June 17,
    2014. Over the next several weeks he performed work for Cobble Construction at
    various sites in the Nashville area. At times Employee worked alone, while at other
    times he worked with Chad Cobble or with other employees of Cobble Construction.
    Employee performed various work duties including helping build stair risers and treads,
    installing cabinets, reinstalling a sink, installing interior doors, installing a floor, and
    painting.
    At the end of Employee's first week of work, June 20, 2014, Chad Cobble paid
    Employee with a personal check in the amount of $700.00. The check included a
    handwritten notation that it was for 38.5 hours. Over the next several weeks, Employee
    received similar personal checks for the work he performed. Each check included a
    handwritten notation for a number of hours.
    On August 2, 2014, Employee was working for Cobble Construction at a residence
    in Brentwood, Tennessee. Arcus Restoration ("Arcus") was the primary or general
    contractor on the project. Employee alleges that in the afternoon of August 2, 2014, he
    went into the bathroom of the residence to move a slab of granite that was sitting on the
    edge of the bathtub and that his back began to bum when he attempted to move the slab.
    He described the slab as being approximately six inches wide and twelve feet long.
    According to the trial court's order, Employee testified that he attempted to paint a
    handrail that afternoon, but his back continued to bum. The following mommg,
    Employee sent Chad Cobble a text message informing that he had been injured.
    According to the trial court's order, Employee testified that he moved the granite
    slab because the homeowner expressed concern to him that the slab was blocking access
    to the bathtub. The trial court's order indicates that Employee stated that, with the
    assistance of another Cobble Construction employee, he had previously placed the slab in
    the area of the bathtub in response to Chad Cobble's request that he and another
    employee pick all of the items up off the floor so that floor finishers could perform their
    2
    work. Employee said that he felt some responsibility to move the granite slab because he
    had placed it near the bathtub. The trial court's order indicates Chad Cobble stated that
    he never asked Employee to move the slab and that it was not Employee's job to move
    the slab. According to the order, Chad Cobble testified that Employee knew he was not
    supposed to touch the granite slab. However, Chad Cobble did not contest Employee's
    assertion that Mr. Cobble instructed him to dear items from the floor so that floor
    finishers could perform their work.
    In the days following the lifting incident and beginning on August 3, 2014, Chad
    Cobble and Employee exchanged numerous text messages including messages wherein
    Chad Cobble asked and expressed concern about Employee's back. The text messages
    included communications in which Employee told Chad Cobble that he had been to a
    doctor and that the doctor had given restrictions that prohibited heavy lifting.
    Employee's text messages also inquired about Cobble Construction's workers'
    compensation insurance coverage. Chad Cobble responded to one of the text messages
    stating that he was "exempt from workers comp." The last date of the text messages that
    were introduced into evidence was August 16, 20 14, and a text on that date from Chad
    Cobble included the statement, "I guess [you] filed a claim with work comp on me [and]
    they called Arcus yesterday." The text continued: "I can't do anything for them anymore.
    One of the owners at Arcus called me chewing me out yesterday. I can't even get my
    check from them now." Employee was terminated on August 16,2014.
    On August 28, 2014, Cobble Construction filed both an Employer's First Report
    of Work Injury or Illness and a Notice of Denial of Claim for Compensation. The Notice
    of Denial stated the basis for denial as follows:
    Pursuant to TCA 50-6-102 (ll)(D) Claimant does not meet the definition of
    an employee. Specifically, Mr. Cobble did not have the right to control the
    conduct of the work. Claimant was given a key to the house and was
    allowed to work when he could. Claimant offered his services as a painter
    to a number of other contractors. Claimant provided all of his own tools
    needed to paint. Claimant could have hired helpers if he so desired, but
    would have been paid the same.
    On August 29, 2014, Employee was seen and evaluated by a medical provider at
    Tennessee Sports Medicine, P.C. The medical records of the August 29, 2014 visit were
    introduced as "Exhibit No. 1 Medical Records of Dr. Charles Kaelin." However, the
    four-page "Orthopedic Note" identifies the author as "Ko MD, Chae." A "Medical
    Record Certification" form of the Division of Workers' Compensation was included in
    Exhibit 1 certifying the records of Dr. Charles Kaelin to be true and accurate. The
    "History of Present Illness" included in the Orthopedic Note included the following:
    3
    [Employee] is a pleasant 46-year-old gentleman with low back pain
    for the past month. He was lifting up a granite countertop during work and
    felt low back pain. He has seen [an] urgent care physician a couple times
    and was given steroid as well as pain medication. He has not undergone
    physical therapy. He has had some bilateral lower extremity radicular
    symptoms. He does not have any red flags. Pain is mostly located in his
    low back.
    The August 29, 2014 Orthopedic Note includes a diagnosis of lumbar
    radiculopathy and muscle spasm. It reflects that medication was prescribed and that
    physical therapy was ordered. Employee was instructed to return in six weeks for follow-
    up. A "Work Status" report included in Exhibit 1 states that Employee is to remain on
    restrictions of"[n]o bending or lifting over 20 lbs."
    Exhibit 5 in the record included a "Work Status" report from Tennessee Sports
    Medicine, P.C., dated September 26, 2014, which indicated Employee was released to
    regular duty and noted Employee "is ordered to do 8 more sessions of physical therapy."
    The medical records introduced into evidence do not indicate whether Employee attended
    the physical therapy sessions. The medical records do not address medical causation
    beyond what is stated in the "History of Present Illness" set out above.
    Following the expedited hearing, the trial court found that Chad Cobble offered
    Employee employment at the rate of $18.00 per hour; that the work to be performed was
    general construction work that was not limited to painting; that Employee suffered an
    injury to his back August 2, 2014, while attempting to lift a piece of granite at a job site;
    that Employee's weekly workers' compensation rate is $335.28, or $47.90 per day; and
    that Employee was terminated by Cobble Construction on August 16, 2014. Based on
    admissions of the parties, the trial court found that Cobble Construction did not have
    workers' compensation coverage in place. The trial court found that Arcus was the
    general contractor on the project on the date of Employee's injury and that Cobble
    Construction was a subcontractor of Arcus. Based upon these findings, the trial court
    ordered that Arcus provide Employee a panel of orthopedic specialists for treatment of
    his injury from which Employee could select a physician to serve as the authorized
    treating physician; that Arcus provide payment for all reasonable and necessary medical
    treatment provided by the physician selected from the panel; and that Arcus pay
    Employee back temporary total disability payments in the amount of $1,389.10 for 29
    days of benefits. Cobble Construction timely filed an Expedited Hearing Notice of
    Appeal.
    Standard of Review
    The standard of review to be applied by the Appeals Board in reviewing a trial
    court's decision is statutorily mandated and limited in scope. Specifically, "[t]here shall
    4
    be a presumption that the findings and conclusions of the workers' compensation judge
    are correct, unless the preponderance of the evidence is otherwise." Tenn. Code Ann. §
    50-6-239(c)(7) (2014). The trial court's decision must be upheld unless "the rights of the
    party seeking review have been prejudiced because findings, inferences, conclusions, or
    decisions of a workers' compensation judge:
    (A)  Violate constitutional or statutory provisions;
    (B) Exceed the statutory authority of the workers' compensation judge;
    (C) Do not comply with lawful procedure;
    (D) Are arbitrary, capricious, characterized by abuse of discretion, or
    clearly unwarranted exercise of discretion; or
    (E) Are not supported by evidence that is both substantial and material in the
    light of the entire record.
    Tenn. Code Ann. § 50-6-217(a)(2) (2014).
    In applying the above standard, courts have construed substantial and material
    evidence to mean "such relevant evidence as a reasonable mind might accept to support a
    rational conclusion and such as to furnish a reasonably sound basis for the action under
    consideration." Clay County Manor, Inc. v. State of Tennessee, 
    849 S.W.2d 755
    , 759
    (Tenn. 1993) (quoting Southern Railway Co. v. State Bd. of Equalization, 
    682 S.W.2d 196
    , 199 (Tenn. 1984)). Like other courts applying the standard embodied in section 50-
    6-217(a)(2), the Appeals Board will not disturb the decision of the trial court absent the
    limited circumstances identified in the statute.
    Analysis
    A. Record on Appeal
    The appellant bears the burden of showing that the evidence presented in the trial
    court preponderates against the trial court's findings. Manufacturers Consol. Service v.
    Rodell, 
    42 S.W.3d 846
    , 865 (Tenn. Ct. App. 2000) (citing Coakley v. Daniels, 
    840 S.W.2d 367
    , 370 (Tenn. Ct. App. 1992)). Likewise, the appellant has the burden to
    ensure that an adequate record is prepared on appeal. As the Supreme Court's Special
    Workers' Compensation Appeals Panel explained in Vulcan Materials Co. v. Watson,
    No. M2003-00975-WC-R3-CV, 2004 Tenn. LEXIS 451, at *6-7 (Tenn. Workers' Comp.
    Panel May 19, 2004) (quoting Manufacturers Consol. 
    Service, 42 S.W.3d at 865
    ):
    The appellant has the duty of preparing a record that conveys a fair,
    accurate and complete account of the proceedings in the trial court with
    respect to the issues on appeal. Tenn. R. App. P. 24(b). We are provided
    with only the trial court's findings of facts and conclusions of law rendered
    from the bench and the exhibits introduced at the trial of this cause, which
    include three doctor's depositions. We do not have a record of the lay
    5
    testimony presented to the trial court. In the absence of an adequate record
    on appeal, this Court must presume the trial court's rulings were supported
    by sufficient evidence.
    Including a transcript or statement of the evidence as part of the record on appeal
    promotes meaningful appellate review and, in tum, public confidence in the integrity and
    fairness of the process. As one court has explained, "[f]ull appellate consideration of a
    trial court's determination ... is part of the process designed to achieve an accurate and
    just decision .... " In reAdoption of JD. W., No. M2000-00151-COA-R3-CV, 2000
    Tenn. App. LEXIS 546, at *12 (Tenn. Ct. App. Aug. 16, 2000). "Without a transcript or
    a statement of the evidence, the appellate court cannot know what evidence was
    presented to the trial court, and there is no means by which we can evaluate the
    appellant's assertion that the evidence did not support the trial court's decision." Britt v.
    Chambers, No. W2006-00061-COA-R3-CV, 2007 Tenn. App. LEXIS 38, at *8 (Tenn.
    Ct. App. Jan. 25, 2007). When the review of a trial court's decision is accompanied by a
    presumption that the findings are correct, "it is essential that the appellate court be
    provided with a transcript of the trial proceedings or a statement of the evidence . . . ."
    !d. at *7. See also Estate of Cockrill, No. M2010-00663-COA-R3-CV, 2010 Tenn. App.
    LEXIS 754, at *11-12 (Tenn. Ct. App. Dec. 2, 2010) ("In cases where no transcript or
    statement of the evidence is filed, the appellate court is required to presume that the
    record, had it been properly preserved, would have supported the action of the trial
    court."); Leek for Estate of Lovelace v. Powell, 
    884 S.W.2d 118
    , 121 (Tenn. Ct. App.
    1996) ("In the absence of a transcript or a statement of the evidence, we must
    conclusively presume that every fact admissible under the pleadings was found or should
    have been found favorably to the appellee."). In short, "[a]n incomplete appellate record
    is fatal to an appeal on the facts," Piper v. Piper, No. M2005-02541-COA-R3-CV, 2007
    Tenn. App. LEXIS 70, at* 11 (Tenn. Ct. App. Feb. 1, 2007), and a reviewing court "must
    conclusively presume that the evidence presented supported the facts as found by the trial
    court." Whitesell v. Moore, No. M2011-02745-COA-R3-CV, 2012 Tenn. App. LEXIS
    894, at *10.
    In the present case, as in Vulcan Materials, the Appeals Board was provided with
    no record of any testimony taken during the expedited hearing. No statement of the
    evidence was offered by the appellant and, under these circumstances, the Appeals Board
    will presume that the trial court's rulings were supported by sufficient evidence.
    B. Employee versus Independent Contractor
    To recover workers' compensation benefits, the claimant must be an employee and
    not an independent contractor or a casual employee. Bargery v. Obion Grain Co., 
    785 S.W.2d 118
    , 121 (Tenn. 1990). Determining whether an individual is characterized as an
    employee or an independent contractor for workers' compensation purposes requires a
    specialized factual analysis. Masiers v. Arrow Transfer & Storage Co., 
    639 S.W.2d 654
    ,
    6
    656-57 (Tenn. 1982) (citing Barnes v. Nat'/ Mortg. Co., 
    581 S.W.2d 957
    (Tenn. 1979)).
    No single aspect of a work relationship is conclusive in making this determination, and in
    deciding whether a worker is an employee or independent contractor, "the trier of fact
    must examine all relevant factors and circumstances" of the relationship. Boruff v. CNA
    Ins. Co., 
    795 S.W.2d 125
    , 127 (Tenn. 1990). The Tennessee Workers' Compensation
    Act requires that "[i]n a work relationship, in order to determine whether an individual is
    an 'employee,' or whether an individual is a 'subcontractor' or an 'independent
    contractor,' the following factors shall be considered:
    (i) The right to control the conduct of the work;
    (ii) The right of termination;
    (iii) The method of payment;
    (iv) The freedom to select and hire helpers;
    (v) The furnishing of tools and equipment;
    (vi) Self-scheduling of working hours; and
    (vii) The freedom to offer services to other entities."
    Tenn. Code Ann.§ 50-6-102(11)(D) (2014).
    These factors are not absolutes that preclude examination of each work
    relationship as a whole and are no more than a means of analysis. 
    Masiers, 639 S.W.2d at 656
    (citing Jackson Sawmill v. West, 
    619 S.W.2d 105
    (Tenn. 1981)). While no single
    factor is determinative, the Tennessee Supreme Court "has repeatedly emphasized the
    importance of the right to control, the relevant inquiry being whether the right existed,
    not whether it was exercised." Galloway v. Memphis Drum Service, 
    822 S.W.2d 584
    ,
    586 (Tenn. 1991). Once it is established that an employment relationship exists, "the
    burden is on the employer to prove the worker was an independent contractor rather than
    an employee." !d. Another factor that has gained significance is the right of termination.
    
    Masiers, 639 S.W.2d at 656
    (citing Wooten Transports, Inc. v. Hunter, 
    535 S.W.2d 858
    (Tenn. 1976)). "As noted in Masiers [citation omitted], 'the power of a party to a work
    contract to terminate the relationship at will is contrary to the full control of work
    activities usually enjoyed by an independent contractor."' 
    Boruff, 795 S.W.2d at 127
    .
    In the instant case, the Expedited Hearing Order evidences that the trial court
    considered all of the above factors except the freedom to select and hire helpers. The
    trial court made findings with regard to each factor addressed. Specifically, the trial court
    found the following: (1) "Mr. Cobble controlled the work that [Employee] performed;"
    (2) Employee's "employment relationship with Cobble Construction was terminated by
    Mr. Cobble on August 16, 2014;" (3) the fact that Employee "was paid on a weekly basis
    and the fact that payment was based on number of hours worked rather than the
    completion of a specific job or project indicates an employer/employee relationship;" (4)
    Employee's "direct purchasing and provision of materials is more indicative of an
    employer/employee relationship than an independent contractor," and "weighs in favor of
    7
    a fmding that [Employee] is an employee of Cobble Construction;" (5) "Mr. Cobble had
    sole responsibility for scheduling the work," but Employee "had control of the hours he
    worked;" and (6) Employee "was free to offer services to other entities if he wished to do
    so."
    Having considered these factors, the trial court concluded that Employee "was an
    employee of Cobble Construction." Tennessee Code Annotated section 50-6-239(c)(7)
    (2014) mandates that we presume the trial court's findings and conclusions to be correct,
    unless the preponderance of the evidence is otherwise. Without a transcript or a
    statement of the evidence, we must presume the trial court's rulings were supported by
    sufficient evidence. See Manufacturers Consol. Service v. Rodell, 
    42 S.W.3d 846
    , 865
    (Tenn. Ct. App. 2000).
    C. Whether Employee's Injury Occurred in the Course and Scope of His
    Employment
    To be compensable, an injury must arise primarily out of and occur in the course
    and scope of the employment. Tenn. Code Ann. § 50-6-102(13) (2014). "Injury" and
    "personal injury" are defined in the Workers' Compensation Act to "mean an injury by
    accident . . . arising primarily out of and in the course and scope of employment, that
    causes death, disablement or the need for medical treatment of the employee." ld. In
    order for an injury be accidental, it must be "caused by a specific incident, or set of
    incidents, arising primarily out of and in the course and scope of employment, and is
    identifiable by time and place of occurrence ...." Tenn. Code Ann. § 50-6-102(13)(A).
    For injury dates on or after July 1, 2014, ''this chapter shall not be remedially or
    liberally construed but shall be construed fairly, impartially, and in accordance with basic
    principles of statutory construction." Tenn. Code Ann. § 50-6-116 (2014). An employee
    has the burden of proving each element of his or her workers' compensation claim by a
    preponderance of the evidence. Tenn. Code Ann. § 50-6-239(c)(6) (2014); Elmore v.
    Travelers Ins. Co., 
    824 S.W.2d 541
    , 543 (Tenn. 1992).
    The Expedited Hearing Order identifies three witnesses who testified at the
    expedited hearing. Based in part on the testimony of Employee and Chad Cobble, the
    trial court found that moving the granite slab "fell directly in-line with [Employee's]
    established practice of performing general construction work for the company," and that
    the work performed by Employee was general construction work that was not limited to
    painting. The trial court found that "on August 2, 2014, [Employee] suffered an injury to
    his back while attempting to lift a piece of granite at a job site." As with the issue
    concerning whether Employee was an independent contractor, we are required by statute
    to presume that the trial court's findings and conclusions are correct, unless the
    preponderance of the evidence is otherwise, Tenn. Code Ann. § 50-6-239(c)(7), and
    without a transcript or a statement of the evidence, we must presume that the trial court's
    8
    rulings were supported by sufficient evidence.       Manufacturers Consol. 
    Service, 42 S.W.3d at 865
    .
    D.     Award of Medical and Temporary Disability Benefits
    An employer is required to furnish "free of charge to the employee, such medical
    and surgical treatment ... made reasonably necessary by accident as defined in this
    chapter." Tenn. Code Ann. § 50-6-204(a)(1)(A) (2014). The trial court found that
    Employee suffered an injury to his back and that he timely reported the incident to Chad
    Cobble. Cobble Construction did not provide a panel of physicians to Employee or
    otherwise provide medical care to Employee, effectively forcing Employee to seek
    treatment on his own. Employee sought medical treatment and on August 29, 2014, he
    was diagnosed with "lumbar radiculopathy [and] muscle spasm." The medical records
    introduced into evidence state that Employee needs further physical therapy and that he
    may need additional imaging studies. Based upon the testimony of the witnesses and the
    medical records introduced into evidence, the trial court concluded that Employee made
    the requisite showing to require a panel of physicians to be provided from which
    Employee is entitled to select a physician to serve as the authorized treating physician for
    such medical care as is reasonably necessary as a result of the work injury. The trial
    court's conclusion is presumed to be correct, Tenn. Code Ann. § 50-6-239(c)(7), and
    without a transcript or a statement of the evidence, the preponderance of the evidence
    cannot be otherwise than as found by the trial court; and we presume that the trial court's
    rulings were supported by sufficient evidence. See Manufacturers Consol. 
    Service, 42 S.W.3d at 865
    .
    To establish entitlement to temporary total disability benefits as contemplated in
    Tennessee Code Annotated section 50-6-207(1), an employee must show that (1) he or
    she was totally disabled from work as a result of a compensable injury; (2) that a causal
    connection exists between the injury and the employee's inability to work; and (3) the
    duration of the period ofthe employee's disability. Gray v. Cullom Mach., Tool & Die,
    Inc., 
    152 S.W.3d 439
    , 443 (Tenn. 2004). Entitlement to temporary total disability
    benefits ends whenever an employee is able to return to work or reaches maximum
    medical improvement. Foreman v. Automatic Systems, Inc., 
    272 S.W.3d 560
    , 575 (Tenn.
    2008); Roberson v. Loretto Casket Co., 
    722 S.W.2d 380
    , 383 (Tenn. 1986); Simpson v.
    Satterfield, 
    564 S.W.2d 953
    , 955 (Tenn. 1978). Temporary partial disability is a distinct
    category of vocational disability separate from temporary total disability, see Tenn. Code
    Ann. § 50-6-207(1)-(2), which arises when the temporary disability is not total.
    "Temporary partial disability refers to the time, if any, during which the injured
    employee is able to resume some gainful employment but has not reached maximum
    recovery." Williams v. Saturn Corp., No. M2004-01215-WC-R3-CV, 2005 Tenn. LEXIS
    1032, at *6 (Tenn. Workers' Comp. Panel Nov. 15, 2005). Temporary partial disability
    has been referred to as the time during which an injured employee is able to resume work
    9
    before reaching maximum medical improvement. Wilkins v. Kellogg Co., 
    48 S.W.3d 148
    ,
    151 (Tenn. 200 1) (superseded by statute as to the manner of calculating temporary partial
    disability as stated in Williams, 2005 Tenn. LEXIS 1032, at *8, n.l).
    When Employee sought medical care August 29, 2014, a "Work Status" record
    was provided that restricted Employee from "bending or lifting over 20 lbs." The trial
    court found that these restrictions were in place from August 29 to September 26, 20 14, a
    period of twenty-nine days following Employee's termination. The trial court concluded
    that Employee is entitled to receive back temporary disability benefits for this twenty-
    nine-day period at a weekly compensation rate of$335.28 or $47.90 per day, and the trial
    court ordered that Employee be paid "back temporary total disability in the amount of
    $1,389.10." Whether the temporary disability benefits should have been classified as
    total or partial does not alter the amount of those benefits under the facts as found by the
    trial court or the period during which Employee is entitled to such benefits. We apply a
    presumption that the findings and conclusions of the trial court are correct, Tenn. Code
    Ann. § 50-6-239(c)(7) (2014), and without a transcript or statement of the evidence
    approved by the trial court we presume that the trial court's fmdings were supported by
    sufficient evidence. See Manufactures Consol. 
    Service, 42 S.W.3d at 865
    .
    E. Principal Contractor's Liability
    Tennessee Code Annotated section 50-6-113(a) (2014) provides that a principal
    contractor is liable for compensation to any employee injured while in the employ of any
    subcontractor to the same extent as the immediate ell}ployer:
    A principal contractor, intermediate contractor or subcontractor
    shall be liable for compensation to any employee injured while in the
    employ of any of the subcontractors of the principal contractor,
    intermediate contractor or subcontractor and engaged upon the subject
    matter of the contract to the same extent as the immediate employer.
    Tenn. Code Ann.§ 50-5-113(a) (2014).
    The trial court found that Arcus was the principle contractor on the project on
    which Employee was working on the date Employee was injured. Based upon party
    admissions, the trial court found that Cobble Construction did not have workers'
    compensation insurance in effect at the time. The trial court accordingly concluded that
    Arcus is liable for the compensation to Employee pursuant to Tennessee Code Annotated
    section 50-6-113(a) to the same extent as Cobble Construction. These findings and the
    trial court's conclusion are entitled to the statutory presumption of correctness, Tenn.
    Code Ann. § 50-6-239(c)(7), and without a transcript or a statement of the evidence we
    presume that the trial court's ruling was supported by sufficient evidence. See
    Manufactures Consol. 
    Service, 42 S.W.3d at 865
    .
    10
    Conclusion
    For the foregoing reasons, we hold that the evidence does not preponderate against
    the trial court's findings and conclusions (1) that Employee was an employee of Cobble
    Construction on August 2, 2014; (2) that Employee sustained an injury by accident
    occurring in the course and scope of his employment with Cobble Construction on
    August 2, 2014; (3) that Employee is entitled to the medical benefits specified in the trial
    court's December 15, 2014 Expedited Hearing Order; (4) that Employee is entitled to an
    award of twenty-nine days of temporary disability benefits for the period August 29,
    2014 through September 26, 2014 in the total amount of $1,389.10; and (5) that Arcus
    was the general contractor and engaged upon the project that Employee was working on
    for the subcontractor, Cobble Construction, when Employee was injured August 2, 2014,
    such that Arcus is liable for the benefits due Employee to the same extent as Cobble
    Construction. Additionally, we find that the trial court's decision does not prejudice the
    rights of the parties or otherwise violate the standards set forth in Tennessee Code
    Annotated section 50-6-217(a)(2). Accordingly, the trial court's decision is affirmed and
    the case is remanded for any further proceedings that may be necessary.
    DaVJ F. Hensley, Judge